Business Blueprint - Material Management
Business Blueprint - Material Management
Version History
Ver. Ver. Changed Change Description Filename
No. Date By
1.0 06/01/10 Initial Draft ACC-BBP-MM-V1.0
20100106.doc
1.1 12/01/10 Rajkumar. Changes in the following section ACC-BBP-MM-V1.1
A 4.2.1,4.2.10,5.2.1,5.2.13,6.2.1,6.7,6.13, 20100112.doc
7.2.1,7.2.8,7.13,8.2.1,8.2.10,8.13,9.2.1,
9.13,10.2.1,10.2.7,10.13,11.13,12.13,1
3.13
1.2 14/01/10 Rajkumar. Changes in the following section ACC-BBP-MM-V1.2
A 5.2.13,5.2.9,4.7.18,5.13,4.13,5.2.15.2,6 20100116.doc
.2.7,6.13,7.2.8,7.2.10,7.13,8.2.12,8.13,
9.2.6,10.2.7,10.2.9.2,10.13,11.13
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Table of Contents
1 Introduction .................................................................................................................. 6
1.1 Abbreviations Used .................................................................................................. 7
2 Organization Structure ................................................................................................. 8
3 Master Data ................................................................................................................. 9
3.1 Material Master (MD-MM-01).................................................................................... 9
3.2 Vendor Master (MD- MM -02) ................................................................................. 12
3.3 Source List (MD- MM -03) ...................................................................................... 14
3.4 Purchase Info Record (MD- MM -04) ...................................................................... 15
3.5 Service Master (MD- MM -05) ................................................................................ 16
4 Project Procurement Material via Quotation (ID: MM-01) ........................................... 18
4.1 Project Procurement Material via Quotation: AS-IS ................................................ 18
4.2 Project Procurement Material via Quotation: TO-BE ............................................... 19
4.3 Risk and Assumptions ............................................................................................ 30
4.4 Changes to Existing Organization .......................................................................... 30
4.5 Input/Data required from other Functions (If any) ................................................... 30
4.6 Output from this function send to others (If any) ..................................................... 30
4.7 System Configuration Considerations..................................................................... 31
4.8 Reports Required from this Business Process ........................................................ 38
4.9 Forms/Documents Printed from this Business Process .......................................... 39
4.10 Interfaces Required for this Business Process .................................................... 39
4.11 Enhancement Required for this Business Process .............................................. 40
4.12 Data Conversion Consideration .......................................................................... 40
4.13 Authorization Specification .................................................................................. 40
4.14 Sign Off for this Business Process ...................................................................... 41
5 Project Procurement - Material via Contract (ID: MM-02) ........................................... 42
5.1 Project Procurement – Material via Contract: AS-IS ............................................... 42
5.2 Project Procurement – Material via Contract: TO-BE .............................................. 43
5.3 Risk and Assumptions ............................................................................................ 54
5.4 Changes to Existing Organization .......................................................................... 55
5.5 Input/Data required from other Functions (If any) ................................................... 55
5.6 Output from this function send to others (If any) ..................................................... 55
5.7 System Configuration Considerations..................................................................... 55
5.8 Reports Required from this Business Process ........................................................ 55
5.9 Forms/Documents Printed from this Business Process .......................................... 56
5.10 Interfaces Required for this Business Process .................................................... 56
5.11 Enhancement Required for this Business Process .............................................. 56
5.12 Data Conversion Consideration .......................................................................... 57
5.13 Authorization Specification .................................................................................. 57
5.14 Sign Off for this Business Process ...................................................................... 58
6 Project Procurement Consumables General – (ID: MM-03) ....................................... 58
6.1 Project Procurement – Consumables General: AS-IS............................................. 58
6.2 Project Procurement – Consumables General: TO-BE ........................................... 60
6.3 Risk and Assumptions ............................................................................................ 69
6.4 Changes to Existing Organization .......................................................................... 69
6.5 Input/Data required from other Functions (If any) ................................................... 69
6.6 Output from this function send to others (If any) ..................................................... 69
6.7 System Configuration Considerations..................................................................... 69
6.8 Reports Required from this Business Process ........................................................ 69
2
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
13.6 Output from this function send to others (If any)................................................ 130
13.7 System Configuration Considerations ............................................................... 130
13.8 Reports Required from this Business Process .................................................. 130
13.9 Forms/Documents Printed from this Business Process ..................................... 130
13.10 Interfaces Required for this Business Process .................................................. 131
13.11 Enhancement Required for this Business Process ............................................ 131
13.12 Data Conversion Consideration ........................................................................ 131
13.13 Authorization Specification ................................................................................ 131
13.14 Sign Off for this Business Process .................................................................... 132
14 Physical Inventory – (ID: MM-11) ............................................................................. 133
14.1 Physical Inventory: AS-IS.................................................................................. 133
14.2 Physical Inventory: TO-BE ................................................................................ 134
14.3 Risk and Assumptions ...................................................................................... 135
14.4 Changes to Existing Organization ..................................................................... 136
14.5 Input/Data required from other Functions (If any) .............................................. 136
14.6 Output from this function send to others (If any)................................................ 136
14.7 System Configuration Considerations ............................................................... 136
14.8 Reports Required from this Business Process .................................................. 136
14.9 Forms/Documents Printed from this Business Process ..................................... 136
14.10 Interfaces Required for this Business Process .................................................. 137
14.11 Enhancement Required for this Business Process ............................................ 137
14.12 Data Conversion Consideration ........................................................................ 137
14.13 Authorization Specification ................................................................................ 137
14.14 Sign Off for this Business Process .................................................................... 138
15 Training Strategy ..................................................................................................... 139
5
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
1 Introduction
mapped in the below listed Business Processes. Individual Business Processes have been
discussed in detail.
Abbreviation Description
ACC Al-Arab Contracting Company LTD
ABA Al Bilad Arabia
PR Purchase Requisition
PO Purchase Order
GR Goods Receipt
GI Goods Issue
IR Invoice Receipt
MD Material Document
AD Accounting Document
CM Commercial Manager
PM Procurement Manager
FM Finance Manager
GM General Manager
7
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
2 Organization Structure
Client
100
Purchase Groups
ACC-KSA Company
1100
1. 100 –
2. 101 –
ACC-KSA Corporate Purchase 3. 102 –
Organization 4. 103 –
1000 5. 104 –
6. 105 –
7. 106 –
8. 107 –
Plants
Central Region Northern Region Eastern Region Western Region Southern Region
1100 1101 1102 1103 1104
Storage Locations
Company Code
The smallest organizational unit for which a complete self-contained set of accounts can be drawn
up for purposes of external reporting. This involves recording all relevant transactions and
generating all supporting documents for financial statements such as balance sheets and profit and
loss statements
Plant
Plant is an organizational unit in Logistics that subdivides the enterprise from the viewpoint of
production, inventory management, material requirements planning and plant maintenance. The
plant produces materials or provides materials and/or services
Purchase Organisation
Purchasing Organization unit in Logistics subdivides an enterprise according to the requirements of
purchasing. A purchasing organization procures materials and services, negotiates conditions of
purchase with vendors, and bears responsibility for such transactions. Plant specific Purchase
Organisation is suitable for ACC requirement
Purchase Group
8
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
The purchasing organization is further subdivided into purchasing groups (buyer groups), which are
responsible for day-to-day buying activities i.e. Buyers are the purchasers. A purchasing group can
also act for several purchasing organizations. At ACC, purchase group are classified based on the
departments.
Storage Location
An organizational unit allowing the differentiation of material in stocks within a plant. This is the
organizational unit at the inventory is managed on the quantity basis. The storage locations are
listed in the System Configuration Consideration section.
3 Master Data
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
9
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
10
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
It is used by the system in managing stocks and carrying out all computations, other departments
can use their own units of measure.
Unit of Issue
Unit of Measure in which a material is issued from the stores. It is the default unit in conjunction with
goods issues and physical Inventory activities.
Order Unit
Unit of Measure in which a material is ordered. It is the default unit in purchasing activities.
Sales Unit
Unit of measure in which a material is sold. It automatically appears as the default in a sales order
and it can be changed.
11
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Master Data
Master Data Description T Code Description
ID Who/Role
MM01 Create
MD-MM-01 Material Master MM02 Change
MM03 Display
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
12
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
control account can be assigned to each vendor. And we can maintain vendor customer relation
and vendor bank details in vendor master.
Terms of Payment
It is a key for defining payment terms composed of cash discount percentages and payment periods.
Details of Terms of payments provided by ACC. Terms of payment could be used on different
options available in the SAP standard system.
Master Data
Master Data Description T Code Description
ID Who/Role
XK01 Create
MD-MM-02 Vendor Master
XK02 Change
13
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Master Data
Master Data Description T Code Description
ID Who/Role
XK03 Display
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
Master Data
Master Data Description T Code Description
ID Who/Role
ME01 Create
MD-MM-03 Source List ME02 Change
ME03 Display
14
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
Standard
Standard info record contains information for standard purchase orders. The info records can be
created for materials and services with and without master records.
These details shall be maintained for a Plant and Purchasing Organization. Details like Prices &
other conditions, under and over delivery tolerances, are stored in these records. The information in
the latest purchasing info record for a combination of vendor and material for that purchasing
organization and plant shall always be defaulted when creating a Purchase Order.
Purchasing info records shall be created manually or automatically. Manual Creation shall be done
when a purchasing info record doesn’t exist already for a vendor – material combination for a
purchasing organization and plant. Manual Update can be done when there are changes in the
values of the Purchasing Info Records.
Automatic updation/creation is also possible at the time of creation of Quotation, Purchase Order or
Contract for those records that already exist. Purchasing Info Records for multiple validity periods
can be maintained at the same time.
15
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Master Data
Master Data Description T Code Description
ID Who/Role
ME11 Create
MD-MM-04 Purchase Info Record ME12 Change
ME13 Display
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
16
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
category shall be maintained. It controls the number range whether the number range is internal or
external.
