2 1-Mar-23 18:29 UPT PULOGADUNG GIS 150KV PRIOK BARAT 5A5 DIAMETER#5 150kV
3 1-Mar-23 18:29 UPT PULOGADUNG GIS 150KV PRIOK BARAT 5A7 DIAMETER#7 150kV
4 1-Mar-23 18:29 UPT PULOGADUNG GIS 150KV PRIOK BARAT 5AB5 DIAMETER#5 150kV
5 1-Mar-23 18:29 UPT PULOGADUNG GIS 150KV PRIOK BARAT 5AB7 DIAMETER#7 150kV
7 3-Mar-23 20:15 UPT PULOGADUNG GIS 150KV PEGANGSAAN PHT 150kV NEW PLUMPANG#2
8 3-Mar-23 20:15 UPT PULOGADUNG GIS 150KV NEW PLUMPANG PHT 150kV PEGANGSAAN#2
9 3-Mar-23 20:15 UPT PULOGADUNG GIS 150KV PEGANGSAAN PHT 150kV NEW PLUMPANG#1
10 3-Mar-23 20:15 UPT PULOGADUNG GIS 150KV NEW PLUMPANG PHT 150kV PEGANGSAAN#1
11 5-Mar-23 20:53 UPT DURI KOSAMBI GIS 150KV LONTAR 5AB4 DIAMETER#4 150kV
13 5-Mar-23 20:53 UPT DURI KOSAMBI GIS 150KV LONTAR 5A4 DIAMETER#4 150kV
15 7-Mar-23 14:32 UPT DURI KOSAMBI GI 150KV BALARAJA TRF#1 150/20kV (INC)
17 9-Mar-23 10:02 UPT DURI KOSAMBI GIS 150KV MUARAKARANG BARU 5AB6 DIAMETER #6 150KV
18 9-Mar-23 10:02 UPT DURI KOSAMBI GIS 150KV MUARAKARANG BARU GT 1.3 (A6)
19 9-Mar-23 10:02 UPT DURI KOSAMBI GIS 150KV MUARAKARANG BARU 5A6 DIAMETER #6 150KV
20 13-Mar-23 15:10 UPT CILEGON GI 150KV RANGKASBITUNG BARU PHT 150kV SAKETI#2
21 13-Mar-23 15:10 UPT CILEGON GI 150KV SAKETI PHT 150kV RANGKASBITUNG BARU#2
22 14-Mar-23 6:33 UPT DURI KOSAMBI GI 150KV PASARKEMIS TRF#1 150/20kV (INC)
23 15-Mar-23 0:23 UPT DURI KOSAMBI GISTET 500KV KEMBANGAN 7B4 DIAMETER#4 500KV
24 15-Mar-23 0:23 UPT DURI KOSAMBI GISTET 500KV KEMBANGAN PHT 500kV BALARAJA#2
25 15-Mar-23 0:23 UPT DURI KOSAMBI GISTET 500KV KEMBANGAN PHT 500kV BALARAJA#1
26 15-Mar-23 0:23 UPT DURI KOSAMBI GISTET 500KV KEMBANGAN 7B3 DIAMETER#3 500kV
27 15-Mar-23 0:23 UPT DURI KOSAMBI GISTET 500KV KEMBANGAN 7AB4 DIAMETER#4 500KV
28 15-Mar-23 0:23 UPT DURI KOSAMBI GISTET 500KV KEMBANGAN 7AB3 DIAMETER#3 500KV
29 15-Mar-23 11:12 UPT PULOGADUNG GISTET 500KV PRIOK 7AB3 DIAMETER#3 500 kV
31 15-Mar-23 11:12 UPT PULOGADUNG GISTET 500KV PRIOK 7A3 DIAMETER#3 500 kV
32 22-Mar-23 1:02 UPT CILEGON GI 150KV BAYAH PHT 150kV PELABUHAN RATU#2
33 22-Mar-23 1:02 UPT CILEGON GI 150KV BAYAH PHT 150kV PELABUHAN RATU#1
34 24-Mar-23 5:02 UPT PULOGADUNG GI 150KV PULOGADUNG PHT 150kV NEW PULOGADUNG#2
35 24-Mar-23 5:02 UPT PULOGADUNG GIS 150KV NEW PULOGADUNG PHT 150kV PULOGADUNG #2
36 26-Mar-23 15:06 UPT CAWANG GITET 500KV DEPOK PHT 500kV BANDUNG SELATAN
38 27-Mar-23 10:36 UPT DURI KOSAMBI GISTET 500KV KEMBANGAN 7AB1 DIAMETER#1 500kV
39 27-Mar-23 10:36 UPT DURI KOSAMBI GISTET 500KV KEMBANGAN PHT 500kV GANDUL#1
40 27-Mar-23 10:36 UPT DURI KOSAMBI GISTET 500KV KEMBANGAN 7A1 DIAMETER#1 500kV
41 27-Mar-23 10:36 UPT CAWANG GITET 500KV DEPOK PHT 500kV GANDUL #2
42 27-Mar-23 10:36 UPT CAWANG GITET 500KV GANDUL 7A1 DIAMETER #1 500kV
43 27-Mar-23 10:36 UPT CAWANG GITET 500KV GANDUL 7AB1 DIAMETER #1 500kV
