Professional Documents
Culture Documents
Vertical
Floor hiegh (mm)
Block
LMR 3500
L46 6450 21000
L45 3300
L44 3200
L43 3200
L42 3200
L41 3200
L40 3200
L39 3200
L38 3200
L37 3200
L36 3200
L35 3200
L34 3200
L33 3200
L32 3200
L31 3200
L30 3200
L29 3200
L28 3200
L27 3200
L26 3200
L25 3200
L24 3200
L23 3200
L22 3200
L21 3200
L20 3200
L19 3200
L18 3200
L17 3200
L16 3200
L15 3200
L14 3200
L13 3200
L12 3200
L11 3200
L10 4500
L9 3400
drop (Soffit slab to Manezzile) Manezzile drop (soffit slab)
L8 3400 85,000 82,000 76,000 79,000 L7-L7a 3100 L7a/L8 4600 L7a(MSB) -L7a 1050
L7 3200 L7-MSB(L7a) 1950 L7a (MSB) 3550
L6 3200 L6-L6a 1600 L6a 3200
L5 3200 L5-L5a 1600 L5a 3200
L4 3200 L4-L4a 1600 L4a 3200
L3 3200 L3-L3a 1600 L3a 3200
L2 3200 L2-L2a 1600 L2a 3200
L1 3200 L1-L1a 1600 L1a 3200
G 5000 G-Ga 1600 Ga 4100
B 3500 102000 B-Ba 2500 Ba 3500
Total 164,250 49000 34950
CIRCUIT Total
MD (kW)/ Diversity Power Type Of Cable MD Overall Cable
From Location To Location TCL (kW) TNB (MD) MD (N) MD (EN) MD (EF) Id MD (A) BREAKER Proposed Cable Size And Method of Installation Cable TVD (mV/m/A) Voltage % VD
MD- ( E ) Factor Factor Breaker Length (m) % VD Rating (A)
Size (A) In Drop (V)
SG-T-1 SG room - Grd TX-T-1 L7 1600 1360 0.85 0 630 VCB 1 1 3 240 AL 11kV Ladder 58
TX-T1 (1600kVA) TX room- L7 MSB-T-1 L7 1925.20 1530.36 1218.43 0.79 2132 2500 ACB 5 20 1 500 CT AL XP Ladder 0.030 0.044 15 1.62 0.39 0.39 3640
MSB-T-1
T1-1 - o/g 1 MSB-T-1 Full Branch L16 626.73 495.12 391.14 0.79 0.79 871.94 1000 MCCB 2 8 1 400 CT AL XP Tray 0.090 0.110 104 12.56 3.03 3.42 1256
TOU L11 DB-MP-11 L11 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 3.48 396
TOU L12 DB-MP-12 L12 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 3.48 396
TOU L13 DB-MP-13 L13 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 3.48 396
TOU L14 DB-MP-14 L14 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 3.48 396
TOU L15 DB-MP-15 L15 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 3.48 396
TOU L16 DB-MP-16 L16 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 3.48 396
T1-2 - o/g 2 MSB-T-1 Full Branch L22 626.73 495.12 391.14 0.79 0.79 871.94 1000 MCCB 2 8 1 400 CT AL XP Tray 0.090 0.110 123 14.86 3.58 3.97 1256
TOU L17 DB-MP-17 L17 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.03 396
TOU L18 DB-MP-18 L18 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.03 396
TOU L19 DB-MP-19 L19 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.03 396
TOU L20 DB-MP-20 L20 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.03 396
TOU L21 DB-MP-21 L21 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.03 396
TOU L22 DB-MP-22 L22 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.03 396
T1-3 - o/g 3 MSB-T-1 Full Branch L28 626.73 495.12 391.14 0.79 0.79 871.94 1000 MCCB 2 8 1 400 CT AL XP Tray 0.090 0.110 142 17.15 4.13 4.52 1256
TOU L23 DB-MP-23 L23 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.58 396
TOU L24 DB-MP-24 L24 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.58 396
TOU L25 DB-MP-25 L25 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.58 396
TOU L26 DB-MP-26 L26 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.58 396
TOU L27 DB-MP-27 L27 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.58 396
TOU L28 DB-MP-28 L28 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.58 396
T1-4 - o/g 4 MSB-T-1 CP-BRT-L10-01 L10 45.00 45.00 45.00 1.00 1.00 62.61 100 MCCB 1 4 1 50 25 AL XP Tray 1.440 0.240 104 9.38 2.26 2.65 165
SG-T2 SG room - Grd TX-T2 L7 1600 1360 0.85 0 630 VCB 1 1 3 240 AL 11kV Ladder 54
TX-T2 -(1600kVA) TX room- L7 MSB-T-2 L7 1751.51 1388.31 1101.38 0.79 1940 2500 ACB 5 20 1 500 CT AL XP Ladder 0.030 0.044 15 1.47 0.36 0.36 3640
MSB-T-2
T2-1 - o/g 1 MSB-T-2 Full Branch L34 622.89 492.08 388.74 0.79 0.79 866.59 1000 MCCB 2 8 1 500 CT AL XP Tray 0.075 0.110 164 18.01 4.34 4.69 1456
TOU L29 DB-MP-29 L29 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.75 396
TOU L30 DB-MP-30 L30 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.75 396
TOU L31 DB-MP-31 L31 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.75 396
TOU L32 DB-MP-32 L32 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.75 396
TOU L33 DB-MP-33 L33 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.75 396
TOU L34 DB-MP-34 L34 100.61 79.48 62.79 0.79 0.79 110.58 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.75 396
T2-2 - o/g 2 MSB-T-2 Full Branch L40 626.73 495.12 391.14 0.79 0.79 871.94 1000 MCCB 2 8 1 500 CT AL XP Tray 0.075 0.110 183 20.22 4.87 5.23 1456
TOU L35 DB-MP-35 L35 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 5.29 396
TOU L36 DB-MP-36 L36 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 5.29 396
TOU L37 DB-MP-37 L37 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 5.29 396
TOU L38 DB-MP-38 L38 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 5.29 396
TOU L39 DB-MP-39 L39 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 5.29 396
TOU L40 DB-MP-40 L40 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 5.29 396
T2-3 - o/g 3 MSB-T-2 Full Branch L45 479.89 379.11 299.50 0.79 0.79 667.64 800 MCCB 2 8 1 400 CT AL XP Tray 0.090 0.110 199 18.41 4.44 4.79 1256
TOU L41 DB-MP-41 L41 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.85 396
TOU L42 DB-MP-42 L42 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.85 396
TOU L43 DB-MP-43 L43 104.46 82.52 65.19 0.79 0.79 114.81 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.24 0.06 4.85 396
TOU L44 DB-MP-44 L44 92.14 72.79 57.50 0.79 0.79 101.27 300 MCCB 1 4 1 185 95 AL XP Tray 0.360 0.230 5 0.22 0.05 4.84 396
TOU L45 DB-MP-45 L45 74.38 58.76 46.42 0.79 0.79 81.75 250 MCCB 1 4 1 120 70 AL XP Tray 0.570 0.230 5 0.24 0.06 4.85 300
T2-4 - o/g 5 MSB-T-2 CP-CWTP-B-01 B1-A 22.00 22.00 22.00 1.00 1.00 30.61 60 MCCB 1 4 1 25 16 CU PVC Trunking 1.500 0.290 82 3.76 0.91 1.26 89
L2 - o/g 2 L7 TOU-B1 B1 69.87 59.39 59.39 0.85 0.00 0.00 0.00 0.00 0.85 0.85 97.21 250 MCCB 1 4 1 150 CT AL XP Tray 0.450 0.230 118 5.78 1.39 3.09 346
TOU-L6 (30A SPN) L6 3.07 2.61 0.85 0.85 12.79 30 MCB
TOU L6 DB-L6 L6 3.07 2.61 0.85 0.85 12.79 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.24 0.10 3.19 57
TOU-L5 (30A SPN) L5 3.07 2.61 0.85 0.85 12.79 30 MCB
TOU L5 DB-L5 L5 3.07 2.61 0.85 0.85 12.79 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.24 0.10 3.19 57
TOU-L4 (30A SPN) L4 3.07 2.61 0.85 0.85 12.79 30 MCB
