BOREPILE DESIGN CALCULATION USING ASSUMED UNIT ROCK SOCKET FRICTION VALUES

Assumptions : Unit Rock Socket Friction:


- For rock with RQD between 0% - 25% use fs = 250kN/m
- For rock with RQD between 20% - 49% use fs = 350kN/m2
- For rock with RQD between 50% - 75% use fs = 450kN/m2
- For rock with RQD between 76% - 100% use fs = 500kN/m2

The respective S.I bore logs recorded the following recovery percentage values and in the absence

of proper RQD%, the recovery shall be utilised at BP the level


Bore No RQD value (%)

1 87%

2 77%
3 88%

4 71%
5 100%
6 100%

Inview that the excavated pit surface of the rock socket will be highly fracfured after being subjected
to control blasting, the strength of the rock within the socket vicinity will substantially be weakened.

Thus for the purpose of design the unit allowable frictional capacity is taken as 300kN/m2.

Tabulated Borepile Capacity

Borepile Diameter (m) Borepile Capacity (2∏r x (3m)socket length

450 1272.4kN
600 1696.5
750 2120.6

900 2544.7
1050 2968.8
1200 3392.9
1350 3817

Tabulated Rock Socket (Caisson Pile) Capacity

Pile Cap Group Borepile Capacity (Area x (3m)socket length


Kn
P1 (1050D) - 3 Nos 5959.8
P5 (900D) - 2 Nos 2030.4
P6 (1200D) - 2 Nos 3609.9
P7 (1050D) - 4 Nos 8717.4
P10 (600D) - 1 Nos 126.9
P16 (750D) - 2 Nos 11385.9
P17 (1200D) - 4 Nos 1410.3
P20 (450D) - 1 Nos 71.1
P23 (1350D) - 2 Nos 4568.4
SUMMARY OF BOREPILE DESIGN CALCULATION FROM
UNIT ROCK SOCKET FRICTION VALUES

Bore Pile Capacity(Derived From Unit Rock Socket Friction) Check against Working Load :

Size Of
Column Applied Geotechnical
Pile No Of
Column Working Load Per Capacity Per Remarks
Proposed Piles
Load (kN) Pile (kN) Pile (kN)
(mm)

1/D1 689.00 450 1 689.0 1272.40 OK!!


1/E 624.00 450 1 624.0 1272.40 OK!!
1/E1 757.00 450 1 757.0 1272.40 OK!!

1/F 729.00 450 1 729.0 1272.40 OK!!


450 1 712.0 1272.40 OK!!
1/F1 712.00
1a/E 663.00 450 1 663.0 1272.40 OK!!
450 1 375.0 1272.40 OK!!
1a/F 375.00
1b/D 638.00 450 1 638.0 1272.40 OK!!
1b/G 677.00 450 1 677.0 1272.40 OK!!
2/C1 625.00 450 1 625.0 1272.40 OK!!
450 1 762.0 1272.40 OK!!
2/D1 762.00
2/E 2924.00 600 2 1462.0 1696.50 OK!!
600 2 1424.0 1696.50 OK!!
2/F 2848.00
2/F2 360.00 450 1 360.0 1272.40 OK!!
2/G1 670.00 450 1 670.0 1272.40 OK!!
3/C1 534.00 450 1 534.0 1272.40 OK!!
3/D1 1357.00 450 2 678.5 1272.40 OK!!
3/E 5937.00 900 3 1979.0 2544.70 OK!!
900 3 1535.7 2544.70 OK!!
3/F 4607.00
3/G 1595.00 450 2 797.5 1272.40 OK!!
3/G1 605.00 450 1 605.0 1272.40 OK!!
450 3 932.0 1272.40 OK!!
3a/H1 2796.00
4/D 3965.00 750 2 1982.5 2120.60 OK!!
4/E 10172.00 1050 4 2543.0 2968.80 OK!!
4/F 17377.00 1200 6 2896.2 3392.90 OK!!
750 3 1806.3 2120.60 OK!!
4/G 5419.00
4/G1 3735.00 750 2 1867.5 2120.60 OK!!
4/H 830.00 450 1 830.0 1272.40 OK!!
4/H1 2796.00 600 2 1398.0 1696.50 OK!!
5/B1 1934.00 450 2 967.0 1272.40 OK!!
5/C 6624.00 1050 3 2208.0 2968.80 OK!!
5/D 11602.00 1200 4 2900.5 3392.90 OK!!
5/E 15818.00 1050 6 2636.3 2968.80 OK!!
5/F 11916.00 1200 4 2979.0 3392.90 OK!!
5/G 11450.00 1350 3 3816.7 3817.00 OK!!
5/H 3844.00 750 2 1922.0 2120.60 OK!! 18(ROCK)
6/B1 5073.00 1050 2 2536.5 2968.80 OK!! 19(ROCK)
6/C 8147.00 1050 3 2715.7 2968.80 OK!!
6/D 13797.00 1350 4 3449.3 3817.00 OK!!
6/E 11624.00 1200 4 2906.0 3392.90 OK!!
6/F 12368.00 1200 4 3092.0 3392.90 OK!!
6/G 13806.00 1350 4 3451.5 3817.00 OK!!
6a/A 2270.00 600 2 1135.0 1696.50 OK!!
6a/B 4815.00 1200 2 2407.5 3392.90 OK!!
6b/A00 4174.00 600 3 1391.3 1696.50 OK!!
6b/B 6338.00 1200 2 3169.0 3392.90 OK!!
7/B1 5579.00 1050 2 2789.5 2968.80 OK!!
7/C 8027.00 1050 3 2675.7 2968.80 OK!!
7/D 10309.00 1350 3 3436.3 3817.00 OK!!
7/E 9829.00 1050 4 2457.3 2968.80 OK!!
7/F 9294.00 1050 4 2323.5 2968.80 OK!!
7a/C 10282.00 1050 4 2570.5 2968.80 OK!!
7a/D 6588.00 1200 2 3294.0 3392.90 OK!!
7a/D1 6244.00 1200 2 3122.0 3392.90 OK!!
7a/E 6003.00 1200 2 3001.5 3392.90 OK!!
7a/F 6208.00 1200 2 3104.0 3392.90 OK!!
8/A 5487.00 600 4 1371.8 1696.50 OK!!
8/B 8028.00 1050 3 2676.0 2968.80 OK!!
8/D 6588.00 1350 2 3294.0 3817.00 OK!!
8/E 1023.00 600 1 1023.0 1696.50 OK!!
8/F 1095.00 600 1 1095.0 1696.50 OK!!
8a/A00 3110.00 600 2 1555.0 1696.50 OK!!
8a/D 9458.50 1350 3 3152.8 3817.00 OK!!
8a/D1 1444.00 600 1 1444.0 1696.50 OK!!
8a/E 1934.00 450 2 967.0 1272.40 OK!!
8a/F 1938.00 450 2 969.0 1272.40 OK!!
9/A 2996.00 600 2 1498.0 1696.50 OK!!
9/B 4705.00 900 2 2352.5 2544.70 OK!!
9/C 5609.00 1050 2 2804.5 2968.80 OK!!
9/D 9458.50 1350 3 3152.8 3817.00 OK!!
9/E 868.00 450 1 868.0 1272.40 OK!!

9/F 887.00 450 1 887.0 1272.40 OK!!


CADANGAN MEMBINA MAHKAMAH SYARIAH
WILAYAH PERSEKUTUAN KUALA LUMPUR (Zone A By AKS)

Caisson Pile Capacity/Working Load Check

Caisson
Column Caisson Caisson
Pile Caisson Pile
Column Working Pile Area Pile depth Remarks
Referenc Capacity (kN)
Load (kN) (m.sq) (m)
e no
3a/J 1986.00 P16 1.567 4.5 2115.45 OK!!
3a/K 1425.00 P16 1.567 3.5 1645.35 OK!!
4/J 2103.00 P16 1.567 4.5 2115.45 OK!!
5/K 107.00 P20 0.079 7.0 166.91 OK!! 18(ROCK)
5/L 156.00 P20 0.079 7.0 166.91 OK!! 19(ROCK)
P10(1200
0.565 7.5 1271.70 OK!!
6/H 1198.00 D)
6/H1 10216.00 P17 12.651 3.0 11385.90 OK!!
P10(1200
0.565 7.0 1186.92 OK!!
6/I 1139.00 D)
6/J 624.00 P6 4.011 3.0 3609.90 OK!!
6/K 4787.00 P5 2.256 7.5 5076.00 OK!!
7/G 10920.00 P7 9.686 4.0 11623.20 OK!!
P10(1350
0.715 6.5 1394.90 OK!!
7/H 1317.00 D)
7/H1 8318.00 P1 6.622 4.5 8939.70 OK!!
P10(1200
0.565 6.0 1017.36 OK!!
7/I 940.00 D)
7/J 6653.00 P6 4.011 6.0 7219.80 OK!!
7/K 4367.00 P5 2.256 6.5 4399.20 OK!!
7/L 956.00 P20 0.565 6.0 1017.36 OK!!
7a/F1 8072.00 P17 12.651 3.0 11385.90 OK!!
7a/H1 10996.00 P17 12.651 3.0 11385.90 OK!!
P10(1200
0.565 7.5 1271.70 OK!!
8/H 1200.00 D)
8/J 7117.00 P23 5.076 5.0 7614.00 OK!!
8/K 3926.00 P23 5.076 3.0 4568.40 OK!!
P20(1200
0.565 4.5 763.02 OK!!
8/L 743.00 D)
8a/F2 5735.00 P6 4.011 5.0 6016.50 OK!!
8a/H1 8522.00 P1 6.622 4.5 8939.70 OK!!
8a/K 4244.00 P5 2.256 6.5 4399.20 OK!!
P20(900D
0.318 4.0 381.51 OK!!
8a/L 341.80 )
9a/F1 2858.00 P16 1.567 6.5 3055.65 OK!!
9a/H 4132.00 P5 2.256 6.5 4399.20 OK!!
9a/H1 4861.00 P5 2.256 7.5 5076.00 OK!!
9a/J 4168.00 P5 2.256 6.5 4399.20 OK!!
9a/K 3452.00 P16 1.567 7.5 3525.75 OK!!

