Abstract. International Civil Aviation Organization (ICAO) regulated Visual Aids for
Navigation stated on Annex 14 Chapter 5 consist of mandatory item which provides important
guidance’s for piloting the airplane. Presently, the system of visual aids for navigation has been
working with the Constant Current Regulator (CCR) which in its development there are
various type at CCR used at airport. One type CCR is still widely used at airport today is the
CCR NBF 1200 power supply using its control system. Reliability and time respons become
problem related those system. Therefore this paper presents an design on CCR NBF 1200
control system simulation to control the brightness level of the lamps which indicating as
visual aid for navigation. The result shows brightness level success controlled by PLC
remotely based on the power level.
1. Introduction
Airfield lighting system or visual aids used by pilot to land and take off visually at night or in bad
weather. Visual aids are the beacon that consisting of lights with certain types, numbers, and layout
intended for facilitating the pilot [1]. Visual aids are required for both commercial and military pilots
which support the comfortable, safe and expedite flights. In addition, visual aids need reliable power
supply. The power supply equipment of visual aids is recognized as CCR (Constant Current
Regulator) that in the development has several types of CCR used in airport. CCR NBF 1200 made by
ADB is one of the types that mostly used in airport.
The power supply voltage is current constant with series resonance or better known as
compensation static as the working principle of CCR NBF 1200, its control system uses
electromagnetic [2]. In the development of electric control system is currently most used
Programmable Logic Controller (PLC) as control system that has more advantages such as practical,
easy to program and reliable [3].Therefore in this study, the researchers use PLC control system to
replace CCR NBF 1200 electromagnetic control, this design is expected to enhance the reliability of
this control so that the continuity and reliability of this equipment is maintained to supply the visual
aids equipment.
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution
of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.
Published under licence by IOP Publishing Ltd 1
ICIASGA 2020 IOP Publishing
Journal of Physics: Conference Series 1845 (2021) 012077 doi:10.1088/1742-6596/1845/1/012077
a) Local Operation
In operation of local main relay G-K2 and brightness relay B1-K4 to B4-K7 remote operation relay
condition is not working. The position of drum switch A1 is moved to position 1 (brightness step 1), if
it desires the CCR operation in step 1 and continuously, if increasing the brightness places in step 2,3,
or 4. Primary coil of Transformator T1 obtain supply voltage 220 Volt and shape series closed via
auxiliary Fuse E3 – E4.
b) Remote Operation
The setting of remote operation is carried out through relay G-K2. The position of Drum switch A1
must be in position “REM”, because of the supply voltage in transformator T1 can not be done by
means of terminal 12, but it must go through contact G-K2, terminal a16 and contact 1 – 1’ on drum
switch A1. Switching brightness CB1 is supplied from contact 1 – 1’ on drum switch A1 and other
side via contact 1 – 1’ and contact 13 – 13’ drum switch A1 and contact 8 – 6 and goes through
normally closed auxiliary contact of contactor brightness CB2, CB3, CB4.
2
ICIASGA 2020 IOP Publishing
Journal of Physics: Conference Series 1845 (2021) 012077 doi:10.1088/1742-6596/1845/1/012077
The concept of equipment design that will be made later is the control of CCR type NBF 1200
using PLC brand LG type Master K120S. In this design, control system of CCR type NBF 1200 is still
electromagnetic that transformed into ladder diagram programmed in PLC, so that in continuity and its
process are easier, and also the work of CCR is more optimal.
3
ICIASGA 2020 IOP Publishing
Journal of Physics: Conference Series 1845 (2021) 012077 doi:10.1088/1742-6596/1845/1/012077
Based on the ladder diagram above, there is P0001 and P0002 in diagram number 27 and 40, P0001
is functioned as input to increase brightness and P0002 is used to decrease the brightness level. This
program is using ADDP, SUBP, And Load Contact, MCS and also timer function.
4
ICIASGA 2020 IOP Publishing
Journal of Physics: Conference Series 1845 (2021) 012077 doi:10.1088/1742-6596/1845/1/012077
Function of M0000 to M0007 in this application connected to output P0040 to P0043 that designed to
manage step brightness connected directly with brightness contactor.
The following is ladder diagram :
5
ICIASGA 2020 IOP Publishing
Journal of Physics: Conference Series 1845 (2021) 012077 doi:10.1088/1742-6596/1845/1/012077
6
ICIASGA 2020 IOP Publishing
Journal of Physics: Conference Series 1845 (2021) 012077 doi:10.1088/1742-6596/1845/1/012077
Ladder diagram above is series substitute on control protection to CCR interference, the principle’s
work is input P0006 as a substitute of standby relay that will activate relay internal M0008. If M0008
is active then M0009 will also be active and activate M0010, so output coil P0044 will be active. If
CCR series is in close circuit (normal condition) there is no interference then P0007 will deactivate
TON T001 so P0044 is still active.
If there is interference in CCR in the form of open circuit then P0007 connected with relay sensor
protection interference will be opened the contact so that TON will count the time until 20 seconds
then will turn of P0044. This decision of time 20 seconds will be adjusted with the condition of
electromagnetic control system installed that is still using RC series (combination of resistor and
capacitor) as time delay if occurs interference in CCR will count the time before turning off the main
circuit breaker which ultimately turning off the whole system of CCR NBF 1200. In manufacturing the
implementation of ladder program using ladder (instruction) PLC brand LG K120 S needs to allocate
the input and output addresses that will be connected physical equipment and the internal relay. This
allocation tool is aimed to facilitate cabling design so the possibility mistakes can be minimized.
The followings are allocation addresses of input and output :
7
ICIASGA 2020 IOP Publishing
Journal of Physics: Conference Series 1845 (2021) 012077 doi:10.1088/1742-6596/1845/1/012077
Address Input /
Function
Output
P0005 decrease brightness
P0006 For relay control where P0005 for standby and P0007 for relay safety of open
P0007 circuit
P0040 Output connected with contactor brightness are P0040 to P0043 and P0044 for
P0041 main CB
P0042
P0043
P0044
4. Conclusions
a. This control system design can enhance the reliability of CCR type NBF 1200 which still use
electromagnetic control due to PLC control program execution, response time is faster and
reliable.
b. Software means that the control function can be easily transformed by changing the program in
software
c. Implementation design is faster, cabling is relatively simple and neat as well as integrated
monitoring.
Refferences
[1] ICAO A and Volume I 2004 Aerodrome Design and Operations, Annex 14 to the Convention
on International Civil Aviation
[2] Anon 1994 Constant Current Regulator and Sequence Flashing Light (DGAC Indonesia)
[3] Systems I C 2006 Introduction to Programmable Logic Controllers ( PLC ’ s ) Industrial
Control Systems Fall 2006 The Need for PLCs • Hardwired panels were very time consuming
[4] Adrien De Backer (ADB) Manual Book CCR NBF 1200 (Zaventem Belgium)
[5] Master K. User’manual LG Programmable Logic Controller (LG Industrial System)
[6] Anon ADB Safegate, Data Sheet, Reliance poer CSF, Constant Current Regulator,
Frroresonant Air Cooled
[7] Setiawan I 2006 Programmable Logic Controller dan Teknik Perancangan Sistem Kontrol