TOU L4 DB-L4 L4 3.07 2.61 0.85 0.85 12.79 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.24 0.10 3.19 57
TOU-L3 (30A SPN) L3 3.07 2.61 0.85 0.85 12.79 30 MCB
TOU L3 DB-L3 L3 3.07 2.61 0.85 0.85 12.79 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.24 0.10 3.19 57
TOU-L2 (30A SPN) L2 3.07 2.61 0.85 0.85 12.79 30 MCB
TOU L2 DB-L2 L2 3.07 2.61 0.85 0.85 12.79 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.24 0.10 3.19 57
TOU-L1 (30A SPN) L1 3.07 2.61 0.85 0.85 12.79 30 MCB
TOU L1 DB-L1 L1 3.07 2.61 0.85 0.85 12.79 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.24 0.10 3.19 57
TOU-GRD (200A TPN) GF 47.96 40.77 0.85 0.85 66.72 200 MCB
TOU-(30A SPN) GF DB-GF-FAÇADE GF 5.04 4.28 0.85 0.85 21.00 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.39 0.16 3.25 57
TOU-(60A TPN) GF DB-GF-TADIKA GF 4.96 4.22 0.85 0.85 6.90 60 MCB 1 4 1 25 16 CU PVC Trunking 1.500 0.290 0.00 0.00 3.09 89
TOU-(60A TPN) GF DB-GF-RF GF 21.97 18.67 0.85 0.85 30.57 60 MCB 1 4 1 25 16 CU PVC Trunking 1.500 0.290 0.00 0.00 3.09 89
TOU-(100A TPN) GF SSB-GF GF 15.99 13.59 0.85 0.85 22.25 100 MCCB 1 4 1 35 25 CU XP Tray 1.150 0.180 5 0.12 0.03 3.11 176
SSB-GF GF DB-GF-LAND GF 1.28 1.09 0.85 0.85 5.33 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 0.00 0.00 3.11 57
SSB-GF GF FP-GF GF 6.46 5.49 0.85 0.85 8.99 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 0.00 0.00 3.11 50
SSB-GF GF GF
DB-GF-LOBBY (By Others) 5.71 4.85 0.85 0.85 7.94 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 0.00 0.00 3.11 50
SSB-GF GF GF
DB-GF-TOILET (By Others) 0.81 0.69 0.85 0.85 3.38 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 0.00 0.00 3.11 57
SSB-GF GF DB-GF GF 1.73 1.47 0.85 0.85 7.21 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.13 0.06 3.17 57
TOU-B1 (30A SPN) B1 DB-B1 B1 3.49 2.97 0.85 0.85 14.54 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 0.00 0.00 3.11 57
TOU B1 DB-B1 B1 3.49 2.97 0.85 0.85 14.54 30 MCB 1 2 1 10
L5 - o/g 5 L7 DB-GF-ECC Grd 60.00 51.00 51.00 0.85 0.00 0.00 0.00 0.00 0.85 0.85 83.47 100 MCB 1 4 1 70 35 AL XP Tray 0.970 0.240 173 13.73 3.31 5.00 211
DB-GF-ECC Grd EV1 CP 7.00 5.95 0.85 0.85 9.74 40 MCB 1 2 1 16 16 CU PVC Trunking 2.800 0.000 76 1.76 0.73 5.74 76
DB-GF-ECC Grd EV2 CP 7.00 5.95 0.85 0.85 9.74 40 MCB 1 2 1 16 16 CU PVC Trunking 2.800 0.000 73 1.69 0.71 5.71 76
DB-GF-ECC Grd DB-GRD-LD-01 CR 2.00 1.70 0.85 0.85 2.78 40 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.05 0.01 5.02 57
DB-GF-ECC Grd EV3 CP 22.00 18.70 0.85 0.85 30.61 40 MCB 1 4 1 16 16 CU PVC Trunking 2.400 0.000 70 4.37 1.05 6.06 68
DB-GF-ECC Grd EV4 CP 22.00 18.70 0.85 0.85 30.61 40 MCB 1 4 1 16 16 CU PVC Trunking 2.400 0.000 67 4.18 1.01 6.01 68
a b
1044.26 467.16 309.51 680.24
Genset-LANDLORD TCL MD (E) MD (EN) MD (EN) MD (EF)
900kVA Grd AMF Grd 1044.26 1025.89 467.16 309.51 680.24 0.85 0.85 1113 1200 ACB 3 12 1 300 CT CU FR Tray 0.045 0.053 18 1.33 0.32 0.32 2190
AMF Grd EMSB-LD L7 1044.26 1025.89 467.16 309.51 680.24 0.85 1113 1200 ACB 3 12 1 300 CT CU FR Tray 0.045 0.053 75 5.54 1.33 1.66 2190
EMSB-Landlord
EL1-O/G1 L7 TERMINATION BOX L46 54.20 42.82 42.82 0.79 34.26 0.80 34.26 0.80 0.79 0.79 75 150 MCCB 1 4 1 120 CT AL XP Tray 0.570 0.230 212 9.45 2.28 3.97 300
