To establish of long term inspection program and its implementation for its soundness to keep the tank in
service.
To determine the rate of corrosion to forecast the repair/replacement.
To initiate procurement action of materials to meet the repair/replacement if required.
The above benefit can only be obtained when proper inspection Records of the tanks are maintained.
Frequency of inspection
Protective coatings
Location of tanks such as isolated land, high risk areas and corrosive atmosphere.
The tank shall be hydrostatically tested by filling water irrespective of any hot jobs carried out in the tank
after internal inspection
Tank shall be filled with water up to the top curb angle gradually and slowly
After 50% of water filling, the tank shall be checked for any leakage or any abnormalities.
All vents at the top of the roof shall be kept open.
After water filling up to required level, the tank shall be kept under observations for 48 hours.
During hydrostatic testing there shall not be any leak from shell courses and bottom plate.
After hydrostatic test the date of the test shall be mentioned in the history card.
INSPECTION REPORTS
Visual inspection, observations of foundation, bottom, shell, Roof and floating roof deck, pontoon boxes etc.
Revision of breather valve/ Replacement of oil of seal and cleaning of flame arrestor, wire mesh etc.
DOCUMENTATION
History Card
Inspection checklist