Address
Execution class
Report 0 EXC2
EN 1090-2
GRAITEC INNOVATION Designed by Date
www.graitec.com Verified by Date
17 Burospace 91572 Bièvres Revision Drawing
Apex Report
Maximum Work Ratio 85.73 % Passed
Table of Contents
1 Joint description..................................................................................................................... 3
2 Load combinations description............................................................................................. 5
3 Design Assumptions............................................................................................................... 5
4 Holes distances conditions..................................................................................................... 6
4.1 Minimum distance conditions for round holes ............................................................................7
4.2 Maximum distance for steel without improved atmospheric corrosion resistance..................... 8
5 Compression verifications..................................................................................................... 8
5.1 Compression resistance of the beam - Right side of the connection...........................................9
6 Bolt verifications with loads from right beam..................................................................... 9
6.1 Bolt tension verification...............................................................................................................9
6.2 Bolts shear verification...............................................................................................................10
6.3 Diametral bearing verification of the bolt on the Right End Plate............................................ 10
6.4 Diametral bearing verification of the bolt on the Left End Plate...............................................11
6.5 Bolts punching shear verification...............................................................................................11
6.6 Bolt combined shear-tension verification..................................................................................11
6.7 Summary - Individual bolt verifications....................................................................................12
7 Bolt verifications with loads from left beam...................................................................... 12
7.1 Bolt tension verification.............................................................................................................12
7.2 Bolts shear verification...............................................................................................................13
7.3 Diametral bearing verification of the bolt on the Left End Plate...............................................13
7.4 Diametral bearing verification of the bolt on the Right End Plate............................................ 14
7.5 Bolts punching shear verification...............................................................................................14
7.6 Bolt combined shear-tension verification..................................................................................14
7.7 Summary - Individual bolt verifications....................................................................................14
8 Stiffeners verifications for beam on right side.................................................................. 15
8.1 Compressed stiffener on beam...................................................................................................15
9 Stiffeners verifications for beam on left side..................................................................... 15
9.1 Compressed stiffener on beam...................................................................................................16
10 Tension verifications............................................................................................................ 16
11 Shear verifications of connection on right side................................................................. 16
11.1 Shear yielding verification of the plate......................................................................................16
11.2 Shear Ultimate Verification........................................................................................................17
11.3 Block tearing verification...........................................................................................................17
11.4 Shear verification of the bolt rows.............................................................................................17
1 Joint description
Haunch
Material: S275 (EN 10025-2)
Dimensions
Haunch
Material: S275 (EN 10025-2)
Dimensions
End Plate
Material: S275 (EN 10025-2)
Section Dimensions
Height
Width
Thickness
Holes diameter
End Plate
Material: S275 (EN 10025-2)
Section Dimensions
Height
Width
Thickness
Holes diameter
3 Design Assumptions
Design standards
EN 1993-1-1 Design of Steel Structures. General Rules and Rules for Buildings
EN 1993-1-8 Design of Steel Structures. Design of Joints
EN 1992-1-1 Design of Concrete Structures. General Rules and Rules for Buildings
EN 1993-1 National Annex: General Eurocode.
Units
Dimensions: mm Area: mm²
Forces: kN Inertia modulus: cm³
Bending moments: kN⋅m Inertia Moment: cm⁴
Stresses: MPa Rotational Stiffness: kN⋅m/rad
Angles: °
Bolts
The shear plane passes through the threaded part of the bolt.
T-Stub Failure Method: Method 1
T-stub method - tensioned zone limit: automatic determination
Approximate value for the transformation parameter, according to Table 5.4 (EN 1993-1-8):
Safety Coefficients
Structural steel Structural concrete:
Application domain:
The joint members are I or H construction steel profiles.
Next, "Right" holes and "Left" holes refer to the joint part to which the holes belong (e.g. right plate).
4.2 Maximum distance for steel without improved atmospheric corrosion resistance
Maximum spacing between the centers of 2 holes on the load direction, according to EN 10025-5*
EN 1993-1-8, Table 3.3
Left holes Constructive condition
failed
Right holes Constructive condition
failed
Maximum spacing between the centers of 2 holes perpendicular on the load direction, according to EN
10025-5*
EN 1993-1-8, Table 3.3
Left holes Passed
Right holes Passed
5 Compression verifications
Compression verifications are done for each beam of the connection (left and right). In the following are
presented only those verifications which are giving the smallest resistance (or work ratio).
Beam cross section design bending moment resistance, reduced if necessary to allow for shear force:
The column profile is class 1, so the moment resistance of the section is calculated using the plastic
modulus:
EN1993-1-1. 6.2.5
The Design Combined Compression Resistance of the Beam Flange and the Adjacent Compression Zone
of the Beam Web
EN 1993-1-8, 6.2.6.7
Diameter:
Mechanical properties:
Class 6.8
Shear area:
For each side of the connection, bolts connecting the member with the end plate are verified with torsor
(group of efforts) from right side of the connection.
Only verifications giving the maximum work ratio are displayed.
- the distance from the most tensioned anchor/bolt (on row 1) to the center of rotation;
- the sum of square distances from the current tensioned anchor/bolt row to center of rotation;
The center of rotation will be considered in the middle thickness of the compressed flange/haunch flange.
6.3 Diametral bearing verification of the bolt on the Right End Plate
Check relation:
Combination: [1]: max(M)
Check relation:
Combination: [1]: max(M)
Check relation:
Combination: [1]: max(M)
Check relation:
EN 1993-1-8, 3.6.1, table 3.4
Combination: [1]: max(M)
Combination
[1]: max(M) [1]: max(M) [1]: max(M) [1]: max(M) [1]: max(M)
Diameter:
Mechanical properties:
Class 6.8
Shear area:
For each side of the connection, bolts connecting the member with the end plate are verified with torsor
(group of efforts) from left side of the connection.
Only verifications giving the maximum work ratio are displayed.
- the distance from the most tensioned anchor/bolt (on row 1) to the center of rotation;
- the sum of square distances from the current tensioned anchor/bolt row to center of rotation;
The center of rotation will be considered in the middle thickness of the compressed flange/haunch flange.
7.3 Diametral bearing verification of the bolt on the Left End Plate
Check relation:
Combination: [1]: max(M)
7.4 Diametral bearing verification of the bolt on the Right End Plate
Check relation:
Combination: [1]: max(M)
Check relation:
Combination:
Check relation:
EN 1993-1-8, 3.6.1, table 3.4
Combination: [1]: max(M)
Combination
[1]: max(M) [1]: max(M) [1]: max(M)
Check relation:
Slenderness classification
Slenderness limit of compressed stiffeners is exceeded (Table 5.2)! Stiffeners are class 4!
Check relation:
Slenderness classification
Slenderness limit of compressed stiffeners is exceeded (Table 5.2)! Stiffeners are class 4!
10 Tension verifications
Verification is not necessary.
Check relation:
Combination: [1]: max(M)
Check relation:
Combination: [1]: max(M)
For bolts that are not centered on members:
n1 - number of bolts that are not required to resist tension; EN 1993-1-8 6.2.2 (2a)
n2 - number of bolts that are also required to resist tension; EN 1993-1-8 6.2.2 (2b)
Check relation:
Combination: [1]: max(M)
Check relation:
Combination: [1]: max(M)
For bolts that are not centered on members:
n1 - number of bolts that are not required to resist tension; EN 1993-1-8 6.2.2 (2a)
n2 - number of bolts that are also required to resist tension; EN 1993-1-8 6.2.2 (2b)
Lb - is the bolt elongation length, taken as equal to the grip length (total thickness of material and
washers), plus half the sum of the height of the bolt head and the height of the nut.
