TIRTA KUNING AYU SUKSES TABEL PROGRESS PELAKSANAAN KONSULTAN PENGAWAS INDEPENDEN
PERUIMDA AIR MINUM (PAM) TIRTA PROYEK : PERJANJIAN KERJASAMA ANTARA PERUMDA AIR MINUM (PAM) KABUPATEN KUNINGAN DAN PT. TIRTA KUNING AYU SUKSES PERUMDA AIR MINUM (PAM)
KAMUNING KABUPATEN KUNINGAN TIRTA KAMUNING
KONSULTAN PENGAWAS INDEPENDEN (KPI) KSO
KABUPATEN KUNINGAN
PT INTIMULYA MULTI KENCANA NO. KONTRAK : No. 03.A/TKAS-JS/IV/2022 dan No.26/KTRK-KSO/IMK-TSE/IV/2022 Tanggal 29 April 2022
(KSO) Minggu KE : 82 (Periode 20 November s/d 26 November 2023 )
0
PT TIRTA SIGMA ENGINEERING-
JUMLAH BOBOT
2022 2023
NO URAIAN KEGIATAN NAMA MANMONTH KETERANGAN
(BULAN) (%) MINGGU KE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83
02/05/2022 09/05/2022 16/05/2022 23/05/2022 30/05/2022 06/06/2022 13/06/2022 20/06/2022 27/06/2022 04/07/2022 11/07/2022 18/07/2022 25/07/2022 01/08/2022 08/08/2022 15/08/2022 22/08/2022 29/08/2022 05/09/2022 12/09/2022 19/09/2022 26/09/2022 03/10/2022 10/10/2022 17/10/2022 24/10/2022 31/10/2022 07/11/2022 14/11/2022 21/11/2022 28/11/2022 05/12/2022 12/12/2022 19/12/2022 26/12/2022 02/01/2023 09/01/2023 16/01/2023 23/01/2023 30/01/2023 06/02/2023 13/02/2023 20/02/2023 27/02/2023 06/03/2023 13/03/2023 20/03/2023 27/03/2023 03/04/2023 10/04/2023 17/04/2023 24/04/2023 01/05/2023 08/05/2023 15/05/2023 22/05/2023 29/05/2023 05/06/2023 12/06/2023 19/06/2023 26/06/2023 03/07/2023 10/07/2023 17/07/2023 24/07/2023 31/07/2023 07/08/2023 14/08/2023 21/08/2023 28/08/2023 04/09/2023 11/09/2023 18/09/2023 25/09/2023 02/10/2023 09/10/2023 16/10/2023 23/10/2023 30/10/2023 06/11/2023 13/11/2023 20/11/2023 27/11/2023
S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
08/05/2022 15/05/2022 22/05/2022 29/05/2022 05/06/2022 12/06/2022 19/06/2022 26/06/2022 03/07/2022 10/07/2022 17/07/2022 24/07/2022 31/07/2022 07/08/2022 14/08/2022 21/08/2022 28/08/2022 04/09/2022 11/09/2022 18/09/2022 25/09/2022 02/10/2022 09/10/2022 16/10/2022 23/10/2022 30/10/2022 06/11/2022 13/11/2022 20/11/2022 27/11/2022 04/12/2022 11/12/2022 18/12/2022 25/12/2022 01/01/2023 08/01/2023 15/01/2023 22/01/2023 29/01/2023 05/02/2023 12/02/2023 19/02/2023 26/02/2023 05/03/2023 12/03/2023 19/03/2023 26/03/2023 02/04/2023 09/04/2023 16/04/2023 23/04/2023 30/04/2023 07/05/2023 14/05/2023 21/05/2023 28/05/2023 04/06/2023 11/06/2023 18/06/2023 25/06/2023 02/07/2023 09/07/2023 16/07/2023 23/07/2023 30/07/2023 06/08/2023 13/08/2023 20/08/2023 27/08/2023 03/09/2023 10/09/2023 17/09/2023 24/09/2023 01/10/2023 08/10/2023 15/10/2023 22/10/2023 29/10/2023 05/11/2023 12/11/2023 19/11/2023 26/11/2023 30/11/2023

