Saudi Aramco SA2636-ENG (11/2010)

NOTES:
1- ALL DIMENSIONS ARE IN MM AND ELEVATIONS ARE IN METERS
UNLESS OTHERWISE NOTED.

SR. SUPPORT LINE PIPING PLAN ISOMETRIC SUPPORT PIPE SUPPORT BOP TOS 2- SUPPORTS SHALL BE MODIFIED ACCORDING TO SITE CONDITIONS.
DESCRIPTION REMARKS
NO. NO. NO. REFERENCE REFERENCE DWG NO. CALL OUT M M
BE-181496 SHT 04 SHW-02-24" 3- FOR EXACT LOCATION OF SUPPORTS REFER TO THE RESPECTIVE
1 102-PS-001 24"-P-1199 BB-863817.001 SHOE + TEFLON PAD 99.285 99.165 ISOMETRICS/PIPING PLAN
PNFS0371 PS-22-1-300-300-200-200
BE-181496 SHT 02 TRW-02-24"-20"-300
2 102-PS-002 24"-P-1199 BB-863817.001 TRUNNION + GUIDE 92.979 92.679 (E-W) GUIDE
BE-181496 SHT 11 SGW-09-20"

3 102-PS-003 24"-P-1199 BB-863817.001 REST 92.979 92.979 STRUCTURAL SUPPORT

4 102-PS-004 24"-P-1199 BB-863817.001 REST 92.979 92.979 STRUCTURAL SUPPORT

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER
5 102-PS-005 24"-P-1199 BB-863817.001 PNFS0101 DS-2-24" DIRECTIONAL STOP 92.979 92.979
BA-230603.001
BE-181496 SHT 04 SHW-02-24"
6 102-PS-006 24"-P-1200 BB-863818.001 SHOE + TEFLON PAD 99.285 99.165
PNFS0371 PS-22-1-300-300-200-200
BE-181496 SHT 02 TRW-02-24"-20"-300
7 102-PS-007 24"-P-1200 BB-863818.001 TRUNNION + GUIDE 92.979 92.679 (E-W) GUIDE
BE-181496 SHT 11 SGW-09-20" LEGEND
8 102-PS-008 24"-P-1200 BB-863818.001 REST 92.979 92.979 STRUCTURAL SUPPORT
TOS - TOP OF STEEL
BOP - BOTTOM OF PIPE
9 102-PS-009 24"-P-1200 BB-863818.001 REST 92.979 92.979 STRUCTURAL SUPPORT

10 102-PS-010 24"-P-1200 BB-863818.001 PNFS0101 DS-2-24" DIRECTIONAL STOP 92.979 92.979

BE-181496 SHT 04 SHW-02-24"


11 102-PS-011 24"-P-1201 BA-230602.001 BB-863819.001 SHOE + TEFLON PAD 99.285 99.165
PNFS0371 PS-22-1-300-300-200-200
BE-181496 SHT 02 TRW-02-24"-20"-300
12 102-PS-012 24"-P-1201 BA-230603.001 BB-863819.001 TRUNNION + GUIDE 92.979 92.679 (E-W) GUIDE
BE-181496 SHT 11 SGW-09-20"

13 102-PS-013 24"-P-1201 BB-863819.001 REST 92.979 92.979 STRUCTURAL SUPPORT

14 102-PS-014 24"-P-1201 BA-230602.001 BB-863819.001 REST 92.979 92.979 STRUCTURAL SUPPORT

15 102-PS-015 24"-P-1201 BB-863819.001 PNFS0101 DS-2-24" DIRECTIONAL STOP 92.979 92.979

REFERENCE DRAWING
DRAWING CONTROL FOR J.O. 10-00615-0001 BD-168257
PIPE SUPPORT DETAIL PNFS0001
PIPE SUPPORT DETAILS BE-181496.016

REVISION VALIDATION

THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-00615-0001-001

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS


OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

PVP SHM AMJ BAQ


05/06/2015 08/31/2015 08/31/2015 08/31/2015
REV. NO. DATE REVISION DESCRIPTION

00 08/31/2015 ISSUED FOR CONSTRUCTION


JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR
10-00615-0001-001 CONSTRUCTION UNTIL CERTIFIED AND DATED.

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
PIPE SUPPORT SCHEDULE
SDT
AXL-2ND STAGE PUMPS AND TANK
PROD. FAC. TANK FARM NO. 1
ABQAIQ SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

102 M BB-185161 001 00


Saudi Aramco 2636-ENG. (11/2010)

EXCEL
Saudi Aramco SA2636-ENG (11/2010)
NOTES:
1- ALL DIMENSIONS ARE IN MM AND ELEVATIONS ARE IN METERS
UNLESS OTHERWISE NOTED.

SR. SUPPORT LINE PIPING PLAN ISOMETRIC SUPPORT PIPE SUPPORT BOP TOS 2- SUPPORTS SHALL BE MODIFIED ACCORDING TO SITE CONDITIONS.
DESCRIPTION REMARKS
NO. NO. NO. REFERENCE REFERENCE DWG NO. CALL OUT M M
3- FOR EXACT LOCATION OF SUPPORTS REFER TO THE RESPECTIVE
30"-P-1191 BB-863806.002 BE-181496 SHT 07 S-05-30" SHOE 99.5 99.400 ISOMETRICS/PIPING PLAN

1 102-PS-136 20"-P-1197 BB-863815.003 REST 99.400 99.400 STRUCTURAL SUPPORT

24"-P-1198 BB-863816.002 REST 99.400 99.400 STRUCTURAL SUPPORT

30"-P-1191 BB-863806.002 BE-181496 SHT 07 S-05-30" SHOE 99.5 99.400

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER
2 102-PS-028 20"-P-1197 BB-863815.003 PNFS0210 PG-5-20" GUIDE 99.400 99.400

24"-P-1198 BB-863816.002 REST 99.400 99.400 STRUCTURAL SUPPORT

BE-181496 SHT 07 S-05-30"


30"-P-1191 BB-863806.002 GUIDE 99.5 99.400
BE-181496 SHT 10 SGW-06-30" LEGEND
3 102-PS-029 20"-P-1197 BB-863815.003 REST 99.400 99.400 STRUCTURAL SUPPORT
TOS - TOP OF STEEL
BOP - BOTTOM OF PIPE
24"-P-1198 BB-863816.002 PNFS0210 PG-5-24" GUIDE 99.400 99.400

BE-181496 SHT 07 S-05-30"


