Professional Documents
Culture Documents
1. Design
The design will incorporate Supplier & Valmont’s accumulative
knowledge in PG-20 Slat Conveyor and best practices in One
Flow Technologies.
2. Machine Overview
Mechanical, Electrical/Electronic Design. According to
ANSI/CEMA, NOM, IEC, for the design of the Motorized Slat
Conveyor, coupled with chains and activated with a gear motor
supported by cam followers or roller, on/off control with VFD,
including safety package according to ISO, OSHA Safety
Machinery Standard.
3. Technical Data
• Bed Speed – 0 to 100 IPM VFD Controlled, Reversible,
Overloaded Protection (Mechanical and Electrical)
• Pull-E-Stop in Both sides of the Slat Conveyor.
• E-Stop Synchronized with previous and next Roller
Conveyors and Burn Table PG-30.
• Capacity 15 Tons for 14' x 62' single plates or 2 x 7' x 62'
double plates (Thickness until 7/8")
• Table Size Width: 14' x Length 62' - 4"" x Height (3' to 4'
Adjustable)
• Gear-Motor with enough power to easily move 15 Ton Raw
Material plus all the Slats and Chains weight.
4. Capabilities
• Capacity 15 Tons for 14' x 62' single plates or 2 7' x 62'
double plates (Thickness until 7/8")
• Table Size Width: 14' x Length 62' - 4" x Height (3' to 4'
Adjustable)
5. Footprint at Max
• Height – 3’ to 4’ (Adjustable)
• Length – 62’ – 4”
• Width – 14’
6. Systems
• Slat movement controlled by VFD (Forward and Backward
movements).
• Jogging ON/OFF Controlled with Fix and Remote Push
Button Stations.
• Mechanical devices to adjust alignment of Drums, Shafts,
Pulleys, and Gears.
• Safety devices to provide a safe operation for all Valmont’s
employees.
7. Paint
• Valmont Standard Blue for structural components with
• Valmont Standard Orange - for moving and sub-components
• Yellow – Safety call outs
• Note: Use Valmont Color Code.
8. Safety
• The machine will be designed and built in compliance with
Valmont Global EHS Standards HS-05 Machinery Safety
Std, ANSI B11.19 and applicable OSHA safety standards
unless otherwise specified by the customer.
9. Documentation
• The information below will be supplied at the time of
installation to the final customer.
Operations Manual
Hazardous Energy Control (LOTO procedure)
Mechanical Schematics
Electrical Schematics
Recommended preventative maintenance schedule
Consumable & critical spare parts listing
10. Assumptions
• Customer will provide utilities (electrical) to the machine
location.
Electrical 460 volts / 60 hz.