A. TENAGA AHLI
1 Pimpinan Tem/Ahli Sipil/ Ahli Teknik Ir. Dedi Mulyadi 15 14.05 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 (0.00)
Lingkungan
2 Koordinator Proyek/Ahli Sipil Teknik Ir. Achmad Gaos 14 11.41 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 -
Bangunan
3 Ahli Air
Sipil Struktur (1) Belly Berlian, S.T 10 7.29 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 -
4 Ahli Sipil Struktur (2) Sofyan Handoko, S.T 9.5 7.74 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 -
5 Ahli Mekanikal/Elektrikal Ir. Gofar Arifin 5 4.08 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 -
6 Ahli Hukum/Kontrak Indra Sofyar, S.H., M.H 2 1.63 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 -
7 Ahli Keuangan Dadan Herdian, S.E 2 1.63 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 -
8 Ahli HSE/K3 Ivan Prana, S.E 12 7.34 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 -
9 Ahli Quantity Control 12 7.34 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 -
-
B PENGAWAS LAPANGAN -
1 Inspektur Bangunan Air Agung Tafani, Amd 6 1.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -
2 Inspektur Struktur (1) 6 1.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -
3 Inspektur Struktur (2) 6 1.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -
3 Inspektur Piping (1) Dido Sudarto, Amd 6 1.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -
4 Inspektur Piping (2) Kusnadi 6 1.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -
4 Inspektur Piping (3) 6 1.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -
4 Inspektur Mekanikal/Elektrikal 3 0.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -
-
4 TENAGA PENDUKUNG LAIN -
1 Asisten Engineer ( Reporting ) Dimas Taufiqurrahman., ST. 14 3.46 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 -
2 Operator Computer 8 1.85 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -
3 Office Boy 15 1.62 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -
-
5 BIAYA LAPANGAN 15 13.85 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 -
-
6 DISKUSI & PEMBAHASAN 15 0.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -
-
7 REPORTING 15 3.48 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 -

BOBOT RENCANA SETIAP BULAN (%) 100.00 0.40 0.40 0.40 0.40 0.96 0.96 0.96 0.96 1.36 1.36 1.36 1.36 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.24 1.24 1.24 1.24 1.24 1.19 1.19 1.19 1.19 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 0.83 0.83 0.83 0.83 1.29 1.29 1.54 1.54 1.19 1.19 1.05 1.05 1.05 1.05 1.05 1.05 0.83 1.29 1.29 1.54 1.54 1.19 1.19 1.05 1.05 1.05 1.05 1.05 1.05 0.83 1.29
KUMULATIF BOBOT RENCANA (%) 0 0 0.40 0.80 1.20 1.61 2.56 3.52 4.48 5.44 6.80 8.16 9.52 10.88 12.44 14.01 15.58 17.14 18.71 20.28 21.84 23.41 24.98 26.54 28.11 29.68 31.14 32.60 34.06 35.52 36.98 38.44 39.90 41.36 42.82 44.28 45.74 46.98 48.23 49.47 50.72 51.96 53.15 54.33 55.52 56.70 57.75 58.80 59.85 60.90 61.94 62.99 64.04 65.09 65.92 66.75 67.58 68.41 69.70 70.99 72.53 74.07 75.26 76.44 77.49 78.54 79.59 80.63 81.68 82.73 83.56 84.85 86.14 87.68 89.22 90.41 91.59 92.64 93.69 94.74 95.78 96.83 97.88 98.71 100.00
BOBOT REALISASI SETIAP BULAN (%) 1.10 1.10 0.81 1.10 1.20 1.00 1.00 0.90 0.90 1.00 0.80 0.90 0.50 1.50 1.50 1.50 1.50 1.70 1.70 1.70 1.50 2.20 2.20 2.20 1.90 0.30 1.90 1.90 1.90 1.39 1.39 1.39 1.39 1.39 1.39 1.18 1.18 1.18 1.18 1.18 1.13 1.13 1.13 1.13 1.00 1.00 1.00 1.00 1.00 0.86 0.65 0.90 0.95 0.50 1.20 1.50 2.21 2.55 0.92 0.92 0.71 0.71 0.63 0.63 0.63 0.63 0.63 0.63 0.50 0.77 0.77 0.92 0.92 0.71 2.20 2.20 2.20 2.20 1.00 1.00 1.00 1.00
KUMULATIF BOBOT REALISASI (%) 0 0 1.10 2.20 3.01 4.11 5.31 6.31 7.31 8.21 9.11 10.11 10.91 11.81 12.31 13.81 15.31 16.81 18.31 20.01 21.71 23.41 24.91 27.11 29.31 31.51 33.41 33.71 35.61 37.51 39.41 40.80 42.18 43.57 44.96 46.35 47.73 48.92 50.10 51.28 52.46 53.65 54.77 55.90 57.02 58.15 59.15 60.14 61.14 62.13 63.13 63.99 64.64 65.54 66.49 66.99 68.19 69.69 71.90 74.45 75.37 76.30 77.01 77.72 78.35 78.98 79.61 80.24 80.87 81.49 81.99 82.77 83.54 84.46 85.39 86.10 88.30 90.50 92.70 94.90 95.90 96.90 97.90 98.90
DEVIASI 0.70 1.40 1.81 2.50 2.75 2.79 2.83 2.77 2.31 1.95 1.39 0.93 -0.13 -0.20 -0.27 -0.33 -0.40 -0.27 -0.13 0.00 -0.07 0.57 1.20 1.83 2.27 1.11 1.55 1.99 2.43 2.36 2.29 2.22 2.14 2.07 2.00 1.93 1.87 1.81 1.75 1.68 1.63 1.57 1.51 1.45 1.40 1.34 1.29 1.24 1.19 1.00 0.60 0.45 0.57 0.24 0.61 1.28 2.20 3.46 2.84 2.23 1.75 1.28 0.86 0.44 0.02 -0.40 -0.82 -1.24 -1.57 -2.08 -2.60 -3.22 -3.83 -4.31 -3.29 -2.14 -0.99 0.16 0.12 0.07 0.02 0.19

