You are on page 1of 6
Annexure 2 \dard Proforma of office order of Dam Safety Unit Sram eave ater eep-2022/(464 / 2022) Fear (are) 30 of Dam Safety Act 2021, it is mandatory for every Dam Owner to AS et ee em Safely Unit for each Specified dam. Hence, in accordance with the ite Dar corer reference 9 Dam Safely Unit is appointed for the Specified dam mentioned below, A) Details of Project 7 Detail 1 f ‘Sr.No | i | | | Name of Project [Lasra High Level Barrage 2 | Name of Specified dam [Lasra High Level Barrage 3 | Class of dam 1 4 Tahsit Kalamb z ae | 5 District [Osmanabad a | B)Details of Office Sr.No | Office a Contact | No. 1 Region thief Engineer (WR), Water Resources, Aurangabad. 0240- | seein) :2aGA476. 2 | Circle Superintending Engineer, Beed Irrigation Project Circle Parli| 02446- | | n 222273 [3 | Division ower Terna Canal Division No..2, Latur | 02382- i | 200456 [2 Subdivision Lower Tema Canal Sub Owision No 6, Latur 02382- 200458 8) Dam Safety Unit [Sr.No T Designation® [7 Soperintending Engineer, Beed irrigation Project Circle, Parli Vajnaih | | 2 | Executive Engineer Lower Tema Canal Division No. 2, Latur 3 | Oepuly Engineer, Mechanical Sub Division Latur. [4 | Sub Divisional Officer Lower Terna Canal Sub Division No. 6, Latur | Above Dam Safety Unit will come into force immediately to perform duties assigned by relevantClauses of Dam Safety Act 2021, Chief Engineer (WR) Water Resources Department Aurangabad No. LTCD- LTCD-2/08/ 150 Date.- 16/01/2023 Copy to :- Chi " es Copyig cies cereal oie Dam Safely Organization, Nashik for information & record please. record ploaeay ines" Beed Inigation Project Circle, Pari (y) for information & Annexure 2 standard Proforma of office order of Da Safoty Unit spree roe potas r= 20221(464 / 2022) Fer (are) fs per Clause 30 of Dam Safety Act 2021, 6 mandatory for every Dam Ouiner to ym. Hence, in accordance with the tutea separate Dam Safety Unit for each Specified da for the. Specified dam mentioned below, Const conser ceerence a Dam Safely Unit is appointed C) Details of Project Detar S.No | Is atta He Se stebi cesta T ame of Project Kitiari = Kawatha Barrege fa Name of Specified dam Killa - Kawatha Barrage _— Soro (oass of dam fie ees retreeee ree peered eee Peer 3 District Latur Pe PE EEE eer A DjDetaits of Office eee aoe Sr.No office Contact |__No. 7 Region po Engineer (WR), Water Resources, ‘Aurangabad | eee i 7 Gude “Superintending Engineer, Beed ligation Praject Circle Patli| 02446 pore - | 222273 | 3 Dwision ‘Lower Tema Canal Division No..2, Latur | 02362- i 200452 = Subaivsion power ema Canal Sub Dwvision Now Latur | 02382- | 200458 ) Dam Safety Unit Seo Designation” Zagneer, Beed irigation Project Cle, Parli Vaynaih 7 Superintending 7 Executive Engin Deputy Engineer, Mechanical Sub Dwision Latur Sub Divisional Officer Love Ger, Lower Tein Canal Owvision No. 2, Latur = Terna Project Sub Division No. 4, Nilanga, Hq Latur ‘Above Cam Safely Unit will come into force immediately 10 perform duties assigned by relevantClauses of Dam Safely Act 2021 Chief Engineor (WR) Water Resources Department ‘Aurangabad No LTCD-2/08/ 151 Date - 16 01/2023 + 16017202; ineer, State Dam Safely Organization, Nashik for information & record please. Copy to :- Chief Engi ding Engineer, Beed Irrigation Project Circle, Parl (y) for intormation & Copy to :- Superintent record please. Technical Documentation -National Registry of specified Dams. Annoxuros 1.7 SAILENT INFORMATION OF EACH SPECIFIED DAM under the jurisdiction of each State Dam safety Organization shall be provided in HARD COPY and SOFT COPY by each stat Dam ani enh eediod amined The following