OF BCB1 OF BOTTOM LONG. BEAM
BOTTOM MAIN
F
BEAM BOTTOM CROSS
BEAM
8
WELDING ON ALL
SIDES EXCEPT
TOP FLANGE
10
F
E E B B
CONNECTION DETAILS-BCB1 SECTION F-F
(SCALE 1:25) (SCALE 1:25)
G
BOTTOM CROSS
BCB2
BCB2
BCB2
BCB2
BCB3
BCB1
BCB1
BCB1
BCB1
BCB1
BCB1
BCB1
BCB1
BEAM
OF BOTTOM LONG. BEAM
8
WELDING ON ALL
SIDES EXCEPT
TOP FLANGE
10
10 18 THK. M.S.
PLATE
G
PLAN - BOTTOM CROSS BEAM
C
D
H
OF BCB3
BOTTOM CROSS
BEAM
8
WELDING ON ALL
SIDES EXCEPT
TOP FLANGE
10
10
18 THK. M.S. PLATE 18 THK. M.S.
SECTION A-A
H
PLATE
(SCALE 1:50)
CONNECTION DETAILS-BCB3 SECTION H-H
(SCALE 1:25) (SCALE 1:25)
OF BOTTOM LONG. BEAM
OF BOTTOM LONG. BEAM
OF ALIGNMENT
OF BOTTOM CROSS BEAM
65 THK. BEARING COAT
NOTE:
65 THK. WEARING COAT
1. All dimensions are in mm.
200 THK. CONCRETE 200 THK. CONCRETE DECK SLAB
(CARRIAGE WAY) DECK SLAB 2. No dimensions shall be scaled from this drawing, only written dimension shall be
200 THK. 65 THK. WEARING
DECK SLAB COAT (TYP.) followed.
100 DIA. PVC
PIPE @ 5000 C/C 3. All steel plates used in fabrication of this bridge are of grade Fe 490B. Only
2.5 % SLOPE 2.5 % SLOPE
ISMC 100 ISMB 600 is of grade Fe 410C.
ISMC 100
70 THK. CONCRETE SHUTTERING 8 ON ALL 8 ON ALL 4. All material shall pass test/analysis prescribed by relevant IS specifications.
SIDES SIDES
5. All steel work fabrication shall be done in accordance with Indian Codes.
70 THK. CONCRETE 70 THK. CONCRETE 6. All workshop fabrication shall be done using SAW (Submerged Arc Welding)
ISMB 600 SECTION C-C 25 THK. PLATE PRECAST PANEL PRECAST PANEL
process.
DRAIN PIPE @ 5000 C/C (SCALE 1:50) DRAIN PIPE @ 5000 C/C
OF BOTTOM LONG. BEAM
(CARRIAGE WAY)
200 THK. 65 THK. WEARING COAT (TYP.)
DECK SLAB
100 DIA. PVC
PIPE @ 5000 C/C 2.5 % SLOPE
2.5 % SLOPE