CUVE 'S' RENCANA

CUVE 'S' RENCANA

Disetujui Oleh :
PT. TIRTA KUNING AYU SUKSES

Sigit Riyanto, ST
Supervisor Engineer
PT. TIRTA KUNING AYU SUKSES T

PROYEK : PERJANJIAN KERJASAMA ANTARA PERUMDA AIR MINUM (PAM) KABUPATEN KUNINGAN DAN PT. TIRTA KUNING AYU SUKSES
PERUIMDA AIR MINUM (PAM) TIRTA KAMUNING KABUPATEN
KUNINGAN

NO. KONTRAK : No. 03.A/TKAS-JS/IV/2022 dan No.26/KTRK-KSO/IMK-TSE/IV/2022 Tanggal 29 April 2022


KONSULTAN PENGAWAS INDEPENDEN (KPI)
PT INTIMULYA MULTI KENCANA
(KSO)
PT TIRTA SIGMA ENGINEERING BULAN KE : 1 (Periode 02 Mei s/d 31 Mei 2022
-

JUMLAH
BOBOT
2022
NO URAIAN KEGIATAN NAMA MANMONTH
(%)
(BULAN)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
02/05/2022 09/05/2022 16/05/2022 23/05/2022 30/05/2022 06/06/2022 13/06/2022 20/06/2022 27/06/2022 04/07/2022 11/07/2022 18/07/2022 25/07/2022 01/08/2022 08/08/2022 15/08/2022 22/08/2022 29/08/2022 05/09/2022 12/09/2022 19/09/2022 26/09/2022
S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
08/05/2022 15/05/2022 22/05/2022 29/05/2022 05/06/2022 12/06/2022 19/06/2022 26/06/2022 03/07/2022 10/07/2022 17/07/2022 24/07/2022 31/07/2022 07/08/2022 14/08/2022 21/08/2022 28/08/2022 04/09/2022 11/09/2022 18/09/2022 25/09/2022 02/10/2022

A. TENAGA AHLI
1 Pimpinan Tem/Ahli Sipil/ Ahli Teknik Ir. Dedi Mulyadi 15 14.05 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17
Lingkungan
2 Koordinator Proyek/Ahli Sipil Teknik Bangunan Ir. Achmad Gaos 14 11.41 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
3 Air
Ahli Sipil Struktur (1) Belly Berlian, S.T 10 7.29 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
4 Ahli Sipil Struktur (2) Sofyan Handoko, S.T 9.5 7.74 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
5 Ahli Mekanikal/Elektrikal Ir. Gofar Arifin 5 4.08 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
6 Ahli Hukum/Kontrak Indra Sofyar, S.H., M.H 2 1.63 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
7 Ahli Keuangan Dadan Herdian, S.E 2 1.63 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
8 Ahli HSE/K3 Ivan Prana, S.E 12 7.34 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
9 Ahli Quantity Control 12 7.34 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

