Subject: Decision of the Authority in the matter of Fuel Charges Adjustment for the
month of October 2023 for XWDISCOs along with Notification Thereof
Enclosed please find herewith copy of the Decision of the Authority (total 11 Pages)
regarding adjustment in fuel charges in respect of Ex-WAPDA Distribution Companies for the
month of October 2023 and its Notification i.e. S.R.O. 1770 (I)/2023 dated December 05, 2023.
2. XWDISCOs are directed that while charging the fuel charges adjustment from their
consumers, the Order of the Honourable Court(s), if any, be kept in mind and ensure compliance
with the Order(s) of the Court(s), whatsoever, in this regard. In case of non-compliance of Courts
Order the concerned DISCO shall be held responsible for violating / defying the orders of the
Honourable Court(s).
1. Secretary, Ministry of Energy (Power Division), 'A' Block, Pak Secretariat, Islamabad.
2. Secretary, Cabinet Division, Cabinet Secretariat, Islamabad.
3. Secretary, Ministry of Finance, 'Q' Block, Pak Secretariat, Islamabad.
4. Member (Power), WAPDA, WAPDA House, Shahrah-e-Quaid-e-Azam, Lahore.
5. Managing Director, NTDC, 414 WAPDA House, Shahrah-e-Quaid-e-Azam, Lahore.
6. Chief Executive Officer, Central Power Purchasing Agency Guarantee Limited,
Shaheen Plaza, 73-West, Fazl-e-Haq Road, Islamabad
Fuel ChargesAdjustmentforXWDlsCOs
for the month of October 2023
\c-
elf
! NEPRA
AUTHORITY )b.
Fuel Charges Adjustment forXWL)ISCOs
for the month of October 2023
7. During the hearing, a commentator raised the issue of timely application of monthly
FCAs within 7 days, as per the provisions of NEPRA Act. The Authority noted that
the issue of timely application of FCAs has already been decided by the Hon.
Supreme Court of Pakistan vide judgment dated 02.05.2018, as under:
"In future, the rime fixed in terms ofprovisions of second pro viso to Section 31(4)
ofAct XL Of 1997 for claimmg tanffrevLion on the basis offuel price fluctuation
shall be four (04) with reference to the bill/notified tanif ofanyparticu/ar month;
b) For filing refund claims by consumers, which are based upon down ward
fluctuation offuel price, we find that a period of two (02) months is reasonable for
the purpose of processing and granting such refunds relatable to the bill of a
particular month;..."
8. The Authority observed that while submitting the monthly FCA request, CPPA-G
and NTDCiNPCC certifies that;
a) 2002 Power Policy Plants
i. All purchases have been made from Generation Companies having valid
generation License issued by NEPRA.
ii. Invoices of all Electricity Purchases have been processed in accordance with
the rates, terms & conditions as determined by NEPRA. Payments related to
periodical adjustments are also made as per decision of NEPRA.
iii. The above statement is true, based on facts and from verifiable documentary
evidence. In case of any deviation / variation observed if not rectified at later
stage, CPPA-G will be responsible for the consequences arising out of any
misstatement under NEPRA Act and its Rules & Regulations.
b) 1994 Power Policy Plants (HUBCO Inclusive)
i. All purchases have been made from IPPs under 1994 Policy, including
HTJBCO & Chasnupp and excluding Tavanir, having valid generation license
issued by NEPRA.
ii. Invoices of all Electricity Purchases have been made strictly in accordance
with the rates, terms & conditions as stipulated in the respective Power
Purchase Agreements.
iii. All payments to IPPs are being made after observing all formalities provided
in the respective Power Purchase Agreements.
iv. All purchases have been made in accordance with the Power Purchase
Agreement
v. The above statement is true, based on facts and from verifiable documentary
evidences. In case of any deviation / variation observed if not rectified at later
stage, CPPA-G will be responsible for the consequences arising out of any
misstatement under NEPRA Act and its Rules & Regulations.
Fuel ChargesAdjustmentforXWDlSCOs
for the month of October 2023
12. CPPA-G in its request claimed net positive amount of Rs.28,324 billion as previous
adjustments in the instant monthly FCA.
