Hi Dennis,

Please refer to the attached progress claim V/O Located at Gombak Camp , Blk 303, 5th Storey.

S/N Description Amount


Sinjoo Engineering Pte Ltd – 100% Progress Claim for V/O Job to Fire
Protection Works on Toilet Renovation .
1 Complete installation of Fire sprinklers pipework $5,300.00
and sprinkler head
2 Complete removal of existing sprinkler piping and $2,100.00
sprinklers
3 Complete Draining of sprinkler water and inclusive
connection of new piping and sprinkler heads
4 Installation of strobe lights with wiring to existing $2,300.00
sub alarm panel
5 Supply and installation of Fire alarm module for the $9,700.00
strobe lights
6 Other necessary works to complete the system $4,800.00
Total $24,200.00