Rock Dowels ITP
Rock Dowels ITP
To PMC AECOM
Approval Comments
Information Other
Approval Comments
Information Other
Signature
PMC’s comments
Signature
Received by Contractor
Name Date
Signature
Page 1 of 02-181100-4800000657-MAH-CIV-ITP-000003_01.
4800000657/000 - Design and Build of
Ro c k S t a b i l i z a t i o n a n d W a d i I n t e r c e p t o r s
-I T P F o r I n s t a l l a t i o n o f R o c k D o w e l s
Page 2 of 02-181100-4800000657-MAH-CIV-ITP-000003_01.
Document History
Document approval
Page 3 of 02-181100-4800000657-MAH-CIV-ITP-000003_01.
INSPECTION AND TEST PLAN FOR INSTALLATION OF ROCK
DOWELS & ROCK NAILS
NEOM QUALITY MANAGEMENT SYSTEM
Main Mofarreh Alharbi & Partners &
NEOM QMS-PRO-005-001 CONSTRUCTION
OF PROJECT (ITP) FOR INSTALLATION OF Contractor: BATCO JV
ROCK DOWELS Sub-
N/A
Contractor:
Design & Build of Rock Stabilization Wadi ITP 02-181100-4800000657-MAH-CIV- Rev. 13-Nov-
Contract 4800000657/00 Contract 01 Date:
Interceptors No.: ITP-003 No.: 2023
No.: Title:
1 Document Review
Method Statement
Approved Method
Reference No 02-
Statement In Code A
1.1 Document Review 181100- H R/H R/H
or Code B with
Method Statement 4800000657-MAH-
comments
CIV-MST-000002
1.2 As per Approved Approved Shop
Shop Drawing Document Review H R/H R/H
Shop Drawing Drawing
Material Submittal
Approved Material
Reference No 02-
Submittal In Code A
1.3 Document Review 181100- H R/H R/H
Material Approval or Code B with
4800000657-MAH-
comments
CIV-MAT-000001
Prequalification of
Approved In Code A
Inspection & Testing Approved
1.4 Document Review or Code B with H R/H R/H
Laboratory / Third Laboratory
Party comments
#02-710000-
Calibration of
1.5 Document Review Calibration Certificates 0000100113-ACM- H R/H R/H
Equipment’s
QMN-REG-000003_01
2 Material Receiving Inspection, Sampling & Testing
Approved Material in
Code A or Code B
List all material Material Submittal/
2.1 with comments/ H W R
Received on site Visual Inspection Approved MIR
Approved Material
Rock dowels, Rock Inspection Request
nails, Couplers,
washers & nuts
Legend:
Page 4 of 02-181100-4800000657-MAH-CIV-ITP-000003_01.
S: Responsible for carrying out random
H: Contractor must not proceed without R: Responsible for reviewing certification or W: Responsible for / and witnessing all
surveillance of inspection or test/Random
approval. reports. inspection or test.
Check.
Page 5 of 02-181100-4800000657-MAH-CIV-ITP-000003_01.
INSPECTION AND TEST PLAN FOR INSTALLATION OF ROCK
DOWELS
NEOM QUALITY MANAGEMENT SYSTEM
Main Mofarreh Alharbi & Partners &
NEOM QMS-PRO-005-001 CONSTRUCTION
OF PROJECT (ITP) FOR INSTALLATION OF Contractor: BATCO JV
ROCK DOWELS Sub-
N/A
Contractor:
Design & Build of Rock Stabilization Wadi ITP 02-181100-4800000657-MAH-CIV- Rev. 13-Nov-
Contract 4800000657/00 Contract 01 Date:
Interceptors No.: ITP-003 No.: 2023
No.: Title:
Page 6 of 02-181100-4800000657-MAH-CIV-ITP-000003_01.
Legend:
S: Responsible for carrying out random
H: Contractor must not proceed without R: Responsible for reviewing certification or W: Responsible for / and witnessing all
surveillance of inspection or test/Random
approval. reports. inspection or test.
Check.
Page 7 of 02-181100-4800000657-MAH-CIV-ITP-000003_01.
INSPECTION AND TEST PLAN FOR INSTALLATION OF ROCK
DOWELS
NEOM QUALITY MANAGEMENT SYSTEM
Main Mofarreh Alharbi & Partners &
NEOM QMS-PRO-005-001 CONSTRUCTION
OF PROJECT (ITP) FOR INSTALLATION OF Contractor: BATCO JV
ROCK DOWELS Sub-
N/A
Contractor:
Design & Build of Rock Stabilization Wadi ITP 02-181100-4800000657-MAH-CIV- Rev. 13-Nov-
Contract 4800000657/00 Contract 01 Date:
Interceptors No.: ITP-003 No.: 2023
No.: Title:
Page 8 of 02-181100-4800000657-MAH-CIV-ITP-000003_01.
Sub-Contractor (If
Main Contractor PMC NEOM Q&E
Applicable)
Name: Name: KAILASH PATIL Name: Name:
Legend:
S: Responsible for carrying out random
H: Contractor must not proceed without R: Responsible for reviewing certification or W: Responsible for / and witnessing all
surveillance of inspection or test/Random
approval. reports. inspection or test.
Check.
Page 9 of 02-181100-4800000657-MAH-CIV-ITP-000003_01.
GENERAL NOTES:
The first (3) of each inspection or testing activities listed require 100% participation of client site inspection personnel. After this period, client inspection may adjust the
level of client participation based on the contractor's performance.
Hold: QA/QC team shall be notified of the schedule of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC Team/Client
representative in attendance.
Review: Required qualification/certification/reports shall be submitted for the QA/QC team review and approval.
Witness: QA/QC team shall be notified of the schedule of inspection or test in advance. If the QA/QC Team/Client representative doesn’t come on time for inspection,
the activity can proceed.
Surveillance: QA/QC team to monitor work in progress without notice from the construction organization/Random check selection.
Review/Hold: QA/QC team shall review and approve all required documents before commencement of the work.
Legend:
S: Responsible for carrying out random
H: Contractor must not proceed without R: Responsible for reviewing certification or W: Responsible for / and witnessing all
surveillance of inspection or test/Random
approval. reports. inspection or test.
Check.
Page 10 of 02-181100-4800000657-MAH-CIV-ITP-000003_01.