The minimum resistance for rows and groups is calculated as the minimum resistance between:
- End Plate Bending Resistance; EN 1993-1-8, 6.2.6.5
- Beam Web Tension Resistance; EN 1993-1-8, 6.2.6.8
Effective resistance of a row in a group is calculated as the difference between the group minimum
resistance and the rest of the rows minimum resistance:
The effective resistance of the row is equal to the effective resistance of a row in a group or the row
minimum resistance, whichever is the smallest.
If the Effective Resistance of one of the previous bolt-rows is greater than 1.9 times the tension resistance
of the bolt, the effective design tension resistance will be recalculated:
14 T-Stub method
14.1 Geometrical parameters
Left 1 0.000 0.000 0.000 0.000 0.000 0.000 152.9 0 100 0 100 100
319
Right 1 0.000 0.000 0.000 0.000 0.000 0.000 153.0 0 100 0 100 100
605
Left 2 0.474 0.657 0.000 0.000 5.684 0.000 282.7 497.1 255.7 312.3 255.7 255.7
433 066 724 898 724 724
Right 2 0.474 0.656 0.000 0.000 5.684 0.000 282.7 497.1 255.7 312.4 255.7 255.7
433 066 829 003 829 829
Left 3 0.000 0.000 0.000 0.000 0.000 0.000 253.6 344.7 223.9 220.9 223.9 223.9
806 077 981 328 981 981
Right 3 0.000 0.000 0.000 0.000 0.000 0.000 253.6 344.7 223.9 220.9 223.9 223.9
806 077 981 328 981 981
Left 4 0.000 0.000 0.000 0.000 0.000 0.000 253.6 160 223.9 80 223.9 223.9
806 981 981 981
Right 4 0.000 0.000 0.000 0.000 0.000 0.000 253.6 160 223.9 80 223.9 223.9
806 981 981 981
Left 4 - 5 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 303.9 303.9
981 981
Right 4 - 5 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 303.9 303.9
981 981
Left 4 - 6 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 383.9 383.9
981 981
Right 4 - 6 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 383.9 383.9
981 981
Left 4 - 7 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 463.9 463.9
981 981
Right 4 - 7 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 463.9 463.9
981 981
Left 5 0.000 0.000 0.000 0.000 0.000 0.000 253.6 160 223.9 80 223.9 223.9
806 981 981 981
Right 5 0.000 0.000 0.000 0.000 0.000 0.000 253.6 160 223.9 80 223.9 223.9
806 981 981 981
Left 5 - 6 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 303.9 303.9
981 981
Right 5 - 6 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 303.9 303.9
981 981
Left 5 - 7 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 383.9 383.9
981 981
Right 5 - 7 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 383.9 383.9
981 981
Left 6 0.000 0.000 0.000 0.000 0.000 0.000 253.6 160 223.9 80 223.9 223.9
806 981 981 981
Right 6 0.000 0.000 0.000 0.000 0.000 0.000 253.6 160 223.9 80 223.9 223.9
806 981 981 981
Left 6 - 7 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 303.9 303.9
981 981
Right 6 - 7 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 303.9 303.9
981 981
Left 7 0.000 0.000 0.000 0.000 0.000 0.000 253.6 206.8 223.9 151.9 223.9 223.9
806 403 981 99 981 981
Right 7 0.000 0.000 0.000 0.000 0.000 0.000 253.6 206.8 223.9 151.9 223.9 223.9
806 403 981 99 981 981
Row Failure
Left 1 40.67 kN -
40.64 kN 40.64 kN 40.64 kN 40.64 kN EP-NC
Right 1 40.64 kN -
Row Failure
Left 2 164.72 kN 703.37 kN
164.72 kN 164.72 kN 164.72 kN 164.72 kN EP-NC