At ACC, Service Categories are classified in to three. The following are the list of Service Category
and the number ranges. Description which describes the service in brief
Master Data
Master Data Description T Code Description
ID Who/Role
Create
MD-MM-05 Service Master AC03 Change
Display
17
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
18
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Purchase Requisition
Automatic
Processing MM-01-02
MM-01-00 Release- Civil& Architect /
Electro Mechanical
Material Submittal For Approval NO
Verify Material Submittal
YES
MM-01-03
Print RFQ
MM-01-07
MM-01-09
NO
Release-
Commercial Manager
YES
MM-01-11 MM-01-10
NO
Print Purchase Order Release-
General Manager
MM-01-12
MM-01-15
Invoice Processing
19
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
➢ Planned date
➢ Lead time
➢ Design drawing approval
➢ Material sample approval
➢ Approval exclusion
➢ Vendor
➢ Client code
This is the gap identified during the workshops but for being a mandatory business requirement it
shall be consider for development. The formats and functionalities will be captured in function
requirement specification (FRS) which will be duly approved by business users.
The Purchase Requisition release level for Civil and Architecture Materials is listed below
The Purchase Requisition release level for Electro-Mechanical Materials is listed below
➢ RFQ header
Contains general information on the RFQ, such as the vendor’s address
➢ Items
Contain the total quantities and delivery dates for the materials or services specified in the RFQ.
This component is used to manage and compare requests for quotation (RFQs) issued to vendors
and the quotations submitted by latter in response to them. In collective number field project code or
particular activity element has to be maintained for future reference like compare quotation.
21
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
A quotation consists of items in which the total quantity and delivery date of an offered material or
service are specified. An item of a quotation may contain a delivery schedule made up of a number
of schedule lines in which the total quantity is broken down into smaller quantities to be delivered
on the specified dates over a certain period.
Compare the prices from all quotations received as a result of a competitive bidding process using
the price comparison list. The comparison list ranks the quotations by item from lowest to highest
price.
Prerequisites
Before generate the price comparison list, the following things need to be consider
Each quotation should have pricing data for the same item. Only then is the correct interpretation
of the mean and total values possible.
If quotations 1 and 2 have pricing data for item 1, but quotation 3 only has price information for
item 2, then the system does not have enough information to accurately compare the prices of all
three quotations.
If a quotation is submitted in a foreign currency, the price is automatically translated into the
currency of the company code, which is determined by purchasing organization.
Reference quotation
Compare the quotations within the list with a sample quotation. The system displays the
percentage deviation between each quotation in the list and the sample quotation.
Mean/minimum value quotation
The price comparison list can also display a "fictitious" quotation reflecting the average or minimum
value of all quotations. Select either the Mean or Minimum value quotation field to choose the type
of fictitious quotation.
Percentage basis
The price comparison list displays the percentage of each item in relation to the maximum,
minimum, or average price. To determine the display type, enter one of the following
➢ “+” Highest value for each item is the 100% value
➢ “-“ Lowest value for each item is the 100% value
➢ +"_" Mean value for each item is the 100% value
Price Comparison
Collective number field will be reference field, which will be used to list down the RFQ’s maintained
with same collective number in price comparison. Eventually price comparison can be done based
on the collective number. Select the appropriate field to specify which of the following should be
taken into account in determining the comparison price.
➢ Cash discount
➢ Delivery costs
➢ Effective price
The information shown in the header relates to the entire PO. For example, the terms of payment
and the delivery terms are defined in the header.
A procurement type is defined for each of the document items. The following procurement types
exist
➢ Standard
➢ Subcontracting
➢ Stock transfer
➢ External service
Delivery of the total quantity of material (or performance of the total volume of services) specified in
a purchase order item can be spread over a certain period in a delivery schedule, consisting of
lines indicating the individual quantities with their corresponding planned delivery dates.
Conditions
Conditions can apply at various levels
➢ To the entire purchase order
➢ At item level, to the material to be supplied
This component enables to store pricing stipulations agreed with the vendor such as applicable
discounts or surcharges, or stipulations regarding the payment of freight costs in the system. It can
be enter in quotations, outline purchase agreements, and info records. The option of entering
general conditions is at vendor level, for example. The system then applies the conditions in
determining the price in purchase orders (POs). The further conditions are in the PO itself
Prices shall be of three types
➢ Gross Price which is exclusive of Discounts or surcharges
➢ Net Price inclusive of surcharges, discounts, taxes
➢ Effective Price which includes the Net Price but taking delivery costs, cash discount
and other incidental costs
Pricing conditions shall be maintained in the purchasing info records or in the header or item level as
applicable at the time of PO creation.
Freight
Freight is to be maintained as a condition type. The Planned Freight costs shall be booked in the
same Purchase Order for which the procurement is to be done. In cases where the material
carrying party is different from the one on whom the PO is raised the Freight Vendor shall also be
maintained in the same PO.
For uncertain freights, approximate/minimal freight shall be entered in the PO, for the internal
system purpose and final PO for vendor shall be sent without mentioning the freight. And when the
actual freight comes to be known, during invoice entry, the correct freight amount can be entered.
The freight invoice will be booked as soon as the material is received in the stores and the value will
be updated in the stocks.
Discount
The Discount condition records shall be maintained with conditions and values associated with
conditions. While processing a transaction, the system will search for valid record and as soon as it
finds the record matching the condition of sale it should return a discount value. Some of the
discounts can be maintained at the time of preparing the purchasing document.
Insurance
23
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
The Insurance conditions records shall be maintained with conditions and values associated with
conditions. The calculation of Insurance value is based on the purchase order value plus freight
value of the goods.
Customs Duty
The Customs conditions records shall be maintained with conditions and values associated with
conditions. Scaling conditions shall be maintained for this condition on the purchasing documents.
Transportation
The Transportation conditions records shall be maintained with conditions and values associated
with conditions. The calculation of transportation value is based on the quantity which is
maintained in the purchase order.
Vendor Confirmations
Vendors can issue confirmations to the relevant purchasing organization indicating their
compliance or non-compliance with scheduled delivery dates.
PO History
The transactions following on from a purchase order are documented in the PO history on an item-
specific basis.
Partner Roles
Instead of the vendor as the order recipient, other business partners can appear in various partner
roles (e.g. goods supplier or invoicing party).
Plant
In the purchase order, each item is destined for a certain plant. Each plant belongs to a company
code, to which the vendor’s (creditor’s) invoice is directed.
Texts
Enter text in a purchase order directly or change texts that are suggested by the system. There are
two kinds of text
➢ Header text: applies to the entire document. Project Address has to be maintained in
Purchase Order header text in Delivery text value for printing purpose
➢ Item text: applies only to the relevant item
Define texts appearance and order on printouts in Customizing for Purchasing.
release Purchase order. At the time of creating Asset Purchase Order the relevant cost centre will
be incorporated. Goods Receipt is not required for asset purchase, Invoice has been released
directly for asset purchase.
General purchases will cover the consumables materials that relates to a project specific or
general department.
At the time of Purchase Order creation, system will capture from various masters e.g. purchasing
info record, vendor master etc. This can be changed subsequently change history of Purchase
order is available at header as well as item level.
The Purchase Order release level for Civil and Architecture Materials is listed below
The Purchase Order release level for Electro Mechanical Materials is listed below
The Purchase Order release level for General Materials is listed below
26
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Subsequent debit shall be used for transactions where the Original invoice has already been
cleared and a subsequent invoice has been raised by the vendor for materials already sent.
Example: Rate change with retrospective effect.
Subsequent Credit shall be used when any deduction is to be levied on the vendor.
There are 3 options that can be used for Invoice Verification.
➢ Goods / Service Item
➢ Delivery Costs
➢ Goods/Service Item + Delivery costs
Based on the Goods/Service and delivery vendors, the option shall be selected.
Vendor invoice shall be entered with reference to Purchase Order. More than one purchase order
can also be processed at one time for one vendor. If required the vendor can be changed from the
original vendor to whom the payment is to be done. If any Invoice verification has been done for any
GR for a PO, the quantity for this GR will not appear in the list. In case where the freight vendor is
different, only those entries related to the delivery costs will be chosen for the payments to this
vendor. It is also possible to raise credit memo against the goods returned to the vendor. In case of
Subsequent debit/credit to be made to the vendor account, (reasons can be change of rates for
previous supplies made, etc), the entries are made using the Invoice Verification. Adjustments to
other accounts like Insurance claims Account, etc. can be entered with invoice verification.
➢ A subsequent debit/credit arises if a transaction has already been settled, and a further
invoice or credit memo is received afterwards
➢ A subsequent debit/credit changes the total invoice value of a purchase order item; the total
invoice quantity remains unchanged. Therefore, only a value-based update of the purchasing
transaction takes place. There is no quantity-based update
➢ An invoice is entered as a subsequent debit if a purchase order item has already been
invoiced and further costs are incurred. (Example: A vendor has inadvertently invoiced at too
low a price and then sends a second invoice for the difference.)
➢ Enter a credit memo as a subsequent credit if a purchase order item was invoiced at too high
a price and later a credit memo is received. (Example: A vendor has inadvertently invoiced at
too high a price and then sends a credit memo for the difference.)
➢ When a subsequent debit/credit is entered, the system suggests the entire invoiced quantity,
but no value. The maximum quantity that can be subsequently debited or credited is the
quantity that has already been invoiced. A subsequent debit/credit for a purchase order item
can be entered if an invoice has already been posted for that item
➢ A subsequent debit/credit cannot refer to a particular invoice
➢ When a subsequent debit/credit is posted, the system posts the invoice amount to the vendor
account
➢ If the quantity to be subsequently debited or credited has already been delivered, the system
makes the offsetting entry to the stock account or the price difference account, depending on
the type of price control used
➢ For purchase order items with account assignment, the system makes the offsetting entry to
the consumption account
➢ If the quantity for subsequent debit/credit has not yet been delivered, the posting is made to
the GR/IR clearing account. Later, when the goods receipt is posted - depending on the price
27
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
control - the system posts the debit/credit to the stock account or the price difference
account, or for PO items with account assignment it posts to the consumption account
28
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
During automatic distribution to the invoice items, the amounts in the items are automatically
increased by the delivery costs part during the invoice post, and it is treated as price variances.
