You are on page 1of 35
498 USTIMAT ING AND COSTING PLASTERING Is — Calculation of quantity of mortar and mat ar for uniform thickness, for filling up the Joints and to Area x thickness gives the quantity of mort by 30% which will give wet mixed mortar ace of wall, his may be inerewsed make up un-tniform st he wet volume may be further increased by ‘To get the total dry volume of ingredient mater jals or mortar U found by usual methods, dividing the dry 25%. The quantities of each material of the mortar may be volume of mortar by the sum of the numerals of the proportions and multiplying by the individual numerals, Materials for 12 mm thick plastering in wall for 100 sqm —~ Wet mixed mortar for uniform layer = 1.2 cum. Adding 30% to HiIl uP joints, uneven surfaces, ete, “56 cu m. Increasing by 25% the total dry volume = 1.95 comes to 1.2 + .36 ). For 1; 6 cement sand mortar, Cement = 77% = 30 cu m, sand = 30 x 6= roportions may be calculated. The quantities the quantity of morta eu m= 2,00 cu m (Si 1,80 cu m, Similarly, the quantities of materials for other P ont proportions are given inthe following page. (Page 499). of materials for diffe Materials for 20 nm thick plastering in wall for 100 sqm — Aste thickness of plaster is more, 20% of mortar may be taken 10 fill up the joints, unevenness ete, The quamity of wel mortar is equal 10 200 x .02 + 20% = 2.00 + 0.40 = 2.40 cum. Increasing by .40 + 0.60 = 3.00 cu m, The quantities of each material of mortar may be found 25% the dry volume by usual method. ich Mortar — For rich mortar plastering, the quantities of materials willbe less asthe cement will be in excess than the voids in sand and the reduction in volume of dry mortar willbe less. Ceiling plastering 12 mm thick for 100 sqm. — For plastering in R.C.C. ceiling the unevenness of surfaces will be less and 20% extra mortar may be taken to get even surface, The quantity of wet mortar in equal to 100 x.012 + 20% = 1.2 +.24= 1.44 cu m. Increasing by 25% the dry volume = 1.44 +036 = 1.80 cum. For 6 mm thick plastering R.C.C. ceiling the quantity of dry mortar may be taken as 1,00 cu m. For plastering in floor over ime concrete the sume quantity of mortar as for wall may be taken 2 there will be sufficient unevenness in the surface of lime concrete. Neat cement flooring, —For neat cement finishing in floor or dado or skirting, the thickness of neat cement layer may be taken as 1.5 mm (',") thick, therefore, the cement paste requirement for 10054"; = 100 x .0015 = 15 cu m. Dry volume of cement increased by 25% = 15 +15 x M=.19 cum = 2 cw m (say) = 6 bags per 100 sqm. ANALYSIS OF RATES 499 Materials required for plastering with ferent mortars of various proportions for 100 sqm — For 12 mm thick plastering, total dry volume 2 cum — Mortar Proportion Cement Sand (i) Cement mortar ib 0.60 cu m (18 bags) 1.20 cum 1 (i) Cement mortar 1:3 0.45 cu m (13% bags) 1.35 cum (iii) Cement mortar 1:4 0.40 cum (12 bags) 1.60 cum (iv). Cement mortar 1:5 0.35 cu m (10% bags) 1.75 cum (vy) Cement mortar 1:6 0.30 cum bags) ‘1.80 cum (vi) Kankar Lime 1.80 cu m Kankar lime (vii) White lime and Surkhi ud 1.00 cum White lime and 1.00 cu m or Sand ‘Surkhi or Sand (viii) White lime and Surkhi 1:2 0.70 cum White lime and 1.40 cu m or Sand Surkhi or Sand : (ix) Cement, White lime 1:1:6 0.30 cu m Cement, 0.30cu m Lime and and Sand 1.80 cu m Sand For 20 mm thick Plastering, total dry volume 3 cu m. (Cement mortar 1:2 1.00 cu m (30 bags) 2.00 cum (i) Cement mortar 1:3 0.78 cu m (23.4 bags) 2.34 cu m (ii) Cement mortar 1:4 0.65 cu m (19% bags) 2.60 cu m (iv) Cement mortar 1:5 0.54 cu m (16.2 bags) 2.70 cum (vy) Cement mortar 1:6 0.46 cu m (13.8 bags) 2.76 cum 28. 12 mm Plastering 1: 6 — unit 1 sq m. Take — 100 sq m Particulars Qutty or Nos. Rate Cost Rs. P. Rs. P. Materials — Cement (9 bags) vs | 0.30. cum 7650.00 per cum| 2295.00 Sand (local) v | 1.80 cum 700.00 percum| 1260.00 Total 3555.00 Labour, ete. — Mistri (Head mason) fy ne. 350.00 per day 116.70 Mason 10 nos. 300.00 per day 3000.00 Mazdoor (Beldar) including raking o joints 15 nos. 220.00 per day 3300.00, Bhishti including (curing) v= |, 008. 200.00 per day 150.00 Scaffolding Sundries, T. and P, ete ..| Lump sum 200.00 L.S. 200.00 Total 6766.10 Total of materials and labour . : = 10321.70 Add 14% Water charges : . 154,80 ‘Add 10% Contractor’s profit ... . es 1032.17 Grand Total [1158.67 Rate per sq m — Rs.11508,67 / 100 = Rs.115.00 for 100 sqm 500 ESTIMATING AND COSTING it . Take — 29. 12 mm Cement plastering in ceiling 1 : 3 with coarse sand — unit 1 sq m. Take — 109 34m T Rate Cost Particulars Qnty or Nos. RS P Bp Materials — : 3442.59 Cement (13% bags) w | 0.45 cum 7650.00 per cu m ( Sand cours 1500.00 per cum | 2025.99 and coarse ve} 1.35 cum i a Labour, ete. — er nm Mistri (Head mason) co | YU, no. 350.00 per day 10 Mason, wa | 12 nos. 300.00 per day 3600.90 Mazdoor (Beldar) «| 15 nos. 220.00 per day 3300.00 Bhishti | Lo. 200.00 per day 200.00 Scaffolding Sundries, T. and P., etc... Lump sum 200.00 LS. 200.00 Total 7416.70 Total of materials and labour ... 12884.29 Add 1¥2% Water charges... oe . Add 10% Contractor's profit .. = 8.40 P Grand Total | 14365.99 Rate per sqm — _Rs,14365.90 / 100 = Rs.144.00 for 100 sqm 30. 12 mm thick Plastering 1 : 3 cement coarse and mortar — surface neat cement finished in dado — unit 1 sq m. Take — 100 sqm Materials — Labour — Cement (13% bags) » 0.45 cum Mistri (Head mason)... "/, no. Sand coarse + 135 cum Mason 12 nos. Cement for surface Mazdoor (Beldar) os 15 nos. finishing (6 bags) «» 0.2cum Bhishti J no. Sundries, T. and P, etc ... L.S 75.00 Add 114% Water charges and 10% Contractor's profit over total cost 31. 6 mm thick cement J : 3 in R.C.C. ceiling — unit 1 sq m. Take — 100 sqm Total volume of dry materials of mortar = 1,00 cu m. Materials — Labour— Cement (7% bags) ~~ 025cum — Mistri (Head mason)... "70. Sand (medium) 0.75cum — Mason 12 nos Mazdoor(Beldar) —,. 1010s Bhishti 100, Add 1/5% Water charges and 10% Sundries, Scaffolding, T. and P. et Contractor's profit over toal cost. LS. Rs. 75.00 ANALYSIS OF RATES 501 POINTING For pointing in brick work the total dry volumes of materials is taken as 0,60 cu m for 100 sqm. Materials required for pointing with different mortars of various proportions for 100 sq m.— 1. Cement mortar 1: 2 0.20 cu m cement (6 bags) and 0.4 cu m sand. 2. Cement mortar 1: 3 0.16 cu m cement (4.8 bags) and 0.48 cu m sand. 3. White lime and Surkhi 0.32 cu m lime (slaked) and 0.32 cu m Surkhi. 4. Kankar lime mortar alone .. 0.50 cu m kankar lime. For all types of pointing the quantity of materials may be taken same as above, except raised pointing where the quantity may be increased by 10%. 32, Cement Pointing 1 : 2— unit 1 sqm. Take — 100 sq m. i Rate Cost Particulars Qutty or Nos. oe 7 . Materials — Cement (6 bags) «| 0.20 cum 7650.00 per cum | — 1530.00 Sand (local) «| 0.40 cum 700.00 per cum 280.00 Total 1810.00 Labour, etc. — Mistri (Head mason) ve | no. 350.00 per day 116.70 Mason v- | 10 nos. 300.00 per day 3000.00 Mazdoor (Beldar) v | 10 nos, 220.00 per day 2200.00 Bhishti we | eno. 200.00 per day 100.00 Scaffolding Sundries, T. and P., etc... Lump sum 125.00 LS. 125.00 Total 5541.70 Total of materials and labour 7351.70 Add 1%4% Water charges... - . 110.30 Add 10% Contractor's profit... : 735.00 Grand Total 8197.00 Rate per sq m — Rs.8197.00 / 100 = Rs.82.00 for 100 sq m = ESTIMATING AND COSTING CEMEN? CONCRETE FLOOR o “A y the thi The quantity of cement concrete may be calculated by multiplying the area sbeebs — and the quantity of each Material may be found on the same principle as for cement c ° Page 485), foe = 7 For 2.5 cm c.c, floor for 100 sq m. of area the quantity of cement concrete 100 x .025 = es 0.2.5 +2 2.5 cum. Adding 10% extra for unevenness of base concrete, the quantity comes to 275 cum. : “ie a oan ay, For 100 cu m cement concrete the total dry volume of materials is 125, i. approximately Soy more, For 2.5 em thick ee floor of 1 : 2: 4 proportion, for 100 sq m total dry volume of materials 7 = 59cum + 50% = 2.75 + 1.375 = 4.125 cum. Therefore, Cement = T+2+4 | = 60 cum (18 bags), Sand = 6x 2 = 1.20 cum, and stone aggregate = .6 x 4 = 2.40 cu m. For neat cement surface finishing additional 0.2 cum (6 bags) of cement will be required. (See page 498). For 2 em thick e.c. floor of 1: 1%: 3 proportion for 100 sq m., the dry volume of materials as _ 4.125 above is equal to 4. quantity of san 25 cum, Therefore, Cement = ore = 75 cum = 22.5 bags., 75x 1% P| 5 oe = 1.125 cu m, and the quantity of Stone aggregate = 0.75 x 3 = 2.25 cum, For neat cement finishing add extra cement of 0.2 cum (6 bags) For 4 em thick ce 1:2: 4 floor 100 Sqm, total dry volume of concrete = 100 x .04 + 10% (for unevenness) + 50% increase for dry volume = 4.4 +2 -6 cum, Therefore, Cement = [55> = 94 cu m (28.2 bags), Sand = .94 x 2 = 1.88 cu m and stone augregate = 94 x 4 = 3.76 cu m. For neut cement finishing add extra cement of 0.2 cu m (6 bags). For coloured cement floor, mix pigment colour with neat surface cement to 1: 6 (colour : cement) to have the desired colour. White cement mi: desired proportion may also be used, but for strength it is better if ordi with white cement in the proportion of | : | to 1 add colour pigment to have the desired colour, in the proportion of 1:3 ixed with colour pigment of the inary portland cement is mixed 3 (grey portland cement : white cement) and then to When colour pigement is mixed with white cement, the requirement of colour pigment is much less, may be | : Sto 1: 10 (pigment : white cement). ANALYSIS OF RATES, 503 33.2.5 cm Cement Concrete Floor 1: 2: 4 unit 1 sq m. Take — /00 sqm. Rate Cost Particulars Qntty or Nos. Rs. P Rs. Pp Materials — Stone ballast 20 mm gauge (Stone grit)... 2.40 cu m 1800.00 per cu m 4320.00 Sand (coarse) 1.20 cum 1500.00 per cu m 1800,00 Cement (18 bags) " 0.60 cum 7650.00 per cum 4590.00 Cement for surface finishing (6 bags)... | 0.20 cu m 7650.00 per cu m 1530.00 Total 12240.00 Labour, ete. — Mistri (Head mason) ot 4, no. 350.00 per day 262.50 Mason - 10 nos. 300.00 per day 3000.00 Mazdoor (Beldar) i 5 nos. 220.00 per day 1100.00 Boy or woman coolie . 5 nos. 200.00 per day 1000.00 Bhishti (including curing) te 2 nos. 200.00 per day 400.00 Side forms Lump sum 200.00 L.S. 200.00. Sundries, T. and P., etc. one Lump sum 90.00 L.S. 90.00, Total 6052.50. Total of materials and labour ... 18292.50 274.00 ‘Add 114% Water charges Add 10% Contractor's profit Grand Total Rate per sq m— Rs,20395.75 / 100 = Rs.204.00 for 100 sq m 34, 2.5 cm Cement Concrete Floor 1 : 1% 3 unit 1 sq m. Take — 100 sq m. Rate Cost Particulars Qatty or Nos. Rs. P. Rs Pp Materials — Stone aggregate (grit) 20 mm gaug 2.25 cum 1800.00 per cum] 4050.00 Sand (coarse) = 1.125 cum 1500.00 per cu m 1687.50 Cement (21 bags) 0.75 cum 7650.00 percum| 5737.50 Cement for surface finishing (6 bags)|. 0.20 cum 7650.00 per cu m 1530.00 ‘Total 13005.00 Labour — Same as for item 33 an 6052.50 Total of materials and labour ... 19057.50 Add 1%% Water charges... 286.00 Add 10% Contractor's profit ... : 1905.75, Grand Total [~~ 21249.25 Rate per sq m— Rs.21249.25 / 100 = Rs.212.50 for 100 sq m 35. 2 cm Cement Concrete Floor 1 : 3 Proportion 100 sq m. Materials— Labour— Mason — 8 nos., Mazdoor (Beldar) Cement (23.4 bags) + 0.78 cum 4 nos., Boy Coolie — 4 nos, other to be Sand coarse same as for item 33 Cement for surface finishing ... 2.34 cum — Add 1%% Water charges and 10% (6 bags) v0.20 cum Contractor's profit Rate per sq m. — 1/100 of 100 sq m. Polished cement concrete floor. — Add to above — (i) Extra cement of 0.1 cu m. (3 bags) per 100 sq m. for additional thick layer of neat cement. (ii) Materials for polishing L.S. Rs. 800.00 (iii) Polishers...... ..80 nos. sot ESTIMATING AND COSTING 36. 7.5 em Thick Lime Concrete in Floor — 1 sq m. Take — 100 4.” i =7.5 cum. With white lime and Surkhi or sand 1 : 2 Quantity of L.C. = 100 x 075 . ty of 10 cum. from i Quantity of materials may be calculated proportionately. 3/4 of the quantity of Srom item 1 of page 482. a Rate Cost ~ [Rate __| Particulars Qntty or Nos. Rs. Rs. Pp Materials — 7 Brick ballast I-ciass 40 mm gauge... | 7.50 cum 650.00 per cu m White lime slaked § e 1.20 cu m 800.00 per cu m feta Surkhi (or sand) : 40 cum 700.00 per cum r : Total 7515.00 Labour, ete. — Mistri (Head mason) | Ano. 350.00 per day 175.00 Mason = | fire 300.00 per day 300.00 Mazdoor (Beldar) .. | 10 nos. 220.00 per day 2200.00 Boy or woman coolie : 10 nos. 200.00 per day 2000.00 Bhishti . Ino. 200.00 per day 200.00 Sundries, T. and P, etc, - | Lump sum 90.00 L.S. 90.00 Total 4965.00 Total of materials and labour 12480.00 Add 14% Water charges... 7 : 187.00 Add 10% Contractor's profit... 7 1248.00 Grand Total [~ 13915.00 Rate per sqm — Rs.13915.00 / 100 = Rs.139.00 for 100 sq m 37. 2.5 mm Cement Concrete 1: 2: 4 over 7.5 em Lime Conerete Floor — unit 1 sqm, Take — 100 sqm. (i) 2.5 em thick cc. 1: 2:4 — 100 sqm Gi) 7.5 thick Lime concrete — 100sqm same as item 33 same as item 36, Materials— Materials— Stone ballast 60 mm gauge... 2.40 cum Brick ballast 40 mm gauge ... 7.50 cu m Sand coarse 1.20 cum White lime slaked . 1.20 cum ‘Cement for surface finishing Surkhi (or sand) . 2.40 cum (6 bags) e 20.cum Labour— Labour— Mistri (Head mason) ve yo, Mistri (Head mason) ¥,n0. Mason = lino! Mason Ino. Mazdoor (Beldar) 5 nos Mazdoor (Beldar) 10 nos. Coolie (Boy) v» S nos, Coolie (Boy) 10 nos. Bhishti 2 nos. Bhishti ve Eno, Side forms LS. Rs. 200.00 | Sundries, 7. and P,, etc. LS. Rs. 90.00 Sundries. T. and P. ete. LS. Rs. 90.00 | Add 14% Water charges and 10% contractor's profit Add 1% Water charges and 10% Contractor's profit ; Cost may be calculated assuming suitable rates : Rate per 100 sqm. — Total of (i) and (ii) ANALYSIS OF RATES 505 38. 7.5 mm Thick Cement Concrete 1 : Materials — Brick ballast Ist class 40 mm gauge 4:8 in Floor — unit 1 sq m. Take — 100 sq m. VW Sand (local) : an Cement (26.4 bags) 0.88 cu m Labour — Same as for item 36, ; Add 14% Water charges and 10% Contractor’s profit. Quantity of cement concrete = 100 x .075 = 7.5 cu m. Quantity of materials may be calculated Proportionately. 