TOU-L7 (60A SPN) L7 2.58 2.04 0.79 0.79 10.76 60 MCB
TOU-(30A SPN) L7 EDB-L7 L7 1.14 0.90 0.79 0.79 4.75 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.08 0.03 4.01 57
TOU-(30A SPN) L7 EDB-L7-MAINT L7 1.44 1.14 0.79 0.79 6.01 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.10 0.04 4.02 57
TOU-L8 (60A SPN) L8 1.51 1.19 0.79 0.79 6.28 60 MCB
TOU-(30A SPN) L8 EDB-L8 L8 0.95 0.75 0.79 0.79 3.96 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 0.00 0.00 3.97 57
TOU-(30A SPN) L8 EDB-L8-POOL L8 0.56 0.44 0.79 0.79 2.32 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 73 0.59 0.25 4.22 57
TOU-L9 (60A TPN) L9 8.14 6.43 0.79 0.79 11.32 60 MCB
TOU-(30A SPN) L9 EDB-L9 L9 0.91 0.72 0.79 0.79 3.80 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.07 0.03 4.00 57
TOU-(30A TPN) L9 EDB-L9-MGO L9 7.23 5.71 0.79 0.79 10.06 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 31 0.94 0.23 4.20 50
TOU-L10 (60A SPN) L10 1.15 0.91 0.79 0.79 1.60 60 MCB
TOU-(30A SPN) L10 EDB-L10 L10 0.81 0.64 0.79 0.79 3.38 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.06 0.02 4.00 57
TOU-(30A SPN) L10 EDB-L10-FIRE L10 0.34 0.27 0.79 0.79 1.42 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 26 0.13 0.05 4.03 57
TOU-L11 (100A TPN) L11 8.14 6.43 0.79 0.79 11.32 100 MCCB
TOU-(30A TPN) L11 EDB-L11-ST1 L11 2.09 1.65 0.79 0.79 2.91 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.04 0.01 3.98 50
TOU-(30A TPN) L11 EDB-L11-ST2 L11 2.01 1.59 0.79 0.79 2.80 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.04 0.01 3.98 50
TOU-(30A TPN) L11 EDB-L11-ST3 L11 2.01 1.59 0.79 0.79 2.80 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.04 0.01 3.98 50
TOU-(30A TPN) L11 EDB-L11-ST4 L11 2.03 1.60 0.79 0.79 2.82 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.04 0.01 3.98 50
TOU-L12(30A TPN) L12 2.58 2.04 0.79 0.79 3.59 30 MCB
TOU L12 EDB-L12 L12 2.58 2.04 0.79 0.79 3.59 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.05 0.01 3.99 50
TOU-L15(30A TPN) L15 2.37 1.87 0.79 0.79 3.29 30 MCB
TOU L15 EDB-L15 L15 2.37 1.87 0.79 0.79 3.29 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.05 0.01 3.98 50
TOU-L18(30A TPN) L18 2.37 1.87 0.79 0.79 3.29 30 MCB
TOU L18 EDB-L18 L18 2.37 1.87 0.79 0.79 3.29 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.05 0.01 3.98 50
TOU-L21(30A TPN) L21 2.37 1.87 0.79 0.79 3.29 30 MCB
TOU L21 EDB-L21 L21 2.37 1.87 0.79 0.79 3.29 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.05 0.01 3.98 50
TOU-L24(30A TPN) L24 2.37 1.87 0.79 0.79 3.29 30 MCB
TOU L24 EDB-L24 L24 2.37 1.87 0.79 0.79 3.29 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.05 0.01 3.98 50
TOU-L27(30A TPN) L27 2.37 1.87 0.79 0.79 3.29 30 MCB
TOU L27 EDB-L27 L27 2.37 1.87 0.79 0.79 3.29 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.05 0.01 3.98 50
TOU-L30(30A TPN) L30 2.37 1.87 0.79 0.79 3.29 30 MCB
TOU L30 EDB-L30 L30 2.37 1.87 0.79 0.79 3.29 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.05 0.01 3.98 50
TOU-L33(30A TPN) L33 2.37 1.87 0.79 0.79 3.29 30 MCB
TOU L33 EDB-L33 L33 2.37 1.87 0.79 0.79 3.29 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.05 0.01 3.98 50
TOU-L34(30A SPN) L34 0.29 0.23 0.79 0.79 1.21 30 MCB
