TABLE OF CONTENTS
TABLE OF CONTENTS .....
LIST OF FIGURES
LIST OF TABLES ..
CHAPTER 1: PROJECT BACKGROUND.
41.1 Statement of the problem,
1.2 Project Description and Objective.
1.3 Project Client.
Client Specifications.
1.4 Project Scope and Limitations.
Scope.
Limitations...
15 Project Development Cycle.
CHAPTER 2: DESIGN CRITERIA AND REVIEW OF RELATED LITERATURE...
2.1 Design Input...
Demography.
Location Map...
Vicinity Map
Topographic Map.
Climate
Hazard.
Seismic Hazard Assessment
Ground Rupture.
Ground Shaking.
Liquefaction...
Volcanic Hazard Assessment
Hydro-Meteorological Assessment.
2.2 Review of Related Literature.
vi
"CHAPTER 3: DESIGN CONSTRAINTS, TRADE OFFS, AND STANDARDS
3.1 Design Constraints
Quantitative Constraints
Economic Constraint (Project Cost)
Constructabilty Constraint (Labor Cost)...
Sustainability Constraint (Maintenance Cost)
Risk Constraint
Uncertainty Constraint
Safety Constraint
Qualitative Constraints
Social Constraint
Public Health Constraint
Political Constraint
3.2 Design Tradeofts
3.3 Multiple Constraints Using Initial Normalization Method
3.4 Raw Data,
3.5 Normalized Method .....
3,6 Design Codes and Standards .....
Fa
25
25
6
2
2a 25
26
26
26
a
a
a
a
a
37
40
oT
51CHAPTER 4: DESIGN PROCESS 53
4.1 Design Methodology 53
4.2 Design Parameters... 7 eens ercnnenneenneesee 5B
4.3 Design Process for Retaining Wall (Context |) on one B
4.4 Design Load 3
4.5 Structural Analysis 76
4.8 Modeling of Structures... 8
47 Analysis of Safety 81
4.8 Design Process for Flood Gate (Context I) 82
4.9 Design Parameters for Flood Gate (Context I!) . seo BB
4.10 Caleulation of Capatity..... ees sesineninnnenntnnsennesee 8
4.11 Design Process for Dredging (Context Ill) 90
4.12 Bathymettic SUEY ..ccnssnstenstnnse even se sees 9
4.13 Monitoring of Dredged Material Dumping Operations ee
4.14 Disposal Sites 93
4.16 Sensitivity Analysis 94
CHAPTER 5: FINAL DESIGN ..... fen eves sercitnsteteesenaneeee 100
5.1 Rainfall Analysis 110
5.2 Protection to Scouring 110
villREFLECTIVE ESSAYS. 114
CURRICULUM VITAE 118
REFERENCES,
APPENDICESList of Figures
Figure 1.1; Project Development Cycle
Figure 2.1.1: Location Map
Figure 2.1.2: Vicinity Map ....
Figure 2.1.3: Topographic Map of San Juan River, Quezon City...
Figure 2.1.4: Climate Map ofthe Philippines...
Figure 2.1.5: Ground Rupture Hazard Map of San Juan, Quezon City
Figure 2.1.6: Ground Shaking Hazard Map of San Juan, Quezon City
Figure 2.2.1: Sheet Piling River Protection in Pampanga
Figure 2.2.1: Retaining Wall in Marikina as River Flood Control
Figure 2.2.3: River Wall Protection in Las Pinas
Figure 2.2.4: Flood Wall Built to Protect Residents of Flood-Prone Barangay in Ilocos Sur
Figure 2.2.5: Vinyl sheet pile as flood protection in Philippines
Figure 2.2.6: Flood Control Structure Builtin Negros Occidental
Figure 2.2.7: Tonsuya river wall in CAMANAVA
Figure 2.2.8: Tulahan River Dredging...
Figure 2.2.9: Marikina River Dredging .....