3/4 of 10 cu m from page 485 39. Mosaic or Terrazo Floor unit 1 sqm. Take — 100 sq m. 6 mm thick mosaic layer 1: 1% over 20 mm cement concrete 1:2: 4 $ Rate Cost Particulars Qntty or Nos. ee : . Materials — 20 mm C.C. 1:2:4 & Stone ballast (grit) 12mm gauge 1.88 cum 1800.00 per cu m 3384.00 Sand (Coarse) 0.94 cum 1500.00 per cu m 1410.00 Cement (14.1 bags) 0.47 cum 7650.00 per cum 3595.50 6 mm mosaic 1:14¢ Marble chips 3 mm gauge (10 q) 0.60 cu m 4000.00 per cu m 2400.00 Marble dust 0.04 cu m 4000.00 per cu m 160.00 Cement (12 bags) 0.40 cu m 7650.00 per cum 3060.00 Total 14009.50 Labour, ete. — Mistri (Head mason) - Ino. 350.00 per day 350.00 Mason (Specialist) a 20 nos. 300.00 per day 6000.00 Mazdoor (Beldar) i‘ 20 nos. 220.00 per day 4400.00 Bhishti a 2 nos. 200.00 per day 400.00 Polisher on 120 nos, 200.00 per day 24000.00 Polishing stone (carborundom) _ .. Lump sum 1000.00 L.S. 1000.00 Oxalic acid powder Lump sum 250.00 L.S. 250.00 Side forms . Lump sum 200.00 L.S. 200.00 Sundries, T. and P., etc. — Lump sum 200.00 L.S. 200.00 Total 36800.00 ‘Total of materials and labour 50809.50 Add 1'4% Water charges 762.00 Add 10% Contractor's profi 5080.95 Grand Total $6652.45 Rate per sqm — Rs.56652.45 / 100 = Rs.567.00 for 100 sqm Note. — To get whitish base 10% to 20% marble dust may be mixed with portland cement. a2 ESTIMATING AND COSTING Calculation of materials for Mosaic Terrazo Floor for 100 sq m — 2 + 10% for uneven and rough base 20 mm thick CC. 1: 2; 4 — Volume of Cc. — 100 x 02 + 1% De 8 33 2.00 - 3241.1 =3.3. cum. Cement = 7°57 .88 cum. + 50% 20 cu m. Dry volume = 0.47 cum. (14.1 bags); Sand = 47 x 2 = .94 cu m; Stone Chips = ATX 4= 6 mm Mosaic Laver 1 : 15 = Volume of mosaic concrete = 100 x .006 + 20% for surface cutting by rubbing = .60 - 172 cu m. Dry volume = .72 + 50% = .72 + 36 = 1.08 cum Cement = —LOS_ | 1.08 9.4 cy m (12 bags); Marble Chips = 0.4 x 14 = 0.60 cum. 1-1 2 Ma ‘or mosaic layer for different proportion— (i) Proportion 1 : 1 — Cement = 0.50 cu m (15 bags). Marble Chips = 0.5 cum. (i) Proportion 1: 1': Cement = 0.40 cu m (12 bags). Marble Chips = 0.6 cum. (ii) Proportion 1 : 2 — Cement = 0.36 cu m (10.8 bags), Marble Chips = 0.72 cu m. (iv) To get whitish base (ground) 10% to 20% of marble dust may be mixed with portland cement. Mosaic Dado or Skirting — 6 mm thick mosaic layer over 20 mm thick cement plaster 1: 3 cement: coarse sand. Materials for cement mortar same as in page 498. Materials for mosaic layer to be same as above. Labour may be increased by 10% over item 39. Note. — Marble Chips are sold by weight — I cu m = 1650 kg = 16.5 quintal. Note on coloured mosaic floor — (® Coloured marble chips may be mixed with white marble chips in the proportion required, usually in the proportion 3 : 1.3 parts of white chips and I part of black chips; shell chips or other coloured chips may also be mixed if so desired. (ii) Pure white cement or white cement, mixed with portland cement in the proportion of 1 : | to | = 3 may be used to get white or partly white ground. (ii) Coloured ground for mosaic floor if required, white cement, mixed with the required pigment colour 2 to 5 kg per bag of white cement should be mixed to have the desired colour, Coloured cement may also be used but it is very costly and may be used for highclass work AAs white cement is costly: generally ordinary cement mixed with marble dust in the proportion of 3 of cement and | of dust is used, and to this mix of cement and marble dust pigment colour of the choice may be added to the required proportion to have the desired colour. For uniformity of colour it is better if cement and colour are mixed at a time to meet the requirement of the flow of one room. 40. Mosaic or Terrazo Floor over and including 7.5 em Lime Concrete — unit 1 sqm — 100 sq m. Combine item 39 with item 36. ANALYSIS OF RATES S07 Al. Mosaic or Terrazo Tile Floor — unit 1 sq m. Take — 100 sqm. iculars ; : Cost Particulars Qutty oF Nos. o » saic Tiles 20 cm x 20 cm nominal size 2500 nos. . 100 sqm 400.00 per sqm | 4000.00 20mm lime mortar — White lime (slaked) 7 locum 800.00 per cu m 800.00 Surkhi . 2cum 500.00 per cum | 1000.00 Cement (for neat cement paste or grout for laying tiles and for joints) 6 bags . 0.20 cum 7650.00 per cum | _ 1530.00 Total ¥3330.00 Labour, ete. — Mistri (Head mason) ses I no. (0.00 per day 350.00 Mason (Specialist) se 15 nos, 300.00 per day 4500.00 Mazdoor (Beldar) 15 nos. 220.00 per day 3300.00 Bhishti 1% nos, 200.00 per day 300.00 Polisher 120 nos. 200.00 per day | 2400.00 Polishing stone Ls. 1000.00 L.s. 1000.00 Oxalic acid power bes LS. 200.00 L.S. 200.00 Sundries, T. and P., etc. LS. 200.00 LS. 200.00 Total 33850.00 Total of materials and lebour ... 7180.00 Add 114% Water charges 1158.00 Add 10% Contractor's profit ... . 7718.00 Grand Total |” 86056.00 Rate per sqm — Rs.86056.00 / 100 = Rs.860.00 for 100 sqm For material of mortar and cement see pages 498 and 499. Tiles are usually supplied unground, if ground tiles are supplied then labour for polishing may be reduced by 50% or 60 nos. polisher may be required for polishing 100 sq m of floor, These are manufactured under press-machine under a pressure of 140 kg per sq cm. The tiles may be of 20 x 20 cm or 30 x 30cm nominal size, having actual size 19.85 x 19.85 cm or 29.85 x 29.85 cm. The mosaic layer consists of 6 mm thickness over a cement concrete bottom layer of 20 mm to 25 mm thickness. The tiles are iaid over 12 mm to 20 mm lime mortar (IS - 1443) over a sub-base of lime concrete or weak cement concrete. After lime mortar is laid hardened sufficiently, a thin layer of cement Paste (of honey like consistency) of about 1.5 mm thickness is spread and then the tiles are laid with vertical joints of 1 mm to 1.5 mm thickness which are filled with the same cement paste. The grinding and polishing are started when the floor and joints have dried and hardened, after 7 days for lime mortar and 3 days for cement mortar. 12 mm to 20 mm thick cement mortar |: 6 may also be used in place of lime mort The mosaic layer may be coloured or with ornamental design, in that ¢ and for joints should be of the same colour. The cos Rs.400.00 to Rs.600.00 per sq m. if specified. the cement paste for laying of the coloured tiles are higher, may be 508 ESTIMATING AND COSTING Brick Floor 10 cm thick surface pointed with cement mortar — am thick 100 sq m is equal 100 sq m. — Brick LT brickwork, but 10% and 06 cu m total dry mortar is required. Fo, of materials are — Brick = 5000 nos, Cement = 0.2 cu m (6 bags be calculated, Requirement of materials for 100 x 0.10 = 10 cu m, Hence materials requirement is same mortar may be taken for unevenness of base. For pointing brick floor laid with 1: 6 cement mortar the quanuly ° cement = 0.5 cu m (15 bags) and sand = 3.0 cu m. For pointing I< and sand = 0.4 cu m are required. Similarly, materials for other proportions may 42. Brick Floor 10 cm thick cement pointed -- unit 1 sd ™ Take — 100 sq (a) Brick laid 1: 6 mortar. surface pointed | : 2 cement moray Rate Cost Particulars Qnity or Nos. 7 B Ra: Brickwork — Materials for brick laying — Buick I-class . 5000 nos. 4500.00 per %» 22500.00 Cement (15 bags) ; 0.50 cum 7650.00 per cum} — 3825.00 Sand local 3.00 cum 700.00 percum| 2100.00 = Total 78425.00_ Labour of brick laying — Mistri (Head mason) ‘1, no. 350.00 per day 175.00 Mason. 0 300.00 per day 3000.00 Mazdoor (Beldar) 220.00 per day 1760.00 Boy or woman coolie 6 nos. 200.00 per day 1200.00 Bhishti . Ino. 200.00 per day 200.00 Sundries, T. and P., ctc. . Lump sum 90.00 L.S. 90.00 Total 6425.00 Cement pointing -- Materials and labour same as for item no. 32 in pagwe 501... . 7351.10 Total of materials and labour ... $2201.10 Add 11% Water charges . : 633.00 ‘Add 10% Contractor's profit .. . |__ 4220.17 Grand Total | 4705487 Rate per sqm — Rs.47054.87 / 100 = Rs.470.00 for 100sq™ Requirement of materials for brick floor with traditional bricks of 9” x 414" x 3° 229" 11.4 x 7.6 em) for 100 sq m. Brick flat floor — 3500 nos. bricks, 2.26 cu m dry mortar; Labour same as above (item 12) 1 abowe Brick on edge floor. — 5300 nos. bricks. 3.40 cu m dry mortar; Labour 25% more ! (item 42). ANALYSIS OF RATES 50 42. (b), (c). Brick Floor 10 cm thick with different mortar — unit 1 sq m. Take — 700 5q ma. (b) With white lime and ’ (c) With cement mortar | : 3 — surkhi mortar 1 ; 2 — Materials— Bricks +» 5000 nos. Materials— Bricks - 5000 nos. White lime slaked «130 cum Cement 0.80 cum Surkhi + 2,60 cum Sand coarse w+ 2.40 cum Labour — Same as in item 42 (a) Labour — Same as in item 42 (a), Pointing — Same as in item 32. Pointing — Same as in item 32. 