You are on page 1of 1

1 2 1 2

16000

4000 4000
4000 4000 4000 4000
1575 2425
3
A-2 Y Y
EWF-1 W2 W1

D1
A D1 A

EWF-1
EWF-1

EWF-1

EWF-1

EWF-1
2000 2000
PWD TOILET
STORAGE ROOM BDRRMO 8000
FL-2
3300 4000 4000
B D2
B

EWF-1

EWF-1
EWF-1

EWF-1
1300 X 1300 X
D1
C C
D1
SESSION HALL
KITCHEN/PANTRY

EWF-1
8800 FL-1
W1
BARANGAY HEALTH BARANGAY HEALTH

EXISTING
EXISTING
EXISTING
STATION STATION
SESSION HALL & FL-1
5500 5500
5500 W1 5500
BARANGAY
CAPTAIN'S OFFICE

W1
2900

EWF-1
D EWF-1
D EWF-1
W1
283.34

1 MASTER PLAN (GROUND FLOOR) 2 MASTER PLAN (SECOND FLOOR) 3 GROUND FLOOR PLAN 4 SECOND FLOOR PLAN
A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS

SCHEDULE OF CEILING FINISHES


MARK WALL DESCRIPTION REMARKS
SCHEDULE OF FLOOR FINISHES SCHEDULE OF WALL FINISHES
USE 0.60mm THK. x 19mm x 50mm x 5000mm DOUBLE MARK FLOOR DESCRIPTION
MARK FLOOR DESCRIPTION
FURRING CHANNELS AT 400mm ON CENTER WITH 400 x 400 VITRIFIED GLAZED TILES FLOOR
FL-1 150mm THK. CHB EXTERIOR WALL WITH PLAIN
4.5mm THK. FIBER CEMENT CEILING BOARD WITH 0.60mm THK. x 12mm x 38mm x 5000mm CARRYING FINISH EWF-1 CEMENT PLASTER PAINTED FINISH
CL-1
PAINTED FINISH ON METAL FURRING CEILING FRAMES. CHANNELS AT 1200mm ON CENTER AND ROD (SUBMIT COLOR SCHEMES FOR APPROVAL)
200 x 200 VITRIFIED GLAZED TILES FLOOR
JOINER(HANGERS/SUPPORTS) AT 1200mm ON FL-2
FINISH
CENTER SHORTER SPAN

1 2 1 2 1 2
4000 4000
4000

LINE OF ROOF ABOVE

A A A

2000 CL-1 2000


2000

CL-1

B B B
1300 CL-1 1300
1300

C C C

CL-1 CL-1

EXISTING
50mm THK., PRE PAINTED, LONG
SPAN, RIB TYPE, METAL ROOFING CL-1
5500 5500
5500 SHEET

BUILDING LINE
CL-1 CL-1

D D D

5 ROOF PLAN 6 GROUND FLOOR CEILING PLAN 7 SECOND FLOOR CEILING PLAN
A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES MASTER PLAN (GROUND FLOOR) ARSEN JOSHUA T. SOLIVEN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MASTER PLAN (SECOND FLOOR) ENGINEERING ASSISTANT
REGIONAL OFFICE No. 02
BASIC INFRASTRUCTURE PROGRAM (BIP) - GROUND FLOOR PLAN
MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SECOND FLOOR PLAN
SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF PREPARED: MARLON S. LUCAS ANACLETO SANTOS A. BUMAGAT JR. EMMANUEL A. MANSIBANG EVELYN C. COSTALES, Ph.D. A 05
ISABELA FOURTH DISTRICT ENGINEERING OFFICE ROOF PLAN
QUEZON, SAN ISIDRO, ISABELA
MULTI-PURPOSE BUILDING, BARANGAY BARANGCUAG, GROUND FLOOR CEILING PLAN ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2 4 15
JONES, ISABELA SECOND FLOOR CEILING PLAN DATE:
BRGY. BARANGCUAG, JONES , ISABELA JOSE C. BAYAUA JR.
SCHEDULE OF FLOOR FINISHES ARCHITECT II DATE DATE DATE
SCHEDULE OF CEILING FINISHES

You might also like