'file:///conversion/tmp/activity_task_scratch/711924518.xls'#$Sheet1
CADANGAN MEMBINA MAHKAMAH SYARIAH
WILAYAH PERSEKUTUAN KUALA LUMPUR (Zone B By BWP)
Bore Pile Capacity/Working Load Check

Size Of
Column Applied Allowable
Pile No Of
Column Working Load Per Working Load Remarks
Proposed Piles
Load (kN) Pile (kN) Per Pile (kN)
(mm)
10/A00 285.00 450 2 142.5 1272.40 OK!!
10/A 2760.00 750 2 1380.0 2120.60 OK!!
10/B 5110.00 1050 2 2555.0 2968.80 OK!!
10/C 5585.00 1050 2 2792.5 2968.80 OK!!
10/D 3250.00 750 2 1625.0 2120.60 OK!!
10/E 3100.00 750 2 1550.0 2120.60 OK!!
11/A00 490.00 450 2 245.0 1272.40 OK!!
11/A00 2910.00 750 3 970.0 2120.60 OK!!
11/A1 5775.00 1050 2 2887.5 2968.80 OK!!
11/C 5900.00 1050 2 2950.0 2968.80 OK!!
11/D 4075.00 750 2 2037.5 2120.60 OK!!
11/E 3985.00 750 2 1992.5 2120.60 OK!! 18(ROCK)
12/A 2385.00 750 2 1192.5 2120.60 OK!! 19(ROCK)
12/A1 3290.00 750 2 1645.0 2120.60 OK!!
12/C 1815.00 450 2 907.5 1272.40 OK!!
13/A00 490.00 450 2 245.0 1272.40 OK!!
13/A 2895.00 750 2 1447.5 2120.60 OK!!
13/A1 5165.00 1050 2 2582.5 2968.80 OK!!
13/C 5820.00 1050 2 2910.0 2968.80 OK!!
13/D 4040.00 750 2 2020.0 2120.60 OK!!
14/A00 460.00 450 2 230.0 1272.40 OK!!
14/A 3415.00 750 2 1707.5 2120.60 OK!!
14/A1 4810.00 1050 2 2405.0 2968.80 OK!!
14/C 5225.00 1050 2 2612.5 2968.80 OK!!
14/D 3245.00 750 2 1622.5 2120.60 OK!!
15/A00 335.00 450 2 167.5 1272.20 OK!!
15/A 3340.00 750 2 1670.0 2120.60 OK!!
15/A1 5900.00 1050 2 2950.0 2968.80 OK!!
15/C 6485.00 750 4 1621.3 2120.60 OK!!
15/D 3445.00 750 2 1722.5 2120.60 OK!!
15b/A00 535.00 450 2 267.5 1272.40 OK!!
15b/C2 800.00 450 2 400.0 1272.40 OK!!
16/A 4000.00 750 2 2000.0 2120.60 OK!!
16/A1 5640.00 1050 2 2820.0 2968.80 OK!!
16/C 8045.00 750 4 2011.3 2120.60 OK!!
16/C1 4000.00 750 2 2000.0 2120.00 OK!!
16/D1 4000.00 750 2 2000.0 2120.60 OK!!
17/A 3820.00 750 2 1910.0 2120.60 OK!!
17/A1 5570.00 1050 2 2785.0 2968.80 OK!!
17/C 6200.00 750 4 1550.0 2120.60 OK!!
17/C1 3840.00 750 2 1920.0 2120.60 OK!!
17/D1 4000.00 750 2 2000.0 2120.60 OK!!
18/A 1710.00 750 2 855.0 2120.60 OK!!
18/A1 2350.00 750 2 1175.0 2120.60 OK!!
18/C 2560.00 750 2 1280.0 2120.60 OK!!
18/C1 1425.00 750 2 712.5 2120.60 OK!!
18/D1 1310.00 750 2 655.0 2120.60 OK!!
18/E1 1700.00 750 2 850.0 2120.60 OK!!
18/F1 1500.00 750 2 750.0 2120.60 OK!!
18B/A00 555.00 450 2 277.5 1272.40 OK!!
18B/C2 800.00 450 2 400.0 1272.40 OK!!
18F/C1 1050.00 450 2 525.0 1272.40 OK!!
18F/D1 1035.00 450 2 517.5 1272.40 OK!!
18E/F3 790.00 450 2 395.0 1272.40 OK!!
20/F3 820.00 450 2 410.0 1272.40 OK!!
20/F1 800.00 750 2 400.0 2120.60 OK!!
20/G1 2425.00 750 2 1212.5 2120.60 OK!!
20/H 3825.00 750 2 1912.5 2120.60 OK!!
'file:///conversion/tmp/activity_task_scratch/711924518.xls'#$Sheet1
CADANGAN MEMBINA MAHKAMAH SYARIAH
WILAYAH PERSEKUTUAN KUALA LUMPUR (Zone B By BWP) 18(ROCK)
Bore Pile Capacity/Working Load Check 19(ROCK)

Caisson
Column Caisson Caisson
Pile Caisson Pile
Column Working Pile Area Pile depth Remarks
Referenc Capacity (kN)
Load (kN) (m.sq) (m)
e no

9A/L 5286.00 P26 12.651 7.5 28464.75 OK!!


10/F 2330 P8 3.069 4.5 4143.15 OK!!
10/F1 4800 P6 4.011 5.0 6016.50 OK!!
10/H 7025 P25 4.942 5.5 8153.97 OK!!
10/I 6785 P25 4.942 6.0 8895.24 OK!!
10/J 6340 P25 4.942 6.5 9636.51 OK!!
10/K 4125 P8 3.069 7.0 6444.90 OK!!
11/F 3085 P8 3.069 4.5 4143.15 OK!!
11/F1 4950 P6 4.011 5.0 6016.50 OK!!
11A/H 7690 P25 4.942 5.5 8153.97 OK!!
11A/I 7090 P25 4.942 6.0 8895.24 OK!!
11A/J 6965 P25 4.942 6.5 9636.51 OK!!
11A/K 4515 P8 3.069 7.0 6444.90 OK!!
13/E 4140 P6 4.011 4.0 4813.20 OK!!
13/F 3125 P8 3.069 4.5 4143.15 OK!!
12A/F1 4910 P6 4.011 5.0 6016.50 OK!!
12A/H 7810 P25 4.942 5.5 8153.97 OK!!
12A/I 7165 P25 4.942 6.0 8895.24 OK!!
12A/J 6310 P25 4.942 6.5 9636.51 OK!!
12A/K 2995 P16 1.567 7.0 3290.70 OK!!
14/E 3195 P8 3.069 4.0 3682.80 OK!!
14/F 2485 P8 3.069 4.5 4143.15 OK!!
14/F1 5050 P6 4.011 5.0 6016.50 OK!!
14/H 9165 P7 9.684 5.5 15978.77 OK!!
14/I 7440 P25 4.942 6.0 8895.24 OK!!
14/J 10265 P7 9.684 6.5 18884.00 OK!!
13B/J3 470 P15 0.820 7.0 1722.00 OK!!
14/K 5770 P8 3.069 7.0 6444.90 OK!!
14d/L 1550 P15 0.820 7.5 1845.00 OK!!
15/E 3340 P8 3.069 4.0 3682.80 OK!!
15/F 2790 P8 3.069 4.5 4143.15 OK!!
15A/F1 5370 P6 4.011 5.0 6016.50 OK!!
15A/H 10070 P7 9.684 5.5 15978.77 OK!!
15A/I 6760 P25 4.942 6.0 8895.24 OK!!
15A/J 11250 P7 9.684 6.5 18884.00 OK!!
15A/K 6020 P8 3.069 7.0 6444.90 OK!!
15b/L 1515 P15 0.820 7.0 1722.00 OK!!
16/E1 4055 P6 4.011 4.0 4813.20 OK!!
16/F1 4560 P8 3.069 5.0 4603.50 OK!!
16A/H 10295 P7 9.684 5.5 15978.77 OK!!
16A/I 7040 P25 4.942 6.0 8895.24 OK!!
16A/J 9590 P7 9.684 6.5 18884.00 OK!!
16A/K 4840 P8 3.069 7.0 6444.90 OK!!
16D/E1 3810 P6 4.011 4.0 4813.20 OK!!
16D/F1 5650 P6 4.011 5.0 6016.50 OK!!
17/E1 9839 P9 26.950 4.0 32340.00 OK!!
17A/H 10380 P7 9.684 5.5 15978.77 OK!! 18(ROCK)
17A/I 8775 P25 4.942 6.0 8895.24 OK!! 19(ROCK)
17A/J 8565 P25 4.942 6.5 9636.51 OK!!
17A/K 4430 P8 3.069 7.0 6444.90 OK!!
18A/H 7760 P25 4.942 5.5 8153.97 OK!!
18A/I 8115 P25 4.942 6.0 8895.24 OK!!
18A/J 7745 P25 4.942 6.5 9636.51 OK!!
18A/K 4750 P8 3.069 7.0 6444.90 OK!!
18C/L 1115 P15 0.820 5.5 1353.00 OK!!
19/H 9745 P7 9.686 5.5 15981.90 OK!!
19/I 7400 P25 4.942 6 8895.24 OK!!
19/J 4970 P8 3.069 6.5 5984.55 OK!!
19/K 3350 P8 3.069 7 6444.90 OK!!
19/L 935 P15 0.820 7.5 1845.00 OK!!
19A/I4 1195 P15 0.820 6.5 1599.00 OK!!
19A/J4 1160 P15 0.820 7 1722.00 OK!!
19A/K 800 P15 0.820 7 1722.00 OK!!
20/I2 4380 P8 3.069 6.5 5984.55 OK!!
'file:///conversion/tmp/activity_task_scratch/711924518.xls'#$Sheet1

