You are on page 1of 642

2500 BOULEVARD ALFRED-NOBEL

SUITE 301
SAINT-LAURENT, QC H4S0A9, CANADA

BOUND PRINTED MATTER

PRINCELY JETS (PVT.) LTD.


ATTN: TAHA ANSARI
2ND FLOOR SERVICES CLUB EXTENSION BUILDING
MEREWETHER ROAD
KARACHI, SINDH
PAKISTAN

Ship Method:
Ship Count Zone

1 RW

CL-605 S/N: 5866


Reg: AP-HKD
Status Report CL-605 S/N 5866 AP-HKD
OWNER: PRINCELY JETS (PVT.) LTD. OPERATOR: PRINCELY JETS (PVT.) LTD. OPERATOR: PRINCELY JETS
ADDRESS: ATTN: TAHA ANSARI ADDRESS: ATTN: TAHA ANSARI ADDRESS: NO. 10, 3RD FLOOR
KARACHI SINDH KARACHI SINDH KARACHI 75520
PHONE: 030 0-2001127 (MOBILE) PHONE: 030 0-2001127 (MOBILE) PHONE: 011-92-21 -521-54 88
FAX: FAX: FAX: 011-92-21 -521-03 60

ANALYS T: SANDRA PINILLA +1-514-63 6-7423 (OFFICE) 800-787-9 749 (EFAX-CARDS) PLEASE RECORD CHANGES TO ADDRESS, LAST
EMAIL: SPINILLA@CAMPSYSTEMS.COM 514-636-2020 (OFFICE) 631-980-4 222 (EFAX-CARDS) ACTUALS (IF ANY) AND FAX THIS SHEET BACK TO
WWW.CAMPSYSTEMS.COM CAMP.
AIRCRAFT SERIAL/REGNO: 5866/AP-HKD MODEL: CL-605 MANUFACTURER: BOMBARDIER AVIATION
DATES LAST ACTUALS CURRENT ACTUAL
CERTIFICATION DATE: 01-APR-2011 2250.8 A/C HRS as of 17-JUN-20 22 ______________ A/C HRS as of ___ _/____/__ ______
INSERVICE DATE: 17-APR-2012
MANUFACTURER DATE: 25-MAR-20 11 1507 AFL as of 17-JUN-20 22 ______________ AFL as of ___ _/____/__ ______

APU SERIAL/PART: P-3 10/38 00804-1 MODEL: GTCP 36-15 0 (CL) MANUFACTURER: HONEYWELL
INSTALLED ON 26-APR-2 017 LAST ACTUALS CURRENT ACTUAL
2109 APU HRS 3596 APU HRS as of 31-MAY-2022 ______________ APU HRS as of ___ _/____/__ ______

0 APUS 0 APUS as of 31-MAY-2022 ______________ APUS as of ___ _/____/__ ______

ENGINE NO. 1 SERIAL/PART: 950967/6089T11G01 MODEL: CF-34-3B (CIMMS) MANUFACTURER: GENERAL ELECTRIC
INSTALLED ON 28-FEB-20 11 LAST ACTUALS CURRENT ACTUAL
0 ENG. HRS 0 A/C HRS 2250.8 ENG. HRS as of 17-JUN-20 22 ______________ ENG. HRS as of ___ _/____/__ ______

0 ENC 1518 ENC as of 17-JUN-20 22 ______________ ENC as of ___ _/____/__ ______

ENGINE NO. 2 SERIAL/PART: 950968/6089T11G01 MODEL: CF-34-3B (CIMMS) MANUFACTURER: GENERAL ELECTRIC
INSTALLED ON 28-FEB-20 11 LAST ACTUALS CURRENT ACTUAL
0 ENG. HRS 0 A/C HRS 2250.8 ENG. HRS as of 17-JUN-20 22 ______________ ENG. HRS as of ___ _/____/__ ______

0 ENC 1517 ENC as of 17-JUN-20 22 ______________ ENC as of ___ _/____/__ ______

BOM BARDIER AND CHALLENGER ARE TRADEMARKS OF BOMBARDIER, INC.

© CAMP SYSTEMS 1 Of 240


Status Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL ADJ WARR EXP COMPLIANC E NEXT D UE MAX LIMIT
TLMC (ENG/APU) A/C
CHA PTER 05 TIME LIMITS/MAINTENANC E C HECK S
05H010 0 100 HOUR CHECK
PKG 10 0 MOS 10-JUN-2022
HRS /MSC 100 224 5.5 234 5.5
REF: See Workcard AFL 150 5

05H040 0 400 HOUR CHECK


PKG 40 0 MOS 13-JUN-2022
HRS /MSC 400 +40/-40 40 224 5.8 3 268 5.8 3 272 5.8 3
REF: See Workcard AFL 150 5

05H060 0 600 HOUR CHECK


PKG 60 0 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 40 188 0.3 252 0.3 256 0.3
REF: See Workcard AFL 123 6

05H080 0 800 HOUR CHECK


PKG 80 0 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 40 224 5.8 3 308 5.8 3 312 5.8 3
REF: See Workcard AFL 150 5

05H120 0 120 0 HOUR CHECK


PKG 12 00 MOS 27-S EP-20 19
HRS /MSC 120 0 +40/-40 40 187 7.3 311 7.3 315 7.3
REF: See Workcard AFL 123 6

05H160 0 160 0 HOUR CHECK


PKG 16 00 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 40 153 4.3 317 4.3 321 4.3
REF: See Workcard AFL 988

05H240 0 240 0 HOUR CHECK


PKG 24 00 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 40 224 5.8 3 468 5.8 3 472 5.8 3
REF: See Workcard AFL 150 5

05H320 0 320 0 HOUR CHECK


PKG 32 00 MOS +40/-40
HRS /MSC 320 0 +40/-40 0 320 0 324 0
REF: See Workcard AFL

05H480 0 480 0 HOUR CHECK


PKG 48 00 MOS +40/-40
HRS /MSC 480 0 +40/-40 0 480 0 484 0
REF: See Workcard AFL

05H640 0 640 0 HOUR CHECK


PKG 64 00 MOS
HRS /MSC 640 0 +40/-40 0 640 0 644 0
REF: See Workcard AFL

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS 2 Of 240
Status Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HR S, 1507 AFL as of 17-Jun-2022
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL ADJ WARR EXP COMPLIANC E NEXT D UE MAX LIMIT
TLMC (ENG/APU) A/C
05M00 6 6 MONTH CHECK
PKG 6 MOS 6 +1m/-1m 14-MAR-2 022 14-S EP-20 22 14-O CT-20 22
HRS /MSC 219 4.6
REF: MPD S ECTION 2 .2.2 AFL 147 5

05M01 2 12 MONTH CHECK


PKG 12 MOS 12 +2m/-2m -10 14-MAR-2 022 04-MAR-2023 04-MAY -2023
HRS /MSC 219 4.6
REF: MPD S ECTION 2 .2.2 AFL 147 5

05M02 4 24 MONTH CHECK


PKG 24 MOS 24 +2m/-2m 34 14-MAR-2 022 17-APR-20 24 17-JUN-2024
HRS /MSC 219 4.6
REF: MPD S ECTION 2 .2.2 AFL 147 5

05M03 6 36 MONTH CHECK


PKG 36 MOS 36 +2m/-2m 21-A PR-2021 21-APR-20 24 21-JUN-2024
HRS /MSC 214 3.4
REF: MPD S ECTION 2 .2.2 AFL 144 9

05M04 8 48 MONTH CHECK


PKG 48 MOS 48 +2m/-2m 35 13-MAR-2 020 17-APR-20 24 17-JUN-2024
HRS /MSC 192 6.4
REF: See Workcard AFL 127 5

05M09 6 96 MONTH CHECK


PKG 96 MOS 96 +2m/-2m 35 13-MAR-2 020 17-APR-20 28 17-JUN-2028
HRS /MSC 192 6.4
REF: See Workcard AFL 127 5

05M19 2 192 MONTH CHE CK


PKG 19 2 MOS 192 +2m/-2m 17-A PR-2012 17-APR-20 28 17-JUN-2028
HRS /MSC
REF: MPD S ECTION 2 .2.2 AFL

APU Model : GTCP 36-150 (CL) Serial # P-310 Part # 3800804-1


050 500 APU - 5 00 HO UR CHECK
PKG 50 0 MOS 14-MAR-2 022
HRS /MSC 500 +40/-40 17 353 8 405 5 409 5
REF: APUS

050 750 APU - 7 50 HO UR CHECK


PKG 75 0 MOS 14-MAR-2 022
HRS /MSC 750 +40/-40 353 8 428 8 432 8
REF: APUS

051 000 APU - 1 000 HOUR CHE CK


PKG 10 00 MOS 13-MAR-2 020
HRS /MSC 100 0 +40/-40 305 5 405 5 409 5
REF: APUS

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS 3 Of 240
Status Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL ADJ WARR EXP COMPLIANC E NEXT D UE MAX LIMIT
TLMC (ENG/APU) A/C
051 500 APU - 1 500 HOUR CHE CK
PKG 15 00 MOS 14-MAR-2 022
HRS /MSC 150 0 +40/-40 353 8 503 8 507 8
REF: APUS

052 250 APU - 2 250 HOUR CHE CK


PKG 22 50 MOS 20-A PR-2017
HRS /MSC 225 0 +40/-40 210 4 435 4 439 4
REF: APUS

053 000 APU - 3 000 HOUR CHE CK


PKG 30 00 MOS 20-A PR-2017
HRS /MSC 300 0 +40/-40 210 4 510 4 514 4
REF: APUS

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS 4 Of 240
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
CHA PTER 00 INFORMATION
CAMP CO DE CHANGE - REVIEW A ND ACKNOWLEDGE THIS NO TIFICATION LE TTER AND RETURNING IT TO CAMP (NO APPROVA L REQ .
NOTIFICA TION L ETTER-NAR OPE RA TO RS )
MOS 01-A PR-2011
HRS /MSC - 0
REF: RCF 00 AFL 0

CI6 5-1903 27 REVIEW TLMC S ECTION 5 -10-10 (TR 5 -2-26) AND S ECTION 5 -10-11 (TR 5- 2-27) - DA TED MAR 27 /201 9
MOS
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF 00 AFL
FORMS

CI6 5-1912 18-TLMC REVIEW CHALLE NG ER 60 5 TLMC REV 21 - DATE D DEC 1 8/2 019
MOS 01-A PR-2011
HRS /MSC - 0
REQUIRE ME NT CHANG E REF: RCF CI65 AFL 0
FORMS

CI6 5-2003 19 TR 5-2-28 REVIEW CHALLE NG ER 60 5 TLMC TR 5 -2-28 - DA TE D MARCH 19/2020


MOS 01-A PR-2011
HRS /MSC - 0
REQUIRE ME NT CHANG E REF: RCF 00 AFL 0
FORMS

CI6 5-2109 02-CAMP REVIEW CAMP ADJUS TMENT FORM FOR BOMBARDIE R CHA LLENGER 605 DATED SE PTEMBER. 2 ,20 21
ADJUS TMENT
MOS
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF 00 AFL
FORMS

CI6 5-2204 08-CAMP REVIEW CAMP ADJUS TMENT FORM FOR CHALL ENGER 6 05, DATED A PR 08 /20 22
ADJUS TMENT
MOS
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF 00 AFL
FORMS

CI6 5-2206 03-CAMP REVIEW CAMP ADJUS TMENT FORM DATED JUN 3/202 2 FOR CHAL LENGER 605
ADJUS TMENT
MOS
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF 00 AFL
FORMS
APU Model : GTCP 36-150 (CL) Serial # P-310 Part # 3800804-1
A0CL-1 61102 APU - REV IEW SERVICE INFO RMATION L ETTER APU-56 (D1 99709 000077 ) REV ISION 2
MOS (EB T)
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF A0CL-16 1102 APUS
FORMS
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
5 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
EC46-1 70201 NO. 1 ENGINE - REVIEW CF34-3 B S ERVICE MANUA L REV 57
MOS (EB T)
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF EC46 ENC
FORMS

EC46-1 70627 NO. 1 ENGINE - REVIEW CF34-3 B E MM TR 05-00 89


MOS (EB T)
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF EC76-17 0627 ENC
FORMS

EC46-1 80907 NO. 1 ENGINE - REVIEW S EI- 780 MM TR 05-0 095


MOS (EB T)
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF EC46 ENC
FORMS

EC46-2 10201 NO. 1 ENGINE - REVIEW CF34-3 B S M SEI-780 REV 61


MOS 17-FEB -2021
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF EC46 ENC
FORMS

EC46-2 10628 NO. 1 ENGINE - REVIEW G ENERAL ELECTRIC S B 7 1-0000 R01


MOS (EB T)
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF EC46 ENC
FORMS
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
EC46-1 70201 NO. 2 ENGINE - REVIEW CF34-3 B S ERVICE MANUA L REV 57
MOS (EB T)
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF EC46 ENC
FORMS

EC46-1 70627 NO. 2 ENGINE - REVIEW CF34-3 B E MM TR 05-00 89


MOS (EB T)
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF EC76-17 0627 ENC
FORMS

EC46-1 80907 NO. 2 ENGINE - REVIEW S EI- 780 MM TR 05-0 095


MOS (EB T)
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF EC46 ENC
FORMS

EC46-2 10201 NO. 2 ENGINE - REVIEW CF34-3 B S M SEI-780 REV 61


MOS 17-FEB -2021
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF EC46 ENC
FORMS

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
6 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
EC46-2 10628 NO. 2 ENGINE - REVIEW G ENERAL ELECTRIC S B 7 1-0000 R01
MOS (EB T)
HRS /MSC -
REQUIRE ME NT CHANG E REF: RCF EC46 ENC
FORMS
CHA PTER 05 TIME LIMITS/MAINTENANC E C HECK S
05-0 0-CUS -9004 RENEWAL INSURANCE CERTIFICA TE
MOS 12 08-S EP-20 21 08-S EP-20 22
HRS /MSC 219 2.3 8
CUS TO ME R CODE REF: AFL 147 4

05-0 0-CUS -9005 RENEWAL C OF A


MOS 12 06-A PR-2022 06-APR-20 23
HRS /MSC 221 2.1 7
CUS TO ME R CODE REF: AFL 149 0

05-0 0-CUS -9006 (s) DAILY INSPE CTION /WALK AROUND CHE CK I.A.W E AG AMP (RE CO RD APU HOURS & CY CLE S ON TECH LO G)
MOS 22-O CT-20 20
HRS /MSC A/R
CUS TO ME R OPE RATIO NS REF: AFL
REQUIRE ME NT

05-0 0-CUS -9007 (s) ROTATE TIRE S


MOS 14-A UG -2017
HRS /MSC A/R 136 4.2
REF: AFL 885

05-5 0-41-2 10-80 1 INS PECTION AFTER THE AIRCRAFT IS PARKED IN STRONG WINDS OR WINDGUSTS
MOS 01-A PR-2011
HRS /MSC A/R 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-01-2 10-80 1 GENERAL VISUAL INS PECTION FO R HARD/OVE RWEIGHT LA NDING DAMAG E
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-02-2 10-80 1 GENERAL VISUAL INS PECTION FO R HARD LANDING DAMAGE
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-03-2 10-80 1 GENERAL VISUAL INS PECTION FO R EXTREME TURBULENCE/MANEUVE R DAMAGE
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
7 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
05-5 1-04-2 10-80 1 GENERAL VISUAL INS PECTION FO R LIGHTNING STRIKE DA MA GE
MOS 31-MAY -2018
HRS /MSC - 156 6.2
UNS CHEDULED REF: AFL 101 6
MAINTENANCE CHECK

05-5 1-05-2 10-80 1 GENERAL VISUAL INS PECTION OF THE FLAP S AND THE LANDING GE AR FOR O VERSPE ED DAMAGE
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-06-2 10-80 1 GENERAL VISUAL INS PECTION FO R THE TIRE BURST DAMAGE .
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-06-2 10-80 2 GENERAL VISUAL INS PECTION AFTER A TIRE DEFLATES .
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-07-2 10-80 1 GENERAL VISUAL INS PECTION OF AIRCRAFT FOR WING LEADING -EDGE OVERHEAT DA MA GE
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-08-2 10-80 1 GENERAL VISUAL INS PECTION OF THE A IR DRIVEN G ENERATO R (ADG) AFTER IN-FL IGHT DEP LOYMENT
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-09-2 20-80 1 DETAIL ED INSPECTIO N OF CAB IN O VERPRESS URIZA TION DAMAG E
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-11-2 10-80 1 GENERAL VISUAL INS PECTION OF THE E NG INE DRIVEN PUMP (EDP) AFTER DRY OPERATION DUE TO HYDRA UL IC
FLUID LOSS.
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-12-2 81-80 1 INS PECTION OF HYDRAULIC FL UID AFTER S YSTEM O VERHEAT
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
8 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
05-5 1-13-2 20-80 1 DETAIL ED DIME NS IONAL INS PECTION OF AIRCRA FT FOR SYMMETRY AND ALIGNME NT
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-14-2 10-80 1 GENERAL VISUAL INS PECTION OF THE PITO T- STA TIC V ISUAL DRAINS AFTER ADVE RSE WEA THER OPERATIO NS
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-15-2 10-80 1 GENERAL VISUAL INS PECTION FO R HIGH ENERGY STOP/REJE CTED TA KEOFF (RTO) DA MA GE
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-16-2 10-80 1 GENERAL VISUAL INS PECTION OF HYDRAULIC HA RRISSON "H" FITTINGS
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-17-2 10-80 1 GENERAL VISUAL INS PECTION OF HYDRAULIC-PUMP SHOCK-MOUNT-CONTAMINATION-CHECK


MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-18-2 10-80 2 GENERAL VISUAL INS PECTION OF THE E LECTRICAL MO TO R DRIVEN PUMP (E MP D) AFTER DRY O PERATIO N DUE TO
HYDRA UL IC FLUID LO SS.
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK

05-5 1-19-2 10-80 2 DETAIL ED INSPECTIO N AFTE R LAV ATORY S PIL L O R LEA K.
MOS 01-A PR-2011
HRS /MSC - 0
UNS CHEDULED REF: AFL 0
MAINTENANCE CHECK
CHA PTER 08 LEVELING AND WEIGHING
08-1 0-CUS -9001 WEIGHT AND BA LANCE - AIRCRAFT RE-WEIGH
MOS 48 14-MAR-2 022 14-MAR-2026
HRS /MSC 219 4.6
CUS TO ME R CODE REF: AFL 147 5
CHA PTER 11 PLACARDS AND MAR KINGS
+ 11-3 0-65-6 01 (s) GENERAL VISUAL INS PECTION OF THE CAB IN P LACARDS - INTERNAL PKG
PK G 1 2 MOS 12 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
9 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
11-CUS-00 1 INS PECT ADHESIVE DECAL TYP E REG ISTRATIO N FOR P RE SENCE AND LEGIBILITY PER SA N MARINO
REGISTRA TION RE QUIREMENTS CAA CAP 08 APP 3 (25).
MOS 6 18-MAR-2 022 18-S EP-20 22
HRS /MSC 500 219 5.7 269 5.7
CUS TO ME R CODE REF: AFL 147 6
CHA PTER 12 SERVICIN G
+ 12-1 5-65-6 01 (s) SANITIZATIO N OF THE POTABLE WATER SYSTEM PKG
PK G 6 MOS 6 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01
+ 12-1 0-00-2 01 NO. 1 ENGINE - SERVICE THE ENGINE OIL TANK
MOS 13-JUN-2022
HRS /MSC 16 224 5.8 3 (226 1.8 3) 2261.83
REF: ENC 151 6
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
+ 12-1 0-00-2 01 NO. 2 ENGINE - SERVICE THE ENGINE OIL TANK
MOS 13-JUN-2022
HRS /MSC 16 224 5.8 3 (226 1.8 3) 2261.83
REF: ENC 151 5
CHA PTER 21 AIR CONDITIONIN G
21-2 0-00-2 01 (s) OPE RA TIONAL TEST P RE SSURE -BULKHEAD CHECK VAL VES PKG
21-2 0-00-2 01 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
REF: AMM 2 1 2 1 0 4 71 0 8 01 AFL 150 5
21-2 0-00-2 02 OPE RA TIONAL TEST L OW SP EED DETECTOR FOR THE AVIONICS EX HAUST FA N. (MRB)
PK G 1 200 MOS 27-S EP-20 19
HRS /MSC 120 0 +40/-40 187 7.3 307 7.3 311 7.3
REF: AMM 2 1 2 4 2 4 71 0 8 01 AFL 123 6
21-2 1-04-9 00-80 1-01 LH PRE SSURE B UL KHEAD CHECK VALVE
320 2062-1 -1 MOS TSN:0 01-A PR-2011
242 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-2 1-04-9 00-80 1-02 RH PRESS URE BULKHEA D CHE CK VA LVE
320 2062-1 -1 MOS TSN:0 01-A PR-2011
242 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-2 1-04-9 00-80 2-01 CONDITIO NE D AIR DUCT CHECK VALV E
320 2076-1 -1 MOS TSN:0 01-A PR-2011
121 0 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

21-2 1-04-9 00-80 3-01 FLT DECK CO NDITIONED AIR CHECK VAL VE
123 790-1- 1 MOS TSN:0 01-A PR-2011
137 5 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
10 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
21-2 1-10-9 00-80 1-01 FLIG HT COMPARTMENT A IR CO NDITIONING DUCT ASSY
601 -95006 -1 MOS TSN:0 01-A PR-2011
104 84934 02 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
21-2 1-10-9 00-80 2-01 FLIG HT COMPARTMENT A IR CO NDITIONING DUCT ASSY
601 -95007 -1 MOS TSN:0 01-A PR-2011
104 89391 01 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

21-2 2-10-9 00-80 2-01 PAS SENGER CO MP ARTMENT A IR CONDITIONING DUCT ASSY
601 -95016 -1 MOS TSN:0 01-A PR-2011
104 81977 04 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

21-2 2-10-9 00-80 3-01 PAS SENGER CO MP ARTMENT A IR CONDITIONING DUCT AS SY


143 14-1 MOS TSN:0 01-A PR-2011
104 88894 01 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

21-2 3-07-9 00-80 1-01 LH ECU,AIR CONDITIO NING UNIT


220 1600-6 MOS TSN:0 01-A PR-2011
189 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

21-2 3-07-9 00-80 1-02 RH ECU,A IR CONDITIONING UNIT


220 1600-6 MOS TSN:0 01-A PR-2011
189 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

21-2 4-01-9 00-80 1-01 AVIONICS COOL ING FAN


604 -96005 -1 MOS TSN:0 01-A PR-2011
172 30017 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

21-2 4-32-9 00-80 1-01 MCE COO LING FAN


822 -1916- 001 MOS TSN:0 01-A PR-2011
44X CK HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

21-2 4-34-3 01 (s) OPE RA TIONAL TEST DATA CONCE NTRATOR UNIT (DCU) FA N PKG
PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 153 4.3
OPTIONAL REF: AMM 2 1 2 4 3 4 71 0 8 01 AFL 988
21-3 0-00-2 01 (s) RESTORATIO N (CLEANING) O UTFLOW VALV E P OPPE T AREA PKG
21-3 0-00-2 01 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 153 4.3
REF: AMM 2 1 3 2 0 1 16 0 8 02 AFL 988
21-3 0-00-2 02 (s) DIS CA RD PRIMARY VALV E A IR FILTER PKG
21-3 0-00-2 02 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 153 4.3
REF: AMM 2 1 3 2 0 7 96 0 8 01 AFL 988

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
11 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
21-3 0-00-2 03 (s) OPE RA TIONAL TEST O F THE PRES SURIZATION CO NTROL SYS TEM (MANUA L MODE) PKG
21-3 0-00-2 03 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
REF: AMM 2 1 3 1 0 0 71 0 8 02 AFL 123 6
21-3 0-00-2 05 (s) OPE RA TIONAL TEST E ME RG ENCY DEPRESS S WITCH/LIG HT PKG
21-3 0-00-2 05 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 1 3 1 0 0 71 0 8 03 AFL 150 5

21-3 1-00-1 01 FUNCTIONAL TEST OUTFLOW VAL VES. (CMR**)


21-3 1-00-1 01 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 153 4.3 313 4.3
REF: AMM 2 1 3 1 0 0 72 0 8 01 AFL 988
21-3 1-01-9 00-80 1-01 EJECTOR,AIR JET P UMP
131 428-1 MOS TSN:0 01-A PR-2011
100 -A2387 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-3 1-01-9 00-80 2-01 FORWARD PRESSURIZATION CONTRO L CHECK VALV E
277 0080-1 02 MOS TSN:0 01-A PR-2011
432 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-3 1-01-9 00-80 2-02 AFT PRES SURIZATION CO NTROL CHE CK VA LVE
277 0080-1 02 MOS TSN:0 01-A PR-2011
432 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-3 1-07-9 00-80 1-01 AIR PRES SURE (VA CUUM) REG ULA TO R
131 402-2 MOS TSN:0 01-A PR-2011
173 8D HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-3 1-10-9 00-80 1-01 MANUA L S YSTEM CAB IN PRE SSURE V ALVE
N662-0 579 MOS TSN:0 01-A PR-2011
100 -1189 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
21-3 1-10-9 00-80 1-02 CABIN PRES SURE SEL ECTO R
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-3 1-10-9 00-80 2-01 CABIN PRES SURE SEL ECTO R
211 9304-1 MOS TSN:0 01-A PR-2011
110 -F0 172 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-3 1-13-9 00-80 1-01 CABIN PRES SURE CONTROL LER
604 -59010 -1 MOS TSN:0 01-A PR-2011
100 -A0492 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
12 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
21-3 2-01-9 00-80 1-01 PRIMA RY OUTFL OW V ALVE
103 632-3 MOS TSR:1 29-MAR-2 018
10-6 19 HRS /MSC O/C TSR:0 153 4.3
REF: See Workcard AFL TSR:0 988
21-3 2-01-9 00-80 1-02 SECONDARY OUTFLO W VAL VE
103 664-2 MOS TSR:6 29-MAR-2 018
62-9 01 HRS /MSC O/C TSR:0 153 4.3
REF: See Workcard AFL TSR:0 988

21-3 3-01-1 01 OPE RA TIONAL TEST CAB IN P RE SSURE A CQ UISITION MO DULE (CMR**)
21-3 3-01-1 01 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 40 224 5.8 3 468 5.8 3 472 5.8 3
REF: AMM 2 1 3 3 0 1 71 0 8 01 AFL 150 5

21-3 3-01-9 00-80 1-01 NO. 1 CPAM - CABIN P RES S ACQ UISITION UNIT
102 75B04 C03 MOS TSN:0 01-A PR-2011
222 6A HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

21-3 3-01-9 00-80 1-02 NO. 2 CPAM - CABIN P RES S ACQ UISITION UNIT
102 75B04 C03 MOS TSN:0 01-A PR-2011
222 5A HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

+ 21-4 1-50-6 01 (s) OPE RA TIONAL TEST O F THE ENTRY A RE A HEA T PKG
PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 153 4.3
STLMC REF: AFL 988

21-4 1-51-9 00-80 1-01 UNDERFLOO R AIR HEATER


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

21-4 1-51-9 00-80 2-01 BAG GAGE BA Y AIR HE ATER


283 1-F3 MOS TSN:0 01-A PR-2011
101 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

21-5 0-00-2 01 (s) OPE RA TIONAL TEST RAM-AIR S HUTOFF VAL VE PKG
21-5 0-00-2 01 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 1 5 2 1 0 71 0 8 01 AFL 150 5
21-5 1-00-3 01 (s) CLEAN WATE R SEP ARATOR PKG
PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
OPTIONAL REF: AMM 2 1 5 1 1 3 16 0 8 01 AFL 150 5
21-5 1-34-9 00-80 1-01 LH PRE SSURE REG UL ATING VALV E
604 -97602 -1 MOS TSO:0 13-JUN-2022
307 6 HRS /MSC O/C TSO:0 224 5.8 3
REF: See Workcard AFL TSO:0 150 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
13 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
21-5 1-34-9 00-80 1-02 RH PRESS URE REGULATING VA LVE
604 -97602 -1 MOS TSN:0 01-A PR-2011
289 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-5 2-10-7 10-80 1 OPE RA TIONAL TEST O F RAM AIR S HUTOFF VA LVE
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883

21-5 2-10-9 00-80 1-01 EMERGENCY RA M AIR VA LVE


398 724-1- 1 MOS TSN:0 01-A PR-2011
224 8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
21-6 1-01-9 00-80 1-01 COCKPIT TEMPERATURE MODE SELE CTOR
625 638-1 MOS TSN:0 01-A PR-2011
625 638-02 457 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
21-6 1-01-9 00-80 1-02 CABIN TEMPERATURE MODE SELE CTOR
625 638-1 MOS TSN:0 01-A PR-2011
625 638-02 460 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
21-6 1-01-9 00-80 1-03 COCKPIT SE LECTO R,TEMP,A /C SELECTOR
627 964-1 MOS TSN:0 01-A PR-2011
627 964-02 288 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
21-6 1-01-9 00-80 1-04 CABIN SE LECTO R,TEMP,A /C SELE CTOR
627 964-1 MOS TSN:0 01-A PR-2011
627 964-02 289 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
21-6 1-13-9 00-80 1-01 COCKPIT TEMPERATURE CONTRO L UNIT
625 514-2 MOS TSN:0 01-A PR-2011
625 514-01 948 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-6 1-13-9 00-80 1-02 CABIN TEMPERATURE CONTRO L UNIT
625 514-2 MOS TSN:0 01-A PR-2011
625 514-01 949 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-6 1-15-9 00-80 1-01 LH TEMPE RA TURE CO NTROL UNIT
625 520-2 MOS TSN:0 01-A PR-2011
625 520-01 925 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-6 1-15-9 00-80 1-02 RH TEMPERATURE CONTRO L UNIT
625 520-2 MOS TSN:0 01-A PR-2011
625 520-01 924 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
14 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
21-6 1-16-9 00-80 1-01 CARGO COMPARTMENT L H -CABIN DUCT TE MP ERATURE SENSOR
660 0423-4 MOS TSN:0 01-A PR-2011
627 962-23 588 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-6 1-16-9 00-80 1-02 CARGO COMPARTMENT RH -CA BIN DUCT TEMPERATURE S ENSOR
660 0423-4 MOS TSN:0 01-A PR-2011
627 962-23 645 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

21-6 1-16-9 00-80 1-03 AFT EQ UIPMENT COMPARTMENT LH - CA BIN DUCT TEMPERATURE S ENS OR
660 0423-4 MOS TSN:0 01-A PR-2011
627 962-23 607 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

21-6 1-16-9 00-80 1-04 AFT EQ UIPMENT COMPARTMENT RH -CABIN DUCT TE MP ERATURE SENSOR
660 0423-4 MOS TSN:0 01-A PR-2011
627 962-23 606 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

21-6 1-19-9 00-80 1-01 COCKPIT FAN S ENS OR


625 692-2- 1 MOS TSN:0 01-A PR-2011
625 692-02 016 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

21-6 1-22-9 00-80 1-01 CABIN FAN S ENSOR


625 692-2- 1 MOS TSN:0 01-A PR-2011
625 692-02 076 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

21-6 1-25-9 00-80 1-01 LH PNE UMATIC SHUTO FF MO TO R


124 904-1- 1 MOS TSN:0 01-A PR-2011
774 8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

21-6 1-25-9 00-80 1-02 RH PNEUMATIC SHUTOFF MOTOR


124 904-1- 1 MOS TSN:0 01-A PR-2011
776 7 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

21-6 1-27-9 00-80 1-01 LH SHUT-OFF, A/C DUCT VALVE


979 558-8 MOS TSN:0 01-A PR-2011
206 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-6 1-28-9 00-80 1-02 RH SHUT- OFF, A /C DUCT VA LVE
979 558-8 MOS TSN:0 01-A PR-2011
206 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-6 1-31-9 00-80 1-01 LH A/C DUCT LIMITER VALVE
129 580-6 MOS TSN:0 01-A PR-2011
894 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
15 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
21-6 1-31-9 00-80 1-02 RH A/C DUCT LIMITER VA LVE
129 580-6 MOS TSN:0 01-A PR-2011
894 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
21-6 1-34-9 00-80 1-01 LH SERVO, P RE SSURE REG ULA TING VALVE
321 4066-1 MOS TSN:0 01-A PR-2011
309 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

21-6 1-34-9 00-80 1-02 RH SE RVO , PRESS URE REGULATING VA LVE


321 4066-1 MOS TSN:0 01-A PR-2011
309 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
CHA PTER 22 AUTO FLIGHT
22-1 1-00-2 01 (s) OPE RA TIONAL TEST S VL - 4 000 RUDDER ACTUATO R BRAKE PKG
22-1 1-00-2 01 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 153 4.3
REF: AMM 2 2 2 2 0 1 71 0 8 03 AFL 988
22-1 1-00-2 02 (s) LUBRICATION E LEVATOR SERVO PKG
22-1 1-00-2 02 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 1 2 2 0 0 4 64 0 8 35 AFL 127 5
22-1 1-00-7 10-80 2 OPE RA TIONAL TEST O F THE FLIGHT CONTROL COMPUTERS (FCC)
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883
22-1 1-01-9 00-80 1-01 FLIG HT CONTROL PANEL
822 -0182- 101 MOS TSO:0 24-FEB -2013
3V7 HB HRS /MSC O/C TSO:0 456 .9
REF: See Workcard AFL TSO:0 187

22-1 1-04-9 00-80 1-01 SERVO AILERON MOUNT


601 R92 614-9 MOS TSN:0 01-A PR-2011
44TWC HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-1 1-10-9 00-80 1-01 SERVO AILERON ACTUATOR
601 R92 614-1 3 MOS TSN:0 01-A PR-2011
3XL NB HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-1 1-13-9 00-80 1-01 ELE VATOR S MT-87 B,S ERVO MO UNT
601 R92 614-1 1 MOS TSN:0 01-A PR-2011
39DGN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-1 1-13-9 00-80 2-01 SERVO EL EVATOR ACTUATOR
601 R92 614-1 5 MOS TSN:0 01-A PR-2011
3PCNC HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
16 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
22-1 2-00-2 01 (s) DETAIL ED INSPECTIO N OF THE LIG HTNING / HIGH INTENSITY RADIATED FIELD (L /HIRF) PROTECTION IN THE FLIGHT PKG
COMPARTME NT
PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
L/HIRF REF: AMM 2 2 1 2 2 2 22 0 8 01 AFL 127 5

22-1 2-00-2 02 (s) DETAIL ED INSPECTIO N OF THE LIG HTNING / HIGH INTENSITY RADIATED FIELD (L /HIRF) PROTECTION IN THE PKG
FUS ELAG E / STA BILIZER - INTERNAL
PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
L/HIRF REF: AMM 2 2 1 2 2 2 22 0 8 02 AFL 127 5

22-1 2-00-2 03 (s) DETAIL ED INSPECTIO N OF THE LIG HTNING / HIGH INTENSITY RADIATED FIELD (L /HIRF) PROTECTION O F THE PKG
VERTICAL STAB ILIZER - INTERNAL
PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 2 1 2 2 2 22 0 8 03 AFL 127 5
22-1 2-00-2 04 (s) DETAIL ED INSPECTIO N OF THE LIG HTNING / HIGH INTENSITY RADIATED FIELD (L /HIRF) PROTECTION IN THE AFT PKG
EQUIPMENT COMPARTME NT
PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
L/HIRF REF: AMM 2 2 1 2 2 2 22 0 8 04 AFL 127 5

22-1 2-00-2 05 (s) DETAIL ED INSPECTIO N OF THE LIG HTNING / HIGH INTENSITY RADIATED FIELD (L /HIRF) PROTECTION IN THE PKG
FUS ELAG E B ETWE EN FS409 .00 AND FS6 21.00, BE LOW WL7 3.5 - INTERNAL
PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
L/HIRF REF: AMM 2 2 1 2 2 2 22 0 8 05 AFL 127 5

22-1 2-00-2 06 (s) DETAIL ED INSPECTIO N OF THE LIG HTNING / HIGH INTENSITY RADIATED FIELD (L /HIRF) PROTECTION O N THE PKG
AVIONICS RACKS
PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
L/HIRF REF: AMM 2 2 1 2 2 2 22 0 8 06 AFL 127 5

22-1 2-00-2 07 (s) SPE CIAL DETAIL ED INSPECTIO N (BORES CO PE) OF THE LIG HTNING / HIG H INTENSITY RADIATED FIE LD (L/HIRF) PKG
PROTECTION ON THE #2 VHF ANTE NNA
PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
L/HIRF REF: AMM 2 2 1 2 2 2 28 0 8 01 AFL 127 5

22-1 2-00-2 08 (s) DETAIL ED INSPECTIO N OF THE LIG HTNING / HIGH INTENSITY RADIATED FIELD (L /HIRF) PROTECTION IN THE PKG
AVIONICS COMPARTMENTS
PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
L/HIRF REF: AMM 2 2 1 2 2 2 22 0 8 08 AFL 127 5

22-1 2-00-2 09 (s) DETAIL ED INSPECTIO N OF THE LIG HTNING / HIGH INTENSITY RADIATED FIELD (L /HIRF) PROTECTION O N THE PKG
UPPER FS 621 BULKHEAD
PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
L/HIRF REF: AMM 2 2 1 2 2 2 22 0 8 09 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
17 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
22-1 2-00-2 10 (s) DETAIL ED INSPECTIO N OF THE LIG HTNING / HIGH INTENSITY RADIATED FIELD (L /HIRF) PROTECTION O N THE WING PKG
DIS CO NNECTS - EX TE RNAL
PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
L/HIRF REF: AMM 2 2 1 2 2 2 22 0 8 10 AFL 127 5
22-1 2-00-2 11 (s) DETAIL ED INSPECTIO N OF THE LIG HTNING / HIGH INTENSITY RADIATED FIELD (L /HIRF) PROTECTION O N THE WING PKG
DIS CO NNECTS - INTERNAL
PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
L/HIRF REF: AMM 2 2 1 2 2 2 22 0 8 11 AFL 127 5
22-1 2-00-2 12 (s) DETAIL ED INSPECTIO N OF THE LIG HTNING / HIGH INTENSITY RADIATED FIELD (L /HIRF) PROTECTION IN THE MA IN PKG
WHEEL WELLS
PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
L/HIRF REF: AMM 2 2 1 2 2 2 22 0 8 12 AFL 127 5
22-1 2-00-2 13 (s) DETAIL ED INSPECTIO N OF THE LIG HTNING / HIGH INTENSITY RADIATED FIELD (L /HIRF) PROTECTION IN THE NO SE PKG
WHEEL WELL AND LANDING GE AR AS SEMBLY
PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
L/HIRF REF: AMM 2 2 1 2 2 2 22 0 8 13 AFL 127 5
22-1 2-04-9 00-80 1-01 IAPS #1A IOC-4100, INPUT/O UTPUT CONCENTRATOR
822 -1362- 084 MOS TSN:10 7 13-MAR-2 020
3J7PJ HRS /MSC O/C TSN:19 26.4 192 6.4
REF: See Workcard AFL TSN:12 75 127 5
22-1 2-04-9 00-80 1-02 IAPS #2A IOC-4100, INPUT/O UTPUT CONCENTRATOR
822 -1362- 084 MOS TSN:10 7 13-MAR-2 020
45L 9T HRS /MSC O/C TSN:19 26.4 192 6.4
REF: See Workcard AFL TSN:12 75 127 5
22-1 2-04-9 00-80 1-03 IAPS #1B IOC-4100, INPUT/O UTPUT CONCENTRATOR
822 -1362- 084 MOS TSN:10 7 13-MAR-2 020
45K WX HRS /MSC O/C TSN:19 26.4 192 6.4
REF: See Workcard AFL TSN:12 75 127 5
22-1 2-04-9 00-80 1-04 IAPS #2B IOC-4100, INPUT/O UTPUT CONCENTRATOR
822 -1362- 084 MOS TSN:10 7 13-MAR-2 020
45K WW HRS /MSC O/C TSN:19 26.4 192 6.4
REF: See Workcard AFL TSN:12 75 127 5
22-1 2-07-9 00-80 1-01 IAPS #1A PO WE R SUPPLY MODULE
622 -9945- 021 MOS TSN:0 01-A PR-2011
3XP 3P HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-1 2-07-9 00-80 1-02 IAPS #1B PO WE R SUPPLY MODULE
622 -9945- 021 MOS TSN:0 01-A PR-2011
3XP FF HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
18 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
22-1 2-07-9 00-80 1-03 IAPS #2A PO WE R SUPPLY MODULE
622 -9945- 021 MOS TSN:0 01-A PR-2011
3XP FH HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-1 2-07-9 00-80 1-04 IAPS #2B PO WE R SUPPLY MODULE
622 -9945- 021 MOS TSN:0 01-A PR-2011
3XP 3L HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

