Professional Documents
Culture Documents
INSTRUCTION
• To be carried out on each 50 flight hours and inspection period shall not be exceeded by 5 hours.
• Each listed inspection item on maintenance is to be performed in accordance with Aircraft model
Piper PA 34-220T Seneca V Maintenance Manual or other applicable publications.
A. PROPELLER GROUP
WARNING:USE EXTREME
CAUTION WHEN
ROTATING PROPELLER
BY HAND; PROPELLER
MAY KICK BACK.
PRIOR TO ROTATING
PROPELLER, ENSURE
BOTH MAGNETO
SWITCHES ARE OFF
(GROUNDED). IF
MAGNETOS ARE NOT
GROUNDED, TURNING
PROPELLER MAY
START ENGINE. ……………………. …………………….
01. Inspect spinner and back plate for cracks ……………………. …………………….
B. ENGINE GROUP
C. TURBOCHARGER GROUP
F. WING GROUP
H. PECIAL INSPECTION
See 5-30-00. ……………………. …………………….
I. OPERATIONAL INSPECTION
01. Check fuel pump and fuel tank selector. ……………………. …………………….
J. GENERAL
Engineering :
……………………. …………………… …………………….
Date :
……………
Maintenance Release :
in accordance with the Civil Aviation Safety Regulations and is safe for flight.
Notes: