Professional Documents
Culture Documents
Brief Description:
1. Direct Labor Cost
# of Manpower Counts Labor/day Rate
Mucker 3 500.0 1,500.0
LHD Operator 3 550.0 1,650.0
Total : 3,150.0
Meter Advance Per Day : 5.0
Cost Per Meter : 630.0
Total Length of the proposed 95.0
Sub-Total of Direct Labor Cost 59,850.0
Direct Mining Cost
A. Horizontal Development (Fresh, & Raw) Dimension: 3 by 3
1. Labor
*assuming=1.5 meter
2. Explosives
per HOLE
DYNAMITE 1
OBC 1
Safety Fuse 8 Ft 1
ANFO 0.5
FUSE LIGHTER
*assuming=1.5 meter
*assuming=1.5 meter
2. Explosives
per HOLE
DYNAMITE 1
OBC 1
Safety Fuse 8 Ft 1
ANFO 0.5
FUSE LIGHTER
*assuming=1.5 meter
3. Rails
SIZES
Rails 9 meters
Trackties 6x6x4 (TIMBER)
Trackspike 35lbs. Nail, 5/8" x 4"
Trackbolt 5/8" x 2-1/2" w/ nut
Fish Plate 35 lbs
Others Acetylene
Others Oxygen
Labor
Explosives
Contingency 10%
Grand Total Cost/meter
Labor
Explosives
Rails
Contingency 10%
Grand Total Cost/meter
TOTAL AMOUNT
550.0
500.0
1,050.0
700.0
TOTAL AMOUNT
1,216.0
1,056.0
2,720.0
1,280.0
20.0
6,292.0
4,194.7
700.0
4,194.7
489.5
5,384.1
TOTAL AMOUNT
550.0
500.0
1,050.0
700.0
TOTAL AMOUNT
1,216.0
1,056.0
2,720.0
1,280.0
20.0
6,292.0
4,194.7
TOTAL
15,600.00
10,771.20
12,960.00
1,160.00
1,880.00
600.00
230.00
43,201.20
9.00
4,800.13
700.0
4,194.7
4,800.1
969.5
10,664.3