43. Brick Floor over and including 7.5 cm Lime Concrete — unit 1 sq m. Take—100 sq m. Combine item 42 with item 36. Brick Tile or Flag Stone Flooring — Requirement of materials. — Size of tiles 30 cm x 30 em x 4 em (nominal size), and laying is done over 12 mm thick mortar with 6 mm thick joints. For 100 sq m are total dry mortar for 12 inm bedding is 2 cu mand for 6 mm thick joints is 0.25 cu m. Thus the sum total of mortar for laying is equal to 2.25 cu m. For surface Pointing of tile floor totai dry mortar will be 50% less than pointing on brick Surface, and is equal to 0.8 cu m. The quantities of each ingredient material of different proportions of mortar may be calculated by usual method. 44, Brick Tile Floor laid in 1:6 cement mortar and surface pointed with 1:2 cement mortar unit 1 sq m. Take — 100 sq m. Materials |. Labour — Tiles 30 cm x 30 cm size 1100 nos. Labour 25% less than in item 42 Mortar | : 6 for laying — Water charges — 114% Cement (9.6 bags) v0.32 cum Sand v1.92 cum Profit i 10% Mortar | : 2 for pointing — Cement (3 bags) = O.lcum Sand + 0.2 cum Cost may be worked out at suitable rates _ ESTIMATING AND COSTING _ , 48. (i) White washing one coat — unit 1 sq m. Take ~ 100 sqm Rate Cost Particulars Qnity or Nos. Rs. kee Materials White li laked @ a unslaked @ 650.00 i 6.50 per ke on Glue powder oe Lump sum sm he 8.09 Surkhi (or sand) we Lump sum 7.0 a a Labour — White washer . °f, no. 250.00 per day 166.70 Boy coolie 7 */, no. 200.00 per day 133.30 Sundries, T. and P., etc, : Lump sum 10.00 LS. 10,00 Total 310.00 Total of materials and labour ... 390.00 Add 10% Contractor's profit ... o [39.00 Grand Total 429.00 Rate per sq m — Rs.429,00 / 100 = Rs.4.30 for 100 sqm 45. (ii) White washing two coat — unit 1 sq m. Take — 100 sq m. Materials — Labour — White lime unslaked 20 kg. White washer . | no, Glue powder w- LS. Rs.12.00 Boy coolie ve 1 no. Blue (pigmentcotour) ... LS. Rs.15.00 } Sundries, ladder, etc... LS. Rs.7.00 10% profit... Rate per sq m = 1/100 of cost of 100 sq m. 45. (iii) White washing three coat — unit 1 sq m. Take — 100 sqm, Materials — Labour— White lime unslaked 30 kg. White washer es 1% nos. Glue powder w» LS. Rs.15.00] Boy coolie . 1% nos. Blue (pigment colour)... LS. Rs.18.00} Sundries. ladder, ete. LS, Re. 10.00 10% profi Rate per sq m = 1/100 of cost of 160 sqm, Note. — (i) Requirement of lime 1 kg per 10 sq m. for each coat of white washing Note. — (ii) Blue pigment colour is added in the top finish coat only. 46. Colour washing two coats over one coat of white washing — unit 1 sq m. Take — 10051! Add to item 45 colouring matter (pigment) 1 102 kg per % sq m. for every cont @ Bes 100.00 per KE depending on the nature of the pigment, Blue pigment powder will not be required, 47. Distempering two co: Ist coat of Distemperin Dry distemper 6!2 Ke @ Rs.50.00/Kg Expert white washer or Distemperer 2 nos. @ Rs ANALYSIS OF RATE unit 1 sqm. Take Boy coolie 2 nos. @ R: = 400.00 Sundries, T. and P., and 45,00, Total... 1270.00 Add 10% Contractor's profit 27.00 Total... 1397.00 per “ sqm Su 100 sqm, 2nd coat of Distempering — Dry distemper 5 kg @ Rs.50,00 = 250.00 Expert white washer or Distemperer 142 nos @ Rs. Boy coolie 1/2 nos. @ Rs.200,00/c; Sundries, ind P., ete, L, 25,00, Total... 950.00 Add 108% Contractor's profit 5.00, Total... 1045.00 per “is sqm Total for two coats = 1397.00 + 1045,00 = 442.00 9 sqm. If the distempe be added in the rat ite per sq m = 2442.00/100 = 24.50. g is to be done on new cement plas with zine sulphate solution (1 kg of zine sulphate mixed with 10 litres of water) and the folloy tered surface, the surface should b: may Washing with zine sulphate solution — 100 sq m. Zine sulphate dry ‘ak @ Rs. 50.00kg a 25.00 White washer To. @ Rs.250.00/day = 250.00 Boy coolie Tne. @ Rs.200.00/day 200.00 Sundries Ls. 00 480.00 Add 10% Contractor 48.00 Total Rs. per Se sqm= Rs. 00 5.30 per sq m Adding to the above the rate for two coats of distempering after washing the surface with zine sulphate solution comes to Rs.29.80 per sq m. 48. Water proof cement painting of approved make and qu unit 1 sqm. Take — 100 sqm. First coat — Snowcem or other make 30 ky @ Rs. 35.00kg = Expert white washer 2¥% nos. @ Rs.250,00/day Boy coolie 242 nos. @ Rs.200.00/day, Sundries, T. and P., ete. L.S. Total Add 10% Contractor's profit Total 2447.50 per % sqm Total for two couts = 247. Rate per sq m 50 + 1804.00 iy two coats on plastered surface Second Coat — Snow-cem or other make 20 ky @ Rs. Ort 700.00, Expert white washer 2 no @ Rs.250.00/day= 500.00 Boy coolie 2 nos. @ Rs.200.00/ay= 400.00 Sundries, T. and P,, ete. LS. 40.00 Total Add 10% Contractor’s profit Total 251.50 per % sy m. -A251.50/100 42.50 50 kg of snowcem covers and area of 100 sq.m. to 150 sqm. for two coats depending on the nature of surface. a. ESTIMATING AND COSTING uacem, Notes on item 48 — (i) Warer proof cement paint as Snowcen, Supercem, Aq Durocem, ete marketed by different Companies may be used. ' ee 3 igment mixed to 1 (ii) Similar compound made of white cement and coloured ‘powdered pigm he require ion to have the desired colour may also be prepared and used (See Chapter 13, Specification) propo! 49. Painting one coat over a coat of priming — unit 1 sq m- iss — 100 sqm. 7 ate Particulars Qatty oF Nos. a BR TR Prime coat — 7 Prime paint 6 litre 100.00 per litre 600.00 Painter 2 nos. 250.00 per day 500.00 Coohte se 2 nos. 200.00 per day 400.00 Sundries, putty, brushes, sand paper, etc. ve {__Lump sum 60.00 LS. 60.00 Total of prime] coat 1560.00 Paint one coat — Paint (ready mixed) oo 10 litre 110.00 per Jitre 1100.00 Painter : 5 nos. 250.00 per day 1250.00 Coolie we 5 nos. 200.00 per day 1000.00 Sundries, putty, brushes, sand paper, etc. es Lump sum 60.00 L.S. 60.00 {Coat for one-coat painting | _3410.00- ‘Total for prime coat and one coat of painting 4970.00 ‘Add 10% Contractor's profit ... = ve 497.00, Grand Total 5467.00 Rate per sq m — Rs.5467.00 / 100 = Rs.54.50 for 100 sqm For every subsequent coat of painting. Same as for one coat of painting above. 50. Painting with Stiff paint one coat unit 1 sq m. Take — 100 sq m. Particulars Qaty or Nos. [Bate Sos Materials — Paint (stiff) : 10 kg. 90.00 per kg 900.00 Linseed oil (boiled) . 4.5 litre 50.00 per litre 225.00 Turpentine nes 3.0 litre 150.00 1275.00 Labour, ete. — Painter 5 nos. 250.00 per day 1250.00 Coolie 5 nos. 200.00 per day 1000.00 Sundries, putty, brushes, sand paper, etc. ves Lump sum 6o.00Ls, | _ 60.00 Total 7310.00 “Total of materials and labour 358500 ‘Add 10% Contractor's profit ... es 3580 Grand Total | 39435? Rate per sq m— Rs. 3943.50 / 100 = Rs. 39.50 for 100 48 ANALYSIS OF RATES 51. Varnishing one coat with copal varnish oil — unit 1 sqm. Take — 100 sym. For one coat of oiling — Linseed oil 6 litre © Rs. 40.00 per litre For varnishing — Copal varnish 6 litre © Rs.70.00 per litre Add 10° Prot For subsequent coat of v 513 over one coat of oiling with double boiled linseed Labour for oiling Labour for varnishing Painter 2 nos. 5 nos. Boy coolie 3 nos. 5 nos Sundries. sand paper T. and P., ete.. L. Rs. 60,00, Rs. 60.00 Mit over total cost. arnishing same as for one coat above, For subsequent coat over Ist coat the m . Wax or French Polish one coat — unit 1 sqm. Take — 100 sym. Mater Wax. or French polish — 5 ke @ Rs.200.00 per Labour — Painter 5 nos Boy coolie 5 nos Sundries. sand paper, T. and P. ete. LS. Add 10% profit over total cost @ Rs.220.00 per day @ Rs.200.00 per day Rs.25.00 $3. Spirit polish one coat unit 1 sq m. Take — 100 sqm. Materials — Spirit (Methylated) — [litre © Rs.60.00 per litre Shellac, resin or chapra '/, kg. @ Rs. 120,00 per kg. Pigment colour LS. Rys.8,00 Labour — Same ay for tem 52 Add 10% profit over total cost — naterials and labour may be reduced by 30%. $4. One coat of coal-tarring — unit ! sqm. | 55. Solignum painting one coat — anit 1 sqm. Take — 100 sqm, Take — 100 sq m. Coal tar —7 litre @ Rs. $0.00 per litre Solignum — 7 litre © Rs. 100,00 per litre ner HL class) 2 00 per day} Painter 2 nos. © Rs.250.60 per day Sundries. T. and P., ew. LS. Rs. 25.00 Boy coohe 2 nos. G Rs.200.00 per day AGU 10% profit over total cost Sundries. T. and P. ete.. LS. Rs.30,00 } Add 10% profit over total cost For subsequent coat over Ist cout the materials and labour may be reduced by 306, PIMATING AND COSTING Si4 1 2— unit 1 qm. Take—109 " 56, 2.em Thick Damp Proof Course (D.P.C.) with cement Mortar Particulars Qnity or Now. oy Cost Materials — _.. Cement (27 bags) 0.90 cum 7650.00 per eum | 6885.99 Sand (coarse) : 1.80 cum 1500.00 per cum | 2700.09 Cem-seal or Impermo (1 ky per bag ‘of cement) : ae . 