10. Building Costs All costs of construction within 5 feet of building line
11. Fixed Equipment All equipment items installed before completion (ie. lock-
Costs ers, medical equipment, fixed seating)
1/3
ARE PA - Building Efficiency
Study online at https://quizlet.com/_8wd9w2
12. Site Develop- All required that lies between 5' of the building line and site
ment Costs boundaries. (ie. grading, walks, street furniture, treatment
plants)
17. Service Area An area used to support the building as a whole and not
an individual occupant
Includes building storage, janitorial rooms, public re-
strooms
18. Mechanical Area Area that involves mechanical equipment, shafts, or utility
services
2/3
ARE PA - Building Efficiency
Study online at https://quizlet.com/_8wd9w2
19. Tare Area Area that includes non-assignable and structural; area left
over when subtracting assignable area from gross area
20. Non-assignable Area necessary for building use/running but not directly
Area assigned to an occupant
Includes major circulation, mechanical, service