B PENGAWAS LAPANGAN
1 Inspektur Bangunan Air Agung Tafani, Amd 6 1.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
2 Inspektur Struktur (1) Eko Nurhidayat, S.T 6 1.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
3 Inspektur Struktur (2) Okavian Bagus P, S.T 6 1.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
3 Inspektur Piping (1) Dido Sudarto, Amd 6 1.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
4 Inspektur Piping (2) Kusnadi 6 1.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
4 Inspektur Piping (3) Dadi 6 1.99 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
4 Inspektur Mekanikal/Elektrikal Supriatna 3 0.99

4 TENAGA PENDUKUNG LAIN

1
Administrasi Proyek Dimas Taufiqurrahman, ST. 14 3.46 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
2 Operator Computer Resti Harmonika 8 1.85
3 Office Boy tobe name 15 1.62 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

5 BIAYA LAPANGAN 15 13.85 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17

6 DISKUSI & PEMBAHASAN 15 0.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7 REPORTING 15 3.48 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04

BOBOT RENCANA SETIAP BULAN (%) 100.00 0.40 0.40 0.40 0.40 0.96 0.96 0.96 0.96 1.36 1.36 1.36 1.36 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57
KUMULATIF BOBOT RENCANA (%) 0 0 0.40 0.80 1.20 1.61 2.56 3.52 4.48 5.44 6.80 8.16 9.52 10.88 12.44 14.01 15.58 17.14 18.71 20.28 21.84 23.41 24.98 26.54
BOBOT REALISASI SETIAP BULAN (%) 1.10 1.10 0.81 1.10 1.20 1.00 1.00 0.90 0.90 1.00 0.80 0.90 0.50 1.50 1.50 1.50 1.50 1.70 1.70 1.70 1.50 2.20
KUMULATIF BOBOT REALISASI (%) 0 0 1.10 2.20 3.01 4.11 5.31 6.31 7.31 8.21 9.11 10.11 10.91 11.81 12.31 13.81 15.31 16.81 18.31 20.01 21.71 23.41 24.91 27.11
DEVIASI 0.70 1.40 1.81 2.50 2.75 2.79 2.83 2.77 2.31 1.95 1.39 0.93 -0.13 -0.20 -0.27 -0.33 -0.40 -0.27 -0.13 0.00 -0.07 0.57

CUVE 'S' RENCANA

CUVE 'S' RENCANA


TABEL PROGRESS PELAKSANAAN KONSULTAN PENGAWAS INDEPENDEN

G AYU SUKSES

2
MINGGU KE
23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
03/10/2022 10/10/2022 17/10/2022 24/10/2022 31/10/2022 07/11/2022 14/11/2022 21/11/2022 28/11/2022 05/12/2022 12/12/2022 19/12/2022 26/12/2022 02/01/2023 09/01/2023 16/01/2023 23/01/2023 30/01/2023 06/02/2023 13/02/2023 20/02/2023 27/02/2023 06/03/2023 13/03/2023 20/03/2023 27/03/2023 03/04/2023 10/04/2023 17/04/2023 24/04/2023 01/05/2023 08/05/2023 15/05/2023 22/05/2023 29/05/2023
S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
09/10/2022 16/10/2022 23/10/2022 30/10/2022 06/11/2022 13/11/2022 20/11/2022 27/11/2022 04/12/2022 11/12/2022 18/12/2022 25/12/2022 01/01/2023 08/01/2023 15/01/2023 22/01/2023 29/01/2023 05/02/2023 12/02/2023 19/02/2023 26/02/2023 05/03/2023 12/03/2023 19/03/2023 26/03/2023 02/04/2023 09/04/2023 16/04/2023 23/04/2023 30/04/2023 07/05/2023 14/05/2023 21/05/2023 28/05/2023 04/06/2023

0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17

0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
0.14 0.14 0.14
0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04

1.57 1.57 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.24 1.24 1.24 1.24 1.24 1.19 1.19 1.19 1.19 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 0.83 0.83 0.83 0.83 1.29
28.11 29.68 31.14 32.60 34.06 35.52 36.98 38.44 39.90 41.36 42.82 44.28 45.74 46.98 48.23 49.47 50.72 51.96 53.15 54.33 55.52 56.70 57.75 58.80 59.85 60.90 61.94 62.99 64.04 65.09 65.92 66.75 67.58 68.41 69.70
2.20 2.20 1.90 0.30 1.90 1.90 1.90 1.39 1.39 1.39 1.39 1.39 1.39 1.18 1.18 1.18 1.18 1.18 1.13 1.13 1.13 1.13 1.00 1.00 1.00 1.00 1.00 0.86 0.65 0.90 0.95 0.50 1.20 1.50 2.21
29.31 31.51 33.41 33.71 35.61 37.51 39.41 40.80 42.18 43.57 44.96 46.35 47.73 48.92 50.10 51.28 52.46 53.65 54.77 55.90 57.02 58.15 59.15 60.14 61.14 62.13 63.13 63.99 64.64 65.54 66.49 66.99 68.19 69.69 71.90
1.20 1.83 2.27 1.11 1.55 1.99 2.43 2.36 2.29 2.22 2.14 2.07 2.00 1.93 1.87 1.81 1.75 1.68 1.63 1.57 1.51 1.45 1.40 1.34 1.29 1.24 1.19 1.00 0.60 0.45 0.57 0.24 0.61 1.28 2.20