13. Regarding adjustment of 25.4 billion for Thar Coal Board-1 (TBC-I), the Authority vide
decision dated 19.10.2023 has revised the FCC of TCB-I for the period February 2023 to
July 31, 2023. Pursuant thereto, CPPA-G has claimed an amount of Rs.25.4 billion, as
previous adjustment, for the mentioned period.
14. Regarding adjustment of Rs.3.2 billion for China hub power coal based power plant, upon
inquiry CPPA-G submitted that same is on account of PPA factors and pertains to a period
from August 2019 to June 2023. Considering the fact that the adjustments claimed by
CPPA-G are more than four years old, therefore, the Authority directs CPPA-G to
0
3:)
ii.
Fuel Charges Adjustment forXWDISCOs
for the month of October 2023
bring these adjustments separately before the Authority along with complete
workings and detailed justification.
15. In view thereof, the following amounts, under previous adjustments, are being
allowed in the instant FCA;
Prrv. A3, Cloimed Prv. Ad. Dedoctior Mouth
POWer ILO,OS
by CPPA-G Re. Allowed Ru. Ru.
Atlu Power 24,335,647 24,335647 - Aug-23
Niuhut Power 10,452,514 10,452,514 - Aug-23
Four.dutiou Power (386943) (386.943) - Aug-23
orieut 59,434,238 59,434,238 - Aug-23
Niohgt Chemigo 83.987.346 83.987.346 - Aug-23
Suit Power 33,617,202 33,617,202 - Aug-23
Eogro Eeecgy (8,808,160) (8.808,160) - Aug-23
Suphire Power 42,020,293 42.020.293 - Aug-23
1-lubro Nurowul 14,489.760 14.489,760 - Aug-23
Liberty Power 19,608,269 19,608,268.91 - Aug-23
Hulmore 25.376,208 25,376,208 - Aug-23
Uch-Il (6,004) (6,004) - Aug-23
Chiutu Hub Power 3,232,624,420 - (3,232,624,420) Aug-19 to )umr-23
Erugro Thur (1,667,079) (1,667,079) - Aug-23
QATPL (17,363,547) (17,363,547) - Aug-23
Huveli Buhudur Shuh (296,080,078) (296,080,078) - Aug-23
Huuruerug Sheudoog Ruyi 475.918,048 475,918,048 - Aug-23
Buloki (273.164,244) (273.164.244) - Aug-23
Port Quuim 87,448,917 87,448,917 - Aug-23
Lucky Electric (731.748) (731,748) - Aug-23
Pmujub Thermul (556.982.293) (556,982,293) - Aug-23
Thur Eoergy Liumled (1.356,922) (1,356.922) - Aug-23
Thur Coul Block 1 25,406,348,999 25,406,348,999 - Feb-July-23
ThuiNovu 52.170 52,169.56 - Aug-23
AES Lelpir (25) (25) - Aug-23
Puk Gen Power Limited (1.021.893) (1,021.893) - Aug-23
Subu Power (10.039.680) (10.039.680) - Aug-23
KANUPP-lI (11.979,674) (11,979,674) - Aug-23
KANIJPP-111 (11,545.763) (11,545,763) - Aug-23
otuI 28324,579.979 25,091,955.558 (3,232,624,421)
16. As per directions of the Authority, NTDC/NPCC and CPPA-G have been providing
the hourly/monthly generation data and other relevant details for deviation from
Economic Merit Order (EMO) and corresponding financial impact. However, it was
observed that, the requisite data/information submitted by CPPA-G along with the
monthly FCA data of October 2023 was not as per the required format. During
hearing, GM- SO (NTDC) presented details regarding system constraints and
justifications for operation of costlier power plants and low utilization of coal power
plants.
17. The Authority observed that during October 2023, the System Operator had
curtailed the drawl of energy from efficient power plants due to following reasons
along-with financial impact of such deviations;
i. Financial impact due to System Constraints (Operation of expensive plants to
avoid overloading on Lahore Sheikhupura grids, SSKT-GHKR transmission
line and HVDC limitation) = 10337 million
18. In view of the above, the total financial impact on account deviation from EMO is
Rs. 103.37 miffion, which is provisionally being withheld from the FCA claim for
the month of October 2023, till the time NTDC/NPCC provides complete
justification to the satisfaction of the Authority. Since the deduction is made by the
Authority due to deviation from EMO by NPCC, which is part of NTDC, therefore,
he Authority directs CPPA-G to pass on the impact of such deduction to NTDC.