22-1 2-10-9 00-80 1-01 IAPS #1A FLIGHT CONTROL COMPUTE R


822 -0809- 810 MOS TSN:10 7 13-MAR-2 020
45L HY HRS /MSC O/C TSN:19 26.4 192 6.4
REF: See Workcard AFL TSN:12 75 127 5

22-1 2-10-9 00-80 1-02 IAPS #1B FLIGHT CONTROL COMPUTE R


822 -0809- 810 MOS TSN:10 7 13-MAR-2 020
45L 6D HRS /MSC O/C TSN:19 26.4 192 6.4
REF: See Workcard AFL TSN:12 75 127 5

22-1 2-10-9 00-80 1-03 IAPS #2A FLIGHT CONTROL COMPUTE R


822 -0809- 810 MOS TSN:10 7 13-MAR-2 020
45L JB HRS /MSC O/C TSN:19 26.4 192 6.4
REF: See Workcard AFL TSN:12 75 127 5

22-1 2-10-9 00-80 1-04 IAPS #2B FLIGHT CONTROL COMPUTE R


822 -0809- 810 MOS TSN:10 7 13-MAR-2 020
45L HX HRS /MSC O/C TSN:19 26.4 192 6.4
REF: See Workcard AFL TSN:12 75 127 5

22-1 2-13-9 00-80 1-01 IAPS #1B CSU-4100 ,CONFIGURATIO N STRAPPING UNIT
822 -1364- 002 MOS TSN:0 01-A PR-2011
45L BN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

22-1 2-13-9 00-80 1-02 IAPS #2B CSU-4100 ,CONFIGURATIO N STRAPPING UNIT
822 -1364- 002 MOS TSN:0 01-A PR-2011
45L 5G HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

22-1 2-13-9 00-80 3-01 OCM-4100 ,OP TIONS CONTROL MODULE


822 -1463- 237 MOS 13-MAR-2 020
4K3 79X HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5
22-1 2-13-9 00-80 4-01 OCM-4100 ,OP TIONS CONTROL MODULE
822 -1463- 237 MOS 13-MAR-2 020
4K3 841 HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5
22-1 2-16-3 01 DIS CA RD NO . 1 FLIGHT MANAG EMENT (FMC) COMPUTER BATTERY
822 -2488- 110 MOS 13-MAR-2 020
4K3 6DR HRS /MSC - 192 6.4
OPTIONAL REF: AMM 2 2 1 2 1 6 96 0 8 01 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
19 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
22-1 2-16-3 01 DIS CA RD NO . 2 FLIGHT MANAG EMENT (FMC) COMPUTER BATTERY
822 -2488- 110 MOS 13-MAR-2 020
4K3 7IG HRS /MSC - 192 6.4
OPTIONAL REF: AMM 2 2 1 2 1 6 96 0 8 01 AFL 127 5
22-1 2-16-3 01 DIS CA RD NO . 3 FLIGHT MANAG EMENT (FMC) COMPUTER BATTERY
PN MOS 29-MAR-2 018
SN-UNKNOWN HRS /MSC - 153 4.3
OPTIONAL REF: AMM 2 2 1 2 1 6 96 0 8 01 AFL 988

22-1 2-16-9 00-80 1-01 NO. 1 FLIG HT MA NA GEMENT (FMC) COMPUTER


822 -2488- 110 MOS 13-MAR-2 020
4K3 6DR HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5
22-1 2-16-9 00-80 1-02 NO. 2 FLIG HT MA NA GEMENT (FMC) COMPUTER
822 -2488- 110 MOS 13-MAR-2 020
4K3 7IG HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5
22-1 2-16-9 00-80 1-03 NO. 3 FLIG HT MA NA GEMENT (FMC) COMPUTER
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-1 2-19-9 00-80 1-01 IAPS #1B IEC,ENVIRONME NTAL CONTRO LLER
822 -0288- 001 MOS TSN:0 01-A PR-2011
45L 9L HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-1 2-19-9 00-80 1-02 IAPS #2B IEC,ENVIRONME NTAL CONTRO LLER
822 -0288- 001 MOS TSN:0 01-A PR-2011
45L 9K HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-1 2-22-9 00-80 1-01 IAPS #1A LHP40 00,LIG HTNING PROTECTOR
822 -0287- 702 MOS TSN:0 01-A PR-2011
45K WB HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-1 2-22-9 00-80 1-02 IAPS #2A LHP40 01,LIG HTNING PROTECTOR
822 -0332- 702 MOS TSN:0 01-A PR-2011
45K YY HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-1 2-25-9 00-80 1-01 MDC-3 110, MAINT DIAG COMPUTER
822 -1987- 006 MOS TSN:0 01-A PR-2011
3XP 7J HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-1 2-25-9 00-80 2-01 IAPS INTEG CARD CAGE CAGE
822 -0781- 001 MOS TSN:0 01-A PR-2011
45M0G HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
20 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
22-1 2-28-9 00-80 1-01 AUTOTHROTTLE POWER ASSEMBL Y
113 5-4 MOS TSN:0 01-A PR-2011
139 191-03 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
22-1 2-28-9 00-80 1-02 LH AUTOTHROTTLE CABL E A SSEMBL Y
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

22-1 2-28-9 00-80 2-01 IAPS #1A SSM-4 000,SERVO SWITCHING MODUL E
822 -0782- 001 MOS TSN:0 01-A PR-2011
45L 7K HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

22-1 2-28-9 00-80 2-02 IAPS #2A SSM-4 000,SERVO SWITCHING MODUL E
822 -0782- 001 MOS TSN:0 01-A PR-2011
45L CK HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

22-2 2-00-1 01 OPE RA TIONAL TEST L H YAW DA MP ER LINEAR ACTUATOR (CMR**)


22-2 2-00-1 01 PK G 4 800 MOS
HRS /MSC 480 0 0 480 0
REF: AMM 2 2 2 2 0 1 71 0 8 02 AFL

22-2 2-00-1 01 OPE RA TIONAL TEST RH Y AW DAMPER LINE AR ACTUATO R (CMR**)


22-2 2-00-1 01 PK G 4 800 MOS
HRS /MSC 480 0 0 480 0
REF: AMM 2 2 2 2 0 1 71 0 8 02 AFL

22-2 2-01-9 00-80 1-01 LH (SVL40 00) YAW DA MP ER LINEAR A CTUATOR


622 -9968- 102 MOS TSN:0 01-A PR-2011
456 KL HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

22-2 2-01-9 00-80 1-02 RH (SV L4000 ) YA W DAMPER LINEA R ACTUA TOR
622 -9968- 102 MOS TSN:0 01-A PR-2011
456 KK HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

22-3 0-01-9 00-80 1-01 AUTOPOWER COMPUTER


C-8863 5-4 MOS TSN:0 01-A PR-2011
141 172-01 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-3 0-05-9 00-80 1-01 ATS CO NTROL PANEL
C-8866 4-3 MOS TSN:0 01-A PR-2011
554 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-3 0-07-9 00-80 1-01 LH INDICATOR, AUTOPOWER DISP LAY
C-8860 4-5 MOS TSN:0 01-A PR-2011
124 767-06 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
21 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
22-3 0-07-9 00-80 1-02 RH INDICA TO R, AUTOP OWER DISPLA Y
C-8860 4-6 MOS TSN:0 01-A PR-2011
126 372-01 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
22-3 0-11-9 00-80 1-02 RH AUTOTHROTTLE CABLE ASS EMBLY
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

22-3 0-11-9 00-80 2-01 LEFT HAND A UTO THROTTLE SERVO MOTOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
22-3 0-11-9 00-80 2-02 RIG HT HA ND AUTO THRO TTLE SERVO MOTOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
221 113-09 01 VERTICAL STAB DUAL VOR A NTENNA CO UP LER
SSP D- 113-38 MOS TSN:0 17-A PR-2012
666 -2447 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
CHA PTER 23 COMMUNIC ATIONS
23-1 0-00-9 00-80 1-01 AEROCOM 1000 CTU UNIT
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
23-1 1-01-9 00-80 1-01 NO.1 V HF-40 00,COMM TRANSCEIVER
822 -1468- 102 MOS TSN:0 01-A PR-2011
45W5V HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

23-1 1-01-9 00-80 1-02 NO.2 V HF-40 00,COMM TRANSCEIVER


822 -1468- 102 MOS TSN:0 01-A PR-2011
45W3X HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
23-1 1-01-9 00-80 1-03 NO.3 V HF-40 00,COMM (O PTIONAL) TRANSCEIV ER
822 -1468- 390 MOS 13-MAR-2 020
78D4T HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5
23-1 1-04-9 00-80 1-01 UPPER FWD VHF NO.1 ANTENNA
S65 -8280- 10 MOS TSO:0 14-MAR-2 022
312 6 HRS /MSC O/C TSO:0 219 4.6
REF: See Workcard AFL TSO:0 147 5
23-1 1-04-9 00-80 1-02 LOWER ,V HF NO .2 ANTENNA
S65 -8280- 10 MOS TSN:0 01-A PR-2011
310 -21504 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
22 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
23-1 2-00-7 10-80 1 OPE RA TIONAL TEST O F HIG H FRE QUENCY (VHF) COMMUNICATIO N SYS TE M
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883
23-1 2-01-9 00-80 1-01 NO.1 HF ( HF-903 1A) TRANSCEIVER
822 -0101- 002 MOS TSN:0 01-A PR-2011
513 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

23-1 2-01-9 00-80 1-02 NO.2 HF ( HF-903 1A) TRANSCEIVER


822 -0101- 002 MOS TSN:0 01-A PR-2011
514 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

23-1 2-03-9 00-80 1-01 NO.1 HF A NTENNA CO UP LER


685 -0350- 002 MOS TSN:0 01-A PR-2011
107 59 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

23-1 2-03-9 00-80 1-02 NO.2 HF A NTENNA CO UP LER


685 -0350- 002 MOS TSN:0 01-A PR-2011
107 58 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

23-1 4-01-9 00-80 1-01 BAND PASS IRIDIUM FILTER


500 918 MOS TSN:0 01-A PR-2011
821 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

23-1 5-09-9 00-80 1-01 SATEL LITE ANTENNA ASS EMBLY


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

23-1 5-13-9 00-80 1-01 DIP LEXER/LNA A SSEMBL Y


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

23-1 5-53-9 00-80 1-01 ANTENNA ,CONTROL UNIT


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
23-1 7-24-9 00-80 1-01 IRIDIUM A NTENNA
015 -11203 -001 MOS 13-MAR-2 020
449 -9376 HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5
23-1 7-24-9 00-80 2-01 COCKPIT, SIG MA 7 HANDSET
500 040-11 -10 MOS TSN:0 01-A PR-2011
090 9-5269 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
23 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
23-2 1-01-9 00-80 1-01 SEL CA L DECODER
120 0008-0 01 MOS TSN:0 01-A PR-2011
656 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
23-2 3-00-9 00-80 1-01 MODULAR EQ UIPMENT CABINET
822 -1877- 001 MOS 13-MAR-2 020
48X 3B HRS /MSC O/C 192 6.4
REF: GENERIC NO RE F AFL 127 5

23-2 3-01-9 00-80 1-01 CMU-4 000,CO MM.MANAGMENT UNIT


822 -1739- 603 MOS TSN:10 7 13-MAR-2 020
3XG 4R HRS /MSC O/C TSN:19 26.4 192 6.4
REF: See Workcard AFL TSN:12 75 127 5
23-2 3-02-9 00-80 1-01 CMU MOUNTING TRAY
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
23-2 3-03-9 00-80 1-01 DATALINK EX TE RNAL COMPENSATION-UNIT (E CU)
822 -1200- 999 MOS TSN:0 01-A PR-2011
49N9N HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
23-4 1-01-9 00-80 1-01 NLG WHE EL WE LL (ZO NE 12 3) ,GROUND- CREW INTERPHONE UNIT
600 -59146 -3 MOS TSN:0 01-A PR-2011
769 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
23-4 1-01-9 00-80 1-02 MAIN AVIONICS COMP. (ZONE 141) ,GROUND-CREW INTERPHONE UNIT
600 -59146 -3 MOS TSN:0 01-A PR-2011
768 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
23-4 1-01-9 00-80 1-03 AFT EQ UIPMENT COMP. ( ZO NE 311 ),G RO UND-CRE W INTERPHONE UNIT
600 -59146 -3 MOS TSN:0 01-A PR-2011
775 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
23-5 1-01-9 00-80 1-01 AUDIO EL ECTRONIC CONTROL UNIT
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
23-5 1-04-9 00-80 1-01 LH AIS -ACP3V,AUDIO CONTROL UNIT
856 -0073- 060 MOS TSN:0 01-A PR-2011
A00 9SV HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
23-5 1-04-9 00-80 1-02 RH AIS-ACP3 V,A UDIO CO NTROL UNIT
856 -0073- 060 MOS TSN:0 01-A PR-2011
A00 9SP HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
24 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
23-6 0-00-2 01 (s) FUNCTIONAL TEST STATIC DISCHA RG ERS PKG
23-6 0-00-2 01 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 3 6 1 0 1 72 0 8 01 AFL 127 5
23-6 0-00-2 02 (s) FUNCTION TE ST (B ONDING CHECK) OF THE STATIC DISCHA RG ER BA SE PKG
PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 3 6 1 0 4 72 0 8 01 AFL 127 5

23-6 0-00-2 03 (s) FUNCTIONAL TEST (BONDING CHE CK ) OF THE NOSE- RA DO ME LIGHTNING STRIPS PKG
236 000-20 3 PK G 4 8 MOS 48 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 3 6 1 0 1 72 0 8 01 AFL 127 5

23-7 1-00-2 01 DIS CA RD CV R ULB UNDERWATER LO CATOR BEACON BATTERY


23-7 1-00-2 01 PN MOS 26-A PR-2021 01-NOV -2023 M
SN-UNKNOWN HRS /MSC DUE 216 3.0 8
MRB REF: AMM 2 3 7 1 0 3 96 0 8 01 AFL 145 7

23-7 1-00-2 02 (s) OPE RA TIONAL TEST O F THE COCKPIT VO ICE RECORDE R (CVR) S YSTEM PKG
23-7 1-00-2 02 PK G 1 200 MOS 27-S EP-20 19
HRS /MSC 120 0 +40/-40 187 7.3
MRB REF: AMM 2 3 7 1 0 0 71 0 8 01 AFL 123 6

23-7 1-00-2 03 OPE RA TIONAL TEST CVR UL B


23-7 1-00-2 03 PK G 3 6 MOS 36 +1m/-1m 04-MAR-2 021 04-MAR-2024 04-A PR-2024
HRS /MSC 212 1.7 3
MRB REF: AMM 2 3 7 1 0 3 71 0 8 01 AFL 143 7

23-7 1-01-9 00-80 1-01 CVR - COCKPIT VO ICE RE CO RDER


210 0-1025 -22 MOS TSR:0 26-A PR-2021
000 95464 0 HRS /MSC O/C TSR:0 216 3.0 8
REF: See Workcard AFL TSR:0 145 7

23-7 1-03-9 00-80 3-01 CVR ULB UNDERWATER L OCATOR BE ACON


PN MOS 26-A PR-2021
SN-UNKNOWN HRS /MSC O/C 216 3.0 8
REF: See Workcard AFL 145 7

23-7 1-04-9 00-80 1-01 CONTROL GREY PA NE L


S15 1-0020 -00 MOS TSN:0 01-A PR-2011
664 756 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
23-7 1-07-9 00-80 1-01 CVR G RE Y MICROP HO NE
N811-0 265 MOS TSN:0 01-A PR-2011
599 989 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
23-7 1-10-9 00-80 1-01 CVR S WITCH
3LO -453/2 MOS TSN:0 01-A PR-2011
923 29 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
25 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
23-7 1-CUS -2001 PERFORM DOWNLOAD AND ANALY SIS O F THE CVR
MOS 12 +10% /-1 0% 14-MAR-2 022 14-MAR-2023 20-A PR-2023
HRS /MSC 219 4.6
REF: AFL 147 5
230 000-04 01 NO.1 A UDIO CO NNECTOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

230 000-04 02 NO.2 A UDIO CO NNECTOR


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
230 000-09 01 FS 260, LH U/FLOO R IRIDIUM, ICS TRA NS CE IVE R
500 617-4 MOS TSN:0 17-A PR-2012
559 4 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
231 104-09 01 VHF 3/AFT.UPPE R ANTENNA , VHF ANTENNA
S65 -8280- 10 MOS TSR:6 14-MAR-2 022
265 1 HRS /MSC O/C TSR:0 219 4.6
REF: AFL TSR:0 147 5
231 700-09 01 SIDELEDGE ASS Y, LHS PHONE SYSTEM, CORDLESS 1. HANDSET
463 092-20 0 MOS TSN:0 17-A PR-2012
S30 04925 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
231 700-09 02 SIDELEDGE ASS Y, RHS FWD PHONE SYS TE M, CO RDLES S 1 . HANDSE T
463 092-20 0 MOS TSN:0 17-A PR-2012
S30 04936 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
231 701-09 01 SPA RE & LOO SE EQUIP CORDLES S, BLA CK HANDSET
463 092-11 0 MOS TSN:0 17-A PR-2012
300 4761 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
231 702-09 01 SPA RE & LOO SE EQUIP P RO NTO PCU
441 -0095- 100 MOS TSN:0 17-A PR-2012
36JTG HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
231 702-09 02 SPA RE & LOO SE EQUIP P RO NTO PCU
441 -0095- 100 MOS TSN:0 17-A PR-2012
36JTH HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
231 702-09 03 SPA RE & LOO SE EQUIP P RO NTO PCU
441 -0095- 100 MOS TSN:0 17-A PR-2012
36JTK HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
26 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
231 704-09 01 DADO FS4 45 RHS IIE-6 000,RF,WIRELE SS UNIT
203 3-1-1 MOS TSN:0 17-A PR-2012
3YRMV HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
235 000-09 01 GAL LEY TOWER AS SY AIS-ACP3V, AUDIO CTRL PAN CONTROL PANEL
856 -0073- 060 MOS TSN:34 TSR:9 08-MAY -2018
A00 KLH HRS /MSC O/C TSN:64 3.4 TSR:0 155 0.8
REF: AFL TSN:35 9 TSR:0 100 4

235 001-09 01 FS 235, AV IO NIC BA Y RH AUDIO CO NTROL UNIT


536 0-1-14 MOS TSN:0 17-A PR-2012
A00 92W HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

235 002-09 01 COCKPIT AUDIO MIXER


502 0-1 MOS TSN:0 17-A PR-2012
402 6 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

237 100-09 01 FS755 RIP S TYP E II, NICAD A SSY


100 -2010- 100 MOS TSN:1 12-O CT-20 18
001 28776 4 HRS /MSC O/C TSN:0 163 3
REF: AFL TSN:0 107 9
CHA PTER 24 ELECTRIC AL POWER
24-0 0-00-3 01 (s) OPE RA TIONAL TEST (CYCLING) OF THE THERMAL CIRCUIT BREAK ERS PKG
PK G 1 2 MOS 12 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
OPTIONAL REF: AMM 2 4 0 0 0 0 71 0 8 01 AFL 147 5

24-0 1-01-9 00-80 1-01 JB1 TRANSFORMER


80E 28CT MOS TSN:0 01-A PR-2011
326 12-48 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

24-0 1-01-9 00-80 2-01 EXTERNAL POWER MO NITOR-


600 -59142 -3 MOS TSN:0 01-A PR-2011
139 09 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

24-0 1-01-9 00-80 3-01 1T1XA TRANSFO RMER


720 847A MOS TSN:0 01-A PR-2011
106 05 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

24-0 1-01-9 00-80 4-01 1T2XA TRANSFO RMER


720 847A MOS TSN:0 01-A PR-2011
106 19 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

24-0 1-01-9 00-80 5-01 2T2XA TRANSFO RMER


720 847A MOS TSN:0 01-A PR-2011
106 27 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
27 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
24-0 1-01-9 00-80 6-01 T1XB TRA NS FO RMER
720 847A MOS TSN:0 01-A PR-2011
106 04 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-0 1-01-9 00-80 7-01 2T1XA TRANSFO RMER
720 847A MOS TSN:0 01-A PR-2011
106 98 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

24-0 1-01-9 00-80 8-01 LOWER TRANSFORMER


601 R59 155-1 MOS TSN:0 01-A PR-2011
322 90-45 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-0 1-01-9 00-80 9-01 MIDDLE TRA NSFORMER
601 R59 155-1 MOS TSN:0 01-A PR-2011
327 43-39 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-0 1-01-9 00-81 0-01 UPPER TRANSFORMER
601 R59 155-1 MOS TSN:0 01-A PR-2011
313 13-28 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-0 1-01-9 00-81 1-01 1K1 XA JUNCTION B OX AIRCRAFT SYS TE M NO.1 G ENE RA TO R CONTA CTOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-0 1-01-9 00-81 1-02 2K1 XA JUNCTION B OX AIRCRAFT SYS TE M NO.2 G ENE RA TO R CONTA CTOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-0 1-01-9 00-81 1-03 K1X B JUNCTION BO X NO.1 APU/EXT P WR GENERATOR CONTACTOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-0 1-08-9 00-80 1-01 JB8 JUNCTION B OX
822 -0845- 001 MOS TSN:0 01-A PR-2011
44X BH HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
24-0 1-08-9 00-80 2-01 JB9 JUNCTION B OX
822 -0845- 001 MOS TSN:0 01-A PR-2011
44X VD HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
24-0 1-10-9 00-80 1-01 LH NO .10 JUNCTIO N BOX
604 -51423 -1 MOS TSN:0 01-A PR-2011
101 10553 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
28 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
24-0 1-11-9 00-80 1-02 RH NO.11 JUNCTION B OX
604 -51423 -3 MOS TSN:0 01-A PR-2011
101 00547 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
24-0 1-18-9 00-80 1-01 JB18 TRA NSFORMER
80E 28CT MOS TSN:0 01-A PR-2011
322 58-2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

24-0 1-18-9 00-80 2-01 JB18 SENSO R


600 -59181 -3 MOS TSN:0 01-A PR-2011
128 66 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

24-1 1-01-9 00-80 1-01 LH IDG - INTE GRATED DRIVE GE NE RA TO R


731 579C MOS TSR:0 12-A PR-2021
204 0/G EN04697 HRS /MSC O/C TSN:11 51 TS R:0 214 3.4
REF: See Workcard AFL TSN:51 3 TSR:0 144 9

24-1 1-01-9 00-80 1-02 RH IDG - INTEGRATED DRIVE GENERATOR


731 579C MOS TSN:0 01-A PR-2011
173 1GEN001 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

24-1 1-01-9 00-80 2-01 APU GENERATOR


720 845E MOS 26-A PR-2017
001 2 HRS /MSC O/C
REF: See Workcard AFL

24-1 2-04-9 00-80 1-01 LH IDG OIL COO LER


63E 79-2 MOS TSN:0 01-A PR-2011
219 8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

24-1 2-04-9 00-80 1-02 RH IDG O IL COOLE R


63E 79-2 MOS TSN:0 01-A PR-2011
221 6 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

24-2 0-00-2 01 (s) DIS CA RD LH IDG CHARGE (OIL-IN) FIL TER ELEMENT PKG
24-2 0-00-2 01 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 4 1 2 1 0 96 0 8 01 AFL 150 5
24-2 0-00-2 01 (s) DIS CA RD RH IDG CHA RG E (O IL- IN) FILTER E LEMENT PKG
24-2 0-00-2 01 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 4 1 2 1 0 96 0 8 01 AFL 150 5
24-2 0-00-2 02 (s) DIS CA RD LH IDG S CAV ENGE (OIL-OUT) FILTER EL EMENT PKG
24-2 0-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 4 1 2 1 6 96 0 8 01 AFL 150 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
29 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
24-2 0-00-2 02 (s) DIS CA RD RH IDG SCAVENGE (O IL- OUT) FILTER ELEMENT PKG
24-2 0-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 4 1 2 1 6 96 0 8 01 AFL 150 5
24-2 0-00-2 06 (s) OPE RA TIONAL TEST CAB IN P OWER S HUT-OFF SWITCH PKG
24-2 0-00-2 06 PK G 2 4 MOS 24 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 2 4 0 0 0 0 71 0 8 02 AFL 147 5

24-2 0-00-2 07 FUNCTIONAL TEST AIR DRIVEN GENERATOR (A DG ) HEA TER


24-2 0-00-2 07 MOS 24 +1m/-1m -1 14-MAR-2 022 13-MAR-2024 13-A PR-2024
HRS /MSC 160 0 +40/-40 219 4.6 379 4.6 383 4.6
REF: AMM 2 4 2 3 0 1 72 0 8 01 AFL 147 5
24-2 1-00-1 01 FUNCTIONAL TEST GENERATOR CONTRO L UNIT (GCU) O VERVOL TAG E PRO TE CTION CIRCUITS (CMR*)
24-2 1-00-1 01 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 153 4.3 313 4.3
REF: AMM 2 4 2 0 0 0 72 0 8 01 AFL 988
24-2 1-04-9 00-80 1-01 LH ENG INE GENERATOR CO NTROL UNIT
720 846D MOS TSN:0 01-A PR-2011
628 5 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-2 1-04-9 00-80 1-02 RH ENGINE G ENERATOR CONTRO L UNIT
720 846D MOS TSN:0 01-A PR-2011
629 2 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-2 1-04-9 00-80 2-01 APU GENERATOR CONTROL UNIT
720 846D MOS TSN:0 01-A PR-2011
629 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
24-2 2-02-9 00-80 1-01 APU GENERATOR A DA PTOR
722 882F MOS 26-A PR-2017
092 8/0 012 HRS /MSC O/C 136 3.8
REF: See Workcard AFL 883
24-2 2-02-9 00-80 1-02 APU GENERATOR A DA PTOR
722 773E MOS TSN:0 01-A PR-2011
928 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
24-2 3-00-1 01 OPE RA TIONAL TEST A IR DRIVEN G ENERATO R (ADG) . (CMR*)
24-2 3-00-1 01 MOS 24 -5 18-MAR-2 022 13-MAR-2024
HRS /MSC 160 0 219 5.7 379 5.7
REF: AMM 2 4 2 3 0 1 71 0 8 01 AFL 147 6
24-2 3-01-9 00-80 1-01 AIR DRIVE N GENERATOR CO NTROL UNIT
604 -90800 -27 MOS TSN:0 01-A PR-2011
208 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
30 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
24-2 3-07-9 00-80 1-01 ADG EJECTION JACK
604 -90800 -5 MOS TSN:0 01-A PR-2011
194 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
24-2 3-13-9 00-80 1-01 ADG, MAN RL SD CABL E
601 R90 830-2 3 MOS TSN:0 01-A PR-2011
709 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

24-2 3-13-9 00-80 2-01 AIR DRIVE N GENERATOR UP LOCK ACTUATOR


604 -90800 -3 MOS TSN:0 01-A PR-2011
196 2 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

24-2 3-22-9 00-80 1-01 AIR DRIVE N GENERATOR RE STOW PUMP


604 -90800 -21 MOS TSN:0 01-A PR-2011
C1918 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

24-2 3-30-9 00-80 1-01 ADG - AIR DRIVEN GENERATOR


604 -90800 -25 MOS TSN:0 01-A PR-2011
281 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

24-2 6-51-9 00-80 1-01 60HZ P OWER CONVERTER


1-00 2-010 2-1943 MOS 22-A UG -2012
HT0 02795 HRS /MSC O/C 230 .4
REF: GENERIC NO RE F AFL 104

24-3 0-00-2 01 (s) OPE RA TIONAL TEST TRANSFORME R RECTIFIE R UNIT (TRU) FAN PKG
24-3 0-00-2 01 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 2 4 3 1 0 1 71 0 8 02 AFL 123 6

24-3 0-00-2 02 FUNCTIONAL TEST MA IN BATTE RY (CAPA CITY CHECK) ( MRB)


24-3 0-00-2 02 175 6-3 PK G 6 MOS 6 +1m/-1m 21-FEB -2022 21-AUG-2 022 21-S EP-20 22
090 52001 79A6C HRS /MSC
REF: AMM 2 4 3 2 0 1 72 0 8 01 AFL

24-3 0-00-2 02-C OVE RHAUL MAIN BATTERY


175 6-3 MOS 12 14-MAR-2 022 14-MAR-2023
090 52001 79A6C HRS /MSC 300 219 4.6 249 4.6
REF: AFL 147 5
24-3 0-00-2 03 FUNCTIONAL TEST APU B ATTERY (CAPA CITY CHECK) (MRB)
24-3 0-00-2 03 401 78-26 PKG 6 MOS 6 +1m/-1m 21-FEB -2022 21-AUG-2 022 21-S EP-20 22
090 52001 C00 3B HRS /MSC
REF: AMM 2 4 3 2 0 4 72 0 8 01 AFL

24-3 0-00-2 03-C OVE RHAUL APU BATTERY


401 78-26 MOS 12 14-MAR-2 022 14-MAR-2023
090 52001 C00 3B HRS /MSC 300 219 4.6 249 4.6
REF: AFL 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
31 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
24-3 0-00-2 04 OPE RA TIONAL TEST DC E SSENTIA L B US (MRB )
24-3 0-00-2 04 PK G 1 200 MOS 27-S EP-20 19
HRS /MSC 120 0 +40/-40 187 7.3 307 7.3 311 7.3
REF: AMM 2 4 6 1 0 0 71 0 8 03 AFL 123 6
24-3 0-00-2 05 (s) OPE RA TIONAL TEST L EFT AND RIG HT BATTERY B US SES PKG
24-3 0-00-2 05 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 153 4.3
REF: AMM 2 4 6 1 0 0 71 0 8 01 AFL 988

24-3 0-00-2 06 OPE RA TIONAL TEST DC E ME RG ENCY BUS (MRB)


24-3 0-00-2 06 PK G 1 200 MOS 27-S EP-20 19
HRS /MSC 120 0 +40/-40 187 7.3 307 7.3 311 7.3
REF: AMM 2 4 6 1 0 0 71 0 8 02 AFL 123 6
24-3 1-01-9 00-80 1-01 NO.1 1 00 AMP CONVE RTER
MS179 76-2 MOS TSN:0 01-A PR-2011
100 70588 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-3 1-01-9 00-80 1-02 NO.2 1 00 AMP CONVE RTER
MS179 76-2 MOS TSN:0 01-A PR-2011
100 70587 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-3 1-01-9 00-80 1-03 NO.3 1 00 AMP CONVE RTER
MS179 76-2 MOS TSN:0 01-A PR-2011
100 70580 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-3 1-01-9 00-80 1-04 NO.4 1 00 AMP CONVE RTER
MS179 76-2 MOS TSN:0 01-A PR-2011
100 70583 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
24-3 2-01-9 00-80 1-01 MAIN BATTERY
175 6-3 MOS TSO:0 14-MAR-2 022
090 52001 79A6C HRS /MSC O/C TSO:0 219 4.6
REF: See Workcard AFL TSO:0 147 5
24-3 2-04-9 00-80 1-01 APU BATTERY
401 78-26 MOS TSO:0 14-MAR-2 022
090 52001 C00 3B HRS /MSC O/C TSO:0 219 4.6
REF: See Workcard AFL TSO:0 147 5
24-3 2-07-9 00-80 1-01 MAIN BATTERY CHARGER
100 -1084- 01 MOS TSN:0 01-A PR-2011
112 6551 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
24-3 2-07-9 00-80 2-01 APU BATTERY CHARGER
100 -1084- 01 MOS TSN:0 01-A PR-2011
102 1196 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
32 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 24-5 2-65-6 01 (s) OPE RA TIONAL TEST O F THE GROUND FAULT INTE RRUPTORS (GFI) PKG
PK G 1 2 MOS 12 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5
240 001-09 01 RELAY DRIVE E QUIP GAL LEY DRIVE EQUIPMENT RELAY
205 2-1-2 MOS TSN:0 17-A PR-2012
3XCDF HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

240 001-09 02 RELAY DRIVE E QUIP LH DADO DRIVE EQ UIPMENT RELA Y


205 2-1-2 MOS TSN:0 17-A PR-2012
42C9P HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

240 005-09 01 GAL LEY PANEL AS SY GALLE Y CB PANEL AS SY


604 DX 240100 1-013 /01 MOS TSN:0 17-A PR-2012
586 6 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

240 006-09 01 CASE ASS Y CAS E A SSY


604 DX 334300 2-001 MOS TSN:0 17-A PR-2012
F81191 0 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
APU Model : GTCP 36-150 (CL) Serial # P-310 Part # 3800804-1
24-2 0-00-2 03 APU - DISCARD AP U GENERATOR ADA PTOR FILTE R ELE ME NT
MOS 20-A PR-2017
HRS /MSC 250 0 +40/-40 210 4 460 4 464 4
MRB REF: See Workcard APUS

24-2 0-00-2 05 (s) APU - DETAILED INSPE CTION A PU GE NE RATOR/ADAPTOR DRY CAVITY PKG
PK G 7 50 MOS 14-MAR-2 022
HRS /MSC 750 +40/-40 353 8
MRB REF: See Workcard APUS

24-2 0-00-2 11 (MS G3) (s) APU - DISCARD OF THE AUXILIA RY PO WE R UNIT ( APU) G ENERATO R/ADAPTOR FILTER ELEMENT
MOS 20-A PR-2017
HRS /MSC N/A 210 4
REF: See Workcard APUS

24-2 2-16-2 07 APU - REMOV E INSPE CT AND INSTAL L NEW APU G ENERATOR ADAP TER FILTER E LEMENT - (POS T SB- 601-05 68 OR
SB- 601-05 81)
MOS 20-A PR-2017
HRS /MSC 250 0 210 4 460 4
REF: See Workcard APUS
CHA PTER 25 EQU IPMENT/FU RNISHINGS
25-0 0-00-9 00-80 1-01 JUMPS EAT A SSEMBLY
JS600A -(RH1 ) MOS TSN:0 01-A PR-2011
PJ3307 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
33 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
25-0 0-01-9 00-80 1-01 COCKPIT MONORAIL S YSTEM S UNVISOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
25-1 1-00-2 01 (s) OPE RA TIONAL TEST INERTIAL REEL CONTROL AND INERTIA REEL PKG
25-1 1-00-2 01 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: AMM 2 5 1 1 0 4 71 0 8 01 AFL 144 9

25-1 1-00-2 02 (s) GENERAL VISUAL INS PECTION PIL OT'S /COPILOT'S SEAT RE STRAINTS PKG
25-1 1-00-2 02 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: AMM 2 5 1 1 0 1 21 0 8 01 AFL 144 9
25-1 1-01-9 00-80 1-01 PILOT SEAT
604 -40022 -5 MOS TSN:0 01-A PR-2011
843 -1406 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
25-1 1-01-9 00-80 2-01 CO-PILOT SEAT
604 -40022 -6 MOS TSN:0 01-A PR-2011
834 -1406 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
25-1 3-01-9 00-80 1-01 LH PIL OT SIDE HEA TE D MAT
596 A0100 00 MOS TSN:0 01-A PR-2011
206 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
25-1 3-01-9 00-80 1-02 RH PILOT SIDE HEATED MAT
596 A0100 00 MOS TSN:0 01-A PR-2011
207 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
25-1 3-01-9 00-80 2-01 LH CO -PIL OT SIDE HE ATE D MAT
596 A0100 00 MOS TSN:0 01-A PR-2011
207 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
25-1 3-01-9 00-80 2-02 RH CO-PILOT SIDE HEATED MA T
596 A0100 00 MOS TSN:0 01-A PR-2011
207 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
25-2 1-65-6 01 OPE RA TIONAL CHE CK OF THE PAS SENGER SEAT INERTIA REELS (INCL UDING DIVANS)
PK G 2 4 MOS 24 14-MAR-2 022 14-MAR-2024
HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-2 1-65-6 02 (s) DETAIL ED VISUAL INS PECTION OF THE P ASSE NG ER SE AT RESTRAINTS. PKG
PK G 2 4 MOS 24 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
34 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
25-2 1-65-6 03 (s) DETAIL ED INSPECTIO N OF THE PASS ENG ER S EATS ( INCLUDING DIVANS AND JUMP SEAT) FO R ATTA CHMENT AND PKG
LOCKING.
PK G 2 4 MOS 24 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

+ 25-3 0-65-6 01 (s) GENERAL VISUAL INS PECTION OF THE G ALLEY WAS TE CONTA INER. PKG
PK G 1 2 MOS 12 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

+ 25-4 0-65-6 01 (s) GENERAL VISUAL INS PECTION OF THE L AVATORY WASTE CO NTAINE R. PKG
PK G 1 2 MOS 12 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

25-6 0-00-2 01 (s) OPE RA TIONAL TEST E ME RG ENCY LO CA TOR TRANSMITTER (ELT) SYSTEM. PKG
25-6 0-00-2 01 PK G 2 4 MOS 24 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 2 5 6 2 0 0 71 0 8 01 AFL 147 5
25-6 0-00-2 02 DIS CA RD EMERGENCY LO CA TO R TRA NS MITTE R (ELT) BATTERY
25-6 0-00-2 02 452 -0133 MOS 03-S EP-20 21 01-J UL-20 25 M
386 221-00 4 HRS /MSC DUE 219 2.3 8
DIS CARD REF: AMM 2 5 6 2 0 1 96 0 8 01 AFL 147 4
25-6 0-00-2 03 (s) DETAIL ED INSPECTIO N EMERGENCY LOCATOR TRANSMITTER (E LT) BA TTERY PKG
25-6 0-00-2 03 452 -0133 PKG 24 MOS 24 +1m/-1m 14-MAR-2 022
386 221-00 4 HRS /MSC 219 4.6
MRB REF: AMM 2 5 6 2 0 1 22 0 8 01 AFL 147 5

25-6 2-00-9 00-80 1-01 BLA DE 40 6, ELT ANTE NNA


110 -340 MOS TSN:0 01-A PR-2011
340 903 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

25-6 2-01-9 00-80 1-01 EMERGENCY LOCATOR TRANSMITTER (E LT) BA TTERY


452 -0133 MOS TSN:18 03-S EP-20 21
386 221-00 4 HRS /MSC O/C TSN:0 219 2.3 8
REF: See Workcard AFL TSN:0 147 4

25-6 2-04-9 00-80 1-01 ELT - E ME RG ENCY LO CA TOR TRANSMITTER


453 -5060 MOS TSN:13 4 18-MAR-2 022
105 69 HRS /MSC O/C TSN:21 95.7 219 5.7
REF: See Workcard AFL TSN:14 76 147 6

+ 25-6 3-65-6 01 (s) DETAIL ED INSPECTIO N OF THE EMERGENCY E XIT LIFE LINE. PKG
PK G 2 4 MOS 24 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N 3RD CREW LIFE V EST PKG
636 00-505 PKG 12 MOS 12 14-MAR-2 022
L51 62076 HRS /MSC 219 4.6
STLMC REF: AFL 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
35 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N COPILOT CREW - LIFE V EST PKG
636 00-505 PKG 12 MOS 12 14-MAR-2 022
L51 62070 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N DIVA N #1 LIFE VE ST PKG
S65 -8280- 10 PK G 1 2 MOS 12 14-MAR-2 022
L17 65578 HRS /MSC 219 4.6
STLMC REF: AFL 147 5

