You are on page 1of 1
= anerann Gouge Shaan _ 962 Tee Durston pee om 1. Use pneumatic method to initiate tests in highly RISING permeable HEAD method uses ar pressure either positive or ‘wareR ust mations. The peuma raunnoe masenucer +4 TEST negative, to displace water. Water level must wee sown Ff Se B mocks jain above screen and transducer. TeASDCE LACE Thee 2 Rising head tess are performed by pressurizing OF WATERLENEL OLE TD FeSSURING cr ARC mn. allowing pressures to stabilize REBATE Posmion 3 Falling head tests are performed in 2 sar manne by applying a vacuum to air column f STEP THREE: TEST PERFORMANCE (GENERAL PERFORMANCE GUIDELINES 1, Perform three or more tests at each well 4 Run each test to near completion ve heads within of static 2. Use at least two inital displacements varying by a fetor of two or more = 3. Conduct both nsing and fling head tests if possibe. Fist andlast tests [Ronco nan comelenon slows daa tbe anayaed wih ee septsated mets Coope ea dS rane, Thee metodscan | bronde negra most sracten, 2sepoosy orev. eo” | | deonmert Sedat me recess | ‘Repeat ests with rent Hare used oases the wai snderying ug test nays mets, apie ‘notice STEP FOUR: DATA PROCESSING Hi ~espectes inal cslacement eximated rom geometrical considerations (ot sug) or a pressure readings (pneumatic initaon. =r ea! al ‘GENERAL PROCESSING GUIDELINES. 4. Compare the expected displacement") with the nia wate seve ‘displacement measured inthe well). Are they different” sa, possible 1 Estimate me test began (and the prose head a tate conditions hy ‘Geptatatone coed lnchube (1) eociva casing edhe Gita oom from te ew ata pt nominal casing radius (2) test intiation to slow (3) measurement rate too ter cohen thigh K formation 2. Subtract ge and from the head (hp) and time records respectively, to ‘tow. and (4) wansducer too deep in ‘compute head deviation tom static and time since test began ievabon 5. Compare normalized d from sate plot Coneidence of normalized plots suggests that assumptions underying 2. Normalize data by dividing deviation data bythe expected -onventional analysis meth plocement plots do wet etna ton mare Geveapmert ay be neces. TAWDNAPLOT DEVATON FROW STAC PLOT] [NORMALIZED DEVIATION PLOT TORMALEED PLOT FOR 23, esrnaon a 4 A REPEAT TESTS € fs = al -8 * oallt ehh Ie. le) ae | So Sod Zo zit |} acrumrosanc|| Bd 2 is a3 \ § ae 7 Bot * bod § ; wisoasem |[E So ge g 2 ad as, od 1 4 jaa 000 ee SS ee Recording Tine (sec) Test Time (s) Test Time(s) Test Time (8) © (tt) (tb) (tt)

You might also like