18(ROCK)
19(ROCK)
18(ROCK)
19(ROCK)
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location:
Subject: GEOTECHNICAL CAPACITY OF BOREPILES BASED ON BH5 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size 450 BORED PILE

Base area= 0.159043 m2

Perimeter= 1.413717 m Type of soil


Sand = 1, Silt =2
F.O.S for skin friction= 2

F.O.S for base pressure= 3


Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-

Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base

Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton

1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00


2 1.50 1.50 7 3.5 1 2.12 1.48 1.48 44.53 15.59
3 3.00 1.50 4.5 5.75 1 2.12 2.44 3.92 28.63 11.50

4 4.50 1.50 7.5 6 1 2.12 2.54 6.47 47.71 19.14


5 6.00 1.50 9 8.25 1 2.12 3.50 9.97 57.26 24.07
6 7.50 1.50 50 29.5 1 2.12 12.51 22.48 318.09 117.27
7 9.00 1.50 50 50 1 2.12 21.21 43.68 318.09 127.87

8 10.50 1.50 50 50 1 2.12 21.21 64.89 318.09 138.47


9(PL) 12.00 1.50 50 50 1 2.12 21.21 86.10 318.09 149.08
10 13.50 1.50 50 50 1 2.12 21.21 107.30 318.09 159.68
11(BL) 15.00 1.50 50 50 1 2.12 21.21 128.51 318.09 170.28
12 16.50 1.50 50 50 1 2.12 21.21 149.71 318.09 180.89
13 18.00 1.50 50 50 1 2.12 21.21 170.92 318.09 191.49
14 19.50 1.50 50 50 1 2.12 21.21 192.12 318.09 202.09
15 21.00 1.50 50 50 1 2.12 21.21 213.33 318.09 212.69
16 22.50 1.50 50 50 1 2.12 21.21 234.54 318.09 223.30
17 24.00 1.50 50 50 1 2.12 21.21 255.74 318.09 233.90
18(ROCK) 25.50 1.50 50 50 1 2.12 21.21 276.95 318.09 244.50
19(ROCK) 27.00 1.50 50 50 1 2.12 21.21 298.15 318.09 255.11

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location:
Subject: GEOTECHNICAL CAPACITY OF BOREPILES BASED ON BH5 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size 600 BORED PILE
Base area= 0.282743 m2
Perimeter= 1.884956 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 7 3.5 1 2.83 1.98 1.98 79.17 27.38

3 3.00 1.50 4.5 5.75 1 2.83 3.25 5.23 50.89 19.58


4 4.50 1.50 7.5 6 1 2.83 3.39 8.62 84.82 32.59
5 6.00 1.50 9 8.25 1 2.83 4.67 13.29 101.79 40.57
6 7.50 1.50 50 29.5 1 2.83 16.68 29.97 565.49 203.48
7 9.00 1.50 50 50 1 2.83 28.27 58.25 565.49 217.62
8 10.50 1.50 50 50 1 2.83 28.27 86.52 565.49 231.76
9(PL) 12.00 1.50 50 50 1 2.83 28.27 114.79 565.49 245.89
10 13.50 1.50 50 50 1 2.83 28.27 143.07 565.49 260.03
11(BL) 15.00 1.50 50 50 1 2.83 28.27 171.34 565.49 274.17
12 16.50 1.50 50 50 1 2.83 28.27 199.62 565.49 288.30
13 18.00 1.50 50 50 1 2.83 28.27 227.89 565.49 302.44
14 19.50 1.50 50 50 1 2.83 28.27 256.17 565.49 316.58
15 21.00 1.50 50 50 1 2.83 28.27 284.44 565.49 330.72
16 22.50 1.50 50 50 1 2.83 28.27 312.71 565.49 344.85
17 24.00 1.50 50 50 1 2.83 28.27 340.99 565.49 358.99
18(ROCK) 25.50 1.50 50 50 1 2.83 28.27 369.26 565.49 373.13
19(ROCK) 27.00 1.50 50 50 1 2.83 28.27 397.54 565.49 387.26

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA

Location:
Subject: GEOTECHNICAL CAPACITY OF BOREPILES BASED ON BH5 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m

Pile size 750 BORED PILE


Base area= 0.441786 m2
Perimeter= 2.356194 m
Type of soil
Sand = 1, Silt =2
F.O.S for skin friction= 2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes

Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 7 3.5 1 3.53 2.47 2.47 123.70 42.47
3 3.00 1.50 4.5 5.75 1 3.53 4.06 6.54 79.52 29.78
4 4.50 1.50 7.5 6 1 3.53 4.24 10.78 132.54 49.57
5 6.00 1.50 9 8.25 1 3.53 5.83 16.61 159.04 61.32
6 7.50 1.50 50 29.5 1 3.53 20.85 37.46 883.57 313.26
7 9.00 1.50 50 50 1 3.53 35.34 72.81 883.57 330.93
8 10.50 1.50 50 50 1 3.53 35.34 108.15 883.57 348.60
9(PL) 12.00 1.50 50 50 1 3.53 35.34 143.49 883.57 366.27
10 13.50 1.50 50 50 1 3.53 35.34 178.84 883.57 383.94
11(BL) 15.00 1.50 50 50 1 3.53 35.34 214.18 883.57 401.61
12 16.50 1.50 50 50 1 3.53 35.34 249.52 883.57 419.28
13 18.00 1.50 50 50 1 3.53 35.34 284.86 883.57 436.96
14 19.50 1.50 50 50 1 3.53 35.34 320.21 883.57 454.63
15 21.00 1.50 50 50 1 3.53 35.34 355.55 883.57 472.30
16 22.50 1.50 50 50 1 3.53 35.34 390.89 883.57 489.97
17 24.00 1.50 50 50 1 3.53 35.34 426.24 883.57 507.64
18(ROCK) 25.50 1.50 50 50 1 3.53 35.34 461.58 883.57 525.31
19(ROCK) 27.00 1.50 50 50 1 3.53 35.34 496.92 883.57 542.99

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location:
Subject: GEOTECHNICAL CAPACITY OF BOREPILES BASED ON BH5 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size 900 BORED PILE
Base area= 0.636173 m2
Perimeter= 2.827433 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F
Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 7 3.5 1 4.24 2.97 2.97 178.13 60.86
3 3.00 1.50 4.5 5.75 1 4.24 4.88 7.85 114.51 42.09
4 4.50 1.50 7.5 6 1 4.24 5.09 12.94 190.85 70.09
5 6.00 1.50 9 8.25 1 4.24 7.00 19.93 229.02 86.31
6 7.50 1.50 50 29.5 1 4.24 25.02 44.96 1272.35 446.59
7 9.00 1.50 50 50 1 4.24 42.41 87.37 1272.35 467.80
8 10.50 1.50 50 50 1 4.24 42.41 129.78 1272.35 489.00
9(PL) 12.00 1.50 50 50 1 4.24 42.41 172.19 1272.35 510.21
10 13.50 1.50 50 50 1 4.24 42.41 214.60 1272.35 531.42
11(BL) 15.00 1.50 50 50 1 4.24 42.41 257.01 1272.35 552.62
12 16.50 1.50 50 50 1 4.24 42.41 299.43 1272.35 573.83
13 18.00 1.50 50 50 1 4.24 42.41 341.84 1272.35 595.03
14 19.50 1.50 50 50 1 4.24 42.41 384.25 1272.35 616.24
15 21.00 1.50 50 50 1 4.24 42.41 426.66 1272.35 637.44
16 22.50 1.50 50 50 1 4.24 42.41 469.07 1272.35 658.65
17 24.00 1.50 50 50 1 4.24 42.41 511.48 1272.35 679.86
18(ROCK) 25.50 1.50 50 50 1 4.24 42.41 553.89 1272.35 701.06
19(ROCK) 27.00 1.50 50 50 1 4.24 42.41 596.31 1272.35 722.27