25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N DIVA N #2 LIFE VE ST PKG


S65 -8280- 10 PK G 1 2 MOS 12 14-MAR-2 022
L17 65581 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N DIVA N #3 LIFE VE ST PKG
S65 -8280- 10 PK G 1 2 MOS 12 14-MAR-2 022
L17 65580 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N DIVA N #4 LIFE VE ST PKG
S65 -8280- 10 PK G 1 2 MOS 12 14-MAR-2 022
L17 65579 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N LH#1 CA BIN LIFE VE ST PKG
S65 -8280- 10 PK G 1 2 MOS 12 14-MAR-2 022
L17 65572 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N LH#2 CA BIN LIFE VE ST PKG
S65 -8280- 10 PK G 1 2 MOS 12 14-MAR-2 022
L17 65573 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N LH#3 CA BIN LIFE VE ST PKG
S65 -8280- 10 PK G 1 2 MOS 12 14-MAR-2 022
L17 65574 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N LH#4 CA BIN LIFE VE ST PKG
S65 -8280- 10 PK G 1 2 MOS 12 14-MAR-2 022
L17 65575 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N PILOT CREW - LIFE V EST PKG
636 00-505 PKG 12 MOS 12 14-MAR-2 022
L51 62088 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N RH#1 CABIN L IFE VEST PKG
S65 -8280- 10 PK G 1 2 MOS 12 14-MAR-2 022
L17 65576 HRS /MSC 219 4.6
STLMC REF: AFL 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
36 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
25-6 3-65-6 02 (s) DETAIL ED INSPECTIO N RH#2 CABIN L IFE VEST PKG
S65 -8280- 10 PK G 1 2 MOS 12 14-MAR-2 022
L17 65577 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 03 RESTORATIO N 3RD CREW L IFE VEST
636 00-505 MOS 120 01-DEC-20 20 01-DEC-20 30
L51 62076 HRS /MSC
REF: AFL

25-6 3-65-6 03 RESTORATIO N COPILOT CREW - L IFE VEST


636 00-505 MOS 120 01-DEC-20 20 01-DEC-20 30
L51 62070 HRS /MSC
REF: AFL

25-6 3-65-6 03 RESTORATIO N DIV AN #1 LIFE V EST


S65 -8280- 10 MOS 120 27-JAN-20 22 27-J AN-20 32
L17 65578 HRS /MSC
REF: AFL

25-6 3-65-6 03 RESTORATIO N DIV AN #2 LIFE V EST


S65 -8280- 10 MOS 120 27-JAN-20 22 27-J AN-20 32
L17 65581 HRS /MSC
REF: AFL
25-6 3-65-6 03 RESTORATIO N DIV AN #3 LIFE V EST
S65 -8280- 10 MOS 120 27-JAN-20 22 27-J AN-20 32
L17 65580 HRS /MSC
REF: AFL
25-6 3-65-6 03 RESTORATIO N DIV AN #4 LIFE V EST
S65 -8280- 10 MOS 120 27-JAN-20 22 27-J AN-20 32
L17 65579 HRS /MSC
REF: AFL

25-6 3-65-6 03 RESTORATIO N LH#1 CABIN LIFE V EST


S65 -8280- 10 MOS 120 27-JAN-20 22 27-J AN-20 32
L17 65572 HRS /MSC
REF: AFL

25-6 3-65-6 03 RESTORATIO N LH#2 CABIN LIFE V EST


S65 -8280- 10 MOS 120 27-JAN-20 22 27-J AN-20 32
L17 65573 HRS /MSC
REF: AFL

25-6 3-65-6 03 RESTORATIO N LH#3 CABIN LIFE V EST


S65 -8280- 10 MOS 120 27-JAN-20 22 27-J AN-20 32
L17 65574 HRS /MSC
REF: AFL

25-6 3-65-6 03 RESTORATIO N LH#4 CABIN LIFE V EST


S65 -8280- 10 MOS 120 27-JAN-20 22 27-J AN-20 32
L17 65575 HRS /MSC
REF: AFL

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
37 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
25-6 3-65-6 03 RESTORATIO N PILOT CREW - L IFE VEST
636 00-505 MOS 120 01-DEC-20 20 01-DEC-20 30
L51 62088 HRS /MSC
REF: AFL

25-6 3-65-6 03 RESTORATIO N RH# 1 CAB IN LIFE VEST


S65 -8280- 10 MOS 120 27-JAN-20 22 27-J AN-20 32
L17 65576 HRS /MSC
REF: AFL
25-6 3-65-6 03 RESTORATIO N RH# 2 CAB IN LIFE VEST
S65 -8280- 10 MOS 120 27-JAN-20 22 27-J AN-20 32
L17 65577 HRS /MSC
REF: AFL

25-6 3-65-6 04 (s) DETAIL ED INSPECTIO N #1 (DIVA N FWD) LIFE RAFT PKG
101 5FA SA-6K 4-1-10 5 PKG 12 MOS 12 14-MAR-2 022
10UL-0 1721 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 04 (s) DETAIL ED INSPECTIO N #2 (DIVA N AFT) L IFE RA FT PKG
101 5FA SA-6K 4-1-10 5 PKG 12 MOS 12 14-MAR-2 022
10UL-0 1720 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 05 RESTORATIO N #1 (DIV AN FWD) LIFE RAFT
101 5FA SA-6K 4-1-10 5 MOS 36 28-FEB -2022 28-FEB-20 25
10UL-0 1721 HRS /MSC
STLMC REF: AFL

25-6 3-65-6 05 RESTORATIO N #2 (DIV AN AFT) L IFE RAFT


101 5FA SA-6K 4-1-10 5 MOS 36 28-FEB -2022 28-FEB-20 25
10UL-0 1720 HRS /MSC
STLMC REF: AFL

25-6 3-65-6 06 VISUAL INSP ECTION WARDROBE FIRST A ID KIT OF THE FIRST AID KIT S EAL.
725 057/72504 0 PKG 1 2 MOS 12 14-MAR-2 022 14-MAR-2023
210 420-00 1LEW HRS /MSC 219 4.6
STLMC REF: AFL 147 5
+ 25-6 3-65-6 09 (s) RESTORATIO N OF THE FL ASHLIGHTS . PKG
PK G 1 2 MOS 12 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

+ 25-6 3-65-6 10 (s) DETAIL ED INSPECTIO N OF THE SMOKE GOG GLES . PKG
PK G 2 4 MOS 24 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5
25-6 3-65-6 11 (s) DETAIL ED INSPECTIO N OF THE SMOKE HOODS. PKG
PK G 1 2 MOS 12 12-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
38 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
251 100-09 01 CABIN LHS SING LE,ASSY SE AT
C3018A FY -101 MOS TSN:0 17-A PR-2012
702 6612 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
251 100-09 02 CABIN RHS S INGLE ,AS SY SEAT
C3018A FY -102 MOS TSN:0 17-A PR-2012
702 6613 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

251 100-09 03 CABIN RHS S INGLE ,AS SY SEAT


C3018A FY -104 MOS TSN:0 17-A PR-2012
702 6615 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

251 100-09 04 CABIN LHS SING LE,ASSY SE AT


C3018A FY -103 MOS TSN:0 17-A PR-2012
702 6614 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

251 100-09 05 CABIN LHS SING LE,ASSY SE AT


C3018A FY -105 MOS TSN:0 17-A PR-2012
702 6616 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

251 100-09 06 CABIN LHS SING LE,ASSY SE AT


C3018A FY -107 MOS TSN:0 17-A PR-2012
702 6617 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

251 101-09 01 DIV AN RHS RHS DIVAN


C3018A FY -112 MOS TSN:0 17-A PR-2012
AFY-DIV HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

252 001-09 01 GAL LEY COFFE E, TIA MAKER


400 -1794- 06 MOS TSN:0 17-A PR-2012
11-1 0-494 64 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

252 010-09 01 GAL LEY TOWER AS SY HO T WATER HEATER


MRX-1000 -10 MOS TSN:0 17-A PR-2012
100 3-472 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
256 089-09 01 WARDROB E FIRST AID KIT
725 057/72504 0 MOS 30-A PR-2020 01-J UN-20 22 M
210 420-00 1LEW HRS /MSC O/C 193 0.2
REF: AFL 127 7
256 091-09 01 SPA RE & LOO SE EQUIP G 2005 DEFIBRILLATOR
502 449 MOS TSN:0 17-A PR-2012
B11 K-0121 7 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
39 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
256 300-09 01 PILOT CREW - L IFE VEST
636 00-505 MOS TSN:0 05-MAY -2021
L51 62088 HRS /MSC O/C TSN:0 216 5.3
REF: AFL TSN:0 146 0
256 300-09 02 COPILOT CREW - L IFE VEST
636 00-505 MOS TSN:0 05-MAY -2021
L51 62070 HRS /MSC O/C TSN:0 216 5.3
REF: AFL TSN:0 146 0

256 300-09 03 3RD CREW L IFE VEST


636 00-505 MOS TSN:0 05-MAY -2021
L51 62076 HRS /MSC O/C TSN:0 216 5.3
REF: AFL TSN:0 146 0
256 300-09 04 LH#1 CABIN LIFE V EST
S65 -8280- 10 MOS TSO:0 14-MAR-2 022
L17 65572 HRS /MSC O/C TSO:0 219 4.6
REF: AFL TSO:0 147 5
256 300-09 05 LH#2 CABIN LIFE V EST
S65 -8280- 10 MOS TSO:0 14-MAR-2 022
L17 65573 HRS /MSC O/C TSO:0 219 4.6
REF: AFL TSO:0 147 5
256 300-09 06 LH#3 CABIN LIFE V EST
S65 -8280- 10 MOS TSO:0 14-MAR-2 022
L17 65574 HRS /MSC O/C TSO:0 219 4.6
REF: AFL TSO:0 147 5
256 300-09 07 LH#4 CABIN LIFE V EST
S65 -8280- 10 MOS TSO:0 14-MAR-2 022
L17 65575 HRS /MSC O/C TSO:0 219 4.6
REF: AFL TSO:0 147 5
256 300-09 08 RH# 1 CAB IN LIFE VES T
S65 -8280- 10 MOS TSO:0 14-MAR-2 022
L17 65576 HRS /MSC O/C TSO:0 219 4.6
REF: AFL TSO:0 147 5
256 300-09 09 RH# 2 CAB IN LIFE VES T
S65 -8280- 10 MOS TSO:0 14-MAR-2 022
L17 65577 HRS /MSC O/C TSO:0 219 4.6
REF: AFL TSO:0 147 5
256 300-09 10 DIV AN #1 LIFE V EST
S65 -8280- 10 MOS TSO:0 14-MAR-2 022
L17 65578 HRS /MSC O/C TSO:0 219 4.6
REF: AFL TSO:0 147 5
256 300-09 11 DIV AN #2 LIFE V EST
S65 -8280- 10 MOS TSO:0 14-MAR-2 022
L17 65581 HRS /MSC O/C TSO:0 219 4.6
REF: AFL TSO:0 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
40 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
256 300-09 12 DIV AN #3 LIFE V EST
S65 -8280- 10 MOS TSO:0 14-MAR-2 022
L17 65580 HRS /MSC O/C TSO:0 219 4.6
REF: AFL TSO:0 147 5
256 300-09 13 DIV AN #4 LIFE V EST
S65 -8280- 10 MOS TSO:0 14-MAR-2 022
L17 65579 HRS /MSC O/C TSO:0 219 4.6
REF: AFL TSO:0 147 5

256 301-09 01 NO.1 INFA NT LIFE VES T


216 203-0 MOS TSN:1 09-JUL-20 13
767 70 HRS /MSC O/C TSN:0 657 .1
REF: AFL TSN:0 263

256 301-09 01A RESTORATIO N NO.1 INFA NT LIFE VES T


216 203-0 MOS 120 20-JUN-2013 20-J UN-20 23
767 70 HRS /MSC
STLMC REF: AFL

256 301-09 02 NO.2 INFA NT LIFE VES T


216 203-0 MOS TSN:1 09-JUL-20 13
767 71 HRS /MSC O/C TSN:0 657 .1
REF: AFL TSN:0 263

256 301-09 02A RESTORATIO N NO.2 INFA NT LIFE VES T


216 203-0 MOS 120 20-JUN-2013 20-J UN-20 23
767 71 HRS /MSC
STLMC REF: AFL

256 310-09 01 #1 (DIV AN FWD) LIFE RAFT


101 5FA SA-6K 4-1-10 5 MOS 14-MAR-2 022
10UL-0 1721 HRS /MSC O/C 219 4.6
REF: AFL 147 5

256 310-09 02 #2 (DIV AN AFT) LIFE RAFT


101 5FA SA-6K 4-1-10 5 MOS 14-MAR-2 022
10UL-0 1720 HRS /MSC O/C 219 4.6
REF: AFL 147 5

256 311-09 01 NO. 1 LIFE RAFT EL T TRA NS MITTE R


3RK00 201 MOS 14-MAR-2 022
139 042 HRS /MSC O/C 219 4.6
REF: AFL 147 5
+ 256 311-09 01A REPLA CE NO. 1 LIFE RAFT E LT TRA NS MITTE R BATTERY
3RK00 201 MOS 14-MAR-2 022 01-O CT-20 23 M
139 042 HRS /MSC DUE 219 4.6
VENDOR RECOMMENDATION REF: AFL 147 5
256 311-09 02 NO. 2 LIFE RAFT EL T TRA NS MITTE R
SRB-40 6 MOS 14-MAR-2 022
139 887 HRS /MSC O/C 219 4.6
REF: AFL 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
41 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 256 311-09 02A REPLA CE NO. 2 LIFE RAFT E LT TRA NS MITTE R BATTERY
SRB-40 6 MOS 14-MAR-2 022 01-J UL-20 26 M
139 887 HRS /MSC DUE 219 4.6
VENDOR RECOMMENDATION REF: AFL 147 5
+ 256 320-09 01 SMOKE HOO D
MR-10008 N MOS 120 TSN:0 12-MAR-2 022 12-MAR-2032
SN-UNKNOWN HRS /MSC TSN:0 219 4.6
STLMC REF: AFL TSN:0 147 5

+ 256 320-09 02 SMOKE HOO D


MR-10008 N MOS 120 TSN:0 12-MAR-2 022 12-MAR-2032
SN-UNKNOWN HRS /MSC TSN:0 219 4.6
STLMC REF: AFL TSN:0 147 5
259 501-09 01 FWD WARDROB E DTE-60 00,DIGITA L TAP PING UNIT
130 8524-1 00 MOS TSN:0 17-A PR-2012
41V FC HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
259 501-09 02 FWD WARDROB E DTE-60 00,DIGITA L TAP PING UNIT
130 8524-1 00 MOS TSO:2 12-A PR-2018
2DWPN HRS /MSC O/C TSO:0 154 0.4
REF: AFL TSO:0 994
259 502-09 01 CKPT,S IDECONSOL E E FB -6000,COCKPIT DIS PLAY
FG-800 0RC-0 01 MOS TSN:0 17-A PR-2012
909 7-01-0 50497 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
259 502-09 02 CKPT,S IDECONSOL E E FB -6000,COCKPIT DIS PLAY
FG-800 0RC-0 01 MOS TSN:0 17-A PR-2012
909 7-01-0 50511 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
259 503-09 01 COCKPIT JEE-60 00,ETHE RNET EQUIP ME NT
822 -2295- 001 MOS TSN:0 17-A PR-2012
44Y 2N HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
259 503-09 02 WARDROB E ETHERNET,DUAL,CD/DVD PL AYER
866 -0025- 001 MOS TSN:0 17-A PR-2012
499 7 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
259 503-09 03 FWD BULKHEAD ASSY , LHS ETHERNET DISPLA Y
866 -0022- 002 MOS 13-MAR-2 020
DL0161 HRS /MSC O/C 192 6.4
REF: AFL 127 5
259 503-09 04 AFT BULK HE AD AS SY, RHS E THERNET DISPLA Y
866 -0022- 002 MOS 13-MAR-2 020
DL0265 HRS /MSC O/C 192 6.4
REF: AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
42 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
259 504-09 01 COCKPIT UNDER FLOOR MO VING MAP EQUIP MODULE
822 -1881- 101 MOS TSO:0 25-A UG -2021
48W8P HRS /MSC O/C TSO:0 219 0.4
REF: AFL TSO:0 147 3
259 506-09 01 MCE CARD P ME -XXX,PROCESS MAP EQUIPMENT
822 -1880- 001 MOS TSN:0 17-A PR-2012
48V YY HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

259 507-09 01 MCE CARD P SE-XX X,P OWER SUPP LY EQUIP ME NT


822 -1879- 001 MOS TSN:0 17-A PR-2012
48V VM HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

259 509-09 01 AVIONIC BAY LIGHTNING SENS PROCESSO R


270 -2687- 010 MOS TSN:0 17-A PR-2012
816 36 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

259 510-09 01 UPPER GALL EY TO WE R GAL LEY TOUCH SCRE EN


130 8521-1 00 MOS TSO:2 20-A UG -2019
2DXWD HRS /MSC O/C TSO:0 185 1.2
REF: AFL TSO:0 121 6

259 640-09 01 AVIONIC BAY STEREO AMPL IFIE R


350 0-1-1 MOS TSN:0 17-A PR-2012
41V 8R HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

259 641-09 01 AVIONIC BAY PRE- AMP,A UDIOLIFIER AMP LIFIER


270 -002 MOS TSN:0 17-A PR-2012
288 4 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

259 900-09 01 GAL LEY MICROWAVE,LHS HINGE OVE N


400 -1409- 01-L MOS TSN:0 17-A PR-2012
11-0 9-492 14 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

259 901-09 01 GAL LEY HI-TEMP,LHS HINGES OVE N


400 -1398- 01-L MOS TSN:0 17-A PR-2012
11-0 4-484 36 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
259 901-09 02 GAL LEY OVE N CONTROL LER
400 -1377- 02 MOS TSR:0 14-DEC-20 20
14-1 0-002 76 HRS /MSC O/C TSR:0 207 8.9 2
REF: AFL TSR:0 140 2
259 910-09 01 LAV ATORY V ANITY ASSY FLUSH,1 X1 SWITCH PANEL
260 0-1-41 -T1 4PA MOS TSN:11 9 TSR:1 18-MAR-2 022
3X2 3T HRS /MSC O/C TSN:21 79.5 TSR:0 219 5.7
REF: AFL TSN:14 66 TS R:0 147 6

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
43 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
259 910-09 02 LAV ATORY V ANITY ASSY CALL,1X1 SWITCH PANEL
260 0-1-42 -T1 4PA MOS TSN:11 9 18-MAR-2 022
3X2 3V HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6
259 910-09 03 BULKHEA D ASS Y, LHS LIG HTS,1X4 SWITCH PANEL
260 0-1-43 -T1 4PA MOS TSN:11 9 TSR:1 18-MAR-2 022
3X1 CJ HRS /MSC O/C TSN:21 79.5 TSR:0 219 5.7
REF: AFL TSN:14 66 TS R:0 147 6

259 910-09 04 WARDROB E JUMPSEA T,1X1 SWITCH P ANEL


260 0-1-44 -T1 4PA MOS TSN:11 9 TSR:1 18-MAR-2 022
3X2 3P HRS /MSC O/C TSN:21 79.5 TSR:0 219 5.7
REF: AFL TSN:14 66 TS R:0 147 6
259 910-09 05 WARDROB E ENTRY,1X4 SWITCH P ANEL
260 0-1-45 -T1 4PA MOS TSN:11 9 TSR:1 18-MAR-2 022
3X2 3R HRS /MSC O/C TSN:21 79.5 TSR:0 219 5.7
REF: AFL TSN:14 66 TS R:0 147 6
259 910-09 06 LHS, P ASSENGE R LH PASSE NG ERS S WITCH PANEL
260 1-1-10 -T1 4PA MOS TSN:11 9 18-MAR-2 022
3YG MF HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6
259 910-09 07 LHS, P ASSENGE R LH PASSE NG ERS S WITCH PANEL
260 1-1-10 -T1 4PA MOS TSN:11 9 18-MAR-2 022
3YG MG HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6
259 910-09 08 RHS FWD, PASS ENGER L H PAS SENGERS SWITCH PA NE L
260 1-1-10 -T1 4PA MOS TSN:11 9 18-MAR-2 022
3YG MD HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6
259 910-09 09 LHS, P ASSENGE R RH PA SSENGERS SWITCH P ANEL
260 1-1-11 -T1 4PA MOS TSN:11 9 TSR:1 18-MAR-2 022
3X2 HR HRS /MSC O/C TSN:21 79.5 TSR:0 219 5.7
REF: AFL TSN:14 66 TS R:0 147 6
259 910-09 10 RHS FWD, PASS ENGER RH P ASSE NG ERS S WITCH PANEL
260 1-1-11 -T1 4PA MOS TSN:11 9 18-MAR-2 022
3X2 HP HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6
259 910-09 11 LHS, P ASSENGE R RH PA SSENGERS SWITCH P ANEL
260 1-1-11 -T1 4PA MOS TSN:11 9 18-MAR-2 022
3X2 HT HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6
259 910-09 12 FWD DIVA N ARMRE ST AS SY PASS ENG ERS SWITCH PANEL
260 1-1-8-T14 PA MOS TSN:11 9 TSR:59 18-MAR-2 022
3X2 HN HRS /MSC O/C TSN:21 79.5 TSR:831.9 219 5.7
REF: AFL TSN:14 66 TS R:593 147 6

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
44 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
259 910-09 13 AFT DIVAN A RMREST ASSY PAS SENGERS SWITCH P ANE L
260 1-1-9-T14 PA MOS TSN:11 9 18-MAR-2 022
3X2 HV HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6
259 910-09 14 SIDELEDGE ASS Y, LHS SWITCH PA NE L
251 6-1-2 MOS TSN:0 17-A PR-2012
408 5G HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

259 910-09 15 SIDELEDGE ASS Y, RHS FWD SWITCH PANEL


251 6-1-2 MOS TSN:0 17-A PR-2012
408 5F HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

259 911-09 01 AFT DIVAN A RMREST ASSY AUDIO CONTRO L P ANEL


260 1-2-2-T14 PA MOS TSN:11 9 18-MAR-2 022
3X2 3K HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6

259 911-09 02 LHS, P ASSENGE R LH AUDIO CO NTROL PANEL


260 1-2-2-T14 PA MOS TSN:11 9 18-MAR-2 022
3X2 3L HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6

259 911-09 03 FWD DIVA N ARMRE ST AS SY AUDIO CONTROL PANEL


260 1-2-3-T14 PA MOS TSN:11 9 18-MAR-2 022
3YG NJ HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6

259 911-09 04 LHS, P ASSENGE R RH AUDIO CONTRO L P ANEL


260 1-2-3-T14 PA MOS TSN:11 9 18-MAR-2 022
3YG NF HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6

259 911-09 05 RHS FWD, PASS ENGER L H AUDIO CONTROL PA NE L


260 1-2-2-T14 PA MOS 18-MAR-2 022
3X2 3J HRS /MSC O/C 219 5.7
REF: AFL 147 6

259 911-09 06 LHS, P ASSENGE R RH AUDIO CONTRO L P ANEL


260 1-2-3-T14 PA MOS TSN:11 9 18-MAR-2 022
3YG NG HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6
259 911-09 07 SIDELEDGE ASS Y, RHS A FT AUDIO CO NTROL PANEL
260 1-2-3-T14 PA MOS TSN:11 9 18-MAR-2 022
3YG NH HRS /MSC O/C TSN:21 79.5 219 5.7
REF: AFL TSN:14 66 147 6
259 912-09 01 COCKPIT REFUE L/DEFUEL PANEL
798 976-1- 1 MOS TSR:15 26-A PR-2015
002 78 HRS /MSC O/C TSR:0 107 0.7 7
REF: AFL TSR:0 688

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
45 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
262 301-09 01 FWD WARDROB E P ORTA BLE FIRE EXTINGUISHER
30H673 MOS 29-MAR-2 018
Y-5 10168 HRS /MSC O/C 153 4.3
REF: AFL 988
262 301-09 02 AFT CABINET, LHS PORTABLE FIRE EXTING UISHER
466 090 MOS TSO:6 29-MAR-2 018
Y-2 97106 HRS /MSC O/C TSO:0 153 4.3
REF: AFL TSO:0 988
CHA PTER 26 FIRE PROTECTION
26-1 1-07-9 00-80 1-01 LH HT SENSING EL EMENT
744 -05215 MOS TSN:0 01-A PR-2011
103 209 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
26-1 1-07-9 00-80 1-02 RH HT SE NS ING ELEMENT
744 -05215 MOS TSN:0 01-A PR-2011
103 402 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
26-1 1-13-9 00-80 1-01 LH EXHAUST NOZZLE AND PYL ON FIRE DETECTION CONTROL UNIT
377 -02836 MOS TSN:0 01-A PR-2011
102 1-963 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
26-1 1-13-9 00-80 1-02 RH EX HAUST NO ZZLE AND P YLON FIRE DETECTIO N CONTROL UNIT
377 -02836 MOS TSN:0 01-A PR-2011
102 1-955 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
26-1 1-19-9 00-80 1-01 LH ENG INE FIRE DE TE CTION CONTRO L UNIT
377 -02836 MOS TSN:0 01-A PR-2011
104 1-006 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

26-1 1-19-9 00-80 1-02 RH ENGINE FIRE DETECTION CONTROL UNIT


377 -02836 MOS TSN:0 01-A PR-2011
104 1-007 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
26-1 2-04-9 00-80 1-03 APU FIRE DE TE CTION CONTRO L UNIT
377 -02836 MOS TSN:0 01-A PR-2011
104 1-005 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
26-1 3-01-9 00-80 1-01 MLG FIRE DE TE CTION CONTRO L UNIT
377 -02836 MOS TSN:0 01-A PR-2011
104 1-002 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
26-1 3-04-2 01 (s) VISUAL CHECK MAIN LANDING GEA R (MLG) SE NSING ELEMENT PKG
26-1 3-04-2 01 PK G 1 200 MOS 27-S EP-20 19
HRS /MSC 120 0 +40/-40 187 7.3
MRB REF: AMM 2 6 1 3 0 4 21 0 8 01 AFL 123 6
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
46 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
26-1 3-04-2 02 (s) FUNCTIONAL TEST MA IN LANDING GEAR (MLG) SENSING EL EMENT PKG
26-1 3-04-2 02 PK G 3 200 MOS +40/-40
HRS /MSC 320 0 +40/-40 0
REF: AMM 2 6 1 3 0 4 72 0 8 01 AFL

26-1 4-51-9 00-80 1-01 BAG GAGE BA Y SMOKE DETE CTOR


473 597-2 MOS 13-JUN-2022
SHA04 32 HRS /MSC O/C 224 5.8 3
REF: GENERIC NO RE F AFL 150 5

26-1 4-51-9 00-80 2-01 LAV ATORY S MO KE DE TE CTOR


473 597-2 MOS 13-JUN-2022
SHA04 79 HRS /MSC O/C 224 5.8 3
REF: GENERIC NO RE F AFL 150 5

26-1 4-65-6 01 RESTORATIO N OF THE LAVA TO RY SMOK E DETECTOR.


MOS 60 26-A PR-2022 26-APR-20 27
HRS /MSC 222 0.8
STLMC REF: AFL 149 0

26-1 4-65-6 02 RESTORATIO N OF THE BAGG AGE COMPARTME NT SMOKE DETECTO R.


MOS 60 26-A PR-2022 26-APR-20 27
HRS /MSC 222 0.8
STLMC REF: AFL 149 0

26-2 0-00-1 01 DIS CA RD OF THE L H#1 DISCHA RG E CARTRIGE OF THE ENG INE FIRE-EX TINGUIS HE R CONTAINERS, PA RT
NO.89777 6-01
897 776-01 MOS 120 01-DEC-20 21 29-NOV -2031 M
430 02 HRS /MSC
LIFE LIMIT REF: AMM 2 6 2 0 0 0 00 0 8 01 AFL

26-2 0-00-1 01 DIS CA RD OF THE L H#2 DISCHA RG E CARTRIGE OF THE ENGINE FIRE -EXTINGUISHER CONTAINERS, PART
NO.89777 6-01
897 776-01 MOS 120 14-MAR-2 022 14-MAR-2032
429 85 HRS /MSC
LIFE LIMIT REF: AMM 2 6 2 0 0 0 00 0 8 01 AFL

26-2 0-00-1 01 DIS CA RD THE RH#1 DISCHARGE CARTRIDG ES OF THE E NG INE FIRE-EX TINGUIS HER CONTAINERS, PA RT
NO.89777 6-01
897 776-01 MOS 120 14-MAR-2 022 14-MAR-2032
429 95 HRS /MSC
LIFE LIMIT REF: AMM 2 6 2 0 0 0 00 0 8 01 AFL

26-2 0-00-1 01 DIS CA RD THE RH#2 DISCHA RG E CARTRIDGES OF THE ENGINE FIRE -EXTINGUISHER CONTAINERS, PART
NO.89777 6-01
897 776-01 MOS 120 14-MAR-2 022 14-MAR-2032
429 64 HRS /MSC
LIFE LIMIT REF: AMM 2 6 2 0 0 0 00 0 8 01 AFL

26-2 0-00-2 04 (s) FUNCTIONAL TEST ENGINE FIRE SHUTO FF-RELAY CIRCUITRY PKG
26-2 0-00-2 04 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
MRB REF: AMM 2 6 2 0 0 0 72 0 8 01 AFL 150 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
47 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
26-2 0-00-2 05 (s) FUNCTIONAL TEST (WEIG HT CHECK) OF THE COCKPIT PORTABLE FIRE- EXTINGUISHER CONTAINER PKG
30H673 PKG 12 MOS 12 +1m/-1m 14-MAR-2 022
Y-2 1307 HRS /MSC 219 4.6
MRB REF: AMM 2 6 2 3 0 1 72 0 8 02 AFL 147 5
26-2 0-00-2 07 DETAIL ED INSPECTIO N OF THE LH ENGINE FIRE-EXTING UISHER CONTAINE R (MRB)
899 486-2 MOS 60 +1m/-1m 14-MAR-2 022 14-MAR-2027 14-A PR-2027
ACB99 19 HRS /MSC 219 4.6
REF: AMM 2 6 2 0 0 0 22 0 8 03 AFL 147 5

26-2 0-00-2 07 DETAIL ED INSPECTIO N OF THE RH ENGINE FIRE-E XTINGUIS HE R CONTA INER (MRB)
899 486-2 MOS 60 +1m/-1m 14-MAR-2 022 14-MAR-2027 14-A PR-2027
AAX 4872 HRS /MSC 219 4.6
REF: AMM 2 6 2 0 0 0 22 0 8 03 AFL 147 5
26-2 0-00-2 08 DETAIL ED INSPECTIO N OF THE CO CK PIT PORTABLE FIRE-E XTINGUIS HE R CONTA INER (MRB)
30H673 MOS 96 +1m/-1m 29-MAR-2 018 29-MAR-2026 29-A PR-2026
Y-2 1307 HRS /MSC 153 4.3
REF: AMM 2 6 2 0 0 0 22 0 8 04 AFL 988
26-2 0-00-2 09 DETAIL ED INSPECTIO N OF THE AUXIL IARY POWER UNIT (AP U) FIRE- EXTINGUISHER CONTAINER (MRB)
472 428-2 MOS 60 +1m/-1m 13-JUN-2022 13-J UN-20 27 13-JUL-20 27
369 3T HRS /MSC 224 5.8 3
REF: AMM 2 6 2 0 0 0 22 0 8 05 AFL 150 5
26-2 1-00-2 01 (s) FUNCTIONAL TEST BOTTLE 1 A ND BOTTL E 2 ARMED PUSH TO DISCH SV ITCH/LIGHTS PKG
26-2 1-00-2 01 PK G 4 800 MOS +40/-40
HRS /MSC 480 0 +40/-40 0
REF: AMM 2 6 2 1 0 0 72 0 8 02 AFL

26-2 1-04-2 01 (s) DETAIL ED INSPECTIO N LH E NG INE FIRE EXTINGUISHER PRES SURE GA UG E PKG
26-2 1-04-2 01 PK G 2 4 MOS 24 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 2 6 2 1 0 4 22 0 8 02 AFL 147 5
26-2 1-04-2 01 (s) DETAIL ED INSPECTIO N RH ENGINE FIRE EX TINGUISHER PRESSURE GAUGE PKG
26-2 1-04-2 01 PK G 2 4 MOS 24 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 2 6 2 1 0 4 22 0 8 02 AFL 147 5
26-2 1-04-9 00-80 1-01 LH ENG INE FIRE EXTINGUISHER B OTTLE
899 486-2 MOS TSO:0 26-A PR-2017
ACB99 19 HRS /MSC O/C TSO:0 136 3.8
REF: GENERIC NO RE F AFL TSO:0 883
26-2 1-04-9 00-80 1-02 RH ENGINE FIRE EX TINGUIS HE R BOTTLE
899 486-2 MOS TSO:0 26-A PR-2017
AAX 4872 HRS /MSC O/C TSN:43 07.8 TSO :0 136 3.8
REF: GENERIC NO RE F AFL TSN:24 30 TS O:0 883
26-2 1-07-9 00-80 1-01 LH#1 DISCHARGE CARTRIDG E
26-2 0-00-1 01 897 776-01 MOS TSN:3 14-MAR-2 022
430 02 HRS /MSC H/T TSN:0 219 4.6
REF: See Workcard AFL TSN:0 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
48 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
26-2 1-07-9 00-80 1-02 RH# 1 DISCHA RG E CARTRIDGE
26-2 0-00-1 01 897 776-01 MOS TSN:3 14-MAR-2 022
429 95 HRS /MSC H/T TSN:0 219 4.6
REF: See Workcard AFL TSN:0 147 5
26-2 1-07-9 00-80 1-03 LH#2 DISCHARGE CARTRIDG E
26-2 0-00-1 01 897 776-01 MOS TSN:0 18-MAR-2 022
429 85 HRS /MSC H/T TSN:0 219 5.7
REF: See Workcard AFL TSN:0 147 6

26-2 1-07-9 00-80 1-04 RH# 2 DISCHA RG E CARTRIDGE


26-2 0-00-1 01 897 776-01 MOS TSN:0 18-MAR-2 022
429 64 HRS /MSC H/T TSN:0 219 5.7
REF: See Workcard AFL TSN:0 147 6

26-2 1-07-9 00-80 1-05 APU DISCHARGE CARTRIDG E


26-2 2-04-1 01 897 776-01 MOS TSN:0 14-MAR-2 022
430 11 HRS /MSC H/T TSN:0 219 4.6
REF: See Workcard AFL TSN:0 147 7

26-2 1-10-9 00-80 1-01 LH FIREX HO SE


109 102-10 1 MOS TSN:0 01-A PR-2011
679 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

26-2 1-10-9 00-80 2-01 RH FIREX HOSE


109 102-10 3 MOS TSN:0 01-A PR-2011
664 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

26-2 1-16-2 01 (s) DETAIL ED INSPECTIO N OF THE FIRE-EXTING UISHING -SYSTEM LINES PKG
26-2 1-16-2 01 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 6 2 0 0 0 22 0 8 02 AFL 127 5

26-2 2-00-2 01 (s) FUNCTIONAL TEST AUXIL IARY POWER UNIT (A PU) FIRE- EXTINGUISHING SYSTEM PKG
26-2 2-00-2 01 PK G 4 800 MOS +40/-40
HRS /MSC 480 0 +40/-40 0
REF: AMM 2 6 2 2 0 0 72 0 8 01 AFL

26-2 2-04-1 01 DIS CA RD OF THE DISCHA RG E CARTRIDGES OF THE AUXILIARY P OWER UNIT (APU) FIRE E XTINGUIS HE R
CONTA INERS, P ART NO. 897 776-01
897 776-01 MOS 120 14-MAR-2 022 14-MAR-2032
430 11 HRS /MSC
LIFE LIMIT REF: AMM 2 6 2 2 0 4 96 0 8 01 AFL

26-2 2-04-2 01 (s) DETAIL ED INSPECTIO N APU FIRE E XTINGUISHE R PRESS URE GAUGE PKG
26-2 2-04-2 01 PK G 2 4 MOS 24 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 2 6 2 2 0 4 22 0 8 02 AFL 147 5

26-2 2-04-9 00-80 1-01 APU FIRE EXTINGUISHER BO TTLE


472 428-2 MOS 13-JUN-2022
369 3T HRS /MSC O/C 224 5.8 3
REF: GENERIC NO RE F AFL 150 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
49 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
26-2 3-01-9 00-80 1-01 COCKPIT PO RTABL E FIRE EX TINGUIS HE R BOTTLE
30H673 MOS TSO:0 29-MAR-2 018
Y-2 1307 HRS /MSC O/C TSO:0 153 4.3
REF: GENERIC NO RE F AFL TSO:0 988
26-2 5-65-6 01 WEIGHT CHE CK AFT CAB INET, LHS PORTABLE FIRE EXTING UISHER - (FUNCTIONAL TES T)
466 090 P KG 12 MOS 12 14-MAR-2 022 14-MAR-2023
Y-2 97106 HRS /MSC 219 4.6
STLMC REF: AFL 147 5

26-2 5-65-6 01 (s) WEIGHT CHE CK FWD WARDROB E PORTA BLE FIRE EXTINGUISHER - (FUNCTIO NA L TEST) PKG
30H673 PKG 12 MOS 12 14-MAR-2 022
Y-5 10168 HRS /MSC 219 4.6
STLMC REF: AFL 147 5
26-2 5-65-6 02 RESTORATIO N (CLEANING) O F AFT CABINET, LHS PORTABLE FIRE EXTING UISHER
466 090 MOS 72 29-MAR-2 018 29-MAR-2024
Y-2 97106 HRS /MSC 153 4.3
STLMC REF: AFL 988
26-2 5-65-6 02 RESTORATIO N (CLEANING) O F COCKPIT PO RTABL E FIRE E XTINGUIS HE R BOTTLE
30H673 MOS 72 29-MAR-2 018 29-MAR-2024
Y-2 1307 HRS /MSC 153 4.3
STLMC REF: AFL 988
26-2 5-65-6 02 RESTORATIO N (CLEANING) O F FWD WARDROB E P ORTA BLE FIRE EXTINGUISHER
30H673 MOS 72 29-MAR-2 018 29-MAR-2024
Y-5 10168 HRS /MSC 153 4.3
STLMC REF: AFL 988
26-2 5-65-6 03 FUNCTIONAL (HYDROSTATIC) TEST A FT CAB INET, LHS PORTABLE FIRE EX TINGUISHER
466 090 MOS 96 29-MAR-2 018 29-MAR-2026
Y-2 97106 HRS /MSC 153 4.3
STLMC REF: AFL 988
26-2 5-65-6 03 FUNCTIONAL (HYDROSTATIC) TEST FWD WARDRO BE PORTABLE FIRE EXTING UISHER
30H673 MOS 96 29-MAR-2 018 29-MAR-2026
Y-5 10168 HRS /MSC 153 4.3
STLMC REF: AFL 988
CHA PTER 27 FLIGHT CONTROLS
27-0 0-00-2 01 (s) DETAIL ED INSPECTIO N AILERON, RUDDER, ELE VATOR A ND SPOILER CONTROL CABLE S IN THE LOWER FORWARD PKG
FUS ELAG E
27-0 0-00-2 01 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 7 0 0 0 0 22 0 8 01 AFL 127 5

27-0 0-00-2 02 (s) DETAIL ED INSPECTIO N AILERON, RUDDER, ELE VATOR A ND SPOILER CONTROL CABLE S IN THE MA IN A VIONICS PKG
COMPARTME NT
27-0 0-00-2 02 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 7 0 0 0 0 22 0 8 02 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
50 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-0 0-00-2 03 (s) DETAIL ED INSPECTIO N OF THE AIL ERON AND S POILER CO NTROL CA BLES IN THE MAIN LA NDING G EAR (MLG ) PKG
WHEEL WELL
27-0 0-00-2 03 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 7 0 0 0 0 22 0 8 03 AFL 127 5

