The document contains graphs showing peak load trends for a 70kV and 20kV transmission system over five months. The 70kV graph shows the peak loads for a transformer and two feeder lines, ranging from 4.7-11.3 MW. The 20kV graph shows the peak loads for four feeders and an incoming transformer, ranging from 0.524-11.2 MW. Tables below each graph provide the dates and times of maximum loads.
The document contains graphs showing peak load trends for a 70kV and 20kV transmission system over five months. The 70kV graph shows the peak loads for a transformer and two feeder lines, ranging from 4.7-11.3 MW. The 20kV graph shows the peak loads for four feeders and an incoming transformer, ranging from 0.524-11.2 MW. Tables below each graph provide the dates and times of maximum loads.
The document contains graphs showing peak load trends for a 70kV and 20kV transmission system over five months. The 70kV graph shows the peak loads for a transformer and two feeder lines, ranging from 4.7-11.3 MW. The 20kV graph shows the peak loads for four feeders and an incoming transformer, ranging from 0.524-11.2 MW. Tables below each graph provide the dates and times of maximum loads.