27.00 kg. 40.00 per ky. 1080.09 : . Toal — | 10665.09> Labour, ete. — Mistri (Head mason) . Yano. 350.00 per day 175.09 Mason . 5 nos 300.00 per day 1500.09 Mazdoor (Beldar) = 5 nos. 220,00 per day 1100.00 Bhishti (including curing) = 1 no. 290.00 per day 200.00 Form insides : Lump sum 200.00 L.S. 200.09 Sundries, T. and P, ete. . Lump sum 75,00 LS. 75.00 Total 3250.00 “Total of materials and labour... 13915.09 Add Water charges... : 209.00 Add 10% Contractor's profit... : “ 1391.50 Grand Total |_15515.50_ Rate per sq m—_Rs.15515.50 / 100 = Rs.155.00 for 100 sqm 57. 2.5 em Thick Cement Concrete 1:1/:3 Damp Proof Course (D.P.C.) unit 1 sqm. Zake—/00.q m Rate Cost Particulars Qnty or Nos._| Rs; FE Ree Stone ballast 12 mm gauge (stone chips)} 2.25 cu m 1700.00 per cum] 3825.00 Sand (coarse) : 1.13 cum 1500.00 per cum] 1695.00 Cement (22% bags) : 0.75 cu m 7650.00 percum| $737.50 Cem-seal or Impermo (1 kg per bag of cement) = 22.50 kg. 40,00 per kg. 900.00 Total 12157.50 Labour, ete. — Mistri (Head mason) ] 4, no. 350.00 per day 116.70 ‘Mason 8 nos. 300.00 per day 2400.00 Mazdoor (Beldar) 8 nos. 10.00 per day 1760.00 Bhishti (including curing) I no. 200.00 per day 200.00 Form insides Lump sum 5.00 LS. 225.00 Sundries, T. and P,, etc = Lump sum 75.00 L. 75,0 Total 4776.10 ‘Total of materials and labour... 16934.20 Add 14% Water charges 254,00 ‘Add 10% Contractor's profit... 1693-2 Grand Total — 18881." Rate per sqm — _Rs.18881.62 / 100 = Rs.189.00 for 10084" ‘Quantity of ingredient materials for different types of Damp Proof Course may be calculated" the same principle as floor. (See page 502). j be used, and Other standard water proofing compounds as pudlo, composeai, sika, ele., may quamity: may be taken as per instructions of the manufacturers. ANALYSIS OF RATES 51S 58. Bitumen Painting over Damp Proof Course unit 1 sq m. Take — 100 sqm. oa coat of bitumen is applied over the surface of Damp Proof Course add to items 56 and 57 — (i) Bitumen (asphalt) e100 kg (1g) ss @ Rs,5000.00 per quintal Sand coarse for covering =... = O.2cum s+. @ Rs,1500.00 per cu m. Mazdoor for heating and laying and covering with sand ... 4 nos, ..@ Rs.220.00 per day 59. Earthwork in Excavation in Foundation including Filling in trenches up to 30 m lead 1.5m lift — unit 100 cu m. Take — 100 cum. Particulars Qnity or Nos. Rate a 7 e R: E Rs. z Materials — Labour, etc. Mistri (Head mason) % no. 350.00 per day 175.00 Mazdoor (Beldar) 20 nos. 220.00 per day | 4400.00 Boy or woman coolie 24 nos. 200.00 per day | 4800.00 s. T. and P, ete. [Lump sum 100.00 Ls. 100.00 Total of materials and labour. 9475.00 Add 10% Contractor's profit... a = 947.50 Grand Total | 10422.50 Rate per % cum — Rs. 10422.00 for 100 cum (a) For every additional lead of 30 m beyond 30 m — Add to item 59 — Beldar — 2 nos. Coolie Z nos. (b) For every additional lift of 1.5 m beyond 1.5 m — Add to item 59 — Beldar — 2 ni Coolie — 2 nos. 60. Earthwork in Banking or in Excavation in Road or Canal Work in Layer of 20 cm including Ramming, Dressing, etc., up to 30 m lead and 1.5 m lift unit 100 cu m. Take — /00 cu m. Materials — Labour, ete. Mate (Head man) ve % no. 350.00 per day 175.00 Mazdoor (Beldar) ve 16 nos. 220.00 per day 3526.00 Boy or woman coolie : 16 nos. 200.00 per day 3200.00, Dressing, Mazdoor (Beldar) % no. 220.00 per day 110.00 Sundries, T. and P,, etc. including repair and sharpening ete. a Lump sum | 200.00 L.s 200.00 Total of materials and Tabour... 7205.00 Add 10% Contractor's profit... 50 Grand Total 7 Rate per % cum — Rs. 7925.00 for 100 cu m Note. — For additional lead and iift same as for 59 (a) andl (b). 516 ESTIMATING AND COSTING 61. Excavation in hard rock by drilling, blasting et. in Billy areas including a lead of 30 m anc lift of 1.5 m unit 100 cu m, Take — 100 cum 3 u st Particulars Qutty or Nos. Rate ° — abour, ete. oe ° ¥ no. 350.00 per day 175.00 Rock cutter ve 7 nos. 300.00 per day 2100.00 Hole Driller - 7 nos. 300.00 per day 2100.00 Mazdoor (Beldar) . 30 nos. 220.00 per day 6600.00 Boy coolie a. 30 nos. 200.00 per day 6000.00 Explosive powder, Fuse, ete... Lump sum 1000.00 L.S. 1000.00 Sundries, T. and P., including sharpening, etc. we _|__Lump sum 200.00 LS. 200.00 Total of materials and labour... 18175.00 ‘Add 10% Contractor's profit ... e 1817.50 Grand Total | 19992.50 Rate per % cum — Rs. 19992.00 62. Excavation in various types of rock by blasting including a lead of 30 m and lift of 15 m —anit 100 cum. Take — 100 cu m. Labour, etc. In soft Inmedium | In hard In very rock and rock and rock and hard rock shale shale shale shale 1. Rock cutter @ Rs. 300.00 per day 3 nos. 4 nos. 6 nos. 8 nos. 2. Hole driller @ Rs. 300.00 per day 3 nos. 4 nos. 6 nos. 8 nos. 3. Mazdoor (Beldar) @ Rs.220.00 per day vs 15 nos, 24 nos. | 28 nos 32 nos. 4. Boy coolie @ Rs. 200.00 per day... | 15 nos. 24 nos. | 28 nos. 32 nos. 5. Explosive powder, Fuse, ete, LS. LS LS. LS Rs.250.00 Rs.325.00| Rs.600.00] Rs.725.00 6. Sundries, T. and P., etc. Rs.90.00 Rs,100.00] Rs.150.00] Rs.175.00 7. Contractor's Profit 10% 10% 10% 10% (Cost of each type may be calculated) ANALYSIS OF RATES SI7 63. Sand Filling in Plinth — unit 1 cu m. Jake — 100 cu m. rticulars Qnty oF Nos. ree P ee A Materials — Sand local (including carriage)... | 100.00 cum. 700.00 cu m 7000.00 Labour, ete. Mistri (Head mason) 7 1), no. 350.00 per day 43.15 Mazdoor (Beldar) te 12 nos. 220.00 per day 2640.00 Boy coolie 7 8 nos. 200.00 per day 1600.00 Bhishti for watering . 2 nos. 200.00 per day 400.00 Sundries, T. and P., etc. _ Lump sum 40.00 LS. 40.00 Total of materials and labour... 74723.15 Add 10% Contractor's profit ... 7 = 7472.37 Grand Total... 82196.12 Rate per cum — Rs, 82196.12/100 = Rs.822.00 for 100 cum 64. Wood-work in Chaukhat or Frame — Wrought, Framed and Fixed — unit 1 cu m. Sal wood work — Take a frame or chaukhat of 200 x 120 cm door without sill of 8 x 12 cm section, of sal wood (Fig. 11-1). Materials — Timber 5.48 x .08 x .12 “ 0.053 cu m. (L=2x 21441 x 12=5.48) Wastage 5% . 0,003 cu m 0.056 cu m 40000.00 per cu m 2240.00 Labour, etc. Mistri (Carpenter) ‘Y, no. 300.00 per day Carpenter °/, n0. 280.00 per day Coolie (Helper) % no. 200.00 per day Sundries, T. and P., ete. Lump sum 45.00 LS. Total of labour Total of materials and labour... Add 10% Contractor's profit ... 261.37 2875.12 Grand Total Rate per cu m (dividing by 0.053) — Rs. 2875.12/0.053 = Rs.54247.00 Note. — (1) For fixing chaukhat in position in wall by mason, lump sum Rs. 100.00 may be added to above. (2) For C.P. Teakwood rate of timber may be taken as may be kept same. (3) For soft-wood rate of timber may be Rs.20000.00 10 25000.00 per cu m. and labour may be reduced by 25% . 