27-0 0-00-2 04 (s) DETAIL ED INSPECTIO N AILERON, RUDDER, ELE VATOR A ND SPOILER CONTROL CABLE S IN THE MID-LOWER PKG
FUS ELAG E
27-0 0-00-2 04 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 7 0 0 0 0 22 0 8 04 AFL 127 5

27-0 0-00-2 05 (s) DETAIL ED INSPECTIO N RUDDER A ND ELEVA TO R CONTROL CABL ES IN THE LOWER MID-FUSE LAGE COMPARTMENT PKG
27-0 0-00-2 05 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 7 0 0 0 0 22 0 8 05 AFL 127 5

27-0 0-00-2 06 (s) DETAIL ED INSPECTIO N RUDDER A ND ELEVA TO R CONTROL CABL ES IN THE AFT EQUIPMENT COMPARTME NT PKG
27-0 0-00-2 06 PK G 2 4 MOS 24 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 2 7 0 0 0 0 22 0 8 06 AFL 147 5

27-0 0-00-2 07 (s) DETAIL ED INSPECTIO N ELEV ATOR CONTRO L CAB LES IN THE VERTICAL STAB ILIZER PKG
27-0 0-00-2 07 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 7 0 0 0 0 22 0 8 07 AFL 127 5

27-0 0-00-2 08 (s) DETAIL ED INSPECTIO N RUDDER A ND ELEVA TO R CONTROL CABL ES IN THE FUSE LAGE /STAB ILIZER SE CTION PKG
27-0 0-00-2 08 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 7 0 0 0 0 22 0 8 08 AFL 127 5

27-0 0-00-2 09 (s) DETAIL ED INSPECTIO N AILERON CONTROL CA BLES IN THE OUTBOA RD WING BOX PKG
27-0 0-00-2 09 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 7 1 1 0 0 22 0 8 11 AFL 127 5
27-0 0-00-2 10 (s) DETAIL ED INSPECTIO N AILERON CONTROL CA BLES IN THE INBOARD TRAILING EDGE PKG
27-0 0-00-2 10 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: AMM 2 7 1 1 0 0 22 0 8 12 AFL 144 9
27-0 0-00-2 11 (s) DETAIL ED INSPECTIO N AILERON CONTROL CA BLES IN THE OUTBOA RD TRAILING EDGE PKG
27-0 0-00-2 11 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: AMM 2 7 1 1 0 0 22 0 8 13 AFL 144 9

27-0 0-00-2 12 (s) DETAIL ED INSPECTIO N AILERON CONTROL CA BLES IN CONTROL COLUMN PKG
27-0 0-00-2 12 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 7 1 1 0 0 22 0 8 14 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
51 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-1 0-00-2 04 (s) OPE RA TIONAL TEST A ILE RO N ANTIFLOA T MECHA NISM. PKG
PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
REF: AMM 2 7 1 5 0 4 71 0 8 01 AFL 150 5
27-1 0-00-2 07 (s) FUNCTIONAL TEST NO . 1 AIL ERON FLIGHT CONTROL S DAMPE R PKG
27-1 0-00-2 07 PK G 4 800 MOS +40/-40
HRS /MSC 480 0 +40/-40 0
REF: AMM 2 7 1 5 0 7 72 0 8 01 AFL

27-1 0-00-2 07 (s) FUNCTIONAL TEST NO . 2 AIL ERON FLIGHT CONTROL S DAMPE R PKG
27-1 0-00-2 07 PK G 4 800 MOS +40/-40
HRS /MSC 480 0 +40/-40 0
REF: AMM 2 7 1 5 0 7 72 0 8 01 AFL

27-1 1-00-7 10-80 1 OPE RA TIONAL TEST O F THE AILERON CO NTROL SYS TE M
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883
27-1 1-01-9 00-80 1-01 CONTROL WHEEL
601 R90 101-3 MOS TSN:0 01-A PR-2011
45 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-1 1-01-9 00-80 2-01 CONTROL WHEEL
601 R90 101-2 MOS TSN:0 01-A PR-2011
516 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-1 1-07-9 00-80 1-01 LH AIL ERO N, CFMS LINK
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-1 1-07-9 00-80 1-02 RH AILERON, CFMS LINK
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-1 1-07-9 00-80 2-01 LH AIL ERO N, I/O UNIT
604 -90401 -1 MOS TSN:0 01-A PR-2011
FR1 225 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-1 1-07-9 00-80 2-02 RH AILERON, I/O UNIT
604 -90401 -3 MOS TSN:0 01-A PR-2011
FR1 229 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-1 1-13-9 00-80 1-01 LH AIL ERO N TENSION REGULA TOR
604 -91301 -1 MOS TSN:0 01-A PR-2011
FR4 29 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
52 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-1 1-13-9 00-80 1-02 RH AILERON TE NS ION RE GULATOR
604 -91301 -2 MOS TSN:0 01-A PR-2011
FR7 042 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-1 2-01-9 00-80 1-01 ROLL AILERON TRIM ACTUA TOR
600 -91100 -3 MOS TSN:0 01-A PR-2011
110 71 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-1 3-04-1 01 OPE RA TIONAL TEST ROL L DISCONNE CT SYSTEM (CMR*/MRB)


27-1 3-04-1 01 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3 304 5.8 3
REF: AMM 2 7 1 3 0 4 71 0 8 01 AFL 150 5

27-1 3-07-9 00-80 1-01 ROLL DIS CO NNECT HANDLE ASSY


600 -90625 -27 MOS TSN:0 01-A PR-2011
577 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-1 4-01-1 01 FUNCTIONAL TEST AIL ERON PO WE R CONTROL UNITS (PCUS). (CMR**)
27-1 4-01-1 01 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3 304 5.8 3
REF: AMM 2 7 1 4 0 1 72 0 8 01 AFL 150 5

27-1 4-01-9 00-80 1-01 LH AIL ERO N PCU UNIT


600 -75100 -17 MOS TSN:0 01-A PR-2011
182 9D HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-1 4-01-9 00-80 1-02 RH AILERON PCU UNIT


600 -75100 -17 MOS TSN:0 01-A PR-2011
183 0D HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-1 4-01-9 00-80 2-01 L/H OUTBD A ILE RO N PCU PRES SURE SWITCH
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-1 4-01-9 00-80 2-02 L/H INB D AILERON PCU PRESSURE SWITCH
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-1 4-01-9 00-80 2-03 R/H INBD AIL ERON PCU P RE SSURE S WITCH
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-1 4-01-9 00-80 2-04 R/H OUTB D AILERON PCU P RE SSURE SWITCH
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
53 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-1 5-01-9 00-80 3-01 LH AIL ERO N AS SY
600 -13000 -1005 MOS TSN:0 01-A PR-2011
586 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-1 5-01-9 00-80 3-02 RH AILERON ASSY
600 -13000 -1006 MOS TSN:0 01-A PR-2011
586 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-1 5-04-1 01 DIS CA RD OF THE L H A ILE RO N ANTIFLOA T SPRING , PART NO. 600-10 057-5/-6.
600 -10057 -5 MOS 01-A PR-2011
CLA04 44 HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 1 5 0 4 96 1 8 01 AFL 100 00 0 100 00
27-1 5-04-1 01 DIS CA RD OF THE RH AILERON ANTIFLOAT SPRING, P ART NO. 600 -1005 7-5/-6.
600 -10057 -6 MOS 01-A PR-2011
CLA04 14 HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 1 5 0 4 96 1 8 01 AFL 100 00 0 100 00
27-1 5-04-9 00-80 1-01 LH AIL ERO N ANTIFLOA T SPRING
27-1 5-04-1 01 600 -10057 -5 MOS TSN:0 01-A PR-2011
CLA04 44 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-1 5-04-9 00-80 1-02 RH AILERON ANTIFLOAT SPRING
27-1 5-04-1 01 600 -10057 -6 MOS TSN:0 01-A PR-2011
CLA04 14 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-1 5-07-1 01 DETAIL ED INSPECTIO N NO. 1 AILERON FLIGHT CONTRO LS DA MPE R (CMR**)
27-1 5-07-1 01 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3 304 5.8 3
REF: AMM 2 7 1 5 0 7 22 0 8 01 AFL 150 5
27-1 5-07-1 01 DETAIL ED INSPECTIO N NO. 2 AILERON FLIGHT CONTRO LS DA MPE R (CMR**)
27-1 5-07-1 01 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3 304 5.8 3
REF: AMM 2 7 1 5 0 7 22 0 8 01 AFL 150 5
27-1 5-07-9 00-80 1-01 LH AIL ERO N FLUTTER DA MP ER
600 -75142 -9 MOS TSN:0 01-A PR-2011
HAI5794 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-1 5-07-9 00-80 1-02 RH AILERON FL UTTER DAMPER
600 -75142 -9 MOS TSN:0 01-A PR-2011
HAI5784 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-1 5-10-9 00-80 1-01 LH AIL ERO N PO SITION TRANSMITTER
600 -59132 -1 MOS TSN:0 01-A PR-2011
P18 73 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
54 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-1 5-10-9 00-80 1-02 RH AILERON POSITION TRANSMITTER
600 -59132 -1 MOS TSN:0 01-A PR-2011
P18 81 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-2 0-00-2 01 (s) GENERAL VISUAL INS PECTION SINGL E RUDDE R CONTROL PA TH PKG
27-2 0-00-2 01 PK G 4 800 MOS +40/-40
HRS /MSC 480 0 +40/-40 0
REF: AMM 2 7 2 1 0 0 21 0 8 01 AFL

27-2 0-00-2 04 (s) FUNCTIONAL TEST LOAD LIMITE R (IN VE RTICA L S TAB ILIZER) TRAVEL S PKG
27-2 0-00-2 04 PK G 4 800 MOS +40/-40
HRS /MSC 480 0 +40/-40 0
REF: AMM 2 7 2 1 2 5 72 0 8 01 AFL

27-2 1-00-1 01 FUNCTIONAL TEST RUDDER BA CK LASH (CMR**)


27-2 1-00-1 01 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3 304 5.8 3
REF: AMM 2 7 2 1 0 0 72 0 8 05 AFL 150 5

27-2 1-00-7 10-80 1 OPE RA TIONAL TEST O F THE RUDDER CO NTROL SYS TEM
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883

27-2 1-16-9 00-80 1-01 UPR ROD ASSY CONTRO L


600 -92602 -13 MOS TSN:0 01-A PR-2011
TY-493 93 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-2 1-16-9 00-80 1-02 LWR ROD ASSY CONTRO L


600 -92602 -13 MOS TSN:0 01-A PR-2011
TY-489 09 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-2 1-16-9 00-80 3-01 BUNGEE, LOAD LIMITE R


600 -91302 -33 MOS TSN:0 01-A PR-2011
202 4 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-2 1-25-2 01 (s) GENERAL VISUAL INS PECTION RUDDER BA LANCE SP RING PKG
27-2 1-25-2 01 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 153 4.3
REF: AMM 2 7 2 1 0 0 21 0 8 04 AFL 988
27-2 1-25-9 00-80 1-01 BUNGEE, LOAD LIMITE R
600 -91302 -31 MOS TSN:0 01-A PR-2011
202 3 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-2 1-34-9 00-80 1-01 NO.1 UPP ER BUNGEE , LOAD LIMITER
600 -91302 -53 MOS TSN:0 01-A PR-2011
126 7 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
55 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-2 1-34-9 00-80 1-02 NO.2 L OWER BUNGEE , LOAD LIMITER
600 -91302 -53 MOS TSN:0 01-A PR-2011
126 8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-2 1-34-9 00-80 1-03 NO.3 CENTER B UNGEE , LOA D LIMITER
600 -91302 -43 MOS TSN:0 01-A PR-2011
905 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-2 2-00-9 00-80 1-01 YAW RUDDER TRIM ACTUATOR


600 -91100 -3 MOS TSN:0 01-A PR-2011
110 25 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-2 3-00-1 01 OPE RA TIONAL TEST P CU LOAD LIMITERS (CMR**)
27-2 3-00-1 01 PK G 3 200 MOS
HRS /MSC 320 0 0 320 0
REF: AMM 2 7 2 1 2 5 71 0 8 01 AFL

27-2 3-01-9 00-80 1-01 UPPER ,RUDDE R POWER CO NTROL UNIT


600 -75101 -29 MOS TSN:0 01-A PR-2011
874 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-2 3-01-9 00-80 1-02 LOWER ,RUDDE R POWER CO NTROL UNIT
600 -75101 -29 MOS TSN:0 01-A PR-2011
874 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-2 3-01-9 00-80 1-03 MIDDLE ,RUDDE R POWER CONTROL UNIT
600 -75101 -29 MOS TSN:0 01-A PR-2011
874 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-2 3-01-9 00-80 1-04 UPPER ,RUDDE R CONTROL ROD
600 -92602 -37 MOS TSN:0 01-A PR-2011
TY-496 27 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-2 3-01-9 00-80 1-05 LOWER ,RUDDE R CONTROL ROD
600 -92602 -37 MOS TSN:0 01-A PR-2011
TY-496 28 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-2 3-01-9 00-80 1-06 MIDDLE ,RUDDE R CONTROL ROD
600 -92602 -37 MOS TSN:0 01-A PR-2011
TY-496 29 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-2 4-01-9 00-80 1-01 COMPLETE RUDDER A SSEMBLY
604 -22001 -1 MOS TSN:0 01-A PR-2011
586 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
56 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-2 4-04-9 00-80 1-01 RUDDER POS. TANDEM TRANSMITTER TRANSDUCER
600 -59191 -5 MOS TSN:0 01-A PR-2011
T3279 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-2 4-07-9 00-80 1-01 PEDES TA L P OWER SUPP LY
601 R59 322-1 MOS TSN:0 01-A PR-2011
330 36-2 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-3 0-00-2 02 (s) GENERAL VISUAL INS PECTION OF THE E LEVATOR POWER-CONTRO L-UNIT (P CU) CE NTERING -SPRING PKG
27-3 0-00-2 02 PK G 1 200 MOS 27-S EP-20 19
HRS /MSC 120 0 +40/-40 187 7.3
REF: AMM 2 7 3 3 0 1 21 0 8 01 AFL 123 6

27-3 0-00-2 09 (s) OPE RA TIONAL TEST E LEVATOR JA M- TOL ERANT MECHA NISM PKG
27-3 0-00-2 09 PK G 3 200 MOS +40/-40
HRS /MSC 320 0 +40/-40 0
REF: AMM 2 7 3 1 1 9 71 0 8 01 AFL

27-3 0-00-2 10 (s) OPE RA TIONAL TEST L OAD L IMITER (VERTICAL STABILIZER) PKG
27-3 0-00-2 10 PK G 3 200 MOS +40/-40
HRS /MSC 320 0 +40/-40 0
REF: AMM 2 7 3 1 1 6 71 0 8 01 AFL

27-3 1-00-7 10-80 1 OPE RA TIONAL TEST O F THE EL EVATOR CO NTROL SYSTEM
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883

27-3 1-02-9 00-80 1-01 NO.1 B UNGE E, LOA D LIMITER


600 -91302 -29 MOS TSN:0 01-A PR-2011
400 5 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-3 1-02-9 00-80 1-02 NO.2 B UNGE E, LOA D LIMITER


600 -91302 -29 MOS TSN:0 01-A PR-2011
398 4 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-3 1-13-1 02 FUNCTION TE ST NO. 1 PFS - PITCH FEEL (CMR**)


27-3 1-13-1 02 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 153 4.3 313 4.3
REF: AMM 2 7 3 1 1 3 72 0 8 01 AFL 988
27-3 1-13-1 02 FUNCTION TE ST NO. 2 PFS - PITCH FEEL (CMR**)
27-3 1-13-1 02 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 153 4.3 313 4.3
REF: AMM 2 7 3 1 1 3 72 0 8 01 AFL 988
27-3 1-13-9 00-08 1-01 NO. 1 PFS - P ITCH FEEL SIMULA TO R
600 -92300 -61 MOS TSN:0 01-A PR-2011
204 67 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
57 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-3 1-13-9 00-80 1-01 NO. 2 PFS - P ITCH FEEL SIMULA TO R
600 -92300 -61 MOS TSN:0 01-A PR-2011
204 68 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-3 2-00-1 01 OPE RA TIONAL TEST E LEVATOR DISCONNECT SYS TE M (CMR*)
27-3 2-00-1 01 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3 304 5.8 3
REF: AMM 2 7 3 2 0 0 71 0 8 01 AFL 150 5

27-3 2-04-9 00-80 1-01 PITCH DISCONECT HANDLE


600 -90625 -25 MOS TSN:0 01-A PR-2011
534 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-3 3-01-1 01 FUNCTIONAL TEST ELEVA TO R BACKL ASH (CMR*)
27-3 3-01-1 01 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3 304 5.8 3
REF: AMM 2 7 3 1 0 0 72 0 8 05 AFL 150 5
27-3 3-01-2 01 (s) GENERAL VISUAL INS PECTION ELEVA TO R BAL ANCE SP RINGS PKG
27-3 3-01-2 01 PK G 4 800 MOS +40/-40
HRS /MSC 480 0 +40/-40 0
REF: AMM 2 7 3 1 0 0 21 0 8 01 AFL

27-3 3-01-9 00-80 1-01 LOB EL EVATOR POWER CONTROL UNIT


600 -75102 -23 MOS TSN:0 01-A PR-2011
361 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-3 3-01-9 00-80 1-02 LIB ELEVA TO R POWER CONTROL UNIT
600 -75102 -23 MOS TSN:0 01-A PR-2011
361 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-3 3-01-9 00-80 1-03 RIB EL EVATOR POWER CONTROL UNIT
600 -75102 -23 MOS TSN:0 01-A PR-2011
361 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-3 3-01-9 00-80 1-04 ROB ELEV ATOR PO WE R CONTROL UNIT
600 -75102 -23 MOS TSN:0 01-A PR-2011
362 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-3 4-04-1 01 FUNCTIONAL TEST LIB EL EVATOR FLUTTER DAMPERS (CMR*)
27-3 4-04-1 01 PK G 4 800 MOS
HRS /MSC 480 0 0 480 0
CMR REF: AMM 2 7 3 4 0 4 72 0 8 01 AFL

27-3 4-04-1 01 FUNCTIONAL TEST LOB ELE VATOR FLUTTE R DAMPERS (CMR*)
27-3 4-04-1 01 PK G 4 800 MOS
HRS /MSC 480 0 0 480 0
REF: AMM 2 7 3 4 0 4 72 0 8 01 AFL

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
58 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-3 4-04-1 01 FUNCTIONAL TEST RIB ELEV ATOR FLUTTER DA MP ERS (CMR*)
27-3 4-04-1 01 PK G 4 800 MOS
HRS /MSC 480 0 0 480 0
REF: AMM 2 7 3 4 0 4 72 0 8 01 AFL

27-3 4-04-1 01 FUNCTIONAL TEST RO B E LEVA TOR FLUTTER DAMPE RS (CMR*)


27-3 4-04-1 01 PK G 4 800 MOS
HRS /MSC 480 0 0 480 0
REF: AMM 2 7 3 4 0 4 72 0 8 01 AFL

27-3 4-04-1 02 DETAIL ED INSPECTIO N LIB E LEVA TOR FL UTTER DAMPE RS (CMR**)
27-3 4-04-1 02 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3 304 5.8 3
REF: AMM 2 7 3 4 0 4 22 0 8 01 AFL 150 5

27-3 4-04-1 02 DETAIL ED INSPECTIO N LOB EL EVATOR FLUTTE R DAMPERS (CMR**)


27-3 4-04-1 02 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3 304 5.8 3
REF: AMM 2 7 3 4 0 4 22 0 8 01 AFL 150 5

27-3 4-04-1 02 DETAIL ED INSPECTIO N RIB ELE VATOR FLUTTE R DAMPERS (CMR**)
27-3 4-04-1 02 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3 304 5.8 3
REF: AMM 2 7 3 4 0 4 22 0 8 01 AFL 150 5

27-3 4-04-1 02 DETAIL ED INSPECTIO N ROB ELEV ATO R FLUTTER DA MP ERS (CMR**)
27-3 4-04-1 02 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3 304 5.8 3
REF: AMM 2 7 3 4 0 4 22 0 8 01 AFL 150 5

27-3 4-04-9 00-80 1-01 LOB EL EVATOR FL UTTER DAMPER


600 -75142 -9 MOS TSN:0 01-A PR-2011
HAI5743 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-3 4-04-9 00-80 1-02 LIB ELEVA TO R FLUTTER DA MPE R


600 -75142 -9 MOS TSN:0 01-A PR-2011
HAI5744 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-3 4-04-9 00-80 1-03 RIB EL EVATOR FLUTTER DAMPER


600 -75142 -9 MOS TSN:0 01-A PR-2011
HAI5745 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-3 4-04-9 00-80 1-04 ROB ELEV ATOR FLUTTER DA MP ER
600 -75142 -9 MOS TSN:0 01-A PR-2011
HAI5746 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-3 4-07-9 00-80 1-01 LH ELEVA TO R POS ITIO N TRA NS MITTE R
600 -59132 -1 MOS TSN:0 01-A PR-2011
T9304 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
59 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-3 4-07-9 00-80 1-02 RH ELE VATOR P OSITION TRANSMITTER
600 -59132 -1 MOS TSN:0 01-A PR-2011
T9307 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-3 4-07-9 00-80 2-01 ELE VATOR P OS. TANDEM TRANSMITTER TRANSDUCER
600 -59191 -5 MOS TSN:0 01-A PR-2011
T3287 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-3 5-00-2 01 (s) OPE RA TIONAL TEST S INGLE CHANNE L O F STALL PROTECTION COMPUTER PKG
27-3 5-00-2 01 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
REF: AMM 2 7 3 5 0 1 71 0 8 01 AFL 150 5
27-3 5-00-2 02 (s) OPE RA TIONAL TEST DUAL CHA NNEL OF STALL PROTECTION COMPUTER PKG
27-3 5-00-2 02 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
REF: AMM 2 7 3 5 0 1 71 0 8 02 AFL 150 5
27-3 5-01-1 05 FUNCTIONAL TEST FL AP AND SIDE SLIP COMPE NS ATION MO NITOR O F THE STAL L P RO TECTIO N SYS TE M (CMR**)
27-3 5-01-1 05 PK G 4 800 MOS
HRS /MSC 480 0 0 480 0
REF: AMM 2 7 3 5 0 1 72 0 8 03 AFL

27-3 5-01-9 00-80 1-01 LH AOA SIGNAL CO NV ERTER


604 -52079 -1 MOS TSN:0 01-A PR-2011
138 375A-0 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-3 5-01-9 00-80 1-02 RH AO A S IGNAL CONVERTER
604 -52079 -1 MOS TSN:0 01-A PR-2011
138 375A-1 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-3 5-01-9 00-80 2-01 STALL PROTECTIO N COMPUTE R
600 -59152 -35 MOS TSR:1 10-JAN-20 16
103 3 MI-66 HRS /MSC O/C TSR:0 125 2.9
REF: See Workcard AFL TSR:0 816
27-3 5-04-1 01 FUNCTIONAL TEST LH ANGL E O F ATTACK TRANSDUCER/SENSOR ASSY (CMR*)
27-3 5-04-1 01 604 -52078 -1 MOS
138 377-04 HRS /MSC N/A
REF: AMM 2 7 3 5 0 4 72 0 8 01 AFL

27-3 5-04-1 01 FUNCTIONAL TEST RH ANGLE OF A TTACK TRA NSDUCER/SE NS OR AS SY (CMR*)


27-3 5-04-1 01 604 -52078 -2 MOS
138 085-05 HRS /MSC N/A
REF: AMM 2 7 3 5 0 4 72 0 8 01 AFL

27-3 5-04-1 02 RESTORATIO N LH A NG LE OF ATTACK TRANSDUCER/SENSO R ASS Y (CMR*)


27-3 5-04-1 02 604 -52078 -1 MOS
138 377-04 HRS /MSC N/A
REF: AMM 2 7 3 5 0 4 16 0 8 01 AFL

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
60 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-3 5-04-1 02 RESTORATIO N RH ANGLE O F ATTA CK TRANSDUCER/SENSOR ASSY (CMR*)
27-3 5-04-1 02 604 -52078 -2 MOS
138 085-05 HRS /MSC N/A
REF: AMM 2 7 3 5 0 4 16 0 8 01 AFL

27-3 5-04-9 00-80 2-01 STALL PROTECTIO N, S TICK SHA KER


600 -59155 -7 MOS TSN:0 01-A PR-2011
845 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-3 5-04-9 00-80 3-01 STALL PROTECTIO N, S TICK SHA KER


600 -59155 -7 MOS TSN:0 01-A PR-2011
847 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-3 5-04-9 00-80 4-01 LH ANG LE OF A TTACK TRANSDUCER/SE NSO R AS SY


604 -52078 -1 MOS TSN:0 01-A PR-2011
138 377-04 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-3 5-04-9 00-80 4-02 RH ANGLE O F ATTA CK TRANSDUCER/SENSOR ASSY


604 -52078 -2 MOS TSN:0 01-A PR-2011
138 085-05 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-3 5-10-1 01 FUNCTIONAL TEST STALL PROTECTION SYSTEM ( SPS) STICK PUSHER CAP STAN SHAFT, PART NO. 600-59 156-7
(VE NDOR PART NO. 50 1-125 8-01) ( CMR**)
27-3 5-10-1 01 MOS 29-MAR-2 018
HRS /MSC N/A 153 4.3
REF: AMM 2 7 3 5 1 3 72 0 8 01 AFL 988

27-3 5-10-9 00-80 1-01 LH UNDERFL OOR A CCEL ERO METE R


600 -59199 -9 MOS TSN:0 01-A PR-2011
DTF12 16 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-3 5-10-9 00-80 1-02 RH UNDE RFLOO R ACCELEROMETER


600 -59199 -9 MOS TSN:0 01-A PR-2011
DTE 9024 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-3 5-10-9 00-80 2-01 CAPSTAN, STICK P US HER ACTUATOR


600 -59156 -19 MOS TSN:0 01-A PR-2011
803 32 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-3 5-10-9 00-80 3-01 STICK PUSHER ACTUATOR


600 -59156 -15 MOS TSN:0 01-A PR-2011
803 52 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-3 5-10-9 00-80 4-01 ELE VATOR, STALL PROTECTIO N PUSHER A SSEMBLY
600 -90525 -809 MOS TSN:0 01-A PR-2011
F92036 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
61 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-3 5-10-9 00-80 5-01 ACCELERATION - NOSE AVIONIC EQUIPMENT SWITCH
604 -59203 -1 MOS TSN:0 01-A PR-2011
967 81 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-3 5-34-9 00-80 1-01 COPILOT SPS TEST INDICATOR
600 -59217 -1 MOS TSN:0 01-A PR-2011
216 9 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-3 5-34-9 00-80 1-02 PILOT SPS TEST INDICATOR


600 -59217 -1 MOS TSN:0 01-A PR-2011
217 6 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-4 0-00-2 02 (s) DETAIL ED INSPECTIO N HORIZONTAL-STABILIZER TRIM-ACTUA TO R ASS Y PKG
27-4 0-00-2 02 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 7 4 2 0 1 22 0 8 01 AFL 127 5
27-4 0-00-2 04 (s) LUBRICATION HORIZO NTAL STABILIZE R PITCH -TRIM -ACTUATOR PKG
27-4 0-00-2 04 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 1 2 2 0 0 4 64 0 8 17 AFL 127 5
27-4 0-00-2 05 (s) OPE RA TIONAL TEST P ITCH TRIM S WITCH PKG
27-4 0-00-2 05 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
REF: AMM 2 7 4 1 0 4 71 0 8 01 AFL 150 5
27-4 0-00-2 06 (s) OPE RA TIONAL TEST HORIZO NTAL STABILIZER TRIM SYSTEM PKG
27-4 0-00-2 06 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
REF: AMM 2 7 4 0 0 0 71 0 8 01 AFL 150 5
27-4 1-00-1 01 OPE RA TIONAL TEST (B ITE) OF THE HO RIZONTA L-STABILIZE R TRIM-CONTROL SY STE M (HSTCS) (CMR**)
27-4 1-00-2 01 MOS 14-MAR-2 022
HRS /MSC 640 219 4.6 283 4.6
REF: AMM 2 7 4 1 0 0 74 0 8 01 AFL 147 5
27-4 1-01-9 00-80 1-01 HORIZONTAL STAB TRIM CONTRO L UNIT
601 R92 301-1 5 MOS TSN:0 01-A PR-2011
552 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-4 2-01-1 01 DIS CA RD OF THE HORIZO NTAL STABILIZER TRIM A CTUATOR ( HSTA), PART NO. 6 04-923 05-3/5/7/9 (V ENDOR PART
NO. 84 54-1/2/3/4 ).
27-4 2-01-1 01 604 -92305 -7 (8454-3 ) MOS 26-A PR-2015
101 1 HRS /MSC TSI:120 8.5 107 0.7 7
LIFE LIMIT REF: AMM 2 7 4 2 0 1 96 0 8 01 AFL 200 00 TSI:997 688 196 91
+ 27-4 2-01-1 05 DIS CA RD OF THE HORIZO NTAL STABILIZER TRIM A CTUATOR ( HSTA), PART NO. 6 04-923 05-3/5/7/9
604 -92305 -7 (8454-3 ) MOS 01-A PR-2011
101 1 HRS /MSC 192 00 0 190 62.27 M
LIFE LIMIT REF: AMM 2 7 4 2 0 1 96 0 8 01 AFL 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
62 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 27-4 2-01-1 08 DIS CA RD L/H LOWER HORIZONTAL -STABILIZER TRIM-ACTUATOR (HS TA ) TRUNNIO N SUPPO RT (PART NO.
601 R92 386-1 /-3)
PN MOS 01-A PR-2011
SN-UNKNOWN HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 4 2 0 1 96 1 8 01 AFL 200 00 0 200 00
+ 27-4 2-01-1 08 DIS CA RD L/H UP PER HORIZO NTAL -STABILIZER TRIM- ACTUATOR ( HS TA) TRUNNIO N SUPPO RT (PART NO.
601 R92 386-1 /-3)
PN MOS 01-A PR-2011
SN-UNKNOWN HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 4 2 0 1 96 1 8 01 AFL 200 00 0 200 00
+ 27-4 2-01-1 08 DIS CA RD R/H LO WE R HORIZONTAL-S TAB ILIZER TRIM-ACTUATOR (HSTA) TRUNNION SUPPORT (P ART NO.
601 R92 386-1 /-3)
PN MOS 01-A PR-2011
SN-UNKNOWN HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 4 2 0 1 96 1 8 01 AFL 200 00 0 200 00
+ 27-4 2-01-1 08 DIS CA RD R/H UPPE R HORIZONTAL-STAB ILIZER TRIM-ACTUATO R (HSTA) TRUNNION SUPPORT (P ART NO.
601 R92 386-1 /-3)
PN MOS 01-A PR-2011
SN-UNKNOWN HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 4 2 0 1 96 1 8 01 AFL 200 00 0 200 00
27-4 2-01-1 09 RESTORATIO N (OV ERHAUL) OF HO RIZONTA L S TA BIL IZER TRIM ACTUATOR , PART NO. 604-92 305-7 AND S UBS
(VE NDOR PART NO. 84 54-3 AND SUBS ) (CMR*)
604 -92305 -7 (8454-3 ) MOS 26-A PR-2015
101 1 HRS /MSC 960 0 107 0.7 7 106 70.77
CMR* REF: AMM 2 7 4 2 0 1 61 5 8 01 AFL 840 0 688 908 8
27-4 2-01-1 10 SPE CIAL DETAIL ED INSPECTIO N HORIZONTAL STA BILIZER TRIM ACTUA TO R , PART NO . 604-9 2305-7 AND S UB S
(VE NDOR PART NO. 84 54-3 AND SUBS ) (CMR**)
604 -92305 -7 (8454-3 ) MOS 120 26-A PR-2015 26-APR-20 25
101 1 HRS /MSC 107 0.7 7
REF: AMM 2 7 4 2 0 1 28 0 8 01 AFL 688

27-4 2-01-1 11 DETAIL ED INSPECTIO N HORIZONTAL STA BILIZER TRIM ACTUA TO R (HSTA) SECONDA RY LO AD PA TH INDICATOR,
PART NO. 604-9 2305-7 AND S UB S ( VENDO R PA RT NO . 8454- 3 A ND SUBS) (CMR*)
604 -92305 -7 (8454-3 ) MOS 17-A PR-2012
101 1 HRS /MSC 500 0 16.2 501 6.2
REF: AMM 2 7 4 2 0 1 22 0 8 02 AFL 10

+ 27-4 2-01-1 12 DIS CA RD L/H LOWER P ART NO. 60 0-9238 3-5/-7 OR 60 1R9 2309-1 /-3 .
MOS 01-A PR-2011
HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 4 2 0 1 96 1 8 03 AFL 780 0 0 780 0
+ 27-4 2-01-1 12 DIS CA RD L/H UP PER P ART NO. 600 -9238 4-5/-7 O R 601 R9 2310-1 /-3
MOS 01-A PR-2011
HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 4 2 0 1 96 1 8 03 AFL 780 0 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
63 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 27-4 2-01-1 12 DIS CA RD R/H LO WE R PART NO . 600-9 2383-5 /-7 OR 601R923 09-1/-3.
MOS 01-A PR-2011
HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 4 2 0 1 96 1 8 03 AFL 780 0 0 780 0
+ 27-4 2-01-1 12 DIS CA RD R/H UPPE R PART NO. 600-92 384-5 /-7 OR 601R9231 0-1/-3
MOS 01-A PR-2011
HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 4 2 0 1 96 1 8 03 AFL 780 0 0 780 0
27-4 2-01-1 13 RESTORATIO N OF THE HORIZONTA L STA BIL IZER TRIM ACTUA TOR (HSTA), PA RT NO . 604-9 2305-9 (V ENDO R P/N
845 4-4) (CMR*)
604 -92305 -7 (8454-3 ) MOS 01-A PR-2011
101 1 HRS /MSC N/A 0
REF: See Workcard AFL 0
27-4 2-01-9 00-80 1-01 L/H UPPE R HORIZONTAL-STABILIZER TRIM-ACTUA TO R (HSTA) TRUNNION S UP PORT
27-4 2-01-1 08 PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC H/T TSN:0 0
REF: See Workcard AFL TSN:0 0

27-4 2-01-9 00-80 1-02 R/H UP PER HORIZO NTAL -STABILIZER TRIM- ACTUATOR ( HS TA) TRUNNIO N SUPPO RT
27-4 2-01-1 08 PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC H/T TSN:0 0
REF: See Workcard AFL TSN:0 0
27-4 2-01-9 00-80 1-03 L/H LO WE R HORIZONTAL-STAB ILIZER TRIM-ACTUA TO R (HSTA) TRUNNION S UP PORT
27-4 2-01-1 08 PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC H/T TSN:0 0
REF: See Workcard AFL TSN:0 0
27-4 2-01-9 00-80 1-04 R/H LOWER HORIZO NTAL -STABILIZER TRIM- ACTUATOR (HS TA ) TRUNNIO N SUPPO RT
27-4 2-01-1 08 PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC H/T TSN:0 0
REF: See Workcard AFL TSN:0 0
27-4 2-01-9 00-80 2-01 HORIZONTAL STABILIZER TRIM ACTUATO R
27-4 2-01-1 01 604 -92305 -7 (8454-3 ) MOS 26-A PR-2015
101 1 HRS /MSC H/T TSN:12 08.5 107 0.7 7
REF: See Workcard AFL TSN:99 7 688
27-4 2-04-9 00-80 1-01 HORIZONTAL STAB MO TO R CONTROL UNIT
706 5-3 MOS 08-FEB -2018
642 HRS /MSC O/C TSN:17 84.4 150 0.2
REF: See Workcard AFL 968
27-5 0-00-2 01 FUNCTIONAL TEST ASYMMETRY/O VERSPEE D DETECTO R AND BRAK E UNIT (MRB)
27-5 0-00-2 01 PK G 1 200 MOS 29-MAR-2 018
HRS /MSC 120 0 +40/-40 153 4.3 273 4.3 277 4.3
REF: AMM 2 7 5 1 0 7 72 0 8 01 AFL 988

27-5 0-00-2 02 (s) DETAIL ED INSPECTIO N LH NO.1 FL EXIBLE DRIVE SHAFT AS SEMBLY PKG
27-5 0-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 7 5 3 0 7 22 0 8 01 AFL 150 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
64 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-5 0-00-2 02 (s) DETAIL ED INSPECTIO N LH NO.2 FL EXIBLE DRIVE SHAFT AS SEMBLY PKG
27-5 0-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 7 5 3 0 7 22 0 8 01 AFL 150 5
27-5 0-00-2 02 (s) DETAIL ED INSPECTIO N LH NO.3 FL EXIBLE DRIVE SHAFT AS SEMBLY PKG
27-5 0-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 7 5 3 0 7 22 0 8 01 AFL 150 5

27-5 0-00-2 02 (s) DETAIL ED INSPECTIO N LH NO.4 FL EXIBLE DRIVE SHAFT AS SEMBLY PKG
27-5 0-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 7 5 3 0 7 22 0 8 01 AFL 150 5

27-5 0-00-2 02 (s) DETAIL ED INSPECTIO N LH NO.5 FL EXIBLE DRIVE SHAFT AS SEMBLY PKG
27-5 0-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 7 5 3 0 7 22 0 8 01 AFL 150 5

27-5 0-00-2 02 (s) DETAIL ED INSPECTIO N RH NO.1 FLEX IBL E DRIV E SHA FT ASSE MB LY PKG
27-5 0-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 7 5 3 0 7 22 0 8 01 AFL 150 5

27-5 0-00-2 02 (s) DETAIL ED INSPECTIO N RH NO.2 FLEX IBL E DRIV E SHA FT ASSE MB LY PKG
27-5 0-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 7 5 3 0 7 22 0 8 01 AFL 150 5

27-5 0-00-2 02 (s) DETAIL ED INSPECTIO N RH NO.3 FLEX IBL E DRIV E SHA FT ASSE MB LY PKG
27-5 0-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 7 5 3 0 7 22 0 8 01 AFL 150 5

27-5 0-00-2 02 (s) DETAIL ED INSPECTIO N RH NO.4 FLEX IBL E DRIV E SHA FT ASSE MB LY PKG
27-5 0-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 7 5 3 0 7 22 0 8 01 AFL 150 5

27-5 0-00-2 02 (s) DETAIL ED INSPECTIO N RH NO.5 FLEX IBL E DRIV E SHA FT ASSE MB LY PKG
27-5 0-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 7 5 3 0 7 22 0 8 01 AFL 150 5
27-5 0-00-2 03 (s) LUBRICATION B ALL NUT OF THE FLAP ACTUATORS PKG
27-5 0-00-2 03 PK G 1 2 MOS 12 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 1 2 2 0 0 4 64 0 8 13 AFL 147 5
27-5 0-00-2 05 (s) LUBRICATION FLAP VA NE ACTUATOR RODS PKG
27-5 0-00-2 05 PK G 1 2 MOS 12 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 1 2 2 0 0 4 64 0 8 09 AFL 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
65 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-5 0-00-2 06 (s) LUBRICATION B ENT-UP TRA ILING E DG E (BUTE ) DOOR HINGE PKG
27-5 0-00-2 06 PK G 1 2 MOS 12 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 1 2 2 0 0 4 64 0 8 10 AFL 147 5
27-5 0-00-2 07 (s) VISUAL CHECK INB OARD AND O UTBO ARD FLAP ACTUATORS PKG
27-5 0-00-2 07 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
REF: AMM 2 7 5 3 0 0 21 0 8 01 AFL 150 5