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location:
Subject: GEOTECHNICAL CAPACITY OF BOREPILES BASED ON BH5 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size 1050 BORED PILE
Base area= 0.865901 m2
Perimeter= 3.298672 m
F.O.S for skin friction= 2 Type of soil
F.O.S for base pressure= 3 Sand = 1, Silt =2
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 7 3.5 1 4.95 3.46 3.46 242.45 82.55
3 3.00 1.50 4.5 5.75 1 4.95 5.69 9.15 155.86 56.53
4 4.50 1.50 7.5 6 1 4.95 5.94 15.09 259.77 94.14
5 6.00 1.50 9 8.25 1 4.95 8.16 23.26 311.72 115.54
6 7.50 1.50 50 29.5 1 4.95 29.19 52.45 1731.80 603.49
7 9.00 1.50 50 50 1 4.95 49.48 101.93 1731.80 628.23
8 10.50 1.50 50 50 1 4.95 49.48 151.41 1731.80 652.97
9(PL) 12.00 1.50 50 50 1 4.95 49.48 200.89 1731.80 677.71
10 13.50 1.50 50 50 1 4.95 49.48 250.37 1731.80 702.45
11(BL) 15.00 1.50 50 50 1 4.95 49.48 299.85 1731.80 727.19
12 16.50 1.50 50 50 1 4.95 49.48 349.33 1731.80 751.93
13 18.00 1.50 50 50 1 4.95 49.48 398.81 1731.80 776.67
14 19.50 1.50 50 50 1 4.95 49.48 448.29 1731.80 801.41
15 21.00 1.50 50 50 1 4.95 49.48 497.77 1731.80 826.15
16 22.50 1.50 50 50 1 4.95 49.48 547.25 1731.80 850.89
17 24.00 1.50 50 50 1 4.95 49.48 596.73 1731.80 875.63
18(ROCK) 25.50 1.50 50 50 1 4.95 49.48 646.21 1731.80 900.37
19(ROCK) 27.00 1.50 50 50 1 4.95 49.48 695.69 1731.80 925.11
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)
Client: JABATAN KERJA RAYA MALAYSIA
Location:
Subject: GEOTECHNICAL CAPACITY OF BOREPILES BASED ON BH5 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size 1200 BORED PILE
Base area= 1.130973 m2
Perimeter= 3.769911 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 7 3.5 1 5.65 3.96 3.96 316.67 107.54
3 3.00 1.50 4.5 5.75 1 5.65 6.50 10.46 203.58 73.09
4 4.50 1.50 7.5 6 1 5.65 6.79 17.25 339.29 121.72
5 6.00 1.50 9 8.25 1 5.65 9.33 26.58 407.15 149.01
6 7.50 1.50 50 29.5 1 5.65 33.36 59.94 2261.95 783.95
7 9.00 1.50 50 50 1 5.65 56.55 116.49 2261.95 812.23
8 10.50 1.50 50 50 1 5.65 56.55 173.04 2261.95 840.50
9(PL) 12.00 1.50 50 50 1 5.65 56.55 229.59 2261.95 868.78
10 13.50 1.50 50 50 1 5.65 56.55 286.14 2261.95 897.05
11(BL) 15.00 1.50 50 50 1 5.65 56.55 342.68 2261.95 925.32
12 16.50 1.50 50 50 1 5.65 56.55 399.23 2261.95 953.60
13 18.00 1.50 50 50 1 5.65 56.55 455.78 2261.95 981.87
14 19.50 1.50 50 50 1 5.65 56.55 512.33 2261.95 1010.15
15 21.00 1.50 50 50 1 5.65 56.55 568.88 2261.95 1038.42
16 22.50 1.50 50 50 1 5.65 56.55 625.43 2261.95 1066.70
17 24.00 1.50 50 50 1 5.65 56.55 681.98 2261.95 1094.97
18(ROCK) 25.50 1.50 50 50 1 5.65 56.55 738.53 2261.95 1123.25
19(ROCK) 27.00 1.50 50 50 1 5.65 56.55 795.07 2261.95 1151.52
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location:
Subject: GEOTECHNICAL CAPACITY OF BOREPILES BASED ON BH5 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size 1350 BORED PILE
Base area= 1.431388 m2
Perimeter= 4.24115 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 7 3.5 1 6.36 4.45 4.45 400.79 135.82
3 3.00 1.50 4.5 5.75 1 6.36 7.32 11.77 257.65 91.77
4 4.50 1.50 7.5 6 1 6.36 7.63 19.40 429.42 152.84
5 6.00 1.50 9 8.25 1 6.36 10.50 29.90 515.30 186.72
6 7.50 1.50 50 29.5 1 6.36 37.53 67.43 2862.78 987.98
7 9.00 1.50 50 50 1 6.36 63.62 131.05 2862.78 1019.78
8 10.50 1.50 50 50 1 6.36 63.62 194.67 2862.78 1051.59
9(PL) 12.00 1.50 50 50 1 6.36 63.62 258.29 2862.78 1083.40
10 13.50 1.50 50 50 1 6.36 63.62 321.90 2862.78 1115.21
11(BL) 15.00 1.50 50 50 1 6.36 63.62 385.52 2862.78 1147.02
12 16.50 1.50 50 50 1 6.36 63.62 449.14 2862.78 1178.83
13 18.00 1.50 50 50 1 6.36 63.62 512.76 2862.78 1210.64
14 19.50 1.50 50 50 1 6.36 63.62 576.37 2862.78 1242.44
15 21.00 1.50 50 50 1 6.36 63.62 639.99 2862.78 1274.25
16 22.50 1.50 50 50 1 6.36 63.62 703.61 2862.78 1306.06
17 24.00 1.50 50 50 1 6.36 63.62 767.22 2862.78 1337.87
18(ROCK) 25.50 1.50 50 50 1 6.36 63.62 830.84 2862.78 1369.68
19(ROCK) 27.00 1.50 50 50 1 6.36 63.62 894.46 2862.78 1401.49
SUMMARY OF BOREPILE DESIGN CALCULATION USING MEYERHOFF FORMULA
Note: GEOTECHNICAL CAPACITY OF BOREPILES BASED ON BH5 ZONE 1
F.O.S for skin friction= 2
F.O.S for base pressure= 3
Geotechni
Size Of
Column Applied cal Quick
Pile No Of
Column Working Load Per Capacity FOS Remarks
Proposed Piles
Load (kN) Pile (kN) Per Pile Check
(mm)
(kN)
(KN)
1/D1 689.00 450 1 689.0 2551.10 3.7 OK!!
1/E 624.00 450 1 624.0 2551.10 4.1 OK!!
1/E1 757.00 450 1 757.0 2551.10 3.4 OK!!

1/F 729.00 450 1 729.0 2551.10 3.5 OK!!


450 1 712.0 OK!!
1/F1 712.00 2551.10 3.6
1a/E 663.00 450 1 663.0 2551.10 3.8 OK!!
450 1 375.0 OK!!
1a/F 375.00 2551.10 6.8
1b/D 638.00 450 1 638.0 2551.10 4.0 OK!!
1b/G 677.00 450 1 677.0 2551.10 3.8 OK!!
2/C1 625.00 450 1 625.0 2551.10 4.1 OK!!
450 1 762.0 OK!!
2/D1 762.00 2551.10 3.3
2/E 2924.00 600 2 1462.0 3872.60 2.6 OK!!
600 2 1424.0 OK!!
2/F 2848.00 3872.60 2.7
2/F2 360.00 450 1 360.0 2551.10 7.1 OK!!
2/G1 670.00 450 1 670.0 2551.10 3.8 OK!!
3/C1 534.00 450 1 534.0 2551.10 4.8 OK!!
3/D1 1357.00 450 2 678.5 2551.10 3.8 OK!!
3/E 5937.00 900 3 1979.0 7222.40 3.6 OK!!
900 3 1535.7 OK!!
3/F 4607.00 7222.40 4.7
3/G 1595.00 450 2 797.5 2551.10 3.2 OK!!
3/G1 605.00 450 1 605.0 2551.10 4.2 OK!!
450 3 932.0 OK!!
3a/H1 2796.00 2551.10 2.7
4/D 3965.00 750 2 1982.5 5429.9 2.7 OK!!
4/E 10172.00 1050 4 2543.0 9251.1 3.6 OK!!
4/F 17377.00 1200 6 2896.2 11515.20 4.0 OK!!
750 3 1806.3 OK!!
4/G 5419.00 5429.9 3.0
4/G1 3735.00 750 2 1867.5 5429.9 2.9 OK!!
4/H 830.00 450 1 830.0 2551.10 3.1 OK!!
4/H1 2796.00 600 2 1398.0 3872.60 2.8 OK!!
5/B1 1934.00 450 2 967.0 2551.10 2.6 OK!!
5/C 6624.00 1050 3 2208.0 9251.1 4.2 OK!!
5/D 11602.00 1200 4 2900.5 11515.20 4.0 OK!!
5/E 15818.00 1050 6 2636.3 9251.1 3.5 OK!!
5/F 11916.00 1200 4 2979.0 11515.20 3.9 OK!!
5/G 11450.00 1350 3 3816.7 14014.90 3.7 OK!!
5/H 3844.00 750 2 1922.0 5429.9 2.8 OK!!
6/B1 5073.00 1050 2 2536.5 9251.1 3.6 OK!!
6/C 8147.00 1050 3 2715.7 9251.1 3.4 OK!!
6/D 13797.00 1350 4 3449.3 14014.90 4.1 OK!!
6/E 11624.00 1200 4 2906.0 11515.20 4.0 OK!!
6/F 12368.00 1200 4 3092.0 11515.20 3.7 OK!!
6/G 13806.00 1350 4 3451.5 14014.90 4.1 OK!!
6a/A 2270.00 600 2 1135.0 3872.60 3.4 OK!!
6a/B 4815.00 1200 2 2407.5 11515.20 4.8 OK!!
6b/A00 4174.00 600 3 1391.3 3872.60 2.8 OK!!
6b/B 6338.00 1200 2 3169.0 11515.20 3.6 OK!!
7/B1 5579.00 1050 2 2789.5 9251.1 3.3 OK!!
7/C 8027.00 1050 3 2675.7 9251.1 3.5 OK!!
7/D 10309.00 1350 3 3436.3 14014.90 4.1 OK!!
7/E 9829.00 1050 4 2457.3 9251.1 3.8 OK!!
7/F 9294.00 1050 4 2323.5 9251.1 4.0 OK!!
7a/C 10282.00 1050 4 2570.5 9251.1 3.6 OK!!
7a/D 6588.00 1200 2 3294.0 11515.20 3.5 OK!!
7a/D1 6244.00 1200 2 3122.0 11515.20 3.7 OK!!
7a/E 6003.00 1200 2 3001.5 11515.20 3.8 OK!!
7a/F 6208.00 1200 2 3104.0 11515.20 3.7 OK!!
8/A 5487.00 600 4 1371.8 3872.60 2.8 OK!!
8/B 8028.00 1050 3 2676.0 9251.1 3.5 OK!!
8/D 6588.00 1350 2 3294.0 14014.90 4.3 OK!!
8/E 1023.00 600 1 1023.0 3872.60 3.8 OK!!
8/F 1095.00 600 1 1095.0 3872.60 3.5 OK!!
8a/A00 3110.00 600 2 1555.0 3872.60 2.5 OK!!
8a/D 9458.50 1350 3 3152.8 14014.90 4.4 OK!!
8a/D1 1444.00 600 1 1444.0 3872.60 2.7 OK!!
8a/E 1934.00 450 2 967.0 2551.10 2.6 OK!!
8a/F 1938.00 450 2 969.0 2551.10 2.6 OK!!
9/A 2996.00 600 2 1498.0 3872.60 2.6 OK!!
9/B 4705.00 900 2 2352.5 7222.40 3.1 OK!!
9/C 5609.00 1050 2 2804.5 9251.1 3.3 OK!!
9/D 9458.50 1350 3 3152.8 14014.90 4.4 OK!!
9/E 868.00 450 1 868.0 2551.10 2.9 OK!!