Fuel Charges Adjustment forXWDISCOs
for the month of October 2023
19. NTDCL, reported provisional T&T losses of 257.763 GWh i.e. 2.491%, based on
energy delivered on NTDCL system during October 2023. NTDC in addition also
reported T&T losses of 23.324 GWh i.e. 2.926%, for PMLTC (HVDC) line. NTDCL
is allowed T&T losses of 2.639% only at 500KV and 220KV network, while PMLTC
(HVDC) is allowed T&T losses of maximum up-to 4.3%.
20. Accordingly, for the month of October 2023, T&T losses of 281.087 GWh have been
verified for NTDCL system oniy at 500 kV and 220 kV network and PMLTC
(HVDC) being within the Authority's allowed limit have also considered while
working out the FCA of October 2023.
21. In view of the above discussion, the Authority has calculated the fuel cost for the
month of October 2023, after accounting for the aforementioned adjustments, and
including costs arising out due to application of various factors, as provided in the
respective PPAs of the Power Producers as claimed by CPPA-G in its FCA request.
Here it is pertinent to mention that the amount arising out due to application of
PPA factors, for the six RFO based IPPs, incorporated under 2002 Power Policy, is
being allowed on provisional basis and shall be subject to adjustment, based on the
final outcome of the ongoing suo moto proceedings against RFO based IPPs.
22. The Authority hereby directs GPPA-G to provide the Technically/financially
verified data of each generation company pertaining to previous month along-with
its next monthly FCA request, in order to ensure that any required adjustments are
made in a timely manner
23. CPPA-G in its request has also included 30.88 GWh for the Net Metering units
procured during October 2023.
24. As per data provided by CPPA-G, during October 2023 following power plants
supplied electricity to DISCOs as per their bilateral contracts;
25. Regarding fuel cost of SPPs/CPP it is important to mention that CPPA-G only
provided data of energy supplied by aforementioned SPPs/CPPs to DISCOs,
however, no fuel cost detail has been claimed / provided along-with the FCA data.
Here it is pertinent to mention that in its previous FCA requests, CPPA-G used to
include the fuel cost of energy purchased by DISCOs from SPPs and the same was
being considered while working out the monthly FCAs.
26. Here it is also pertinent to mention that while approving the Power Acquisition
Requests (PARs) for such SPPs, the Authority also prescribed an adjustment
mechanism for indexation of fuel cost component based on prevalent fuel prices.
CPPA-G in its previous monthly FCAs used to claim the fuel cost for such energy
Fuel ChargesAdjustmentforXHVISCOs
for the month of October 2023
as per the revised fuel prices, although not as per the latest prices. As CPPA-G has
not claimed any cost for the energy supplied by SPPs/CPPs, therefore, in order to
avoid piling up of costs and one time burdening of consumers, the cost for energy
supplied by SPPs during October 2023 has been accounted for based on the
reference Fuel cost component as approved by the Authority in the respective PAR
of such SPP/CPPs.
27. Based on the aforementioned discussion and in light of earlier decisions of the
Authority for FCA of May 2023 and onward, separate FCA of each DISCO after
accounting for the energy purchased from CPPA-G, bilateral contracts (Captive,
SPPs) and Net metering as part of individual basket of each DISCO has been worked
out. However, since a uniform tariff regime is in place in the country, therefore, the
Authority has also worked out a National Average Uniform monthly FCA to be
charged from all the consumers of XWDISCOs.
T&T Lose
Description Unit
CPPA-0
Pool
1-8180800
01ff.
xwrnsco.