Figure 2.2.10: Laoag River Dredging
Figure 2.2.11: Pasig City Pumping Station ........:nsse eves
Figure 2.2.12: Valenzuela Pumping Station
Figure 2.2.13: Xylem Water System
Figure 2.2.14: Flood Control Structure for River Backflow in Pampanga
Figure 2.2.15: Mandangoa Spillway 0. evn
Figure 2.2.16: Bontoc Spillway
Figure 3.2.1; Combination of Reinforced Concrete and Structural Steel as river wall protection ....
Figure 3.2.2: Flood bypass filed with nearly annual floods, flood banks to avoid a flood plain
Figure 3.2.3: Deepening of Riverbed ...
Figure 3.2.4: Mississippi River Spillway
Figure 3.2.5: San Antonio River Flood Tunnel
Figure 3.2.6; Stormwater Pump Station
4
12,
13
13
14
15
16
wa lT
eal
18
19
20
a
22
23
24
28
29
34
33
34
36Figure 4.2.1: Catchment Area
Figure 4.2.2: Topographic Map of the Project Site
Figure 4.2.3: Topographic Map of the Project Site Basin
Figure 4.2.4: Land Cover...
Figure 4.2.4; Land Use . vnc even
Figure 4.2.5: Soi Cover.
Figure 4.2.6: Geometry Model in HEC-RAS .....
Figure 4.2.7: 25-YR Flood Depth Map (Existing Scenario)...
Figure 4.2.8: 10-YR Flood Depth Map (Existing Scenario)
Figure 4.2.9: 2-YR Flood Depth Map (Existing Scenario)
Figure 4.2.10: Flood Points Location
Figure 4.2.11: Dredging Area
Figure 4.2.12: 25-YR Flood Depth Map (With Proposed Project Scenario)
Figure 4.2.13: 10-YR Flood Depth Map (With Proposed Project Scenario)
Figure 4.2.14: 2-YR Flood Depth Map (With Proposed Project Scenario)
Figure 4.3.1: Design Process for Retaining Wal
Figure 4.5.1: Cross Section ..
Figure 4.6.1: Geometric Model of Retaining Wall...
Figure 4.6.2: Geometric model of cantilever retaining wall and bar placement
Figure 4.6.3: Geometric model of Steel Casing on Pile foundation
Figure 4.6.4: Geometric model ofthe Steel sheet,
Figure 4.6.5: Geometric Model of Pile Foundation and Stee! Sheet Top View
Figure 4.8.1: Design Process for Flood Gate
Figure 4.10.1: Design Perspective of Proposed Flood Gate System
Figure 4.10.2: Floor Plan of Proposed Flood Gate System
Figure 4.10.3; Cross Section .....
Figure 4.10.4; Specification of Steel Sheet Pile...
Figure 4.10.5: Detail Connection of Steel Sheet Pile .......s.cssssstnse
x
87
87
88
88
89Figure 4.11.1: Design Process for Dredging 90
Figure 4.11.2: Design Perspective for Dredging ..... evn sven 9
Figure 4.11.3: Dredge Prism Illustration (Reprinted from US Army Corps of Engineers (2008)... 92
Figure 4.15.1: Sensitivity Analysis Economic Vs. Constructabily 0... evenness
Figure 4.15.2: Sensitivity Analysis Economic Vs. Sustainability... ccnannnnennsenee 9B
Figure 4.17: Sensitivity Analysis Economic Vs. Uncertainty... 7 . 97
Figure 4.15.4: Sensitivity Analysis Economic Vs. Risk 7 nese even 9B
Figure 4.16.5: Sensitivity Analysis Economic Vs, Safely fen ee)
Figure 5.1: Bored file elevation 401
Figure 5.2; Revetment Plan 102
Figure 5.3: Capping Beam Rebar Detail 402
Figure 5.4: Typical Section of Revetment 103
Figure 5.5: Bored Pile Detail
Figure 5.6: Steel Sheet Pile Connection Detail
Figure 5.7: Section 2A
Figure 5.8: Section 28 ....... eeseestsae eeceeste eeseeseene cesseneenesnsen OT
Figure 5.9: Section View ....... eeseeseene eesteseseene eesetseensenstseeseesot 4 OB
Figure 5.10: Front View & Section View ....... seseeseeae cessesnentsaeseeasee 109
Figure 5.11: Front View - 6" CHB End Wall es . eeseee eeseeseeneeseen 109
xiList of Tables
Table 2.1; Seismic Hazard Assessment of San Juan River, Quezon City...