TOU L34 EDB-L34-SPP L34 0.29 0.23 0.79 0.79 1.21 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.02 0.01 3.98 57
TOU-L36(30A TPN) L36 2.37 1.87 0.79 0.79 3.29 30 MCB
TOU L36 EDB-L36 L36 2.37 1.87 0.79 0.79 3.29 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.05 0.01 3.98 50
TOU-L39(30A TPN) L39 2.37 1.87 0.79 0.79 3.29 30 MCB
TOU L39 EDB-L39 L39 2.37 1.87 0.79 0.79 3.29 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.05 0.01 3.98 50
TOU-L42(30A TPN) L42 2.37 1.87 0.79 0.79 3.29 30 MCB
TOU L42 EDB-L42 L42 2.37 1.87 0.79 0.79 3.29 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.05 0.01 3.98 50
TOU-L45(60A TPN) L45 5.11 4.04 0.79 0.79 7.11 60 MCB
TOU-(30A TPN) L45 EDB-L45 L45 2.43 1.92 0.79 0.79 3.38 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.05 0.01 3.98 50
TOU-(30A SPN) L45 EDB-L45-POOL L45 2.68 2.12 0.79 0.79 11.18 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 60 2.33 0.97 4.94 57
TOU-L46(30A TPN) L46 1.03 0.81 0.79 0.79 1.43 30 MCB
TOU-(30A SPN) L46 EDB-L46-TANK L46 0.43 0.34 0.79 0.79 1.79 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 33 0.21 0.09 4.06 57
TOU-(30A SPN) L46 EDB-ROOF-FAN LMR 0.25 0.20 0.79 0.79 1.05 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 19 0.07 0.03 4.00 57
TOU-(30A SPN) L46 EDB-LMR LMR 0.34 0.27 0.79 0.79 1.42 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 31 0.15 0.06 4.04 57
EL2-O/G2 L7 TERMINATION BOX B1 49.68 42.69 42.69 0.86 34.15 0.80 34.15 0.80 0.86 0.86 69.12 150 MCCB 1 4 1 70 CT AL XP Tray 0.970 0.240 115 7.60 1.83 3.53 211
TOU-L6 (30A SPN) L6 1.14 0.90 0.79 0.79 4.75 30 MCB
TOU L6 EDB-L6 L6 1.14 0.90 0.79 0.79 4.75 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.08 0.03 3.56 57
TOU-L5 (30A SPN) L5 1.14 0.90 0.79 0.79 4.75 30 MCB
TOU L5 EDB-L5 L5 1.14 0.90 0.79 0.79 4.75 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.08 0.03 3.56 57
TOU-L4 (30A SPN) L4 1.14 0.90 0.79 0.79 4.75 30 MCB
TOU L4 EDB-L4 L4 1.14 0.90 0.79 0.79 4.75 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.08 0.03 3.56 57
TOU-L3 (30A SPN) L3 1.14 0.90 0.79 0.79 4.75 30 MCB
TOU L3 EDB-L3 L3 1.14 0.90 0.79 0.79 4.75 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.08 0.03 3.56 57
TOU-L2 (30A SPN) L2 1.14 0.90 0.79 0.79 4.75 30 MCB
TOU L2 EDB-L2 L2 1.14 0.90 0.79 0.79 4.75 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.08 0.03 3.56 57
TOU-L1 (30A SPN) L1 1.14 0.90 0.79 0.79 4.75 30 MCB
TOU L1 EDB-L1 L1 1.14 0.90 0.79 0.79 4.75 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.08 0.03 3.56 57
TOU-GRD (100A TPN) GF 20.68 16.34 0.79 0.79 28.78 100 MCCB
TOU--(30A SPN) GF EDB-GF GF 1.15 0.91 0.79 0.79 4.80 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.08 0.03 3.56 57
TOU-(100A TPN) GF ESSB-GF GF 19.53 15.43 0.79 0.79 27.17 60 MCCB 1 4 1 35 25 CU PVC Trunking 1.100 0.270 5 0.14 0.03 3.56 110
ESSB-GF GF EDB-GF-MAINT GF 0.97 0.77 0.79 0.79 4.06 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 93 1.31 0.55 4.11 57
ESSB-GF GF EDB-ME-TNB GF 3.68 2.91 0.79 0.79 15.35 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 78 4.16 1.73 5.29 57
ESSB-GF GF EDB-TNB GF 2.59 2.05 0.79 0.79 10.81 60 MCB 1 2 1 25 16 CU PVC Trunking 1.800 0.330 n/a #VALUE! #VALUE! #VALUE! 101