Enagy Procured from CPPA-C Pool GWh 9,232 'II (0.22) 8,541
Fuel Cost .00080,4 rrom Pool Ru Ml, 102.214 7.859 94.358
Naticual
0,9 or psino Uric FOSCO GF.PcQ 008CO EPCO If SCO LOSCO MEPCO PESCO TESCO Q,ESCO
Avg Uoirorou
Eomgy Prootred from CPPA-C Pl GWh 1.242 809 444 290 828 1,806 1,582 950 II' 397 8,841
Energy Procured front Not M,9fliOg CWh 2,78 3.06 0.05 0.07 9.59 9.96 3.08 1.41 0.00 0.07 3088
Energy Procwmt from SPPS cwn 5.80 4.62 20,43 1,14 0.15 32.13
Total Energy CWh 1.24S 818 448 311 830 1.896 1,587 959 114 397 &604
Fuel CotS 000at,d from Pool Es. Ml, 13.220 8.936 4,905 3.207 9,065 20,834 17.482 50.578 5.255 4,382
Fuel CotS for Entogy Pr000red
though bioteral 000teucto - Ru. 5410 9., 42.8 32
Total Fuel Car S Is, Mis 13,720 8.936 4.909 3.250 9.063 20.834 17.402 10,578 1,255 4,582 94,418
Actual Fuel Coot oOmp0000t (FCC) Rs./kWh II .0235 00.9275 10,9535 80.4562 10.9195 10.9092 11.0123 11.0293 11.0472 11,0454
Referent, Fuel Cost oumpourot (FCC) 85./kWh 7.0938 7. 8938 7 .8938 7.0938 7.8938 7.8928 7.0950 7.8938 7.8938 7.8938
28. CPPA-G is directed to develop a proper mechanism for Inter DISCO settlement of
FCA worked for each XWDISCOs and the FCA charged from consumers after
consultation with DISCOS, in order to ensure proper accounting of energy and cost
of each DISCO as per their own basket.
29. The Authority, after incorporating the aforementioned adjustments, has reviewed
and assessed a National Average Uniform increase of Rs.3.0786/kWh (Annex-H) in
the applicable tariff for X\,VDISCOs on account of variations in the fuel charges for
the month of October 2023 as per the following details:
30. In view of the aforementioned, the Authority has decided that adjustment as
eferred above;
Fuel ChargesAdjustmentforXWDlSCOs
forthe month of October 2023
b. Shall be shown separately in the consumers' bills on the basis of units bified to
the consumers in the month of October 2023.
c. XWDISCOs shall reflect the fuel charges adjustment in respect of October 2023
in the billing month of December 2023.
d. While effecting the Fuel Adjustment Charges, the concerned XWDISCOs shall
keep in view and strictly comply with the orders of the courts notwithstanding
this order.
AUTHORITY
Waseem Mükhtar
Chairman
7/,;
Annex-U
Source Wise Generation
October 2023
Sources Reference Actual
GWh 96 OWls 96
Hydel 2907.35 26.34% 3,114.14 32.54%
Coal - Local 1,904.60 17.26% 1,334.01 13.94%
Coal - Imported 1,494.47 13.54% 336.16 3.51%
HSD - 0.00% - 0.00%
RFO 3.64 0.03% 0.07 0.00%
Gas 1,405.58 12.73% 703.78 7.35%
RLNG 1,204.08 10.91% 1,938.71 20.25%
Nuclear 1,606.37 14.55% 1,826.26 19.08%
Import Iran 45.00 0.41% 22.54 0.24%
Mixed 11.87 0.11% - 0.00%
Wind 199,54 1.81% 191.14 2.00%
Baggasse 39.18 0.35% 28.76 0.30%
Solar 216.05 1.96% 76.00 0.79%
0
0
0
-
I11
156,251.300I
307,532,700 I
0,028,730I
ffl
:
U
.10-I
!
CENCOJ —
I
jo.,.,,o.o lions
U_I
JOlt,0.0 honk S
-
70401.7
.J.r,*010SlotSI
jltfl. I1000Total
GENCOJI -
05310 CCSlotS1(06) ____________
00,0.0 SlatS 2 (003
.•
U
U
U,
0
•
I
.,-.
fl
a
I
§
fl1
1111
.j...,,,...,,..,..,,..,,
S5fl
1
9
=
q
I
...
-a
ro
a
§
to 4.753.325.173
P
a!