30"-P-1191 BB-863806.002 SHOE + GUIDE 99.5 99.400
BE-181496 SHT 10 SGW-06-30"

4 102-PS-030 20"-P-1197 DA-720755.001 BB-863815.003 PNFS0210 PG-5-20" GUIDE 99.400 99.400

24"-P-1198 BB-863816.002 PNFS0210 PG-5-24" GUIDE 99.400 99.400

30"-P-1191 BB-863806.002 BE-181496 SHT 07 S-05-30" SHOE 99.5 99.400

5 102-PS-031 20"-P-1197 BB-863815.003 REST 99.400 99.400 STRUCTURAL SUPPORT

24"-P-1198 BB-863816.002 REST 99.400 99.400 STRUCTURAL SUPPORT

30"-P-1191 BB-863806.002 BE-181496 SHT 07 S-05-30" SHOE 99.5 99.400

6 102-PS-044 20"-P-1197 BB-863815.003 PNFS0210 PG-5-20" GUIDE 99.400 99.400


REFERENCE DRAWING
DRAWING CONTROL FOR J.O. 10-00615-0001 BD-168257
24"-P-1198 BB-863816.002 REST 99.400 99.400 STRUCTURAL SUPPORT
PIPE SUPPORT DETAIL PNFS0001
BE-181496 SHT 07 S-05-30" PIPE SUPPORT DETAILS BE-181496.016
30"-P-1191 BB-863806.002 SHOE + GUIDE 99.5 99.400
BE-181496 SHT 10 SGW-06-30"

7 102-PS-027 20"-P-1197 BB-863815.003 REST 99.400 99.400 STRUCTURAL SUPPORT

24"-P-1198 BB-863816.002 PNFS0210 PG-5-24" GUIDE 99.400 99.400

30"-P-1191 BB-863806.003 BE-181496 SHT 07 S-05-30" SHOE 100.500 100.400


8 102-PS-019
24"-P-1197 BB-863815.001 REST 100.400 100.400 STRUCTURAL SUPPORT

BE-181496 SHT 07 S-05-30" REVISION VALIDATION


30"-P-1191 BB-863806.003 GUIDE 100.500 100.400
BE-181496 SHT 10 SGW-06-30"
9 102-PS-018
PNFS0210 PG-5-24" THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
24"-P-1197 BB-863815.001 GUIDE + DIRECTIONAL STOP 100.400 100.400
PNFS0101 DS-2-24" REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

BE-181496 SHT 07 S-05-30"


30"-P-1191 BB-863806.003 GUIDE 100.500 100.400
BE-181496 SHT 10 SGW-06-30" 10-00615-0001-001
10 102-PS-020
24"-P-1197 BB-863815.001 PNFS0210 PG-5-24" GUIDE 100.400 100.400
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
30"-P-1191 BA-863792.001 BB-863806.003 BE-181496 SHT 07 S-05-30" SHOE 100.500 100.400
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

PVP SHM AMJ BAQ


11 102-PS-021 24"-P-1197 BB-863815.001 REST 100.400 100.400 STRUCTURAL SUPPORT
05/06/2015 08/31/2015 08/31/2015 08/31/2015
REV. NO. DATE REVISION DESCRIPTION
24"-P-1198 BB-863816.001 PNFS0210 PG-5-24" GUIDE 99.400 99.400
00 08/31/2015 ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR
12 102-PS-042 20"-P-1197 BB-863815.002 REST 93.6 93.6 STRUCTURAL SUPPORT CONSTRUCTION UNTIL CERTIFIED AND DATED.
10-00615-0001-001

13 102-PS-025 20"-P-1197 BB-863815.002 REST 93.6 93.6 STRUCTURAL SUPPORT SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
10"-P-BYPASS BB-863815.002 BE-181496 SHT 14 SPS-03-10" SHOE 93.717 93.6 PIPE SUPPORT SCHEDULE
SDT
14 102-PS-023
AXL-2ND STAGE PUMPS AND TANK
20"-P-1197 BB-863815.002 PNFS0210 PG-5-20" GUIDE 93.6 93.6
PROD. FAC. TANK FARM NO. 1
ABQAIQ SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

102 M BB-185161 002 00


Saudi Aramco 2636-ENG. (11/2010)

EXCEL
Saudi Aramco SA2636-ENG (11/2010)
NOTES:
1- ALL DIMENSIONS ARE IN MM AND ELEVATIONS ARE IN METERS
UNLESS OTHERWISE NOTED.

SR. SUPPORT LINE PIPING PLAN ISOMETRIC SUPPORT PIPE SUPPORT BOP TOS 2- SUPPORTS SHALL BE MODIFIED ACCORDING TO SITE CONDITIONS.
DESCRIPTION REMARKS
NO. NO. NO. REFERENCE REFERENCE DWG NO. CALL OUT M M
3- FOR EXACT LOCATION OF SUPPORTS REFER TO THE RESPECTIVE
1 102-PS-022 24"-P-1198 BB-863816.001 REST 93.6 93.6 STRUCTURAL SUPPORT ISOMETRICS/PIPING PLAN

20"-P-1197 BB-863815.002 PNFS0210 PG-5-20" GUIDE 93.6 93.6


102-PS-024
24"-P-1198 BB-863816.001 PNFS0210 PG-5-24" GUIDE 93.6 93.6

2 102-PS-026 24"-P-1198 BB-863816.001 REST 93.6 93.6 STRUCTURAL SUPPORT

102-PS-043 24"-P-1198 BB-863816.001 REST 93.6 93.6 STRUCTURAL SUPPORT

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER
102-PS-045 24"-P-1198 BB-863816.001 PNFS0210 PG-5-24" GUIDE 93.6 93.6

BA-863792.001
3 102-PS-055 24"-P-1191 BB-863806.003 REST 94.325 94.325 STRUCTURAL SUPPORT
LEGEND
102-PS-080 30"-P-1191 BB-863806.003 PNFS0371 PS-22-1-500-500-400-400 REST+TEFLON PAD - - VALVE SUPPORT
TOS - TOP OF STEEL

BE-181496 SHT 07 S-05-30" BOP - BOTTOM OF PIPE


102-PS-052 30"-P-1191 BB-863806.003 SHOE + GUIDE 100.500 100.400
BE-181496 SHT 10 SGW-06-30"
BE-181496 SHT 03 TRW-04-30"-24"-581
4 102-PS-054 30"-P-1191 BB-863806.003 TRUNNION + GUIDE 94.249 94.249 0 mm GAP
PNFS0210 PG-5-24"

