You are on page 1of 2
West Central Railway WCRIMIC/O2/112 Sr. DME (Chg.) JBP/BPLIKTT Office of the General Manager Mechanical Branch Jabalpur Dated: 01.12.2023 Sub: POHIIOH/SS2/SS1 Plan for the month of December-2023. POH/IOH/SS2/SS1 arising for the month of December-23 is submitted by the Divisions. Accordingly an action plan is prepared regarding feed of due POH & SS2 Coaches to CRWS/BPL. Similarly OH, SS1 & extension of POH due coaches has been prepared and enclosed herewith as Annexure-| Divisions are requested to achieve the given target so that feed of CRWS/BPL may be maintained. DA:- as per above (1 page) XE (Samir Lohai CRSE(Chg & EnHiM) WCR Jabalpur C/- Dy. CME/WS/HQIWCR - for information and necessary action please. Dy. CME-IICRWSIBPL — for information and necessary action please. © scanned with OKEN Scanner Annexure -| Dec_- 2023 (POH/SS2/SS1/SS2 (Planning A. POH arising & despatch plannig:- Div |__BalNov-23 [Arising Dec -23 | Total (Bal +Arising) | Despatch Plan _| Extension AC [NAC | Total [AC [NAC | Total [AC | NAC | Total [AC [ NAC] Total| Plan vepfiy s [6 13 [wl 21} 4 | 23 | 2 [2] te] 20 7 BP |] aero gf) oe |e |e hen fr a | NIC kit | - [4 [4 y= 2a Tag 6 [ae [fat | at 7 wer| i | 3 {10 | 3 [46 | 49 [4 [55 | 59 | 2 | 43 | 45 4 B. SS2 arising & Despatch planning - Div Bal Nov -23 [Arising DeciJan-24 | Total (Bal + Arising) | Despatch plan of Divisions AC [NAG [Total |AC [NAC | Total [AC [NAC | Total | AC | NAC | Total wert 3 4 aee)2e toe [ea 5 | 6 14 5 6 4 BPE | 2 - 201 2 3s 3 az | ate aat2 15 ra |e ers 2-41 3 Pe SI 3 2 4 3 wer| 5 [7 6 [s | 18 [23 [10 [49 | 29 | 10 | 19 29 C. 10H & SS1 Arising & bogie requirement of WCR Coaches:- Div. [Balance | Arising Total Arising in Dec | Target of10H & SS1_| Requirement of Nov-23 | Dec-23 | ~23 (coaches) of Divisions (Coaches) | Bogies in Dec - 23 TOH] S81 | 10H | S81 | 10H SST 1OH SSt_ | 1CF THB BPs | iti) ea) 14cpe is | 2 15 12 30. 24 (2 Ee 23 & 23 8 46, 16 Kir | o | 0 | 9] 2 9 2 3 2 | 18 4 wer | 10 | 10 | 37 | 12 a7 22 a7 22 {94 44 D. Performance of the divisions (Nov — 2023):- Div TO TC S51 POH S82 POH Extension ‘Target | Done | Target | Done | Target | Desp | Target | _Desp_| Target | Dona epee (sees spiel 2t 16 | 20 | 16 | 15 10 5 5 BPL | 24 | 18 [6 4 4 2 12 10 0 0 KTT 2 4 5 5 25 | 20 5 [4 5 5 wer | 47 [43 [32 [25 [49 | 38_[ 2 Nl 24 | 39 110 ZN CRSE (| &EnHi ICR © scanned with OKEN Scanner

You might also like