18, Let the solution pump operate independently for about 30 minutes. Constantly observe the
liquid level in the absorber while the solution pump operates.
19, After about 30 minutes, stop the solution pump.
20. Press the Refrigerant Pump Auto button.
21, Return the valve cap. There is an O-ring between the cap and valve, When fitting the cap,
make sure that the O-ring is set normally.
® Note: If the unit model is EXEL/EXWL, control the refrigerant density according to Table 49
when the decrystallization is finished.
Precautions for de-crystallization
+ Cycle the chilled and cooling water pumps off and on during the melting process.
+ Remove any sensors that are sensitive to heat before you start the melting operation. The
temperature of the chilled and cooling water that remains in the absorption chiller can rise to
about 158°F,
+ When you start the chiller after melting the crystals, discharge the chilled water and cooling
water first. If that water is left in the machine, the paint on the inside walls can be peeled off.
Maintenance and inspection items along with standard inspection periods are shown in the next
table, For details, contact your local johnson Controls Service Center.
Inspection frequency can be adjusted according to the actual operating conditions.
Table 29: Maintenance and inspection
frase [Contents Frequency ‘Scope:
(Collect the operation data (Refer to 155.34-C12) and
Recording of operation data _|check the data withthe data collected during the |t weekly c
factory test,
(check of liquid fevel 'see Table 47, Check the liquid level at each part. Daily €
[check the steam condensate [Check to see thatthe steam condensate control
leantrol valve {valve is operating smoothly. [weekly ie
Use the procedure shown in Refrigerant refining
[Refine refrigerant |method to refine the refrigerant.
Every 6 months s
‘The chiller has an automatic
[purge system. Perform it
fone time at beginning of the] S
‘season every year and one
time every 2:3 months.
hanual purging from purging |see Purge procedure. Manually purge non-
kank {condensable gas from the purging tank
Intanual purging from absorber|See Purge procedure. Manually purge nan-
ide |condensable gas from the absorber side. Every 2-3 months s
[eepecement oF alinvacuum |eepiace the oll inthe vacuum pump periodically. Monthly c
[afer the replacement ofthe lubricant olor the
[check of vacuum Pump —__|vacuurm pump. be sure to pul the pulley belt and Monthy c
[check the smooth motion ofthe pulley.
icheck the outside of the machine for damage
[such as leakage for chilled water and cooling
lappearance check jwater, rusting, and so on). Check the solution pump |Monthly c
land refrigerant pump for abnormal sounds and
\lbration,
‘YHAU-C Single Effect SteamFired Absorption Chiller (Mod A) reyTable 29: Maintenance and inspection
ladcition of inhibitor
Ihe solution to detect leakage in the early period
Fak antes remweney cape
jand motors (solution pump, refrigerant pump)
jeasurerentorisuaton faite cece or lonering of suato. When
jresistance of electric devices measuring the insulation resistance, be sure to rear s
Liscemnect the ares of te temperatre contol,
boon
Frac aer Tr cesar a conTTTEN Ta ;
rec oF parte oF CORT ehek the opeTaTGR GPE CONTeT RARE OPER 5
[panel [troubles caused by malfunction of the control panel. Y
[secre perornanceat — fee Paro prveaire Chee penoTMaMe TT en cmonna :
purge un ug unt perodaly
evecko eaage ROUGH oy measure vactum dom Svea, RTT —L_—, 5
[purge solenoid valves leakage through purge solenoid valves. early
Joveraurcheck of purge rer ovehau of purge lect vaNE
[solenoid valves [periodically. [rear ‘
Nessie te aOR Tron conaeRES TE
freroraiagnines _[easure ne amount oTnoncnde foeryemante 5
[reccconinay of oaeave
exo Jreccconinutyofpretecvebondngercut ary 5
See Water quay convo Conran ual oF
nays quay ot ied fil water, coving water, and sear drain win
foter coving water, and he standard range. suet perform test very months c
fram arin fabs wtnin one month aerne es operation
Kee
Te Gor ok one, Dae TE
[seiecargd teh ie ach ne purging
[Check the amount of solution |is performed. If the amount of the refrigerant Yearly (during operation at s
fins retigerare Jecomes‘atstootow te condensation reverie [10D
factor does ot werk neal ccoangy eck
fhe amount ofthe refigeant period
lev bearings are ured othe sluon pF
fing retigean ump, and they are normaly
Jssssembivinspecon ara _ fbr th water saurtono thu brome
Laing otsouton pune and ndratgeane They are worn facet mower. P28 5
|refrigerant pump Isince excessive wear can cause a pump problem, 10.000 rs
fsstsemble and inspect tem perce. The
ners sranermube deane prods 9
[DSsenDWapeGToNaRaPisseemBe inspect and cane vacuum Pup 5
Leaning otvacumpump_fomamaints capac sos
[Replacement of gaskets of Replace the gaskets of the airtight parts te maintain [*" 7
bighe pars fie aghtes ofthe born cle,
Frsecton of ad
Pater stamtercase and loven te water camber as cover prod, fHM)29%H* °
paced check the inside paint for damage. Check the inside
Frsoetonofcooing force hein rat
tarchanbercaseand >” ary 5
feiacerent of pacing
Feit pr epoxy ran lnndondvens
jinside wall of chilled water and [Repair the paint of the inside wall periodically. Icoaling water: *y fear s
[cooling water chamber cases ” x
1 [Re once FR ERG EST
fina ofsolutonand [rer tprevencrresionoinstepars ana [ey months 5
128
‘YHAUCC Single Effect Steam-Fired Absorption Chiller (Mod A)Table 29: Maintenance and inspection
Fa Fen ra es
fitatonandretningot — enencatenchonge tue sures lomertne—_6yers $
(arety elays |check the operation of the safety relays periodically, |Yearly s
lorwater jet (Evaporator) __|slime, soft scales, and other foreign matter from the| VET 2 Years s
jor water jet (Generator) very 4 years 5
Esserenaacey esac ;
[chemical cleaning of bes since hard scales sticking to the tubes cannot be
evaporator) @ removed with a brush or water jet, remove them Every 4 years* s
|(Generator) [very 8 years 5
[Chec for sight leakage machine should be checked for slight leakage with every 2 years s
Absorber, condenser) heck the inside ofthe tubes 4 Cees S
JEddy current test on tubes team periodically JEvery 4 years or s
[control valve seat [leaks while the chiller is stopping ¥
@ Note:
wc
‘ustomer and S = Johnson Controls Service
2. Note: *If water quality analysis indicates necessity.
Refrigerant pump manual stop
The refrigerant pump can be stopped manually for maintenance purposes. It can be stopped even
while the chiller operates
1, Navigate to the Control Panel Setting screen.
2. Press the Refrigerant Pump Stop button.
@ Note: After the maintenance of the refrigerant pump is complete, press the Refrigerant Pump
Auto button. Continued operation in the stop mode can cause damage to and failure of the
chiller,
‘YHAU-C Single Effect SteamFired Absorption Chiller (Mod A)
78