102-PS-135 24"-P-1197 BB-863815.001 REST 94.401 94.401 STRUCTURAL SUPPORT

102-PS-017 24"-P-1197 BB-863815.001 GUIDE 97.625 97.625 STRUCTURAL SUPPORT

30"-P-1191 BB-863806.002 BE-181496 SHT 07 S-05-30" SHOE 99.5 99.400

5 102-PS-032 20"-P-1197 BB-863815.004 REST 99.400 99.400 STRUCTURAL SUPPORT

24"-P-1198 BB-863816.003 REST 99.400 99.400 STRUCTURAL SUPPORT

S-05-30"
30"-P-1191 BB-863806.002 BE-181496 SHT 07 ,BE-181496 SHT 10 SHOE + GUIDE 99.5 99.400
SGW-06-30"

6 102-PS-033 20"-P-1197 BB-863815.004 PNFS0210 PG-5-20" GUIDE 99.400 99.400


REFERENCE DRAWING
DRAWING CONTROL FOR J.O. 10-00615-0001 BD-168257
24"-P-1198 BB-863816.003 PNFS0210 PG-5-24" GUIDE 99.400 99.400
PIPE SUPPORT DETAIL PNFS0001
PIPE SUPPORT DETAILS BE-181496.016
30"-P-1191 BB-863806.002 BE-181496 SHT 07 S-05-30" SHOE 99.5 99.400

7 102-PS-034 20"-P-1197 BB-863815.004 REST 99.400 99.400 STRUCTURAL SUPPORT

24"-P-1198 BB-863816.003 REST 99.400 99.400 STRUCTURAL SUPPORT

30"-P-1191 BB-863806.002 BE-181496 SHT 07 S-05-30" SHOE 99.5 99.400

8 102-PS-035 20"-P-1197 BB-863815.004 PNFS0210 PG-5-20" GUIDE 99.400 99.400

REVISION VALIDATION
24"-P-1198 DA-720753.001 BB-863816.003 PNFS0210 PG-5-24" GUIDE 99.400 99.400

THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


30"-P-1188 BB-863803.001 BE-181496 SHT 07 S-05-30" SHOE 100.74 100.64
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
9 102-PS-058
30"-P-1190 BB-863805.001 BE-181496 SHT 07 S-05-30" SHOE 100.74 100.64
10-00615-0001-001

30"-P-1191 BB-863806.001 BE-181496 SHT 07 S-05-30" SHOE 99.5 99.4


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
OTHER
BE-181496 SHT 07 S-05-30" (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
30"-P-1188 BB-863803.001 SHOE +DIRECTIONAL STOP 100.74 100.64
BE-181496 SHT 09 SGW-05-30" ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
10 102-PS-051
BE-181496 SHT 07 S-05-30" PVP SHM AMJ BAQ
30"-P-1190 BB-863805.001 SHOE +DIRECTIONAL STOP 100.74 100.64
BE-181496 SHT 09 SGW-05-30" 05/06/2015 08/31/2015 08/31/2015 08/31/2015
REV. NO. DATE REVISION DESCRIPTION
30"-P-1189 BB-863804.001 BE-181496 SHT 07 S-05-30" SHOE 100.74 100.64
00 08/31/2015 ISSUED FOR CONSTRUCTION
BE-181496 SHT 07 S-05-30" JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR
30"-P-1191 BB-863806.001 SHOE +DIRECTIONAL STOP 99.5 99.4 CONSTRUCTION UNTIL CERTIFIED AND DATED.
BE-181496 SHT 09 SGW-05-30" 10-00615-0001-001

11 102-PS-050 30"-P-1188 BB-863803.001 BE-181496 SHT 07 S-05-30" SHOE 100.74 100.64 SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
30"-P-1190 BB-863805.001 BE-181496 SHT 07 S-05-30" SHOE 100.74 100.64 PIPE SUPPORT SCHEDULE
SDT
AXL-2ND STAGE PUMPS AND TANK
30"-P-1191 BB-863806.001 BE-181496 SHT 07 S-05-30" SHOE 99.5 99.4
PROD. FAC. TANK FARM NO. 1
12 102-PS-049
ABQAIQ SAUDI ARABIA
30"-P-1188 BB-863803.001 BE-181496 SHT 07 S-05-30" SHOE 100.74 100.64
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

102 M BB-185161 003 00


Saudi Aramco 2636-ENG. (11/2010)

EXCEL
Saudi Aramco SA2636-ENG (11/2010)
NOTES:
1- ALL DIMENSIONS ARE IN MM AND ELEVATIONS ARE IN METERS
UNLESS OTHERWISE NOTED.

SR. SUPPORT LINE PIPING PLAN ISOMETRIC SUPPORT PIPE SUPPORT BOP TOS 2- SUPPORTS SHALL BE MODIFIED ACCORDING TO SITE CONDITIONS.
DESCRIPTION REMARKS
NO. NO. NO. REFERENCE REFERENCE DWG NO. CALL OUT M M
3- FOR EXACT LOCATION OF SUPPORTS REFER TO THE RESPECTIVE
1 102-PS-053 20"-P-1197 BB-863815.004 PNFS0210 PG-5-20" GUIDE 101.784 101.784 ISOMETRICS/PIPING PLAN

2 102-PS-016 30"-P-1189 BB-863804.002 BE-181496 SHT 07 S-05-30" SHOE 100.74 100.64

3 102-PS-048 30"-P-1191 BB-863806.001 BE-181496 SHT 07 S-05-30" SHOE 99.5 99.4

4 102-PS-047 30"-P-1195 BB-863810.001 BE-181496 SHT 07 S-05-30" SHOE 95.188 95.088

BE-181496 SHT 02 TRW-02-30"-24"-681

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER
5 102-PS-046 30"-P-1195 BB-863810.001 TRUNNION + TEFLON PAD 95.188 94.888
PNFS0371 PS-22-1-500-500-400-400
BE-181496 SHT 02 TRW-02-30"-24"-681
6 102-PS-056 30"-P-1192 BB-863807.001 TRUNNION + TEFLON PAD 95.188 94.888
PNFS0371 PS-22-1-500-500-400-400

7 102-PS-057 30"-P-1192 BB-863807.001 BE-181496 SHT 07 S-05-30" SHOE 95.188 95.088


LEGEND
BE-181496 SHT 02 TRW-02-30"-24"-681
8 102-PS-065 30"-P-1194 BB-863809.001 TRUNNION + TEFLON PAD 95.188 94.888
PNFS0371 PS-22-1-500-500-400-400 TOS - TOP OF STEEL
BOP - BOTTOM OF PIPE
9 102-PS-066 30"-P-1194 BB-863809.001 BE-181496 SHT 07 S-05-30" SHOE 95.188 95.088