Disetujui Oleh :
PT. TIRTA KUNING AYU SUKSES

Muhan Najib
Project Manager
PERUMDA AIR MINUM (PAM)
TIRTA KAMUNING KSO
KABUPATEN KUNINGAN

2023
KETERANGAN

58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83
05/06/2023 12/06/2023 19/06/2023 26/06/2023 03/07/2023 10/07/2023 17/07/2023 24/07/2023 31/07/2023 07/08/2023 14/08/2023 21/08/2023 28/08/2023 04/09/2023 11/09/2023 18/09/2023 25/09/2023 02/10/2023 09/10/2023 16/10/2023 23/10/2023 30/10/2023 06/11/2023 13/11/2023 20/11/2023 27/11/2023
S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
11/06/2023 18/06/2023 25/06/2023 02/07/2023 09/07/2023 16/07/2023 23/07/2023 30/07/2023 06/08/2023 13/08/2023 20/08/2023 27/08/2023 03/09/2023 10/09/2023 17/09/2023 24/09/2023 01/10/2023 08/10/2023 15/10/2023 22/10/2023 29/10/2023 05/11/2023 12/11/2023 19/11/2023 26/11/2023 30/11/2023

0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 (0.00)

0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 -

0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 -

0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 -

0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 -


-
-

0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 -

0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 -
-
-
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -
-
-
-

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -
-
0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 -
-
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -
-
0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 -

1.29 1.54 1.54 1.19 1.19 1.05 1.05 1.05 1.05 1.05 1.05 0.83 1.29 1.29 1.54 1.54 1.19 1.19 1.05 1.05 1.05 1.05 1.05 1.05 0.83 1.29
70.99 72.53 74.07 75.26 76.44 77.49 78.54 79.59 80.63 81.68 82.73 83.56 84.85 86.14 87.68 89.22 90.41 91.59 92.64 93.69 94.74 95.78 96.83 97.88 98.71 100.00
2.55 0.92 0.92 0.71 0.71 0.63 0.63 0.63 0.63 0.63 0.63 0.50 0.77 0.77 0.92 0.92 0.71 2.20 2.20 2.20 2.20 1.00 1.00 1.00 1.00 1.10
74.45 75.37 76.30 77.01 77.72 78.35 78.98 79.61 80.24 80.87 81.49 81.99 82.77 83.54 84.46 85.39 86.10 88.30 90.50 92.70 94.90 95.90 96.90 97.90 98.90 100.00
3.46 2.84 2.23 1.75 1.28 0.86 0.44 0.02 -0.40 -0.82 -1.24 -1.57 -2.08 -2.60 -3.22 -3.83 -4.31 -3.29 -2.14 -0.99 0.16 0.12 0.07 0.02 0.19 0.00

Dibuat Oleh :
KONSULTAN PENGAWAS INDEPENDEN (KPI)
PT INTIMULYA MULTI KENCANA
(KSO)
PT TIRTA SIGMA ENGINEERING

Ir. Dedi Mulyadi


Team Leader
PT. TIRTA KUNING AYU SUKSES
TABEL PROGRESS PELAKSANAAN KONSULTAN PENGAWAS INDEPENDEN

PROYEK : KERJASAMA ANTARA PERUMDA AIR MINUM


(PAM) TIRTA KAMUNING
KABUPATEN KUNINGAN DAN PT. TIRTA KUNING
PERUIMDA AIR MINUM (PAM) TIRTA KAMUNING KABUPATEN KUNINGAN KSO
AYU SUKSES (TKAS) PERUMDA AIR MINUM (PAM)
TIRTA KAMUNING
KABUPATEN KUNINGAN
NO. KONTRAK : No. 03.A/TKAS-JS/IV/2022 dan
No.
KONSULTAN PENGAWAS INDEPENDEN (KPI)
PT INTIMULYA MULTI KENCANA 26/KTRK-KSO/IMK-TSE/IV/2022 Tanggal 29 April' 2022
(KSO) BULAN KE : I (Periode 02 MEI s/d 31 MEI' 2022)
PT TIRTA SIGMA ENGINEERING
-
2022 2023
JUMLAH BULAN KE-
BOBOT
NO URAIAN KEGIATAN NAMA MANMONTH KETERANGAN
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
(BULAN)
MEI JUN JUL AGU SEPT OKT NOV DES' 2022 JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOV

A. TENAGA AHLI

1
Pimpinan Tem/Ahli Sipil/ Ahli Teknik Lingkungan Ir. Dedi Mulyadi 15 14.05 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74
2 Koordinator Proyek/Ahli Sipil Teknik Bangunan Air Ir. Achmad Gaos 14 11.41 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63
3 Ahli Sipil Struktur (1) Belly Berlian, S.T 10 7.29 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61
4 Ahli Sipil Struktur (2) Sofyan Handoko, S.T 9.5 7.74 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70
5 Ahli Mekanikal/Elektrikal Ir. Gofar Arifin 5 4.08 0.68 0.68 0.68 0.68 0.68 0.68
6 Ahli Hukum/Kontrak Indra Sofyar, S.H., M.H 2 1.63 0.82 0.82
7 Ahli Keuangan Dadan Herdian, S.E 2 1.63 0.82 0.82
8 Ahli HSE/K3 Ivan Prana, S.E 12 7.34 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
9 Ahli Quantity Control Hendarman, S.T 12 7.34 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46

B PENGAWAS LAPANGAN
1 Inspektur Bangunan Air Agung Tafani, Amd 6 1.99 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
2 Inspektur Struktur (1) Eko Nurhidayat, S.T 6 1.99 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
3 Inspektur Struktur (2) Okavian Bagus P, S.T 6 1.99 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
3 Inspektur Piping (1) Dido Sudarto, Amd 6 1.99 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
4 Inspektur Piping (2) Kusnadi 6 1.99 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
4 Inspektur Piping (3) Dadi 6 1.99 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
4 Inspektur Mekanikal/Elektrikal Supriatna 3 0.99 0.17 0.17 0.17 0.17 0.17 0.17

4 TENAGA PENDUKUNG LAIN


1 Administrasi Proyek Tommy Gustaman, S.T 14 3.46 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19
2 Operator Computer Resti Harmonika 8 1.85 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
3 Office Boy tobe name 15 1.62 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09

5 BIAYA LAPANGAN 15 13.85 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73

6 DISKUSI & PEMBAHASAN 15 0.30 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

7 REPORTING 15 3.48 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18

BOBOT RENCANA SETIAP BULAN 100.00 1.75 5.50 5.42 6.34 6.34 6.34 5.81 5.81 5.81 7.44 5.98 4.67 4.67 3.65 5.98 4.67 4.67 3.65 5.49
KUMULATIF BOBOT RENCANA 0 0 1.75 7.25 12.67 19.01 25.35 31.69 37.51 43.32 49.13 56.58 62.56 67.23 71.90 75.55 81.53 86.19 90.86 94.51 100.00
BOBOT REALISASI SETIAP BULAN 4.11 4.10 3.60 5.00 6.60 8.10 6.00 6.06 5.34 5.86 5.37 4.50 5.05 7.32 3.23 3.30 6.96 7.40 2.10
KUMULATIF BOBOT REALISASI 0 0 4.11 8.21 11.81 16.81 23.41 31.51 37.51 43.57 48.92 54.77 60.14 64.64 69.69 77.01 80.24 83.54 90.50 97.90 100.00
DEVIASI 2.36 0.96 -0.86 -2.20 -1.94 -0.18 0.00 0.25 -0.22 -1.81 -2.42 -2.59 -2.21 1.46 -1.29 -2.65 -0.36 3.39 0.00

RENCANA KERJA
Dibuat Oleh :
KONSULTAN PENGAWAS INDEPENDEN (KPI)
REALISASI KERJA Disetujui Oleh : Disetujui Oleh : PT INTIMULYA MULTI KENCANA
PERUMDA AIR MINUM (PAM) TIRTA KAMUNING PT. TIRTA KUNING AYU SUKSES (KSO)
KABUPATEN KUNINGAN PT TIRTA SIGMA ENGINEERING

_______________________ Muhan Najib Ir. Dedi Mulyadi


Direktur Project Manager Team Leader