....i.,
2,211,165,040
... ..
SSI..0,,0I6
301,S55,l"
i'
321,1(5,104 325,101,004
257,358,164 317.318.154
10'L0' 006' Ii)
232,471,243 0 1.075.074)
iIHII
lcg.,11,ng 'll.M5.,lsl
602toflhl'0
q
1
F-
iflilthLfflHffl IhJH
a..
CENTRAL POWER PURCHASING AGENCY (0000)
Eoerg ProCEromerot sep.58 (Pro 18101029
o 0.0011. poe,., RING aos t6h1039 105 052,635 7164,923 168,017,508 42,020,292 . 42,020,203 202,872,928 7,104,923 210,037,001
HSD . . . - . - -
10 00600 tF0',td - CPa 214 . . 14,400 768 (809) 14,400,150 14,420,700 (601) _J,402,j,09
II LlS*I1yPOCtSl RFO 106 - . 10,000,260 (3,740) l°.!94,!99 10,,592,,209 19,504,522
RING j3.74.!}
IA Ooi1.0I• r, — . . 20,376,208 25 576 208 28,176,208 . 25376,208
(ISO - . . . , .
10 0065 - GAs 301 . . (6004) . (6,004) (9,004) . (6,004)
14 JOW.il 609.00. 26 14,206,400 0S,314,499 17,042 550 103,203,010 0 (1197.601) 9,191,000) 80,244,456 16.700,067 102 099,328
15 JOW1ll 6Sg2. 20 10,073 020 60,264,204 12,673 999 72,918,103 0 (0,002,104) __Jj,I82,l,5(9 _,5Q,264,204 11,490,810 71706,010
10 NON _ ._,(9,oaaS92,,__. 24 5 S ' ' ' '
— ' .___fl
II Cl,il101poo.t O.g.SN. 02 4,423,040 - 26,400,105 0,101,780 32,641.809, (0) 158,402 105,402 lOj869,IOO 6,340.182 22,800,290
IA Hers. 0,0.16111. 6.0260. 11 . ' - - -
00 linloillodoblelLlel1.4 6,0055. 30 - 135 000 170 977 5
-- dl 000l..IN,Ie007LirO.d E.gaS 22 . . - . .
' 000 070 on
. . - - -
27 ofllnuo.NP..e..(P.3.l .0 Cool- Impolled 1.220 - . . . . 1,232.024,420 (10,)(9S..99,19 3212,030,S70 3232,024,420 (10 789 04)) 3.212 838 070
20 009,0 P000..5.,15.rlpl Cool. Local 600 258,220,200 3,702,112,064 340,205,114 4,132,919,9L8 (1,667,070) (223,064,410) (224,731,2151 3700046086 117,140.674 3.007,757,000
20 L.weli SUgar COIlS 00.55., 41 . . - . . -
25
S 5
— -
AOTPS. OLNG ii 300,745,100 0,607,500,064 129,093,828 9,807,400,002 (97.363 047) (07,164,459)
25* 0.650332,717 139.002.916 0,700.125633
HSO — , . S .
71 RLNC 1.230 678,151100 I5,906,260,493 ' ._.:_ S_ - ' --
0.7.119.0.40105.6 273 504331 10.239,826 727 (206,080.070) ' (200,000 070) 15.670.100,415 271,506,224 10,643740649
,an Iso . . - ' ' ' -
2? Olala,0 860.2010 egO EO.1.ylPOR Lid Coal. mpo,1e4 1320 - . . . . 475.090 040 13300400 409,270,440 475,010,044 13.360.400 409,270,442
00 8.1011 RING 1,320 582,017,100 13,700,722.133 262,122,695 14,012,854,828 (273,164,244J - (273,164,244) 13,477057,009 262,132.615 12,739,600,004
20* (ISO . . . . . .