The system does not perform a price check after automatically distributing the delivery costs.
Unplanned delivery costs that were distributed to individual items are not listed separately in the
PO history. They are already a part of the calculated value.
If the unplanned delivery costs are posted to a separate G/L account, the unplanned delivery costs
are not debited to the stocks or the account assignment objects. The system does not show
unplanned delivery costs that are posted to a separate G/L account, in the PO history.
Invoice post contains only unplanned delivery costs with reference to a purchase order, if at least
one invoice has already been posted for the purchase order. Otherwise all the invoiced values
would be zero, and it would not be possible to distribute the delivery costs. The system apportions
unplanned delivery costs to the items in proportion to the total value invoiced so far and the values
in the current invoice. The system can also be able to distribute unplanned delivery costs manually
to individual invoice items, by changing the amounts of the invoice items.
In the case of unplanned delivery costs, the costs are not split up according to their origin. The way
in which the system posts unplanned delivery costs depends on the settings in Customizing. They
are either distributed automatically to the individual invoice items, or posted to a separate G/L
account. During automatic distribution, the unplanned delivery costs are posted according to the
price control.
For a material with moving average price, the system posts to the stock account as long as there is
a stock coverage.
Business
Business Process Step Input Dependency:
Process T Code Who/Role
Description Output :
Step ID
Project
MM-01-01 Auto generated PR ME53N
Manager
MM-01-02 Release PR ME54N Civil/Architect
Purchase
MM-01-03 Create RFQ ME41 With reference to PR
Officer
Procurement
MM-01-04 Release RFQ (PM) ME45
Manager
Procurement
MM-01-05 Print RFQ ME9A With reference to RFQ
Manager
Purchase
MM-01-06 Maintain Quotation ME47 With reference to RFQ
Officer
Procurement
MM-01-07 Compare Quotation ME49 With reference to RFQ
Manager
Purchase With reference to
MM-01-08 Purchase Order ME21N
Officer Quotation
Procurement
MM-01-09 Release PO Level-1 ME29N
Manager
Commercial
Manager or
MM-01-10 Release PO Level-2 ME29N Electro-
Mechanical
Manager
29
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Business
Business Process Step Input Dependency:
Process T Code Who/Role
Description Output :
Step ID
General
MM-01-11 Release PO Level-3 ME29N
Manager
Purchase
MM-01-12 Print PO ME9F With reference to PO
Officer
MM-01-13 Shipment Control File Z With reference to PO
Warehouse
MM-01-14 Goods Receipt MIGO With reference to PO
Manager
Warehouse
MM-01-15 Print GRN MB90 With reference to GRN
Manager
Procurement
MM-01-16 Invoice Receipt MIRO With reference to PO
Accountant
101 Electro-Mechanical
102
03000 Concrete
04000 Masonry
05000 Metals
09000 Finishes
10000 Specialties
11000 Equipments
12000 Furnishings
32
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
21000 Vehicles
24000 Tools
25000 Asset
33
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
EXW Ex-Works
CO Coil
UP Unpacked
NT Nylon Net
SM Sheet Metal
TO Todd
TR Tankers
BX Box Packing
ACC ACC
34
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
1000000 2000000
4.7.16 Conditions
ZINS Insurance
36
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
EM Electro-Mechanical
4.7.17.1 Characteristics-PR
Char.Code Description
4.7.17.2 Class
ACC_PR Class
PM Procurement Manager
CM Commercial Manager
GM General Manager
For Electro-Mechanical material
EM Electro-Mechanical Manager
CM Commercial Manager
GM General Manager
4.7.18.1 Characteristics-PO
Char.Code Description
37
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Char.Code Description
VAL_PO Value
4.7.18.2 Class
ACC_PO Class
Report Format
Report Report (Attach Document:
Report ID T Code Excel, word, Image..) Gap Identified
Name Description
Purchase Purchase
REP-MM-
Document ME2M Document By SAP Standard
01
By Material Material
Purchase Purchase SAP Standard
REP-MM-
Document ME2L Document By
02
By Vendor Vendor
Quotation SAP Standard
REP-MM- Quotation By
By Material ME4C
03 Material Group
Group
Purchase Purchase SAP Standard
REP-MM-
Document ME2J Document by
04
by Project Project
Purchase SAP Standard
REP-MM- Purchase
Document ME2K
05 Document General
General
Purchase SAP Standard
Purchase
REP-MM- Document
ME2C Document by
06 by Material
Material Group
Group
Purchase SAP Standard
Purchase
REP-MM- Document
ME2B Document by
07 by Tracking
Tracking Number
Number
38
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Report Format
Report Report (Attach Document:
Report ID T Code Excel, word, Image..) Gap Identified
Name Description
Format
T (Attach Document:
Form ID FRM Name FRM Description Gap ID
Code Excel, word,
Image..)
Format
T (Attach Document:
Interface ID INT Name INT Description Gap ID
Code Excel, word,
Image..)
39
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Format
T (Attach Document:
Interface ID INT Name INT Description Gap ID
Code Excel, word,
Image..)
NA NA NA
Format
Enhancement T (Attach Document:
ENH Name ENH Description Gap ID
ID Code Excel, word,
Image..)
Shipment Z Shipment Control
ENH-MM-01 GAP-MM-04-E
Control File File
Material Z
ENH-MM-02 Material Submittal GAP-MM-05-E
Submittal
40
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Consultant-
1 Rajkumar Asokan ABA
MM
41
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
42
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Purchase Requisition
Automatic
Processing MM-02-02
Release- Civil& Architect /
MM-02-00 Electro Mechanical
For Approval (Verify Material Submittal) NO
Material Submittal
YES
MM-02-03
Contract Processing
Not Approved
MM-02-12
Not Approved
For Approval Purchase Order Processing
MM-02-08
Release- NO
MM-02-13
Procurement
Release- NO
Manager
YES For Approval Procurement
Manager
MM-02-09
YES
NO
Release- MM-02-14
Commercial Manager NO
Release-
YES Commercial Manager
MM-02-10
YES
NO
Release- MM-02-15
General Manager NO
Release-
General Manager
MM-02-11
MM-02-16
NO
Print Contract Print Purchase Order
MM-02-20
Invoice Processing
43
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
➢ Planned date
➢ Lead time
➢ Design drawing approval
➢ Material sample approval
➢ Approval exclusion
➢ Vendor
➢ Client code
This is the gap identified during the workshops but for being a mandatory business requirement it
shall be consider for development. The formats and functionalities will be captured in function
requirement specification (FRS) which will be duly approved by business users.
The Purchase Requisition release level for Civil and Architecture Materials is listed below
44
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
The Purchase Requisition release level for Electro-Mechanical Materials is listed below
➢ RFQ header
Contains general information on the RFQ, such as the vendor’s address
➢ Items
Contain the total quantities and delivery dates for the materials or services specified in the RFQ.
This component is used to manage and compare requests for quotation (RFQs) issued to vendors
and the quotations submitted by latter in response to them. In collective number field project code or
particular activity element has to be maintained for future reference like compare quotation. The
RFQ release level are listed below
45
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
of schedule lines in which the total quantity is broken down into smaller quantities to be delivered
on the specified dates over a certain period.
Compare the prices from all quotations received as a result of a competitive bidding process using
the price comparison list. The comparison list ranks the quotations by item from lowest to highest
price.
Prerequisites
Before generate the price comparison list, the following things need to be consider
Each quotation should have pricing data for the same item. Only then is the correct interpretation
of the mean and total values possible.
If quotations 1 and 2 have pricing data for item 1, but quotation 3 only has price information for
item 2, then the system does not have enough information to accurately compare the prices of all
three quotations.
If a quotation is submitted in a foreign currency, the price is automatically translated into the
currency of the company code, which is determined by purchasing organization.
Reference quotation
Compare the quotations within the list with a sample quotation. The system displays the
percentage deviation between each quotation in the list and the sample quotation.
Mean/minimum value quotation
The price comparison list can also display a "fictitious" quotation reflecting the average or minimum
value of all quotations. Select either the Mean or Minimum value quotation field to choose the type
of fictitious quotation.
Percentage basis
The price comparison list displays the percentage of each item in relation to the maximum,
minimum, or average price. To determine the display type, enter one of the following
➢ “+” Highest value for each item is the 100% value
➢ “-“ Lowest value for each item is the 100% value
➢ +"_" Mean value for each item is the 100% value
Price Comparison
Collective number field will be reference field, which will be used to list down the RFQ’s maintained
with same collective number in price comparison. Eventually price comparison can be done based
on the collective number. Select the appropriate field to specify which of the following should be
taken into account in determining the comparison price.
➢ Cash discount
➢ Delivery costs
➢ Effective price
5.2.9 Contract
The procurement of the agreed material is done by raising the PO as per contract terms and
conditions. A form of outline purchase agreement under which materials are procured on
predetermined dates within a certain time period for a certain Quantity or Value of contract
The contract release level for Civil and Architecture & General Materials are listed below
46
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
The contract release level for Electro-Mechanical Materials are listed below
Document types will have separate numbering series. Quantity or Value contract document type will
be used to execute this business process. Refer system configuration consideration.
47
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
be enter in quotations, outline purchase agreements, and info records. The option of entering
general conditions is at vendor level, for example. The system then applies the conditions in
determining the price in purchase orders (POs). The further conditions are in the PO itself
Prices shall be of three types
➢ Gross Price which is exclusive of Discounts or surcharges
➢ Net Price inclusive of surcharges, discounts, taxes
➢ Effective Price which includes the Net Price but taking delivery costs, cash discount
and other incidental costs
Pricing conditions shall be maintained in the purchasing info records or in the header or item level as
applicable at the time of PO creation.
Freight
Freight is to be maintained as a condition type. The Planned Freight costs shall be booked in the
same Purchase Order for which the procurement is to be done. In cases where the material
carrying party is different from the one on whom the PO is raised the Freight Vendor shall also be
maintained in the same PO.
For uncertain freights, approximate/minimal freight shall be entered in the PO, for the internal
system purpose and final PO for vendor shall be sent without mentioning the freight. And when the
actual freight comes to be known, during invoice entry, the correct freight amount can be entered.
