The daily report from the PDS godown in Ghevranarela on November 11, 2023 includes: 1) Details on the timing of entry and exit of first and last PDS trucks along with weighing operations; 2) Issues faced with FCI and NIC servers; 3) Number of trucks taking single and multiple trips; 4) Notes on any issues at FCI and DSCSC levels; and 5) A suggestion to combine lifting operations for PDS in Ghevra and Narela.
The daily report from the PDS godown in Ghevranarela on November 11, 2023 includes: 1) Details on the timing of entry and exit of first and last PDS trucks along with weighing operations; 2) Issues faced with FCI and NIC servers; 3) Number of trucks taking single and multiple trips; 4) Notes on any issues at FCI and DSCSC levels; and 5) A suggestion to combine lifting operations for PDS in Ghevra and Narela.
The daily report from the PDS godown in Ghevranarela on November 11, 2023 includes: 1) Details on the timing of entry and exit of first and last PDS trucks along with weighing operations; 2) Issues faced with FCI and NIC servers; 3) Number of trucks taking single and multiple trips; 4) Notes on any issues at FCI and DSCSC levels; and 5) A suggestion to combine lifting operations for PDS in Ghevra and Narela.
PERFORMA FOR DAILY REPORTING BY INCHARGE POSTED AT PDS GODOWN
Date of Report:-..11-2023... S. NO. PARTICULARS REPORTREMARKS
1. Name of PDS Godown GHEVRANARELA
2 Time of entry of first PDS 09:29 A.M.
truck in godown 3. Time of starting of 10:05 A.M. weighbridge 4 Tine of exit of first PDS truck 11:20 A.M. from Godown 5. Time of entry of last PDS 03:50 P.M. truck in godown 6. Any Problem faced due to FCI Server 7 Any Problem faced due to NIC Server 8 How many PDS trucks taken 21 only single trip 9 How many PDS trucks taken 8 multiple trips 10. Issues at FCI level
11. Issues at DSCSC level
12, Suggestions, if any
COMBINED LIFTING FOR PDS GHEVRA (NARELA AND GHEVRA).