SCOPE OF WORK

PROJECT NAME REOVILE

PROJECT SCOPE ARMOURED CABLE REPLACEMENT AND INSTALLATION

CONTRACT FIX And SUPPLY

PROJECT BENEFICIARIES

The NMB BANK, Zimbabwe.

WORKS TO BE PROVIDED BY THE CONTRACTOR (GOLMAC CONSTRUCTION)

1.1 Description of Works

The following table outlines works that are to be carried out on each of the 24 clusters
Thus, including replacement of armored cables in meters, trenching and cable laying, installation of prepaid ZESA
meters and Meter board furbish for unit 3 up to 26

UNIT 4core Trenching Uninstalled


NUMBER armored and cable Prepaid
cable mtrs laying m2 Meter [x]

3 x
4 37 32 x
5 52 45 x
6 50 45 x
7 41 35
8 43 38
9 30 25
10 32 26
11 37 32
12 36 30
13 22 17
14 47 42
15 49 44
16 34 29

Reoville project scope of


works
GOLMAC CONSTRUCTION & CIVIL
WORKS (PVT) LTD

BUILDING, CIVIL ENGINEERING, PLUMBING & CONTRACTORS


33 Morton Jeffrey Eastlea Harare
Phone: +263 778 511 559/ +263 777 920 291
P. O Box 75, Harare
. golmacconstruction@gmail.co
. golmacplumbers@hotmail.com

17 34 29
18 52 47
19 51 46
20 43 38
21 43 38
22 37 34
23 38 32
24 38 34
25 39 32
26 34 29

The works includes supply, installation of all the required armored cables with necessary accessories and equipment,
testing & commissioning on all other ancillary work required to complete the replacement and connection of the units
to the ZESA mainline at Reoville Project. Thus, also including the provision of required manpower, machinery and skilled
electrician’s for Meter box Connections, trenching and cable laying and proper communications with Malbereign ZESA
for the installations in the shortest possible amount of time.

GENERAL RESPONSEBILITIES

Transportation of materials, testing and commissioning of all the equipment shall be officially GOLMACS
responsibility. The Services shall also include some duties normally performed by Malbereign ZESA field staff, which
includes the connection of cables to main electricity points. These shall include, yet not be limited to, liaising and
maintaining strong working relations with all Malbereign ZESA stuff to obtain all required letters, approvals,
documentation…etc.

Prior to taking over of the Works or any section of the Works or to putting any portion of the Works into service,
Golmac shall carry out Tests upon Completion in accordance with the provisions of the contract. The tests shall be
carried out in the presence of the Engineer and to his satisfaction.