You are on page 1of 27
HUAWE! Optix OSN 9800 M05 Quick Installation Guide Copyright© Huawel Technologies Co.,Ltd. 2021 llrightsreserved No part this document maybe teprosced a Wansmited nan frm a by any means without pre writen consent of Hue! Techaleges Co, Lid ‘Trademarks and Permissions -Enr and other Huawei trademarks ae the propery of Huawei Tecnologes Co. Li [Alote vademarks and wade names mentoned inthis document ae the propery af the respecWve holders Notice ‘The purchase products, sevies ac fates ar plates by the contact mace batman Huse ante customer Allor part ofthe prods, senices and festires eserbealin this document may net be thin the purchase seope oF the usage scope, Unless ctnernise specified nthe contrat al satements, information, end recommendations i ths document are provided "AS IS" wsheut warantes, uranes o representations of ay kin, eer express or imled ‘Te information inthis documents subject to change without notes. Every efor has been made in the preparation of hs document to ensue accuracy ofthe contents, bt a sfatermene,nfomaton, and recommendations nv document donot consiive a warranty of any Kind exoress or pled Huawei Technologies Co., Ltd. Aetess: use Indust Bae Bantsn,Longpsne ‘Shenznen 518128 People's Repubic of China bate: rps eam Ema supponthuawe com ‘says 05 GORDO) Canigh & Fwal Techraiogea Ca, Ue ‘opt OSN 9800 MOS (Guck instalation Gide Updates between document issues are cumulative, Therefore, the latest document issue contains all updates mace in revous issues. issue ‘Change Description ‘Change Position oF This issue he fst ofcial release “ded this dosurent @ 1. Aaed ihe precautions forthe ‘Requirements forthe InsialationPositon ofthe | Installation Precautions A Conditioner in the Equloment Room 2, Added he deserpton of appleable seenaros and precautions fer nsialing te | General Requirements Tor instalation Space and Mos, Alrinlet Temperature 08 1. Added ie description of GSFP26 optical module delivery ‘Optical Module Delivery Modes 2 Added descriptions about TMECTU and TMFSAUX, Instaling NM Cables ‘seu 08 BORTOSIOY ConyrGht Hue) Techno Om, ‘opt OSN 9800 MOS (Guck instalation Gide Pracaulons > Instaation Preeauont Installation [Dror This document provides qudetins for quick hardware instalation. scribes procedures for onsite Instalaon, but doesnot describe pre-delvery assembly. Safety information ‘+ Always wear protective gloves when ing or wansporting a cabinet to prevent hand injuries or damage tothe cabinet surface. ‘The equipment is heey To prevent human injures or equipment damage, aways use aURing device to transport or poston the equipment Use a pallet tuck hea-uty bogie wagon to transport the equipment on even ground, and use 2 cargo bt to tansport the equipment between differnt flrs f he equipment room does not have a cargo li, 2 saircimbing tuck recommended to anspor te equipment between diferent ors Requirements forthe Installation Position ofthe Air Coneitione in the Equipment Room Ifthe aistnce between 2 caine and the ar exhaust vent of an sr conditioner is ss than 31m, ensre thatthe relative humidity inthe equipment room is ower than 75% to prevent condensation in the cabinet SD Protection [Aye wear ESD gloves or an ESD wrist trp prior to contact with the equipment or before handling devices, boards, oC chips to prevent damage to senstive components de electrostatic dicharge from the human body. Ensire thatthe ESD wri trap i property grounded Binding Cables Binding iterate between cable es or optical fiver binding raps nsde the cabinet cannot exceed 250 mm. finding intervals cannot exceed 200 mm for user cables) Binding intervals between cable tes for al cables and corrugated pipes outsie the cabinet are determin based on the distance beoween the two horizontal beams ofthe overhead cable ay If the cable ough dees not conan any beams the bincng intra between cable es cannot exoed 250 mm. ‘Checking Before installation Ensure thatthe equipment room, cabinets, power supplies ground cables, optical