44 27-Mar-23 10:36 UPT CAWANG GITET 500KV GANDUL 7B2 DIAMETER #2 500kV
45 27-Mar-23 10:36 UPT CAWANG GITET 500KV GANDUL 7B3 DIAMETER #3 500kV
46 27-Mar-23 10:36 UPT CAWANG GITET 500KV GANDUL 7B4 DIAMETER #4 500kV
47 27-Mar-23 10:36 UPT CAWANG GITET 500KV GANDUL 7B5 DIAMETER #5 500kV
49 27-Mar-23 10:36 UPT CAWANG GITET 500KV GANDUL PHT 500kV KEMBANGAN #1
50 27-Mar-23 10:36 UPT CAWANG GITET 500KV GANDUL 7B6 DIAMETER #6 500kV
51 27-Mar-23 10:38 UPT CAWANG GITET 500KV DEPOK PHT 500kV BANDUNG SELATAN
52 27-Mar-23 14:27 UPT DURI KOSAMBI GI 150KV MUARAKARANGBARU 5A5 DIAMETER#5 150kV
53 27-Mar-23 14:27 UPT DURI KOSAMBI GI 150KV MUARAKARANGBARU 5AB5 DIAMETER#5 150kV
54 27-Mar-23 14:27 UPT DURI KOSAMBI GI 150KV MUARAKARANGBARU GTG 1.1 (53A)
56 29-Mar-23 15:11 UPT PULOGADUNG GIS 150KV PRIOK BARAT 5A5 DIAMETER#5 150kV
58 29-Mar-23 15:11 UPT PULOGADUNG GIS 150KV PRIOK BARAT 5AB5 DIAMETER#5 150kV
59 30-Mar-23 3:11 UPT DURI KOSAMBI GI 150KV CILEDUG TRF#2 150/20kV (INC)
61 30-Mar-23 16:00 UPT CAWANG GISTET 500KV CAWANG BARU PHT 500kV BEKASI
62 30-Mar-23 16:00 UPT PULOGADUNG GITET 500KV BEKASI 7B1 DIAMETER#1 500kV
63 30-Mar-23 16:00 UPT PULOGADUNG GITET 500KV BEKASI 7AB1 DIAMETER#1 500kV
64 30-Mar-23 16:00 UPT PULOGADUNG GITET 500KV BEKASI PHT 500kV CAWANG
66 31-Mar-23 6:15 UPT DURI KOSAMBI GI 150KV JATAKE TRF#1 150/22kV (INC)
67 31-Mar-23 6:15 UPT DURI KOSAMBI GI 150KV JATAKE TRF#2 150/22kV (INC)
68 31-Mar-23 19:28 UPT DURI KOSAMBI GIS 150KV GROGOL TRF#2 150/22kV (INC)
Laporan Gangg
GGN Line
Tegangan MVA Kd Aset Kategori
KTT
150kV TL5 TIDAK GANGGUAN PEMBANGKIT
BENDA LAIN => UNCONTROLABLE (SYSTEM FAULT) Distance Trip fasa S-T Trip
BENDA LAIN => UNCONTROLABLE (SYSTEM FAULT) Distance Trip Z1 fasa S-T Trip
BENDA LAIN => UNCONTROLABLE (SYSTEM FAULT) Differential Trip fasa R-S Trip
LAIN-LAIN => UNCONTROLABLE (SYSTEM FAULT) Differential Trip fasa R-S Trip
PETIR => CONTROLABLE SISI TT/TM (SYSTEM FAULT) Distance Z1 Fasa R-N, FL 26,03 km Reclose Sukses
PETIR => CONTROLABLE SISI TT/TM (SYSTEM FAULT) Distance Z1 Fasa R-N , FL 10,10km Reclose Sukses
GANGGUAN BUSBAR 20 KV => UNCONTROLABLE (SYSTEM
FAULT) OCR Momen 20kV Trip
TELEPROTEKSI => CONTROLABLE SISI SEKUNDER (NON 21 Receive DEF Receive Lockout K408 & K409 master trip BF AB :
SYSTEM FAULT) External Trip BF B : External Trip Trip
T/L - RANGKAIAN KONTROL TRIP => CONTROLABLE SISI 21 Receive DEF Receive Lockout K408 & K409 master trip BF AB :
SEKUNDER (NON SYSTEM FAULT) External Trip BF B : External Trip Trip
TELEPROTEKSI => CONTROLABLE SISI SEKUNDER (NON 21 Receive Lockout K408 & K409 master trip BF AB : External Trip
SYSTEM FAULT) BF B : External Trip Trip
TELEPROTEKSI => CONTROLABLE SISI SEKUNDER (NON 21 Receive Lockout K408 & K409 master trip BF AB : External Trip
