MVAC SYSTEM
Chiller Plant room
Chiller 1500RT 21,900 3 65,700 5134x2800x2959 Tower-Basement B01
Chiller 750RT 11,530 2 23,060 4431x1994x2470 Tower-Basement B01
Chilled Water Pump 1,697 5 8,485 2000x1050x1100 Tower-Basement B01
Condensor Pump 2,080 5 10,400 2100x1150x1200 Tower-Basement B01
MCC Panel 200 3 600 Tower-Basement B01
Piping 183240 1 183,240 Tower-Basement B01
Ducting 2000 1 2,000
FCU 50 8 400 1200x600x240 Tower-Basement B01
Other 4380 1 4,380 Tower-Basement B01
Cooling Tower area Podium-L6
Cooling Tower 1875TR 38,000 4 152,000 17010x6235x6040
Condensor Pipe 111240 1 111,240
Primary Air Handling Unit 4032 1 4,032 5000x3100x3900
Stair Pressurize Fan 460 15 6900 950x850x850
Ducting 1000 1 1,000
Other 7600 1 7,600
Make Up Tank area
Make Up Tank-200m3 207000 2 414,000 12000x5000x4000 Podium-L6
Other 150 1 150
AHU room-Tower (Typical) Tower
Air Handling Unit 1236 1 1236 3600x2450x2030
Piping 1000 1 1000
Ducting 500 1 500
Other 247 1 247
Page 1 of 10
Equipment Approx. Q'ty of Total Equipment Approx. Approx. Equipment
No. Room/ Equipment Weight (kg) Equipment Weight (kg) Dimension (LxWxH) (mm) Location
ELECTRICAL SYSTEM
DB-COM 45 600x250x1100
Page 2 of 10
Equipment Approx. Q'ty of Total Equipment Approx. Approx. Equipment
No. Room/ Equipment Weight (kg) Equipment Weight (kg) Dimension (LxWxH) (mm) Location
DB-MVAC 35 600x250x900
Busduct & Cable
Other
DB-PD-L1-COM2 35 1 35 600x250x900
DB-PD-L1-CP 45 1 45 600x250x1100
Busduct & Cable n/a
Other
Genset Room
Genset…2500kVA 15500.00 3 46500 6150x2750x2286
Genset…2000kVA 15000.00 3 45000 6050x2750x2286
Day Tank + Storage Tank 41000.00 1 41000 TBA
Busduct & Cable 274.5 1 274.5
Sync. Panel 1500.00 1 1500 6000x1400x2000
Other
Substation Room
MV Switch Board 1500 1 1500 6162x710x1606
Cable 58.86 1 58.86
Other
Transformer Room
Transformer 2500kVA 6100 3 18300 2300x1550x2350
Transformer 2000kVA 5100 3 15300 2300x1550x2350
ACB Panel 500 6 3000 1850x995x2200
Busduct & Cable 58.86 1 58.86
Other
LVSB Room
LVSB Switch Board 1500 3 4500 9700x1400x2000
Busduct & Cable 495.9 1 495.9
Other
MDF Room
Racks 42U 150 25 3750 1100x800x635
Page 3 of 10
Equipment Approx. Q'ty of Total Equipment Approx. Approx. Equipment
No. Room/ Equipment Weight (kg) Equipment Weight (kg) Dimension (LxWxH) (mm) Location
Other
PBX Room
Racks 42U 150 17 2550 1100x800x1888
Other 1
FCC & CCTV Room
Rack 42U 150 1 150 1100x800x1888
CCTV Control Board Included
BMS Workstation Included
Other
PLUMBING SYSTEM
Page 4 of 10
Equipment Approx. Q'ty of Total Equipment Approx. Approx. Equipment
No. Room/ Equipment Weight (kg) Equipment Weight (kg) Dimension (LxWxH) (mm) Location
Page 5 of 10
Remarks Load Factor Load Value
15.24 1.2 20
15 20
PAU-L6-01
Page 6 of 10
Remarks Load Factor Load Value
11 15
11 15
MAHU-L6-01-02
11 15
PAU-L6-02-03-04
11 15
11 15
Page 7 of 10
Remarks Load Factor Load Value
9.16 20
11 15
11 20
11 15
11 15
Page 8 of 10
Remarks Load Factor Load Value
11 15
11 15
Page 9 of 10
Remarks Load Factor Load Value
As per drawing