40000.00 per cum, labour S18 ESTIMATING AND COSTING 65, 40 mm Thick Panelled Door of Indian Teak Wood unit I sq m- im (shutter only) as per (Fig. 11-1). Area = 2.162 sq m Take a door shutter 106.4 cm x 203, LC B Thick [ Ontty. Rate Cost Particulars No. ness | or nos. |= m_|_m_[m Rs P. Rs. p 4 | 2032] 010 | vot 0.0325 Top rail 1 | 1068} 0.12 | 0.04 0.0051 Frieze rail 1 | 1g6s} 0.12 | 004 0,005! Lock rail 1 | 1068] O18 | 0.04 0.007 Bottom rail 1 | L064} 0.15 | 0.04 0,064 Panels (sum total) Length and breadth L=2032—x 12+ 18+ 15) +(6x 1.2) 153.4em=1.534m B=(10640+1.2)— (4x 10)+(4x 1.2)= 1_| 1534} 74 | ors | 0.0278 0.0846 Add 5% for wastage 0.0042, Brass fittings — 0.0888 — | 4000.00 355200 cum percum Tower bolt 30 em (upper) Ino. 0.0 40.00 Tower bolt 15 cm (lower) Ino. 25.00 e 25.00 Hinges 10cm 6 nos. 10,00 6000 Brass handle 2 nos. 35.00 7000 Wooden cleat 2 nos. 5.00 1000 Hinges 2.5 em (for wooden cleat) 2 nos. 5.00 lo Screws 40mm 20 nos. 50.00 per % no}. 10.00 Screws 20mm 80 nos. 25.00 per %nof. 20.00 Hasp and staple or sliding bolts (ior locking) one per room Lumpsum|__9000_ LS. 000 Total 3887.0 Labour, ete. — Mistri (Carpenter) "7,, no. 300.00 per day 20.00 Carpenter 4 nos. 280.00 per day | 1120.00 Coolie (helper) 2 nos. 220.00 per day 440,00 ue, ete. Lump sum 25100 Lump sum 3500 1640.00 Total of materials and labour $5210 Add 10% Contractor's profit : 552.70. Grand Total 3079.70 Rate per sqm — Rs. 6079,70/2.162 — Rs.2812.00 2.162sym The rate of fittings alone per sq mof shutters. Height of shunters = 210-8 + 12 cost of fittings divided by the area of shutter = Rs.335.00/2.162 = Rs.155.00 203.2 em : Breadth of shutters = 120 -2.x8 + 2.x 1.2 = 1064 6 ANANLYSIS OF RATES 505 Note.— (1) Total cost of door including chaukhat may be worked out by adding items 64 and 65, The hold fasts are taken separately: 2) Panels may he thinner than styles and rails by 6 mn to 29 mm, If the rate excluding fittings is required., the cost of fittings is to be excluded. (3) Students for simplicity may assume shutters (only) of size 120 x 210 em (1.2.x 2.1 m) or 100 x 200 em 61.0 x 2.0 mand work out the quantity of timber PANELLED DOOR 120. cm ——______ 120m style ' 4 % 7 (Sk 8x 12m Frame tact 12040 mm. it “Top rail + q * 1 120%40 mm 120 mm Frieze rail Fig. 11-1 8x12cm — t It It It q q It q ql q q q It Hl i q q q q q qi q q q I h q qi q q q q q I q i q It It q q It q 250m 30 em long 150x40mm FL, q 1 i F_ beta al | HZ com Elevation om Se }-____— 120 om —___ TOO ey 100}— ape i Chowkhat 812 m+ Plan 520 DETAILS OF DOOR JOINTS Top rail Lock rail 7 For glazing 12 Bile Bottom rail For Paneling LL \Lstail of joints between style and rails. Vertical Detail joint of frame Fig. 11-2 Glazed window shutter — 1 Top rail 75x40 mm — Fave, +— Glass pane 40mm 4} style 75x40 mma]! Sash bar 40x40 mm ue Buttom rail _ J 7mm 75x40 mm F Elevation 75mm Adm Baten OT : 4 pr Plan Section Moulding with beading ESTIMATING AND. COSTING Detail of Pane! joint Moulding withoutbeading (i) Plain joint (i Panel Detail of Sash bar 15 mmi0 mnt mm eet Fig. 11-3 ANALYSIS OF RATES S21 66. 4mm Thick Panelled Door of Indian Teak Wood — unit 1 sq m. ‘Take a window shutter 100 x 150 em (shutter only). Area = 1.5 sq m (Fig. 11.3). iB B Thick | Qntty, Rate Cost Particulars No. ee ee eee ka a Re Fi Materials— Timber Stiles 4 | 150 | 07s | 004 024 Top and bottom rail 2 1.00 0.075 0.04 Sash bars verticles (15 mm insertion) 2 | 138 | 004 | 004 0,008 Sash bars horizontal (15 mm insertion) = 50— Q2x75)+2x15) 38cm=.38m ... 6 |038 | 004 | 004 0,003 00085 Add 5% for wastage 0.002 Brass fittings — -———] 0.037.cum} 4000.00 148000 Fittings — Tower bolt 30 em (upper) Ino. 4000 each 40.00 Tower bolt 15.cm (lower) Ino. 25.00 each 2500 Hinges 10cm 4 nos. 1000 each 4000 Brass handle Ino. (3500 each 3500 Wooden cleat 2 nos. 500 each 10.00 Hinges 2.5 cm (for wooden cleat) 2 nos. 5.00 each 1000 Screws 40mm 20 nos. 50.00 per%nos| 10.00 Screws 20mm 50 nos. 25.00 per%nos| 1250 Glasspanes 16 nos. x 18.5 x 33.75 cm = 1,00sqm} 30000 persqm} — 30000 1.00 sq m Breadth =¥% [150—(2x7.5)—1 +(2x 1.5)}=18.5cm Ht ="/,[150—(2x75)—(3x )+2415)] =33.75em Putty, and nails for fixing panes Lump sum|__ 60.00 60,00 Total 2022.50 Labour, ete. — Mistri (Carpenter) ‘hs no. 30000 per day 20.00 Carpenter 2 nos. 28000 per day | 56000 Coolie (helper) I no. 22000 per day 220.00 Putty, glue, ete. Lumpsum] 50.00 LS. 50.00 Sundries, T. and P., etc. Lump sum| 00_L. 35.0 SE Total eee | mr OS 00 a Total of materials and labour : 2007.50 Add 10% Contractor's profit : 20075 Grand Total 3198.25 Rate per sqm—Rs, 3198.25/1.5 = Rs.2132.00 for 1.5 sym Note. = Ifthe rate excluding fittings is required, the cost of fitting is to be excluded. sal ESTIMATING AND COSTING for R.C.C. Beam — ; room 4.5 metre (Fig. 11.4) is of Rate of Centering and Shuttering, Form work ‘Take beam of § metre clear span, 60 cm depth and 30.cm breadth, height ofthe 53cum. Quantity of R-C.C. work including 25 om bearing = 8.50. 60x.30= L | B | Thick’ | Qntey Rate co Particulars No. ness | oF nos. ele een Rs. PB. Rs. p Materials— Timber Planks, sides of beam 2 | 850 | oo} oo2s | 0255 Planks, under the ‘beam 10cm on wall 1 | 820 | 035) 005 0.144 Planks at ends.. 2 Joss | 035] 0025 | 011 Support under the beam I mele, with bracket — Horizontal planks 7 | 00 | ots} os | 0032 inclined pieces of brackets 7x2] 055 | 00s} 004 | a015 Side stiffeners at 1 m cle, planks. 2x9] 080 | 008} 004 | 0046 Braces for props 5 em inside wall ... 2 8.10 0.10 0.04 0.065 under the props .. 7 |o4s | 025] 005 | 0.039 Wedges under the props 2 7 |o2s | o12{ 008 | 0017 Total | 0.624 Add 5% for wastage 0081 Total| of | timber | 0.655 cum{ 1500000 9825.00 Ballies 10 cmav. dia, props under the beamat | move. (height up to bottom of beam 3.9 1m) ends supported over walls, 7 nos. props of 3.73 m actual length 3754 2625m 4500 perrn | 1181.25 Tie bolts 12mm dia, S00 em long with Semx3 cm x 6mm washers o2}—- | — | — 18nos. 2000 each 36000 Total 7136625 Subtract 10% for salvage|value | of timber |:7082.50/105 113200 Total cost of| timber and balliss| 1022025 Assuming that the timber and ballies will become unserviceable afier being used for 20 times, oS of using once = Rs.10229.25/20 = Rs.511.45 (Cond) ANALYSIS OF RATES 523 (Continued from previous page) Particulars Qntty or Nos. Rate Cost Rs. P. Rs. P. Cost of timber and ballies = = 511.45 Labour, ete. For erection, fixing, dismantling and removing, etc. — Mistry (Head mason) “4, no. 350.00 per day 43.75 Carpenter (II class) Uno. 280.00 per day 280.00 Mazdoor (Beldar) 2 nos. 220.00 per day 440.00 Nails Lump sum 40.00 L.S. 40.00 Oiling of timber surface Lump sum 50.00 Ls. 50.00 Sundries, T. and P., ete. Lump sum 25.00 LS. 25.00 Total of labour 878.75 Total of materials and labo 1390.20 Add 10% Contractor's profit ... . 139.00 Grand Total [1529.20 for 1.53 cum of RCC. Rate per cu m of R.C.C. work = Rs, 1529.20/1.53 = Rs.999.50 work Rate per sq m of centering and shuttering - Area of centering and shuttering two Rs. 1529.20 Rate per sqm = = Rs.118.00 12.96 Rate per sq m = Rs. 118.00 per sqm of centering and shuttering. Fig. 11-4 y IMATING AND COSTING 68. Analy f Rate of Centering and Shuttering, Form work for R.C.C, Slab — Take a oom 4m x Sm. 3.6m high. ‘Area of Slab = 20sqm_ (Fiz, 11.5) T B Qnity. Rate Cost Particulars No or nos. pela Ree ee Rs op Mater Timber Planks (under stab) 1 5,00 4.00 0.25 0,500 Beams at | metre inthree rows... 6 4,00 0.07 O14 ing planks under the props . | | OAS 0.25 0.05 0.135 Braces for props at the middle, in both direction W .. 6 4.00 0.08 0.04 0077 (i). | 4 5.00 0.08 00+ 0.064 Wedges under the props * mM | 025 O12 0.08 0,058 Planks on vertical edges of slabs assuming 15 em thick slab and 15 embearing (i) {2 }430 | 015 | 0025 | 0032 Gi) |? |s30 | aus [0025 | 0.040 Total | I.14Teum Add 5% for wastage .. 