ESSB-GF GF EDB-GF-CR GF 5.91 4.67 0.79 0.79 24.63 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 67 5.74 2.39 5.95 57
ESSB-GF GF EDB-MDF-01 GF 2.73 2.16 0.79 0.79 3.80 60 MCB 1 4 1 25 16 CU PVC Trunking 1.500 0.290 89 0.46 0.11 3.67 89
ESSB-GF GF EDB-GF-GH2 GF 1.81 1.43 0.79 0.79 7.54 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 39 1.02 0.43 3.99 57
ESSB-GF GF EDB-GF-GH1 GF 1.82 1.44 0.79 0.79 7.59 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 104 2.75 1.14 4.70 57
TOU-B1 (100A TPN) B1 22.16 20.95 0.95 0.95 30.83 100 MCCB
TOU-(60A TPN) B1 ESSB-B1 B1 5.76 4.55 0.79 0.79 8.01 40 MCB 1 4 1 16 16 CU PVC Trunking 2.400 0.000 5 0.08 0.02 3.54 68
ESSB-B1 B1 EDB-B1 B1 2.68 2.12 0.79 0.79 11.18 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.19 0.08 3.62 57
ESSB-B1 B1 EDB-STAIRS 5 B1 1.16 0.92 0.79 0.79 1.62 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 5 0.02 0.01 3.55 50
ESSB-B1 B1 EDB-MAINT 1 B1 0.77 0.61 0.79 0.79 3.22 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 5 0.06 0.02 3.57 57
ESSB-B1 B1 EDB-MAINT 2 B1 1.14 0.90 0.79 0.79 4.75 30 MCB 1 2 1 10 10 CU PVC Trunking 4.400 0.000 112 1.85 0.77 4.31 57
TOU-(30A TPN) B1 ESSB-B1-SP B1 16.40 16.40 16.40 16.40 0.85 0.85 26.84 40 MCB 1 4 1 16 16 CU PVC Trunking 2.400 0.000 5 0.27 0.07 3.59 68
ESSB-B1-SP B1 CP-SP-B1-O1 B1 3.00 3.00 3.00 1.00 3.00 1.00 1.00 1.00 4.17 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 110 1.74 0.42 4.01 50
ESSB-B1-SP B1 CP-SP-B1-O2 B1 3.00 3.00 3.00 1.00 3.00 1.00 1.00 1.00 4.17 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 77 1.22 0.29 3.89 50
ESSB-B1-SP B1 CP-SP-B1-O3 B1 3.00 3.00 3.00 1.00 3.00 1.00 1.00 1.00 4.17 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 46 0.73 0.18 3.77 50
ESSB-B1-SP B1 CP-SP-UW-O1 B1 7.40 7.40 7.40 1.00 7.40 1.00 1.00 1.00 10.30 30 MCB 1 4 1 10 10 CU PVC Trunking 3.800 0.000 60 2.35 0.57 4.16 50
EL3-O/G3 L7 ESSB-L8-FAN L8 73.00 73.00 0.00 0.00 0.00 0.00 73.00 1.00 1.00 0.85 119 200 MCCB 1 4 1 70 35 CU FR Tray 0.590 0.175 18 1.28 0.31 2.00 279
ESSB-L8-FAN GF CP-PF-L8-SL1-01 L8 12.00 12.00 0.00 0.00 0.00 0.00 12.00 1.00 1.00 0.85 19.64 40 MCCB 1 4 1 10 10 CU FR Trunking 4.000 0.000 75 5.01 1.21 3.21 63
ESSB-L8-FAN GF CP-PF-L8-ST1-01 L8 12.00 12.00 0.00 0.00 0.00 0.00 12.00 1.00 1.00 0.85 19.64 40 MCCB 1 4 1 10 10 CU FR Trunking 4.000 0.000 91 6.08 1.46 3.47 63
ESSB-L8-FAN GF CP-PF-L8-ST2-01 L8 17.00 17.00 0.00 0.00 0.00 0.00 17.00 1.00 1.00 0.85 27.82 60 MCCB 1 4 1 16 16 CU FR Trunking 2.500 0.000 75 4.43 1.07 3.07 85
ESSB-L8-FAN GF CP-PF-L8-ST3-01 L8 20.00 20.00 0.00 0.00 0.00 0.00 20.00 1.00 1.00 0.85 32.74 60 MCCB 1 4 1 16 16 CU FR Trunking 2.500 0.000 54 3.76 0.91 2.91 85
ESSB-L8-FAN GF CP-PF-L8-ST4-01 L8 12.00 12.00 0.00 0.00 0.00 0.00 12.00 1.00 1.00 0.85 19.64 40 MCCB 1 4 1 10 10 CU FR Trunking 4.000 0.000 32 2.14 0.51 2.52 63
EL5-O/G5 L7 CP-WRP-L10-01 L10 138.80 138.80 0.00 0.00 138.80 1.00 1.00 0.85 227 400 MCCB 1 4 1 185 95 CU FR Tray 0.220 0.165 120 7.47 1.80 3.49 530
EL6-O/G6 L7 ESSB-L10-FIRE 2 L10 127.30 127.30 24.75 0.00 0.00 0.00 1.00 0.85 208 300 MCCB 1 4 1 120 70 CU FR Tray 0.340 0.165 117 9.16 2.21 3.90 398