9/F 887.00 450 1 887.0 2551.10 2.9 OK!!


Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 5/K 5/L
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion

Base area= 0.079 m2

Perimeter= 1.124 m Type of soil


Sand = 1, Silt =2
F.O.S for skin friction= 2

F.O.S for base pressure= 3


Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-

Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base

Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton

1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00


2 1.50 1.50 12 6 1 1.69 2.02 2.02 37.92 13.65
3 3.00 1.50 7 9.5 1 1.69 3.20 5.23 22.12 9.99

4 4.50 1.50 9 8 1 1.69 2.70 7.93 28.44 13.44


5 6.00 1.50 50 29.5 1 1.69 9.95 17.88 158.00 61.60
6 7.50 1.50 50 50 1 1.69 16.86 34.74 158.00 70.04
7 9.00 1.50 50 50 1 1.69 16.86 51.60 158.00 78.47

8 10.50 1.50 50 50 1 1.69 16.86 68.47 158.00 86.90


9(PL) 12.00 1.50 50 50 1 1.69 16.86 85.33 158.00 95.33
10 13.50 1.50 50 50 1 1.69 16.86 102.20 158.00 103.77
11(BL) 15.00 1.50 50 50 1 1.69 16.86 119.06 158.00 112.20
12(ROCK) 16.50 1.50 50 50 1 1.69 16.86 135.93 158.00 120.63
13(ROCK) 18.00 1.50 50 50 1 1.69 16.86 152.79 158.00 129.06
14(ROCK) 19.50 1.50 50 50 1 1.69 16.86 169.65 158.00 137.49
15(ROCK) 21.00 1.50 50 50 1 1.69 16.86 186.52 158.00 145.93
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid: 6/H
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 0.565 m2
Perimeter= 3.007 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 4.51 5.41 5.41 271.20 93.11

3 3.00 1.50 7 9.5 1 4.51 8.57 13.98 158.20 59.72


4 4.50 1.50 9 8 1 4.51 7.22 21.20 203.40 78.40
5 6.00 1.50 50 29.5 1 4.51 26.61 47.81 1130.00 400.57
6 7.50 1.50 50 50 1 4.51 45.10 92.91 1130.00 423.12
7 9.00 1.50 50 50 1 4.51 45.10 138.01 1130.00 445.67
8 10.50 1.50 50 50 1 4.51 45.10 183.11 1130.00 468.22
9(PL) 12.00 1.50 50 50 1 4.51 45.10 228.21 1130.00 490.77
10 13.50 1.50 50 50 1 4.51 45.10 273.31 1130.00 513.32
11(BL) 15.00 1.50 50 50 1 4.51 45.10 318.41 1130.00 535.87
12(ROCK) 16.50 1.50 50 50 1 4.51 45.10 363.51 1130.00 558.42
13(ROCK) 18.00 1.50 50 50 1 4.51 45.10 408.60 1130.00 580.97
14(ROCK) 19.50 1.50 50 50 1 4.51 45.10 453.70 1130.00 603.52
15(ROCK) 21.00 1.50 50 50 1 4.51 45.10 498.80 1130.00 626.07

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA

Location: 6/H1
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m

Pile size Cassion


Base area= 12.651 m2
Perimeter= 14.227 m
Type of soil
Sand = 1, Silt =2
F.O.S for skin friction= 2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes

Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 21.34 25.61 25.61 6072.48 2036.96
3 3.00 1.50 7 9.5 1 21.34 40.55 66.16 3542.28 1213.84
4 4.50 1.50 9 8 1 21.34 34.15 100.30 4554.36 1568.27
5 6.00 1.50 50 29.5 1 21.34 125.91 226.21 25302.00 8547.11
6 7.50 1.50 50 50 1 21.34 213.41 439.62 25302.00 8653.81
7 9.00 1.50 50 50 1 21.34 213.41 653.03 25302.00 8760.52
8 10.50 1.50 50 50 1 21.34 213.41 866.44 25302.00 8867.22
9(PL) 12.00 1.50 50 50 1 21.34 213.41 1079.85 25302.00 8973.93
10 13.50 1.50 50 50 1 21.34 213.41 1293.26 25302.00 9080.63
11(BL) 15.00 1.50 50 50 1 21.34 213.41 1506.67 25302.00 9187.34
12(ROCK) 16.50 1.50 50 50 1 21.34 213.41 1720.08 25302.00 9294.04
13(ROCK) 18.00 1.50 50 50 1 21.34 213.41 1933.49 25302.00 9400.74

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: 6/I
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion BORED PILE
Base area= 0.565 m2
Perimeter= 3.007 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F
Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 4.51 5.41 5.41 271.20 93.11
3 3.00 1.50 7 9.5 1 4.51 8.57 13.98 158.20 59.72
4 4.50 1.50 9 8 1 4.51 7.22 21.20 203.40 78.40
5 6.00 1.50 50 29.5 1 4.51 26.61 47.81 1130.00 400.57
6 7.50 1.50 50 50 1 4.51 45.10 92.91 1130.00 423.12
7 9.00 1.50 50 50 1 4.51 45.10 138.01 1130.00 445.67
8 10.50 1.50 50 50 1 4.51 45.10 183.11 1130.00 468.22
9(PL) 12.00 1.50 50 50 1 4.51 45.10 228.21 1130.00 490.77
10 13.50 1.50 50 50 1 4.51 45.10 273.31 1130.00 513.32
11(BL) 15.00 1.50 50 50 1 4.51 45.10 318.41 1130.00 535.87
12(ROCK) 16.50 1.50 50 50 1 4.51 45.10 363.51 1130.00 558.42
13(ROCK) 18.00 1.50 50 50 1 4.51 45.10 408.60 1130.00 580.97
14(ROCK) 19.50 1.50 50 50 1 4.51 45.10 453.70 1130.00 603.52
15(ROCK) 21.00 1.50 50 50 1 4.51 45.10 498.80 1130.00 626.07
16(ROCK) 22.50 1.50 50 50 1 4.51 45.10 543.90 1130.00 648.62
17(ROCK) 24.00 1.50 50 50 1 4.51 45.10 589.00 1130.00 671.17

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: 6/J
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion BORED PILE
Base area= 4.011 m2
Perimeter= 8.011 m
F.O.S for skin friction= 2 Type of soil
F.O.S for base pressure= 3 Sand = 1, Silt =2
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 12.02 14.42 14.42 1925.28 648.97
3 3.00 1.50 7 9.5 1 12.02 22.83 37.25 1123.08 392.99
4 4.50 1.50 9 8 1 12.02 19.23 56.48 1443.96 509.56
5 6.00 1.50 50 29.5 1 12.02 70.90 127.37 8022.00 2737.69
6 7.50 1.50 50 50 1 12.02 120.16 247.54 8022.00 2797.77
7 9.00 1.50 50 50 1 12.02 120.16 367.70 8022.00 2857.85
8 10.50 1.50 50 50 1 12.02 120.16 487.87 8022.00 2917.93
9(PL) 12.00 1.50 50 50 1 12.02 120.16 608.03 8022.00 2978.02
10 13.50 1.50 50 50 1 12.02 120.16 728.20 8022.00 3038.10
11(BL) 15.00 1.50 50 50 1 12.02 120.16 848.36 8022.00 3098.18
12(ROCK) 16.50 1.50 50 50 1 12.02 120.16 968.53 8022.00 3158.26
13(ROCK) 18.00 1.50 50 50 1 12.02 120.16 1088.69 8022.00 3218.35
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)
Client: JABATAN KERJA RAYA MALAYSIA
Location: 6/K
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion BORED PILE
Base area= 2.256 m2
Perimeter= 6.008 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 9.01 10.81 10.81 1082.88 366.37
3 3.00 1.50 7 9.5 1 9.01 17.12 27.94 631.68 224.53
4 4.50 1.50 9 8 1 9.01 14.42 42.36 812.16 291.90
5 6.00 1.50 50 29.5 1 9.01 53.17 95.53 4512.00 1551.76
6 7.50 1.50 50 50 1 9.01 90.12 185.65 4512.00 1596.82
7 9.00 1.50 50 50 1 9.01 90.12 275.77 4512.00 1641.88
8 10.50 1.50 50 50 1 9.01 90.12 365.89 4512.00 1686.94
9(PL) 12.00 1.50 50 50 1 9.01 90.12 456.01 4512.00 1732.00
10 13.50 1.50 50 50 1 9.01 90.12 546.13 4512.00 1777.06
11(BL) 15.00 1.50 50 50 1 9.01 90.12 636.25 4512.00 1822.12
12(ROCK) 16.50 1.50 50 50 1 9.01 90.12 726.37 4512.00 1867.18
13(ROCK) 18.00 1.50 50 50 1 9.01 90.12 816.49 4512.00 1912.24
14(ROCK) 19.50 1.50 50 50 1 9.01 90.12 906.61 4512.00 1957.30
15(ROCK) 21.00 1.50 50 50 1 9.01 90.12 996.73 4512.00 2002.36
16(ROCK) 22.50 1.50 50 50 1 9.01 90.12 1086.85 4512.00 2047.42
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: 7/G
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion BORED PILE
Base area= 9.686 m2
Perimeter= 12.449 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 18.67 22.41 22.41 4649.28 1560.96
3 3.00 1.50 7 9.5 1 18.67 35.48 57.89 2712.08 932.97
4 4.50 1.50 9 8 1 18.67 29.88 87.76 3486.96 1206.20
5 6.00 1.50 50 29.5 1 18.67 110.17 197.94 19372.00 6556.30
6 7.50 1.50 50 50 1 18.67 186.73 384.67 19372.00 6649.67
7 9.00 1.50 50 50 1 18.67 186.73 571.41 19372.00 6743.04
8 10.50 1.50 50 50 1 18.67 186.73 758.14 19372.00 6836.40
9(PL) 12.00 1.50 50 50 1 18.67 186.73 944.87 19372.00 6929.77
10 13.50 1.50 50 50 1 18.67 186.73 1131.61 19372.00 7023.14
11(BL) 15.00 1.50 50 50 1 18.67 186.73 1318.34 19372.00 7116.50
12(ROCK) 16.50 1.50 50 50 1 18.67 186.73 1505.08 19372.00 7209.87
13(ROCK) 18.00 1.50 50 50 1 18.67 186.73 1691.81 19372.00 7303.24
14(ROCK) 19.50 1.50 50 50 1 18.67 186.73 1878.54 19372.00 7396.61
CADANGAN MEMBINA MAHKAMAH SYARIAH
WILAYAH PERSEKUTUAN KUALA LUMPUR (Zone A By AKS)