The freight invoice will be booked as soon as the material is received in the stores and the value will
be updated in the stocks.
Discount
The Discount condition records shall be maintained with conditions and values associated with
conditions. While processing a transaction, the system will search for valid record and as soon as it
finds the record matching the condition of sale it should return a discount value. Some of the
discounts can be maintained at the time of preparing the purchasing document.
Insurance
The Insurance conditions records shall be maintained with conditions and values associated with
conditions. The calculation of Insurance value is based on the purchase order value plus freight
value of the goods.
Customs Duty
The Customs conditions records shall be maintained with conditions and values associated with
conditions. Scaling conditions shall be maintained for this condition on the purchasing documents.
Transportation
The Transportation conditions records shall be maintained with conditions and values associated
with conditions. The calculation of transportation value is based on the quantity which is
maintained in the purchase order.
Vendor Confirmations
Vendors can issue confirmations to the relevant purchasing organization indicating their
compliance or non-compliance with scheduled delivery dates.
PO History
The transactions following on from a purchase order are documented in the PO history on an item-
specific basis.
Partner Roles
48
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Instead of the vendor as the order recipient, other business partners can appear in various partner
roles (e.g. goods supplier or invoicing party).
Plant
In the purchase order, each item is destined for a certain plant. Each plant belongs to a company
code, to which the vendor’s (creditor’s) invoice is directed.
Texts
Enter text in a purchase order directly or change texts that are suggested by the system. There are
two kinds of text
➢ Header text: applies to the entire document. Project Address has to be maintained in
Purchase Order header text in Delivery text value for printing purpose
➢ Item text: applies only to the relevant item
Define texts appearance and order on printouts in Customizing for Purchasing.
The Purchase Order release level for Civil and Architecture Materials are listed below
The Purchase Order release level for General Materials are listed below
*Release level will be triggered based on the permitted value to release the purchase order
*For example if the permitted value limit is 1SAR – 10,000SAR for Procurement Manager, the
release will be done only by the Procurement Manager. Now if the value is more than 10,000 SAR
and less than 20,000 SAR, the release will be done by first the Procurement Manager and then the
Commercial Manager and if the value is more than 20,000 SAR, the release will be done by
Procurement Manager, Commercial manager & then General Manager.
50
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Vendor invoice shall be entered with reference to Purchase Order. More than one purchase order
can also be processed at one time for one vendor. If required the vendor can be changed from the
original vendor to whom the payment is to be done. If any Invoice verification has been done for any
GR for a PO, the quantity for this GR will not appear in the list. In case where the freight vendor is
different, only those entries related to the delivery costs will be chosen for the payments to this
vendor. It is also possible to raise credit memo against the goods returned to the vendor. In case of
Subsequent debit/credit to be made to the vendor account, (reasons can be change of rates for
previous supplies made, etc), the entries are made using the Invoice Verification. Adjustments to
other accounts like Insurance claims Account, etc. can be entered with invoice verification.
➢ A subsequent debit/credit changes the total invoice value of a purchase order item; the total
invoice quantity remains unchanged. Therefore, only a value-based update of the purchasing
transaction takes place. There is no quantity-based update.
➢ An invoice is entered as a subsequent debit if a purchase order item has already been
invoiced and further costs are incurred. (Example: A vendor has inadvertently invoiced at too
low a price and then sends a second invoice for the difference.)
➢ Enter a credit memo as a subsequent credit if a purchase order item was invoiced at too high
a price and later a credit memo is received. (Example: A vendor has inadvertently invoiced at
too high a price and then sends a credit memo for the difference.)
➢ When a subsequent debit/credit is entered, the system suggests the entire invoiced quantity,
but no value. The maximum quantity that can be subsequently debited or credited is the
quantity that has already been invoiced. A subsequent debit/credit for a purchase order item
can be entered if an invoice has already been posted for that item.
➢ A subsequent debit/credit cannot refer to a particular invoice.
➢ When a subsequent debit/credit is posted, the system posts the invoice amount to the vendor
account.
➢ If the quantity to be subsequently debited or credited has already been delivered, the system
makes the offsetting entry to the stock account or the price difference account, depending on
the type of price control used.
➢ For purchase order items with account assignment, the system makes the offsetting entry to
the consumption account.
➢ If the quantity for subsequent debit/credit has not yet been delivered, the posting is made to
the GR/IR clearing account. Later, when the goods receipt is posted - depending on the price
control - the system posts the debit/credit to the stock account or the price difference
account, or for PO items with account assignment it posts to the consumption account.
52
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
customs authority). In Invoice Verification, these delivery costs can also be posted to a different
invoicing party to different vendor on the Detail tab page.
Planned delivery costs can be divided into
➢ Freight costs
➢ Customs
Delivery costs can be invoiced in one of three ways
➢ Fixed amount, independent of scope of supply
➢ Quantity-dependent amount
➢ Percentage of value of goods to be delivered
For planned delivery costs, at goods receipt the system posts relevant provisions to a clearing
account. Depending on the origin type, specific clearing account can be customized. This clearing
account is balanced when the corresponding invoice is posted. If no price differences arise
between the planned delivery costs from the purchase order and the requested delivery costs in
the invoice, the material master record does not change at the time of invoice. If price differences
do arise, these are treated in the same way as price variances for ordered materials.
Unplanned delivery costs are delivery costs that were not agreed upon in the purchase order, and
that are first entered at invoice receipt. Enter the total amount of the unplanned delivery costs on
the Detail tab page in invoice.
System automatically posts the unplanned delivery costs to the individual items, or to a separate
G/L account based on the requirement.
During automatic distribution to the invoice items, the amounts in the items are automatically
increased by the delivery costs part during the invoice post, and it is treated as price variances.
The system does not perform a price check after automatically distributing the delivery costs.
Unplanned delivery costs that were distributed to individual items are not listed separately in the
PO history. They are already a part of the calculated value.
If the unplanned delivery costs are posted to a separate G/L account, the unplanned delivery costs
are not debited to the stocks or the account assignment objects. The system does not show
unplanned delivery costs that are posted to a separate G/L account, in the PO history.
Invoice post contains only unplanned delivery costs with reference to a purchase order, if at least
one invoice has already been posted for the purchase order. Otherwise all the invoiced values
would be zero, and it would not be possible to distribute the delivery costs. The system apportions
unplanned delivery costs to the items in proportion to the total value invoiced so far and the values
in the current invoice. The system can also be able to distribute unplanned delivery costs manually
to individual invoice items, by changing the amounts of the invoice items.
In the case of unplanned delivery costs, the costs are not split up according to their origin. The way
in which the system posts unplanned delivery costs depends on the settings in Customizing. They
are either distributed automatically to the individual invoice items, or posted to a separate G/L
account. During automatic distribution, the unplanned delivery costs are posted according to the
price control.
For a material with moving average price, the system posts to the stock account as long as there is
a stock coverage.
Business
Business Process Step Input Dependency :
Process T Code Who/Role
Description Output :
Step ID
53
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Business
Business Process Step Input Dependency :
Process T Code Who/Role
Description Output :
Step ID
Project
MM-02-00 Material Submittal Z
Engineer
Project
MM-02-01 Auto generated PR ME53N
Manager
MM-02-02 Release PR ME54N Civil/Architect
Purchase
MM-02-03 Create RFQ ME41 With reference to PR
Officer
Procurement
MM-02-04 Release RFQ (PM) ME45
Manager
MM-02-05 Print RFQ ME9A PM/EM With reference to RFQ
Purchase
MM-02-06 Maintain Quotation ME47 With reference to RFQ
Officer
MM-02-07 Compare Quotation ME49 PM With reference to RFQ
Purchase
MM-02-08 Contract ME31K With reference to RFQ
Officer
With reference to
MM-02-09 Release Contract Level-1 ME35K PM
Contract
With reference to
MM-02-10 Release Contract Level-1 ME35K CM
Contract
With reference to
MM-02-11 Release Contract Level-2 ME35K GM
Contract
Purchase With reference to
MM-02-12 Print Contract ME9K
Officer Contract
Purchase With reference to
MM-02-13 Purchase Order ME21N
Officer Contract
MM-02-14 Release PO Level-1 ME29N PM/EM
54
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Reports described in business process MM-01 will also be used for this business process MM-
02.The additional forms specific for this business process is listed in below table
Report Format
Report T Report (Attach Document:
Report ID Excel, word, Image..) Gap Identified
Name Code Description
REP-MM- Contract by
ME3L Contract by Vendor SAP Standard
16 Vendor
REP-MM- Contract by ME3M Contract by SAP Standard
55
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Report Format
Report T Report (Attach Document:
Report ID Excel, word, Image..) Gap Identified
Name Code Description
17 Material Material
Forms described in business process MM-01 will also be used for this business process MM-02.The
additional forms specific for this business process is listed in below table
Format
T (Attach Document:
Form ID FRM Name FRM Description Gap ID
Code Excel, word,
Image..)
Format
T (Attach Document:
Interface ID INT Name INT Description Gap ID
Code Excel, word,
Image..)
NA
Enhancement described in business process MM-01 will also be used for this business process MM-
02.
Format
Enhancement T (Attach Document:
ENH Name ENH Description Gap ID
ID Code Excel, word,
Image..)
NA
56
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Data Conversion described in business process MM-01 will also be used for this business process
MM-02.The additional data conversion specific for this business process is listed in below table
Though we have captured all the gaps in this BBP document that are identified for supporting the
business process during workshops and individual interaction sessions, the above listed
Gaps/development elements will be consolidated in the FRICE Inventory list separately. This shall
further be evaluated and analyzed by the Project Management to include or exclude from the
present Implementation Scope
Consultant-
1 Rajkumar Asokan ABA
MM
SAP application. As this implementation is not just aimed to bring in an ERP application In the
company but to as well to refine the current business practices by adopting Best Business Practices
suggested by SAP with its varied experience and proven track record.