cables. and associate devices are ready for installtion Star the instalation according tothe engineering design documents afer confiming that al conditions are ret. ‘seu 08 BORTOSIOY Conyraht Huei Techno Om, UE z ‘opt OSN 9800 MOS (Guck instalation Gide Precautions > Raqutemants and recautons for Operating Boards Instatation No, Installation Personnel | nstalation Tire ‘operating board Wlearing ESD gloves __Wearingan ESD wrist strp___without ESD protection Een 1/2 song eeon sory" thes athe andr oto cence ton may i. ‘ny cnt rant be comedy he neo pret i is ‘Sherer mark arson ei dF ay oat tate al web en encanto ‘rove satan a nage hobo passin eee bat 6 Prt te bat asa rege repair io egal asap rl crac Min |O/O/O GO} ‘seu 08 BORTOSIOY ConyrGht Hue) Techno Om, 3 ‘opt OSN 9800 MOS (Guck instalation Gide oe “Toots for nstaling Cabinets Precautions > Instat Tels =—S— = 1 oA = sac eae Hanmer da J eumoice| sar areaumn Maite e S—_ es— | ae t i tae ay ‘law honmee omiten te atts Pondecmarter | WG-42 ssi wrench zn es | gee Pale re Texque wrerch Equipment or hstaling Cabinets ssi 08 ripe seowimer | _latesascrondver | _Actitio wren veatcin___[Searente bint tint cox erming to recipes Conc srpper ots cpl Digest pers (wre sepper Povercibiecrpnateal | _ Rework sr mast Fb enc ‘seu 08 BORTOSIOY ConyrGht Huet Techno Om, ‘opt OSN 9800 MOS (Guck instalation Gide Pracauions > instalation acessories ne Nouneng ears or urting ears or ee ore es she xneh eabat beeTSteatine ow eso round Cale 0c Power Cabe (oT teil (Cont en trina Fe ing sap Cable te AC per ates sue 05 2ORT-OSy ConyrGht Huet Techno Om, 3 ‘opt OSN 9800 MOS (Guck instalation Gide appearance a sore ‘The above shows the power boar ate, The MS subrack supers beth DC power supe (PU) and AC power supiy APU ‘Arays wear ESD gloves ora ESD wrist sao iro contact wih fe cup or belo anaing deeee, boards, or chi fo prevent damage o ceive componeats du 10 ‘lecostatetscharge fm the human body Ensue that the ESD wrt saps poverty wounds ‘seu 08 BORTOSIOY ConyrGht Hue) Techno Om, 3 ‘opt OSN 9800 MOS (Guck instalation Gide Instaling the MOS Suorack>Intalaon Process ‘seu 08 BORTOSIOY Copyright Huawel Teemroages CoO 7 ‘opt OSN 9800 MOS Instaling the MOS Subrack > General Requirements for Insallaion Space and Air Inet (Guck instalation Gide “Temperate sneak ana aod SS Installation Space Requirements (New Deployment Scenario) * Temperature Requirements for ‘Pe orn eins pp entre lore ceo q thealriniet ‘he Mos suck can isa nace Woo ean, BI tan ho MOS suck eo acai, rao Pathe space equenets stein (New Deployment Scenario) iinas Toe aR 7 SSeS ae ae : seocowrsgutcte | Sane stot ida moiningearereTaCatnen [595 88 ' cealwesnm re srt the rer sure fhe esrb ae ‘mice mounting ear eR view) sont mewn rf tow Installation Space Requirements and Airinlet Temperature Requirements (Reuse and Capacity Expansion Scenarios) or caoacy expansion scenarios on te he ews, cova! Ham eres reat, ‘seu 08 BORTOSIOY ConyrGht Hume) TeeinopeS Om, 3 ‘opt OSN 9800 MOS Instaling the MOS Subrack > (Example) Instaing NOS Subrack i an ETSI Cabinet with (Guck instalation Gide Mica Couns Instalaton No. Inealtion Personne! | instalation Time Installation Procedure ret oatng rs the mun ts cnt calms oth cai, eo Precautions me =a some > ee : ee oreo aeons oo emma | ebeececaa! __. ieee ee. gee ve See ‘seu 08 BORTOSIOY ConyrGht Hue) Techno Om, 7 ‘opt OSN 9800 MOS (Guck instalation Gide Insaling the MOS Subrack > (Optional Istaling Boards Instalaton No. Instaltlon Personne! instalation Time Shy ll a re roan, “nthe gesarners en ah aie the atte mata a ‘hen stacy set fr! loge pac al tte bo crt 13> Pash tee acter ems inert cr cn yas oretrtr estan ten natg atom rte, Younes {epulte tarda oe edurbet pion rt aga ‘seu 08 BORTOSIOY ConyrGht Hue) Techno Om, % ‘opt OSN 9800 MOS (Guck instalation Gide Instaling the MOS Subrack > Optical Nose Detvery Modes 1. The QSFP28opsical modules are packaged Independently (as shown in Figure 1), and then are packaged with the matching boards (as shown in Figure 2) In