1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS
OTHERWISE NOTED. DO NOT SCALE THE DRAWINGS, ANY DISCREPANCIES FOUND SHOULD
BE REPORTED TO THE RESPONSIBLE ARCHITECT OR ENGINEER IMMEDIATELY.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR OR BUILDERS TO ASCERTAIN AND CONFIRM
THAT ALL DIMENSIONS SHOWN IN THESE DRAWINGS SHALL COMPLY WITH THE SITE
DIMENSIONS AND LEVELS PRIOR TO PREPARING DRAWINGS AND EXECUTING THE WORKS.
3. ALL WORKS ARE TO BE CARRIED OUT TO Q.C.S. AND OTHER RELEVANT CODES OF
CONSTRUCTIONS.
4. FOR GENERAL NOTES, SYMBOLS AND ABBREVIATIONS, REFER TO DRAWING NO. M-A0-0001
5. THE FRESH AIR BRANCH SERVING TO EACH TERMINAL UNIT SHALL BE PROVIDED WITH VCD.
6. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH THE OTHER RELEVANT
ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWING AND ALL RELEVANT
SECTIONS OF THE SPECIFICATIONS.
7. EXACT LOCATION & DETAIL OF ELECTRO-MECHANICAL OPENING SHALL BE COORDINATED
WITH ELECTRO-MECHANICAL ENGINEER.
8. DIMENSION AND LOCATION OF SERVICES COORDINATED WITH RESPECTIVE ARCHITECTURAL
AND SERVICES DRAWINGS PRIOR TO COMMENCEMENT OF ANY WORK. ANY DISCREPANCY
FOUND SHOULD BE BROUGHT TO THE NOTICE OF THE CONCERNED ENGINEER.
9. REFER TO SCHEDULE OF FINISHES FOR FLOORS, WALLS AND CEILINGS.
10. ALL LEVELS INDICATED IN PLANS, ELEVATIONS & SECTIONS ARE BASED IN QATAR NATIONAL
DATUM (QND).
11. QND LEVELS ARE INDICATIVE ONLY AND TO BE VERIFIED ON SITE BY THE APPOINTED
CONTRACTOR BASED ON SITE CONDITIONS. THE REQUIRED/RELEVANT ADJUSTMENTS ON
E F G H I J K L M N O
DRAWINGS FOR ALL DISCIPLINES (ARCH,CIVIL, MEP)TO BE DONE BY THE APPOINTED
CONTRACTOR WITHOUT TIME AND COST IMPACT.
12. THE CONTRACTOR SHOULD MAKE THE REQUIRED CHANGES PER LATEST ID LAYOUT WITHOUT
ANY VARIATION CLAIM.
9000 6850 6850 6850 6850 6850 6850 6850 6850 6850 6850
6
6850
STAIRCASE 5 UP
-125
7 T
VOID SPACE
VOID
53
FIRE WATER TANK 2
16
SPACE -115
R8
A1-FCU-61
8557
ADA
8 JAN
-104
-103 DOMESTIC WATER TANK 1
-116
STORE DRESSING ROOM
-109 -111
MEP
SHAFT EL -3.20 m FFL
DISCLAIMER: The CAD data is being supplied only to assist in production of the Sub-Consultant/Trade Contractor's work. It may contain some discrepancies and hence it should always be cross-checked with other relevant documents applying due diligence. Users are solely responsible for anything they produce using all or part of
MALE TOILET A1-FCU-58
UP -102 A1-FCU-59
T
STAIRCASE 13 A1-FCU-57
-100
T T
SERVICE CORRIDOR
ORCHESTRA PIT
A1-FCU-57
A1-FCU-60
T
-- -101
EL -3.20 m FFL SPACE
-121
A1-FCU-62
DOMESTIC WATER TANK 2
T T -117
STORE
-123 FEMALE TOILET A1-FCU-59
-105
A1-FCU-58
MEP
T
SHAFT
STORE DRESSING ROOM
JAN -108 -112
9 -107
ADA EL -3.20 m FFL IRRIGATION WATER TANK
A1-FCU-60
-106
the provided CAD data. CAD data is not intended to be issued to any third party without AEB's written consent for the same. In providing you with this CAD data, AEB does not assume any liability whatsoever unless expressed otherwise.
-118
R8
T
VOID
SPACE
VOID SPACE
STORM WATER TANK
-119
10
STAIRCASE 6
-124 0 MAY 2017 ISSUED FOR SCHEMATIC TENDER AM
6850
UP
1100
A1-FCU-62 NO. DATE DESCRIPTION APPROVED
AEB STAMP PLANNING APPROVAL
11
CONSULTANT:
PROJECT :
DANAT EDUCATION-1
OWNER :
MR. ALI AL FARDAN
SITE :
MESAIMEER, DOHA QATAR
TITLE :
BASEMENT FLOOR PLAN
VENTILATION LAYOUT
DRAWN BY : DESIGN BY : CHECKED BY : APPROVED BY :
SSR MSZ AM AMR
DATE : SCALE @ A0:
1 BASEMENT FLOOR PLAN - VENTILATION LAYOUT APRIL 2017 1 : 100
M-A1-0200 SCALE: 1:100 PROJECT NO : DRAWING NO : REVISION
1314-17 M-A1-0200 0