You are on page 1of 1

R.

GEN SET
±0,00
KEMENTRIAN RISET,TEKNOLOGI,DAN PENDIDIKAN TINGGI
UNIVERSITAS PALANGKARAYA
DAPUR
KM/WC KM/WC KM/WC JURUSAN TEKNIK SIPIL
±0,00
-0.05 -0.05 +3.73 2023
JUDUL TUGAS BESAR
MUSHOLA
+3.80 Perencanaan dan Rekayasa
Bangunan Gedung

DI GAMBAR OLEH

1. Lucky Pe r an 203020501075
R. ARSIP
2.Pr stant Ocata a Ra a eng 203020501078
R. STAF ±0,00
3.Aru C o a Nuran sa 203020501082
±0,00
.E a et C r st ne Wakary 203020501087
R. UPK 5.R cky Josua Rena dy 203030501139
±0,00
ASISTEN PEMBIMBING TUGAS BESAR

KM/WC
-0,05 R. RAPAT
+3.78
R. TAMU/KASIR
DWI TIUN NOVYEREMIA
±0,00 NIM. 193010501031
R. BKAD
DOSEN PEMBIMBING TUGAS BESAR
±0,00

BALKON OKTA MEILAWATY, S.T., M.T.


TERAS DEPAN NIP. 197705052005012022
+3.76
-0.02 KOORDINATOR MATA KULIAH

Ir. Maryanto, M.T.


NIP. 19660308199321001

KETERANGAN GAMBAR

DENAH RENCANA INSTALASI AIR


KOTOR

SKALA GAMBAR

TAMAN
-0,40
1:133
KODE GAMBAR

KETERANGAN LEGENDA DI LT. 1 KETERANGAN LEGENDA DI LT. 2

BIO SEPTIC TANK (1 Bh) BIO SEPTIC TANK (1 Bh) A16


CLOSED JONGKOK (2 Bh) CLOSED JONGKOK (1 Bh)
NOMOR GAMBAR
FLOOR DRAIN (3 Bh) FLOOR DRAIN (1 Bh)

JALUR AIR KOTOR (PIPA 4") JALUR AIR KOTOR (PIPA 4)


JALUR AIR LIMBAH (PIPA 2") JALUR AIR LIMBAH (PIPA 2") 16

You might also like