Course Mid-term
outline Assignment not submitted Due date: 2023-09-18, 23:59 IST.
Week 2: 2) Which of the following is a key element of supply chain management? 1 point
Analyzing
Capacity in Isolating suppliers
Operations () Reducing customer options
Increasing lead times
Week 3:
Supply Managing the flow of goods and services
Chain in
Operations ()
3) If an organisation has taken over a firm that supplies raw material, which of the 2 points
Mid Term following costs would reduce?
Quiz ()
Carrying cost
Quiz: Mid- Ordering cost
term
Both cost will be reduced
(assessment?
name=147) No change in any cost
SWAYAM
Feedback () 4) In a service firm, the following decisions are taken. What would be the impact of 3 points
such decisions on performance measures – Cost, Quality, Delivery and Flexibility,
Week 4:
Productivity
Improvement Decision 1 (D1): Training program for skill upgradation and Multiskilling of the workforce.
in Decision 2 (D2): Standard Operating Procedures deployed at key steps in the process.
Operations ()
5) Which option describes the following operating systems in the decreasing order of 2 points
complexity; (A – Organising a football tournament, B – Construction of an international airport, C
– Manufacturing of Papers Rolls of Standard Size, D – ATM Facility of a Bank)
B,D,C,A
B,C,A,D
B,A,C,D
C,A,D,B
6) The time taken for a potter to make a pot, starting from bringing the mud, loading it 2 points
onto the potter wheel, turning the wheel to shape the pot, drying and heat treating the pot is 6
hours. He starts working daily at 8 AM. Assume no stock at the beginning. Which of the following
statements is True ?
7) A manufacturing system has output rate of 10 units/hour. A process with capacity 3 points
of 10 units/hr, is increased to 20 units/hr, then which of the following is true?
8) Operations process of which of the following items is different from others? 1 point
Ship Building
Building a Subway in a Metro
Satellites
Cell phone Manufacturing
9) When the arrival rate and service rate of a system doubles, the queue length 1 point
Remains Constant
Doubles
Halves
Cannot be determined
11) In order to analyse the capacity of a sugar mill, which of the following is not a 1 point
necessary information?
12) In order to design a supply chain, which of the following needs to be considered? 2 points
Customer profile
Supplier location
Product profile
(A) and (C) above
13) In a worker paced assembly line, if the demand is 30/hr and the sum of processes 3 points
time is 10 min, what is the minimum number of stations required to ensure a cycle time of 5 min?
3
4
5
6
14) A firm which was offering a standard product, has started offering different 2 points
variations. Which of the following statement(s) is/are correct in this context?
15) In designing an efficient supply chain, which of the following factors are important 1 point
16) Which of the following products would need a responsive supply chain? 1 point
17) Which of the following activities does not come under the purview of operations 2 points
management?
You may submit any number of times before the due date. The final submission will be
considered for grading.
Submit Answers