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
59
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
MM-03-01
For Approval
MM-03-02
MM-03-03
MM-03-05
NO
Release-
Commercial Manager
YES
MM-03-07 MM-03-06
NO
Print Purchase Order Release-
General Manager
MM-03-09 MM-03-08
MM-03-10
Invoice Processing
60
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
At ACC, all the consumable materials are non-stock material, whenever if the goods are received
the system will automatically book the charges in to the consumption account.
The Purchase Requisition release level for Civil and Architecture Materials is listed below
The Purchase Requisition release level for Electro-Mechanical Materials is listed below
61
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
62
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Discount
The Discount condition records shall be maintained with conditions and values associated with
conditions. While processing a transaction, the system will search for valid record and as soon as it
finds the record matching the condition of sale it should return a discount value. Some of the
discounts can be maintained at the time of preparing the purchasing document.
Insurance
The Insurance conditions records shall be maintained with conditions and values associated with
conditions. The calculation of Insurance value is based on the purchase order value plus freight
value of the goods.
Customs Duty
The Customs conditions records shall be maintained with conditions and values associated with
conditions. Scaling conditions shall be maintained for this condition on the purchasing documents.
Transportation
The Transportation conditions records shall be maintained with conditions and values associated
with conditions. The calculation of transportation value is based on the quantity which is
maintained in the purchase order.
Vendor Confirmations
Vendors can issue confirmations to the relevant purchasing organization indicating their
compliance or non-compliance with scheduled delivery dates.
PO History
The transactions following on from a purchase order are documented in the PO history on an item-
specific basis.
Partner Roles
Instead of the vendor as the order recipient, other business partners can appear in various partner
roles (e.g. goods supplier or invoicing party).
Plant
In the purchase order, each item is destined for a certain plant. Each plant belongs to a company
code, to which the vendor’s (creditor’s) invoice is directed.
Texts
Enter text in a purchase order directly or change texts that are suggested by the system. There are
two kinds of text
➢ Header text: applies to the entire document. Project Address has to be maintained in
Purchase Order header text in Delivery text value for printing purpose
➢ Item text: applies only to the relevant item
Define texts appearance and order on printouts in Customizing for Purchasing.
Project PO will cover the domestic and international procurement need of civil and architecture
materials, electro mechanical materials and work orders are account assigned to a respective
project WBS element & G/L account.
Asset purchases, Asset master record will be created by the Finance department and it will be
released for Procurement activities. Based on the Asset master record, purchase department will
release Purchase order. At the time of creating Asset Purchase Order the relevant cost centre will
be incorporated. Goods Receipt is not required for asset purchase, Invoice has been released
directly for asset purchase.
General purchases will cover the consumables materials that relates to a project specific or
general department.
At the time of Purchase Order creation, system will capture from various masters e.g. purchasing
info record, vendor master etc. This can be changed subsequently change history of Purchase
order is available at header as well as item level.
The Purchase Order release level for Civil and Architecture Materials are listed below
The Purchase Order release level for Electro Mechanical Materials are listed below
The Purchase Order release level for General Materials are listed below
64
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
At ACC, all the consumable materials are non-stock material, whenever if the goods are received
the system will automatically book the charges in to the consumption account. Stock will not get
updated in the system for consumable materials.
Other goods receipts include initial entry of stock balances, external goods receipts without a
purchase order.
If a material is delivered for a purchase order, it is important for all of the departments involved that
the goods receipt entry in the system references this purchase order, for the following reason
➢ Goods receiving can check whether the delivery actually corresponds to the order.
➢ The system can propose data from the purchase order during entry of the goods receipt (for
example, the material ordered, its quantity, and so on). This simplifies both data entry and
checking (over deliveries and under deliveries).
➢ The delivery is marked in the purchase order history. This allows the Purchasing
department to monitor the purchase order history and initiate reminder procedures in the
event of a late delivery.
➢ The vendor invoice is checked against the ordered quantity and the delivered quantity.
➢ The goods receipt is valuated on the basis of the purchase order price or the invoice price.
65
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Vendor invoice shall be entered with reference to Purchase Order. More than one purchase order
can also be processed at one time for one vendor. If required the vendor can be changed from the
original vendor to whom the payment is to be done. If any Invoice verification has been done for any
GR for a PO, the quantity for this GR will not appear in the list. In case where the freight vendor is
different, only those entries related to the delivery costs will be chosen for the payments to this
vendor. It is also possible to raise credit memo against the goods returned to the vendor. In case of
Subsequent debit/credit to be made to the vendor account, (reasons can be change of rates for
previous supplies made, etc), the entries are made using the Invoice Verification. Adjustments to
other accounts like Insurance claims Account, etc. can be entered with invoice verification.
➢ A subsequent debit/credit arises if a transaction has already been settled, and a further
invoice or credit memo is received afterwards
➢ A subsequent debit/credit changes the total invoice value of a purchase order item; the total
invoice quantity remains unchanged. Therefore, only a value-based update of the purchasing
transaction takes place. There is no quantity-based update
➢ An invoice is entered as a subsequent debit if a purchase order item has already been
invoiced and further costs are incurred. (Example: A vendor has inadvertently invoiced at too
low a price and then sends a second invoice for the difference.)
➢ Enter a credit memo as a subsequent credit if a purchase order item was invoiced at too high
a price and later a credit memo is received. (Example: A vendor has inadvertently invoiced at
too high a price and then sends a credit memo for the difference.)
➢ When a subsequent debit/credit is entered, the system suggests the entire invoiced quantity,
but no value. The maximum quantity that can be subsequently debited or credited is the
quantity that has already been invoiced. A subsequent debit/credit for a purchase order item
can be entered if an invoice has already been posted for that item
➢ A subsequent debit/credit cannot refer to a particular invoice
➢ When a subsequent debit/credit is posted, the system posts the invoice amount to the vendor
account
➢ If the quantity to be subsequently debited or credited has already been delivered, the system
makes the offsetting entry to the stock account or the price difference account, depending on
the type of price control used
➢ For purchase order items with account assignment, the system makes the offsetting entry to
the consumption account
66
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
➢ If the quantity for subsequent debit/credit has not yet been delivered, the posting is made to
the GR/IR clearing account. Later, when the goods receipt is posted - depending on the price
control - the system posts the debit/credit to the stock account or the price difference
account, or for PO items with account assignment it posts to the consumption account
67
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
System automatically posts the unplanned delivery costs to the individual items, or to a separate
G/L account based on the requirement.
During automatic distribution to the invoice items, the amounts in the items are automatically
increased by the delivery costs part during the invoice post, and it is treated as price variances.
The system does not perform a price check after automatically distributing the delivery costs.
Unplanned delivery costs that were distributed to individual items are not listed separately in the
PO history. They are already a part of the calculated value.
If the unplanned delivery costs are posted to a separate G/L account, the unplanned delivery costs
are not debited to the stocks or the account assignment objects. The system does not show
unplanned delivery costs that are posted to a separate G/L account, in the PO history.
Invoice post contains only unplanned delivery costs with reference to a purchase order, if at least
one invoice has already been posted for the purchase order. Otherwise all the invoiced values
would be zero, and it would not be possible to distribute the delivery costs. The system apportions
unplanned delivery costs to the items in proportion to the total value invoiced so far and the values
in the current invoice. The system can also be able to distribute unplanned delivery costs manually
to individual invoice items, by changing the amounts of the invoice items.
In the case of unplanned delivery costs, the costs are not split up according to their origin. The way
in which the system posts unplanned delivery costs depends on the settings in Customizing. They
are either distributed automatically to the individual invoice items, or posted to a separate G/L
account. During automatic distribution, the unplanned delivery costs are posted according to the
price control.
For a material with moving average price, the system posts to the stock account as long as there is
a stock coverage.
Business
Business Process Input Dependency :
Process T Code Who/Role
Step Description Output :
Step ID
Purchase
MM-03-01 Create PR ME51N
Officer
Department
MM-03-02 Release PR ME54N
Manager
Purchase
MM-03-03 Create PO ME21N With reference to PR
Officer
MM-03-04 Release PO – Level 1 ME29N PM/EM
68
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Reports described in business process MM-01 will also be used for this business process MM-03.
Report Format
Report T Report (Attach Document:
Report ID Excel, word, Image..) Gap Identified
Name Code Description
NA
69
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Forms described in business process MM-01 will also be used for this business process MM-03.
Format
T (Attach Document:
Form ID FRM Name FRM Description Gap ID
Code Excel, word,
Image..)
Purchase ME9F
FRM-MM-02 Purchase Order GAP-MM-02-F
Order
Goods MB90
Goods Receipt
FRM-MM-03 Receipt GAP-MM-03-F
Voucher
Voucher
Format
T (Attach Document:
Interface ID INT Name INT Description Gap ID
Code Excel, word,
Image..)
NA
Format
Enhancement T (Attach Document:
ENH Name ENH Description Gap ID
ID Code Excel, word,
Image..)
NA
Data Conversion described in business process MM-01 will also be used for this business process
MM-03.
70
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Though we have captured all the gaps in this BBP document that are identified for supporting the
business process during workshops and individual interaction sessions, the above listed
Gaps/development elements will be consolidated in the FRICE Inventory list separately. This shall
further be evaluated and analyzed by the Project Management to include or exclude from the
present Implementation Scope.
71
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Consultant-
1 Rajkumar Asokan ABA
MM
72
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
73
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Purchase Requisition
Automatic
Processing MM-04-02
Release- Civil& Architect /
Electro Mechanical
For Approval NO
YES
MM-04-03
Print RFQ
MM-04-07
For Approval
MM-04-08
NO
Releasel-
Procurement
Manager
YES
MM-04-09
NO
Release-
Commercial Manager
YES
MM-04-10
NO
Release-
General Manager
MM-04-12 MM-04-11
MM-04-13
Invoice Processing
74
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
The Purchase Requisition release level for Civil and Architecture Materials is listed below
The Purchase Requisition release level for Electro-Mechanical Materials is listed below
➢ RFQ header
Contains general information on the RFQ, such as the vendor’s address
➢ Items
Contain the total quantities and delivery dates for the materials or services specified in the RFQ
This component is used to manage and compare requests for quotation (RFQs) issued to vendors
and the quotations submitted by latter in response to them. In collective number field project code or
particular activity element has to be maintained for future reference like compare quotation.
