You are on page 1of 3

TOP OF

PILE CAP PILE CAP TABULATION OF PIER BORED PILES (GROUP A)

BORED PILE BORED PILE LENGTH (H)


500
500
PIER (mm)
DIAMETER QTY.
NO.

SPIRAL PITCH Ø16 @ 100


(mm)

150
TOP MID BOT TOTAL
6 C P1 2000 19000 6000 5000 30000 10
L OF BOREDPILE
BR1 D-441
2000

P6 2-Ø20 @ 2000 P2 2000 19000 6000 6000 31000 10

1850
C
L OF BOREDPILE P6 2-Ø20 @ 2000
STIFFENER LOOP STIFFENER LOOP P3 2000 19000 6000 14000 39000 10
BOTTOM OF VERTICAL SPACING VERTICAL SPACING
PILE CAP P1 21-Ø36 P4 2000 19000 6000 9000 34000 10

150

150
100

P3 21-Ø28 P5 2000 19000 6000 12000 37000 10

150
P1A 21-Ø36
2 P3A 21-Ø28 P6 2000 19000 6000 15000 40000 10
4000

BR1 D-440 P7 2000 19000 6000 22000 47000 10

P4a P5a
P1 P8 2000 19000 6000 15000 40000 10
P1A P5a Ø16 @ 100 SPIRAL P9 2000 19000 6000 18000 43000 10

2000
2000

2000
1400
P4a Ø16 @ 100 SPIRAL P10 2000 19000 6000 26000 51000 10
P11 2000 19000 6000 20000 45000 10

SPIRAL PITCH Ø16 @ 200


P4c Ø16 @ 250 SPIRAL P12 2000 19000 6000 23000 48000 10
P7 2-Ø20 @ 2000 P13 2000 19000 6000 25000 50000 10
3 STIFFENER LOOP

150
VERTICAL SPACING P14 2000 19000 6000 26000 51000 10
15000

BR1 D-440

150

150
P15 2000 19000 6000 23000 48000 10
P2 21-Ø36

2 SECTION P2A 21-Ø36 4 SECTION


P4b P5b
P2 P2A BR1 D-440 SCALE 1:30 BR1 D-440 SCALE 1:30

C P6 2-Ø20 @ 2000 C
L OF BOREDPILE
L OF BOREDPILE
NOTE: STIFFENER LOOP
VERTICAL SPACING VERTICAL SPACING
STIFFENER AND
150 P1 21-Ø36

150
SPACE BARS
NOT SHOWN 150 P1A 21-Ø36 P9 5-Ø20 EW/
H = (SEE TABLE)

EQ. SPACED
FOR CLARITY
6000

300
VARIES
P5b Ø16 @ 200 SPIRAL
2000

2000
1400

P4b Ø16 @ 200 SPIRAL P6 2-Ø20 @ 2000


STIFFENER LOOP
P4c SPIRAL PITCH Ø16 @ 250

P7 2-Ø20 @ 2000 NOTE:


STIFFENER LOOP PURSUANT TO ITEM 5 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULES
150

VERTICAL SPACING AND REGULATION OF R.A. 9184, THE APPROVAL BY THE AUTHORIZED
GOVERNMENT OFFICIALS OF DETAILED ENGINEERING SURVEYS AND DESIGNS
UNDERTAKEN BY CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY
150

150
OF THE LATTER FOR THE TECHNICAL INTEGRITY OF THE SURVEYS AND
DESIGNS NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE
APPROVING OFFICIALS.
4 P2 21-Ø36 THE DESIGN CONSULTANT SHALL BE HELD FULLY RESPONSIBLE FOR THE
STRUCTURAL DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO
BR1 D-440 FAULTY AND/OR INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE

3 SECTION P2A 21-Ø36 5 SECTION CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

TAKAYUKI TSUCHIDA
BR1 D-440 SCALE 1:30 BR1 D-440 SCALE 1:30 ACTING TEAM LEADER

P3 P3A

NOTE:
BR1
REFER TO GENERAL NOTES FOR BRIDGES (3), L NOTES FOR BORED PILE (CAST IN PLACE PILES)
A-08

5
100

BR1 D-440
150 150
2000

1 SECTION ELEVATION
BR1 D-440 SCALE NTS

SCALE 1:30

CTI Engineering In Association with :