27-5 0-00-2 08 (s) FUNCTIONAL TEST INBOA RD AND OUTBOARD FLA P A CTUATORS PKG
27-5 0-00-2 08 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 2 7 5 3 0 0 72 0 8 01 AFL 150 5
27-5 1-00-9 00-80 1-01 FLAP CONTROL LE VER
601 R93 003-5 MOS TSN:0 01-A PR-2011
171 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 1-00-9 00-80 2-01 LH BRA KE DE TE CTOR
600 -93000 -123 MOS TSN:0 01-A PR-2011
220 5A HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-5 1-00-9 00-80 2-02 RH BRAKE DETECTOR
600 -93000 -123 MOS TSN:0 01-A PR-2011
220 6A HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-5 1-00-9 00-80 3-01 FLAP CONTROL UNIT
8-34 1-06 MOS TSN:0 01-A PR-2011
D1014 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 1-04-1 01 FUNCTIONAL TEST FL AP CO NTROL UNIT (AL L DRIVERS-ON CIRCUIT) (CMR*)
27-5 1-04-1 01 PK G 4 800 MOS
HRS /MSC 480 0 0 480 0
REF: AMM 2 7 5 1 0 4 72 0 8 01 AFL

27-5 2-00-9 00-80 1-01 FLAP PDU - POWER DRIVE UNIT


600 -93000 -71 MOS TSN:0 01-A PR-2011
108 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 2-00-9 00-80 1-02 NO.1 FLAP P OWER DRIVE SY STEM MOTOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 2-00-9 00-80 1-03 NO. 2 FLAP POWER DRIVE SYS TEM MOTOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
66 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-5 2-00-9 00-80 1-04 FLAP POWER DRIVE UNIT PO TE NTIOMETER
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 2-00-9 00-80 1-05 LH WING - OUTBOA RD FL AP - O UTER ACTUATOR ( WS 26 4)
600 -93000 -113 MOS TSN:0 01-A PR-2011
157 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-5 2-00-9 00-80 1-06 RH WING - OUTB OARD FLAP - OUTER ACTUA TO R (WS 264)
600 -93000 -114 MOS TSN:0 01-A PR-2011
131 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-5 2-00-9 00-80 1-07 LH WING - OUTBOA RD FL AP - INNE R ACTUA TOR (WS 178)
600 -93000 -115 MOS TSN:0 01-A PR-2011
157 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-5 2-00-9 00-80 1-08 RH WING - OUTB OARD FLAP - INNER A CTUATOR (WS 178 )
600 -93000 -116 MOS TSN:0 01-A PR-2011
133 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-5 2-00-9 00-80 1-09 LH WING - INBOARD FLAP - INNER ACTUATOR ( WS 76 .50 )
600 -93000 -95 MOS TSN:0 01-A PR-2011
291 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-5 2-00-9 00-80 1-10 RH WING - INBO ARD FLAP - INNER ACTUA TO R (WS 76.50)
600 -93000 -95 MOS TSN:0 01-A PR-2011
291 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-5 3-00-1 01 (LWS 264.00) RESTORATIO N OF THE LH WING - OUTBOARD FLA P - OUTER A CTUATOR (WS 264 )
600 -93000 -113 MOS
157 9 HRS /MSC
CMR REF: AMM 2 7 5 3 0 4 61 0 8 01 AFL 960 0 0 960 0
27-5 3-00-1 01 (LWS178 .00) RESTORATIO N OF THE LH WING - OUTBOARD FLA P - INNER ACTUATOR (WS 1 78)
600 -93000 -115 MOS
157 9 HRS /MSC
CMR REF: AMM 2 7 5 3 0 4 61 0 8 01 AFL 960 0 0 960 0
27-5 3-00-1 01 (RWS 264 .00 ) RESTORATIO N OF THE RH WING - OUTBO ARD FLAP - OUTE R ACTUATOR (WS 264)
600 -93000 -114 MOS
131 9 HRS /MSC
CMR REF: AMM 2 7 5 3 0 4 61 0 8 01 AFL 960 0 0 960 0
27-5 3-00-1 01 (RWS1 78.00) RESTORATIO N OF THE RH WING - OUTBO ARD FLAP - INNER ACTUATOR (WS 178)
600 -93000 -116 MOS
133 9 HRS /MSC
CMR REF: AMM 2 7 5 3 0 4 61 0 8 01 AFL 960 0 0 960 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
67 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-5 3-00-9 00-80 1-01 LH WING - INBOARD FLAP - OUTER ACTUATO R (WS 127.25)
600 -93000 -93 MOS TSN:0 01-A PR-2011
292 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 3-00-9 00-80 1-02 RH WING - INBO ARD FLAP - O UTER ACTUATOR (WS 1 27.25)
600 -93000 -93 MOS TSN:0 01-A PR-2011
292 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-5 3-00-9 00-80 2-01 LH NO .1 FLEXIBLE, FL AP CO N SHAFT


600 -93000 -61 MOS TSN:0 01-A PR-2011
297 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 3-00-9 00-80 2-02 RH NO.1 FLE XIB LE, FLAP CON S HA FT
600 -93000 -61 MOS TSN:0 01-A PR-2011
296 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 3-00-9 00-80 3-01 LH NO .2 FLEXIBLE, FL AP CO N SHAFT
600 -93000 -63 MOS TSN:0 01-A PR-2011
242 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 3-00-9 00-80 3-02 RH NO.2 FLE XIB LE, FLAP CON S HA FT
600 -93000 -63 MOS TSN:0 01-A PR-2011
242 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 3-00-9 00-80 4-01 LH NO .3 FLEXIBLE, FL AP CO N SHAFT
600 -93000 -65 MOS TSN:0 01-A PR-2011
284 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 3-00-9 00-80 4-02 RH NO.3 FLE XIB LE, FLAP CON S HA FT
600 -93000 -65 MOS TSN:0 01-A PR-2011
284 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 3-00-9 00-80 5-01 LH NO .4 FLEXIBLE, FL AP CO N SHAFT
600 -93000 -67 MOS TSN:0 01-A PR-2011
283 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 3-00-9 00-80 5-02 RH NO.4 FLE XIB LE, FLAP CON S HA FT
600 -93000 -67 MOS TSN:0 01-A PR-2011
283 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 3-00-9 00-80 6-01 LH NO .5 FLEXIBLE, FL AP CO N SHAFT
600 -93000 -69 MOS TSN:0 01-A PR-2011
283 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
68 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-5 3-00-9 00-80 6-02 RH NO.5 FLE XIB LE, FLAP CON S HA FT
600 -93000 -69 MOS TSN:0 01-A PR-2011
283 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 4-10-9 00-80 1-01 LOB VA NE ACTUATOR AS SEMBLY
600 -14202 -17 MOS TSN:0 01-A PR-2011
CLA06 85 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-5 4-10-9 00-80 1-02 LH MID VA NE ACTUATOR AS SEMBLY


600 -14202 -17 MOS TSN:0 01-A PR-2011
CLA07 74 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-5 4-10-9 00-80 1-03 LIB VANE ACTUATOR ASSEMBL Y


600 -14202 -17 MOS TSN:0 01-A PR-2011
CLA06 90 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-5 4-10-9 00-80 1-04 RIB VA NE ACTUATO R ASS EMBLY


600 -14202 -17 MOS TSN:0 01-A PR-2011
CLA07 64 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-5 4-10-9 00-80 1-05 RH MID VANE ACTUATOR ASSE MB LY


600 -14202 -17 MOS TSN:0 01-A PR-2011
CLA07 63 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-5 4-10-9 00-80 1-06 ROB VANE ACTUATOR ASSE MB LY


600 -14202 -17 MOS TSN:0 01-A PR-2011
CLA07 71 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-5 4-10-9 00-80 1-07 NO. 1 INB OARD FLAP VANE BEA M
57-5 0-00-1 20 600 -14250 -29 MOS TSN:0 01-A PR-2011
CLA19 14 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-5 4-10-9 00-80 1-08 NO. 2 INB OARD FLAP VANE BEA M
57-5 0-00-1 20 600 -14250 -29 MOS TSN:0 01-A PR-2011
CLA20 34 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-5 4-10-9 00-80 1-09 NO. 3 INB OARD FLAP VANE BEA M
57-5 0-00-1 20 600 -14250 -29 MOS TSN:0 01-A PR-2011
CLA19 19 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-5 4-10-9 00-80 1-10 NO. 4 INB OARD FLAP VANE BEA M
57-5 0-00-1 20 600 -14250 -29 MOS TSN:0 01-A PR-2011
CLA20 20 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
69 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-5 4-10-9 00-80 1-11 NO. 5 INB OARD FLAP VANE BEA M
57-5 0-00-1 20 600 -14250 -29 MOS TSN:0 01-A PR-2011
CLA20 19 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
27-5 4-10-9 00-80 1-12 NO. 6 INB OARD FLAP VANE BEA M
57-5 0-00-1 20 600 -14250 -29 MOS TSN:0 01-A PR-2011
CLA20 29 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-5 5-00-9 00-80 1-01 LH FLA P P OSITIONER TRANSMITTER


600 -93030 -9 MOS TSN:0 01-A PR-2011
664 771 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-5 5-00-9 00-80 1-02 RH FLAP POS ITIONER TRANSMITTER
600 -93030 -11 MOS TSN:0 01-A PR-2011
854 4480 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-6 0-00-2 01 (s) LUBRICATION FLIGHT SP OIL ER FLEXS HA FT & CONTROL CA BLE ENDS PKG
27-6 0-00-2 01 PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 +40/-40 224 5.8 3
REF: AMM 1 2 2 0 0 4 64 0 8 18 AFL 150 5
27-6 1-00-7 10-80 1 OPE RA TIONAL TEST O F THE FLIGHT SPO ILE RS
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883
27-6 1-00-7 10-80 2 OPE RA TIONAL TEST O F THE GROUND SP OILERS
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883
27-6 1-00-9 00-80 1-01 LOB SP OILER P OWER CONTRO L UNIT
600 -75103 -15 MOS TSN:0 01-A PR-2011
358 6A HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-6 1-00-9 00-80 1-02 LIB SPOILER POWER CONTROL UNIT
600 -75103 -15 MOS TSN:0 01-A PR-2011
358 1A HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-6 1-00-9 00-80 1-03 RIB SP OIL ER PO WE R CONTROL UNIT
600 -75103 -15 MOS TSN:0 01-A PR-2011
358 5A HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-6 1-00-9 00-80 1-04 ROB SPO ILE R POWER CO NTROL UNIT
600 -75103 -15 MOS TSN:0 01-A PR-2011
358 4A HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
70 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
27-6 1-00-9 00-80 2-01 LH SPOILER - BUNGEE , LOA D LIMITER
600 -91302 -47 MOS TSN:0 01-A PR-2011
841 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-6 1-00-9 00-80 2-02 RH SP OIL ER - BUNGEE, L OAD L IMITER
600 -91302 -49 MOS TSN:0 01-A PR-2011
885 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-6 1-00-9 00-80 3-01 LH SPOILER POSITION TRANSMITTER


600 -59132 -1 MOS TSN:0 01-A PR-2011
P18 67 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-6 1-00-9 00-80 3-02 RH SP OIL ER PO SITION TRANSMITTER


600 -59132 -1 MOS TSN:0 01-A PR-2011
P18 78 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-6 1-00-9 00-80 4-01 FLT SP OIL ER CONTRO L L EVER


604 -90606 -3 MOS TSN:0 01-A PR-2011
173 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-6 1-00-9 00-80 5-01 FLIG HT SPOILER LEVE R


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

27-6 1-00-9 00-80 6-01 PUSH-PULL CONTROL UNIT


600 -91303 -11 MOS TSN:0 01-A PR-2011
896 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-6 1-00-9 00-80 7-01 PUSH-PULL CONTROL UNIT


600 -91303 -13 MOS TSN:0 01-A PR-2011
922 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

27-6 3-04-9 00-80 2-01 SPO ILE R MANIFOL D ASS Y O /O ASS EMBLY
600 -75124 -7 MOS TSN:0 01-A PR-2011
915 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-6 3-07-9 00-80 1-01 LH SPOILER ACTUATOR UNIT
600 -75106 -7 MOS TSN:0 01-A PR-2011
183 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
27-6 3-07-9 00-80 1-02 RH SP OIL ER ACTUATO R UNIT
600 -75106 -7 MOS TSN:0 01-A PR-2011
182 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
71 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
271 101-09 01 PILOT INSTL CO NTROL COLUMN
600 -90100 -879 MOS TSN:0 17-A PR-2012
586 6 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
274 014-70 1 TAILCO NE AS SY
604 -21411 -1 MOS 22-JUN-2018
J46890 6 HRS /MSC O/C 156 7.7
CUS TO ME R CODE REF: AFL 101 7
CHA PTER 28 FUEL
12-1 1-28-2 80-01 DO MICRO BIA L GRO WTH TE ST TASK
MOS 28-JUL-20 18
HRS /MSC - 159 7.8
REF: AFL 104 5
12-1 1-28-7 50-80 1 DO WA TE R CONTA MINATION CHECK
MOS 28-JUL-20 18
HRS /MSC - 159 7.8
REF: AFL 104 5
28 -10- 00-620 -802 DO BIO CIDE TREATMENT OF FUEL TANKS IF MICROBIAL GROWTH IS DETECTE D
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883
28-0 0-00-7 10-80 1 OPE RA TO IONAL TEST OF THE FUEL SYS TEM
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883
28-0 0-01-9 00-80 1-01 LIB FUEL SYS TE M DRA IN VALVE
277 0086-1 03 MOS TSN:0 01-A PR-2011
636 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-0 0-01-9 00-80 1-02 LOB FUEL SYSTEM DRAIN V ALVE


277 0086-1 03 MOS TSN:0 01-A PR-2011
636 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-0 0-01-9 00-80 2-01 RH FUEL SYSTEM DRAIN VA LVE
277 0086-1 03 MOS TSN:0 01-A PR-2011
636 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-1 0-00-2 01 (s) GENERAL VISUAL INS PECTION FUEL ACCESS PANEL S PKG
28-1 0-00-2 01 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 2 8 1 1 0 1 21 0 8 01 AFL 123 6
28-1 0-00-2 02 (s) GENERAL VISUAL INS PECTION FUEL DRA IN VALVE S PKG
28-1 0-00-2 02 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 2 8 1 1 0 7 21 0 8 01 AFL 123 6
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
72 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
28-1 0-00-2 03 (s) GENERAL VISUAL INS PECTION WA TE R DRA IN V ALVE S PKG
28-1 0-00-2 03 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 2 8 1 1 0 4 21 0 8 01 AFL 123 6
28-1 0-00-2 04 (s) GENERAL VISUAL INS PECTION FUEL TANK E XTERIOR PKG
28-1 0-00-2 04 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 2 8 1 0 0 0 21 0 8 01 AFL 123 6

28-1 0-00-2 05 (s) GENERAL VISUAL INS PECTION SADDLE TANK DRA IN PKG
28-1 0-00-2 05 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 2 8 1 3 1 0 21 0 8 01 AFL 123 6

28-1 0-00-2 06 (s) GENERAL VISUAL INS PECTION GRAVITY FIL LER CAP PKG
28-1 0-00-2 06 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 2 8 1 0 0 0 21 0 8 02 AFL 123 6

28-1 0-00-2 07 (s) FUNCTIONAL TEST VENT LINE S HROUDS PKG


28-1 0-00-2 07 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 8 1 4 2 2 72 0 8 01 AFL 127 5

28-1 0-00-2 08 (s) FUNCTIONAL TEST MO TIVE- FLO W LINES SHRO UDS PKG
28-1 0-00-2 08 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 8 2 2 1 0 72 0 8 01 AFL 127 5

28-1 0-00-2 09 (s) FUNCTIONAL TEST FUEL- FE ED LINE S HROUDS PKG


28-1 0-00-2 09 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 8 2 1 1 6 72 0 8 01 AFL 127 5

28-1 0-00-2 10 (s) FUNCTIONAL TEST FO RWARD A ND AFT AUXILIA RY TANKS - INTERSPACE AND FUEL TRANSFER L INE SHROUDS PKG
28-1 0-00-2 10 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 8 1 2 1 0 72 0 8 02 AFL 127 5

28-1 0-00-2 13 (s) VISUAL CHECK VENT AND DISTRIB UTION SHROUD DRAINS FOR B LOCKAGE A ND LEAKA GE PKG
28-1 0-00-2 13 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 2 8 0 0 0 0 21 0 8 01 AFL 123 6
28-1 2-07-9 00-80 1-01 FWD FUEL TANK
800 11-203 MOS TSN:0 01-A PR-2011
AVFWD0875 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-1 2-07-9 00-80 2-01 AFT AUX FUE L TANK
800 22-119 MOS TSN:0 01-A PR-2011
AVA FT087 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
73 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
28-1 3-01-9 00-80 1-01 FUE L TANK
601 -21001 -21 MOS TSN:0 01-A PR-2011
586 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-1 3-04-9 00-80 1-01 DRA IN, WATER, TAIL TANK VALV E
68C4H MOS TSN:0 01-A PR-2011
726 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-1 4-01-9 00-80 1-01 LH REL IEF, V ENT VALV E


288 0022-1 01 MOS TSN:0 01-A PR-2011
495 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-1 4-01-9 00-80 1-02 RH RELIEF, VENT V ALVE
288 0022-1 01 MOS TSN:0 01-A PR-2011
495 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-1 4-04-9 00-80 1-01 TAIL RELIEF, VE NT VALVE
604 -62150 -1 MOS TSN:0 01-A PR-2011
571 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-1 4-19-9 00-80 1-01 CENTE R RELIEF, VENT VA LVE
288 0022-1 02 MOS TSN:0 01-A PR-2011
496 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-1 5-00-2 01 (s) FUNCTIONAL TEST RO TO R-B URST PROTECTION P RE SSURE-SWITCH PKG
28-1 5-00-2 01 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 153 4.3
REF: AMM 2 8 4 2 1 3 72 0 8 01 AFL 988
28-1 5-00-2 02 (s) OPE RA TIONAL TEST TAIL-TANK TRANSFER SHUTOFF-VALV E PKG
28-1 5-00-2 02 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 153 4.3
REF: AMM 2 8 1 5 2 2 71 0 8 01 AFL 988
28-1 5-00-2 03 (s) OPE RA TIONAL TEST TAIL-TANK SECONDARY TRANSFER-PUMP PKG
28-1 5-00-2 03 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 153 4.3
REF: AMM 2 8 1 5 2 8 71 0 8 01 AFL 988
28-1 5-01-9 00-80 1-01 LH EJE CTOR, TRANSFER PUMP
278 0473-1 05 MOS TSN:0 01-A PR-2011
286 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-1 5-01-9 00-80 1-02 RH EJECTOR, TRANSFER PUMP
278 0473-1 05 MOS TSN:0 01-A PR-2011
289 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
74 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
28-1 5-04-9 00-80 1-01 LH EJE CTOR, FUEL SYSTEM PUMP
278 0472-1 03 MOS TSN:0 01-A PR-2011
181 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-1 5-04-9 00-80 1-02 RH EJECTOR, FUEL SY STEM PUMP
278 0472-1 03 MOS TSN:0 01-A PR-2011
181 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-1 5-10-9 00-08 1-01 LH SHUT-OFF, FUE L S YS VALVE


600 -62533 -3 MOS TSN:0 01-A PR-2011
130 8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

28-1 5-10-9 00-08 1-02 RH SHUT- OFF, FUEL SYS VA LVE


600 -62533 -3 MOS TSN:0 01-A PR-2011
130 9 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

28-1 5-13-9 00-80 1-01 LH TRANSFER S HUT-OFF VA LVE


AV1 6B208 2-4 MOS TSN:0 01-A PR-2011
AA2 57281 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-1 5-13-9 00-80 1-02 RH TRANS FE R SHUT-O FF VALV E


AV1 6B208 2-4 MOS TSN:0 01-A PR-2011
AA2 57276 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-1 5-16-9 00-80 1-01 LH TAIL TANK CHECK VALVE


601 R62 296-5 MOS TSN:0 01-A PR-2011
409 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-1 5-16-9 00-80 1-02 RH TAIL TANK CHE CK VA LVE


601 R62 296-5 MOS TSN:0 01-A PR-2011
409 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-1 5-22-9 00-80 1-01 TAIL TANK TRANSFER VALV E


601 -62900 -7 MOS TSN:0 01-A PR-2011
AA2 45413 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-1 5-28-9 00-80 1-01 LH XFR, TAIL TA NK PUMP
604 -62146 -1 MOS TSN:0 01-A PR-2011
E78 824 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-1 5-28-9 00-80 1-02 RH XFR, TAIL TANK PUMP
604 -62146 -1 MOS TSN:0 01-A PR-2011
E78 825 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
75 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
28-1 5-43-1 01 FUNCTIONAL TEST TA IL TANK RES TRICTOR (CMR**)
28-1 5-43-1 01 MOS
HRS /MSC 150 00 0 150 00
REF: AMM 2 8 1 5 4 3 72 0 8 01 AFL

28-1 5-46-9 00-80 2-01 BAL ANCE LINE S HUT-OFF VA LVE


AV1 6B208 2-4 MOS TSN:0 01-A PR-2011
AA2 57280 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-2 0-00-2 02 (s) OPE RA TIONAL TEST COL LECTO R- TANK CHE CK VA LVE PKG
28-2 0-00-2 02 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 2 8 1 1 1 9 71 0 8 01 AFL 127 5
28-2 1-07-9 00-80 1-01 LH EJE CTOR, FUEL SYSTEM PUMP
278 0602-1 05 MOS TSN:0 01-A PR-2011
216 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-2 1-07-9 00-80 1-02 RH EJECTOR, FUEL SY STEM PUMP
278 0602-1 05 MOS TSN:0 01-A PR-2011
217 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-2 1-13-2 01 OPE RA TIONAL TEST L H ENGINE FIRE WA LL FUEL SHUTO FF VALVE
28-2 1-13-2 01 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3 248 0.3 252 0.3
REF: AMM 2 8 2 1 1 3 71 0 8 01 AFL 123 6
28-2 1-13-2 01 OPE RA TIONAL TEST RH E NG INE FIREWALL FUEL SHUTOFF VA LVE
28-2 1-13-2 01 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3 248 0.3 252 0.3
REF: AMM 2 8 2 1 1 3 71 0 8 01 AFL 123 6
28-2 1-13-9 00-80 1-01 LH ENG INE FIREWALL FUEL SHUTOFF VA LVE
601 -62900 -7 MOS TSN:0 01-A PR-2011
AA2 50349 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-2 1-13-9 00-80 1-02 RH ENGINE FIRE WA LL FUEL SHUTOFF VALV E
601 -62900 -8 MOS TSN:0 01-A PR-2011
AA2 49368 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-2 2-04-9 00-80 1-01 LH FUEL SYS TE M CHE CK VA LVE
869 A-8TB MOS TSN:0 01-A PR-2011
10-1 02078 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-2 2-04-9 00-80 1-02 RH FUEL SYSTEM CHECK VALV E
869 A-8TB MOS TSN:0 01-A PR-2011
10-1 02081 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
76 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
28-2 3-01-9 00-80 1-01 LH PUMP CARTRIDGE
601 R62 181-5 MOS TSN:0 01-A PR-2011
E86 705 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-2 3-01-9 00-80 1-02 RH PUMP CA RTRIDGE
601 R62 181-5 MOS TSN:0 01-A PR-2011
E86 707 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-2 4-00-1 01 OPE RA TIONAL TEST A UX ILIARY POWER UNIT (APU) FUE L FEED SHUTOFF-VAL VE AND NEGATIVE-G
SHUTO FF-VA LVE FOR INTERNAL LEAK S (CMR*)
28-2 4-00-1 01 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 224 5.8 3 464 5.8 3
REF: AMM 2 8 2 4 0 0 71 0 8 01 AFL 150 5

28-2 4-01-9 00-80 1-01 APU FUEL BO OST P UMP CARTRIDG E


601 R62 181-7 MOS TSN:0 01-A PR-2011
E92 781 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-2 4-13-9 00-80 1-01 VAL VE, G ATE , FUE L S YSTEM VA LVE
AV1 6B217 8-2 MOS TSN:0 01-A PR-2011
AA2 46311 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
28-2 4-19-9 00-80 1-01 NEGATIVE-G SHUTOFF VALV E
867 9409 MOS TSN:0 01-A PR-2011
AA2 52792 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-2 4-25-9 00-80 1-01 LH PUMP CANIS TE R


601 R62 181-1 MOS TSN:0 01-A PR-2011
E81 782 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-2 4-25-9 00-80 1-02 RH PUMP CA NISTER


226 115-2 MOS TSN:0 12-A PR-2021
L59 542 HRS /MSC O/C TSN:0 214 3.4
REF: See Workcard AFL TSN:0 144 9

28-2 4-25-9 00-80 2-01 APU PUMP CANISTER


601 R62 181-1 MOS TSN:0 01-A PR-2011
E08 379 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-2 5-01-9 00-80 1-01 FUE L/DEFUEL ADAPTOR VALVE


277 0082-1 01 MOS TSN:0 01-A PR-2011
223 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-2 5-01-9 00-80 2-01 REFUE L/DEFUEL CHE CK VA LVE


278 0481-1 02 MOS TSN:0 01-A PR-2011
310 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
77 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
28-2 5-13-9 00-80 1-01 LH REFUEL/DEFUE L, SHUTO FF VALVE
288 0025-1 01 MOS TSN:0 01-A PR-2011
504 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-2 5-13-9 00-80 1-02 RH REFUE L/DEFUEL, S HUTOFF VA LVE
288 0025-1 01 MOS TSN:0 01-A PR-2011
504 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-2 5-13-9 00-80 1-03 CENTE R REFUE L/DEFUEL, S HUTOFF VAL VE


288 0025-1 01 MOS TSN:0 01-A PR-2011
505 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-2 5-16-9 00-80 1-02 FUE L/DEFUEL PANEL
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-2 5-22-9 00-80 1-01 FWD TAIL TANK RE FUEL/DEFUE L S HUTOFF VA LVE
601 -62900 -7 MOS TSN:0 01-A PR-2011
AA2 50345 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-2 5-22-9 00-80 1-02 AFT TAIL TANK REFUE L/DEFUEL SHUTOFF V ALVE
601 -62900 -7 MOS TSN:0 01-A PR-2011
AA2 50347 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-2 5-25-9 00-80 1-01 PUMP FUEL XFR EJECTOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-3 1-00-2 01 OPE RA TIONAL TEST DUMP V ALVE (MRB )
28-3 1-00-1 01 PK G 1 200 MOS 25-S EP-20 19
HRS /MSC 120 0 +40/-40 40 188 0.3 312 0.3 316 0.3
REF: AMM 2 8 3 1 0 1 71 0 8 01 AFL 123 6
28-3 1-01-9 00-80 1-01 GATE, FUEL SYS TE M DUMP VAL VE
AV1 6B217 8-2 MOS 08-A PR-2016
U30275 HRS /MSC O/C 131 3.0 2
REF: See Workcard AFL 851
28-4 1-01-9 00-80 1-01 LH PRO BE, NO.1 PROBE
768 959-1 MOS TSN:0 05-JUL-20 13
364 1 HRS /MSC O/C TSN:0 640 .5
REF: See Workcard AFL TSN:0 258
28-4 1-01-9 00-80 2-01 LH PRO BE, NO.3 PROBE
768 -961-1 B MOS TSN:0 01-A PR-2011
120 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
78 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
28-4 1-01-9 00-80 2-02 RH PROB E, NO.1 P RO BE
768 -959-1 MOS TSN:0 01-MAR-2 013
364 3 HRS /MSC O/C TSN:0 459 .7
REF: See Workcard AFL TSN:0 190
28-4 1-01-9 00-80 3-01 LH PRO BE, NO.4 PROBE
768 -962-2 B MOS TSN:0 01-A PR-2011
121 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 1-01-9 00-80 3-02 RH PROB E, NO.3 P RO BE


768 -961-1 B MOS TSN:0 01-A PR-2011
120 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 1-01-9 00-80 4-01 LH PRO BE, NO.5 PROBE


768 -963-1 B MOS TSN:0 01-A PR-2011
616 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 1-01-9 00-80 4-02 RH PROB E, NO.4 P RO BE


768 -962-2 B MOS TSN:0 01-A PR-2011
120 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 1-01-9 00-80 5-01 LH PRO BE, NO.6 PROBE


768 -964-1 B MOS TSN:0 01-A PR-2011
123 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 1-01-9 00-80 5-02 RH PROB E, NO.5 P RO BE


768 -963-1 B MOS TSN:0 01-A PR-2011
617 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 1-01-9 00-80 6-02 RH PROB E, NO.6 P RO BE


768 -964-1 B MOS TSN:0 01-A PR-2011
123 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 1-01-9 00-80 7-01 LH NO .2 PROBE


768 -960-1 B MOS TSN:0 01-A PR-2011
244 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 1-01-9 00-80 7-02 RH NO.2 P RO BE
768 -960-1 B MOS TSN:0 01-A PR-2011
248 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 1-04-9 00-80 1-01 NO.1 CENTER TANK FUEL QTY PROBE
768 -965-1 B MOS TSN:0 01-A PR-2011
261 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
79 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
28-4 1-04-9 00-80 1-02 NO.2 CENTER TANK FUEL QTY PROBE
768 -966-1 B MOS TSN:0 01-A PR-2011
650 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 1-04-9 00-80 1-03 NO.3 CENTER TANK FUEL QTY PROBE
768 -967-1 B MOS TSN:0 01-A PR-2011
124 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 1-10-9 00-80 1-01 FUE L TAIL TA NK PROB E


768 -969-1 MOS TSN:0 01-A PR-2011
668 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 1-13-9 00-80 1-01 FUE L Q UA NTITY GA UG ING (FQGC) CO MP UTER
736 847-17 MOS TSN:0 01-A PR-2011
762 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 1-13-9 00-80 1-02 LH W/S 2 - FWD, LEVEL S ENS OR
601 R62 304-5 MOS TSN:0 01-A PR-2011
613 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 1-13-9 00-80 2-01 LH W/S 294, L EVEL SE NS OR
601 R62 304-5 MOS TSN:0 01-A PR-2011
613 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 1-13-9 00-80 3-01 LH W/S 2 - AFT, LEV EL SENSOR
601 R62 304-5 MOS TSN:0 01-A PR-2011
609 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 1-13-9 00-80 4-01 RH W/S 29 4, LEV EL SENSOR
601 R62 304-5 MOS TSN:0 01-A PR-2011
619 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 1-22-9 00-80 1-01 TAIL TANK HIGH LEVE L S ENSOR
601 R62 304-5 MOS TSN:0 01-A PR-2011
617 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 1-22-9 00-80 2-01 TAIL TANK 38% LEV EL SENSOR
601 R62 304-3 MOS TSN:0 01-A PR-2011
226 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 1-22-9 00-80 2-02 TAIL TANK LOW LEVEL SE NS OR
601 R62 304-3 MOS TSN:0 01-A PR-2011
226 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
80 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
28-4 2-01-9 00-80 1-01 LH ELECT BO OST P UMP PRESS URE SWITCH
601 R62 291-3 MOS TSN:0 01-A PR-2011
L04 9625 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 2-01-9 00-80 1-02 RH ELE CT BOOS T PUMP PRE SSURE S WITCH
601 R62 291-3 MOS TSN:0 01-A PR-2011
L04 9627 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 2-04-9 00-80 1-01 LH MA IN E JE CTOR PRESSURE S WITCH


601 R62 291-1 MOS TSN:0 01-A PR-2011
L04 9615 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 2-04-9 00-80 1-02 RH MAIN EJECTOR PRES SURE SWITCH


601 R62 291-1 MOS TSN:0 01-A PR-2011
L04 9616 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 2-07-9 00-80 1-01 LH FUEL DIFF P RES S SWITCH


601 R62 292-7 MOS TSN:0 01-A PR-2011
108 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 2-07-9 00-80 1-02 RH FUEL DIFF PRESS SWITCH


601 R62 292-7 MOS TSN:0 01-A PR-2011
109 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 2-10-9 00-80 1-01 APU FUEL PUMP PRESSURE SWITCH


600 -59180 -1 MOS TSN:0 01-A PR-2011
173 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 2-13-9 00-80 1-01 ROTOR-BURS T PROTECTION PRESSURE SWITCH


600 -59180 -3 MOS TSN:0 01-A PR-2011
231 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

28-4 2-16-9 00-80 1-01 LH FUEL TEMPERATURE SENSO R


601 R62 452-1 MOS TSN:0 01-A PR-2011
V95 11 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 2-16-9 00-80 1-03 TAIL TANK CTR TRANSFER S WITCH
GP4 22-13 06-3 MOS TSN:0 01-A PR-2011
306 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
28-4 2-16-9 00-80 2-01 TAIL TANK CTR TRANSFER S WITCH
GP4 22-13 06-3 MOS TSN:0 01-A PR-2011
306 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
APU Model : GTCP 36-150 (CL) Serial # P-310 Part # 3800804-1
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
81 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
28-2 0-00-2 01 (s) APU - DISCARD FUEL-FEED LINE FILTER OF THE A PU PKG
PK G 1 000 MOS 13-MAR-2 020
HRS /MSC 100 0 +40/-40 305 5
MRB REF: See Workcard APUS
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01
28-2 1-13-2 02 NO. 1 ENGINE - OP ERA TIONAL TEST E NG INE FIREWALL FUE L S HUTOFF-VALVE FOR LEAKS
MOS 29-MAR-2 018
28.005 HRS /MSC 160 0 +40/-40 153 4.3 (313 4.3 ) 3 134.3 317 4.3
REF: See Workcard ENC
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
28-2 1-13-2 02 NO. 2 ENGINE - OP ERA TIONAL TEST E NG INE FIREWALL FUE L S HUTOFF-VALVE FOR LEAKS
MOS 29-MAR-2 018
28.005 HRS /MSC 160 0 +40/-40 153 4.3 (313 4.3 ) 3 134.3 317 4.3
REF: See Workcard ENC
CHA PTER 29 HYDRAULIC POWER
29-1 0-00-2 01 (s) VISUAL CHECK FIL TER DIFFE RE NTIAL-PRES SURE INDICATO R PKG
29-1 0-00-2 01 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 2 9 1 0 0 0 21 0 8 01 AFL 123 6
29-1 1-00-3 01 (s) FUNCTIONAL TEST (ACIDITY INS P) OF HYDRAULIC FL UID (S YST #1 & #2) PKG
PK G 2 4 MOS 24 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
OPTIONAL REF: AMM 2 9 1 1 0 0 28 1 8 01 AFL 147 5
29-1 1-01-9 00-80 1-01 LH HYD, NEUTRAL ENGINE PUMP
601 R75 113-3 MOS 23-JUL-20 12
MX727 894 HRS /MSC O/C 172 .9
REF: GENERIC NO RE F AFL 80
29-1 1-01-9 00-80 1-02 RH HYD, NEUTRAL ENGINE P UMP
601 R75 113-5 MOS TSR:0 12-A PR-2021
MX738 435 HRS /MSC O/C TSR:0 214 3.4
REF: GENERIC NO RE F AFL TSR:0 144 9

29-1 1-01-9 00-80 1-03 NO.2 E NG INE DRIVEN PUMP ,CASE DRAIN ASSY FILTE R
600 -75114 -3 MOS TSN:0 01-A PR-2011
100 07 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-01-9 00-80 1-04 NO.1 E LECTRIC PUMP, CASE DRAIN ASS Y FILTER
600 -75114 -3 MOS TSN:0 01-A PR-2011
999 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-01-9 00-80 2-01 NO.2 HYD RE TURN FIL TE R
600 -75117 -1 MOS TSN:0 01-A PR-2011
634 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
82 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
29-1 1-01-9 00-80 2-02 NO.1 E NG INE DRIVEN PUMP ,CASE DRAIN ASSY FILTE R
600 -75114 -3 MOS TSN:0 01-A PR-2011
100 02 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-04-9 00-80 1-01 NO.1 P UMP, ELECTRIC MOTOR ASSEMBL Y
601 R75 154-7 MOS TSN:0 01-A PR-2011
MX741 707 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 1-04-9 00-80 1-02 NO.2 P UMP, ELECTRIC MOTOR ASSEMBL Y


601 R75 154-7 MOS TSN:0 01-A PR-2011
MX746 212 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 1-07-9 00-80 1-01 NO.1 P RE SSURE TRANSDUCER


600 -59174 -17 MOS TSN:0 01-A PR-2011
779 9-12-2 76 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 1-07-9 00-80 1-02 NO.2 P RE SSURE TRANSDUCER


600 -59174 -17 MOS TSN:0 01-A PR-2011
779 9-8-97 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 1-07-9 00-80 1-03 NO.1 HYD RE TURN FIL TE R


600 -75117 -1 MOS TSN:0 01-A PR-2011
634 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 1-07-9 00-80 2-01 NO.1B HY DRAULIC SY S P RE SSURE S WITCH


600 -59134 -1 MOS TSN:0 01-A PR-2011
650 6 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

29-1 1-07-9 00-80 3-01 NO.2A HY DRAULIC SY S P RE SSURE S WITCH


600 -59134 -1 MOS TSN:0 01-A PR-2011
650 8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

29-1 1-07-9 00-80 4-01 NO.2B HY DRAULIC SY S P RE SSURE S WITCH


600 -59134 -1 MOS TSN:0 01-A PR-2011
651 3 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
29-1 1-08-9 00-80 1-01 NO.1 HYD SYS. PRE SSURE MANIFO LD
601 R75 118-3 MOS TSN:0 01-A PR-2011
504 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-08-9 00-80 1-02 NO.2 HYD SYS. PRE SSURE MANIFO LD
601 R75 118-3 MOS TSN:0 01-A PR-2011
504 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
83 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
29-1 1-13-9 00-80 1-01 NO.1 HYD, PRES SURE RELIEF V ALVE
601 R75 158-1 MOS TSN:0 01-A PR-2011
511 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-23-9 00-80 1-01 NO.2 E LECTRIC PUMP, CASE DRAIN ASS Y FILTER
600 -75114 -3 MOS TSN:0 01-A PR-2011
996 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 1-23-9 00-80 1-02 UPPER CA SE DRAIN CHECK VALVE


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-24-9 00-80 1-01 LOWER CASE DRA IN CHECK VALV E
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-24-9 00-80 1-02 NO.1 HYDRAULIC SYS TEM ACCUMULATOR
29-1 0-00-1 01 601 R75 138-1 MOS TSN:0 01-A PR-2011
601 63-780 2TNA HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-24-9 00-80 1-03 NO.2 HYDRAULIC SYS TEM ACCUMULATOR
29-1 0-00-1 01 601 R75 138-1 MOS TSN:0 01-A PR-2011
601 63-780 6TNA HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-28-9 00-80 1-01 NO.1 HYDRAULIC SYS TEM ACCUMULATOR HIGH P RE SSURE G AUGE
600 -75125 -3 MOS TSN:0 01-A PR-2011
10-1 11938 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-28-9 00-80 1-02 NO.2 HYDRAULIC SYS TEM ACCUMULATOR HIGH P RE SSURE G AUGE
600 -75125 -3 MOS TSN:0 01-A PR-2011
10-1 11938 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-28-9 00-80 1-03 NO.3 HYDRAULIC SYS TEM ACCUMULATOR
29-1 0-00-1 01 601 R75 139-3 MOS TSN:11 08-A PR-2016
110 94-318 5 HRS /MSC O/C 131 3.0 2
REF: See Workcard AFL 851
29-1 1-40-9 00-80 1-01 NO.1 HYDRAULIC SYS . TE MP , RESERVOIR TRANSDUCER
601 R75 127-1 MOS TSN:0 01-A PR-2011
W4583 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-43-9 00-80 1-01 NO.2 HYDRAULIC SYS . FUSE LAGE ,REAR RE SERVOIR
730 2-1 MOS TSN:0 01-A PR-2011
171 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
84 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
29-1 1-43-9 00-80 2-01 NO.2 HYDRAULIC SYS . TE MP , RESERVOIR TRANSDUCER
601 R75 127-1 MOS TSN:0 01-A PR-2011
W4580 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 1-49-9 00-80 1-01 NO.1 HYDRAULIC SYS . EQUIP B AY, AFT RES ERVOIR
600 -75112 -21 MOS TSN:0 01-A PR-2011
553 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 1-52-2 01 (s) OPE RA TIONAL TEST L H HYDRA ULIC FIRE WA LL SHUT OFF VAL VE. PKG
29-1 1-52-2 01 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 153 4.3
MRB REF: AMM 2 9 1 1 5 2 71 0 8 01 AFL 988

