Bridge Engineering Interview Questions and Answers Pdf
1. Generally, a culvert has span less than
a. 3 m b. 6 m c. 9 m d. 12 m Ans: B 2. A bridge of span 25 m may be treated as a. Culvert b. Minor bridge c. Major bridge d. Long span bridge Ans: B 3. A bridge of more than ____ span is treated as long span bridge. a. 30 m b. 60 m c. 90 m d. 120 m Ans: D 4. As far as possible the alignment of a bridge should be a. Square b. Skew c. Curved d. None of the above Ans: A 5. Temporary bridge are built during a. Military operations b. Project executions c. Rescue operations d. All the above Ans: D 6. Movable bridge are built across a. Streams b. Rivers c. Channels d. Dry valley Ans: C 7. A bascule bridge is a a. Fixed bridge b. Movable bridge c. Deck bridge d. Through bridge Ans: B 8. Which one of the following is not a low cost bridge a. Wooden bridge b. Masonry bridge c. Floating bridge d. Movable bridge Ans: B 9. The end supports of a bridge superstructure are known as a. Wing walls b. Piers c. Abutments d. Bed blocks Ans: C 10. The floor provided between masonry wall below the river bed is known as a. Wing wall b. Curtain wall c. Bed block d. Kerb Ans: B