0.057 Toul | of | amber | 1.198cum | 15000.00 percum| — 1797000 Ballie props 10cm average dia4 props | 24 ]350 | — | — 400m 45.00_perrm 378000 foreach beam (3.3m Total 2175000 actual length) 2175.00 Deduct 10% for slavage| valug of | timber 12820.00/10) Total cost of timbey 19575.00 and ballies ‘Assuming that the timber and ballies will become unserviceable after being used for 20 times, cost of using once = Rs.19575.00/20=Rs.978.75 Cost of timber and ballies - 978.75 Labour, ete. — For erection, fixing, dismantling and removing, etc. — Mistri (Head mason) 1,00. 350.00 per day 4375 Carpenter (II class) : 2nos. 230.00 per day | 56000 Mazdoor (Beldar) - 3 nos. 22000 per day | 660.00 Nails : . Lumpsum | — 40,00 LS. 4000 Ciling of timber surface a Lumpsum | 7500 LS. 750 Sundries, T. and P., etc. = Lump sum |__ 3000_LS. 3000, Total 140815 Total of materials and labour 2387.0 Add 10% Contractor's profit : : | “23875 Grand Total 7262625 Rate per sqm — Rs. 2626,25/20 — Rs. 131.30 for 20sq™ (Contd) ANALYSIS OF RATES Rate per cum — 68. (a) If the slab is 12 em thick R.C.C. — 26525 _ ‘ Rate per cu m of R.C.C. work OO (b) If the slab is 15 em thick Ri 2626.25, _— ere ct . Rate per cu m of R.C.C. work 0x15 ge Per culn FORM WORK OF SLAB ENTERING AND SHU TTERING) 25mm Planking | | ‘or sheathing | Beanngpianks | J 45 mmx25 omxSem ~ Fig. 11-5 69. Galvanized Corrugated Iron Sheet 24 B.W.G. (GI. Sheet) Roofing — unit 1 sq m Take— 10 sq m (15 cm end overlap and two corrugations side overlap). Materials — GI. Sheet 24 B.W.G. (12.8 sq m = 70 kg) 0.70 q 3100.00 per q 2170.06 GI. bolts and nuts 2% no. 25.00 per doz. 50 GI. hooks and nuts (J bolts) 2 doz. 40.00 per doz. 30.00 Limpet washer 4Y% doz. 4.00 per doz. 18.00 Bitumen washer 4% doz. 3.50 per doz. 15.75 Total Labour, ete. Mistri (Head mason) “ ‘1, NO. 350.00 per day 21.87 Carpenter oy Ino. 300.00 per day 300.00 Mazdoor (Beldar) oo 1 no. 220.00 per day 220.00 Sundries, T. and P., ete. ~ Lump sum 35.00 L.S. 35.00 Total Total of materials and labour... Add 10% Contractor's profit ... . Grand Total Rate per sqm — Rs, 3215.43/10 = Rs.321.50 526 ESTIMATING AND COSTING 70. Allahabad Title Roofing Flat and Semi-round Tiles including Battens — unit 1 sqm, Take — 10 sq m. ‘< To Particulars Qnty or Nos . Pp cone Materials — : Flat tiles (including wastage)... 120 nos, 700.00 : hos. 840.09 Half round tiles (including wastage) 120 nos. 700.00 % nos 840.00 Cement (6 bags) . 0.02 cu m. 7650.00 per cum 153.09 Sand local 0.12 cum 700,00 per cum 84.00 Timber battens 50 x 40 mm (sal wood) . 0,06 cu m aon 317.00 Labour, ete. Mistri (Head mason) - 1, 10. 350,00 per day 21.87 Carpenter Ino. 300.00 per day 300,00 Tile layer os I no. 300.00 per day 300.00 Mazdoor (Beldary 7 2 nos, 220.00 per day 440.00 Boy coolie : Ino. 200.00 per day 200.00 Sundries, Scaffolding. etc : Lump sum 0 50,00 13187 Total of materials and labour 562887 Add 10% Contractor's pro 562.88 Grand Total... 6191.95 Rate per cum — Rs, 6191.75/10 = Rs.619.00 for 10 sqm 71. Mangalore Tile Roofing including Battens — unit 1 sq m. Take — /0 sq m. Materials — Tile 160 nos. 700.00 % nos. 1120.00 Timber battens 50 x 40 mm (sal wood) 0.06 cu m 40000.00 per cum. | _ 2400.00 | Total 3520.00 Labour, ct. Mistri (Head mason) i 1, n0. 350,00 per day 21.87 Carpenter 5 I no. 300.00 per day 300.00 Tile layer " 1% nos 300.00 per day 300.00 Mazdoor (Beldar) . I no, 220.00 per day 220.00 Boy coolie . 1 no. 200.00 per day 200.00 Sundries. Scaffolding. etc. Lump sum OLS. | 50,00. Total TO9L.87 ‘Total of materials and labour... 4611.87 Add 10% Contractor's profit ... ‘461.18 ae sor3.08 Rate per sqm — Rs. 5073.05/10 = A for 10 9q™ ANALYSIS OF RATES, $27 72. Roniganj Tile Roofing Jaid in lime surkhi mortar 1 : 2 proportions and joints pointed with 1: 2 cement sand mortar excluding battens — unit 1 sq na. Take — 10 sq.m. Materials — Labour — Raniganj Tile 125 nos @ Rs. 700.00 % nos, Mistei (Head mason) 1, nos. Lime (slaked) 0.05 cum @ Rs. 800.00 per cum @ Rs.350,00 per day Surkhi 0.10 cum @ Rs, 500,00 per cw m Tile layer mason 1% nos, Cement (412 bags) 0.15 cu m @ Rs.7650.00 per cu m @ Rs.300.00 per day Sand 0.30 cu m @ Rs. 700.00 per cum Mazdoor(Beldar) 2 nos. @ Rs. 220,00 per day Add 10% profit over total cost Sundries. scaffolding, T. and P, ete. LS. Rs. 50.00 73. Single Country Tile Roofing (Large Size Tiles) including Bamboo Frame — unit 1 sqm. Take = 10 sy m. Particulars Quuy or Nos, | Rate Cost Rs. PRRs Materials — 1 Flattiles ale 120/nos: 3000.00 “%a nos, 360.00 mental tle o | 120 nos. 3000.00 “%a» nos. 360.00 Bumboos 2 : 40 nos, 5.00 each 200.00 Chatai (Mat) of 12sqm 10.06 per sqm | 120.00 Ban (rope) | Ske 20.00 per kg 160.00 Nails 7 1 kg 40.00 per kg 40.00 Labour, ete. Tile layer a | 2 Zino: 300.00 per day 600.00 Mazdoor (Beldar) 2 nos. 220.00 per day 440.00 Sun atfolding, etc. ~ | Lump sum 50.00 L.S. 50.00 Total of materials and labour... 2270.00 Add 10% Contractor's profit .. . e 227.00 Grand Total 2497.00 Rate per sq m— Rs. 2497.00/10 = Rs.250.00 for 10 sq.m 74. Single Country Tile Roofing including Bamboo Framing, Small Tiles — unit 1 sqm. Take — 10.sq m. Particulars Qnty or Nos. Rate Cost Rx op [Rs P, Materials — Flat tiles 500 nos. 1000.00 Segmental tile 500 nos. 2000.00 *% nos. 1000.00 Bamboos 2.5 cm dia. ae 40 nos. 5.0U each 200.00 Ban (rope) . | Ske 20.00 per ke 100.00 Nails a lke 40.00 per kg 40,00 Labour, ete. Tile layer » | 2 nos. 300.00 per day 600.00 Muzdoor (Beldar) : 2 nos. 220,00 per day 440.00 Sundies. Sexffolding, ete. 2 Lump sum 50.00 L.S 50.00 Total of materials and labour, 3430.00 Add 10% Contractor's profit . 343.00 Grand Total... 3773.00 Rate per sy mi — Rs, 3773.00/10 = Rs.377.00 for 10 sym Ananirao Pawar College of Architecture 528 Parvati, Pune -9 n Two Layers — unit 1 sqm ESTIMATING AND COSTING Take — 10 sq.m. 78, Thatch Roofing 15 cm Thick i Rate Cost. Particulars | Qntty or Nos. Rs. Rs. P. Materials — aoe ne Grass pulas (bundles) } fe nos. ne ee ois i nos. ‘ ee mds Ske 20.00 per ke 100.00 CChatai (Mat) 12 sqm 10.00 per sqm 120.00 Serena 2 nos. 300.00 per day 600.00 Mazdoor (Beldar) 2 nos. 720.00 per day pone Sundries, ete. Lump sum 15.00 LS. 00 Total of materials and labour... pa ‘Add 10% Contractor's profit. . . Grand Total 1759.45 Rate per sqm — Rs. 1759.45/10 = Rs.176.00 for 10 sqm 76, 20 mm Thick Timber Ceiling Rebated with 40 x 20 Frame) — unit 1 sq m. Take a room 4.20 m ‘With Deodar Timber — x 6.00 m area = 25.2 sy m. mm Beading over joints (Excluding Materials — Planks 20 mm thick, 25.2 sqm including 10% wastage = 5.2 x 02 10% = 0.554 cu m Beading 20 mm thick 40 mm wide, assuming 60 em x 60 em panel = (11 nos. x 4.2 m +8 nos. x 6.0 m) x 04 x .02 + 10% = 0.083 cum Total timber = 0.637 cum | 0.637 cum | 3000.00 per cum | 1910.00 Nails 40 mm 1kg 40.00 per kg 40.00 Screw 40 mm 400 nos. 50.00 per % nos} 200.00 Labour, ete. Mistri (Head mason) Ino. 350.00 per day 350.00 Carpenter 3 nos. 300.00 per day 900.00 Mazdoor (Beldar) 3 nos. 220.00 per day 660.00 Scaffolding Lump sum 175.00 L.S. 175.00 Sundries, T. and P.. etc. Lump sum 75.00 LS. 75.00 Tou a aoe otal of To and labour... oe Grand Total [3366100 Rate per sq m—_Rs.23661.00/25.2 = Rs.939.00 for 25.2 sam ANALYSIS OF RATES : 529 77. Asbestos cement sheet ceiling 6 mm thick, with 40 mm x 20 mm teak wood beading (Excluding Frame) — unit 1 sq m. Take a room 4.50 6.30 m Area = 28.35 5q mn Materials — Asbestos cement sheet plain 6 mm thick including 5% wastage = 28.35 + 1.42 = 29.77 sq m . 29.77 sqm 180.00 sq m 5358.60 Teak wood beading assuming 90 cm x 90 cm panels = [(8 nos. x 4.5 + 6 nos. x 6.30) x 0.04 x 0.02] + 10% wastage = 0.065 cu m 0.065 cum — | 40000.00 cu m 2600.00 Screw 50 mm . 