2 Search for Work Order by Asset, Work Order, or Description and click Enter
© Copyright 2012, First Solar, Inc. | Maximo Calibration - Work Orders_30-Jul-14 | Page 1 of 7
Click on the Work Order number to open
3
2A. Update the Tool Used – Job Plan is Set Up with Planned Tools
If the Job Plan is not Set Up with Planned Tools, please skip to Step 2B.
Step Action
© Copyright 2012, First Solar, Inc. | Maximo Calibration - Work Orders_30-Jul-14 | Page 2 of 7
5 If necessary, narrow the search by typing in the Description field, if necessary, then hit Enter
8 If the Rotating Asset Field is not populated, click the arrow next
to the Rotating Asset Field (detail menu button). If it is already
populated, proceed to step 12.
10 If necessary, enter the appropriate Site number into the Site box (1001 = PBG, 3001 = KLM) and click
Enter
© Copyright 2012, First Solar, Inc. | Maximo Calibration - Work Orders_30-Jul-14 | Page 3 of 7
11 Select the Tool used by clicking on the Asset
number
12 The Rotating Asset Field should now indicate the Tool selected
2B. Update the Tool Used – Job Plan is Not Set Up with Planned Tools
If you have completed updating the tool used through Step 2A, proceed to Step 3.
Step Action
© Copyright 2012, First Solar, Inc. | Maximo Calibration - Work Orders_30-Jul-14 | Page 4 of 7
5 If necessary, narrow the search by typing in the Description field, then hit Enter
8 If the Rotating Asset Field is not populated, click the arrow next
to the Rotating Asset Field (detail menu button). If it is already
populated, proceed to step 12.
10 If necessary, enter the appropriate Site number into the Site box (1001 = PBG, 3001 = KLM) and click
Enter
© Copyright 2012, First Solar, Inc. | Maximo Calibration - Work Orders_30-Jul-14 | Page 5 of 7
11 Select the Tool used by clicking on the Asset
number
12 The Rotating Asset field should now indicate the Tool selected
Note: When the reading exceeds the Tolerances, warnings will be indicated by in multiple
places, giving a notification to the technician that the reading is not in spec. In addition, in
the Asset Functions area, FAIL will be indicated in the As Found Status.
© Copyright 2012, First Solar, Inc. | Maximo Calibration - Work Orders_30-Jul-14 | Page 6 of 7
4 Adjust the asset as necessary and measure again
Note: The goal is to ensure that the As Left Status is a PASS in the Asset Functions area. If the
asset passes, move on to the next step. If the asset does not pass, more adjustments may
be necessary.
7 Click Save
© Copyright 2012, First Solar, Inc. | Maximo Calibration - Work Orders_30-Jul-14 | Page 7 of 7