International Co., Ltd. PREPARED : PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
Consulting Engineers NGEL L Z RO & SSOCI TES
INTERN TION L
Joint venture with : Consulting Engineers
and Architects TAKEYUKI TAKADA (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
Chodai Co., Ltd. SR. BRIDGE ENGINEER
LAGUNA LAKESHORE BRIDGE NO. 1 GROUP A
Consulting Engineers
KRC ROAD NETWORK PROJECT PIER BORED PILE DETAILS BR1 241
REPUBLIC OF THE PHILIPPINES
Oriental Consultants
Global Co., Ltd.
SUBMITTED : (PHASE-1) P1 TO P15 (1 OF 11) DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ZENAIDA B. MAUHAY BLESILDA S. RAMOS SHARIF MADSMO H. HASIM DANILO L. BALISI MEDMIER G. MALIG ADOR G. CANLAS, CESO IV
CONTRACT PACKAGE 1 PROJECT MANAGER III CHIEF, BRIDGES DIVISION PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN OIC-ASSISTANT SECRETARY FOR TECHNICAL SERVICES UNDERSECRETARY FOR TECHNICAL SERVICES D 440 1167
Nippon Engineering UPMO-ROADS MANAGEMENT CLUSTER II (MULTILATERAL) RMC-II (MULTILATERAL), UPMO BUREAU OF DESIGN RMC-II (MULTILATERAL), UPMO
Consultants TCGI ENGINEERS TAKAYUKI TSUCHIDA NATIONAL CAPITAL REGION AND INFORMATION MANAGEMENT SERVICE AND INFORMATION MANAGEMENT SERVICE
Co., Ltd. ACTING TEAM LEADER PORT AREA, MANILA DATE DATE DATE DATE DATE DATE
SPIRAL

WELDED
P8 4-Ø20 SPACER WELD LENGTH 1a SINGLE V-GROOVE 2a
(VERT SPACING) LAPPED SPLICE FOR
@ 2000 SEE DETAILS BR1 D-441
BR1 D-441 SPIRAL DETAIL
STAGGERED
VERT REINF

2-Ø20 @ 2000 P7
STIFFENER LOOP

7 SPIRAL SPLICING DETAIL 8 STIFFENER LOOP DETAILS BARS


WELDED BR1 D-441 SCALE NTS BR1 D-441 SCALE NTS
FACE OF
BORED PILE
NOTES:
NOTES FOR LAP WELD CONNECTION:
100 CLR 1. WELDING SHALL CONFORM TO ANSI/AWS D1.4-92 "STRUCTURAL WELDING CODE REINFORCEMENT 1. ALL QUANTITIES SHALL BE VERIFIED DURING CONSTRUCTION.
STEEL". 2. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL THE SHOP DRAWINGS
INDICATING THE BENDING, CUTTING, SPLICING AND INSTALLATION OF ALL REINFORCING BARS.
2. CARE SHALL BE TAKEN NOT TO DAMAGE THE BORED PILE MAIN BARS DURING WELDING.
NO VARIATION OF THE DESIGN SHALL BE MADE WITHOUT PRIOR APPROVAL OF THE DESIGN
6 SPACER AND STIFFENER BARS 3. SPIRAL REINFORCEMENT AND CONFINEMENT SHALL BE WELDED LAPPED SPLICE. ENGINEER.
BR1 D-440 SCALE NTS 4. STIFFENER LOOP REINFORCEMENT SHALL BE FULL STRENGTH SINGLE V-GROOVE BUTT WELD. 3. BAR BENDING, SPLICING OF BARS AND LOCATION OF WELD SHALL BE SHOWN IN THE DRAWINGS.
5. ALL WELDING SHALL BE DONE BY WELDERS PRE-QUALIFIED BY THE ENGINEER. 4. ANY VARIATION SHALL BE APPROVED BY THE ENGINEER AFTER CONSULTATION WITH THE
DESIGN ENGINEER.