29-1 1-52-2 01 (s) OPE RA TIONAL TEST RH HYDRAULIC FIREWALL SHUT OFF V ALVE . PKG
29-1 1-52-2 01 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 153 4.3
MRB REF: AMM 2 9 1 1 5 2 71 0 8 01 AFL 988

29-1 1-52-9 00-80 1-01 LH HYDRAULIC FIREWALL S HUT O FF VALVE


601 R75 151-9 MOS TSN:0 01-A PR-2011
E79 601 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 1-52-9 00-80 1-02 RH HYDRAUL IC FIREWALL SHUT OFF VA LVE


601 R75 151-9 MOS TSN:0 01-A PR-2011
E79 602 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 2-00-3 01 (s) FUNCTIONAL TEST (ACIDITY INS P) OF HYDRAULIC FL UID (S YST #3 ) PKG
PK G 2 4 MOS 24 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
OPTIONAL REF: AMM 2 9 1 2 0 0 28 1 8 01 AFL 147 5

29-1 2-01-9 00-80 1-01 PUMP, EL ECTRIC MOTOR AS SEMBLY


601 R75 154-7 MOS TSN:0 01-A PR-2011
MX745 931 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 2-01-9 00-80 2-01 PUMP, EL ECTRIC MOTOR AS SEMBLY


601 R75 154-7 MOS 22-A UG -2019
MX725 778 HRS /MSC O/C 185 1.2
REF: See Workcard AFL 121 6
29-1 2-01-9 00-80 3-01 BAL L A SSY ATTENTUATOR
601 R75 155-1 MOS TSN:0 01-A PR-2011
MX745 600 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
29-1 2-01-9 00-80 4-01 BAL L A SSY ATTENTUATOR
601 R75 155-1 MOS TSN:0 01-A PR-2011
MX744 504 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
85 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
29-1 2-04-9 00-80 1-01 UPPER HY D PRESS URE SWITCH
600 -59134 -1 MOS TSN:0 01-A PR-2011
649 3 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
29-1 2-04-9 00-80 1-02 LOWER HYD PRES SURE SWITCH
600 -59134 -1 MOS TSN:0 01-A PR-2011
649 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 2-04-9 00-80 2-01 NO.3 P RE SSURE TRANSDUCER


600 -59174 -17 MOS TSN:0 01-A PR-2011
779 9-12-2 72 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 2-04-9 00-80 3-01 NO.3 P RE SSURE MANIFO LD
601 R75 118-3 MOS TSN:0 01-A PR-2011
503 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 2-10-9 00-80 1-01 NO.1 HYD SYS, BALL ASS Y A TTENUATOR
601 R75 155-1 MOS TSN:0 01-A PR-2011
MX745 432 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
29-1 2-10-9 00-80 1-02 NO.2 HYD SYS, BALL ASS Y A TTENUATOR
601 R75 155-1 MOS TSN:0 01-A PR-2011
MX745 433 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
29-1 2-10-9 00-80 1-03 NO.1A HY DRAULIC SY S. PRESS URE SWITCH
600 -59134 -1 MOS TSN:0 01-A PR-2011
651 0 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
29-1 2-10-9 00-80 1-04 NO.3 P RE SSURE RELIEF VALVE
601 R75 158-1 MOS TSN:0 01-A PR-2011
509 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 2-10-9 00-80 2-01 NO.2 HYD, PRES SURE RELIEF V ALVE
601 R75 158-1 MOS TSN:0 01-A PR-2011
511 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 2-16-9 00-80 1-01 NO.3 HYD RE TURN FIL TE R
600 -75117 -1 MOS TSN:0 01-A PR-2011
633 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 2-19-9 00-80 1-01 LH NO .3 HYDRA ULIC S YSTEM CAS E DRAIN ASS Y FILTER
600 -75114 -3 MOS TSN:0 01-A PR-2011
996 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
86 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
29-1 2-19-9 00-80 1-02 RH NO.3 HYDRAULIC SYS TE M CASE DRA IN ASSY FILTER
600 -75114 -3 MOS TSN:0 01-A PR-2011
999 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
29-1 2-28-9 00-80 1-01 NO.3 HYDRAULIC SYS TEM ACCUMULATOR HIGH P RE SSURE G AUGE
600 -75125 -3 MOS TSN:0 01-A PR-2011
10-0 71637 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 2-37-9 00-80 1-01 NO.3 HYDRAULIC SYS TEM RESERVOIR


730 3-1 MOS 13-MAR-2 020
256 A HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5

29-1 2-37-9 00-80 2-01 NO.3 TEMPE RATURE RES ERVOIR TRA NS DUCER
601 R75 127-1 MOS TSN:0 01-A PR-2011
W1332 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

29-1 2-40-9 00-80 1-01 NO.3 HYD, PRES SURE RELIEF V ALVE
601 R75 119-1 MOS TSN:0 01-A PR-2011
491 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
CHA PTER 30 ICE AND RAIN PROTECTION
30-1 0-00-2 01 (s) FUNCTIONAL TEST SENSOR DE TE CTION CIRCUIT PKG
30-1 0-00-2 01 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 3 0 1 2 1 9 72 0 8 01 AFL 150 5

30-1 1-00-1 01 DETAIL ED INSPECTIO N OF THE WING ANTI-ICE DUCT PICCOLO -TUBE . (CMR**)
PK G 6 400 MOS +40/-40
HRS /MSC 640 0 +40/-40 0 640 0 644 0
REF: AMM 3 0 1 1 0 7 22 0 8 01 AFL

30-1 1-04-9 00-80 1-01 LH CO UPL ING ASS Y,A NTI-ICING WINDOW
601 -80026 -5 MOS TSN:0 01-A PR-2011
104 84276 05 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

30-1 1-04-9 00-80 1-02 RH COUPLING A SSY,ANTI-ICING WINDOW


601 -80026 -5 MOS TSN:0 01-A PR-2011
104 84276 06 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

30-1 1-07-9 00-80 1-01 LH DUCT ASS Y CO UPL ING


601 -80033 -3 MOS TSN:0 01-A PR-2011
114 92774 01 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

30-1 1-07-9 00-80 1-02 RH DUCT ASSY COUPLING


601 -80033 -4 MOS TSN:0 01-A PR-2011
114 92775 01 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
87 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 30-1 2-00-1 02 FUNCTIONAL TEST OF THE L OW TEMPERATURE G RO UND WING A NTI-ICE (LTGWAIS) OVERHEAT CIRCUIT - (POS T
SB 605 -30-00 1) (CMR**)
MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3 464 5.8 3 468 5.8 3
MRB REF: AMM 3 0 1 2 2 5 72 0 8 01 AFL 150 5
+ 30-1 2-00-1 03 DIS CA RD LH MODULATING AND SHUT-OFF VAL VE - (P OST S B 6 05-30 -001)
321 4442-4 MOS 01-A PR-2011
407 0 HRS /MSC 135 00 0 135 00
LIFE LIMIT REF: AMM 3 0 1 2 0 4 96 0 8 01 AFL 0
+ 30-1 2-00-1 03 DIS CA RD RH MO DULA TING A ND SHUT-OFF V ALVE - (POS T SB 605 -30-00 1)
321 4442-4 MOS 01-A PR-2011
407 2 HRS /MSC 135 00 0 135 00
LIFE LIMIT REF: AMM 3 0 1 2 0 4 96 0 8 01 AFL 0
30-1 2-00-9 00-80 1-01 LH THERMAL SWITCH
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

30-1 2-00-9 00-80 1-02 RH THERMAL SWITCH


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
30-1 2-00-9 00-80 2-01 LOB CONTRO L/O VERHEAT S ENSOR
624 384-2 MOS TSN:0 01-A PR-2011
110 C-4 093 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
30-1 2-00-9 00-80 2-02 LIB CO NTROL/OVE RHEAT SENSOR
624 384-2 MOS TSN:0 01-A PR-2011
110 C-4 090 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
30-1 2-00-9 00-80 2-03 RIB CONTRO L/O VERHEAT SE NS OR
624 384-2 MOS TSN:0 01-A PR-2011
100 C-4 085 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
30-1 2-00-9 00-80 2-04 ROB CONTROL/OVE RHEA T SENSO R
624 384-2 MOS TSN:0 01-A PR-2011
100 C-4 083 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
30-1 2-00-9 00-80 3-01 WING SKIN TEMP CONTROLL ER
624 382-2 MOS TSN:0 01-A PR-2011
624 382-00 954 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

30-1 2-00-9 00-80 4-01 LH PRE SSURE S WITCH


642 000-2 MOS TSN:0 01-A PR-2011
457 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
88 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
30-1 2-00-9 00-80 4-02 RH PRESS URE SWITCH
642 000-2 MOS TSN:0 01-A PR-2011
456 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
30-2 1-00-7 10-80 1 OPE RA TIONAL TEST O F THE COWL ANTI ICE SYSTEM
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883

30-2 1-01-9 00-80 1-01 LH ENG INE COWL DUCT


228 -56041 -101 MOS TSN:0 01-A PR-2011
SB/RJ/333 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

30-2 1-01-9 00-80 1-02 RH ENGINE COWL DUCT


228 -56041 -101 MOS TSN:0 01-A PR-2011
SB/RJ/333 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

+ 30-2 2-00-1 01 OPE RA TIONAL TEST O F THE COWL ANTI-ICE FAILURE INDICATION - ( POST SB 605-30 -001) (CMR*)
MOS 13-MAR-2 020
HRS /MSC 600 192 6.4 252 6.4
REF: AMM 3 0 2 2 0 0 71 0 8 01 AFL 127 5

30-2 2-00-9 00-80 1-01 LH BLEED AIR PRESSURE SWITCH


126 81 MOS TSN:0 01-A PR-2011
498 1 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

30-2 2-00-9 00-80 1-02 RH BLE ED AIR P RE SSURE S WITCH


126 81 MOS TSN:0 01-A PR-2011
498 3 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

30-2 2-00-9 00-80 2-01 LH CO WL , ANTI-ICE VA LVE


601 -97097 -9 MOS TSN:0 01-A PR-2011
235 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

30-2 2-00-9 00-80 2-02 RH COWL, ANTI- ICE VALV E


601 -97097 -9 MOS TSN:0 01-A PR-2011
235 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
30-3 1-16-9 00-80 1-01 SENSO R, A/D, HT CONTROLLER
604 -59007 -1 MOS TSN:0 01-A PR-2011
111 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
30-3 1-16-9 00-80 2-01 SENSO R, A/D, HT CONTROLLER
604 -59007 -1 MOS TSN:0 01-A PR-2011
111 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
89 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
30-4 0-00-2 01 (s) FUNCTIONAL TEST CO PIL OT WINDSHIELD RAIN REPE LLENT LA YER PKG
30-4 0-00-2 01 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 3 0 4 0 0 0 72 0 8 01 AFL 123 6
30-4 0-00-2 01 (s) FUNCTIONAL TEST PIL OT WINDSHIELD RAIN REPE LLENT LA YER PKG
30-4 0-00-2 01 PK G 6 00 MOS 09-O CT-20 19
HRS /MSC 600 +40/-40 188 3.4
MRB REF: AMM 3 0 4 0 0 0 72 0 8 01 AFL 124 3

30-4 0-00-3 01 DETAIL ED INSPECTIO N OF THE WINDSHIELD/SIDE WINDOW AERODYNAMIC SEAL .


NOTE: WHICHEVER INTERVAL COMES FIRST
MOS 12 +1m/-1m 13-JUN-2022 13-J UN-20 23 13-JUL-20 23
HRS /MSC 600 +40/-40 224 5.8 3 284 5.8 3 288 5.8 3
OPTIONAL REF: AMM 5 6 1 0 0 1 22 0 8 04 AFL 150 5
30-4 1-00-9 00-80 1-01 LH TEMP, DUAL CHANNEL CONTRO L UNIT
600 -59100 -9 MOS TSN:0 01-A PR-2011
191 5B HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

30-4 1-00-9 00-80 1-02 RH TEMP, DUAL CHANNEL CONTROL UNIT


600 -59100 -9 MOS TSN:0 01-A PR-2011
191 6B HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
30-4 1-00-9 00-80 2-01 LH WINDS HIELD HE AT CONTRO LLER
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
30-4 1-00-9 00-80 2-02 RH WINDSHIE LD HEAT CO NTROLL ER
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
30-4 1-00-9 00-80 3-01 LH SIDE WINDOW HEA T CONTROL LER
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
30-4 1-00-9 00-80 3-02 RH SIDE WINDO W HEAT CONTROLLER
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
30-8 1-00-2 01 OPE RA TIONAL TEST ICE DETECTIO N SYS TE M (MRB)
30-8 1-00-2 01 PK G 1 200 MOS 27-S EP-20 19
HRS /MSC 120 0 +40/-40 187 7.3 307 7.3 311 7.3
REF: AMM 3 0 8 1 0 0 71 0 8 01 AFL 123 6

30-8 1-01-9 00-80 1-01 LH ICE DE TE CTOR


604 -51262 -3 MOS TSN:0 01-A PR-2011
266 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
90 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
30-8 1-01-9 00-80 1-02 RH ICE DETECTOR
087 1BN8-1 MOS 22-JUN-2018
189 5 HRS /MSC O/C 156 7.7
REF: See Workcard AFL 101 7
301 107-09 02 WING RH DUCT ASSY
601 -80032 -8 MOS TSN:0 17-A PR-2012
116 01937 01 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
CHA PTER 31 IND ICATING/RECORDIN G SYSTEMS
31-0 0-00-9 00-80 1-01 LIGHT DIMMER CONTROL UNIT
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

31-0 0-00-9 00-80 1-02 LIGHT DIMMER CONTROL UNIT


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
31-0 0-CUS -9001 PERFORM DOWNLOAD AND ANALY SIS O F THE FDR
MOS 12 14-MAR-2 022 14-MAR-2023
HRS /MSC 219 4.6
CUS TO ME R CODE REF: AFL 147 5
31-1 1-00-9 00-80 1-01 NO. 1 (MFD) ADAPTIVE FL IGHT DISPLA Y
822 -1917- 207 MOS TSO:59 13-MAR-2 020
46G YW HRS /MSC O/C TSO:855.63 192 6.4
REF: See Workcard AFL TSO:587 127 5

31-1 1-00-9 00-80 1-02 NO. 2 (MFD) ADAPTIVE FLIGHT DIS PLAY
822 -1917- 207 MOS 13-MAR-2 020
3V0 DD HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5

31-1 1-01-9 00-80 1-01 IMT-52 20,CO CKP IT DISPL AY MO UNT


822 -1576- 001 MOS TSN:0 01-A PR-2011
45J3W HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

31-1 1-01-9 00-80 1-02 IMT-52 20,CO CKP IT DISPL AY MO UNT


822 -1576- 001 MOS TSN:0 01-A PR-2011
3WK7G HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

31-1 1-01-9 00-80 1-03 IMT-52 20,CO CKP IT DISPL AY MO UNT


822 -1576- 001 MOS TSN:0 01-A PR-2011
3WK7J HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

31-1 1-01-9 00-80 1-04 IMT-52 20,CO CKP IT DISPL AY MO UNT


822 -1576- 001 MOS TSN:0 01-A PR-2011
45J3Y HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
91 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
31-1 5-01-9 00-80 1-01 ADG AUTO DEP LOY CONTROLL ER
600 -59143 -7 MOS TSN:0 01-A PR-2011
616 6 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
31-1 7-04-9 00-80 1-01 DATA B ASE UNIT
822 -3000- 602 MOS 13-MAR-2 020
4HIL6R HRS /MSC O/C 192 6.4
REF: GENERIC NO RE F AFL 127 5

31-2 1-01-9 00-80 1-01 GPS DIGITAL CLOCK


261 9-02-2 MOS TSN:0 01-A PR-2011
CLK10 842 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
31-3 1-00-2 01 DIS CA RD FDR ULB UNDE RWATER LOCATOR BE ACON BA TTERY
31-3 1-00-2 01 DK120 /90 MOS 29-MAR-2 018 26-MAR-2025 M
AT107 536 HRS /MSC DUE 153 4.3
MRB REF: AMM 3 1 3 1 0 7 96 0 8 01 AFL 988
31-3 1-00-2 02 OPE RA TIONAL TEST FDR ULB
31-3 1-00-2 02 PK G 3 6 MOS 36 +1m/-1m 04-MAR-2 021 04-MAR-2024 04-A PR-2024
HRS /MSC 212 1.7 3
MRB REF: AMM 3 1 3 1 0 7 71 0 8 01 AFL 143 7
31-3 1-00-2 03 (s) FUNCTIONAL TEST FL IGHT DATA RECORDE R (FDR) DEDICATED S ENSORS (POST SB-60 5-31-0 01) PKG
31-3 1-00-2 03 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 3 1 3 1 0 1 72 0 8 01 AFL 127 5
31-3 1-00-2 04 (s) FUNCTIONAL TEST FL IGHT DATA RECORDE R (FDR) FORCE SE NS ORS (P OST S B-605 -31-00 1) PKG
31-3 1-00-2 04 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 3 1 3 1 0 1 72 0 8 04 AFL 127 5
31-3 1-04-9 00-80 1-01 FDR TRIAXIAL ACCELEROMETER
300 1-01-1 11 MOS 13-JUN-2022
052 2-DT83 45U HRS /MSC O/C 224 5.8 3
REF: See Workcard AFL 150 5
31-3 1-07-9 00-80 1-01 FDR - FLIGHT DATA RE CO RDER
210 0-2045 -22 MOS TSN:13 1 18-MAR-2 022
000 80499 7 HRS /MSC O/C TSN:21 95.7 219 5.7
REF: See Workcard AFL TSN:14 76 147 6
31-3 1-07-9 00-80 2-01 FDR ULB UNDERWA TE R LOCATOR BEACON
DK120 /90 MOS TSN:0 29-MAR-2 018
AT107 536 HRS /MSC O/C TSN:0 153 4.3
REF: See Workcard AFL TSN:0 988
31-4 1-00-2 02 (s) OPE RA TIONAL TEST A UDIO WA RNING CONTRO L P ANEL PKG
31-4 1-00-2 02 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 3 1 5 1 0 1 71 0 8 01 AFL 123 6

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
92 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
31-4 1-00-2 03 (s) OPE RA TIONAL TEST E LECTRONIC FLIGHT INSTRUME NT SYSTEM (EFIS) PKG
31-4 1-00-2 03 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 3 1 6 1 0 0 71 0 8 05 AFL 150 5
31-4 1-01-9 00-80 1-01 LH CURSOR CO NTROL PANEL
822 -2164- 002 MOS TSR:11 17-DEC-20 18
42C2NY HRS /MSC O/C TSR:0 165 8.7
REF: See Workcard AFL TSR:0 109 1

31-4 1-01-9 00-80 1-02 RH CURS OR CONTRO L P ANE L


822 -2164- 002 MOS TSN:92 11-DEC-20 18
3VHPL HRS /MSC O/C TSN:16 58.7 165 8.7
REF: See Workcard AFL TSN:10 91 109 1

31-4 1-03-9 00-80 1-01 EICAS - REMOTE DATA UNIT


822 -1533- 202 MOS TSN:0 01-A PR-2011
3YB WB HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

31-4 1-04-9 00-80 1-03 NO.1 DCU - DATA CONCENTRATOR UNIT


822 -0179- 205 MOS 13-MAR-2 020
3YB PY HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5

31-4 1-04-9 00-80 1-04 NO. 2 DCU - DATA CONCE NTRATOR UNIT
822 -0179- 205 MOS 13-MAR-2 020
3YB RB HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5

31-4 3-25-9 00-80 3-01 UMT-1 8,DCU MOUNT


622 -9977- 005 MOS TSN:0 01-A PR-2011
3PV 3W HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

31-4 3-25-9 00-80 4-01 UMT-1 8,DCU MOUNT


622 -9977- 005 MOS TSN:0 01-A PR-2011
3PW7R HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

31-5 2-01-9 00-80 1-01 LAMP DRIVE R UNIT


622 -9822- 001 MOS 13-JUN-2022
667 HRS /MSC O/C 224 5.8 3
REF: See Workcard AFL 150 5
31-6 1-00-2 01 OPE RA TIONAL TEST O F THE BA SIC REVERSIONARY CO NTROL PANEL (MRB)
31-6 1-00-2 01 MOS 36 +1m/-1m 21-A PR-2021 21-APR-20 24 21-MAY -2024
HRS /MSC 320 0 +40/-40 214 3.4 534 3.4 538 3.4
REF: AMM 3 4 2 4 0 4 71 0 8 01 AFL 144 9
31-6 1-01-9 00-80 1-01 NO. 1 PRIMA RY FLIGHT DISP LAY PFD
822 -1917- 207 MOS TSN:10 7 13-MAR-2 020
3Y0 5T HRS /MSC O/C TSN:19 26.4 192 6.4
REF: See Workcard AFL TSN:12 75 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
93 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
31-6 1-01-9 00-80 1-02 NO. 2 PRIMA RY FLIGHT DISP LAY PFD
822 -1917- 207 MOS TSN:10 7 13-MAR-2 020
3Y0 8T HRS /MSC O/C TSN:19 26.4 192 6.4
REF: See Workcard AFL TSN:12 75 127 5
313 100-09 01 ELE CTRONIC (ECU) CFMS CONTRO L UNIT
BA6 70-702 85-5 MOS TSN:0 17-A PR-2012
FR2 041 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

313 100-09 02 FLIG HT DATA CONVERSION UNIT


822 -2877- 001 MOS TSN:0 17-A PR-2012
49FMW HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
313 102-09 01 LBL 17 CRVDT RVDT
601 R59 333-5 MOS TSN:0 17-A PR-2012
A02 60 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
313 102-09 02 RBL 17 CRVDT RVDT
601 R59 333-5 MOS TSN:0 17-A PR-2012
A02 63 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
313 102-09 03 RUDDER RVDT
601 R59 333-3 MOS TSN:0 17-A PR-2012
A01 36 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
313 102-09 04 LBL 26 RVDT SG L CHANNEL
601 R59 333-1 MOS TSN:0 17-A PR-2012
A19 54 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
313 102-09 05 RBL26 RVDT SG L CHANNEL
601 R59 333-1 MOS TSN:0 17-A PR-2012
A19 60 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
313 103-09 01 PILOT ELEVA TO R ROD CFMS SE NS OR
BA6 70-937 85-3 MOS TSN:0 17-A PR-2012
FR0 947 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
313 103-09 02 COPILOT ELEVA TO R ROD CFMS SE NS OR
BA6 70-937 85-3 MOS TSN:0 17-A PR-2012
FR0 949 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
313 103-09 03 PILOT LHS CFMS RUDDER SENSOR
BA6 70-934 85-3 MOS TSN:0 17-A PR-2012
FR1 889 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
94 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
313 103-09 04 PILOT RHS CFMS RUDDER S ENSOR
BA6 70-934 85-3 MOS TSN:0 17-A PR-2012
FR1 894 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
313 103-09 05 COPILOT RHS CFMS RUDDER S ENSOR
BA6 70-934 85-3 MOS TSN:0 17-A PR-2012
FR1 896 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

313 103-09 06 COPILOT LHS CFMS RUDDER SENSOR


BA6 70-934 85-3 MOS TSN:0 17-A PR-2012
FR1 911 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

313 104-09 01 LHS OUTB . BRAKE PRESS URE TRA NS DUCER


601 R75 148-3 MOS TSN:0 17-A PR-2012
786 7-12-2 15 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

313 104-09 02 LHS INB. B RA KE PRESSURE TRANSDUCE R


601 R75 148-3 MOS TSN:0 17-A PR-2012
786 7-12-2 09 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

313 104-09 03 RHS INB. BRAKE PRES SURE TRANSDUCER


601 R75 148-3 MOS TSN:0 17-A PR-2012
786 7-12-2 26 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

313 104-09 04 RH OUTB. BRAK E P RE SSURE TRANSDUCER


601 R75 148-3 MOS TSN:0 17-A PR-2012
786 7-12-2 19 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

313 105-09 01 FORCE TRANSDUCER


604 -90402 -5 MOS TSN:0 17-A PR-2012
FR0 513 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

313 105-09 02 FORCE TRANSDUCER


604 -90402 -7 MOS TSN:0 17-A PR-2012
FR0 503 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
CHA PTER 32 LANDING GEAR
32-0 0-00-3 01 CLEANING O F THE LA NDING GE AR AND UNDERCA RRIAGE AREA.
MOS
HRS /MSC A/R
REF: AMM 3 2 0 0 0 0 14 0 8 01 AFL

32-0 0-01-2 01 (s) FUNCTIONAL TEST LANDING-GE AR EMERGE NCY-E XTENSIO N SYS TE M PKG
32-0 0-01-2 01 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
REF: AMM 3 2 3 4 0 0 72 0 8 01 AFL 150 5
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
95 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-0 0-01-2 02 (s) FUNCTIONAL TEST MA IN LANDING GEAR (MLG) SHOCK S TRUT AS SEMBLY PKG
32-0 0-01-2 02 PK G 1 200 MOS 30-A PR-2020
HRS /MSC 120 0 +40/-40 193 0.2
MRB REF: AMM 3 2 1 1 0 7 72 0 8 01 AFL 127 7
32-0 0-01-2 03 (s) FUNCTIONAL TEST NO SE LANDING GEAR (NLG) SHOCK STRUT AS SEMBLY PKG
32-0 0-01-2 03 PK G 1 200 MOS 27-S EP-20 19
HRS /MSC 120 0 +40/-40 187 7.3
MRB REF: AMM 3 2 2 1 1 6 72 0 8 01 AFL 123 6

32-0 0-01-2 04 (s) LUBRICATION MAIN LA NDING G EAR (MLG ) PKG


32-0 0-01-2 04 PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 +40/-40 224 5.8 3
REF: AMM 1 2 2 0 0 4 64 0 8 02 AFL 150 5
32-0 0-01-2 05 (s) LUBRICATION NOS E L ANDING G EAR ( NLG ) PKG
32-0 0-01-2 05 PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 +40/-40 224 5.8 3
REF: AMM 1 2 2 0 0 4 64 0 8 01 AFL 150 5
32-0 0-01-2 06 (s) LUBRICATION MAIN LA NDING G EAR (MLG ) DOO RS PKG
32-0 0-01-2 06 PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 +40/-40 224 5.8 3
REF: AMM 1 2 2 0 0 4 64 0 8 33 AFL 150 5
32-0 0-01-2 07 (s) LUBRICATION NOS E L ANDING G EAR ( NLG ) DOO RS PKG
32-0 0-01-2 07 PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 +40/-40 224 5.8 3
REF: AMM 1 2 2 0 0 4 64 0 8 32 AFL 150 5
32-0 0-01-2 08 (s) DETAIL ED INSPECTIO N LANDING-G EAR E ME RG ENCY -EXTENSION CABL E IN THE NLG WHEEL WELL PKG
32-0 0-01-2 08 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 3 2 3 4 2 8 22 0 8 02 AFL 127 5
32-0 0-01-2 09 (s) DETAIL ED INSPECTIO N LANDING-G EAR E ME RG ENCY -EXTENSION CABL E IN THE FO RWARD A VIO NICS PKG
COMPARTME NT
32-0 0-01-2 09 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 3 2 3 4 2 8 22 0 8 03 AFL 127 5
32-0 0-01-2 10 (s) DETAIL ED INSPECTIO N LANDING-G EAR E ME RG ENCY -EXTENSION CABL E IN THE MA IN A VIONICS CO MP ARTMENT PKG
32-0 0-01-2 10 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 3 2 3 4 2 8 22 0 8 04 AFL 127 5
32-0 0-01-2 11 (s) DETAIL ED INSPECTIO N LANDING-G EAR E ME RG ENCY -EXTENSION CABL E IN THE MID-LOWER FUSEL AGE PKG
COMPARTME NT
32-0 0-01-2 11 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 3 2 3 4 2 8 22 0 8 05 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
96 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-0 0-01-2 12 (s) DETAIL ED INSPECTIO N LANDING-G EAR E ME RG ENCY -EXTENSION CABL E IN THE ML G WHEEL WELL PKG
32-0 0-01-2 12 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 3 2 3 4 2 8 22 0 8 06 AFL 127 5
32-0 0-01-2 13 (s) GENERAL VISUAL INS PECTION MA IN L ANDING GEAR (ML G) ASSE MB LY PKG
32-0 0-01-2 13 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 3 2 1 1 0 0 21 0 8 01 AFL 123 6

32-0 0-01-2 14 (s) GENERAL VISUAL INS PECTION NO SE LANDING GEAR (NLG) ASSE MB LY PKG
32-0 0-01-2 14 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 3 2 2 1 0 1 21 0 8 01 AFL 123 6

32-0 0-01-2 15 (s) DETAIL ED INSPECTIO N MAIN LANDING GEA R (MLG) ASS EMBLY PKG
32-0 0-01-2 15 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 3 2 1 1 0 0 22 0 8 01 AFL 127 5

32-0 0-01-2 16 (s) DETAIL ED INSPECTIO N NOSE LANDING GEA R (NLG) ASS EMBLY PKG
32-0 0-01-2 16 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 3 2 2 1 0 1 22 0 8 02 AFL 127 5

32-0 0-01-2 17 RESTORATIO N (OV ERHAUL) LH ML G , DRES SED A SSEMBLY


32-0 0-01-2 17 604 -85001 -25 P KG 192 MOS 192 +1m/-1m 17-A PR-2012 17-APR-20 28 17-MAY -2028
10MDT0541 HRS /MSC
OVE RHAUL REF: AMM 3 2 1 1 0 0 28 0 8 01 AFL

32-0 0-01-2 17 RESTORATIO N (OV ERHAUL) RH MLG , DRESSE D ASS EMBLY


32-0 0-01-2 17 604 -85001 -26 P KG 192 MOS 192 +1m/-1m 17-A PR-2012 17-APR-20 28 17-MAY -2028
10MDT0537 HRS /MSC
OVE RHAUL REF: AMM 3 2 1 1 0 0 28 0 8 01 AFL

32-0 0-01-2 18 RESTORATIO N (OV ERHAUL) NLG - NO SE LANDING GEAR ASSE MB LY


32-0 0-01-2 18 604 -85002 -41 P KG 192 MOS 192 +1m/-1m 17-A PR-2012 17-APR-20 28 17-MAY -2028
12MDT0591 HRS /MSC
OVE RHAUL REF: AMM 3 2 2 1 0 1 28 0 8 01 AFL

32-1 0-00-2 01 SPE CIAL DETAIL ED INSPECTIO N LH MLG SIDE BRA CE FITTING SHAFT P ART NO. 601 R10 237-1 ONLY .
601 R10 237-3 MOS 26-A PR-2017
HD0 015 HRS /MSC N/A 136 3.8
MRB REF: NDT MT-3 2-10-0 01 AFL 883
32-1 0-00-2 01 SPE CIAL DETAIL ED INSPECTIO N RH MLG SIDE BRACE FITTING SHAFT PART NO. 601R1023 7-1 ONLY.
601 R10 237-3 MOS 26-A PR-2017
HD0 018 HRS /MSC N/A 136 3.8
MRB REF: NDT MT-3 2-10-0 01 AFL 883
32-1 1-00-1 02 DIS CA RD OF THE L H MAIN LANDING GEA R (MLG) FITTING, P ART NO. 190 62-1/-2 (NHA 19064 -103/-104/-10 5/-1 06).
604 -85001 -31 MOS 01-A PR-2011
09S PP000 31 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 0 0 96 1 8 02 AFL 192 50 0 192 50

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
97 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-1 1-00-1 02 DIS CA RD OF THE RH MAIN L ANDING G EAR ( ML G) FITTING, PART NO. 19062 -1/- 2 (NHA19 064-10 3/-1 04/-105/-106 ).
190 64-106 MOS 01-A PR-2011
13S PP001 91 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 0 0 96 1 8 02 AFL 192 50 0 192 50
32-1 1-00-1 03 DIS CA RD OF THE L H MAIN LANDING GEA R (MLG) PINTLE PIN, PART NO. 19038 - 3.
190 38-3 MOS
09S PP000 46 HRS /MSC
LIFE LIMIT REF: AMM 3 2 1 1 0 0 96 1 8 01 AFL 192 50 0 192 50
32-1 1-00-1 03 DIS CA RD OF THE RH MAIN L ANDING G EAR ( ML G) P INTLE PIN, P ART NO. 19 038- 3.
190 38-3 MOS
09S PP000 51 HRS /MSC
LIFE LIMIT REF: AMM 3 2 1 1 0 0 96 1 8 01 AFL 192 50 0 192 50
32-1 1-00-9 00-80 1-01 LH MLG , DRESS ED AS SEMBLY
604 -85001 -25 MOS TSN:0 01-A PR-2011
10MDT0541 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-1 1-00-9 00-80 1-02 RH MLG , DRESSED ASSE MB LY
604 -85001 -26 MOS TSN:0 01-A PR-2011
10MDT0537 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-1 1-00-9 00-80 2-01 LH MLG P INTLE PIN
32-1 1-00-1 03 190 38-3 MOS 13-MAR-2 020
09S PP000 46 HRS /MSC H/T 192 6.4
REF: GENERIC NO RE F AFL 127 5
32-1 1-00-9 00-80 2-02 RH MLG PINTLE PIN
32-1 1-00-1 03 190 38-3 MOS 13-MAR-2 020
09S PP000 51 HRS /MSC H/T 192 6.4
REF: GENERIC NO RE F AFL 127 5
32-1 1-07-1 01 DIS CA RD OF THE L H MLG S HO CK STRUT UPPER PIN, PA RT NO .19 134 -3
191 34-3 MOS 01-A PR-2011
09E XC1187 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 0 7 96 1 8 01 AFL 192 50 0 192 50
32-1 1-07-1 01 DIS CA RD OF THE RH MLG SHOCK STRUT UPPE R PIN, PART NO.1913 4- 3
191 34-3 MOS 01-A PR-2011
09E XC1186 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 0 7 96 1 8 01 AFL 192 50 0 192 50
32-1 1-07-1 02 DIS CA RD OF THE L H MLG SHOCK STRUT L OWER PIN, PART NO.191 46- 3
191 46-3 MOS 01-A PR-2011
09MER131 7 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 0 7 96 1 8 02 AFL 192 50 0 192 50
32-1 1-07-1 02 DIS CA RD OF THE RH ML G S HO CK STRUT LOWER PIN, P ART NO.19146- 3
191 46-3 MOS 01-A PR-2011
09MER133 2 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 0 7 96 1 8 02 AFL 192 50 0 192 50

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
98 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-1 1-07-1 03 DIS CA RD OF THE L H MLG SHOCK S TRUT PISTON, PA RT NO .
191 14-1/-3 (NHA 191 15-10 1/-1 03).
191 15-103 MOS 01-A PR-2011
09S PP000 49 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 0 7 96 1 8 03 AFL 192 50 0 192 50
32-1 1-07-1 03 DIS CA RD OF THE RH MLG SHOCK STRUT PISTO N, PART NO.
191 14-1/-3 (NHA 191 15-10 1/-1 03).
191 15-103 MOS 01-A PR-2011
09S PP000 41 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 0 7 96 1 8 03 AFL 192 50 0 192 50
32-1 1-07-1 04 DIS CA RD OF THE L H MLG S HO CK STRUT CYLINDER, PA RT NO . 1910 4 -1/- 3 ( NHA 1910 5 -101 / -10 3).
191 05-103 MOS 01-A PR-2011
09S PP000 49 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 0 7 96 1 8 04 AFL 192 50 0 192 50
32-1 1-07-1 04 DIS CA RD OF THE RH MLG SHOCK STRUT CYLINDER, PART NO. 1 9104-1 /- 3 (NHA 1 9105 -1 01/ -103).
191 05-103 MOS 01-A PR-2011
09S PP000 44 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 0 7 96 1 8 04 AFL 192 50 0 192 50
32-1 1-07-9 00-80 1-01 LH SHO CK S TRUT ASS EMBLY
604 -85001 -5 MOS TSN:0 01-A PR-2011
10S PP000 51 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-1 1-07-9 00-80 1-02 RH SHOCK STRUT ASSEMBL Y


604 -85001 -5 MOS TSN:60 08-A PR-2016
10S PP000 46 HRS /MSC O/C TSN:13 13.02 131 3.0 2
REF: See Workcard AFL TSN:85 1 851

32-1 1-07-9 00-80 2-01 LH CYL INDER,MLG SHOCK PIN


32-1 1-07-1 01 191 34-3 MOS TSN:0 01-A PR-2011
09E XC1187 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-1 1-07-9 00-80 2-02 RH CYLINDE R,MLG SHOCK P IN
32-1 1-07-1 01 191 34-3 MOS TSN:0 01-A PR-2011
09E XC1186 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-1 1-07-9 00-80 3-01 LH PIV OT,MLG TRA LING ARM PIN
32-1 1-07-1 02 191 46-3 MOS TSN:0 01-A PR-2011
09MER131 7 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

32-1 1-07-9 00-80 3-02 RH PIVOT,ML G TRALING A RM PIN


32-1 1-07-1 02 191 46-3 MOS TSN:0 01-A PR-2011
09MER133 2 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
99 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-1 1-07-9 00-80 4-01 LH MLG FITTING
32-1 1-00-1 02 604 -85001 -31 MOS TSN:0 01-A PR-2011
09S PP000 31 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-1 1-07-9 00-80 4-02 RH MLG FITTING
32-1 1-00-1 02 190 64-106 MOS TSN:17 08-A PR-2016
13S PP001 91 HRS /MSC H/T TSN:0 131 3.0 2
REF: GENERIC NO RE F AFL TSN:0 851

32-1 1-07-9 00-80 5-01 LH MLG S HO CK STRUT CYLINDER


32-1 1-07-1 04 191 05-103 MOS TSN:0 01-A PR-2011
09S PP000 49 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-1 1-07-9 00-80 5-02 RH MLG SHOCK STRUT CYLINDER
32-1 1-07-1 04 191 05-103 MOS TSN:0 01-A PR-2011
09S PP000 44 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-1 1-07-9 00-80 6-01 LH MLG S HO CK STRUT PISTON
32-1 1-07-1 03 191 15-103 MOS TSN:0 01-A PR-2011
09S PP000 49 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-1 1-07-9 00-80 6-02 RH MLG SHOCK STRUT P ISTON
32-1 1-07-1 03 191 15-103 MOS TSN:0 01-A PR-2011
09S PP000 41 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
+ 32-1 1-10-1 01 DIS CA RD OF THE L H MAIN L ANDING G EAR (ML G) TRAILING ARM, PA RT NO . 19083 3 ( NHA 1908 4 103).
604 -85001 -71 MOS 01-A PR-2011
09S PP000 46 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 1 0 96 1 8 02 AFL 364 30 0 364 30
32-1 1-10-1 01 DIS CA RD OF THE RH MAIN LANDING GE AR (MLG) TRAIL ING ARM, PART NO. 19 083 3 (NHA 1 9084 1 03).
604 -85001 -71 MOS 01-A PR-2011
09S PP000 41 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 1 0 96 1 8 02 AFL 364 30 0 364 30
32-1 1-10-1 02 DIS CA RD OF THE LH MLG MAIN FITTING/TRAIL ING ARM PIVOT PIN, P ART
NO. 19 039 -1.
190 39-1 MOS 01-A PR-2011
10S PP000 51 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 1 0 96 1 8 03 AFL 192 50 0 192 50
32-1 1-10-1 02 DIS CA RD OF THE RH MLG MAIN FITTING/TRA ILING ARM PIVOT PIN, P ART NO. 190 39 -1.
190 39-1 MOS 01-A PR-2011
09S PP000 46 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 1 0 96 1 8 03 AFL 192 50 0 192 50
32-1 1-10-9 00-80 1-01 LH TRAILING ARM
32-1 1-10-1 01 604 -85001 -71 MOS TSN:0 01-A PR-2011
09S PP000 46 HRS /MSC H/T TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
100 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-1 1-10-9 00-80 1-02 RH TRAIL ING ARM
32-1 1-10-1 01 604 -85001 -71 MOS TSN:0 01-A PR-2011
09S PP000 41 HRS /MSC H/T TSN:0 0
REF: See Workcard AFL TSN:0 0
32-1 1-10-9 00-80 2-01 LH MLG MAIN FITTING /TRAIL ING ARM PIVOT PIN
32-1 1-10-1 02 190 39-1 MOS TSN:0 01-A PR-2011
10S PP000 51 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