salient [se Information Remarks No. Namie ofthe State or UTin which the Dam in Located | |Maharashtra Lasra High Level Barrage ‘asta, Ta. Kalam, Dist Osmanabad (ESSA engineer ‘Lower Terna Canal Division No.2 Latur | S_[Full [Commissioning ofthe Dam [Date of Commissioning of the Dam 7 Material with which the Dam was Constructed ea features of the iHeight(m) (above deepest foundation level) ~~ [Length ofthe Crest im) _ ——Teottom wid mw if [-_[Top width (m) ~[eapicty of the Reservoirin m3) (@Adive Storage ‘b) Dead Storage — [Max flood Discharge (i m3) (@ Design Flood Observed Flood ‘Specially difficult Foundation n problems inusual Dam Design 3 inspection Galleries inthe Dam Electric 10.50x7.00m Sales in Working Condition = nce Manual itenance Manual Prepared? zy thencanenie te e oe [Does the Reservoir get sited? No 3 of the Reservoir capacity is lost? + J No. Information Remarks Through the Dam Body "Peak Water Leakage (in m3) 14 Structural Safety Assessment “Was Structural Safety Assessment pe “Tif yes , what was the retrofit measure adopted? [15 _|Oam Break Analysis [Was Dam Break Analysis performed? TTiyes were Disaster management Plans | “46_ Emergency Action Plan [__|If Yes .was the Dam Found to be Safe as an Emergeny Acton Pan Frenared? oR ifyes was it shared with the SDMA and ODMA? NO Superintending Engineer Execlibererpineer Lower Terma Canal Division No2 Beed ligation Project Circle Latur wy paral (V) Technical Documentation -National Registry of specified Dams Annoxures 1.7 SAILENT INFORMATION OF EACH SPECIFIED DAM under the jurisdiction of each State Dam safety Organization _rne fotowang salient shall be provided in HARD COPY and SOFT COPY by each state Dam safety Organization = Information | | Remarks “ame of te State OF UT in which the Dam in Located Waharashira 2 Name Of the Dam Killar - Kawatha Barrage 3. Full Address of the Dam Killar, Tq, Ausa , Dist. Latur Lattude: 18-02-00" N longitude: 76-14'-50" E 4 Name of the Dam Owner | ipaaphee Engineer ‘Lower Terna Canal Division No.2 Latur § Full Address of the Dam Owner | Sinchan Bhavan, Old Ausa Road, Latur & Commissioning of the Dam I Date of Commissioning of the Dam jJun-19 ‘Material with which the Dam was Constructed | __|Conerete, Steel Structure, Earth work (ea § _ Sailent features of the Dam Heightim) (above deepest foundation level) 21.87m © ‘Length of the Crest (rm) [79.00 m Bottom width (m) 17.347 m Top Width (m) 13.10 m ~“Capicity of the Reservoir(in m3) | }4.015 mm? ~~ (a) Active Storage 1 |h.015 mm* ~_{b) Dead Storage | [0.000 ‘Max flood Discharge (in m3) +1 (@) Design Flood | 4240.86 cumecs ~ (0) Observed Flood \ ~ Specialy difficutt Foundation problems NO —Inusual Dam Design NO “9 Inspection Galleries in the Dam ‘Nil Electric $40.00 x 4.00 m { (7 ‘Number of Gates in Working Condition i }1 Operation & Maintenance Manual {No Was an Operation & Maintenance Manual Prepared? =|: INO __ItNo,by when is the same likely to be prepared? _12 Sitting of Reservoir | “Does the Reservoir get silted? |No /es what percentage of the Reservoir ‘capacity is lost? - | \nformation Remarks Through the Dam Body aking \Peak Water Leakage. (in m3), ural Safety Assessment ~ Was Suc Structural Safety Assessment performed? sy ae fas the Dam Found to be Safe as the Dam Retrofitted? ‘when was it retrofitted 2 aT ‘was the retrofit measure ure adopted? [Dam Break Analysis _ Ta reak Analysis performed? 5 [Emergency Action Plan ‘Was an Emergency Action tyes ‘was it shared with the n Plan Prepared? > SDMA and DDMA? = a Superintending Engineer Lower Tera Canal Division No2 Beed Irigation Project Circle Latur parali ™) “Hy

You might also like