SYSTEM FAULT) BF B : External Trip Trip
TELEPROTEKSI => CONTROLABLE SISI SEKUNDER (NON 21 Receive DEF Receive Lockout K408 & K409 master trip BF AB :
SYSTEM FAULT) External Trip BF B : External Trip Trip
TELEPROTEKSI => CONTROLABLE SISI SEKUNDER (NON 21 Receive Lockout K408 & K409 master trip BF AB : External Trip
SYSTEM FAULT) BF B : External Trip Trip
PETIR => CONTROLABLE SISI TT/TM (SYSTEM FAULT) Distance Reclose Sukses
DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) LCD fasa S Trip
DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) LCD fasa SPhasa T - N - Fault Locator : 8.5 KM sekitar tower 645 -
- Distance Trip
646 12.1 KM sekitar tower 637 - 636 - Data TWS : 19.36 KM sekitar
PETIR => CONTROLABLE SISI TT/TM (SYSTEM FAULT) tower 619 - 618 Reclose Sukses
LCD main A : -trigger -trip -arc init -dif trip -z1 trip -cb1 R close -cb1 T
AKIBAT PEKERJAAN PIHAK LAIN => UNCONTROLABLE closemain
LCD LCD Amain B : -power
: -trigger swing
-trip -arc init block -F87L
-dif trip operated
-z1 trip -cb1 R-21soft.op
close -cb1- T
(SYSTEM FAULT) cb1 trip
close A -cb1
LCD maintripB :B-power
-cb1 trip C block -F87L operated -21soft.op - Trip
swing
AKIBAT PEKERJAAN PIHAK LAIN => UNCONTROLABLE cb1 trip A -cb1 trip B -cb1 trip C Fault Location : 20.70km Arus
(SYSTEM FAULT) gangguan
LCD main :A13 kA
: -trigger -trip -arc init -dif trip -z1 trip -cb1 R close -cb1 T Trip
AKIBAT PEKERJAAN PIHAK LAIN => UNCONTROLABLE close LCD main B : -power swing block -F87L operated -21soft.op -
(SYSTEM FAULT) cb1 trip A -cb1 trip B -cb1 trip C Trip
BELUM DIKETAHUI => UNCONTROLABLE (SYSTEM FAULT) DIFG, TRIP ABC Reclose Sukses
AKIBAT PEKERJAAN PIHAK LAIN => UNCONTROLABLE Relay LCD MAIN A - DIFF TRIP - Z1 Trip fasa R - FL - 15 KM - DIF-
(SYSTEM FAULT) A Relay CBF 7A1 dan 7AB1 - trip Trip
AKIBAT PEKERJAAN PIHAK LAIN => UNCONTROLABLE Relay LCD MAIN A - DIFF TRIP - Z1 Trip fasa R - FL - 15 KM - DIF-
(SYSTEM FAULT) A Relay CBF 7A1 dan 7AB1 - trip Trip
PETIR => CONTROLABLE SISI TT/TM (SYSTEM FAULT) Line Diff Main A, Line Diff Main B Reclose Sukses
PETIR => CONTROLABLE SISI TT/TM (SYSTEM FAULT) Line Diff Main A, Line Diff Main B Reclose Sukses
GANGGUAN BUSBAR 20 KV => UNCONTROLABLE (SYSTEM
FAULT) OCR LV Phasa ST LOCK OUT VAJ96 H Trip
GANGGUAN BUSBAR 20 KV => UNCONTROLABLE (SYSTEM
FAULT) OCR LV Phasa ST LOCK OUT VAJ96 H Trip
GANGGUAN BUSBAR 20 KV => UNCONTROLABLE (SYSTEM
FAULT) OCR LV Phasa ST LOCK OUT VAJ96 H Trip
GANGGUAN PENYULANG => UNCONTROLABLE (SYSTEM
FAULT) EF/GF Trip Trip
WA BAGIAN BARAT
t 2023
Tidak Meluas Terjadi gangguan pada Trafo PS GT 2.2 PLTGU Priok Proteksi Benar
Tidak Meluas Counter PMT: R : 305 ke 306 S : 297 T : 295 cuaca hujan petir Proteksi Benar
cuaca hujan petir Counter PMT: R : 242 ke 243 S : 225 T : 194 Proteksi Benar & Teleproteksi Benar
