MAY
S.No. ITEMS DESCRIPTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 FLOORINGS TILES
2 AEROCON PARTITIONS INTERNAL
3 ELECTRICAL
4 PLUMBING
5 FIRE
6 HVAC COPPER PIPING
7 CONCEALED UNITS
8 DRAIN LINES
9 DUCTS
10 OXYGEN
12 FLOORING VINYL
13 WALL CLADDING TILES
14 WALL PUTTY
15 WOODEN DOORS WITH WOODEN FRAM
16 WPC DOORS GRANITE FRAMES
17 UPVC WINDOWS
18 FIXED GLASS EXTERNAL
19 GLASS PARTITIONS INTERNAL
20 O.T WALLS AND DOORS
21 LIFT
22 FALSE CEILING GYPSUM
23 FALSE CEILING CALCIUM SILICATE
24 LIGHTING
25 WALL GAURDS
26 PAINTING
27 ELEVATION TEXTURES OR COLORS
28 EXTERNAL LIGHTING
29 FABRICATION RAILINGS
30 PERGOLAS
31 SUPPORTS
32 ELEVATION DETAILS
33 EXTERNAL FLOORING
34 PARKING LINE MARKING
35 HVAC GRILLS INSTALLATION
36 UNITS INSTALLATION
37 FIXED FURNITURE
38 LOOSE FURNITURE
39 SIGNAGES