Resubmission is Required
Comments Sheet
PROJECT EXIT 10 DEVELOPMENTS
CONTRACTOR SPML/AFET
Comments.
• provide support details in conformance with the building structure, complete with
calculation signed and stamped by a structural engineer.
• Rigid support for pipes is required to prevent damage to the sprinkler system and ensure that
it operates effectively. Proper support is necessary to prevent the pipes from shifting or moving
over time.
• Provide details for all seismic bracing and support systems, including their locations and
installation requirements.
• Supports, hangers, and seismic bracing shall be by NFPA standards.
• To reflect the actual dimensions for the valves, FHC, and any used components.
• Show the location of the structural movement joint on the drawing and provide flexible
connections accordingly.
• Provide detailed dimensions and locations of all sprinkler heads, hangers, pipes, and other
components to ensure proper installation.
• Ensure that all sprinkler heads are installed by the manufacturer's specifications and NFPA
13
• drain pipe connected in reverse to the main drain and need to be revised.
requirements to ensure the system's effectiveness in the event of a fire.
• Provide details for all special sprinklers, including their location, spacing, orientation, and
elevation,distance from the wall. Ensure that the maximum distance is not exceeded.
• Ensure that all work complies with NFPA 13 and local civil defense regulations.
• The contractor must coordinate with the drop beam and maintain the minimum distance
between the beam and the sprinkler head as per NFPA 13.
The shop drawing lacks necessary documentation, and references such as :
(B)
Name Mhd Aloulabi Action Status:
Signature Date 08/08/2023