WELD LENGTH
50 12 x BAR DIA. 50
NOTE:
WELD
PURSUANT TO ITEM 5 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULES
AND REGULATION OF R.A. 9184, THE APPROVAL BY THE AUTHORIZED 45° TO 60°
GOVERNMENT OFFICIALS OF DETAILED ENGINEERING SURVEYS AND DESIGNS
UNDERTAKEN BY CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY
OF THE LATTER FOR THE TECHNICAL INTEGRITY OF THE SURVEYS AND
DESIGNS NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE
APPROVING OFFICIALS.

THE DESIGN CONSULTANT SHALL BE HELD FULLY RESPONSIBLE FOR THE


STRUCTURAL DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO
FAULTY AND/OR INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE
D

CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

TAKAYUKI TSUCHIDA
ACTING TEAM LEADER

30
D
BACGOUGE TO 30mm
30
METAL BEFORE WELDING
WELD
OTHERSIDE

2a FOR STIFFINER LOOP


1a ELEVATION BR1 D-441 SCALE NTS
BR1 D-441 SCALE NTS

1 LAP SPLICE FOR SPIRAL 2 DETAIL OF FULL STRENGTH SINGLE V-GROOVE BUTT WELD
BR1 D-441 SCALE NTS BR1 D-441 SCALE NTS

CTI Engineering In Association with :


International Co., Ltd. PREPARED : PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
Consulting Engineers NGEL L Z RO & SSOCI TES
INTERN TION L
Joint venture with : Consulting Engineers
and Architects TAKEYUKI TAKADA BRIDGE NO. 1 GROUP A (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
Chodai Co., Ltd. SR. BRIDGE ENGINEER
LAGUNA LAKESHORE
Consulting Engineers
KRC ROAD NETWORK PROJECT PIER BORED PILE DETAILS BR1 242
REPUBLIC OF THE PHILIPPINES
Oriental Consultants SUBMITTED : (PHASE-1) P1 TO P15 (2 OF 11) ZENAIDA B. MAUHAY BLESILDA S. RAMOS SHARIF MADSMO H. HASIM DANILO L. BALISI MEDMIER G. MALIG ADOR G. CANLAS, CESO IV
Global Co., Ltd. DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CONTRACT PACKAGE 1 PROJECT MANAGER III CHIEF, BRIDGES DIVISION PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN OIC-ASSISTANT SECRETARY FOR TECHNICAL SERVICES UNDERSECRETARY FOR TECHNICAL SERVICES D 441 1167
Nippon Engineering UPMO-ROADS MANAGEMENT CLUSTER II (MULTILATERAL) RMC-II (MULTILATERAL), UPMO BUREAU OF DESIGN RMC-II (MULTILATERAL), UPMO
Consultants TCGI ENGINEERS TAKAYUKI TSUCHIDA NATIONAL CAPITAL REGION AND INFORMATION MANAGEMENT SERVICE AND INFORMATION MANAGEMENT SERVICE
Co., Ltd. ACTING TEAM LEADER PORT AREA, MANILA DATE DATE DATE DATE DATE DATE
BORED PILE REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES (BR 1 GROUP A)
TOTAL TOTAL
DIMENSION (Out to Out) (mm) LENGTH UNIT
BAR BENDING TOTAL WEIGHT (kg) CONCRETE
LOCATION BAR MARK BAR SHAPE SPACING No. OF BARS BAR SIZE PER BAR WEIGHT REMARKS
DIAGRAM LENGTH (m) VOLUME
a b c (mm) (kg/m) GRADE 60 (m³)
a P1a B AS SHOWN 21 36 500 11500 12000 252.00 7.990 2014
P1 P1b A AS SHOWN 21 36 12000 12000 252.00 7.990 2014
A
P1c A AS SHOWN 21 36 7500 7500 157.50 7.990 1259
b a
P1e B AS SHOWN 21 36 500 8900 9400 197.40 7.990 1578
B
P1A P1f A AS SHOWN 21 36 12000 12000 252.00 7.990 2014
P1g A AS SHOWN 21 36 10100 10100 212.10 7.990 1695
P2a B AS SHOWN 21 36 500 11500 12000 252.00 7.990 2014
a P2
P2b A AS SHOWN 21 36 11500 11500 241.50 7.990 1930 VERT. BARS
C P2d B AS SHOWN 21 36 600 8800 9400 197.40 7.990 1578
PITCH