BE-181496 SHT 02 TRW-02-30"-24"-681


10 102-PS-070 30"-P-1193 BB-863808.001 TRUNNION + TEFLON PAD 95.188 94.888
PNFS0371 PS-22-1-500-500-400-400

11 102-PS-071 30"-P-1193 BB-863808.001 BE-181496 SHT 07 S-05-30" SHOE 95.188 95.088

12 102-PS-167 30"-P-1509 BB-192000.001 BE-181496 SHT 07 S-05-30" SHOE 95.088 94.988

13 SL-102-29 30"-P-1509 BB-192000.001 BE-181496 SHT 07 S-05-30" SHOE 95.088 94.988

14 SL-102-25 30"-P-1509 BB-192000.001 BE-181496 SHT 07 S-05-30" SHOE 95.088 94.988

15 102-PS-164 30"-P-1509 BB-192000.001 BE-181496 SHT 07 S-05-30" SHOE 97.374 97.274

16 102-PS-163 30"-P-1509 BB-192000.001 BE-181496 SHT 07 S-05-30" SHOE 97.374 97.274

17 102-PS-EXS 30"-P-602 REST STRUCTURAL SUPPORT


REFERENCE DRAWING
DRAWING CONTROL FOR J.O. 10-00615-0001 BD-168257
18 102-PS-EXS 30"-P-602 DA-720753.001 REST STRUCTURAL SUPPORT
PIPE SUPPORT DETAIL PNFS0001
PIPE SUPPORT DETAILS BE-181496.016
19 102-PS-172 30"-P-1507 BB-192001.001 BE-181496 SHT 07 S-05-30" SHOE 95.088 94.988

20 SL-102-30 30"-P-1507 BB-192001.001 BE-181496 SHT 07 S-05-30" SHOE 95.088 94.988

21 SL-102-26 30"-P-1507 BB-192001.001 BE-181496 SHT 07 S-05-30" SHOE 95.088 94.988

22 102-PS-169 30"-P-1507 BB-192001.001 BE-181496 SHT 07 S-05-30" SHOE 97.374 97.274

23 102-PS-168 30"-P-1507 BB-192001.001 BE-181496 SHT 07 S-05-30" SHOE 97.374 97.274

REVISION VALIDATION
24 102-PS-EXS 30"-P-605 REST STRUCTURAL SUPPORT

THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


25 102-PS-EXS 30"-P-605 REST STRUCTURAL SUPPORT
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

26 102-PS-177 30"-P-1212 BB-192002.001 BE-181496 SHT 07 S-05-30" SHOE 95.088 94.988


10-00615-0001-001

27 SL-102-31 30"-P-1212 BB-192002.001 BE-181496 SHT 07 S-05-30" SHOE 95.088 94.988


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
28 SL-102-27 30"-P-1212 BB-192002.001 BE-181496 SHT 07 S-05-30" SHOE 95.088 94.988
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

PVP SHM AMJ BAQ


29 102-PS-174 30"-P-1212 BB-192002.001 BE-181496 SHT 07 S-05-30" SHOE 97.374 97.274
05/06/2015 08/31/2015 08/31/2015 08/31/2015
REV. NO. DATE REVISION DESCRIPTION
30 102-PS-173 30"-P-1212 BB-192002.001 BE-181496 SHT 07 S-05-30" SHOE 97.374 97.274
00 08/31/2015 ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR
31 102-PS-EXS 30"-P-608 REST STRUCTURAL SUPPORT CONSTRUCTION UNTIL CERTIFIED AND DATED.
10-00615-0001-001

32 102-PS-EXS 30"-P-608 REST STRUCTURAL SUPPORT SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
33 102-PS-182 30"-P-1508 BB-192003.001 BE-181496 SHT 07 S-05-30" SHOE 95.088 94.988 PIPE SUPPORT SCHEDULE
SDT
AXL-2ND STAGE PUMPS AND TANK
34 SL-102-32 30"-P-1508 BB-192003.001 BE-181496 SHT 07 S-05-30" SHOE 95.088 94.988
PROD. FAC. TANK FARM NO. 1
ABQAIQ SAUDI ARABIA
35 SL-102-28 30"-P-1508 BB-192003.001 BE-181496 SHT 07 S-05-30" SHOE 95.088 94.988
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

102 M BB-185161 004 00


Saudi Aramco 2636-ENG. (11/2010)

EXCEL
Saudi Aramco SA2636-ENG (11/2010)
NOTES:
1- ALL DIMENSIONS ARE IN MM AND ELEVATIONS ARE IN METERS
UNLESS OTHERWISE NOTED.

SR. SUPPORT LINE PIPING PLAN ISOMETRIC SUPPORT PIPE SUPPORT BOP TOS 2- SUPPORTS SHALL BE MODIFIED ACCORDING TO SITE CONDITIONS.
DESCRIPTION REMARKS
NO. NO. NO. REFERENCE REFERENCE DWG NO. CALL OUT M M
3- FOR EXACT LOCATION OF SUPPORTS REFER TO THE RESPECTIVE
1 102-PS-179 30"-P-1508 BB-192003.001 BE-181496 SHT 07 S-05-30" SHOE 97.374 97.274 ISOMETRICS/PIPING PLAN

2 102-PS-178 30"-P-1508 BB-192003.001 BE-181496 SHT 07 S-05-30" SHOE 97.374 97.274


DA-720753.001
3 102-PS-EXS 30"-P-611 REST STRUCTURAL SUPPORT

4 102-PS-EXS 30"-P-611 REST STRUCTURAL SUPPORT

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER
30"-P-1188 BB-863803.002 BE-181496 SHT 07 S-05-30" SHOE 100.74 100.64

30"-P-1190 BB-863805.002 BE-181496 SHT 07 S-05-30" SHOE 100.74 100.64


5 102-PS-036 DA-720753.002
BE-181496 SHT 07 S-05-30"
30"-P-1189 BB-863804.002 SHOE 100.74 100.64
BE-181496 SHT 10 LEGEND
24"-P-1198 BB-863816.003 REST 99.4 99.4 STRUCTURAL SUPPORT
TOS - TOP OF STEEL
BOP - BOTTOM OF PIPE
6 102-PS-037 20"-P-1197 BB-863815.004 REST 101.784 101.784 STRUCTURAL SUPPORT