200 nos. 60.00 per % nos} 120,00 Screw 60 mm a 450) nos. 60.00 per % nos} 270.00 Nails 50 mm ; Ike 40,00 ke 40.00 Labour, ete. Mistri (Head mason) . 1, no. 350.00 per day 58.30 Carpenter te 2‘nos. 300.00 per day 600.00 Mazdoor (Beldar) . 2 nos. 220.00 per day 440.00 Scaffolding : Lump sum 175.00 LS. 175.00 Sundries, T. and P. etc a Lump sum 75.00 LS. 75.00 Otal of materials and Tabour. 9736.90 Add 10% Contractor's profi . . 973.69 Grand Total... 10710.59 Rate per sq m— Rs.10710,59/28,35 = Rs.378.00____|for 28.35 sqm 78. Terraced Roofing of 7.5 cm thick lime concrete over two layers of tile — unit 1 sq m. Take — 10 sq m. Materials — Tile work — Tiles Ist class 30cm x 30.cmx 30mm } 230 nos. 4000.00 %» nos. 920.00 Lime slaked ’ 0.09 cu m 800.00 / cu m 72.00 Surkhi . 0.18 cum 500.00 / cum 90.00 Lime Concrete — Brick ballast 25 mm gauge = 0.75 cu m. 700.00 / cu m 525.00 Lime slaked : 0.12 cum 800.00 / cu m 96.00 Surkhi : 0.24 cum 500.00 / cu m 120.00 Molasses (gur) 2kg 50.00 /kg 100.00 Bail fruit, etc. . Lump sum 60.00 LS. 60.00 Labour, ete. Total 1983.00 Mistri (Head mason) . Yh, no. 350.00 per day 29.17 Mason te 2'nos. 300.00 per day 600.00 Mazdoor (Beldar) : 4 nos, 220.00 per day 880.00 Boy or woman coolie : 7 nos. 200.00 per day 1400.00, Bhishti : %, no. 200.00 per day 150.50 Sundries, T. and P,, Lump sum 75.00 L. 75.00 Te 2134.17 Total of materials and labour. SHITAT Add 1%% Water charges ‘ 1: we 76.75 Add 10% Contractor's profit... . : 5 Grand Total. 5705.63 Rate per sq m— Rs,.5705.63/10 = Rs.570.00 for 10 sqm Note. — Tile of 30 cm x45 em 40 mm size maw also be used. In that case 260 nos. tiles will be required. 530 ESTIMATING AND COSTING 79, Mud Roofing 15 em earth over two layers of tiles with two coats of bitumen painting oy thi of tiles helow earth layer — unit 1 sq.m, Take — 10 sy me Materials — ] Tiles Ist class 30. em x 30.em.x 30mm | 230 Aes. 400,00 "/» nos. 920.00 Lime slaked = (0,09 cum 800,00 / cu m To Surkhi d 0.18. cum 500.00 /cum 90.00 Bitumen (12 kg for {st coat and Ske for 2nd cout) . kg 50.00 /kg. 1000.00 Earth (loamy soil) [ 750.00 % cum lias Bhusa, cowdung, ete. - Lump sum 30.00 L.S. 30.00 Labour — Mistri (Head mason) Y,, no. 350.00 per day 29.17 Mason, 1% nos. | 300.90 per day 450.00 Mazdoor (Beldar) : 5 nos. 220,00 per day 1100.09 Bhishti : Yo. | 200.00 per day 50.00 Sundries. T. and P.. Lump sum 75.00 L.S 75.00 Total of materials and labour... 3827.42 Add 10% Contractor's profit : Grand Total . Rate per sqm —_Rs4210.16/10 = Rs.421.00 Hor 10 sqm Note— For cheaper specifications surface may be finished witk gobri lepping (cowdung solution wash) bitumen painting may be omitted. 80. Brick making and Burning in Kilns — unit 1000 nos. Materials — Coal dust @18 tonne perlakh 0.18 Tonne 5000.00 / tonne 900.00 Labour — Mistri (Head mason) : 1, no. 350.00. per day 43.75 Moulder Vo. 300.00 per day 300.00) Mazdoor (Beldar) for digging, pugging and carrying earth =... 2 nos. Mazdoor (Beldar) for carrying moulded bricks and stacking dried bricks a 2 nos. Mazdoor (Beldar) for ioading kiln .. 2nos. 7 nos. | 220.00 per day 1540.00 Mazdoor (Beldar) for firing Ya no. 2 Mazdoor (Beldar) for unloading and stacking bricks a Ya nol Bhishti ‘1, no. 200.00 per day 66.67 Chimmey, moulds, ete. = Lump sum. 75.00 per day 75.00 Acquisition of Land and Royalty Lump sum 90.00 per day 90,00 Wood fuel for firing kiln = Lump sum 90.00 L.S. 90.00 Sundries. T. and P.. etc. . Lump sum 50.00 L.S. 50.00. ‘Total of materials and labour... 3155.42 Add 19% Contractor's profit ... | 315.54 Grand Total, 3470.96 Rs.3470.00 av c Rate per ‘nos. Out turn — T class ou% IL Class Ki II Class, 10% Over-burnt mis-shapen bricks 10s ANALYSIS OF RATES 531 81, Kankar Lime Burning and Manufacturing — unit 1 cum. Take — 10 cu m. Materials — Labour — Kankar 10 cum Head mason % no. Charcoal 15 quintal Mazdoor (Beldar) 35 nos, Wood fuel 2.5 quintal Boy coolie 20 nos, Grinding of bumt kankar Lump sum Land and kiln, etc. Lump sum Sundries Lump sum Add 10% Contractor's profit. Rate per cu m — Rs. . Grand Total for 10 cu m R: 82. Quarrying Kankar — unit 1 cu m. Take — 10 cu m. Particulars Qutty or Nos. Rate om R: z Rs Pp. Labour for digging, cleaning and stacking —] Mazdoor (Beldar) 16 nos. 220.00 per day 3520.00 Boy coolie 12 nos. 200.00 per day 2400.00, Royalty for land Lump sum 45.00 L.S. 45.00 Sundries, T. and P., etc. Lump sum 25.00 LS. 25.00 Total of materials and labour... 5990.00 Add 10% Contractor’s profit ... = 599.00 Grand Total. 6589.00 Rate per cu m — Rs.6589.00/10 = Rs.659.00 for 10 cum 83, Breaking Brick Ballast (over burnt) to 40 mm (1!2”) gauge — unit 1 cu m. Take —10 cu m. Rate Cost Particulars Quity or Nos. RP Rs. B Labour for digging, cleaning and stacking Mazdoor (Beldar) for breaking 12 nos. 220.00 per day 2640.00 Mazdoor (Beldar) for stacking 2 nos. 220.00 per day 440.00 Sundries, T. and P,, etc. Lump sum 60.00 LS. 60.000 Total of labour 3140.00 ‘Add 10% Contractor's profit... = 314.00 Grand Total... 3454.00 Rate per cu m — Rs.3454.00/10 = Rs.345.00 for 10 cum 498 ESTIMATING AND COSTING PLASTERING Calculation of quantity of mortar and materials — for uniform thickness, for filing YP the joints and to ‘oye which will give wet mined mor be further increased by cds, dividing the dry Area x thickness gives the quantity of mortar this may be inc terials or mortar the make up un-uniform surface of wall, reased by 3 To get the total dry volume of ingredient mat wet volume may he mortar may be found Py usual metho \d multiplying. by the individual 259. The quantities of each material of U he proportions an volume of mortar by the sum of the numerals of numerals. Materials for 12 mm thick plastering in wall for 100 sa ™—~ = 1.2 cu m. Adding 30% to fill up = 1.56 cu m. Increasing by,25% the total dry volume = 1.95 Wet mixed mortar for uniform laye joints, uneven surfaces, et, 30 cu m, sand = .30 x 6= the quantity of mortar comes to 1.2 + 36 eu m= 2,00 cu m (Say), For 1 : 6 cement sand mortar, Cement = 746 for other proportions may be are given in the following page (Page 499). -alculated. The quantities 1.80 cu m. Similarly, the quantities of materials of materials for different proportions Materials for 20 mm thick plastering in wall for 100 sq 1" — ‘Aa the thickness of plaster is move, 20% of mortar SY be taken to fill up the joints, unevenness, etc. The quantity of wet mortar is equal 10 200 x 02 + 20% = 2.00 + 0.4 = 2.40 + 0,60 = 3.00 cu m. The quantities of each material of mortar may 2.40 cu m. Increasing by 2596 the dry volume y be found by usual method. For rich mortar plastering, the quantities of materials will be less as the cement will Rich Mortar. — n sand and the reduction in volume of dry mortar will be less. be in excess than the voids it Ceiling plastering 12 mm thick for 100 39. — For plastering in R.C.C. ceiling the unevenness of Jf wet mortar surfaces will be less and 20% extra mortar may be taken to get even surface. The quantity o is equal to 100 x 012 + 20% = 1.2-+.24= 144 cum Increasing by 25% the dry volume = 1.44 +036 = 1.80 cum. For 6 mm thick plastering. R.C.C. ceiling the quantity of dry mortar may be taken as 1.00 cum For plastering in floor over lime concrete the same quantity of mortar as for wall may be taken there will be sufficient unevenness in the surface of lime concrete. at cement flooring. — For neat cement finishing in floor or dado or skirting, the thickness of met Ne sqm cement layer may be taken as 1.5 mm ('/") thick, therefore, the cement paste requirement for 100 = 100 x .0015 = .15 cu m. Dry volume of cement increased by 25% = 15 + 15 x4 =.19. cu = bags per 100 sq m. 2 cu m (say) =

You might also like