bores (shown in igre 3) for devery. Other types of optal modules are inserted ito the corresponding optical ports of boards and then ae packaged for delivery 21a prevent materials contusion after materia boxes are unpacked ons, it recommended that you unpack the materials boxes one by one instal optical ‘metus in a box the coresponding boards, and then unpack the next materi box. Fore Independent caging of Fore 2 independent pcagog Fae 3 cantined packaging of CSF ‘asr28 pte matte ‘matching | ca re toe, ‘seu 08 BORTOSIOY ConyrGht Huet Techno Om, 3 ‘opt OSN 9800 MOS (Guck instalation Gide Insaling the Mos Subrack > (Optional Instaling a Fier Management Tay lation No. | Installation Personnel. | Installation Time Installation Procedure ‘ect the tation fx mating es and stat he manning eas. Inga enamine at rn (ONO) KS) (Coxon isa he PGND cate the eo the fr management Ly ‘he nese undp Precautions |The er management rye an anal senany wn an be a ery “acauTon Ss es handing opal bers at and cv tock tothe opal roe + penance 12 | Fer manapeent || Me pine Me Mégeand eae . HUAWEI sue 05 2ORT-OSy ConyrGht Hume) Techno Om, co ‘opt OSN 9800 MOS (Guck instalation Gide Instating the MOS Subrack > (Optional) Cong Fibers inthe Fiber Management Tay "When handing opt fr, do ct stad ce oar ck into the cl eile rey wthut a Resa pled an pul aut though ne ter manage ay ete, When yo spec ‘rae the ap fhe be trough ee tony Berend be pled et frm te ie Installation No. Installation Personnel Installation Time @ Paste er mare _ ie ber mamagrent oy scardg the fe @ cow meter manner a 2 Sea Instaation Tes CS tat Manes [ale a ‘seu 08 BORTOSIOY Conyraht Huet Techno Om, 5 ‘opt OSN 9800 MOS (Guck instalation Gide Enrehat he ground pts clean ant ‘hori ro pantr neato coat on. Insaling the MOS Subrack > Ingtaling the PGND Cab ofthe Subrack Instalaton No. Inctalistion Personne! instalation Tr Installation Procedure Dastan onthe kash tte nak andre eho OT era Precautions a 5 : HUawe! ‘seu 08 BORTOSIOY ConyrGht Hue) Techno Om, 6 ‘opt OSN 9800 MOS (Guck instalation Gide ocean) Sein Sah BTA Before removing a nsertng he oer cable uno the BC power Stops to prowent eect hooks ‘Aer the power cables ais ensure tat he owe cbs oat \merfre wi fo cabnet doo oc 1 power supply requirements em Pannetes Instaaton No. COO © Insaling the MOS Subrack > igang Power Cables (HU) Installation Personnel | Insaitlon Tine Installation Procedure ‘eck ater OC powers asics weit ie D1 ced Gite lbw atch The BE pov su mio sheusirs PL ratte pet ameter te OC pee ci io th ee sh ‘race ne Pl tara When ya ear eek sun mates ak ‘nope comet retnan pe Fete poet abl tres he conespondig hes onthe lated eke te foe sa ab he one eer Precautions The MoS poids Do ant AGMDE pone gp mck. When OC po {ep net De pons aeons in 01S se SAG om Spy este REMUDS po eas ‘owe cerns ta 3 oot eg a canct beeen ee ‘Ws eigen canbe caps oer POU poner, Deve sel tho nating Oe pve al soragt tt a san, ‘oars lei athe powers othe ove, en. aoc eres murder oust ence fC pve ay ecient epoe e PL See i ac ears Songs Repro Pd Inston Tools esgoe 2 Instaotion Materials ‘seu 08 BORTOSIOY Copyright Hume) Teeinowes Om, ‘opt OSN 9800 MOS (Guck instalation Gide Peta) ‘ech power cable 0 a ‘nsw at he power cables So ot ‘rere withthe cael doe ck Sy BERNE Sasi "The AC and HVDC votages ae ich ‘Boers remoung and naerirg a power abl um af ie AC and HVDC power ‘Supptesoprevetelectic shocks, ‘Bet instatng he power cal, you must st Sete power suten on he APL boars o be ‘OFF atta, erathen um io “OW ator ae Instaling Power Cables (APU) Installation Personnel | Insalitlon Tine Instalation Procedure ‘hw eta ACHVOC pone pty eles ae al sas 01 ‘etioeatne atns a RGN bw uh oa S Pass be AC pve cabl rag these fh aie manage Fae ‘ero NSHVDS power py meas othe AC po ae af sored cap eo Zo ‘Aaj en clap Precautions ‘ees eke EACH gy ee, Me ‘fer ACO poet sn ee ro ACHE per maser oe ee acter frecessy toes th the AC pve cal a eve Do ‘etter he care Oa rat ise tecl ikea hres cary eget Toate bythe power sl othe ce, ier a sues wrod ews ca fw ACHE pve si os Hs, you tT ple the ACMVDS ‘mesure (API rater tr} one Foren foe ‘Strict Rein oar nd Campana = "opasng ne BIPGU ‘Sone? eharternt poate! errata Instaltion Toole es0goe |? 