Gangguan bersamaan dengan sambaran petir disekitar GITET
Tidak Meluas GangguanDari
Balaraja. bersamaan dengan ditemukan
hasil investigasi ledakan pada busbar wiring
rangkaian 20kV TP yang Proteksi Benar
tidak sesuai,
Gangguan dimana memungkinkan
bersamaan terjadinya
dengan sambaran mala kerja
petir disekitar apabila
GITET
terdapat sambaran
Balaraja. Dari hasil petir, dimana
investigasi commonrangkaian
ditemukan menggunakanwiring+48(GND)
TP yang Proteksi Benar & Teleproteksi Salah
tidak sesuai,
Gangguan dimana memungkinkan
bersamaan terjadinya
dengan sambaran mala kerja
petir disekitar apabila
GITET
Tidak Meluas terdapat sambaran
Balaraja. Dari hasil petir, dimana
investigasi commonrangkaian
ditemukan menggunakanwiring+48(GND)
TP yang Proteksi Benar & Teleproteksi Salah
tidak sesuai,
Gangguan dimana memungkinkan
bersamaan terjadinya
dengan sambaran mala kerja
petir disekitar apabila
GITET
terdapat sambaran
Balaraja. Dari hasil petir, dimana
investigasi commonrangkaian
ditemukan menggunakanwiring+48(GND)
TP yang Proteksi Benar & Teleproteksi Salah
tidak sesuai,
Gangguan dimana memungkinkan
bersamaan terjadinya
dengan sambaran mala kerja
petir disekitar apabila
GITET
terdapat sambaran
Balaraja. Dari hasil petir, dimana
investigasi commonrangkaian
ditemukan menggunakanwiring+48(GND)
TP yang Proteksi Benar & Teleproteksi Salah
tidak sesuai, dimana memungkinkan terjadinya mala kerja apabila
terdapat sambaran petir, dimana common menggunakan +48(GND) Proteksi Benar & Teleproteksi Salah
Gangguan bersamaan dengan sambaran petir disekitar GITET
Balaraja. Dari hasil investigasi ditemukan rangkaian wiring TP yang
tidak sesuai, dimana memungkinkan terjadinya mala kerja apabila
terdapat sambaran
Penyebab gangguanpetir, dimana
: Fuel common menggunakan
Gas Compressor +48(GND)
B, indikasi katup ITV Proteksi Benar & Teleproteksi Salah
(inlet trotle valve) close, Gangguan tersebut tidak mengakibatkan
pemutusangangguan
Penyebab pelayanan: Fuel
beban Distribusi.
Gas Compressor B, indikasi katup ITV Proteksi Benar
(inlet trotle valve) close, Gangguan tersebut tidak mengakibatkan
pemutusangangguan
Penyebab pelayanan: Fuel
beban Distribusi.
Gas Compressor B, indikasi katup ITV Proteksi Benar
(inlet trotle valve) close, Gangguan tersebut tidak mengakibatkan
pemutusan pelayanan beban Distribusi. Proteksi Benar
Info darihujan
Cuaca pihakderas
KIT gangguan disebabkan
disertai petir dan anginoleh Ann Loss
kencang. Of GI
Di sisi Flame Proteksi Benar
Sukatani bay Bekasi #2 PMT posisi open.Setelah dilaksanakan
Info dari pihak
investigasi KIT gangguan
di lapangan disebabkan
ditemukan adanyaoleh Annasing
benda Loss/ Of
atapFlame Proteksi Benar
spandex yang terbang pada ruas Sukatani-Kosambi Baru 2.