BE-181496 SHT 07 S-05-30"


30"-P-1188 BB-863803.002 SHOE + GUIDE 100.740 100.640
BE-181496 SHT 10 SGW-06-30"
BE-181496 SHT 07 S-05-30"
30"-P-1190 BB-863805.002 SHOE + GUIDE 100.740 100.640
BE-181496 SHT 10 SGW-06-30"
7 102-PS-059
BE-181496 SHT 07 S-05-30"
30"-P-1189 BB-863804.002 SHOE + GUIDE 100.740 100.640
BE-181496 SHT 10 SGW-06-30"

24"-P-1198 BB-863816.003 PNFS0210 PG-5-24" GUIDE 99.4 99.400

30"-P-1188 BB-863803.002 BE-181496 SHT 07 S-05-30" SHOE 100.740 100.640

30"-P-1190 BB-863805.002 BE-181496 SHT 07 S-05-30" SHOE 100.740 100.640


8 102-PS-060
30"-P-1189 BB-863804.002 BE-181496 SHT 07 S-05-30" SHOE 100.740 100.640

24"-P-1198 BB-863816.003 PNFS0210 PG-5-24" GUIDE 99.400 99.400


REFERENCE DRAWING
BA-230602.001 BE-181496 SHT 07 S-05-30"
DRAWING CONTROL FOR J.O. 10-00615-0001 BD-168257
30"-P-1188 BB-863803.002 BE-181496 SHT 10 SGW-06-30" SHOE + GUIDE + DIRECTIONAL STOP 99.600 99.500
PIPE SUPPORT DETAIL PNFS0001
9 102-PS-061 BE-181496 SHT 09 SGW-05-30"
BE-181496 SHT 07 S-05-30" PIPE SUPPORT DETAILS BE-181496.016
30"-P-1190 BB-863805.002 SHOE + DIRECTIONAL STOP 99.600 99.500
BE-181496 SHT 09 SGW-05-30"
BE-181496 SHT 07 S-05-30"
10 102-PS-072 30"-P-1189 BB-863804.002 SHOE + GUIDE 99.6 99.500
BE-181496 SHT 10 SGW-06-30"
BE-181496 SHT 02 TRW-02-24"-20"-605
11 102-PS-073 24"-P-1209 BB-139073.001 TRUNNION + TEFLON PAD 94.453 94.133
PNFS0371 PS-22-1-450-450-350-350
BE-181496 SHT 07 S-05-30"
12 102-PS-067 30"-P-1190 BB-863805.002 SHOE + GUIDE 99.600 99.500
BE-181496 SHT 10 SGW-06-30"
BE-181496 SHT 02 TRW-02-24"-20"-605
13 102-PS-068 24"-P-1208 BB-139072.001 TRUNNION + TEFLON PAD 94.453 94.133
PNFS0371 PS-22-1-450-450-350-350
REVISION VALIDATION
14 102-PS-038 30"-P-1188 BB-863803.002 BE-181496 SHT 07 S-05-30" SHOE 99.600 99.500

THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


15 102-PS-039 24"-P-1198 BB-863816.003 REST 99.400 99.400 STRUCTURAL SUPPORT
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

16 102-PS-040 24"-P-1198 BB-863816.003 PNFS0210 PG-5-24" GUIDE 99.400 99.400


10-00615-0001-001

17 102-PS-075 30"-P-1188 BB-863803.002 BE-181496 SHT 07 S-05-30" SHOE 99.9 99.800


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
OTHER
BE-181496 SHT 07 S-05-30" (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
18 102-PS-076 30"-P-1188 BA-230603.001 BB-863803.002 SHOE + GUIDE 99.900 99.800
BE-181496 SHT 10 SGW-06-30" ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

BE-181496 SHT 02 TRW-02-24"-20"-605 PVP SHM AMJ BAQ


19 102-PS-077 24"-P-1207 BB-863824.001 TRUNNION + TEFLON PAD 94.453 94.133
PNFS0371 PS-22-1-450-450-350-350 05/06/2015 08/31/2015 08/31/2015 08/31/2015
REV. NO. DATE REVISION DESCRIPTION
20 102-PS-078 20"-P-1197 BB-863815.002 REST 93.6 93.6 STRUCTURAL SUPPORT
00 08/31/2015 ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR
21 102-PS-188 2"-BD-1227 BA-863792.001 BB-191988.001 PNFS0802 FG-3-2" REST + GUIDE 97.135 97.135 CONSTRUCTION UNTIL CERTIFIED AND DATED.
10-00615-0001-001

22 102-PS-257 2"-BD-1227 BB-191988.001 PNFS0802 FG-3-2" REST + GUIDE 93.106 93.106 SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
PIPE SUPPORT SCHEDULE
SDT
AXL-2ND STAGE PUMPS AND TANK
PROD. FAC. TANK FARM NO. 1
ABQAIQ SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

102 M BB-185161 005 00


Saudi Aramco 2636-ENG. (11/2010)

EXCEL
Saudi Aramco SA2636-ENG (11/2010)
NOTES:
1- ALL DIMENSIONS ARE IN MM AND ELEVATIONS ARE IN METERS
UNLESS OTHERWISE NOTED.

SR. SUPPORT LINE PIPING PLAN ISOMETRIC SUPPORT PIPE SUPPORT BOP TOS 2- SUPPORTS SHALL BE MODIFIED ACCORDING TO SITE CONDITIONS.
DESCRIPTION REMARKS
NO. NO. NO. REFERENCE REFERENCE DWG NO. CALL OUT M M
3- FOR EXACT LOCATION OF SUPPORTS REFER TO THE RESPECTIVE
1 102-PS-137 1"-BD-1226 BB-176634.001. REST 97.966 97.966 STRUCUTURAL SUPPORT ISOMETRICS/PIPING PLAN

2 102-PS-138 1"-BD-1220 BB-139090.001. REST 97.966 97.966 STRUCUTURAL SUPPORT

3 102-PS-139 4"-OW-1231 BB-176638.001 REST 96.200 96.200 STRUCUTURAL SUPPORT

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER
4

5 DELETED

7 102-PS-194 1"-BD-1216 BA-863793.001 BB-139086.001 PNFS0809 FPG-10-286-1"-150 GUIDE 100.763 100.763 WORK POINT ELEVATION ( CLEAT)
LEGEND
8 102-PS-195 1"-BD-1222 BB-176630.001 PNFS0611 FPS-12-283 VERTICAL ANCHOR 106.763 106.763 WORK POINT ELEVATION ( CLEAT)
TOS - TOP OF STEEL
BOP - BOTTOM OF PIPE
9 102-PS-196 1"-BD-1222 BB-176630.001 PNFS0809 FPG-10-286-1"-150 GUIDE 103.763 103.763 WORK POINT ELEVATION ( CLEAT)