76
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
The price comparison list displays the percentage of each item in relation to the maximum,
minimum, or average price. To determine the display type, enter one of the following
➢ “+” Highest value for each item is the 100% value
➢ “-“ Lowest value for each item is the 100% value
➢ +"_" Mean value for each item is the 100% value
Price Comparison
Collective number field will be reference field, which will be used to list down the RFQ’s maintained
with same collective number in price comparison. Eventually price comparison can be done based
on the collective number. Select the appropriate field to specify which of the following should be
taken into account in determining the comparison price.
➢ Cash discount
➢ Delivery costs
➢ Effective price
77
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
The Purchase Order release level for Civil and Architecture services are listed below
The Purchase Order release level for Electro Mechanical services are listed below
The Purchase Order release level for General services are listed below
*Release level will be triggered based on the permitted value to release the purchase order
*For example if the permitted value limit is 1SAR – 10,000SAR for Procurement Manager, the
release will be done only by the Procurement Manager. Now if the value is more than 10,000 SAR
and less than 20,000 Sar, the release will be done by first the Procurement Manager and then the
78
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Commercial Manager and if the value is more than 20,000 SAR, the release will be done by
Procurement Manager, Commercial manager & then General Manager.
Business
Business Process Step Input Dependency :
Process T Code Who/Role
Description Output :
Step ID
Project
MM-04-01 Auto generated PR ME53N
Manager
MM-04-02 Release PR ME54N Civil/Architect
79
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Business
Business Process Step Input Dependency :
Process T Code Who/Role
Description Output :
Step ID
Purchase
MM-04-03 Create RFQ ME41 With reference to PR
Officer
Procurement
MM-04-04 Release RFQ (PM) ME45
Manager
Procurement
MM-04-05 Print RFQ ME9A With reference to RFQ
Manager
Purchase
MM-04-06 Maintain Quotation ME47 With reference to RFQ
Officer
Procurement
MM-04-07 Compare Quotation ME49 With reference to RFQ
Manager
Purchase With reference to
MM-04-08 Purchase Order ME21N
Officer Quotation
MM-04-09 Release PO Level-1 ME29N PM/EM
Commercial
MM-04-10 Release PO Level-2 ME29N
Manager
General
MM-04-11 Release PO Level-3 ME29N
Manager
Purchase
MM-04-12 Print PO ME9F With reference to PO
Officer
MM-04-13 Service Entry Sheet ML81N Site-In Charge With reference to PO
Procurement
MM-01-14 Invoice Receipt MIRO With reference to SES
Accountant
Reports described in business process MM-01 will also be used for this business process MM-
04.The additional forms specific for this business process is listed in below table
Report Format
Report (Attach Document:
Report ID Report Name T Code Excel, word, Gap Identified
Description Image..)
Format
T (Attach Document:
Form ID FRM Name FRM Description Gap ID
Code Excel, word,
Image..)
81
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Format
T (Attach Document:
Interface ID INT Name INT Description Gap ID
Code Excel, word,
Image..)
NA
Format
Enhancement T (Attach Document:
ENH Name ENH Description Gap ID
ID Code Excel, word,
Image..)
NA
82
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Consultant-
1 Rajkumar Asokan ABA
MM
83
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
84
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Purchase Requisition
Automatic
Processing MM-05-02
YES
MM-05-03
Contract Processing
Not Approved
MM-05-12
Not Approved
For Approval
Service / Work Order
Processing
MM-05-08
Release- NO
MM-05-13
Procurement
Release- NO
Manager
YES For Approval Procurement
Manager
MM-05-09
YES
NO
Release- MM-05-14
Commercial Manager NO
Release-
YES Commercial Manager
MM-05-10
YES
NO
Release- MM-05-15
General Manager NO
Release-
General Manager
MM-05-11
MM-05-16
NO
Print Contract Print Purchase Order
MM-05-17
MM-05-18
Invoice Processing
85
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
The Purchase Requisition release level for Civil and Architecture Services are listed below
The Purchase Requisition release level for Electro-Mechanical Services are listed below
➢ RFQ header
Contains general information on the RFQ, such as the vendor’s address
➢ Items
Contain the total quantities and delivery dates for the materials or services specified in the RFQ
This component is used to manage and compare requests for quotation (RFQs) issued to vendors
and the quotations submitted by latter in response to them. In collective number field project code or
particular activity element has to be maintained for future reference like compare quotation.
87
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
The price comparison list displays the percentage of each item in relation to the maximum,
minimum, or average price. To determine the display type, enter one of the following
➢ “+” Highest value for each item is the 100% value
➢ “-“ Lowest value for each item is the 100% value
➢ +"_" Mean value for each item is the 100% value
Price Comparison
Collective number field will be reference field, which will be used to list down the RFQ’s maintained
with same collective number in price comparison. Eventually price comparison can be done based
on the collective number. Select the appropriate field to specify which of the following should be
taken into account in determining the comparison price.
➢ Cash discount
➢ Delivery costs
➢ Effective price
8.2.7 Contract
The procurement of the agreed service is done by raising the PO as per contract terms and
conditions. A form of outline purchase agreement under which services are procured on
predetermined dates within a certain time period for a certain Quantity or Value of contract
The contract release level for Civil and Architecture & General Services are listed below
The contract release level for Electro-Mechanical Services are listed below
89
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
The Purchase Order release level for Civil and Architecture services are listed below
The Purchase Order release level for Electro Mechanical services are listed below
The Purchase Order release level for General services are listed below
90
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
For each incoming invoice, Logistics Invoice Verification creates an MM invoice document and an
FI invoice document.
The invoice documents update data in
➢ Materials Management
➢ Financial Accounting
The Accounts department does invoice entry after the stores user makes relevant entries & verifies
conditions in the PO (e.g. Price and Payment terms). If the conditions in the PO are satisfied then
the Invoice forwarded to finance department.
The Invoice Verification involves the following processes
➢ Invoice
➢ Credit Memo
➢ Subsequent Debit
➢ Subsequent Credit
There are 3 options that can be used for Invoice Verification.
➢ Goods / Service Item
➢ Delivery Costs
➢ Goods/Service Item + Delivery costs
Business
Business Process Step Input Dependency :
Process T Code Who/Role
Description Output :
Step ID
Project
MM-05-01 Auto generated PR ME53N
Manager
MM-05-02 Release PR ME54N Civil/Architect
Purchase
MM-05-03 Create RFQ ME41 With reference to PR
Officer
Procurement
MM-05-04 Release RFQ (PM) ME45
Manager
MM-05-05 Print RFQ ME9A PM/EM With reference to RFQ
Purchase
MM-05-06 Maintain Quotation ME47 With reference to RFQ
Officer
Procurement
MM-05-07 Compare Quotation ME49 With reference to RFQ
Manager
Purchase
MM-05-08 Create Contract ME31K With reference to RFQ
Officer
MM-05-09 Release Contract-Level 1 ME35K PM/EM
Commercial
MM-05-10 Release Contract-Level 2 ME35K
Manager
General
MM-05-11 Release Contract-Level 3 ME35K
Manager
Purchase With reference to
MM-05-12 Purchase Order ME21N
Officer Quotation
91
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Business
Business Process Step Input Dependency :
Process T Code Who/Role
Description Output :
Step ID
MM-05-13 Release PO Level-1 ME29N PM/EM
Commercial
MM-05-14 Release PO Level-2 ME29N
Manager
General
MM-05-15 Release PO Level-3 ME29N
Manager
Purchase
MM-05-16 Print PO ME9F With reference to PO
Officer
MM-05-17 Service Entry Sheet ML81N Site-In Charge With reference to PO
Procurement
MM-05-18 Invoice Receipt MIRO With reference to SES
Accountant
92
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Reports described in business process MM-01 & MM-04 will also be used for this business process
MM-05.
Report Format
Report T Report (Attach Document:
Report ID Excel, word, Image..) Gap Identified
Name Code Description
NA
Forms described in business process MM-01 & MM-04 will also be used for this business process
MM-05.
Format
T (Attach Document:
Form ID FRM Name FRM Description Gap ID
Code Excel, word,
Image..)
NA
Format
T (Attach Document:
Interface ID INT Name INT Description Gap ID
Code Excel, word,
Image..)
NA
Format
Enhancement T (Attach Document:
ENH Name ENH Description Gap ID
ID Code Excel, word,
Image..)
NA
93
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
94
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Consultant-
1 Rajkumar Asokan ABA
MM
95
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
96
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
MM-06-01
Purchase Requisition
Automatic – from SD
Processing
MM-06-02
MM-06-03
Maintain Quotation
MM-06-04
Compare Quotation
MM-06-05
Price Update in SD
Document
97
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
➢ RFQ header
Contains general information on the RFQ, such as the vendor’s address
➢ Items
Contain the total quantities and delivery dates for the materials or services specified in the RFQ.
This component is used to manage and compare requests for quotation (RFQs) issued to vendors
and the quotations submitted by latter in response to them. In collective number field project code or
particular activity element has to be maintained for future reference like compare quotation.
98
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
99
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
on the collective number. Select the appropriate field to specify which of the following should be
taken into account in determining the comparison price.
➢ Cash discount
➢ Delivery costs
➢ Effective price
Quotations for the external services are requested from the subcontractors. Some subcontractors
may be requested just to provide quotations for labor or material in the Subcontractor BOS. This
assumes that the materials are purchased by ACC and provided to the subcontractor for
construction work. We can compare the prices of different quotations related to a particular bid using
the price comparison list. The quotations are listed by items with the most reasonable price first. The
System will copy the prices from the subcontractor quotation to the customer quotation by calling the
price transfer in the subcontractor services report
Business
Business Process Step Input Dependency :
Process T Code Who/Role
Description Output :
Step ID
MM-06-01 Purchase Requisition ME51N Tendering
100
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Reports described in business process MM-01 & MM-04 will also be used for this business process
MM-06
Report Format
Report T Report (Attach Document:
Report ID Excel, word, Image..) Gap Identified
Name Code Description
NA
Reports described in business process MM-01 & MM-04 will also be used for this business process
MM-06
Format
T (Attach Document:
Form ID FRM Name FRM Description Gap ID
Code Excel, word,
Image..)
