You are on page 1of 1

KEYPLAN

T1 T2

T3

NOTES:
1. THIS DRAWING IS THE COPYRIGHT OF WME CONSULTANTS, AND
MUST NOT BE RETAINED, COPIED OR USED WITHOUT THE ABOVE
CONSULTANT'S AUTHORITY.
2. DO NOT SCALE FROM THE DRAWINGS.
3. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES
UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON
SITE AND APPROVED BY THE ENGINEER.
4. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER
RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE
SPECIFICATIONS. ANY DISCREPANCIES ARE TO BE BROUGHT TO
THE ATTENTION OF THE ENGINEER AND RESOLVED BEFORE
COMMENCEMENT OF ANY WORK.

STRUCTURAL REFERENCE DRAWING


BASEMENT-02 (FOUNDATION) GENERAL
RP-WME-ST-TWR1-B2-100-00
ARRANGEMENT PLAN

TOWER 1 - BASEMENT-1 LEVEL GENERAL


RP-WME-ST-TWR1-B1-100-00
ARRANGEMENT PLAN - ZONE 1

TOWER 1 - GROUND FLOOR GENERAL


RP-WME-ST-TWR1-GF-100-00
ARRANGEMENT PLAN - ZONE 1

TOWER 1 - PODIUM P1 LEVEL GENERAL


RP-WME-ST-TWR1-P1-100-00
ARRANGEMENT PLAN - ZONE 1

TOWER 1 - PODIUM P2 LEVEL GENERAL


RP-WME-ST-TWR1-P2-100-00
ARRANGEMENT PLAN - ZONE 1

TOWER 1 - PODIUM P3 & P4 LEVEL


RP-WME-ST-TWR1-P3-100-00
GENERAL ARRANGEMENT PLAN - ZONE 1

500
ARCH. REFERENCE DRAWING
350 RECEIVE MAIL ON -23RD MARCH 2023
350
300
300

250 1380

400

1550

300 115
1550

300
2175

2775
1775

850 850

165

750
1355 275

350
350
VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF.

PODIUM P3 LEVEL TO OUTER LINK OUTER LINK OUTER LINK OUTER LINK OUTER LINK OUTER LINK OUTER LINK OUTER LINK OUTER LINK
U/S PODIUM P5 LEVEL
INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS

R0 11.04.2023 ISSUED FOR CONSTRUCTION RK


REV NO. DATE DESCRIPTION BY.
500 STATUS:
350 ISSUED FOR CONSTRUCTION
PROJECT:

300 350

300 RIVALI PARK, PHASE III


Mumbai, India

CLIENT:
250 1380
450
1550
2175

300 115
1775

850

2775
1550

850
300

750
ARCHITECT:
165

450
350
1355 275

29 Bank Street, Fort, Mumbai 400 023 Tel : 2266 1920

STRUCTURAL / MEP CONSULTANT:

VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF.

DRAWING TITLE:
PODIUM P2 LEVEL TO OUTER LINK OUTER LINK OUTER LINK OUTER LINK OUTER LINK OUTER LINK OUTER LINK OUTER LINK OUTER LINK
U/S PODIUM P3 LEVEL TOWER-01
INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS
COLUMN SCHEDULE - SHEET-2
T1-C10,T1-C11,T1-C12,
T1-C01 T1-C02,T1-C03,T1-C06,T1-C07 T1-C04,T1-C05 T1-C08 T1-C09,T1-C15 T1-C13 T1-C14 T1-C19
FLOOR LVL T1-C16,T1-C17,T1-C18
DATE: SCALE @ A1: DRN BY: CHKD BY: APP BY: REVISION
SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION 11-04-2023 1 : 25 SR SP NR R0
PROJECT No: DRAWING No:
P550012 RP-WME-ST-TWR1-00-410-02