10 102-PS-197 1"-BD-1223 BB-176631.001 PNFS0611 FPS-12-283 VERTICAL ANCHOR 103.638 103.638 WORK POINT ELEVATION ( CLEAT)

11 102-PS-198 1"-BD-1223 BB-176631.001 PNFS0809 FPG-10-290-1"-150 GUIDE 100.638 100.638 WORK POINT ELEVATION ( CLEAT)

12 102-PS-199 1"-BD-1224 BB-176632.001 PNFS0611 FPS-12-290 VERTICAL ANCHOR 100.513 100.513 WORK POINT ELEVATION ( CLEAT)

13 102-PS-200 1"-BD-1222 BB-176630.001.A PNFS0809 FPG-10-290-1"-150 GUIDE 100.763 100.763 WORK POINT ELEVATION ( CLEAT)

1"-LO-1503 BB-181427.001 PNFS0802 FPG-3-1" GUIDE 96.461 96.461


14 102-PS-183
1"-LO-1504 BB-181428.001 PNFS0802 FPG-3-1" GUIDE 96.461 96.461
1"-LO-1503 BB-181427.001 PNFS0802 FPG-3-1" GUIDE 96.461 96.461
15 102-PS-184 BA-863792.001
1"-LO-1504 BB-181428.001 PNFS0802 FPG-3-1" GUIDE 96.461 96.461
1"-LO-1503 BB-181427.001 PNFS0802 FPG-3-1" GUIDE 96.461 96.461
16 102-PS-185
1"-LO-1504 BB-181428.001 PNFS0802 FPG-3-1" GUIDE 96.461 96.461

17 102-PS-186 2"-BD-1213 BB-139083.001 REST 96.311 96.311 STRUCUTURAL SUPPORT


REFERENCE DRAWING
DRAWING CONTROL FOR J.O. 10-00615-0001 BD-168257
18 102-PS-187 2"-BD-1213 BB-139083.001 REST 96.311 96.311 STRUCUTURAL SUPPORT
PIPE SUPPORT DETAIL PNFS0001
PIPE SUPPORT DETAILS BE-181496.016
19 102-PS-189 1"-BD-1216 BB-139086.001 PNFS0611 FPS-12-283 VERTICAL ANCHOR 106.763 106.763 WORK POINT ELEVATION ( CLEAT)

20 102-PS-190 1"-BD-1216 BA-863793.001 BB-139086.001 PNFS0809 FPG-10-283-1"-150 GUIDE 103.763 103.763 WORK POINT ELEVATION ( CLEAT)

21 102-PS-191 1"-1217 BB-139087.001 PNFS0611 FPS-12-283 VERTICAL ANCHOR 103.638 103.638 WORK POINT ELEVATION ( CLEAT)

22 102-PS-192 1"-1217 BB-139087.001 PNFS0809 FPG-10-290-1"-150 GUIDE 100.638 100.638 WORK POINT ELEVATION ( CLEAT)

23 102-PS-193 1"-BD-1218 BB-139088.001 PNFS0611 FPS-12-290 VERTICAL ANCHOR 100.513 100.513 WORK POINT ELEVATION ( CLEAT)
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:


24 102-PS-201 2"-BD-1213 BB-139083.001 PNFS0802 FPG-3-2" GUIDE 93.170 93.170
10-00615-0001-001

25 102-PS-202 2"-BD-1213 BB-139083.001 REST 93.170 93.170 STRUCUTURAL SUPPORT


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
26 102-PS-203 2"-BD-1213 BB-139083.001 REST 93.170 93.170 STRUCUTURAL SUPPORT
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
BA-863792.001
PVP SHM AMJ BAQ
27 102-PS-204 2"-BD-1213 BB-139083.001 PNFS0802 FPG-3-2" GUIDE 93.170 93.170
05/06/2015 08/31/2015 08/31/2015 08/31/2015
REV. NO. DATE REVISION DESCRIPTION
28 102-PS-205 2"-BD-1214 BB-139084.001 PNFS0802 FPG-3-2" GUIDE 93.170 93.170
00 08/31/2015 ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR
29 102-PS-206 2"-BD-1214 BB-139084.001 PNFS0802 FPG-3-2" GUIDE 93.170 93.170 CONSTRUCTION UNTIL CERTIFIED AND DATED.
10-00615-0001-001

30 102-PS-207 2"-BD-1225 BA-863793.001 BB-176633.001 REST 97.05 97.05 STRUCUTURAL SUPPORT SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
31 102-PS-255 24"-P-1198 BB-836816.001 PNFS0802 FPG-3-2" GUIDE 93.096 93.096 PIPE SUPPORT SCHEDULE
SDT
BA-863792.001
AXL-2ND STAGE PUMPS AND TANK
32 102-PS-256 24"-P-1198 BB-836816.001 PNFS0802 FPG-3-2" GUIDE 93.096 93.096
PROD. FAC. TANK FARM NO. 1
ABQAIQ SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

102 M BB-185161 006 00


Saudi Aramco 2636-ENG. (11/2010)

EXCEL
Saudi Aramco SA2636-ENG (11/2010)
NOTES:
1- ALL DIMENSIONS ARE IN MM AND ELEVATIONS ARE IN METERS
UNLESS OTHERWISE NOTED.

