PROJECT: DESIGN & BUILD OF ROCK STABILIZATION WADI INTERCEPTORS

INSPECTION CHECKLIST

CHECKLIST FOR INSTALLATION OF PROTECTION WIRE MESH

Checklist No. JV-CIV-ICL- 04 Rev.01 Date:

Client: NEOM PMC: AECOM Contractor: Batco Al Harbi JV

Contract No. 4800000657/000 WIR No:

ITP No. 02-181100-4800000-MAH-CIV-ITP-004 Rev.02 Area/Location :

ITEM
WORK ACTIVITY REFERENCE PASS FAIL N/A RE-INSP DATE
NO.
Technical Specification Book 5
Marked the area of Protection wiremesh on the slope as per approved shop
1 Clause No.1.3.3
drawing

Technical Specification Book 5


2 Drilling of rock nail on each slope Clause No.1.3.3

Technical Specification Book 5


3 Installation & grouting of rock nails Clause No.1.4.4

Technical Specification Book 5


4 Installation of Protection wiremesh Clause No.1.3.3

Technical Specification Book 5


5 Check the overlap for installed wiremesh done properly Clause No.1.3.3

Technical Specification Book 5


6 Check lacing wires fixed tightly at the joint with proper interval Clause No.1.3.3

Technical Specification Book 5


7 Fixing of rope at each bench through eye bolts Clause No.1.3.3

Technical Specification Book 5


8 Check ropes fixed and tightened properly with clamps Clause No.1.3.3

REMARKS:

CONTRACTOR PMC / NEOM Q&E

PMC Representative
Construction Representative*
Name, Initials and Date: Work is Complete and Ready for Inspection: Name, Initials and Date:
T&I Witnessed QC Record Reviewed Work Verified

QC Engineer/ Inspector ETSD Representative

Name, Initials and Date: Performed Inspection Work / Rework May Proceed Name, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified