ENGINEERING CONSTRUCTION REFERENCE SHEET
INSTRUCTIONS:
1 The Construction Reference Sheet must be completed in its entirety.
A Construction Reference Sheet must be submitted for each category/specialty code being requested. Feel free to make copies of this
2
form as needed.
A minimum of four references must be supplied for evaluation for each category/specialty code. The maximum number of categories
3
that can be approved is three. Dates of projects must be in the following format (mm/dd/yyyy).
The same references are permitted for different specialties so long as the agency/company supplying the reference can attest to that
4
specific category of work.
References are required upon recertification. For existing categories, references can be for work completed within the past 5 years. If
5
pursuing a new category, references should be for work completed within the past 3 years.
NOTE: The contract for each reference must be $100,000 or higher.
Firm Name Specialty Code
Contact Name Title/Position
Phone Number Email Address
Reference Number 1
Organization/Company Telephone
Contact Name Email Address
Title/Position Street Address
Project/Contract Number City/State/Zip
Project/Contract Title
Scope of Work Performed
Date Work Completed Contract Amount $
Reference Number 2
Organization/Company Telephone
Contact Name Email Address
Title/Position Street Address
Project/Contract Number City/State/Zip
Project/Contract Title
Scope of Work Performed
Date Work Completed Contract Amount $
Reference Number 3
Organization/Company Telephone
Contact Name Email Address
Title/Position Street Address
Project/Contract Number City/State/Zip
Project/Contract Title
Scope of Work Performed
Date Work Completed Contract Amount $
Reference Number 4
Organization/Company Telephone
Contact Name Email Address
Title/Position Street Address
Project/Contract Number City/State/Zip
Project/Contract Title
Scope of Work Performed
Date Work Completed Contract Amount $
NOTE: When the scope of work is part of a larger project, provide a brief description of work performed by you and the amount of your contract portion. If known,
include the project number and title. For maintenance contracts, state annual average and length of maintenance contract.
OBDCR 2/2019
ALL CATEGORIES: M/WBE & SBE LISTINGS
Category Specialty Code Category Specialty Code
Alarms 16.001 Milling 02.152
Asbestos Removal 02.450 Misc. Metals 5.001
Asphalt Clng. 02.153 Modular Building 02.314
Asphalt Milling 02.152 Mold Remediation ----
Asphalt Paving 02.153 Pavement Striping 02.153
Blasting 03.003 Paving & Utilities 02.150
Borings 02.250 Pile Driving 02.251
Caulking 02.300 Pipe & Catch Basin Cleaning 02.154
Ceilings 02.300 Pipe Insulation 15.050
Concrete 03.000 Plumbing 15.050
Corrosion Control 03.003 Power Cleaning 03.003
Curtain Wall 02.300 Railroad Construction 02.400
Demolition 02.000 Rigging 02.252
Electrical 16.000 Roofing 07.000
Electronics 16.001 Sandblasting 03.003
Elevator Installation 16.000 Sawcutting 02.200
Fencing & Guardrails 02.050 Scaffolding 02.252
Fiber Optics 16.001 Sealcoating 02.153
Fire Protection & Sprinklers 15.051 Sheet Metal 15.000
Fireproofing 02.304 Sign Erection 02.312
Floor Covering 02.300 Site Work 02.151
Flooring 02.300 Solid Waste Disposal 02.600
G.C.-Bldg. 02.300 Steel Erection 05.000
G.C.-Heavy 02.250 Steel Fabrication 05.003
Glazing 02.310 Stonework 02.308
Hazardous Material Disposal 02.600 Storefronts 02.307
Hazardous Material Removal 02.600 Structural Steel/Bridge Painting 02.300
Highway Safety Equipment 02.200 Surveying 02.100
HVAC Controls 15.000 Tile & Terrazzo 02.308
Inspection & Testing ---- Toll/Information Booths ----
Insulation 02.300 Traffic Signs 02.312
Interior Renovations 02.300 Trucking 02.151
Janitorial Svcs. ---- Underground Storage Tanks 02.500
Landscaping 02.100 Underwater Inspection 02.351
Loading Bridges ---- Waterproofing 02.309
Marine Construction 02.350 Welding 05.000
Masonry 02.305 Well Drilling 02.251
Mechanical 15.000/15.050
*Inclusive corresponding category numbers from Contracts Division
OBDCR 2/2019