3 Instaation Materials se Huawer ‘seu 08 BORTOSIOY Conyraht Hue) Techno Om, ‘opt OSN 9800 MOS (Guck instalation Gide Insaling the MOS Subrack> Intaling NM Cables “The MOS aierack can be conactad emul MS subracks na deh tology mplement communication pretation ‘Sconario 1: TMESCTU is configured inthe master subrack 1 The slave subvackiscontgurad with the THEZAUX “The EXCTU and E1CTUEZCTU boards cant te uses together nthe master sbrack +The acta stanaoy CTU oar nthe master euaack must be comectd tthe slave subrack Onf the CTU bean te same sk canbe comeced othe AL toad Fr oral, the GE? prt onthe CTU (UTS) bard th mastrsubrack can ely be connect a GE or GE2pot on a AUK WU72) beard ne la track Inthe master strack, ‘RenAGe’ pr onthe EscTUtoar canon Deed as te A por ‘seu 08 BORTOSIOY ‘Scenario 2: TMEICTUMTME2CTUCEFI Is configured in the mastorsubrack ‘The slave sutcack can be configured wen th TMESALK,TMEICTU, cr THEZCTU, ‘inna master eusrack, te E1CTUE2CTU boas carne be wed togatorweh the EsCTUtoad ‘The active anc standby CTU bares ne maser subvack must be conecteto tho sav subrack. Only CTU boardin he same st canbe commacadto te (CTUIALX board For eaple, e GEt or GEZ prt onthe CTU (U73) board in the ‘master surack can ony e connected tote GE or GE2 prt onthe CTUAUX, (7) poudin te save sea | | L ConyrGht Hue) Techno Om, ‘opt OSN 9800 MOS (Guck instalation Gide Insatng the NOS Subrak > istaling/Roung Fibers Instalaton No. Inctaiatlon Personne! instalation Instataton Procedure "sat te gal toh tot mr of he Dato eae ‘targa fare le anda # the concerto oe on ‘Brat lin pea Mas ech el St pti er rag hand feieel tees eee aba ‘Wren hancng oa ers coe stn cleo fk ot pea {ter ut ely wee sen ‘Te erg as 65742 ort a On youve ber 2 Resim poe rarbe ort sana tne ‘Ataris aa, opt ot ihn ott ee 2 inte be puget nah pa ut ep ete abe Eriargos vow of cable manogoment ane Sita eT Tier arg nde ora tic ar heared penn oe Sincere a Sry eer rer cad Sennen ee eee = ato ae Solo fo |e es " = ae = ct z HUAWEI ‘seu 08 BORTOSIOY Copyright Humvel Teeinowes Om, B ‘opt OSN 9800 MOS (Guck instalation Gide Checking the Insalaion => Ovrall stalin elect ten attton compte, dtl check hat MS ee awe Ban pay MEL ete preset on tethers No. Watto Check For Method 1 ‘The cats we petionetin te ce eel yt oe spoke enametn dn ea napeton| : Ths sta) an ct corps a eat etn andre te tarps oro FS | vasa papecicn ND tgs, srach rate te pesat ont ces 2 ae neste pan bate te cate eset eva npn | ‘ aes erated ez othe eget des a npn . ‘ais ae no canage uate of oplens The ale camesos we corectd caret | vasa ype fone @ [be tah ae oes call het mated eae lh eat evant 7 ‘he hos red ouie a cabin we pace aie teu ansee petted om 8 | Vasa pace Po ce pon sty aes oc, : ‘bende ter cal hee mitten orn ae tnt orem | Vasa epecen i. ‘en a pcan art we pope Bae hd gn Tw 9609 | vay pete ee ia et ah a oh he no a etter Teagan ‘seu 08 BORTOSIOY Copyright Hume) Techno Om, a ‘opt OSN 9800 MOS i — a or prea r ‘rest breoter | enrTae) | en Povo Ke QD erecta en an Son a oe = Ee ES se = i = SE EE ie eS See = ee ae sano = Cao ee eee 7 | _ ae ‘seu 08 BORTOSIOY ConyrGht Hue) Techno Om, B ‘opt OSN 9800 MOS (Guck instalation Gide Engineering Labels > Afiing Labels ee wore ‘Ac labal ta cable 2 cr away rom ts connector, ED mg atanetos Power Cable cate ldentcaton sate ‘ac eran lato pe cable wen the By Hcg aeton 4 dns, Signa Cable ek ttt eh cave entation pat Aachen pate ne gt ie ‘sate wont cates td wt ene 2 wy (1) nore Fossuones i‘: FFasens a ctl routed vray the label must ace othe ght. a cable routed horizontal, the abst must face downmards ‘seu 08 BORTOSIOY Copyright Hue) Techno Om, ‘opt OSN 9800 MOS (Guck instalation Gide ed Enginaerng Labels > Stancars Enginenring Labee ee “af honoraria ) commenced Sunes! eeaeeess Ca aR THIS TNS TE =

You might also like