01 Pot0.oie Coal. ImpolS 0.320 49.344 700 609153070 18.820.665 00±,9,22,755 07,442,917 _Q8.29!) 01.350,710 072,649907 18.731.400 tO1.373.4. 9,
02 L00000l.nRlCP0,t.200n,FFOVU,010.4 CO2Llmpo0e4 000 286817000 2,970403.350 108120,009 3683,533,365 (731,!( 09704,801 88072102 S,5)971.6j0 107,034,060 3,772,906,470
03 P0,1.6mM?..! POe., Malta LUr,16.d OLNG (.120 240,430 000 5643,394.251 70,490,080 9719,085,240 (2,56,902,202) (I) __.._jeS9,99)(99) 5.086.411,088 70490,080 5)62,802,040
04 152IE9099U,no.d Co.i.L000l 330 200083000 2155880,800 108089073 2313074761 (1356 flfl 113,417060 112000058 2189,9,2(j06 271,003.054 2,456030,449
05 nalO7.ie100k.1 Pow., O.fl.t.000000pal Cool. Local 1.320 187568,600 8,138,226 907 525071.089, 8,003,200 902 20,402,540099 732,409,033 20,130.835,032 33,044.570 968 1,207,080,610 25902124,209
0* 1I..iuoe. Poo..rll..rlPst) LW Coal. LoS 310 00,130,100 9,730,430,424 69,838.703 1,800,009,127 92170 60001139 80,003.008 1.730.402.093 199,590,442 1,880,073,030
506.00321: 00,237 3,730,202,009 67,149,300,027 3,072,002,377 60,320,204,064 20,252,067,054 79S.140,760 29,992,012,182 . 92,008,308,700 2.000,058,tds 98,474,170,046
0103 TONI:. 22,034 0,013,968,809 76.704.040.663 2.402417,640 72,200,406.303 10,324,070.976 793,730.004 20,002,300403 . 000,031,028,642 3,186,156.054 008.334.754,766
170.0089. 0.. 26 - . -.
20,6 WINd 50 -- 6,721,710
Prone, Clod 50 4,890.350
001 Wad 50 6,430,200
P0002.901 WInd 50 5.62,2,200
Wild 53 2,713,156
yOliflusEyo.yLtd., 00.2 50 - 3.090,320
M.5000..d!aH0.l 9004 00 6,025,150
5IiAEN.200112P0009, Wad 50 2,004,560
1 652100 WIld PCW•0 WIld 50 --
5.0.;. 5.0.0.0 0004
-- 1 50 3926,420
I lapel 00102 - WOd SI 4,404,400
I 0.3,07510.9.00,02 Pow., (FF10420 UiHiI.d (tOad 50 2,022,020 -
I grotwInd WOOd 50 6,534,542
I UEPLWitd 0004 99 - 8,163,402
I suld.o4da000l.,P.,6 0.6.0 109 93900,090
I 0.ilo 001.0 P800 - 5.0.1 130 14,574,350 . . . - - -
I 8810iae 8,0100 Solar 1730 93,672,075 . .
I 0?nlrae,00 00580 130 14,633,210 , ail.)I - (I
.
: _____________
1. aaPO9ed 101a 50 10.687,031 J'___ ".fl . -
00
24
Jh.rcio VII,.
AOWEVIIS
(Sled
9412
30
50
4,091 .300
4757400
fl
Co
2€
101
155
VOId
VOId
50
50
4,355,320
4,301,083
ICY
flfli,3,LSipJflj 7.
27 10000 80.10,5 WIld 30 9,210,121 ''3' '
- .
05 10070 60.1.1.0 50 0,032,470 . . .
-
01
Ia
I00008O5l0l.0
0000900902
, 50
50 9120064 .
I-__-
ps fl¼ a
i'.*
.70005 ,00P01
"
51 P.004.000661.0 Ee.IUp.O URO.d SO 0 .38,340 . .
02 . ,
unoe,,r..080.I5yLU1S.d . 50 4,697,020 . . - .
88 LIoNy 8,0.0.301,0 (P110.1.) LAo02d 50 4,940,420 .
84 9.012 05 VOId (P50 1.12. ' 00 9,222,800 . j, • __
80
58
70*0000702 P's,.1 IPsO LId.
MU. WIld 502009 Ltd.
OAIIS
0002
CO
50
4,972,440
0 33,060
.
.
" A's
_"tj,, a',
11 L.6581d. 80.050 02041.4 00804 50 9,901090 .
IS LIS,0IYNMPIO0.PIUd. 02102 50 4,768,590 . -
80 00 07.1.9 Lid. - 08.4 50 4,793,030 . . .