Caisson Pile Capacity/Working Load Check

Caisson Socket
Column Caisson Caisson Quick
Pile Caisson Pile
Column Working Pile Area Pile depth Perimeter FOS Remarks
Referenc Capacity (kN)
Load (kN) (m.sq) (m) (m) Check
e no
3a/J 1986.00 P16 1.567 4.5 5.007 13849.10 6.97 OK!!
3a/K 1425.00 P16 1.567 3.5 5.007 13849.10 9.72 OK!!
4/J 2103.00 P16 1.567 4.5 5.007 13849.10 6.59 OK!!
5/K 107.00 P20 0.079 7.0 1.128 1459.30 13.64 OK!!

5/L 156.00 P20 0.079 7.0 1.128 1459.30 9.35 OK!!


P10(1200
0.565 7.5 3.007 6260.70 OK!!
6/H 1198.00 D) 5.23
6/H1 10216.00 P17 12.651 3.0 14.227 94007.40 9.20 OK!!
P10(1200
0.565 7.0 3.007 6711.70 OK!!
6/I 1139.00 D) 5.89
6/J 624.00 P6 4.011 3.0 8.011 32183.50 51.58 OK!!
6/K 4787.00 P5 2.256 7.5 6.008 20474.20 4.28 OK!!
7/G 10920.00 P7 9.686 4.0 12.449 73966.10 6.77 OK!!
P10(1350
0.715 6.5 3.383 7572.30 OK!!
7/H 1317.00 D) 5.75
7/H1 8318.00 P1 6.622 4.5 10.293 52685.00 6.33 OK!!
P10(1200
0.565 6.0 3.007 6260.70 OK!!
7/I 940.00 D) 6.66
7/J 6653.00 P6 4.011 6.0 8.011 33385.10 5.02 OK!!
7/K 4367.00 P5 2.256 6.5 6.008 20023.60 4.59 OK!!
7/L 956.00 P20 0.565 6.0 3.007 6260.70 6.55 OK!!
7a/F1 8072.00 P17 12.651 3.0 14.227 104516.10 12.95 OK!!
7a/H1 10996.00 P17 12.651 3.0 14.227 104516.10 9.50 OK!!
P10(1200
0.565 7.5 3.007 7759.20 OK!!
8/H 1200.00 D) 6.47
8/J 7117.00 P23 5.076 5.0 9.012 39662.70 5.57 OK!!
8/K 3926.00 P23 5.076 3.0 9.012 40639.50 10.35 OK!!
P20(1200
0.565 4.5 3.007 5959.20 OK!!
8/L 743.00 D) 8.02
8a/F2 5735.00 P6 4.011 5.0 8.011 31957.60 5.57 OK!!
8a/H1 8522.00 P1 6.622 4.5 10.293 51913.00 6.09 OK!!
8a/K 4244.00 P5 2.256 6.5 6.008 20023.60 4.72 OK!!
P20(900D
0.318 4.0 2.255 3991.10 OK!!
8a/L 341.80 ) 11.68
9a/F1 2858.00 P16 1.567 6.5 5.007 13849.10 4.85 OK!!
9a/H 4132.00 P5 2.256 6.5 6.008 20474.20 4.96 OK!!
9a/H1 4861.00 P5 2.256 7.5 6.008 20474.20 4.21 OK!!
9a/J 4168.00 P5 2.256 6.5 6.008 20474.20 4.91 OK!!
9a/K 3452.00 P16 1.567 7.5 5.007 14975.70 4.34 OK!!

'file:///conversion/tmp/activity_task_scratch/711924518.xls'#$Sheet1
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 3a/J 3a/K 4/J
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 1.567 m2

Perimeter= 5.007 m Type of soil


Sand = 1, Silt =2
F.O.S for skin friction= 2
F.O.S for base pressure= 3

Limiting Skin Friction= Ton/m2


Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft

Qbu=40*N*Ab for sand N= SPT value at pile base


Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu

Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00

2 1.50 1.50 12 6 1 7.51 9.01 9.01 752.16 255.23


3 3.00 1.50 7 9.5 1 7.51 14.27 23.28 438.76 157.90
4 4.50 1.50 9 8 1 7.51 12.02 35.30 564.12 205.69

5 6.00 1.50 50 29.5 1 7.51 44.31 79.61 3134.00 1084.47


6 7.50 1.50 50 50 1 7.51 75.11 154.72 3134.00 1122.03
7 9.00 1.50 50 50 1 7.51 75.11 229.83 3134.00 1159.58
8 10.50 1.50 50 50 1 7.51 75.11 304.94 3134.00 1197.14

9(PL) 12.00 1.50 50 50 1 7.51 75.11 380.05 3134.00 1234.69


10 13.50 1.50 50 50 1 7.51 75.11 455.15 3134.00 1272.24
11(BL) 15.00 1.50 50 50 1 7.51 75.11 530.26 3134.00 1309.80
12(ROCK) 16.50 1.50 50 50 1 7.51 75.11 605.37 3134.00 1347.35
13(ROCK) 18.00 1.50 50 50 1 7.51 75.11 680.48 3134.00 1384.91
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 7/H
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 0.715 m2
Perimeter= 3.382 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 5.07 6.09 6.09 343.20 117.44
3 3.00 1.50 7 9.5 1 5.07 9.64 15.73 200.20 74.60
4 4.50 1.50 9 8 1 5.07 8.12 23.85 257.40 97.72
5 6.00 1.50 50 29.5 1 5.07 29.93 53.78 1430.00 503.56
6 7.50 1.50 50 50 1 5.07 50.73 104.51 1430.00 528.92
7 9.00 1.50 50 50 1 5.07 50.73 155.25 1430.00 554.29
8 10.50 1.50 50 50 1 5.07 50.73 205.98 1430.00 579.66
9(PL) 12.00 1.50 50 50 1 5.07 50.73 256.72 1430.00 605.03
10 13.50 1.50 50 50 1 5.07 50.73 307.45 1430.00 630.39
11(BL) 15.00 1.50 50 50 1 5.07 50.73 358.19 1430.00 655.76
12(ROCK) 16.50 1.50 50 50 1 5.07 50.73 408.92 1430.00 681.13
13(ROCK) 18.00 1.50 50 50 1 5.07 50.73 459.66 1430.00 706.49
14(ROCK) 19.50 1.50 50 50 1 5.07 50.73 510.39 1430.00 731.86
15(ROCK) 21.00 1.50 50 50 1 5.07 50.73 561.12 1430.00 757.23
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 7/H1
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 6.622 m2
Perimeter= 10.293 m
Type of soil
Sand = 1, Silt =2
F.O.S for skin friction= 2
F.O.S for base pressure= 3

Limiting Skin Friction= Ton/m2


Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft

Qbu=40*N*Ab for sand N= SPT value at pile base


Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu

Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00

2 1.50 1.50 12 6 1 15.44 18.53 18.53 3178.56 1068.78


3 3.00 1.50 7 9.5 1 15.44 29.34 47.86 1854.16 641.99
4 4.50 1.50 9 8 1 15.44 24.70 72.57 2383.92 830.92

5 6.00 1.50 50 29.5 1 15.44 91.10 163.66 13244.00 4496.50


6 7.50 1.50 50 50 1 15.44 154.40 318.06 13244.00 4573.70
7 9.00 1.50 50 50 1 15.44 154.40 472.46 13244.00 4650.90
8 10.50 1.50 50 50 1 15.44 154.40 626.86 13244.00 4728.10

