You are on page 1of 2

| BAY | INCOMING | OUTGOING | TRAFO | LINE | COUPLER | GRAFIK |

TREND BEBAN PUNCAK

GRAFIK PEMBEBANAN 70KV


11.3 11.3
12 10 9.5 9.8
9.1
10 7.5 7.7
8 6.6 5.9 6.4
4.7 5.1 5.3 5.2
6
4
2
0
JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER
TRAFO 9.1 10 11.3 11.3 9.8
BIMA 1 4.7 5.1 5.9 7.5 5.3
BIMA 2 6.6 9.5 6.4 7.7 5.2

TRAFO BIMA 1 BIMA 2

BAY TRAFO LINE BIMA 1 LINE BIMA 2


11.3 MW
TGL 07/10/2023 JAM 18:30 WITA
-7.5 MW
TGL 04/10/2023 JAM 10:00 WITA
-7.7 MW
TGL 04/10/2023 JAM 13:00 WITA
11.3 Mw

BAY TRAFO LINE BIMA 1 LINE BIMA 2


9.8 MW -5.3 MW -5.2 MW
TGL 09/11/2023 JAM 19:00 WITA TGL 09/11/2023 JAM 18:30 WITA TGL 09/11/2023 JAM 18:30 WITA
| BAY | INCOMING | OUTGOING | TRAFO | LINE | COUPLER | GRAFIK |

TREND BEBAN PUNCAK


GRAFIK PEMBEBANAN 20KV
12
10
8
6
4
2
0
LESU WAWO MANGGE EXP SAPE INC.TRAFO
JULI 0.896 0.87 2.8 5 9.1
AGUSTUS 0.597 0.873 2.8 5.8 9.9
SEPTEMBER 0.524 0.876 2.8 7.5 11.2
OKTOBER 0.562 0.913 3.5 7.1 11.2
NOVEMBER 3.5 0.905 2.4 7.3 10.3

JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER

F.LESU F.WAWO F.MANGGE F.PLTD SAPE INCOMING TRAFO


562 KW
TGL 08/10/2023
JAM 19:00 WITA
913 KW
TGL 15/10/2023
JAM 19:00 WITA
3.5 MW
TGL 27/10/2023
JAM 06:00 WITA
7.1 MW
TGL 05/10/2023
JAM 18:30 WITA
11.2 MW
TGL 07/10/2023
JAM 18:30 WITA
11.2 Mw

F.LESU F.WAWO F.MANGGE F.PLTD SAPE INCOMING TRAFO


3522 KW 905 KW 2.4 MW 7.3 MW 10.3 MW
TGL 29/11/2023 TGL 06/11/2023 TGL 01/11/2023 TGL 09/11/2023 TGL 09/11/2023
JAM 12:00 WITA JAM 20:00 WITA JAM 18:00 WITA JAM 18:30 WITA JAM 18:30 WITA

You might also like