Professional Documents
Culture Documents
PMT OPRNS
AMIEF 2713: DATA AND OPERATING LIMITS - SHELL & TUBE HEAT EXCHANGERS
EQUIPMENT DATA
ENGG CERT
TUBE SIDE
DESCRIPTION
OPERATING LIMITS
(OPERATING LIMITS REQUIRE OPERATIONS ENGINEERING APPROVAL)
JO/EWO
SHELL TUBES
OC (OF) OC (OF)
DESIGN PRESS.: kPa(ga) (psig) DESIGN PRESS.: kPa(ga) (psig)
MIN. THICK. AT: OC (OF) NOTE ANY OTHER BASIS MIN. THICK. AT: OC (OF) NOTE ANY OTHER BASIS
kPa(ga) (psig) tm c kPa(ga) (psig) tm c
DISCIPLINE
ENGINEER SHELL CHANNEL
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISION CERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
SIS FOR DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SIS
A
0
SAUDI ARABIA JO / EWO