CO2
CO2
Makmal 2&4
Food Engineering Lab
3 Nos compressor outgoing
(Refer schematic drawing) Opening - through floor
(Location to be confirmed at site) to 1st floor and 2nd floor
DB-A2(a)
incoming supply
from DB-A2-
MSB Room
Makmal 7&9
Packaging Lab 2
1 No. Compressor Outgoing
(refer to schematic drawing)
from New MSB-A2
incoming supply
DB-CR
DB-CR
incoming supply
from New MSB-A2
Pressure
Gauge
4Y12
R6-125mm Links
R.C Column ( x 4 Nos) Ground Slab :
R6-125mm Links Concrete G20N
4Y12 4Y12 Roof Beam
R6-125mm Links
R6-125mm Links
R6-125mm Links
4Y12
4Y12 125mm
R.C Column
R6-125mm
B.R.C R6-125mm Links R6-125mm Links
A7 4Y12
B.R.C
4Y12
A7
X X 100mm thk R.C Slab
250mm 4Y12
125mm
R6-125mm Links
200mm
4Y12
125mm