9(PL) 12.00 1.50 50 50 1 15.44 154.40 781.26 13244.00 4805.30


10 13.50 1.50 50 50 1 15.44 154.40 935.66 13244.00 4882.50
11(BL) 15.00 1.50 50 50 1 15.44 154.40 1090.06 13244.00 4959.70
12(ROCK) 16.50 1.50 50 50 1 15.44 154.40 1244.46 13244.00 5036.90
13(ROCK) 18.00 1.50 50 50 1 15.44 154.40 1398.86 13244.00 5114.10
14(ROCK) 19.50 1.50 50 50 1 15.44 154.40 1553.26 13244.00 5191.30
15(ROCK) 21.00 1.50 50 50 1 15.44 154.40 1707.66 13244.00 5268.50
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 7/I 7/L
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 0.565 m2
Perimeter= 3.007 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 4.51 5.41 5.41 271.20 93.11
3 3.00 1.50 7 9.5 1 4.51 8.57 13.98 158.20 59.72
4 4.50 1.50 9 8 1 4.51 7.22 21.20 203.40 78.40
5 6.00 1.50 50 29.5 1 4.51 26.61 47.81 1130.00 400.57
6 7.50 1.50 50 50 1 4.51 45.10 92.91 1130.00 423.12
7 9.00 1.50 50 50 1 4.51 45.10 138.01 1130.00 445.67
8 10.50 1.50 50 50 1 4.51 45.10 183.11 1130.00 468.22
9(PL) 12.00 1.50 50 50 1 4.51 45.10 228.21 1130.00 490.77
10 13.50 1.50 50 50 1 4.51 45.10 273.31 1130.00 513.32
11(BL) 15.00 1.50 50 50 1 4.51 45.10 318.41 1130.00 535.87
12(ROCK) 16.50 1.50 50 50 1 4.51 45.10 363.51 1130.00 558.42
13(ROCK) 18.00 1.50 50 50 1 4.51 45.10 408.60 1130.00 580.97
14(ROCK) 19.50 1.50 50 50 1 4.51 45.10 453.70 1130.00 603.52
15(ROCK) 21.00 1.50 50 50 1 4.51 45.10 498.80 1130.00 626.07
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 7/J
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 4.011 m2
Perimeter= 8.011 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 12.02 14.42 14.42 1925.28 648.97
3 3.00 1.50 7 9.5 1 12.02 22.83 37.25 1123.08 392.99
4 4.50 1.50 9 8 1 12.02 19.23 56.48 1443.96 509.56
5 6.00 1.50 50 29.5 1 12.02 70.90 127.37 8022.00 2737.69
6 7.50 1.50 50 50 1 12.02 120.16 247.54 8022.00 2797.77
7 9.00 1.50 50 50 1 12.02 120.16 367.70 8022.00 2857.85
8 10.50 1.50 50 50 1 12.02 120.16 487.87 8022.00 2917.93
9(PL) 12.00 1.50 50 50 1 12.02 120.16 608.03 8022.00 2978.02
10 13.50 1.50 50 50 1 12.02 120.16 728.20 8022.00 3038.10
11(BL) 15.00 1.50 50 50 1 12.02 120.16 848.36 8022.00 3098.18
12(ROCK) 16.50 1.50 50 50 1 12.02 120.16 968.53 8022.00 3158.26
13(ROCK) 18.00 1.50 50 50 1 12.02 120.16 1088.69 8022.00 3218.35
14(ROCK) 19.50 1.50 50 50 1 12.02 120.16 1208.86 8022.00 3278.43
15(ROCK) 21.00 1.50 50 50 1 12.02 120.16 1329.02 8022.00 3338.51

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 7/K
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 2.256 m2
Perimeter= 6.008 m
F.O.S for skin friction= 2 Type of soil
F.O.S for base pressure= 3 Sand = 1, Silt =2
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 9.01 10.81 10.81 1082.88 366.37
3 3.00 1.50 7 9.5 1 9.01 17.12 27.94 631.68 224.53
4 4.50 1.50 9 8 1 9.01 14.42 42.36 812.16 291.90
5 6.00 1.50 50 29.5 1 9.01 53.17 95.53 4512.00 1551.76
6 7.50 1.50 50 50 1 9.01 90.12 185.65 4512.00 1596.82
7 9.00 1.50 50 50 1 9.01 90.12 275.77 4512.00 1641.88
8 10.50 1.50 50 50 1 9.01 90.12 365.89 4512.00 1686.94
9(PL) 12.00 1.50 50 50 1 9.01 90.12 456.01 4512.00 1732.00
10 13.50 1.50 50 50 1 9.01 90.12 546.13 4512.00 1777.06
11(BL) 15.00 1.50 50 50 1 9.01 90.12 636.25 4512.00 1822.12
12(ROCK) 16.50 1.50 50 50 1 9.01 90.12 726.37 4512.00 1867.18
13(ROCK) 18.00 1.50 50 50 1 9.01 90.12 816.49 4512.00 1912.24
14(ROCK) 19.50 1.50 50 50 1 9.01 90.12 906.61 4512.00 1957.30
15(ROCK) 21.00 1.50 50 50 1 9.01 90.12 996.73 4512.00 2002.36
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 7a/F1 7a/H1
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 12.651 m2
Perimeter= 14.227 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 21.34 25.61 25.61 6072.48 2036.96
3 3.00 1.50 7 9.5 1 21.34 40.55 66.16 3542.28 1213.84
4 4.50 1.50 9 8 1 21.34 34.15 100.30 4554.36 1568.27
5 6.00 1.50 50 29.5 1 21.34 125.91 226.21 25302.00 8547.11
6 7.50 1.50 50 50 1 21.34 213.41 439.62 25302.00 8653.81
7 9.00 1.50 50 50 1 21.34 213.41 653.03 25302.00 8760.52
8 10.50 1.50 50 50 1 21.34 213.41 866.44 25302.00 8867.22
9(PL) 12.00 1.50 50 50 1 21.34 213.41 1079.85 25302.00 8973.93
10 13.50 1.50 50 50 1 21.34 213.41 1293.26 25302.00 9080.63
11(BL) 15.00 1.50 50 50 1 21.34 213.41 1506.67 25302.00 9187.34
12(ROCK) 16.50 1.50 50 50 1 21.34 213.41 1720.08 25302.00 9294.04
13(ROCK) 18.00 1.50 50 50 1 21.34 213.41 1933.49 28454.60 10451.61

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 8/H
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 0.565 m2
Perimeter= 3.007 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 4.51 5.41 5.41 271.20 93.11
3 3.00 1.50 7 9.5 1 4.51 8.57 13.98 158.20 59.72
4 4.50 1.50 9 8 1 4.51 7.22 21.20 203.40 78.40
5 6.00 1.50 50 29.5 1 4.51 26.61 47.81 1130.00 400.57
6 7.50 1.50 50 50 1 4.51 45.10 92.91 1130.00 423.12
7 9.00 1.50 50 50 1 4.51 45.10 138.01 1130.00 445.67
8 10.50 1.50 50 50 1 4.51 45.10 183.11 1130.00 468.22
9(PL) 12.00 1.50 50 50 1 4.51 45.10 228.21 1130.00 490.77
10 13.50 1.50 50 50 1 4.51 45.10 273.31 1130.00 513.32
11(BL) 15.00 1.50 50 50 1 4.51 45.10 318.41 1130.00 535.87
12(ROCK) 16.50 1.50 50 50 1 4.51 45.10 363.51 1130.00 558.42
13(ROCK) 18.00 1.50 50 50 1 3.00 30.00 393.51 1130.00 573.42
14(ROCK) 19.50 1.50 50 50 1 4.50 45.00 438.51 1130.00 595.92
15(ROCK) 21.00 1.50 50 50 1 0.00 0.00 438.51 1130.00 595.92
16(ROCK) 21.00 1.50 50 50 1 36.00 360.00 798.51 1130.00 775.92

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 8/J
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 5.076 m2

Type of soil
Sand = 1, Silt =2
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 8/K
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 5.076 m2

Perimeter= 9.012 m Type of soil


Sand = 1, Silt =2
F.O.S for skin friction= 2
F.O.S for base pressure= 3

Limiting Skin Friction= Ton/m2


Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft

Qbu=40*N*Ab for sand N= SPT value at pile base


Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu

Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00

2 1.50 1.50 12 6 1 13.52 16.22 16.22 2436.48 820.27


3 3.00 1.50 7 9.5 1 13.52 25.68 41.91 1421.28 494.71
4 4.50 1.50 9 8 1 13.52 21.63 63.53 1827.36 640.89

5 6.00 1.50 50 29.5 1 13.52 79.76 143.29 10152.00 3455.65


6 7.50 1.50 50 50 1 13.52 135.18 278.47 10152.00 3523.24
7 9.00 1.50 50 50 1 13.52 135.18 413.65 10152.00 3590.83
8 10.50 1.50 50 50 1 13.52 135.18 548.83 10152.00 3658.42

9(PL) 12.00 1.50 50 50 1 13.52 135.18 684.01 10152.00 3726.01


10 13.50 1.50 50 50 1 13.52 135.18 819.19 10152.00 3793.60
11(BL) 15.00 1.50 50 50 1 13.52 135.18 954.37 10152.00 3861.18
12(ROCK) 16.50 1.50 50 50 1 13.52 135.18 1089.55 10152.00 3928.77
13(ROCK) 18.00 1.50 50 50 1 13.52 135.18 1224.73 10152.00 3996.36
13(ROCK) 19.50 1.50 50 50 1 13.52 135.18 1359.91 10152.00 4063.95
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 8/L
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 0.565 m2
Perimeter= 3.007 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 4.51 5.41 5.41 271.20 93.11
3 3.00 1.50 7 9.5 1 4.51 8.57 13.98 158.20 59.72
4 4.50 1.50 9 8 1 4.51 7.22 21.20 203.40 78.40
5 6.00 1.50 50 29.5 1 4.51 26.61 47.81 1130.00 400.57
6 7.50 1.50 50 50 1 4.51 45.10 92.91 1130.00 423.12
7 9.00 1.50 50 50 1 4.51 45.10 138.01 1130.00 445.67
8 10.50 1.50 50 50 1 4.51 45.10 183.11 1130.00 468.22
9(PL) 12.00 1.50 50 50 1 4.51 45.10 228.21 1130.00 490.77
10 13.50 1.50 50 50 1 4.51 45.10 273.31 1130.00 513.32
11(BL) 15.00 1.50 50 50 1 4.51 45.10 318.41 1130.00 535.87
12(ROCK) 16.50 1.50 50 50 1 4.51 45.10 363.51 1130.00 558.42
13(ROCK) 18.00 1.50 50 50 1 3.00 30.00 393.51 1130.00 573.42
14(ROCK) 19.50 1.50 50 50 1 4.50 45.00 438.51 1130.00 595.92
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 8a/F2
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 4.011 m2
Perimeter= 8.011 m
Type of soil
Sand = 1, Silt =2
F.O.S for skin friction= 2
F.O.S for base pressure= 3