NA
Format
T (Attach Document:
Interface ID INT Name INT Description Gap ID
Code Excel, word,
Image..)
NA
101
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Format
Enhancement T (Attach Document:
ENH Name ENH Description Gap ID
ID Code Excel, word,
Image..)
NA
Though we have captured all the gaps in this BBP document that are identified for supporting the
business process during workshops and individual interaction sessions, the above listed
Gaps/development elements will be consolidated in the FRICE Inventory list separately. This shall
further be evaluated and analyzed by the Project Management to include or exclude from the
present Implementation Scope.
102
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Consultant-
1 Rajkumar Asokan ABA
MM
103
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
104
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
MM-07-01
Purchase Requisition
Manual
Processing Not Approved
For Approval
MM-07-02
MM-07-03
MM-07-05
NO
Release-
Commercial Manager
YES
MM-07-07 MM-07-06
NO
Print Purchase Order Release-
General Manager
MM-07-09 MM-07-08
MM-07-10
Invoice Processing
105
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
For uncertain freights, approximate/minimal freight shall be entered in the PO, for the internal
system purpose and final PO for vendor shall be sent without mentioning the freight. And when the
actual freight comes to be known, during invoice entry, the correct freight amount can be entered.
The freight invoice will be booked as soon as the material is received in the stores and the value will
be updated in the stocks.
Discount
The Discount condition records shall be maintained with conditions and values associated with
conditions. While processing a transaction, the system will search for valid record and as soon as it
finds the record matching the condition of sale it should return a discount value. Some of the
discounts can be maintained at the time of preparing the purchasing document.
Insurance
The Insurance conditions records shall be maintained with conditions and values associated with
conditions. The calculation of Insurance value is based on the purchase order value plus freight
value of the goods.
Customs Duty
The Customs conditions records shall be maintained with conditions and values associated with
conditions. Scaling conditions shall be maintained for this condition on the purchasing documents.
Transportation
The Transportation conditions records shall be maintained with conditions and values associated
with conditions. The calculation of transportation value is based on the quantity which is
maintained in the purchase order.
Vendor Confirmations
Vendors can issue confirmations to the relevant purchasing organization indicating their
compliance or non-compliance with scheduled delivery dates.
107
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
PO History
The transactions following on from a purchase order are documented in the PO history on an item-
specific basis.
Partner Roles
Instead of the vendor as the order recipient, other business partners can appear in various partner
roles (e.g. goods supplier or invoicing party).
Plant
In the purchase order, each item is destined for a certain plant. Each plant belongs to a company
code, to which the vendor’s (creditor’s) invoice is directed.
Texts
Enter text in a purchase order directly or change texts that are suggested by the system. There are
two kinds of text
➢ Header text: applies to the entire document
➢ Item text: applies only to the relevant item
Define texts appearance and order on printouts in Customizing for Purchasing.
The Purchase Order release level for Civil and Architecture Materials are listed below
108
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
The Purchase Order release level for Electro Mechanical Materials are listed below
The Purchase Order release level for General Materials are listed below
*Release level will be triggered based on the permitted value to release the purchase order
*For example if the permitted value limit is 1SAR – 10,000SAR for Procurement Manager, the
release will be done only by the Procurement Manager. Now if the value is more than 10,000 SAR
and less than 20,000 Sar, the release will be done by first the Procurement Manager and then the
Commercial Manager and if the value is more than 20,000 SAR, the release will be done by
Procurement Manager, Commercial manager & then General Manager.
If a material is delivered for a purchase order, it is important for all of the departments involved that
the goods receipt entry in the system references this purchase order, for the following reason
➢ Goods receiving can check whether the delivery actually corresponds to the order.
➢ The system can propose data from the purchase order during entry of the goods receipt (for
example, the material ordered, its quantity, and so on). This simplifies both data entry and
checking (over deliveries and under deliveries).
➢ The delivery is marked in the purchase order history. This allows the Purchasing
department to monitor the purchase order history and initiate reminder procedures in the
event of a late delivery.
➢ The vendor invoice is checked against the ordered quantity and the delivered quantity
109
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Vendor invoice shall be entered with reference to Purchase Order. More than one purchase order
can also be processed at one time for one vendor. If required the vendor can be changed from the
original vendor to whom the payment is to be done. If any Invoice verification has been done for any
GR for a PO, the quantity for this GR will not appear in the list. In case where the freight vendor is
different, only those entries related to the delivery costs will be chosen for the payments to this
vendor. It is also possible to raise credit memo against the goods returned to the vendor. In case of
Subsequent debit/credit to be made to the vendor account, (reasons can be change of rates for
previous supplies made, etc), the entries are made using the Invoice Verification. Adjustments to
other accounts like Insurance claims Account, etc. can be entered with invoice verification.
110
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
➢ A subsequent debit/credit arises if a transaction has already been settled, and a further
invoice or credit memo is received afterwards.
➢ A subsequent debit/credit changes the total invoice value of a purchase order item; the total
invoice quantity remains unchanged. Therefore, only a value-based update of the purchasing
transaction takes place. There is no quantity-based update.
➢ An invoice is entered as a subsequent debit if a purchase order item has already been
invoiced and further costs are incurred. (Example: A vendor has inadvertently invoiced at too
low a price and then sends a second invoice for the difference.)
➢ Enter a credit memo as a subsequent credit if a purchase order item was invoiced at too high
a price and later a credit memo is received. (Example: A vendor has inadvertently invoiced at
too high a price and then sends a credit memo for the difference.)
➢ When a subsequent debit/credit is entered, the system suggests the entire invoiced quantity,
but no value. The maximum quantity that can be subsequently debited or credited is the
quantity that has already been invoiced. A subsequent debit/credit for a purchase order item
can be entered if an invoice has already been posted for that item.
➢ A subsequent debit/credit cannot refer to a particular invoice.
➢ When a subsequent debit/credit is posted, the system posts the invoice amount to the vendor
account.
➢ If the quantity to be subsequently debited or credited has already been delivered, the system
makes the offsetting entry to the stock account or the price difference account, depending on
the type of price control used.
➢ For purchase order items with account assignment, the system makes the offsetting entry to
the consumption account.
➢ If the quantity for subsequent debit/credit has not yet been delivered, the posting is made to
the GR/IR clearing account. Later, when the goods receipt is posted - depending on the price
control - the system posts the debit/credit to the stock account or the price difference
account, or for PO items with account assignment it posts to the consumption account.
111
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Planned delivery costs are not binding to one specific vendor. When planning the delivery costs in
the purchase order, enter a specific vendor for the delivery costs (such as a freight vendor or a
customs authority). In Invoice Verification, these delivery costs can also be posted to a different
invoicing party to different vendor on the Detail tab page.
Planned delivery costs can be divided into
➢ Freight costs
➢ Customs
Delivery costs can be invoiced in one of three ways
➢ Fixed amount, independent of scope of supply
➢ Quantity-dependent amount
➢ Percentage of value of goods to be delivered
For planned delivery costs, at goods receipt the system posts relevant provisions to a clearing
account. Depending on the origin type, specific clearing account can be customized. This clearing
account is balanced when the corresponding invoice is posted. If no price differences arise
between the planned delivery costs from the purchase order and the requested delivery costs in
the invoice, the material master record does not change at the time of invoice. If price differences
do arise, these are treated in the same way as price variances for ordered materials.
Unplanned delivery costs are delivery costs that were not agreed upon in the purchase order, and
that are first entered at invoice receipt. Enter the total amount of the unplanned delivery costs on
the Detail tab page in invoice.
System automatically posts the unplanned delivery costs to the individual items, or to a separate
G/L account based on the requirement.
During automatic distribution to the invoice items, the amounts in the items are automatically
increased by the delivery costs part during the invoice post, and it is treated as price variances.
The system does not perform a price check after automatically distributing the delivery costs.
Unplanned delivery costs that were distributed to individual items are not listed separately in the
PO history. They are already a part of the calculated value.
If the unplanned delivery costs are posted to a separate G/L account, the unplanned delivery costs
are not debited to the stocks or the account assignment objects. The system does not show
unplanned delivery costs that are posted to a separate G/L account, in the PO history.
Invoice post contains only unplanned delivery costs with reference to a purchase order, if at least
one invoice has already been posted for the purchase order. Otherwise all the invoiced values
would be zero, and it would not be possible to distribute the delivery costs. The system apportions
unplanned delivery costs to the items in proportion to the total value invoiced so far and the values
in the current invoice. The system can also be able to distribute unplanned delivery costs manually
to individual invoice items, by changing the amounts of the invoice items.
In the case of unplanned delivery costs, the costs are not split up according to their origin. The way
in which the system posts unplanned delivery costs depends on the settings in Customizing. They
are either distributed automatically to the individual invoice items, or posted to a separate G/L
account. During automatic distribution, the unplanned delivery costs are posted according to the
price control.
For a material with moving average price, the system posts to the stock account as long as there is
a stock coverage.
For a material with standard price, the system posts the unplanned delivery costs to the price
difference account.
112
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Business
Business Process Step Input Dependency :
Process T Code Who/Role
Description Output :
Step ID
MM-07-01 Purchase Requisition ME51N Department
Release Purchase Department
MM-07-02 ME54N
Requisition Manager
Purchase
MM-07-03 Create Purchase Order ME21N
Officer
Release Purchase Order
MM-07-04 ME29N PM/EM
Level – 1
Release Purchase Order Commercial
MM-07-05 ME29N
Level – 2 Manager
Release Purchase Order General
MM-07-06 ME29N
Level – 3 Manager
Purchase
MM-07-07 Print Purchase Order ME9F
Officer
Warehouse
MM-07-08 Goods Receipt MIGO
Manager
Warehouse
MM-07-09 Print GRV MB90
Manager
Accountant _
MM-07-10 Invoice Receipt MIRO
AP
113
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Reports described in business process MM-01 will also be used for this business process MM-07.