Table 3.2.1: Advantages and Disadvantages of Retaining Wall.
Table 3.2.2: Advantages and Disadvantages of Flood Gate system ..
Table 3.2,
Table 3.2.4:
\dvantages and Disadvantages of Dredging ....rn-no
\dvantages and Disadvantages of Spillway ..
Table 3.2.5: Advantages and Disadvantages of Flood Tunnel
Table 3.2.6: Advantages and Disadvantages of Pumping Station
Table 3.3.1: Evaluation Raw Designers Data
Table 3.3.2: Normalization Raw Evaluation Data
coo
28
30
231
34
36
36
38
38
Table 3.3.3: Weighted percentage for the sum of Constraints. which weighted Economical and
Safety.
Table 3.3.4; Weighted percentage for sum of Constraints which weighted Safety and Economical
Table 3.3.5: Weighed percentage fr sum of Cnsns which weighed Rist, Uncen, Eeonomiea
and Safety
Table 3.4.1: Economic Raw Data Trade off Context (Dredging)
Table 3.4.2: Economic Raw Data Trade off Context (Retaining Wall)
Table 3.4.3: Economic Raw Data Trade off Context (Flood bypass System / Flood Gate)
Table 3.4.4: Actviies Raw Data Forecast in Trade off Context | (Dredging)
Table 3.4.5: Gantt Chart for Trade off Context (Dredging)
Table 3.4.6:
Table 3.4,
Table 3.4.8: Activities Raw Data forecast in Trade off Context Ill (Flood Gate)
Table 3.4.9: Gantt Chart Trade off Context Ill (Flood Gate) ..
Table 3.5.1: Designer's Raw Data
tivities Raw Data forecast in Trade off Context (Retaining wall)
jantt Chart Trade off Context Il Retaining wal)
Table 3.5.2: Normalization of Data of Design of Structural Components Context .....
Table 3.5.3: 1% Weighted sum of Various Percentage for Structural Components...
Table 3.5.4: 2° Weighted sum of Various Percentage for Structural Components
Table 3.5.5: 3 Weighted sum of Various Percentage for Structural Components
Table 4.2.1: Size of Catchment Areas
xi
39
39
40
40
42
42
44
45
45
46
GB
47
48
49
49
50
51
54Table 4.2.4.1: Land Use of Project Basin
Table 4.2.4.2: Soil Classification of the Project Basin
Table 4.2.4.3: Design Hyetographs
Table 4.2.4.4: Discharge Results
Table 4.2.4.5: Manning's Roughness Coefficient ‘NV...
Table 4.2.4.6: Freeboard Criteria for Discharge
Table 4.2.4.7: Recommended Freeboard for San Juan River
Table 4.4.1:
Table 4.4.2: Earth Pressure Coefficient ..
Table 4.4.3: Seismic Parameters
Table 4.5.1: Assumptions of Primary Section
Table 4.10.1: Superimposed Dead Loads for Flood Gate
Superimposed Dead Loads for Retaining Wall
Table 4.10.2: Sheet Steel Pile Size
Table 4,10,3: Shear Wall Size
Table 4.15.1: Sensitivity Analysis Economic Vs, Constructabilty
Table 4.15.2: Sensitivity Analysis Economic Vs, Sustainability.
Table 4.15.3: Sensitivity Analysis Economic Vs. Uncertainty...
Table 4.15.4: Sensitivity Analysis Economic Vs. Risk...
Table 4.15.5: Sensitivity Analysis Economic Vs, Safety
Table 5.1: Bar Bending Diagram .....
Table 5.1.1: Earth Pressure Coefficient
Table 6.2.1: Scour Depth Calculation
Table 5.2.2: Flood Depth at Cross-Section Per Retumn Period
xiv
55
56
62
63
65
wT
70
eon
aT
15
7
85
89
89
94
95
96
oT
98
106
110
114
112