Professional Documents
Culture Documents
14/12/2023 2:24:21 pm
1 2 3 4
APPROVAL
5250
1575 1575 2100
A A
4
1
S.2
S.3
1 2 3 4
12000
1575 1575 1575 2100 1575
1575
Y16 11- 200 B
3150
A A
Project Name
1575
Y16 11- 200 T
FOUNDATION LAYOUT
1 1 : 50
Consultant
1 2 3 4
5250
A
SLAB LEVEL
FOUNDATION
LAYOUT
900
GROUND LEVEL
0
4050
4050
2400
2400
12Y25 13 Designed by Designer
FOOTING FOOTING
Drawn by Author
750
750
-3000 -3000
Date DECEMBER 2023
Tel
8400
TYPICAL COL. SECTION
4
FOUNDATION LAYOUT 1 : 50
2 1 : 50
S.2
Scale
1 : 50
APPROVAL
1 2 3 4
6000
375
375
A A
A
750
13 13 13 13
750
4 4
12
13 13 Project Name
13 13
A
PROPOSED BRIDGE
CONSTRUCTION AT UGBOGUI
SEC. 2/S.3 EDO STATE
2 1 : 25
12000
12000
12750
Client Name
Owner
Consultant
A
900
2 2
S.3 S.3
4050
2400
B B
375
375
Designed by Designer
Drawn by Author
375 1575 1575 2100 375
Date DECEMBER 2023
6000 Tel
BEAM LAYOUT
3 1 : 25 S.3
Scale
As
indicated
APPROVAL
1 2 3 4
1 2 3 4
5250
375 5250 375
1575 1575 2100 375 1575 1575 2100 375
2- Y12 4- 100
26
27
28- Y12 4- 100 B
26 27
61- Y12 25- 100 B
SEC. 2/S.4
2 1 : 35
A B
A A
4- Y25 29 4- Y25 19
4
S.4
Project Name
BM 1 (450 X 900)mm
3 1 : 50
PROPOSED BRIDGE
CONSTRUCTION AT UGBOGUI
1
EDO STATE
28
28 28
41- Y12 27- 150 T 28
12000
12000
19
200
19
900
19 19
16 16
19 Client Name
29
Owner
SEC 1/S.4
4 1 : 35
Consultant
1 2 3 4
2 2
S.4 S.4
5250
1575 1575 2100
86- Y12 26- 150
4- Y25 30 6
S.4 2- Y25 23
A
B B
4- Y25 22 4- Y25 23 30 SLAB AND BEAM
DETAILS
6
S.4
200
28- Y12 4- 100 T
28- Y12 4- 100 T 23
900
21 23
23
BM 2 (450 X 900)mm 22
61- Y12 15- 100 T 5 1 : 50 Designed by Designer
28- Y12 4- 100 B
6 1 : 35
5250
1 2 3 4
Scale
As
indicated