Report Format
Report T Report (Attach Document:
Report ID Excel, word, Image..) Gap Identified
Name Code Description
NA
Forms described in business process MM-01 will also be used for this business process MM-07.
Format
T (Attach Document:
Form ID FRM Name FRM Description Gap ID
Code Excel, word,
Image..)
Asset MB9F
Asset Purchase
FRM-MM-07 Purchase GAP-MM-09-F
Order
Order
Format
T (Attach Document:
Interface ID INT Name INT Description Gap ID
Code Excel, word,
Image..)
NA
114
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Format
Enhancement T (Attach Document:
ENH Name ENH Description Gap ID
ID Code Excel, word,
Image..)
NA
Though we have captured all the gaps in this BBP document that are identified for supporting the
business process during workshops and individual interaction sessions, the above listed
Gaps/development elements will be consolidated in the FRICE Inventory list separately. This shall
further be evaluated and analyzed by the Project Management to include or exclude from the
present Implementation Scope.
115
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Consultant-
1 Rajkumar Asokan ABA
MM
116
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
117
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
MM-08-01
MM-08-02
Material Receipt in
Project Warehouse
MM-08-03
Stock overview
(Project Warehouse)
118
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Using Transfer Posting component, one can transfer material from one storage location to another
storage location. At ACC, every plant will have two storage locations. Storage locations are
classified as Project Warehouse and Central Warehouse.
Transfer posting refers to the process of removal of materials from one storage location to another
storage location. If the materials are received at central warehouse for a project, that materials are
transferred from central warehouse to project warehouse by using transfer posting functionality in
SAP system.
While doing transfer posting goods receipt number needs to be maintained. Based on this number,
material transfer document will be printed with all the information like Purchase Requisition number,
Purchase Order number and Project.
First Step (at Central Warehouse): Material transferred (Removal) from Central Warehouse to
Project Warehouse by using 313 Q movement type. Material transfer document will be printed.
Second Step (at Project Warehouse): Material transferred (Place/Receipt) from Central Warehouse
to Project Warehouse by using 315 Q movement type.
Business
Business Process Step Input Dependency :
Process T Code Who/Role
Description Output :
Step ID
Material Transfer at Central
MM-08-01 MB1B With reference to GRV
Central Warehouse Storekeeper
Print Material Transfer Central
MM-08-02 MB90 With reference to MD
document Storekeeper
Material Receipt at Project
MM-08-03 MB1B
Project Warehouse Storekeeper
Project
MM-08-04 Stock Overview MMBE
Storekeeper
Reports described in business process MM-01 will also be used for this business process MM-08.
Report Format
Report T Report (Attach Document:
Report ID Excel, word, Image..) Gap Identified
Name Code Description
NA
Forms described in business process MM-01 will also be used for this business process MM-08.
Format
T (Attach Document:
Form ID FRM Name FRM Description Gap ID
Code Excel, word,
Image..)
Material MB90
Material Transfer
FRM-MM-07 Transfer GAP-MM-10-F
document
document
120
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Format
T (Attach Document:
Interface ID INT Name INT Description Gap ID
Code Excel, word,
Image..)
NA
Format
Enhancement T (Attach Document:
ENH Name ENH Description Gap ID
ID Code Excel, word,
Image..)
NA
121
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Consultant-
1 Rajkumar Asokan ABA
MM
122
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
123
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
MM-09-01
Stock overview
(Project Warehouse)
MM-09-02
NO
Stock Available
Raise Purchase Requisition
YES
MM-09-03
Material Issue
MM-09-04
Material Consumption in
Project Warehouse
124
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Using Goods Issue component, one can post a material withdrawal or a material issue. A goods
issue leads to a reduction in storage location stock.
Standard SAP system allows goods issue for
➢ Project from Unrestricted Project
➢ Network from Unrestricted Project
At ACC, materials will be issued for project by using 221 ‘Q’ movement type and for network by
using 281 ‘Q’. After goods issue the system will automatically reduce the stock for project
warehouse and the cost will be booked against the project WBS element.
Business
Business Process Step Input Dependency :
Process T Code Who/Role
Description Output :
Step ID
Project
MM-09-01 Stock Overview MMBE
Storekeeper
Raise Purchase Project
MM-09-02 ME51N
Requisition Storekeeper
Project
MM-09-03 Goods Issue for Project MB1A
Storekeeper
Material Consumption in Project
MM-09-04 MB1A
Project Warehouse Storekeeper
Reports described in business process MM-01 will also be used for this business process MM-09.
Report Format
Report T Report (Attach Document:
Report ID Excel, word, Image..) Gap Identified
Name Code Description
NA
Format
T (Attach Document:
Form ID FRM Name FRM Description Gap ID
Code Excel, word,
Image..)
NA
Format
T (Attach Document:
Interface ID INT Name INT Description Gap ID
Code Excel, word,
Image..)
NA
Format
Enhancement T (Attach Document:
ENH Name ENH Description Gap ID
ID Code Excel, word,
Image..)
NA
126
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Though we have captured all the gaps in this BBP document that are identified for supporting the
business process during workshops and individual interaction sessions, the above listed
Gaps/development elements will be consolidated in the FRICE Inventory list separately. This shall
further be evaluated and analyzed by the Project Management to include or exclude from the
present Implementation Scope.
Consultant-
1 Rajkumar Asokan ABA
MM
127
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
128
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
MM-10-01
MM-10-02
Recovery From
Vendor
➢ Create return delivery for rejection with respect to latest goods receipt document. Materials
sent back to supplier for replacement/ as return by making return delivery using movement
type ‘122’.
➢ Credit memo will be created for return delivery process.
➢ Rejected material stock will be reduced by the system automatically
Business
Business Process Step Input Dependency :
Process T Code Who/Role
Description Output :
Step ID
With reference to
Store
MM-10-01 Return Delivery MIGO Material document
Supervisor
Number
With reference to
MM-10-02 Credit Memo MIRO
Vendor
129
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Reports described in business process MM-01 will also be used for this business process MM-10.
Report Format
Report T Report (Attach Document:
Report ID Excel, word, Image..) Gap Identified
Name Code Description
NA
130
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Format
T (Attach Document:
Form ID FRM Name FRM Description Gap ID
Code Excel, word,
Image..)
NA
Format
T (Attach Document:
Interface ID INT Name INT Description Gap ID
Code Excel, word,
Image..)
NA
Format
Enhancement T (Attach Document:
ENH Name ENH Description Gap ID
ID Code Excel, word,
Image..)
NA
131
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Consultant-
1 Rajkumar Asokan ABA
MM
132
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Eventually we have not denied those business practices which are must required for the business
functioning but they cannot be mapped in SAP. In this case these requirements have been taken for
Customization/Development as a GAP.
In this context we have considered this section of AS-IS as not required and the succeeding sections
of this process will demonstrate the Best Practiced business processes.
133
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Manual
MM-1-01
Create Physical Inventory
Batch process Document
for PID MM-11-02
Creation
Print PID
MM-11-03
MM-11-04
Difference in NO
Re-count
Comparison
YES
MM-11-05
Approval
MM-11-06 MM-11-07
134
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
At ACC, Yearly once physical Inventory will be taken for all the materials, so stock adjustment will
happen once in a year in the SAP system. The journal entries are listed below
Excess Quantity:
Stock DR
Gain/Loss account CR
Shortage Quantity:
Stock CR
Gain/Loss account DR
Physical inventory component allows the carrying out of physical inventory of the company’s
warehouse stock for balance sheet purpose. There are different types of physical inventory
procedures like Periodic Processing, Continuous inventory, Cycle counting. Any of these techniques
can be used for this process.
Periodic Inventory
In this process all the stocks in the company are physically counted on the balance sheet key date.
The entire warehouse must be blocked for materials movement
Continuous Inventory
Continuous inventory ensures that all the material is counted at least once during the year. Stocks
are counted throughout the year.
Cycle Counting
Cycle counting is a method of physical inventory where inventory is counted at regular intervals
within a fiscal year. These intervals (or cycles) depend on the cycle counting indicator set for the
materials. It allows fast-moving items to be counted more frequently than slow-moving items.
Business
Business Process Step Input Dependency :
Process T Code Who/Role
Description Output :
Step ID
Store
MM-11-01 Create PID MI01
Supervisor
Store
MM-11-02 Print PID MI21
Supervisor
Store
MM-11-03 Enter Count MI04 With reference to PID
Supervisor
Store
MM-11-06 Post the Difference MI07 With reference to PID
Supervisor
Store
MM-11-07 Print PID MI21
Supervisor
135
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Reports described in business process MM-01 will also be used for this business process MM-11.
Report Format
Report T Report (Attach Document:
Report ID Excel, word, Image..) Gap Identified
Name Code Description
NA
136
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Format
T (Attach Document:
Form ID FRM Name FRM Description Gap ID
Code Excel, word,
Image..)
Format
T (Attach Document:
Interface ID INT Name INT Description Gap ID
Code Excel, word,
Image..)
NA
Format
Enhancement T (Attach Document:
ENH Name ENH Description Gap ID
ID Code Excel, word,
Image..)
NA
137
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
Consultant-
1 Rajkumar Asokan ABA
MM
138
SAP@RRAB
Business Blueprint - Material Management
Created By: Rajkumar.A Created : 24-Oct-21 10/24/2021
Document : ACC-BBP-MM-V1.2 20100116 UPDATED :
15 Training Strategy
This section comprises of briefing the Training Approach that shall be adopted for this
implementation.
1. Training document “User Manual” will be made for the business processed mapped in the
BBP
2. The Same User Manual will be used for training Key Users by us
3. And as well for End User training by Key users
4. The following are the sections mainly comprised in the User Manual.
a) Project Procurement Material via Quotation
b) Project Procurement Material via Contract
c) Project Procurement Consumables General
d) Project Procurement Service via Quotation
e) Project Procurement Service via Contract
f) RFQ Process for Tendering Department
g) Asset Procurement
h) Material Transfer
i) Goods Issue
j) Return Delivery
k) Physical Inventory
5. Separate Key User training Plan will be made by us in the realization phase
6. And would follow the plan for completing the training
139