This document provides information on a low pressure gas distribution project in Tien Hai - Thai Binh, Vietnam. It discusses the pipeline system and dehydration phase. The document also contains piping and instrument diagrams for cooling water and notes revisions from November 2014 to April 2015.
Original Description:
Original Title
KTA.TB-PAC03-M07-009.Rev.0.Piping & Instrument Diagrams for Cooling Water System
This document provides information on a low pressure gas distribution project in Tien Hai - Thai Binh, Vietnam. It discusses the pipeline system and dehydration phase. The document also contains piping and instrument diagrams for cooling water and notes revisions from November 2014 to April 2015.
This document provides information on a low pressure gas distribution project in Tien Hai - Thai Binh, Vietnam. It discusses the pipeline system and dehydration phase. The document also contains piping and instrument diagrams for cooling water and notes revisions from November 2014 to April 2015.
TIEN HAI – THAI BINH LOW PRESSURE GAS DISTRIBUTION PIPELINE
PROJECT SYSTEM
PHASE DEHYDRATION
PIPING AND INSTRUMENT DIAGRAMS FOR
COOLING WATER
0 23/04/2015 Issued for Approval NXP LDT VGV
F 06/04/2015 Issued for Approval NXP LDT VGV E 05/03/2015 Issued for Approval NXP LDT VGV D 02/02/2015 Issued for Approval NXP LDT VGV C 19/01/2015 Issued for Approval NXP LDT VGV B 20/12/2014 Issued for Approval NXP LDT VGV
A 21/11/2014 Issued for Review NXP LDT VGV
Prepared by Checked by Approved by Checked by Approved by
Rev Date Description Alpha-ECC PVGAS D
Contractor: Contractor’s Document Number:
KTA.TB-PAC03-M07-009 ALPHA – ECC Total pages:02 (Incl. this page)