Info dari pihak
Gangguan KIT gangguan
tersebut disebabkan pemutusan
tidak mengakibatkan oleh Ann Loss Of Flame
pelayanan Proteksi Benar
beban Distribusi. Jaringan SUTT 150kV Sukatani-Bekasi merupakan
Aset wilayah
Penyebab UIT JBTakibat Gangguan di Sistem Instrumen Control
gangguan Proteksi Benar
dikarenakan ada masalah di Card Komunikasi. Gangguan tersebut
tidak mengakibatkan
Penyebab gangguan pemutusan pelayanan
akibat Gangguan bebanInstrumen
di Sistem Distribusi.Control Proteksi Benar
dikarenakan ada masalah di Card Komunikasi. Gangguan tersebut
tidak mengakibatkan
Penyebab gangguan pemutusan pelayanan
akibat Gangguan bebanInstrumen
di Sistem Distribusi.Control Proteksi Benar
dikarenakan ada masalah di Card Komunikasi. Gangguan tersebut
tidak mengakibatkan
Gangguan bersamaanpemutusan pelayanan
dengan gangguan beban Distribusi.
penyulang yaitu pada Proteksi Benar
penyulang siswa dan reaktor. Gangguan menyebabkan flash antar
elemen danbersamaan
Gangguan flash pada dengan
NGR gangguan penyulang yaitu pada Proteksi Benar
penyulang siswa dan reaktor. Gangguan menyebabkan flash antar
elemen
PHT dan Bekasi
500kV flash pada NGRsukses cuaca hujan deras disertai petir,
Reclose Proteksi Benar
dari rekaman Vaisala diduga Petir COUNTER AR CB AB : 148-149
CB B : 159-160 Proteksi Benar
Saat gangguan cuaca hujan deras disertai petir. Proteksi Benar
1. Lampirkan rekaman gangguan (pdf dan Zip) 2. Lampirkan Berita UNCONTROLABLE (SYSTEM FAULT)
Acara Investigasi Gangguan (dokumen vaisala, hasil uji SF6, hasil uji
pentanahan) 3. Lampirkan Berita Acara Tindak Lanjut Gangguan UNCONTROLABLE (SYSTEM FAULT)
6-Mar-23 4,51
6-Mar-23 4,51
6-Mar-23 4,50
6-Mar-23 4,51
6-Mar-23 4,50
6-Mar-23 4,51
7-Mar-23 3,59
6-Mar-23 3,06
6-Mar-23 3,05
6-Mar-23 3,06
6-Mar-23 0,68
6-Mar-23 0,68
6-Mar-23 0,68
13-Mar-23 6,51
13-Mar-23 5,96
13-Mar-23 4,96
3-Apr-23 25,18
3-Apr-23 25,18
3-Apr-23 25,18
14-Mar-23 0,84
14-Mar-23 0,84
20-Mar-23 6,36
21-Mar-23 6,30
21-Mar-23 6,29
21-Mar-23 6,29
21-Mar-23 6,30
21-Mar-23 6,29
21-Mar-23 6,30
16-Mar-23 0,90
16-Mar-23 0,90
16-Mar-23 0,89
24-Mar-23 2,40
24-Mar-23 2,40
24-Mar-23 0,26
24-Mar-23 0,26
27-Mar-23 0,78
28-Mar-23 0,85
28-Mar-23 1,01
28-Mar-23 1,01
28-Mar-23 1,01
28-Mar-23 0,85
28-Mar-23 0,82
28-Mar-23 0,82
28-Mar-23 0,82
28-Mar-23 0,83
28-Mar-23 0,83
28-Mar-23 0,83
28-Mar-23 0,82
28-Mar-23 0,80
28-Mar-23 0,83
28-Mar-23 0,84
3-Apr-23 7,00
3-Apr-23 7,00
27-Mar-23 0,05
27-Mar-23 0,05
30-Mar-23 1,26
30-Mar-23 1,26
30-Mar-23 1,26
30-Mar-23 0,45
30-Mar-23 0,44
31-Mar-23 0,78
30-Mar-23 0,23
30-Mar-23 0,23
30-Mar-23 0,23
3-Apr-23 3,19
3-Apr-23 3,33
2-Apr-23 2,70
3-Apr-23 2,62