a P2A P2e A AS SHOWN 21 36 12000 12000 252.00 7.990 2014


P2f A AS SHOWN 21 36 4100 4100 86.10 7.990 688
b

P3a A AS SHOWN 21 28 12000 12000 252.00 4.834 1219


PIER BORED P3 135.09
PILE P3b A AS SHOWN 21 28 9300 9300 195.30 4.834 945
D P3f A AS SHOWN 21 28 12000 12000 252.00 4.834 1219
a a P3A
P3g A AS SHOWN 21 28 11900 11900 249.90 4.834 1208
b b
c P4a D AS SHOWN 28 16 1700 100 12000 336.00 1.578 531
E P4 P4b D AS SHOWN 35 16 1700 200 12000 420.00 1.578 663
P4c D AS SHOWN 45 16 1700 250 12000 540.00 1.578 853 SPIRAL
b a b
P5a D AS SHOWN 23 16 1400 100 12000 276.00 1.578 436
F P5
P5b D AS SHOWN 29 16 1400 200 12000 348.00 1.578 550
P6 C 2000 46 20 5230 5230 240.58 2.466 594
STIFFENER LOOP
P7 C 2000 22 20 4290 4290 94.38 2.466 233
P8 E 2000 92 20 150 150 200 500 46.00 2.466 114 SPACER
1250 (max)
P9 F AS SHOWN 10 20 300 1725 17.25 2.466 43
1000 (min) NOTES:
TOTAL QUANTITY FOR PILE = 27406 135.09
1. REBAR SCHEDULE IS BASED ON AVERAGE
QUANTITIES OF EACH PIER IN THE GROUP.

NOTE:

PURSUANT TO ITEM 5 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULES


AND REGULATION OF R.A. 9184, THE APPROVAL BY THE AUTHORIZED
GOVERNMENT OFFICIALS OF DETAILED ENGINEERING SURVEYS AND DESIGNS
UNDERTAKEN BY CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY
OF THE LATTER FOR THE TECHNICAL INTEGRITY OF THE SURVEYS AND
DESIGNS NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE
APPROVING OFFICIALS.

THE DESIGN CONSULTANT SHALL BE HELD FULLY RESPONSIBLE FOR THE


STRUCTURAL DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO
FAULTY AND/OR INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE
CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

TAKAYUKI TSUCHIDA
ACTING TEAM LEADER

CTI Engineering In Association with :


International Co., Ltd. PREPARED : PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
Consulting Engineers NGEL L Z RO & SSOCI TES
INTERN TION L
Joint venture with : Consulting Engineers
and Architects TAKEYUKI TAKADA (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
Chodai Co., Ltd. SR. BRIDGE ENGINEER
LAGUNA LAKESHORE BRIDGE NO. 1 GROUP A
Consulting Engineers
KRC ROAD NETWORK PROJECT PIER BORED PILE BR1 243
REPUBLIC OF THE PHILIPPINES
Oriental Consultants
Global Co., Ltd.
SUBMITTED : (PHASE-1) REINFORCEMENT SCHEDULE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ZENAIDA B. MAUHAY BLESILDA S. RAMOS SHARIF MADSMO H. HASIM DANILO L. BALISI MEDMIER G. MALIG ADOR G. CANLAS, CESO IV
CONTRACT PACKAGE 1 AND ESTIMATED QUANTITIES PROJECT MANAGER III CHIEF, BRIDGES DIVISION PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN OIC-ASSISTANT SECRETARY FOR TECHNICAL SERVICES UNDERSECRETARY FOR TECHNICAL SERVICES D 442 1167
Nippon Engineering UPMO-ROADS MANAGEMENT CLUSTER II (MULTILATERAL) RMC-II (MULTILATERAL), UPMO BUREAU OF DESIGN RMC-II (MULTILATERAL), UPMO
Consultants TCGI ENGINEERS TAKAYUKI TSUCHIDA NATIONAL CAPITAL REGION P1 TO P15 (3 OF 11) AND INFORMATION MANAGEMENT SERVICE AND INFORMATION MANAGEMENT SERVICE
Co., Ltd. ACTING TEAM LEADER PORT AREA, MANILA DATE DATE DATE DATE DATE DATE

You might also like