32-1 1-10-9 00-80 2-02 RH MLG MAIN FITTING/TRAILING A RM PIV OT PIN


32-1 1-10-1 02 190 39-1 MOS TSN:0 01-A PR-2011
09S PP000 46 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

32-1 1-13-1 01 DIS CA RD OF THE L H MAIN LANDING GEA R (MLG) AXL E, PART NO. 19050 - 3.
190 50-3 MOS 01-A PR-2011
09S PP000 55 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 1 3 96 1 8 01 AFL 192 50 0 192 50
32-1 1-13-1 01 DIS CA RD OF THE RH MAIN L ANDING G EAR ( ML G) A XLE, PART NO. 19 050- 3
190 50-3 MOS 01-A PR-2011
09S PP000 49 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 1 1 1 3 96 1 8 01 AFL 192 50 0 192 50
32-1 1-13-9 00-80 1-01 LH MLG A XLE
32-1 1-13-1 01 190 50-3 MOS TSN:0 01-A PR-2011
09S PP000 55 HRS /MSC H/T TSN:0 0
REF: See Workcard AFL TSN:0 0

32-1 1-13-9 00-80 2-01 RH MLG AXL E


32-1 1-13-1 01 190 50-3 MOS TSN:0 01-A PR-2011
09S PP000 49 HRS /MSC H/T TSN:0 0
REF: See Workcard AFL TSN:0 0

32-1 2-00-2 01 DETAIL ED INSPECTIO N HINGE AND FASTENERS OF THE MA IN LANDING GEAR DO OR
32-1 2-00-2 01 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 3 2 1 2 0 1 22 0 8 01 AFL 127 5

32-1 2-04-9 00-80 1-01 LH MLG DOO R


604 -31178 -5 MOS TSN:0 01-A PR-2011
586 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-1 2-04-9 00-80 1-02 RH MLG DOOR
604 -31178 -6 MOS TSN:0 01-A PR-2011
586 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-1 3-07-9 00-80 1-01 LOWER OUTB OARD PRES SURE TRANSDUCER
600 -59174 -17 MOS TSN:0 01-A PR-2011
777 7-7-18 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
101 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-2 0-05-9 00-80 1-01 NLG STEERING CUFF
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-2 0-05-9 00-80 2-01 NLG ONE WA Y RES TRICTOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-2 0-05-9 00-80 2-02 NLG ONE WA Y RES TRICTOR


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-2 0-05-9 00-80 3-01 NLG TO RQ UE - UPPER LINK
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-2 0-05-9 00-80 4-01 NLG TO RQ UE - LOWER LINK
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-2 0-05-9 00-80 5-01 NLG PINION - GE AR COVE R
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-2 1-00-1 02 DIS CA RD NL G MAIN FITTING OF THE NLG MA IN FITTING, PA RT NO . 2008 11316 OR
200 91 1 (NHA 200 81126 9 O R 200 90 101 ).
200 90-101 MOS 01-A PR-2011
11MDC03030 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 2 1 0 0 96 1 8 01 AFL 194 80 0 194 80
32-2 1-00-1 03 DIS CA RD OF THE L H NLG PIV OT (TRUNION) PIN (MAIN FITTING TO
AIRCRAFT), PART NO. 20081 1601.
200 81160 1 MOS 01-A PR-2011
11E XC1775 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 2 1 0 0 96 1 8 02 AFL 194 80 0 194 80
32-2 1-00-1 03 DIS CA RD OF THE RH NLG PIVO T (TRUNIO N) PIN (MAIN FITTING TO AIRCRAFT), PART NO. 20 08116 01.
200 81160 1 MOS 01-A PR-2011
11E XC1774 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 2 1 0 0 96 1 8 02 AFL 194 80 0 194 80
32-2 1-00-1 04 DIS CA RD NL G S HO CK STRUT SLIDING TUBE OF THE NLG SHOCK STRUT SL IDING TUBE, PA RT NO .
200 81170 7
200 81170 7 MOS 01-A PR-2011
11MBM00 743 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 2 1 1 6 96 1 8 01 AFL 194 80 0 194 80

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
102 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-2 1-00-1 05 DIS CA RD NL G DRAG BRACE LOWER L INK OF THE NL G DRAG BRACE LOWER L INK, P ART NO.
200 81431 1 (NHA 20081 4213).
200 81421 3 MOS 01-A PR-2011
11MER467 8328 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 2 1 0 7 96 1 8 01 AFL 194 80 0 194 80
32-2 1-00-1 06 DIS CA RD NL G DRAG BRACE UP PER L INK O F THE NLG DRA G B RA CE UPPE R LINK , PART NO. 2 0049 1 / 3 (NHA 2 0050
101 )
200 50-101 MOS 01-A PR-2011
11A LT2 00169 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 2 1 0 7 96 1 8 02 AFL 194 80 0 194 80
32-2 1-00-1 07 DIS CA RD NL G DRAG BRACE HINGE PIN OF THE NL G DRAG BRACE HINGE PIN, PART NO.
200 81462 4.
200 81462 4 MOS 01-A PR-2011
11MER951 33 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 2 1 0 7 96 1 8 03 AFL 194 80 0 194 80
32-2 1-00-9 00-80 1-01 LH NLG P IVO T (TRUNIO N) PIN- ( MA IN FITTING TO AIRCRAFT) PIN
32-2 1-00-1 03 200 81160 1 MOS TSN:0 01-A PR-2011
11E XC1775 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

32-2 1-00-9 00-80 1-02 RH NLG PIVOT ( TRUNION) PIN- (MAIN FITTING TO A IRCRA FT) PIN
32-2 1-00-1 03 200 81160 1 MOS TSN:0 01-A PR-2011
11E XC1774 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

32-2 1-00-9 00-80 1-03 NLG DRAG B RA CE HINGE PIN


32-2 1-00-1 07 200 81462 4 MOS TSN:0 01-A PR-2011
11MER951 33 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

32-2 1-00-9 00-80 2-01 NLG - NOS E LANDING GEAR ASSE MBL Y
604 -85002 -41 MOS TSN:0 01-A PR-2011
12MDT0591 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-2 1-00-9 00-80 2-02 SHOCK STRUT A SSEMBL Y


604 -85002 -31 MOS TSN:0 01-A PR-2011
12MDT0591 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-2 1-00-9 00-80 3-01 NLG DRAG B RA CE UPPER LINK


32-2 1-00-1 06 200 50-101 MOS TSN:0 01-A PR-2011
11A LT2 00169 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

32-2 1-00-9 00-80 4-01 NLG DRAG B RA CE LO WE R LINK


32-2 1-00-1 05 200 81421 3 MOS TSN:0 01-A PR-2011
11MER467 8328 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
103 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-2 1-00-9 00-80 5-01 NLG MAIN FITTING
32-2 1-00-1 02 200 90-101 MOS TSN:0 01-A PR-2011
11MDC03030 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-2 1-07-1 02 DIS CA RD NL G A TTACHME NT PIN OF THE NL G A TTACHMENT PIN (MAIN FITTING TO DRAG
BRACE), P ART NO. 200 81172 1
200 81172 1 MOS 01-A PR-2011
11MER113 612 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 2 1 0 7 96 1 8 04 AFL 194 80 0 194 80
32-2 1-07-1 03 DIS CA RD OF THE L H NLG DRAG BRACE UP PER P IVO T PIN, PART NO.20081 4601
200 81460 1 MOS 01-A PR-2011
11E XC0316 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 2 1 0 7 96 1 8 05 AFL 194 80 0 194 80
32-2 1-07-1 03 DIS CA RD OF THE RH NLG DRAG BRACE UPP ER PIVO T PIN, PART NO.20081 4601
200 81460 1 MOS 01-A PR-2011
11E XC0315 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 2 1 0 7 96 1 8 05 AFL 194 80 0 194 80
32-2 1-07-9 00-80 1-01 LH NO SE LANDING GEAR DRAG BRACE UPPER PIV OT PIN
32-2 1-07-1 03 200 81460 1 MOS TSN:0 01-A PR-2011
11E XC0316 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-2 1-07-9 00-80 1-02 RH NOSE LA NDING GE AR DRAG BRACE UPP ER PIVO T PIN
32-2 1-07-1 03 200 81460 1 MOS TSN:0 01-A PR-2011
11E XC0315 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-2 1-07-9 00-80 2-01 NLG ATTA CHMENT PIN
32-2 1-07-1 02 200 81172 1 MOS TSN:0 01-A PR-2011
11MER113 612 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-2 1-07-9 00-80 2-02 NLG DRAG B RA CE AS SEMBLY
604 -85002 -51 MOS TSN:0 01-A PR-2011
12MDT0599 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-2 1-13-1 01 DIS CA RD NL G A XLE FITTING OF THE NLG AX LE FITTING, PA RT NO . 2008 11308 (NHA
200 81121 8).
200 81121 8 MOS 01-A PR-2011
11MDC03457 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 2 1 1 3 96 1 8 01 AFL 194 80 0 194 80
32-2 1-13-1 02 DIS CA RD TUBE, SLIDING, NLG PIN OF THE NLG PIN, SLIDING TUB E TO END FITTING , PART
NO. 20 08116 02
200 81160 2 MOS 01-A PR-2011
11E XC0617 HRS /MSC 0
LIFE LIMIT REF: AMM 3 2 2 1 1 3 96 1 8 02 AFL 194 80 0 194 80

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
104 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-2 1-13-9 00-80 1-01 TUB E, SLIDING, NL G P IN
32-2 1-13-1 02 200 81160 2 MOS TSN:0 01-A PR-2011
11E XC0617 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-2 1-13-9 00-80 1-02 NLG AXLE FITTING
32-2 1-13-1 01 200 81121 8 MOS TSN:0 01-A PR-2011
11MDC03457 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

32-2 1-16-9 00-80 1-01 NLG SHOCK STRUT SL IDING TUBE


32-2 1-00-1 04 200 81170 7 MOS TSN:0 01-A PR-2011
11MBM00 743 HRS /MSC H/T TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

32-2 2-04-9 00-80 1-01 NLG DOOR


600 -33044 -1005 MOS TSN:0 01-A PR-2011
F93577 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-2 2-07-9 00-80 1-01 DOOR, NLG ACTUA TO R


600 -75136 -5 MOS TSN:0 01-A PR-2011
HAI1776 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-3 0-30-9 00-80 4-01 LH MA IN L ANDING GEAR SIDE STAY ACTUATOR PISTON
32-3 2-01-1 05 170 14-8 MOS 17-JUL-20 20
337 9 HRS /MSC H/T TSN:47 77 195 5.0 5
REF: GENERIC NO RE F AFL TSN:33 80 130 9

32-3 0-30-9 00-80 4-02 RH MAIN LANDING GE AR SIDE S TA Y A CTUATOR P ISTON


32-3 2-01-1 05 170 14-8 MOS 19-A UG -2020
353 5 HRS /MSC H/T TSN:20 41 197 2.1
REF: GENERIC NO RE F AFL TSN:98 2 132 6

32-3 0-30-9 00-80 5-01 LH MA IN L ANDING GEAR SIDE STAY ACTUATOR ROD END CAP
170 13-11 MOS TSN:0 17-JUL-20 20
483 1 HRS /MSC O/C TSN:0 195 5.0 5
REF: GENERIC NO RE F AFL TSN:0 130 9

32-3 0-30-9 00-80 5-02 RH MAIN LANDING GE AR SIDE S TA Y A CTUATOR ROD END CAP
170 13-11 MOS 19-A UG -2020
IA0239 HRS /MSC O/C TSN:58 38.3 197 2.1
REF: GENERIC NO RE F AFL TSN:33 15 132 6
32-3 0-65-9 00-80 1-01 NLG PISTON - RETRACTIO N ACTUA TO R ROD
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-3 1-01-8 00-90 1-01 LANDING GE AR CONTRO L HANDLE
601 R50 967-1 1 MOS TSN:0 01-A PR-2011
206 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
105 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-3 2-01-1 02 DIS CA RD OF THE LH MAIN LANDING GE AR (MLG) STAY SIDE P IN,
PART NO. 6318 - 1/ -3 (NHA 6350 -1 / -3 ).
635 0-3 MOS 13-MAR-2 020
19S PP007 84 HRS /MSC 192 6.4
LIFE LIMIT REF: AMM 3 2 3 2 0 1 96 1 8 02 AFL 192 50 127 5 205 25
32-3 2-01-1 02 DIS CA RD OF THE RH MA IN LANDING GEAR (MLG) STAY SIDE PIN,
PART NO. 6318 - 1/ -3 (NHA 6350 -1 / -3 ).
635 0-3 MOS 13-MAR-2 020
19S PP007 77 HRS /MSC 192 6.4
LIFE LIMIT REF: AMM 3 2 3 2 0 1 96 1 8 02 AFL 192 50 127 5 205 25
32-3 2-01-1 03 DIS CA RD OF THE L H MAIN L ANDING G EAR (ML G) SIDE- S TA Y- ACTUA TOR EYE - BOLT (RO D -E ND), P ART NO.
194 00 -2 (NHA 19 400 -1) .
194 00-1 MOS 17-JUL-20 20
983 HRS /MSC 195 5.0 5
LIFE LIMIT REF: AMM 3 2 3 2 0 1 96 1 8 01 AFL 438 90 TSI:228 7 130 9 429 12
32-3 2-01-1 03 DIS CA RD OF THE RH MAIN LANDING GE AR (MLG) SIDE- STAY- A CTUATOR E YE -BO LT (ROD -END), PART NO.
194 00 -2 (NHA 19 400 -1) .
194 00-1 MOS 19-A UG -2020
024 HRS /MSC 197 2.1
LIFE LIMIT REF: AMM 3 2 3 2 0 1 96 1 8 01 AFL 438 90 TSI:331 5 132 6 419 01
32-3 2-01-1 04 DIS CA RD OF THE L H MAIN L ANDING G EAR (ML G) SIDE STAY
ACTUA TO R CYLINDER, P ART NO . 170 27- 8 (NHA 17 027 -9)
170 27-9 MOS 17-JUL-20 20
573 A HRS /MSC 195 5.0 5
LIFE LIMIT REF: AMM 3 2 3 2 0 1 96 1 8 03 AFL 438 90 TSI:327 7 130 9 419 22
32-3 2-01-1 04 DIS CA RD OF THE RH MAIN LANDING GE AR (MLG) SIDE S TA Y
ACTUA TO R CYLINDER, P ART NO . 170 27- 8 (NHA 17 027 -9)
170 27-9 MOS 19-A UG -2020
365 A HRS /MSC 197 2.1
LIFE LIMIT REF: AMM 3 2 3 2 0 1 96 1 8 03 AFL 438 90 TSI:331 5 132 6 419 01
32-3 2-01-1 05 DIS CA RD OF THE L H MAIN L ANDING G EAR (ML G) SIDE STAY ACTUATOR PISTON, PART NO. 1 7014 -6 /- 8
170 14-8 MOS 17-JUL-20 20
337 9 HRS /MSC 195 5.0 5
LIFE LIMIT REF: AMM 3 2 3 2 0 1 96 1 8 04 AFL 438 90 TSI:338 0 130 9 418 19
32-3 2-01-1 05 DIS CA RD OF THE RH MAIN LANDING GE AR (MLG) SIDE S TA Y A CTUATOR P ISTON, PA RT NO . 1701 4 -6/- 8
170 14-8 MOS 19-A UG -2020
353 5 HRS /MSC 197 2.1
LIFE LIMIT REF: AMM 3 2 3 2 0 1 96 1 8 04 AFL 438 90 TSI:982 132 6 442 34
32-3 2-01-9 00-80 1-01 LH MA IN L ANDING GEAR SIDES TAY PIN
32-3 2-01-1 02 635 0-3 MOS 13-MAR-2 020
19S PP007 84 HRS /MSC H/T 192 6.4
REF: GENERIC NO RE F AFL 127 5

32-3 2-01-9 00-80 1-02 RH MAIN LANDING GE AR SIDESTAY PIN


32-3 2-01-1 02 635 0-3 MOS 13-MAR-2 020
19S PP007 77 HRS /MSC H/T 192 6.4
REF: GENERIC NO RE F AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
106 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-3 2-01-9 00-80 2-01 LH MA IN L ANDING GEAR SIDE STAY ACTUATOR EYE BO LT (ROD-END)
32-3 2-01-1 03 194 00-1 MOS 17-JUL-20 20
983 HRS /MSC H/T TSN:46 77.1 195 5.0 5
REF: GENERIC NO RE F AFL TSN:22 87 130 9
32-3 2-01-9 00-80 2-02 RH MAIN LANDING GE AR SIDE S TA Y A CTUATOR E YE BOLT (RO D-E ND)
32-3 2-01-1 03 194 00-1 MOS 19-A UG -2020
024 HRS /MSC H/T TSN:58 38.3 197 2.1
REF: GENERIC NO RE F AFL TSN:33 15 132 6

32-3 2-01-9 00-80 3-01 LH MLG S IDE STAY ACTUATOR CY LINDER


32-3 2-01-1 04 170 27-9 MOS 17-JUL-20 20
573 A HRS /MSC H/T TSN:69 86.9 195 5.0 5
REF: GENERIC NO RE F AFL TSN:32 77 130 9

32-3 2-01-9 00-80 3-02 RH MLG SIDE STAY ACTUATOR CYLINDE R


32-3 2-01-1 04 170 27-9 MOS 19-A UG -2020
365 A HRS /MSC H/T TSN:58 38.3 197 2.1
REF: GENERIC NO RE F AFL TSN:33 15 132 6

32-3 2-01-9 00-80 4-01 LH SIDE STAY, L G A CTUATOR


190 11-107 MOS TSO:0 17-JUL-20 20
004 05 HRS /MSC O/C TSO:0 195 5.0 5
REF: See Workcard AFL TSO:0 130 9

32-3 2-01-9 00-80 4-02 RH SIDE S TA Y, LG ACTUA TO R


190 11-107 MOS 19-A UG -2020
003 41 HRS /MSC O/C TSN:58 38.3 197 2.1
REF: See Workcard AFL TSN:33 15 132 6

32-3 2-04-9 00-80 1-01 LH MLG UPLO CK A SSEMBLY


601 R85 001-1 1 MOS TSN:0 01-A PR-2011
10S M0 0022 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-3 2-04-9 00-80 1-02 RH MLG UPLOCK ASS EMBLY


601 R85 001-1 1 MOS TSN:0 01-A PR-2011
10S M0 0021 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-3 2-07-9 00-80 1-01 SEL ECTO R VAL VE


601 R75 145-1 MOS TSN:0 01-A PR-2011
064 5T HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-3 2-10-9 00-80 1-01 MLG PRIO RITY V ALVE
461 9-3 MOS TSN:0 01-A PR-2011
213 4B HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-3 2-13-9 00-80 1-01 MLG B/PASS VA LVE
601 R75 160-5 MOS TSN:0 01-A PR-2011
058 5T HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
107 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-3 3-00-9 00-80 1-01 NLG RETRACTIO N ACTUA TO R
600 -85002 -37 MOS TSN:0 01-A PR-2011
12FAH088 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-3 3-01-9 00-80 1-01 NLG RETRACTIO N ACTUA TO R (LOWE R) PIN
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-3 3-04-9 00-80 1-01 NLG UPLOCK ASSE MB LY


32-3 3-04-1 01 166 00-103 MOS 13-MAR-2 020
09S M0 030 HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5
32-3 3-07-9 00-80 1-01 NLG DOOR S ELECTOR VA LVE
601 R75 146-1 MOS TSN:0 01-A PR-2011
146 3T HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-3 3-07-9 00-80 1-02 SEL ECTO R, NLG VA LVE
601 R75 146-1 MOS TSN:0 01-A PR-2011
145 6T HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-3 3-10-9 00-80 1-01 NLG RELIEF PRIORITY VALV E
462 2 MOS TSN:0 01-A PR-2011
223 0A HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-3 4-04-9 00-80 1-01 LH MLG A CTUATOR
600 -85001 -87 MOS TSN:0 01-A PR-2011
10MDT1578 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-3 4-04-9 00-80 1-02 RH MLG ACTUATOR
600 -85001 -87 MOS TSN:0 01-A PR-2011
10MDT1549 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-3 4-16-9 00-80 1-01 MANUA L S ELECTOR V ALVE
601 R75 149-1 MOS TSN:0 01-A PR-2011
065 1T HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-3 4-19-9 00-80 1-01 EMERGENCY EXT. RELIEF V ALVE
P44 -771 MOS TSN:0 01-A PR-2011
10-0 91612 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-3 4-22-9 00-80 1-01 LH MA NUAL BYP ASS, NLG V ALVE
600 -75120 -3 MOS TSN:0 01-A PR-2011
180 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
108 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-3 4-22-9 00-80 1-02 RH MANUAL BYPAS S, NLG VALV E
600 -75120 -3 MOS TSN:0 01-A PR-2011
180 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 0-00-2 01 (s) FUNCTIONAL TEST BRAKE ACCUMULATORS PKG
32-4 0-00-2 01 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
REF: AMM 3 2 4 3 0 7 72 0 8 01 AFL 150 5

32-4 0-00-2 02 SPE CIAL DETAIL ED INSPECTIO N LIB MLG WHEEL


32-4 0-00-2 02 501 2373 MOS 02-NOV -2020
AUG06 -2315 HRS /MSC 206 0.1 2
MRB REF: AMM 3 2 4 1 0 1 28 0 8 01 AFL 750 139 3 214 3
32-4 0-00-2 02 SPE CIAL DETAIL ED INSPECTIO N LOB MLG WHE EL - (32- 40-00- 202)
32-4 0-00-2 02 501 2373 MOS 10-NOV -2020
FEB08 -2687 HRS /MSC 206 7.3 2
MRB REF: AMM 3 2 4 1 0 1 28 0 8 01 AFL 750 139 5 214 5
32-4 0-00-2 02 SPE CIAL DETAIL ED INSPECTIO N RIB MLG WHE EL
32-4 0-00-2 02 501 2373 MOS 23-A PR-2021
MAR14-40 45 HRS /MSC 216 0.7
MRB REF: AMM 3 2 4 1 0 1 28 0 8 01 AFL 750 145 4 220 4
32-4 0-00-2 02 SPE CIAL DETAIL ED INSPECTIO N ROB ML G WHEEL
32-4 0-00-2 02 501 2373 MOS 13-JUN-2022
AUG08 -2882 HRS /MSC 224 5.8 3
MRB REF: AMM 3 2 4 1 0 1 28 0 8 01 AFL 750 150 5 225 5
32-4 0-00-2 03 SPE CIAL DETAIL ED INSPECTIO N LH NOS E WHEEL
32-4 0-00-2 03 501 0598 MOS 28-FEB -2021
APR07 -6511 HRS /MSC 211 8.6 3
MRB REF: AMM 3 2 4 2 0 1 28 0 8 01 AFL 750 143 3 218 3
32-4 0-00-2 03 SPE CIAL DETAIL ED INSPECTIO N RH NOSE WHE EL
32-4 0-00-2 03 501 0598 MOS 04-MAR-2 021
JUL 99-224 3 HRS /MSC 212 1.7 3
MRB REF: AMM 3 2 4 2 0 1 28 0 8 01 AFL 750 143 7 218 7
32-4 0-00-2 04 (s) LUBRICATION MAIN LA NDING G EAR (MLG ) B RA KE CO NTROL VALV E A SSEMBL Y PKG
32-4 0-00-2 04 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
REF: AMM 1 2 2 0 0 4 64 0 8 25 AFL 150 5
32-4 0-00-2 05 (s) DETAIL ED INSPECTIO N BRAKE WEAR PINS PKG
32-4 0-00-2 05 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 3 2 4 3 1 9 22 0 8 01 AFL 123 6
32-4 0-00-2 06 DETAIL ED INSPECTIO N LIB MLG WHEEL
32-4 0-00-2 06 501 2373 MOS 02-NOV -2020
AUG06 -2315 HRS /MSC T/C 206 0.1 2
MRB REF: AMM 3 2 4 1 0 1 22 0 8 02 AFL 139 3

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
109 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-4 0-00-2 06 DETAIL ED INSPECTIO N LOB MLG WHE EL - (32- 40-00- 206)
32-4 0-00-2 06 501 2373 MOS 10-NOV -2020
FEB08 -2687 HRS /MSC T/C 206 7.3 2
MRB REF: AMM 3 2 4 1 0 1 22 0 8 02 AFL 139 5
32-4 0-00-2 06 DETAIL ED INSPECTIO N RIB MLG WHE EL
32-4 0-00-2 06 501 2373 MOS 23-A PR-2021
MAR14-40 45 HRS /MSC T/C 216 0.7
MRB REF: AMM 3 2 4 1 0 1 22 0 8 02 AFL 145 4

32-4 0-00-2 06 DETAIL ED INSPECTIO N ROB ML G WHEEL


32-4 0-00-2 06 501 2373 MOS 13-JUN-2022
AUG08 -2882 HRS /MSC T/C 224 5.8 3
MRB REF: AMM 3 2 4 1 0 1 22 0 8 02 AFL 150 5
32-4 0-00-2 07 RESTORATIO N (OV ERHAUL) OF LIB MLG WHEEL
32-4 0-00-2 07 501 2373 MOS 02-NOV -2020
AUG06 -2315 HRS /MSC 206 0.1 2
OVE RHAUL REF: AMM 3 2 4 1 0 1 61 5 8 01 AFL 150 0 139 3 289 3
32-4 0-00-2 07 RESTORATIO N (OV ERHAUL) OF LOB MLG WHE EL - (3 2-40-00 -207)
32-4 0-00-2 07 501 2373 MOS 10-NOV -2020
FEB08 -2687 HRS /MSC 206 7.3 2
OVE RHAUL REF: AMM 3 2 4 1 0 1 61 5 8 01 AFL 150 0 139 5 289 5
32-4 0-00-2 07 RESTORATIO N (OV ERHAUL) OF RIB MLG WHEE L
32-4 0-00-2 07 501 2373 MOS 23-A PR-2021
MAR14-40 45 HRS /MSC 216 0.7
OVE RHAUL REF: AMM 3 2 4 1 0 1 61 5 8 01 AFL 150 0 145 4 295 4
32-4 0-00-2 07 RESTORATIO N (OV ERHAUL) OF RO B MLG WHEEL
32-4 0-00-2 07 501 2373 MOS 04-S EP-20 20
AUG08 -2882 HRS /MSC 199 7.5 8
OVE RHAUL REF: AMM 3 2 4 1 0 1 61 5 8 01 AFL 150 0 134 4 284 4
32-4 0-00-2 08 DETAIL ED INSPECTIO N LH NOS E WHEEL
32-4 0-00-2 08 501 0598 MOS
APR07 -6511 HRS /MSC T/C
MRB REF: AMM 3 2 4 2 0 1 22 0 8 01 AFL

32-4 0-00-2 08 DETAIL ED INSPECTIO N RH NOSE WHE EL


32-4 0-00-2 08 501 0598 MOS 04-MAR-2 021
JUL 99-224 3 HRS /MSC T/C 212 1.7 3
MRB REF: AMM 3 2 4 2 0 1 22 0 8 01 AFL 143 7
32-4 0-00-2 09 RESTORATIO N (OV ERHAUL) LH NO SE WHEE L
32-4 0-00-2 09 501 0598 MOS 28-FEB -2021
APR07 -6511 HRS /MSC 211 8.6 3
OVE RHAUL REF: AMM 3 2 4 2 0 1 61 5 8 01 AFL 150 0 143 3 293 3
32-4 0-00-2 09 RESTORATIO N (OV ERHAUL) RH NOSE WHEEL
32-4 0-00-2 09 501 0598 MOS 04-MAR-2 021
JUL 99-224 3 HRS /MSC 212 1.7 3
OVE RHAUL REF: AMM 3 2 4 2 0 1 61 5 8 01 AFL 150 0 143 7 293 7

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
110 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-4 1-01-2 10-80 1 INS PECTION OF TIRE
MOS 23-DEC-20 14
HRS /MSC - 954 .4
REF: AFL 541
32-4 1-01-4 00-80 1 INS TAL L MLG WHEEL/TIRE ASS Y
MOS 07-MAR-2 014
HRS /MSC -
REF: AFL
32-4 1-01-9 00-80 1-01 LOB MLG WHEEL
501 2373 MOS TSR:0 10-NOV -2020
FEB08 -2687 HRS /MSC O/C TSR:0 206 7.3 2
REF: See Workcard AFL TSR:0 139 5
32-4 1-01-9 00-80 1-02 LIB ML G WHEEL
501 2373 MOS TSO:0 02-NOV -2020
AUG06 -2315 HRS /MSC O/C TSO:0 206 0.1 2
REF: See Workcard AFL TSO:0 139 3

32-4 1-01-9 00-80 1-03 RIB MLG WHE EL


501 2373 MOS TSR:0 23-A PR-2021
MAR14-40 45 HRS /MSC O/C TSR:0 216 0.7
REF: See Workcard AFL TSR:0 145 4

32-4 1-01-9 00-80 1-04 ROB MLG WHEE L


501 2373 MOS TSR:0 04-S EP-20 20
AUG08 -2882 HRS /MSC O/C TSR:0 199 7.5 8
REF: See Workcard AFL TSR:0 134 4

32-4 1-01-9 00-80 2-01 LOB MLG TIRE


027 -697-0 MOS TSN:0 10-NOV -2020
834 5R0 0396 HRS /MSC O/C TSN:0 206 7.3 2
REF: See Workcard AFL TSN:0 139 5

32-4 1-01-9 00-80 2-02 LIB ML G TIRE


027 -697-0 MOS 02-NOV -2020
911 3R0 0221 HRS /MSC O/C 206 0.1 2
REF: See Workcard AFL 139 3

32-4 1-01-9 00-80 2-03 RIB MLG TIRE


027 -697-0 MOS 23-A PR-2021
011 1P050 62 HRS /MSC O/C 216 0.7
REF: See Workcard AFL 145 4

32-4 1-01-9 00-80 2-04 ROB MLG TIRE


027 -697-0 MOS TSN:0 13-JUN-2022
131 9P051 01 HRS /MSC O/C TSN:0 224 5.8 3
REF: See Workcard AFL TSN:0 150 5

32-4 2-01-9 00-80 1-01 LH NO SE WHEE L


501 0598 MOS TSR:0 28-FEB -2021
APR07 -6511 HRS /MSC O/C TSR:0 211 8.6 3
REF: See Workcard AFL TSR:0 143 3

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
111 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-4 2-01-9 00-80 1-02 RH NOSE WHEEL
501 0598 MOS TSO:0 TSR:16 04-MAR-2 021
JUL 99-224 3 HRS /MSC O/C TSO:0 TSR:212.43 212 1.7 3
REF: See Workcard AFL TSO:0 TSR:174 143 7
32-4 2-01-9 00-80 2-01 LH NLG TIRE
031 -614-0 MOS TSN:0 28-FEB -2021
619 8S003 32 HRS /MSC O/C TSN:0 211 8.6 3
REF: See Workcard AFL TSN:0 143 3

32-4 2-01-9 00-80 2-02 RH NLG TIRE


031 -614-0 MOS TSN:0 04-MAR-2 021
931 5S004 13 HRS /MSC O/C TSN:0 212 1.7 3
REF: See Workcard AFL TSN:0 143 7
32-4 3-04-9 00-80 1-01 NO.2 (L OWER)BRAKE CONTROL VA LVE
604 -75115 -5 MOS TSN:0 01-A PR-2011
054 7T HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 3-04-9 00-80 1-02 NO.3 (UPP ER)BRAKE CONTROL VA LVE
604 -75115 -5 MOS TSN:0 01-A PR-2011
054 8T HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 3-07-9 00-80 1-01 #2 BRAKE SY STEM, HY DRAULIC SY STEM ACCUMULA TO R
29-1 0-00-1 01 601 R75 138-1 MOS TSN:0 01-A PR-2011
601 63-780 9TNA HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 3-07-9 00-80 1-02 #3 BRAKE SY STEM, HY DRAULIC SY STEM ACCUMULA TO R
29-1 0-00-1 01 601 R75 139-1 MOS 08-A PR-2016
110 93-653 2 HRS /MSC O/C 131 3.0 2
REF: See Workcard AFL 851
32-4 3-13-9 00-80 1-01 UPPER MLG BRAK E A CCUMULA TO R (#3 SY STE M) - HIGH PRESSURE GAUGE
600 -75125 -3 MOS TSN:0 01-A PR-2011
10-1 02150 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 3-13-9 00-80 1-02 LOWER MLG BRAKE ACCUMULATOR ( #2 SYSTEM) - HIGH PRES SURE GA UG E
600 -75125 -3 MOS TSN:0 01-A PR-2011
10-1 02151 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 3-16-9 00-80 1-01 LOB VO LUME TRIC FUS E
601 R75 150-1 MOS TSN:0 01-A PR-2011
696 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 3-16-9 00-80 1-02 LIB VOLUMETRIC FUSE
601 R75 150-1 MOS TSN:0 01-A PR-2011
696 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
112 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-4 3-16-9 00-80 1-03 RIB VO LUME TRIC FUS E
601 R75 150-1 MOS TSN:0 01-A PR-2011
696 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 3-16-9 00-80 1-04 ROB VOLUMETRIC FUSE
601 R75 150-1 MOS TSN:0 01-A PR-2011
697 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-4 3-19-9 00-80 1-01 LOB BRAK E, MLG BRAKE


501 2333 MOS TSO:6 26-A PR-2017
MAR06-15 89 HRS /MSC O/C TSO:0 136 3.8
REF: See Workcard AFL TSO:0 883

32-4 3-19-9 00-80 1-02 LIB BRAKE, MLG BRAK E


604 -85123 -101 MOS TSO:4 12-S EP-20 18
MAY12 -2679 HRS /MSC O/C TSO:0 162 1.3
REF: See Workcard AFL TSO:0 106 9

32-4 3-19-9 00-80 1-03 RIB BRAK E, MLG BRAKE


501 2333 MOS TSO:2 15-MAR-2 018
MAY94 -0019 HRS /MSC O/C TSO:0 153 4.3
REF: See Workcard AFL TSO:0 988

32-4 3-19-9 00-80 1-04 ROB BRAKE, ML G B RA KE


604 -85123 -101 MOS TSO:1 12-S EP-20 18
JAN09-205 7 HRS /MSC O/C TSO:0 162 1.3
REF: See Workcard AFL TSO:0 106 9

32-4 4-01-9 00-80 1-01 LOB WHEEL SPE ED TRANSDUCER


604 -87000 -1 MOS TSN:0 01-A PR-2011
227 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-4 4-01-9 00-80 1-02 LIB WHEE L S PEED TRANSDUCE R


604 -87000 -1 MOS TSN:0 01-A PR-2011
226 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-4 4-01-9 00-80 1-03 RIB WHEEL SPE ED TRANSDUCER


604 -87000 -1 MOS TSN:0 01-A PR-2011
226 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 4-01-9 00-80 1-04 ROB WHE EL SPEED TRANSDUCER
604 -87000 -1 MOS TSN:0 01-A PR-2011
226 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 4-04-9 00-80 1-01 ANTI-S KID, A SCU CONTROL UNIT
604 -87000 -9 MOS TSN:0 01-A PR-2011
656 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
113 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-4 5-01-9 00-80 1-01 CABLE AS SY CO NTROL UNIT
601 R88 005-1 MOS TSN:0 01-A PR-2011
380 9 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-4 5-04-9 00-80 1-01 LH BRA KE CO NTROL CABLE
600 -88003 -9 MOS TSN:0 01-A PR-2011
333 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-4 5-04-9 00-80 1-02 RH BRAKE CONTRO L CAB LE


600 -88003 -9 MOS TSN:0 01-A PR-2011
333 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 5-07-9 00-80 1-01 LH BRA KE CO NTROL CABLE
600 -88004 -33 MOS TSN:0 01-A PR-2011
175 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 5-07-9 00-80 1-02 RH BRACKET, CONTRO L, PUSH-PULL CABLE
600 -88004 -35 MOS TSN:0 01-A PR-2011
179 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 5-13-9 00-80 1-01 PARKING BRAKE SHUT-O FF VALVE
604 -75401 -5 MOS TSN:0 01-A PR-2011
T01070 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-4 7-01-9 00-80 1-01 NO.2 CONTROL ,DUAL VALV E
604 -87000 -5 MOS TSN:0 01-A PR-2011
119 7 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-4 7-01-9 00-80 1-02 NO.3 CONTROL ,DUAL VALV E
604 -87000 -5 MOS TSN:0 01-A PR-2011
119 8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
32-5 0-00-2 01 (s) OPE RA TIONAL TEST NOS EWHE EL STEERING SEL ECTOR AND ARMING VAL VE PKG
32-5 0-00-2 01 PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 +40/-40 224 5.8 3
REF: AMM 3 2 5 1 0 0 71 0 8 03 AFL 150 5
32-5 0-00-2 02 OPE RA TIONAL TEST NOS EWHE EL STEERING MODUL E ( ECM) P/N 601 -8610 0-13, V ENDO R P/N 704 0-13/15
32-5 0-00-2 02 MOS 25-S EP-20 13
32.120 HRS /MSC N/A 766 .9
MRB REF: AMM 3 2 5 1 3 1 71 0 8 01 AFL 313
32-5 1-00-9 00-80 1-01 COMPENSATOR, STEE RING, NLG COMPUTE R
600 -85002 -13 MOS TSN:0 01-A PR-2011
10CEP 0238 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
114 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-5 1-00-9 00-80 3-01 UPPER INBO ARD BRAKE PRESS URE TRA NS DUCER
600 -59174 -17 MOS TSN:0 01-A PR-2011
777 7-7-18 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-5 1-00-9 00-80 4-01 MANIFOLD/STEERING AS SY CO NTROL UNIT
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

32-5 1-01-9 00-80 1-01 NOSEWHEEL CONTRO L HANDWHE EL


601 -86100 -21 MOS TSN:0 01-A PR-2011
10MDT0916 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-5 1-04-9 00-80 1-01 STEERING P OTE NTIOMETER


601 -86100 -17 MOS TSN:0 01-A PR-2011
719 -62 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-5 1-09-9 00-80 1-01 RVT SE NS OR


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

32-5 1-13-9 00-80 1-01 STEERING UNIT, NOSE WHEEL CONTROL UNIT
601 -86100 -27 MOS TSN:0 01-A PR-2011
10-3 70 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

32-5 1-16-9 00-80 1-01 STEERING A RMING , NLG (FS 177) VALV E
600 -85002 -11 MOS TSN:0 01-A PR-2011
CW100000 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-5 1-16-9 00-80 2-01 STEERING S ELECTOR, NL G (FS 193) VALV E


600 -85002 -11 MOS TSN:0 01-A PR-2011
CW100003 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-6 1-01-9 00-80 1-01 SENSO R, PROX, EL ECTRONIC CONTROL UNIT