00 oUlfrjiil.dskcSloLimilad 001,4 CO 5,086,580 . , . -
41 Ala. Solar Lunilad 505., 149 15.001,400 . . . '
dl U6.UlWI0dP,o..l.Ui)P,t)L00. 00110 109 4,472,320 . . . , .
13 tI00800l.0tEO5089LUN6.d 1.114 50 5.399,020 . . . ' .
44 M•50 WIld POW., U000d 92nd 50 7,618,970 . ' ' ' ' ' '
000.P.W 2,893 207,039,538 . . . . . . .
C-Total: 40,924 9,970,290,271 75,066,726.000 3,039,208,228 82,005,014,331 28,324,010,079 00,004,227 19.123,504,208 . 007,300,308,004 3,938,293,453 101,220,098,937
1o4t
CENTRAL POWER PURCHASING AGENCY ICPPA)
STEER Procurement Repoll )ProV)SI002I)
For Ore Month of October 2023
Fuel
0088
FreE.22l05n.rr A Fuel COST
P,.2,04jHNSnarrH FreE. 04105640, In EPP Total Fuel Cost Total VRAM
560. POOer ProduCErS Fuel Capacity Energy EVIl, on..9., en nypi,, ,.,,s p..) Tonal
(MW) EN. I N.) n.. RN. OS. Energy Cost
IRS.) --
Summary -
Ordal 3,114.144044 . 259,040.801 350040,001 - 0,585712 5260713 - 364,306,814 364.306,814
2 CCaLLOOaI 1,234,011,400 16,111,000 163 1 093,00l,flS 17239 881,938 25,403,377,108 112 781,313 26118,180 681 41 550,237,331 1,805 isSue 43350030,618
Co.LlepN,rNd 336,161,700 4,400,586,420 128,050,514 4057,554,103 3.795.259 627 83,989,203 3078,440,010 8,2SS,0tt,5,0 210,140,877 8.405,998,042
3 058 . - - -
ER. (1,225,722) 2,570752 180575 2707327 141811038 (7020) 141804912 144305691 173549 144,862,240
S 703,776,762 1,575,40e,488 642 087,240 10,217 875 ,2e 10.201 107) (4,779) (9,205,578) 0,500 287 351 642002,409 10208360,600
rule 1,938,704,704 41,944,727.641 181,213,654 10720 941,595 (983142,220) (932) (903 943 952) 44969 080721 701,212,722 41.74Z798.443
_40!_
6 0ornr 1,520,264,000 2,249,222,295 . 2,241,222,215 )23,528,431) . (23 525,437) 2,211696.7Th . 2,217606775
7 le,p,,ttronl..n 22,039,200 522,184,539 . 522,954,530 . . . 522,184539 . 502,184,530
0 WInd POWEr 191,140,047 , . , - - -
9 Sole, 70908691 - - . . . '
10 e.aaee. 28,793,595 172,040,578 36,804,507 208874500 )0( )2,221,472) 12221,472) 172 089 578 34,583,035 206,652,013
VolS1 POE The mOntfl 9,570,278,271 78,005,726,105 3,039,285,236 02,105,514 231 26,324,579,979 199 004,227 29,123,084.206 107 310,306,084 3,038,292,453 111,228,592,037
PreC. Ad] 56n.nTe 28,324.579 979 789,004,227 21,123,084,206
090540 TOTALS, 9,575,275,275 107,300,306,004 3,030,202,453 111228090037
To Be Published in
Official Gazette of Pakistan Part-Il
NOTIFICATION
Actual National Avg. Uniform Fuel Charge Component for Rs. 10.9724/kwh
October 2023 for XWDISCOs Consumers
Corresponding Reference Fuel Charge Component Rs.7 .893 8/kWh
National Avg. Uniform Fuel Price Variation for the month of R3.O786/kwh
October 2023 - Increase for XWDISCOs Consumers
3. While effecting the Fuel Adjustment Charges, the concerned XWDISCOs shall
keep in view and strictly comply with the orders of the courts notwithstanding this order.