ESSB-L10-FIRE 2 L10 CP-SPP-L10-02 L10 24.75 24.75 24.75 1.00 0.00 0.00 0.00 0.00 1.00 0.85 40.51 75 MCCB 1 4 1 25 16 CU FR Tray 1.600 0.190 13 0.77 0.19 4.09 140
ESSB-L10-FIRE 2 L10 CP-HRP-L10-01 L10 7.50 7.50 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.85 12.28 50 MCCB 1 4 1 10 10 CU FR Tray 4.000 0.000 13 0.54 0.13 4.03 74
ESSB-L10-FIRE 2 L10 CP-SPP-L10-01 L10 39.75 39.75 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.85 65.06 100 MCCB 1 4 1 25 16 CU FR Tray 1.600 0.190 20 1.90 0.46 4.36 140
ESSB-L10-FIRE 2 L10 CP-TP-L10-01 L10 55.30 55.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.85 90.51 150 MCCB 1 4 1 50 25 CU FR Tray 0.860 0.180 20 1.49 0.36 4.26 215
EL7-O/G7 L34 CP-SPP-L34-01 L34 24.75 24.75 0.00 0.00 0.00 0.00 24.75 1.00 1.00 0.85 41 60 MCCB 1 4 1 35 25 CU FR Tray 1.150 0.180 203 8.82 2.12 3.82 176
EL8-O/G8 LMR SSB-BL (by others) LMR 25.80 25.80 25.80 1.00 25.80 1.00 25.80 1.00 1.00 0.85 42 100 MCCB 1 4 1 35 25 CU FR Tray 1.150 0.180 230 10.41 2.51 4.20 176
EL9-O/G9 LMR SSB-PL (by others) LMR 198.90 198.90 198.90 1.00 198.90 1.00 0.00 0.00 1.00 0.85 326 500 MCCB 2 8 1 300 300 AL XP Tray 0.110 0.110 230 11.34 2.73 4.43 1082
EL10-O/G10 LMR ESSB-ROOF-FAN LMR 74.00 74.00 0.00 0.00 74.00 1.00 1.00 0.85 121 200 MCCB 1 4 1 300 150 CU FR Tray 0.135 0.160 225 5.42 1.31 3.00 730
ESSB-ROOF-FAN LMR CP-PF-LMR-SL1-01 LMR 41.00 41.00 0.00 0.00 0.00 0.00 41.00 1.00 1.00 0.85 67.11 120 MCCB 1 4 1 25 16 CU FR Tray 1.600 0.190 5 0.49 0.12 3.12 140
ESSB-ROOF-FAN LMR CP-PF-LMR-ST2-01 LMR 33.00 33.00 0.00 0.00 0.00 0.00 33.00 1.00 1.00 0.85 54.01 100 MCCB 1 4 1 25 16 CU FR Tray 1.600 0.190 5 0.39 0.10 3.10 140
EL11-O/G11 B1 ESSB-B1-FAN B1 75.00 75.00 37.50 0.00 75.00 1.00 1.00 0.85 123 200 MCCB 1 4 1 120 70 CU FR Tray 0.340 0.165 210 9.69 2.34 4.03 398
ESSB-B1-FAN B1 CP-SSF-B1-01 B1 45.00 45.00 22.50 0.50 0.00 0.00 45.00 1.00 1.00 0.85 73.65 100 MCCB 1 4 1 25 16 CU FR Tray 1.600 0.190 5 0.54 0.13 4.16 140
ESSB-B1-FAN B1 CP-SSF-B1-02 B1 30.00 30.00 15.00 0.50 0.00 0.00 30.00 1.00 1.00 0.85 49.10 60 MCCB 1 4 1 16 16 CU FR Tray 2.500 0.000 5 0.52 0.13 4.16 99
EL12-O/G12 B1 ESSB-B1-FIRE B1 110.63 110.63 58.50 0.00 91.88 0.83 1.00 0.85 181 250 MCCB 1 4 1 240 120 CU FR Tray 0.170 0.165 217 9.09 2.19 3.89 630
ESSB-B1-FIRE B1 CP-TP-B1-01 B1 18.75 18.75 18.75 1.00 0.00 0.00 0.00 0.00 1.00 0.85 30.69 60 MCCB 1 4 1 16 16 CU FR Tray 2.500 0.000 5 0.33 0.08 3.96 99
ESSB-B1-FIRE B1 CP-WRP-B1-01 B1 49.13 49.13 0.00 0.00 0.00 0.00 49.13 1.00 1.00 0.85 80.41 100 MCCB 1 4 1 25 16 CU FR Tray 1.600 0.190 5 0.59 0.14 4.03 140
ESSB-B1-FIRE B1 CP-SPP-B1-01 B1 39.75 39.75 39.75 1.00 0.00 0.00 39.75 1.00 1.00 0.85 65.06 100 MCCB 1 4 1 25 16 CU FR Tray 1.600 0.190 5 0.47 0.11 4.00 140
ESSB-B1-FIRE B1 CP-HRP-b1-02 B1 3.00 3.00 0.00 0.00 0.00 0.00 3.00 1.00 1.00 0.85 4.91 30 MCB 1 4 1 6 6 CU FR Tray 6.800 0.000 21 0.60 0.14 4.03 54
EL13-O/G13 L7 CP-SSF-B1-03 B1 24.00 24.00 12.00 0.50 0.00 0.00 24.00 1.00 1.00 0.85 39 80 MCCB 1 4 1 50 25 CU FR Tray 0.860 0.180 194 6.29 1.52 3.21 215
EL14-O/G14 L7 CP-FAF-B1-01 B1 30.00 30.00 15.00 0.50 0.00 0.00 30.00 1.00 1.00 0.85 49 100 MCCB 1 4 1 95 50 CU FR Tray 0.430 0.170 178 3.98 0.96 2.65 341
