- Refer to comments inside the shop drawing.

- Refer to the comments attached herein.


- Provide support details in conformance with the different building structure system " Concrete slab and Composite Decking slab ", in line
with the necessary calculation.
- The subject SHD has exclusion parts .Therefore the contractor is hereby requested to resubmit the layouts including all areas in due
course, for the Engineer review and final approval
- Refer to the PDF file for the model comments.
Mhd Aloulabi 17/08/2023

Contractor to comply with WME comments mentioned herein

Tamer Ebrahim 17-08-2023


Conditional approved

Resubmission is Required
Comments Sheet
PROJECT EXIT 10 DEVELOPMENTS
CONTRACTOR SPML/AFET

1HMRA10-RUHH-08-SPM-FP-SHD-00001-01 Received 29/07/23


Document No.
date:

SUBJECT BASEMENT FIRE PROTECTION LAYOUT (SHEETS 07 TO10)


Revision 01

Comments.

• provide support details in conformance with the building structure, complete with
calculation signed and stamped by a structural engineer.
• Rigid support for pipes is required to prevent damage to the sprinkler system and ensure that
it operates effectively. Proper support is necessary to prevent the pipes from shifting or moving
over time.
• Provide details for all seismic bracing and support systems, including their locations and
installation requirements.
• Supports, hangers, and seismic bracing shall be by NFPA standards.
• To reflect the actual dimensions for the valves, FHC, and any used components.
• Show the location of the structural movement joint on the drawing and provide flexible
connections accordingly.
• Provide detailed dimensions and locations of all sprinkler heads, hangers, pipes, and other
components to ensure proper installation.
• Ensure that all sprinkler heads are installed by the manufacturer's specifications and NFPA
13
• drain pipe connected in reverse to the main drain and need to be revised.
requirements to ensure the system's effectiveness in the event of a fire.
• Provide details for all special sprinklers, including their location, spacing, orientation, and
elevation,distance from the wall. Ensure that the maximum distance is not exceeded.
• Ensure that all work complies with NFPA 13 and local civil defense regulations.
• The contractor must coordinate with the drop beam and maintain the minimum distance
between the beam and the sprinkler head as per NFPA 13.
The shop drawing lacks necessary documentation, and references such as :

1.Material type\class is to be identified in shop drawings.


2.Reference to approved\submitted material submittals.
3.Reference to General installation details.
4.Hanger\ supports locations along with the reference to the general installation details.
5.Minimum requirement of sections.\ elevation to be included in the shop drawings.
6.Reference to approved\IFC schedule of equipment\material.
7.Reference to approved calculations.
Reviewed and commented by

(B)
Name Mhd Aloulabi Action Status:
Signature Date 08/08/2023