Limiting Skin Friction= Ton/m2


Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft

Qbu=40*N*Ab for sand N= SPT value at pile base


Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu

Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00

2 1.50 1.50 12 6 1 12.02 14.42 14.42 1925.28 648.97


3 3.00 1.50 7 9.5 1 12.02 22.83 37.25 1123.08 392.99
4 4.50 1.50 9 8 1 12.02 19.23 56.48 1443.96 509.56

5 6.00 1.50 50 29.5 1 12.02 70.90 127.37 8022.00 2737.69


6 7.50 1.50 50 50 1 12.02 120.16 247.54 8022.00 2797.77
7 9.00 1.50 50 50 1 12.02 120.16 367.70 8022.00 2857.85
8 10.50 1.50 50 50 1 12.02 120.16 487.87 8022.00 2917.93

9(PL) 12.00 1.50 50 50 1 12.02 120.16 608.03 8022.00 2978.02


10 13.50 1.50 50 50 1 12.02 120.16 728.20 8022.00 3038.10
11(BL) 15.00 1.50 50 50 1 12.02 120.16 848.36 8022.00 3098.18
12(ROCK) 16.50 1.50 50 50 1 12.02 120.16 968.53 8022.00 3158.26
13(ROCK) 18.00 1.50 50 50 1 3.00 30.00 998.53 8022.00 3173.26
14(ROCK) 19.50 1.50 50 50 1 4.50 45.00 1043.53 8022.00 3195.76
15(ROCK) 21.00 1.50 50 50 1 0.00 0.00 1043.53 8022.00 3195.76
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 8a/H1
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 6.622 m2
Perimeter= 10.293 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 15.44 18.53 18.53 3178.56 1068.78
3 3.00 1.50 7 9.5 1 15.44 29.34 47.86 1854.16 641.99
4 4.50 1.50 9 8 1 15.44 24.70 72.57 2383.92 830.92
5 6.00 1.50 50 29.5 1 15.44 91.10 163.66 13244.00 4496.50
6 7.50 1.50 50 50 1 15.44 154.40 318.06 13244.00 4573.70
7 9.00 1.50 50 50 1 15.44 154.40 472.46 13244.00 4650.90
8 10.50 1.50 50 50 1 15.44 154.40 626.86 13244.00 4728.10
9(PL) 12.00 1.50 50 50 1 15.44 154.40 781.26 13244.00 4805.30
10 13.50 1.50 50 50 1 15.44 154.40 935.66 13244.00 4882.50
11(BL) 15.00 1.50 50 50 1 15.44 154.40 1090.06 13244.00 4959.70
12(ROCK) 16.50 1.50 50 50 1 15.44 154.40 1244.46 13244.00 5036.90
13(ROCK) 18.00 1.50 50 50 1 15.44 154.40 1398.86 13244.00 5114.10
14(ROCK) 19.50 1.50 50 50 1 15.44 154.40 1553.26 13244.00 5191.30
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 8a/K
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 2.256 m2
Perimeter= 6.008 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 9.01 10.81 10.81 1082.88 366.37
3 3.00 1.50 7 9.5 1 9.01 17.12 27.94 631.68 224.53
4 4.50 1.50 9 8 1 9.01 14.42 42.36 812.16 291.90
5 6.00 1.50 50 29.5 1 9.01 53.17 95.53 4512.00 1551.76
6 7.50 1.50 50 50 1 9.01 90.12 185.65 4512.00 1596.82
7 9.00 1.50 50 50 1 9.01 90.12 275.77 4512.00 1641.88
8 10.50 1.50 50 50 1 9.01 90.12 365.89 4512.00 1686.94
9(PL) 12.00 1.50 50 50 1 9.01 90.12 456.01 4512.00 1732.00
10 13.50 1.50 50 50 1 9.01 90.12 546.13 4512.00 1777.06
11(BL) 15.00 1.50 50 50 1 9.01 90.12 636.25 4512.00 1822.12
12(ROCK) 16.50 1.50 50 50 1 9.01 90.12 726.37 4512.00 1867.18
13(ROCK) 18.00 1.50 50 50 1 9.01 90.12 816.49 4512.00 1912.24
14(ROCK) 19.50 1.50 50 50 1 9.01 90.12 906.61 4512.00 1957.30
15(ROCK) 21.00 1.50 50 50 1 9.01 90.12 996.73 4512.00 2002.36

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 8a/L
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 0.318 m2
Perimeter= 2.256 m
F.O.S for skin friction= 2 Type of soil
F.O.S for base pressure= 3 Sand = 1, Silt =2
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 3.38 4.06 4.06 152.64 52.91
3 3.00 1.50 7 9.5 1 3.38 6.43 10.49 89.04 34.92
4 4.50 1.50 9 8 1 3.38 5.41 15.90 114.48 46.11
5 6.00 1.50 50 29.5 1 3.38 19.96 35.86 636.00 229.93
6 7.50 1.50 50 50 1 3.38 33.83 69.70 636.00 246.85
7 9.00 1.50 50 50 1 3.38 33.83 103.53 636.00 263.77
8 10.50 1.50 50 50 1 3.38 33.83 137.37 636.00 280.68
9(PL) 12.00 1.50 50 50 1 3.38 33.83 171.20 636.00 297.60
10 13.50 1.50 50 50 1 3.38 33.83 205.04 636.00 314.52
11(BL) 15.00 1.50 50 50 1 3.38 33.83 238.87 636.00 331.44
12(ROCK) 16.50 1.50 50 50 1 3.38 33.83 272.71 636.00 348.35
13(ROCK) 18.00 1.50 50 50 1 3.38 33.83 306.54 636.00 365.27
14(ROCK) 19.50 1.50 50 50 1 3.38 33.83 340.38 636.00 382.19
15(ROCK) 21.00 1.50 50 50 1 3.38 33.83 374.21 636.00 399.11
Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN
KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 9a/F1
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 1.567 m2
Perimeter= 5.007 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 7.51 9.01 9.01 752.16 255.23
3 3.00 1.50 7 9.5 1 7.51 14.27 23.28 438.76 157.90
4 4.50 1.50 9 8 1 7.51 12.02 35.30 564.12 205.69
5 6.00 1.50 50 29.5 1 7.51 44.31 79.61 3134.00 1084.47
6 7.50 1.50 50 50 1 7.51 75.11 154.72 3134.00 1122.03
7 9.00 1.50 50 50 1 7.51 75.11 229.83 3134.00 1159.58
8 10.50 1.50 50 50 1 7.51 75.11 304.94 3134.00 1197.14
9(PL) 12.00 1.50 50 50 1 7.51 75.11 380.05 3134.00 1234.69
10 13.50 1.50 50 50 1 7.51 75.11 455.15 3134.00 1272.24
11(BL) 15.00 1.50 50 50 1 7.51 75.11 530.26 3134.00 1309.80
12(ROCK) 16.50 1.50 50 50 1 7.51 75.11 605.37 3134.00 1347.35
13(ROCK) 18.00 1.50 50 50 1 7.51 75.11 680.48 3134.00 1384.91

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 9a/H 9a/H1 9a/J
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 2.256 m2
Perimeter= 6.008 m
F.O.S for skin friction= 2 Type of soil
Sand = 1, Silt =2
F.O.S for base pressure= 3
Limiting Skin Friction= Ton/m2
Recomm. Structural capacity= 24 tonnes
Meyerhof Formulae:-
Qsu =0.2*Nave*As for sand Nave= Average SPT value along the shaft
Qbu=40*N*Ab for sand N= SPT value at pile base
Qsu =0.17*Nave*As for silt As= Area of pile shaft Qu= Qsu+Qbu
Qbu=25*N*Ab for silt Ab= Area of pile base Qw=Qu/S.F

Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
m m N' of area Ton at depth
Value Soil m2 Ton Ton Ton
1(OGL) 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00
2 1.50 1.50 12 6 1 9.01 10.81 10.81 1082.88 366.37
3 3.00 1.50 7 9.5 1 9.01 17.12 27.94 631.68 224.53
4 4.50 1.50 9 8 1 9.01 14.42 42.36 812.16 291.90
5 6.00 1.50 50 29.5 1 9.01 53.17 95.53 4512.00 1551.76
6 7.50 1.50 50 50 1 9.01 90.12 185.65 4512.00 1596.82
7 9.00 1.50 50 50 1 9.01 90.12 275.77 4512.00 1641.88
8 10.50 1.50 50 50 1 9.01 90.12 365.89 4512.00 1686.94
9(PL) 12.00 1.50 50 50 1 9.01 90.12 456.01 4512.00 1732.00
10 13.50 1.50 50 50 1 9.01 90.12 546.13 4512.00 1777.06
11(BL) 15.00 1.50 50 50 1 9.01 90.12 636.25 4512.00 1822.12
12(ROCK) 16.50 1.50 50 50 1 9.01 90.12 726.37 4512.00 1867.18
13(ROCK) 18.00 1.50 50 50 1 9.01 90.12 816.49 4512.00 1912.24
14(ROCK) 19.50 1.50 50 50 1 9.01 90.12 906.61 4512.00 1957.30
15(ROCK) 21.00 1.50 50 50 1 9.01 90.12 996.73 4512.00 2002.36
16(ROCK) 21.00 1.50 50 50 1 9.01 90.12 1086.85 4512.00 2047.42

Project: CADANGAN MEMBINA MAHKAMAH SYARIAH WILAYAH PERSEKUTUAN


KUALA LUMPUR (Zone A By AKS)

Client: JABATAN KERJA RAYA MALAYSIA


Location: Grid : 9a/K
Subject: GEOTECHNICAL CAPACITY OF CAISSON PILES BASED ON BH1 ZONE 1
USING MEYERHOF FORMULAE
Original Ground Level(OGL) : 96.416m
Platform Level(PL) : 84.0m
Basement Level(BL) : 79.5m
Pile size Cassion
Base area= 1.567 m2

Type of soil
Sand = 1, Silt =2