EL15-O/G15 L7 ESSB-GRD-PF Grd HT Roo additional 29.00 29.00 0.00 0.00 0.00 0.00 29.00 1.00 1.00 0.85 47 80 MCCB 1 4 1 35 16 CU FR Tray 1.150 0.180 193 9.82 2.37 4.06 176
ESSB-GRD-PF fire Acces Lobby _GCP-PF-GRD-FL Grd additional 9.00 9.00 0.00 0.00 0.00 0.00 9.00 1.00 1.00 0.85 15 30 MCCB 1 4 1 6 6 CU FR Tray 6.800 0.000 23 1.96 0.47 4.53 54
ESSB-GRD-PF ST-5 _Grd CP-PF-GRD-ST5-01 Grd additional 20.00 20.00 0.00 0.00 0.00 0.00 20.00 1.00 1.00 0.85 33 40 MCCB 1 4 1 10 10 CU FR Tray 4.000 0.000 25 2.78 0.67 4.73 74
Cable
Group Neutral
Capacity (A) Iz > In
Factor length
Iz
e a.c. 2
H A B
11 flat & touching 12 flat spaced DC 3 & 4 in conduit/trunking
Z r x Z SIZE r x
20 21 22 23 Ref No:- 1 2 3 4
1.46 1.44 0.32 1.48 50 1.55 1.60 0.30
1.00 0.97 0.31 1.02 70 1.05 1.10 0.30
0.75 0.71 0.31 0.78 95 0.77 0.81 0.29
0.61 0.57 0.31 0.64 120 0.61 0.64 0.29
0.50 0.45 0.30 0.54 150 0.49 0.51 0.28
0.43 0.36 0.30 0.47 185 0.39 0.42 0.28
0.35 0.28 0.30 0.41 240 0.30 0.32 0.27
0.31 0.22 0.30 0.37 300 0.24 0.26 0.27
0.28 0.180 0.29 0.34 380 0.190 0.22 0.27
0.27 0.145 0.29 0.32 480 0.150 0.180 0.26
0.25 0.120 0.29 0.31 600 0.120 0.150 0.26
0.23 0.095 0.29 0.30 740 0.099
0.23 0.076 0.29 0.30 960 0.075
0.22 0.063 0.28 0.29 1200 0.060
e a.c. 2
H A B
11 flat & touching 12 flat spaced DC 3 & 4 in conduit/trunking
Z r x Z SIZE r x
20 21 22 23 Ref No:- 1 2 3 4
1.46 1.44 0.32 1.48 50 1.55 1.60 0.30
1.00 0.97 0.31 1.02 70 1.05 1.10 0.30
0.75 0.71 0.31 0.78 95 0.77 0.81 0.29
0.61 0.57 0.31 0.64 120 0.61 0.64 0.29
0.50 0.45 0.30 0.54 150 0.49 0.51 0.28
0.43 0.36 0.30 0.47 185 0.39 0.42 0.28
0.35 0.28 0.30 0.41 240 0.30 0.32 0.27
0.31 0.22 0.30 0.37 300 0.24 0.26 0.27
0.28 0.180 0.29 0.34 380 0.190 0.22 0.27
0.27 0.145 0.29 0.32 480 0.150 0.180 0.26
0.25 0.120 0.29 0.31 600 0.120 0.150 0.26
0.23 0.095 0.29 0.30 740 0.099
0.23 0.076 0.29 0.30 960 0.075
0.22 0.063 0.28 0.29 1200 0.060
e a.c.
H A B
11 flat & touching 12 flat spaced DC 3 & 4 in conduit/trunking
Z r x Z SIZE r x
20 21 22 23 Ref No:- 1 2 3 4
40.000 40.000 0.000 40.000 1 44.000 44.000 0.000
27.000 27.000 0.000 27.000 1.5 29.000 29.000 0.000
16.000 16.000 0.000 16.000 2.5 18.000 18.000 0.000
10.000 10.000 0.000 10.000 4 11.000 11.000 0.000
6.800 6.800 0.000 6.800 6 7.300 7.300 0.000
4.000 4.000 0.000 4.000 10 4.400 4.400 0.000
2.500 2.500 0.000 2.500 16 2.800 2.800 0.000
1.600 1.600 0.270 1.650 25 1.750 1.800 0.330
1.150 1.150 0.260 1.200 35 1.250 1.300 0.310
0.870 0.860 0.260 0.890 50 0.930 0.950 0.300
0.620 0.590 0.250 0.650 70 0.630 0.650 0.290
0.460 0.430 0.250 0.490 95 0.460 0.490 0.280
0.380 0.340 0.240 0.420 120 0.360 0.390 0.270
0.320 0.280 0.240 0.370 150 0.290 0.310 0.270
0.280 0.220 0.240 0.330 185 0.230 0.250 0.270
0.240 0.170 0.240 0.290 240 0.180 0.195 0.260
0.210 0.135 0.240 0.270 300 0.145 0.160 0.260
0.195 0.110 0.240 0.260 400 0.105 0.130 0.260
0.180 0.085 0.240 0.250 500 0.086 0.110 0.260
0.170 0.068 0.230 0.240 630 0.068 0.094 0.250
0.165 0.055 0.230 0.240 800 0.053
0.165 0.047 0.230 0.240 1000 0.042
A Copper
DC mV/m
SIZE 2 Cables
Ref No:- 1 2 3
250 0.27300
400 0.15580
600 0.10250
800 0.07100
1000 0.05290
1250 0.04050
1600 0.03100
1800 0.02820
2000 0.02470
2500 0.02030
3000 0.01660
3500 0.01410
4000 0.01250
4500 0.01103
5000 0.00940
6000 0.00848
e PVC/SWA/PVC (Cu)
C
3/4 Core
r x z
6 7 8