SR. SUPPORT LINE PIPING PLAN ISOMETRIC PIPE SUPPORT BOP TOS 2- SUPPORTS SHALL BE MODIFIED ACCORDING TO SITE CONDITIONS.
SUPPORT DWG NO. DESCRIPTION REMARKS
NO. NO. NO. REFERENCE REFERENCE CALL OUT M M
3- FOR EXACT LOCATION OF SUPPORTS REFER TO THE RESPECTIVE
ISOMETRICS/PIPING PLAN
1 102-PS-081 4"-OW-1231 BB-176638.001 REST 96.200 96.200 STRUCTURAL SUPPORT

12"-P-1203 BB-863821.001 REST 96.200 96.200 STRUCTURAL SUPPORT

BE-181496 SHT 05 SHW-02-26"


2 102-PS-082 26"-P-1202 BB-863820.001 SHOE + TEFLON PAD 97.254 97.154
PNFS0371 PS-22-1-300-300-200-200

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER
4"-OW-1231 BB-176638.001 REST 96.200 96.200 STRUCTURAL SUPPORT

PNFS0209 PG-4-2-300
12"-P-1203 BB-863821.001 REST + GUIDE + LINE STOP 96.200 96.200
PNFS0101 DS-2-3
BE-181496 SHT 05 SHW-02-26"
3 102-PS-083 26"-P-1202 BB-863820.001 SHOE + TEFLON PAD 97.254 97.154
PNFS0371 PS-22-1-300-300-200-200 LEGEND
4"-OW-1231 BB-176638.001 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200
TOS - TOP OF STEEL
BOP - BOTTOM OF PIPE
12"-P-1203 BB-863821.001 REST 96.200 96.200 STRUCTURAL SUPPORT

4 102-PS-084 26"-P-1202 BB-863820.001 BE-181496 SHT 05 SHW-02-26" SHOE 97.254 97.154

4"-OW-1232 BB-183514.001 REST 96.200 96.200 STRUCTURAL SUPPORT


4"-OW-1231 BB-176638.001 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200

BA-863795.001

5 DELETED

6 102-PS-086 4"-OW-1232 BB-183514.001 REST 96.611 96.611 STRUCTURAL SUPPORT

12"-P-1203 BB-863821.001 REST 96.200 96.200 STRUCTURAL SUPPORT


7 102-PS-087
4"-OW-1232 BB-183514.001 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200
4"-OW-1231 BB-176638.001 REST 96.200 96.200 STRUCTURAL SUPPORT REFERENCE DRAWING
DRAWING CONTROL FOR J.O. 10-00615-0001 BD-168257
12"-P-1203 BB-863821.001 REST 96.200 96.200 STRUCTURAL SUPPORT
PIPE SUPPORT DETAIL PNFS0001
BE-181496 SHT 05 SHW-02-26" PIPE SUPPORT DETAILS BE-181496.016
8 102-PS-088 26"-P-1202 BB-863820.001 SHOE + GUIDE 97.254 97.154
BE-181496 SHT 10 SGW-06-26"
4"-OW-1232 BB-183514.001 REST 96.200 96.200 STRUCTURAL SUPPORT
4"-OW-1231 BB-176638.001 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200

12"-P-1203 BB-863821.001 REST 96.200 96.200 STRUCTURAL SUPPORT

9 102-PS-089 26"-P-1202 BB-863820.001 BE-181496 SHT 05 SHW-02-26" SHOE 97.254 97.154

4"-OW-1232 BB-183514.001 PNFS0209 PG-4-1-04" GUIDE 96.200 96.200


4"-OW-1231 BB-176638.001 REST 96.200 96.200 STRUCTURAL SUPPORT
REVISION VALIDATION

THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-00615-0001-001

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS


OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

PVP SHM AMJ BAQ


05/06/2015 08/31/2015 08/31/2015 08/31/2015
REV. NO. DATE REVISION DESCRIPTION

00 08/31/2015 ISSUED FOR CONSTRUCTION


JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR
10-00615-0001-001 CONSTRUCTION UNTIL CERTIFIED AND DATED.

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
PIPE SUPPORT SCHEDULE
SDT
AXL-2ND STAGE PUMPS AND TANK
PROD. F AC. TANK FARM NO. 1
ABQAIQ SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

102 M BB-185161 007 00


Saudi Aramco 2636-ENG. (11/2010)

EXCEL
Saudi Aramco SA2636-ENG (11/2010)
NOTES:
1- ALL DIMENSIONS ARE IN MM AND ELEVATIONS ARE IN METERS
UNLESS OTHERWISE NOTED.

SR. SUPPORT LINE PIPING PLAN ISOMETRIC SUPPORT PIPE SUPPORT BOP TOS 2- SUPPORTS SHALL BE MODIFIED ACCORDING TO SITE CONDITIONS.
DESCRIPTION REMARKS
NO. NO. NO. REFERENCE REFERENCE DWG NO. CALL OUT M M
3- FOR EXACT LOCATION OF SUPPORTS REFER TO THE RESPECTIVE
1 102-PS-115 REST 97.011 97.011 STRUCTURAL SUPPORT ISOMETRICS/PIPING PLAN

2 102-PS-116 PNFS0209 PG-4-1-4" GUIDE 97.011 97.011


4"-0W-1228 BB-176635.001
3 102-PS-117 PNFS0209 PG-4-1-4" GUIDE 97.011 97.011

4 102-PS-118 REST 97.011 97.011 STRUCTURAL SUPPORT

5 102-PS-119 REST 97.011 97.011 STRUCTURAL SUPPORT

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER
6 102-PS-120 PNFS0209 PG-4-1-4" GUIDE 97.011 97.011
4"-0W-1229 BB-176636.001
7 102-PS-121 PNFS0209 PG-4-1-4" GUIDE 97.011 97.011
LEGEND
8 102-PS-122 REST 97.011 97.011 STRUCTURAL SUPPORT
TOS - TOP OF STEEL
BOP - BOTTOM OF PIPE
9 102-PS-123 REST 97.011 97.011 STRUCTURAL SUPPORT

10 102-PS-124 PNFS0209 PG-4-1-4" GUIDE 97.011 97.011


4"-0W-1230 BB-176637.001
11 102-PS-125 PNFS0209 PG-4-1-4" GUIDE 97.011 97.011

12 102-PS-126 REST 97.011 97.011 STRUCTURAL SUPPORT

102-PS-140 1"-BD-1219 BB-139089.001 REST 97.05 97.05 STRUCTURAL SUPPORT


13
102-PS-141 1"-BD-1219 BB-139089.001 REST 97.05 97.05 STRUCTURAL SUPPORT
102-PS-142 1"-BD-1219 BB-139089.001 PNFS0802 FPG-3-1/2" GUIDE 97.05 97.05
14
102-PS-143 1"-BD-1219 BB-139089.001 REST 97.05 97.05 STRUCTURAL SUPPORT
102-PS-144 1"-BD-1219 BB-139089.001 PNFS0802 FPG-3-1/2" GUIDE 97.05 97.05
15
102-PS-145 1"-BD-1219 BB-139089.001 REST 97.05 97.05 STRUCTURAL SUPPORT