Right 2 164.72 kN 703.4 kN
Row Failure
Left 3 166.19 kN 615.99 kN
166.19 kN 166.19 kN 166.19 kN 166.19 kN EP-NC
Right 3 166.19 kN 615.99 kN
Row Failure
Left 4 166.19 kN 628.31 kN
166.19 kN 166.19 kN 166.19 kN 166.19 kN EP-NC
Right 4 166.19 kN 628.31 kN
Row Failure
Left 5 166.19 kN 628.31 kN
166.19 kN 131.98 kN 131.98 kN 131.98 kN EP-NC
Right 5 166.19 kN 628.31 kN
Groups
298.17 kN 852.71 kN
4-5 298.17 kN 166.19 kN 131.98 kN
298.17 kN 852.71 kN
Row Failure
Left 6 166.19 kN 628.31 kN
166.19 kN 78.47 kN 78.47 kN 78.47 kN EP-NC
Right 6 166.19 kN 628.31 kN
Groups
298.17 kN 852.71 kN
5-6 298.17 kN 131.98 kN 166.19 kN
298.17 kN 852.71 kN
376.63 kN 1077.11 kN
4-6 376.63 kN 298.17 kN 78.47 kN
376.63 kN 1077.11 kN
Row Failure
Left 7 166.19 kN 628.31 kN
166.19 kN 78.47 kN 78.47 kN 78.47 kN EP-NC
Right 7 166.19 kN 628.31 kN
Groups
298.17 kN 852.71 kN
6-7 298.17 kN 78.47 kN 219.7 kN
298.17 kN 852.71 kN
376.63 kN 1077.11 kN
5-7 376.63 kN 210.44 kN 166.19 kN
376.63 kN 1077.11 kN
455.1 kN 1301.51 kN
4-7 455.1 kN 376.63 kN 78.47 kN
455.1 kN 1301.51 kN
Next, moment resistance is verified with torsor (group of efforts) from right side of the connection.
Check relation:
Combination: [1]: max(M)
EN 1993-1-8, 6.2.7.2 (1)
Row
Number (kN) (mm) (kN⋅m)
1 40.64 862.5428 35.05
2 164.72 722.5428 119.02
3 166.19 366.8079 60.96
4 166.19 286.8079 47.66
5 131.98 206.8079 27.29
6 78.47 126.8079 9.95
7 78.47 46.8079 3.67
303.61
Next, moment resistance is verified with torsor (group of efforts) from left side of the connection.
Check relation:
Combination: [1]: max(M)
For each side of the connection, welds connecting the member with the end plate are verified with torsor
(group of efforts) from right side of the connection.
Only welds verifications giving the maximum work ratio are displayed.
17.2 Member weld verification by moment resistance (weld design method: simplified)
Check relation:
Combination: [1]: max(M)
For each side of the connection, welds connecting the member with the end plate are verified with torsor
(group of efforts) from left side of the connection.
Only welds verifications giving the maximum work ratio are displayed.
18.2 Member weld verification by moment resistance (weld design method: simplified)
Check relation:
Combination: [1]: max(M)
19 Rotational Stiffness
- it is calculated by taking into account effective lengths for individual tensioned rows and effective
lengths for tensioned rows as part of a group;
EN 1993-1-8, 6.3.3.1 (6.30)
Row 2
Stiffness coefficient for end plate in bending (right)
Row 3
Stiffness coefficient for end plate in bending (right)
Row 4
Stiffness coefficient for end plate in bending (right)
Row 5
Stiffness coefficient for end plate in bending (right)
Row 6
Stiffness coefficient for end plate in bending (right)
Row 7
Stiffness coefficient for end plate in bending (right)
Row
(mm) (mm) (mm²) (cm³)
1 0.6237 862.5428 538 464.01
2 1.7357 722.5428 1254.1 906.14
3 2.0168 366.8079 739.8 271.36
4 1.4819 286.8079 425 121.9
5 0.8504 206.8079 175.9 36.37
6 0.8504 126.8079 107.8 13.67
7 1.4819 46.8079 69.4 3.25
Stiffness ratio:
Shape factor:
EN 1993-1-8, 6.3.1, Table 6.8
Secant stiffness:
The joint is contained in an unbraced structure (the bracings reduce less than 80% of displacement)