16 102-PS-146 1"-BD-1219 BB-139089.001 PNFS0802 FPG-3-1/2" GUIDE 97.050 97.050


BA-863793.001
17 102-PS-147 1"-BD-1219 BB-139089.001 REST 97.050 97.050 STRUCTURAL SUPPORT
REFERENCE DRAWING
DRAWING CONTROL FOR J.O. 10-00615-0001 BD-168257
18 102-PS-148 1"-BD-1219 BB-139089.001 PNFS0802 FPG-3-1/2" GUIDE 97.050 97.050
PIPE SUPPORT DETAIL PNFS0001
PIPE SUPPORT DETAILS BE-181496.016
19 102-PS-149 1"-BD-1225 BB-176633.001 REST 97.050 97.050 STRUCTURAL SUPPORT

20 102-PS-150 1"-BD-1225 BB-176633.001 PNFS0802 FPG-3-1/2" GUIDE 97.050 97.050

21 102-PS-151 1"-BD-1225 BB-176633.001 REST 97.050 97.050 STRUCTURAL SUPPORT

22 102-PS-152 1"-BD-1225 BB-176633.001 PNFS0802 FPG-3-1/2" GUIDE 97.050 97.050

23 102-PS-153 1"-BD-1225 BB-176633.001 REST 97.050 97.050 STRUCTURAL SUPPORT

24 102-PS-154 1"-BD-1225 BB-176633.001 PNFS0802 FPG-3-1/2" GUIDE 97.050 97.050

REVISION VALIDATION
25 102-PS-155 1"-BD-1225 BB-176633.001 REST 97.050 97.050 STRUCTURAL SUPPORT

THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


26 102-PS-156 1"-BD-1225 BB-176633.001 PNFS0802 FPG-3-1/2" GUIDE 97.050 97.050
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

27 102-PS-157 95.800 95.800 STRUCTURAL SUPPORT


10-00615-0001-001

28 102-PS-158 PNFS0209 PG-4-1-4" GUIDE 95.800 95.800


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
4"-OW-1232 BB-183514.001 (DESIGN AGENCY)
OTHER
REQUIRED (SAUDI ARAMCO)
29 102-PS-159 95.800 95.800 STRUCTURAL SUPPORT
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

PVP SHM AMJ BAQ


30 102-PS-160 PNFS0209 PG-4-1-4" GUIDE 95.800 95.800
05/06/2015 08/31/2015 08/31/2015 08/31/2015
REV. NO. DATE REVISION DESCRIPTION
31 102-PS-210 1"-BD-1219 BB-139089.001 PNFS0611 FPS-12-295 VERTICAL ANCHOR 98.383 98.383 WORK POINT ELEVATION ( CLEAT)
00 08/31/2015 ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR
32 102-PS-211 1"-BD-1225 BB-176633.001 PNFS0611 FPS-12-295 VERTICAL ANCHOR 98.383 98.383 WORK POINT ELEVATION ( CLEAT) CONSTRUCTION UNTIL CERTIFIED AND DATED.
10-00615-0001-001

33 102-PS-161 4"-OW-1232 BB-183514.001 PNFS0209 PG-4-1-4" GUIDE 95.800 95.800 SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
PIPE SUPPORT SCHEDULE
SDT
AXL-2ND STAGE PUMPS AND TANK
PROD. FAC. TANK FARM NO. 1
ABQAIQ SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

102 M BB-185161 008 00


Saudi Aramco 2636-ENG. (11/2010)
EXCEL
Saudi Aramco SA2636-ENG (11/2010)
NOTES:
1- ALL DIMENSIONS ARE IN MM AND ELEVATIONS ARE IN METERS
UNLESS OTHERWISE NOTED.

SR. SUPPORT LINE PIPING PLAN ISOMETRIC SUPPORT PIPE SUPPORT BOP TOS 2- SUPPORTS SHALL BE MODIFIED ACCORDING TO SITE CONDITIONS.
DESCRIPTION REMARKS
NO. NO. NO. REFERENCE REFERENCE DWG NO. CALL OUT M M
3- FOR EXACT LOCATION OF SUPPORTS REFER TO THE RESPECTIVE
ISOMETRICS/PIPING PLAN

1 DELETED

2 DELETED

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER
3 102-PS-093 26"-P-1202 BB-863820.001 BE-181496 SHT 05 SHW-02-26" SHOE 96.533 96.433
BA-366651.001
LEGEND
4 102-PS-094 26"-P-1202 BB-863820.001 BE-181496 SHT 05 SHW-02-26" SHOE 96.533 96.433
TOS - TOP OF STEEL
BOP - BOTTOM OF PIPE
5 102-PS-095 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200

6 102-PS-096 REST 96.200 96.200 STRUCTURAL SUPPORT

7 102-PS-097 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200

8 102-PS-098 REST 96.200 96.200 STRUCTURAL SUPPORT

9 102-PS-099 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200

10 102-PS-100 REST 96.200 96.200 STRUCTURAL SUPPORT

102-PS-101 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200


11
102-PS-102 REST 96.200 96.200 STRUCTURAL SUPPORT

12 102-PS-103 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200


REFERENCE DRAWING
DRAWING CONTROL FOR J.O. 10-00615-0001 BD-168257
13 102-PS-104 REST 96.200 96.200 STRUCTURAL SUPPORT
PIPE SUPPORT DETAIL PNFS0001
4"-OW-1231 BA-863793.001 BB-176638.001.
PIPE SUPPORT DETAILS BE-181496.016
14 102-PS-105 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200

15 102-PS-106 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200

16 102-PS-107 REST 96.200 96.200 STRUCTURAL SUPPORT

17 102-PS-108 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200

18 102-PS-109 REST 96.200 96.200 STRUCTURAL SUPPORT

19 102-PS-110 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200

REVISION VALIDATION
20 102-PS-111 REST 96.200 96.200 STRUCTURAL SUPPORT

THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


21 102-PS-112 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

22 102-PS-113 REST 96.200 96.200 STRUCTURAL SUPPORT


10-00615-0001-001

23 102-PS-114 PNFS0209 PG-4-1-4" GUIDE 96.200 96.200


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

PVP SHM AMJ BAQ


05/06/2015 08/31/2015 08/31/2015 08/31/2015
REV. NO. DATE REVISION DESCRIPTION

00 08/31/2015 ISSUED FOR CONSTRUCTION


JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR
10-00615-0001-001 CONSTRUCTION UNTIL CERTIFIED AND DATED.

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
PIPE SUPPORT SCHEDULE
SDT
AXL-2ND STAGE PUMPS AND TANK
PROD. FAC. TANK FARM NO. 1
ABQAIQ SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

102 M BB-185161 009 00


Saudi Aramco 2636-ENG. (11/2010)