604 -50969 -9 MOS TSN:0 01-A PR-2011
H597 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-6 1-04-9 00-80 1-01 LH MLG WOW SENSOR, NO.2 (OUTBD), HARNES S
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-6 1-04-9 00-80 2-01 LH MLG WOW SENSOR NO.1 (INBD), HARNE SS
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
115 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-6 1-04-9 00-80 3-01 RH MLG WOW S ENSOR, NO.2 (O UTBD), HARNESS
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-6 1-04-9 00-80 4-01 RH MLG WOW S ENSOR NO.1 (INBD), HARNESS
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

32-6 1-07-9 00-80 1-01 NLG HARNES S


193 00-251 MOS TSN:0 01-A PR-2011
10-6 18 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-6 1-07-9 00-80 1-02 NLG HARNES S
193 00-261 MOS TSN:0 01-A PR-2011
11-6 17 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-6 1-07-9 00-80 1-03 NLG HARNES S
193 00-231 MOS TSN:0 01-A PR-2011
9-62 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-6 1-07-9 00-80 2-01 NLG HARNES S
193 00-201 MOS TSN:0 01-A PR-2011
7-67 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-6 1-07-9 00-80 3-01 NLG HARNES S
193 00-221 MOS TSN:0 01-A PR-2011
8-64 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
32-ZL-0 0-204 (s) GENERAL VISUAL INS PECTION NO SE LANDING GEAR DO OR - LH PKG
32-ZL-0 0-204 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
32-ZL-0 0-205 (s) GENERAL VISUAL INS PECTION NO SE LANDING GEAR DO OR - RH PKG
32-ZL-0 0-205 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
32-ZL-0 0-206 (s) GENERAL VISUAL INS PECTION AFT NOSE LANDING GEA R DOOR PKG
32-ZL-0 0-206 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
32-ZL-0 0-207 (s) GENERAL VISUAL INS PECTION MA IN L ANDING GEAR DO OR - LH PKG
32-ZL-0 0-207 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
116 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
32-ZL-0 0-208 (s) GENERAL VISUAL INS PECTION MA IN L ANDING GEAR DO OR - RH PKG
32-ZL-0 0-208 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
322 204-09 01 NLG LH NLG FORWARD (LH) DO OR AS SY
600 -33043 -965 MOS TSN:0 17-A PR-2012
F93070 3 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

322 204-09 02 NLG RH NLG FO RWARD ( RH) DO OR AS SY


600 -33043 -966 MOS TSN:0 17-A PR-2012
H10465 8 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
CHA PTER 33 LIGHTS
33-1 2-02-9 00-80 1-01 LIGHTING,ILC CONTROLL ER
510 ZT01Y 01 MOS TSN:0 01-A PR-2011
643 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
33-1 3-07-9 00-80 2-01 PILOT RE ADING MA P L IG HT
2LA 00516 3-25 MOS TSN:0 01-A PR-2011
171 5847 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
33-1 3-07-9 00-80 2-02 COPILOT RE ADING MA P L IGHT
2LA 00516 3-25 MOS TSN:0 01-A PR-2011
171 5835 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

33-2 4-65-6 01 (s) OPE RA TIONAL TEST O F THE ORDINANCE SIGNS. PKG
PK G 1 2 MOS 12 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

33-4 1-13-9 00-80 1-01 PULSE LITE CONTROL UNIT


600 -50491 -3 MOS TSN:0 01-A PR-2011
BW006 80 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

33-4 2-10-9 00-80 1-01 NAVIGATION, TA IL LIGHT


2LA 00618 1-02 MOS TSN:76 24-MAY -2018
103 3 HRS /MSC O/C TSN:0 156 5
REF: See Workcard AFL TSN:0 101 5

33-4 4-04-9 00-80 1-01 LH ANTI-COLLISION LIGHT


2LA 00617 8-03 MOS TSN:0 01-A PR-2011
170 7925 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

33-4 4-04-9 00-80 1-02 RH ANTI-COL LIS ION LIGHT


2LA 00617 8-03 MOS TSN:0 01-A PR-2011
170 7929 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
117 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
33-4 4-07-9 00-80 1-01 LH POWER S TROBE UNIT
8ES 00542 1-09 MOS TSN:0 01-A PR-2011
170 9320 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
33-4 4-07-9 00-80 1-02 RH PO WE R STROBE UNIT
8ES 00542 1-09 MOS TSN:0 01-A PR-2011
170 9321 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

33-4 4-13-9 00-80 1-01 TAIL S TROBE PO WER UNIT


8ES 00542 1-09 MOS TSN:15 24-MAY -2018
377 7560 HRS /MSC O/C TSN:0 156 5
REF: GENERIC NO RE F AFL TSN:0 101 5
33-4 6-01-9 00-80 1-01 LOWER RED STROBE (BE ACON) LIGHT
2LA 00276 0-39 MOS TSN:0 01-A PR-2011
171 2248 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
33-4 6-01-9 00-80 1-02 UPPER RE D STROBE (BE ACO N) LIGHT
2LA 00276 0-39 MOS TSN:0 01-A PR-2011
164 7123 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
33-4 6-04-9 00-80 1-01 BEA CO N LIGHT PO WE R SUPPLY UNIT
8ES 00276 9-03 MOS TSN:0 01-A PR-2011
171 6227 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
33-5 0-00-2 01 (s) FUNCTIONAL TEST BAGG AGE BAY - AFT EMERGE NCY LIGHTS PO WE R-S UP PLY. PKG
33-5 0-00-2 01 PK G 1 2 MOS 12 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 3 3 5 1 0 1 72 0 8 01 AFL 147 5
33-5 0-00-2 01 (s) FUNCTIONAL TEST BAGG AGE BAY - FWD EMERGENCY L IGHTS POWER-SUPPL Y. PKG
33-5 0-00-2 01 PK G 1 2 MOS 12 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 3 3 5 1 0 1 72 0 8 01 AFL 147 5
33-5 0-00-2 01 (s) FUNCTIONAL TEST CO CK PIT EMERGENCY L IGHTS POWER-SUPPL Y. PKG
33-5 0-00-2 01 PK G 1 2 MOS 12 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 3 3 5 1 0 1 72 0 8 01 AFL 147 5
33-5 0-00-2 01 (s) FUNCTIONAL TEST RH CA BIN EMERGENCY LIG HTS POWER-SUPP LY. PKG
33-5 0-00-2 01 PK G 1 2 MOS 12 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 3 3 5 1 0 1 72 0 8 01 AFL 147 5
33-5 0-00-2 02 (s) OPE RA TIONAL TEST E ME RG ENCY LIGHTS PKG
33-5 0-00-2 02 PK G 1 2 MOS 12 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 3 3 5 1 0 0 71 0 8 01 AFL 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
118 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
33-5 1-01-9 00-80 1-01 COCKPIT EMERGENCY LIGHTS PO WE R SUPPL Y
60-1 321-1 MOS 14-MAR-2 022
251 99 HRS /MSC O/C 219 5.6
REF: See Workcard AFL 147 5
33-5 1-01-9 00-80 1-02 RH CABIN EMERGE NCY LIGHTS PO WE R SUPPL Y
60-1 321-1 MOS 14-MAR-2 022
245 82 HRS /MSC O/C 219 4.6
REF: See Workcard AFL 147 5

33-5 1-01-9 00-80 1-03 BAG GAGE BA Y - FWD EMERGENCY LIGHTS PO WE R SUPPL Y
60-1 321-1 MOS 14-MAR-2 022
245 78 HRS /MSC O/C 219 4.6
REF: See Workcard AFL 147 5

33-5 1-01-9 00-80 1-04 (AFT) E ME RG ENCY LIGHTS P OWER S UPP LY


60-1 321-1 MOS 14-MAR-2 022
245 86 HRS /MSC O/C 219 4.6
REF: See Workcard AFL 147 5

33-5 2-65-6 01 (s) OPE RA TIONAL TEST O F THE INTERIOR E ME RG ENCY LIGHTS. PKG
PK G 1 2 MOS 12 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

33-5 2-65-6 03 (s) FUNCTIONAL TEST OF THE S ELF-IL LUMINATED EX IT S IG N. PKG


PK G 2 4 MOS 24 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

352 300-09 01 WARDROB E PORTA BLE OXY GEN B OTTLE


560 0-9C1A-Y ON MOS TSO:0 12-A PR-2021
P13 04045 0 HRS /MSC O/C TSO:0 214 3.4
REF: AFL TSO:0 144 9
CHA PTER 34 NAVIGATION
34-0 0-01-9 00-80 1-01 STANDBY CO MP ASS
PAI-70 0-5V MOS TSN:0 01-A PR-2011
747 40 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-0 0-CUS -9001 UPDATE L OAD MK V EGP WS TERRAIN DA TA BASE


MOS 3 13-JUN-2022 13-S EP-20 22
HRS /MSC 224 5.8 3
CUS TO ME R CODE REF: AFL 150 5

34-0 0-CUS -9002 UPDATE JEP PESEN PROLINE 2 1 E LECTRONIC CHA RTS IN FSU WITH LATEST CYCLE
MOS 14 13-JUN-2022 29-J UN-20 22 M
HRS /MSC 224 5.8
REF: AFL 150 5

34-0 0-CUS -9003 UPDATE 1 & 2 FMS AND IFIS E-MAP WITH LATEST DATAB ASE
DAYS 28 17-JUN-2022 15-J UL-20 22
HRS /MSC 225 0.8
REF: AFL 150 7
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
119 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
34-0 0-CUS -9004 UPDATE DATAB ASE GRAPHICA L WX DATA E XPIRE D
MOS 14-MAR-2 022
HRS /MSC DUE 219 4.6
CUS TO ME R CODE REF: AFL 147 5
34-1 1-00-2 01 (s) FUNCTIONAL TEST PITOT-STATIC SYS TE M PKG
34-1 1-00-2 01 PK G 3 6 MOS 36 +1m/-1m 08-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 3 4 1 1 0 0 72 0 8 01 AFL 147 5

34-1 1-00-2 02 (s) DETAIL ED INSPECTIO N PITO T-S TA TIC PROB ES PKG
34-1 1-00-2 02 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: AMM 3 4 1 1 0 1 22 0 8 01 AFL 144 9
34-1 1-00-2 03 (s) SERVICING VISUAL DRAIN PKG
34-0 0-00-2 03 PK G 2 4 MOS 24 +1m/-1m 08-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 3 4 1 1 0 9 61 6 8 01 AFL 147 5
+ 34-1 1-01-1 03 DIS CA RD OF THE L H PITO T-S TA TIC PROB ES (RVSM Q UA LIFIED A/C)
085 6KV9 MOS 01-A PR-2011
265 978 HRS /MSC 960 0 0 960 0
LIFE LIMIT REF: AMM 3 4 1 1 0 1 96 0 8 01 AFL 0
+ 34-1 1-01-1 03 DIS CA RD OF THE RH P ITOT-STATIC PROBES (RVS M QUALIFIED A/C)
856 KV10 MOS 01-A PR-2011
264 470 HRS /MSC 960 0 0 960 0
LIFE LIMIT REF: AMM 3 4 1 1 0 1 96 0 8 01 AFL 0
34-1 1-01-9 00-80 1-01 LH PITOT STATIC P RO BE
34-1 1-01-1 03 085 6KV9 MOS TSN:0 01-A PR-2011
265 978 HRS /MSC 960 0 TSN:0 0 960 0
RVSM REF: See Workcard AFL TSN:0 0
34-1 1-01-9 00-80 1-02 RH PITOT STATIC PROBE
34-1 1-01-1 03 856 KV10 MOS TSN:0 01-A PR-2011
264 470 HRS /MSC 960 0 TSN:0 0 960 0
RVSM REF: See Workcard AFL TSN:0 0
34-1 1-04-9 00-80 1-01 STANDBY PITOT PROBE
851 HF MOS TSN:0 01-A PR-2011
280 548 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-1 1-07-9 00-80 1-01 L/H STATIC PRESS URE,RT PORT
ST315- 3L MOS TSN:0 01-A PR-2011
119 7105 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-1 1-07-9 00-80 1-02 R/H STATIC P RE SSURE,RT P ORT
ST315- 3R MOS TSN:0 01-A PR-2011
146 9504 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
120 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
34-1 1-13-9 00-80 1-01 TAT - AIR TEMP SENSOR
102 AH2AG MOS TSN:0 01-A PR-2011
B11 03 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-1 2-00-2 03 (s) FUNCTIONAL TEST INTEGRATED S TA NDBY INS TRUMENT PKG
34-1 2-00-2 03 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 3 4 1 2 0 6 72 0 8 01 AFL 127 5

34-1 2-01-9 00-80 1-01 INTEG RATED STANDB Y INSTRUMENT


C16786 MA 01 MOS 13-JUN-2022
C16786 03579 9 HRS /MSC O/C 224 5.8 3
REF: See Workcard AFL 150 5

34-1 2-CA-200 RECERTIFY THE INTEGRATED S TA NDBY INS TRUMENT PER 14 CFR 9 1.4 11 P ART 43, APP. E
PK G 2 4 MOS 24 08-MAR-2 022 08-MAR-2024
HRS /MSC 219 4.6
14 CFR REF: GENERIC NO RE F AFL 147 5

34-1 3-00-1 02 FUNCTIONAL TEST OF THE NO. 1 A IR DA TA COMPUTE R (ADC) (RV SM QUAL IFIE D A/C)
34-1 3-00-1 02 822 -0842- 621 P KG 24 MOS 24 08-MAR-2 022 08-MAR-2024
3WHYB HRS /MSC 219 4.6
RVSM REF: AMM 3 4 1 3 0 0 72 0 8 09 AFL 147 5

34-1 3-00-1 02 FUNCTIONAL TEST OF THE NO. 2 A IR DA TA COMPUTE R (ADC) (RV SM QUAL IFIE D A/C)
34-1 3-00-1 02 822 -0842- 621 P KG 24 MOS 24 08-MAR-2 022 08-MAR-2024
3WHXY HRS /MSC 219 4.6
RVSM REF: AMM 3 4 1 3 0 0 72 0 8 09 AFL 147 5

34-1 3-01-9 00-80 1-01 NO. 1 AIR DATA CO MP UTER (ADC)


822 -0842- 621 MOS TSN:0 01-A PR-2011
3WHYB HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-1 3-01-9 00-80 1-02 NO. 2 AIR DATA CO MP UTER (ADC)


822 -0842- 621 MOS TSN:0 01-A PR-2011
3WHXY HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-1 3-CA-200 RECERTIFY NO. 1 A IR DA TA COMPUTE R (ADC) PER 14 CFR 91.411


822 -0842- 621 P KG 24 MOS 24 08-MAR-2 022 08-MAR-2024
3WHYB HRS /MSC 219 4.6
FAA REF: GENERIC NO RE F AFL 147 5
34-1 3-CA-200 RECERTIFY NO. 2 A IR DA TA COMPUTE R (ADC) PER 14 CFR 91.411
822 -0842- 621 P KG 24 MOS 24 08-MAR-2 022 08-MAR-2024
3WHXY HRS /MSC 219 4.6
FAA REF: GENERIC NO RE F AFL 147 5
34-2 4-01-9 00-80 1-01 DIS PLAY CONTROL PA NE L
822 -2165- 002 MOS TSO:0 09-JUL-20 20
2G6 BV HRS /MSC O/C TSO:0 195 3.4 8
REF: See Workcard AFL TSO:0 130 7

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
121 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
34-2 4-01-9 00-80 2-01 DIS PLAY CONTROL PA NE L
822 -2165- 002 MOS TSO:6 25-A UG -2013
34L TL HRS /MSC O/C TSO:0 731 .1
REF: See Workcard AFL TSO:0 296
34-2 4-07-9 00-80 1-01 EFIS-THIRD VANE A0A TRANSMITTER TRANSDUCER
856 -0077- 010 MOS 27-MAR-2 014
FK1544 HRS /MSC O/C 766 .9
REF: See Workcard AFL 313

34-4 1-01-9 00-80 1-01 RADAR, WEATHER RTA-854 ANTENNA


622 -8440- 004 MOS TSN:0 01-A PR-2011
3PTCP HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-4 3-01-9 00-80 1-01 TTR-40 00, TCAS II COMPUTER
822 -1294- 032 MOS TSN:48 26-A PR-2015
173 719 HRS /MSC O/C TSN:10 70.77 107 0.7 7
REF: GENERIC NO RE F AFL TSN:68 8 688
34-4 3-09-9 00-80 1-01 UPPER TCAS (O PTIONAL) ANTENNA
622 -8973- 001 MOS TSN:0 17-NOV -2017
490 XP6 HRS /MSC O/C TSN:0 142 6
REF: GENERIC NO RE F AFL TSN:0 928
34-4 3-13-9 00-80 1-01 FWD DME ANTENNA
S65 -5366- 7L MOS TSN:0 01-A PR-2011
261 -10363 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-4 3-13-9 00-80 1-02 AFT DME ANTENNA
S65 -5366- 7L MOS TSN:0 01-A PR-2011
261 -10365 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-4 3-13-9 00-80 2-01 LOWER TCAS A NTENNA
622 -8973- 0010 MOS TSN:0 01-A PR-2011
445 MV HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
34-4 4-01-9 00-80 1-01 UMT-1 2,RAD.ALT. MOUNT
622 -5212- 004 MOS TSN:0 01-A PR-2011
18HOHO HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
34-4 4-01-9 00-80 2-01 ALT-40 00,TRANSCEIVER ALTIMETER
822 -0615- 206 MOS TSN:0 01-A PR-2011
3Y9 6B HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
34-4 4-07-9 00-80 1-01 FWD RADIO ALTIME TE R ANTENNA
763 44000 01-001 MOS TSN:0 01-A PR-2011
543 -55084 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
122 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
34-4 4-07-9 00-80 1-02 AFT RADIO A LTIMETER A NTENNA
763 44000 01-001 MOS TSN:0 01-A PR-2011
543 -55088 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-4 5-01-9 00-80 1-01 IRU - INERTIAL REFERENCE UNIT
HG210 0AB06 MOS TSN:0 01-A PR-2011
560 35025 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-4 5-01-9 00-80 2-01 IRU - INERTIAL REFERENCE UNIT


HG210 0AB06 MOS TSN:0 01-A PR-2011
560 35520 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-4 5-01-9 00-80 3-01 IRU - INERTIAL REFERENCE UNIT


HG210 0AB06 MOS TSN:0 01-A PR-2011
560 43777 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-4 5-05-9 00-80 1-01 LH A/C PERSONALITY MO DULE


751 9272-9 01 MOS TSN:0 01-A PR-2011
400 27922 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-4 5-05-9 00-80 1-02 RH A/C PE RS ONALITY MODULE


751 9272-9 01 MOS TSN:0 01-A PR-2011
400 27920 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-4 5-05-9 00-80 2-01 A/C PE RS ONALITY MODULE


751 9272-9 01 MOS TSN:0 01-A PR-2011
805 9244 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-4 6-04-9 00-80 2-01 WX-10 00, LDS, L IGHTNING DETE CTION A NTENNA
270 -2687- 030 MOS TSN:0 01-A PR-2011
827 27 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-4 8-01-9 00-80 1-01 TAWS-TERRA IN-AV OIDANCE WA RNING S YSTEM


965 -0976- 003-23 6-236 MOS TSN:10 7 13-MAR-2 020
EMK5- 31771 HRS /MSC O/C TSN:19 26.4 192 6.4
REF: See Workcard AFL TSN:12 75 127 5
34-5 1-00 OPE RA TIONAL CHE CK OF THE NAVIGATION CHECK IAW AMM 34-5 1-00-7 20-805
MOS
HRS /MSC O/C
REF: AFL

34-5 1-01-9 00-80 1-02 LH NAV -4000 ,VHF NAV IGA TION TRANSCEIVER
822 -1465- 001 MOS TSR:0 29-NOV -2019
4KDDJ HRS /MSC O/C TSR:0 190 9.3
REF: GENERIC NO RE F AFL TSR:0 126 3

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
123 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
34-5 1-01-9 00-80 2-01 RH NAV-4 000,VHF NAVIGATION TRANS CE IVE R
822 -1465- 001 MOS TSO:0 12-A UG -2012
21FLV HRS /MSC O/C TSO:0 199 .7
REF: GENERIC NO RE F AFL TSO:0 98
34-5 1-07-9 00-80 1-01 LH VOR/L OC ANTENNA
763 45000 02-001 MOS TSN:0 01-A PR-2011
180 -6095 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-5 1-07-9 00-80 1-02 RH VO R/LOC ANTE NNA


763 45000 02-001 MOS TSN:0 01-A PR-2011
180 -6097 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-5 1-10-9 00-80 1-01 G/S - G LIDES LOPE ANTENNA
S41 422-2 MOS TSN:0 01-A PR-2011
111 -6976 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-5 1-13-9 00-80 1-01 MARKER BEACON ANTENNA
763 45000 01-001 MOS TSN:0 01-A PR-2011
102 -8983 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-5 2-04-9 00-80 1-01 ADF ANTENNA
622 -7384- 001 MOS TSN:0 01-A PR-2011
462 YN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-5 3-01-9 00-80 1-01 DME-4000 TRANSCEIV ER
822 -1466- 001 MOS TSN:0 01-A PR-2011
3YD5Y HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-5 3-01-9 00-80 2-01 DME-4001 TRANSCEIV ER
822 -1466- 001 MOS TSN:0 01-A PR-2011
3YD5X HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-5 4-01-9 00-80 1-01 NO.1 TDR-94D TRANSPONDER
622 -9210- 501 MOS 13-MAR-2 020
3V2 WY HRS /MSC O/C 192 6.4
REF: GENERIC NO RE F AFL 127 5
34-5 4-01-9 00-80 1-02 NO.2 TDR-94D TRANSPONDER
622 -9210- 501 MOS 13-MAR-2 020
45DFW HRS /MSC O/C 192 6.4
REF: GENERIC NO RE F AFL 127 5
34-5 4-04-9 00-80 1-01 UPPER ATC TRA NS PONDER (XP NDR) ANTENNA
S65 -5366- 7L MOS TSN:0 01-A PR-2011
261 -10293 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
124 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
34-5 4-04-9 00-80 1-02 LOWER ATC TRA NS PONDER (X PNDR) ANTE NNA
S65 -5366- 7L MOS TSN:0 01-A PR-2011
261 -10190 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-5 4-04-9 00-80 1-03 UPPER TCAS TRANSPONDER (X PNDR) ANTE NNA
S65 -5366- 7L MOS TSN:0 01-A PR-2011
261 -10292 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-5 4-04-9 00-80 1-04 LOWER TCAS TRANSPONDER ( XPNDR) ANTENNA


S65 -5366- 7L MOS TSN:0 01-A PR-2011
261 -10292 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-5 4-CA-200 RECERTIFY NO.1 TRANSP ONDE R - PER 1 4 CFR 91 .41 3 P ART 43, A PP. F
PK G 2 4 MOS 24 08-MAR-2 022 08-MAR-2024
HRS /MSC 219 4.6
FAA REF: GENERIC NO RE F AFL 147 5

34-5 4-CA-200 RECERTIFY NO.2 TRANSP ONDE R - PER 1 4 CFR 91 .41 3 P ART 43, A PP. F
PK G 2 4 MOS 24 08-MAR-2 022 08-MAR-2024
HRS /MSC 219 4.6
FAA REF: GENERIC NO RE F AFL 147 5

34-5 5-01-9 00-80 1-01 GLO BAL POS ITION, GPS RECEIVER
822 -2189- 004 MOS 03-O CT-20 18
46F6X HRS /MSC O/C 162 7.2
REF: See Workcard AFL 107 6

34-5 5-01-9 00-80 2-01 GLO BAL POS ITION, GPS RECEIVER
822 -2189- 004 MOS 03-O CT-20 18
4V7 92 HRS /MSC O/C 162 7.2
REF: See Workcard AFL 107 6

34-5 5-04-9 00-80 1-01 GLO BAL POS ITION, GPS ANTENNA
S67 -1575- 135 MOS TSN:0 01-A PR-2011
818 -0404 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

34-5 5-04-9 00-80 2-01 GLO BAL POS ITION, GPS ANTENNA
S67 -1575- 135 MOS TSN:0 01-A PR-2011
818 -0984 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
34-6 1-01-9 00-80 1-01 NO. 1 CONTROL , CDU-620 0 DISPLA Y
822 -1485- 402 MOS 13-FEB -2015
2YRDR HRS /MSC O/C 100 2.6 2
REF: See Workcard AFL 607
34-6 1-01-9 00-80 1-02 NO. 2 CONTROL , CDU-620 0 DISPLA Y
822 -1485- 402 MOS TSN:43 18-NOV -2014
3R8WD HRS /MSC O/C TSN:99 2.7 922 .7
REF: See Workcard AFL TSN:49 5 495

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
125 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
344 401-09 01 AFT BA Y E QUIP .#2 RA DIO, A LT-400 ALTIMETER
822 -0615- 206 MOS TSN:0 17-A PR-2012
495 WT HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
344 401-09 02 AVIONIC BAY MOUNTING (UMT-12) TRAY
622 -5212- 004 MOS TSN:0 17-A PR-2012
3WKJN HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

344 407-09 01 AFT FUSE/RA D.ALT.(FWD) RA DIO ALTIME TE R ANTE NNA


S67 -2002 MOS TSN:0 17-A PR-2012
543 -56265 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
344 407-09 02 AFT FUSE/RA D.ALT.(AFT) RADIO AL TIMETER ANTENNA
S67 -2002 MOS TSN:0 17-A PR-2012
543 -59163 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
CHA PTER 35 OXYGEN
12-1 4-35-6 10-80 1 CHE CK Q UANTITY OF OXYG EN SY STE M
MOS 15-NOV -2019
HRS /MSC - 190 5.7
REF: AFL 125 9
12-1 4-35-6 14-80 1 SERVICING OF O XYGE N SYS TE M (ONLY IF NECESSA RY)
MOS 09-JUL-20 20
HRS /MSC - 195 3.4 8
REF: AFL 130 7
35-0 0-00-2 02 (s) OPE RA TIONAL TEST P ASSE NG ER OX YGEN SYSTEM PKG
35-0 0-00-2 02 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: AMM 3 5 2 0 0 0 71 0 8 01 AFL 144 9

35-0 0-00-2 04 (s) OPE RA TIONAL TEST CREW O XYGE N MASK PKG
35-0 0-00-2 04 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: AMM 3 5 1 1 0 7 71 0 8 01 AFL 144 9
35-0 0-00-2 06 RESTORATIO N 3RD CREW MEMBE R OXY GEN REG UL ATO R MASK AS SEMBLY
35-0 0-00-2 06 MC10-13-0 3 MOS 72 +1m/-1m 13-JUN-2022 01-APR-20 28 M 01-MAY -2028
B09 2420 HRS /MSC
OVE RHAUL REF: AMM 3 5 1 1 0 7 61 5 8 01 AFL

35-0 0-00-2 06 RESTORATIO N COPILOT OXYGE N REGULATOR MA SK ASSE MB LY OF MASK REGULA TO R


35-0 0-00-2 06 MF1 0-03-0 3 MOS 72 +1m/-1m 11-MAY -2017 11-MAY-2 023 11-JUN-2023
SE5 87741 HRS /MSC
OVE RHAUL REF: AMM 3 5 1 1 0 7 61 5 8 01 AFL

35-0 0-00-2 06 RESTORATIO N PILOT OXYGE N REGULATOR MA SK ASSE MB LY OF MASK REGULA TO R


35-0 0-00-2 06 MF1 0-03-0 3 MOS 72 +1m/-1m 13-O CT-20 16 13-O CT-20 22 13-NOV -2022
103 6711 HRS /MSC
OVE RHAUL REF: AMM 3 5 1 1 0 7 61 5 8 01 AFL
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
126 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 35-0 0-00-2 07 DIS CA RD OF THE O XYGE N CYLINDER
MOS 180 01-A PR-2011 01-APR-20 26
HRS /MSC
LIFE LIMIT REF: AMM 3 5 1 1 0 1 96 0 8 01 AFL

35-0 0-00-2 07 DIS CA RD OF THE O XYGE N CYLINDER.


806 371-31 1 MOS 180 14-MAR-2 022 14-MAR-2037
CO912 0024 HRS /MSC
LIFE LIMIT REF: AMM 3 5 1 1 0 1 96 0 8 01 AFL

35-0 0-00-2 08 (s) GENERAL VISUAL INS PECTION OXYG EN INDICA TION SYSTEM PKG
35-0 0-00-2 08 PK G 2 4 MOS 24 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 3 5 1 2 0 0 21 0 8 01 AFL 147 5

35-0 0-00-2 10 RESTORATIO N OF THE OXYG EN CYLINDER REGULATOR.


806 371-31 1 MOS 60 18-MAR-2 022 18-MAR-2027
CO912 0024 HRS /MSC 219 5.7
OVE RHAUL REF: AMM 3 5 1 1 0 1 28 0 8 01 AFL 147 6

35-0 0-00-6 01 FUNCTIONAL TEST (HY DROS TA TIC TEST) OXYG EN CYLINDE R, RE GULATOR (RHS KIDNEEY PA NE L) BOTTL E
806 371-34 0 MOS 60 17-FEB -2018 01-FEB-20 23 M
C10030 010 HRS /MSC
STLMC REF: AFL

35-0 0-00-6 02 DIS CA RD RH 40 C.U FT O XYGEN CYLINDER


MOS 180 01-A PR-2011 01-APR-20 26
HRS /MSC 0
LIFE LIMIT REF: GENERIC NO RE F AFL 0

35-1 1-07-9 00-80 1-01 PILOT OXYG EN REGULATOR MA SK ASSE MB LY


MF1 0-03-0 3 MOS TSO:12 05-O CT-20 17
103 6711 HRS /MSC O/C TSN:17 17.4 TSO :0 140 7.2
REF: See Workcard AFL TSN:96 3 TSO :0 912

35-1 1-07-9 00-80 1-02 COPILOT OXYG EN REGULATOR MA SK ASSE MB LY


MF1 0-03-0 3 MOS TSO:5 05-O CT-20 17
SE5 87741 HRS /MSC O/C TSN:16 65 TS O:0 140 7.2
REF: See Workcard AFL TSN:14 72 TS O:0 912

35-1 1-07-9 00-80 1-03 3RD CREW MEMBE R OXY GEN REG UL ATO R MASK AS SEMBLY
MC10-13-0 3 MOS 13-JUN-2022
B09 2420 HRS /MSC O/C 224 5.8 3
REF: See Workcard AFL 150 5
35-1 1-10-9 00-80 1-01 LH CREW OXYG EN STOWAG E B OX
MXP41 1-3 MOS TSN:12 0 TSO :1 08-FEB -2018
SE2 8611 HRS /MSC O/C TSN:64 66 TS O:0 150 0.2
REF: See Workcard AFL TSN:30 25 TS O:0 968
35-1 1-10-9 00-80 1-02 RH CREW OX YGEN STOWAGE BOX
MXP41 1-3 MOS TSN:0 01-A PR-2011
SE4 6750 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
127 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
35-1 2-07-9 00-80 1-01 OXY GEN (S1WQ) PRESSURE SWITCH
P24 028 MOS TSN:0 01-A PR-2011
687 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
35-1 2-07-9 00-80 2-01 OXY GEN (S2WQ) PRESSURE SWITCH
P24 028 MOS TSN:0 01-A PR-2011
656 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

35-2 1-13-9 00-80 1-01 SHUT OFF VA LVE


P21 046 MOS TSN:0 01-A PR-2011
127 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
35-2 2-01-9 00-80 1-01 OXY GEN (S3WQ) PRESSURE SWITCH
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
35-2 2-04-9 00-80 1-01 OXY GEN (S4WQ) PRESSURE SWITCH
801 2 MOS TSN:0 01-A PR-2011
126 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
35-2 3-65-6 01 (s) OPE RA TIONAL TEST O F THE PA SSENGE R OXY GEN S YSTEM. PKG
PK G 2 4 MOS 24 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5
35-2 3-65-6 02 (s) FUNCTIONAL TEST OF THE P ASSE NG ER OX YGEN SYSTEM. PKG
PK G 3 6 MOS 36 21-A PR-2021
HRS /MSC 214 3.4
STLMC REF: AFL 144 9
35-2 3-65-6 03 (s) OPE RA TIONAL TEST O F THE CREW O XYGEN SYSTEM MODIFICATIONS MAS KS. PKG
PK G 1 2 MOS 12 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5
35-2 3-65-6 04 RESTORATIO N OF THE CREW OXY GEN S YSTEM MODIFICATIO NS MASKS
MOS 72 14-MAR-2 022 14-MAR-2028
HRS /MSC 219 4.6
CUS TO ME R CODE REF: AFL 147 5
35-2 3-65-6 05 (s) GENERAL VISUAL INS PECTION WA RDROBE PO RTABL E O XYGE N BOTTLE OF THE PORTABLE OX YGEN CY LINDER, PKG
REGULATOR, AND MA SK.
560 0-9C1A-Y ON PKG 12 MOS 12 14-MAR-2 022
P13 04045 0 HRS /MSC 219 4.6
STLMC REF: AFL 147 5

35-2 3-65-6 06 FUNCTIONAL (HYDROSTATIC) TEST WARDROBE PORTABLE OX YGEN BOTTLE


560 0-9C1A-Y ON MOS 60 04-A PR-2021 04-APR-20 26
P13 04045 0 HRS /MSC
STLMC REF: AFL

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
128 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
35-2 3-65-6 07 (s) DETAIL ED INSPECTIO N OF THE PROTECTIVE BREATHING EQUIPMENT (PBE ). PKG
PK G 1 2 MOS 12 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5
35-2 8-98-9 00-80 2-01 OXY GEN CYL INDER
35-0 0-00-2 07 806 371-31 1 MOS TSO:0 12-MAR-2 022
CO912 0024 HRS /MSC H/T TSO:0 219 4.6
REF: GENERIC NO RE F AFL TSO:0 147 5

350 021-09 01 COCKPIT OX YGEN, DUAL BOX ASS Y


PA1 003 MOS TSN:0 17-A PR-2012
115 0 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

350 022-09 01 02 CYLINDER AREA OXYG EN CHECK VALVE


P21 018 MOS TSN:0 17-A PR-2012
462 6 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

350 022-09 02 OXY GEN SYSTEM O XYGE N SYS TE M CHE CK VA LVE


P21 018 MOS TSN:0 17-A PR-2012
750 9-1-66 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

351 000-09 01 WARDROB E MA SK


108 00C-2F MOS TSN:6 26-A PR-2015
N/A HRS /MSC O/C TSN:0 107 0.7 7
REF: AFL TSN:0 688

351 001-09 01 PAS SENGER OXYG EN CONTRO L P ANEL


604 -44101 -5 MOS TSN:7 17-A PR-2012
305 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

351 101-09 01 OXY GEN CYL INDER, REGULATOR (RHS KIDNEE Y P ANEL) BOTTLE
806 371-34 0 MOS 180 TSN:12 7 30-A PR-2020 30-S EP-20 24
C10030 010 HRS /MSC 193 0.2
LIFE LIMIT REF: AFL 127 7

351 217-09 01 OXY P (S3WQ)/COCKPIT RHS PRES SURE, OXYG EN SWITCH


P24 028 MOS TSN:0 17-A PR-2012
727 3 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
352 031-09 01 DIV AN CAB NEBULIZE R, THERAPEUT KIT
O2C33 K01-18 0 MOS TSN:0 17-A PR-2012
418 88A HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
+ 352 310-09 01 WARDROB E (DISCARD TASK 25 -60-02 -602) PBE
MR-10042 N MOS 120 TSN:8 14-MAR-2 022 14-J UL-20 31
E21 02564 HRS /MSC TSN:0 219 4.6
STLMC REF: AFL TSN:0 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
129 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 352 310-09 02 AFT END CAB INET (DISCARD TASK 25 -60-02 -602) PBE
MR-10042 N MOS 120 TSN:7 26-A PR-2015 01-MAR-2025 M
E14 05701 HRS /MSC 107 0.7 7
STLMC REF: AFL 688
CHA PTER 36 PNEUMATIC
36-1 1-00-3 01 (s) RESTORATIO N (CLEANING) O F THE 10 TH STAGE BLE ED AIR SHUTOFF VAL VE FILTER PKG
PK G 3 200 MOS
HRS /MSC 320 0 +40/-40 0
OPTIONAL REF: AMM 3 6 1 1 0 1 13 0 8 01 AFL

36-1 1-00-9 00-80 1-01 LH 10TH STAGE SHUT-OFF,BLE ED AIR VA LVE


604 -97601 -1 MOS TSN:48 26-A PR-2015
617 3 HRS /MSC O/C TSN:10 70.77 107 0.7 7
REF: See Workcard AFL TSN:68 8 688
36-1 1-00-9 00-80 1-02 RH 10TH S TA GE SHUT-OFF,B LEED AIR VALV E
604 -97601 -1 MOS TSN:48 26-A PR-2015
617 4 HRS /MSC O/C TSN:10 70.77 107 0.7 7
REF: See Workcard AFL TSN:68 8 688
36-1 1-00-9 00-80 1-03 10TH S TA GE SHUT-OFF,B LEED AIR VALV E
604 -97601 -3 MOS TSN:0 01-A PR-2011
617 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
36-1 1-00-9 00-80 2-01 10TH S TA GE BLEED AIR CHE CK VA LVE
600 -97006 -7 MOS TSN:0 01-A PR-2011
151 226 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
36-1 1-00-9 00-80 3-01 LH BLEED AIR CLEANER
600 -97196 -1 MOS TSN:0 01-A PR-2011
A59 7 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

36-1 1-00-9 00-80 3-02 RH BLE ED AIR CLE ANER


600 -97196 -2 MOS TSN:0 01-A PR-2011
A60 2 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
36-1 1-13-9 00-80 1-01 LH 10TH STAGE BL EED A IR DUCT
138 61-101 MOS TSN:0 01-A PR-2011
104 93047 02 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
36-1 1-13-9 00-80 1-02 RH 10TH S TA GE BLEE D AIR DUCT
228 -56335 -103 MOS TSN:0 01-A PR-2011
104 93049 02 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
36-1 1-13-9 00-80 2-01 LH LOW P RE SSURE B LEED A IR DUCT
138 50-105 MOS TSN:0 01-A PR-2011
104 95031 02 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
130 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
36-1 1-13-9 00-80 2-02 RH LO W PRESS URE BLEE D AIR DUCT
138 50-105 MOS TSN:0 01-A PR-2011
114 96911 02 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
36-1 1-13-9 00-80 2-03 STARTER DUCT
228 -56334 -103 MOS TSN:0 01-A PR-2011
114 97731 01 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

36-1 1-13-9 00-80 2-04 LH CHECK VALV E


624 90-7B MOS TSN:0 01-A PR-2011
439 7 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

36-1 1-13-9 00-80 2-05 RH CHECK V ALVE


624 90-7B MOS TSN:0 01-A PR-2011
439 3 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0

36-1 2-00-3 01 (s) RESTORATIO N (CLEANING) O F THE 14 TH STAGE BLE ED AIR SHUTOFF VAL VE FILTER PKG
PK G 3 200 MOS +40/-40
HRS /MSC 320 0 +40/-40 0
OPTIONAL REF: AMM 3 6 1 2 0 1 13 0 8 01 AFL

36-1 2-00-9 00-80 1-01 LH 14TH STAGE SHUT-OFF VAL VE


604 -97603 -1 MOS TSN:0 01-A PR-2011
407 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

36-1 2-00-9 00-80 1-02 RH 14TH S TA GE SHUT-OFF V ALVE


604 -97603 -1 MOS TSN:0 01-A PR-2011
408 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

36-1 2-00-9 00-80 2-01 LH MO DULATING A ND SHUT-OFF V ALVE


321 4442-4 MOS TSN:0 01-A PR-2011
407 0 HRS /MSC H/T TSN:0 0
REF: See Workcard AFL TSN:0 0

36-1 2-00-9 00-80 2-02 RH MODULATING AND SHUT-OFF VAL VE


321 4442-4 MOS TSN:0 01-A PR-2011
407 2 HRS /MSC H/T TSN:0 0
REF: See Workcard AFL TSN:0 0
36-1 2-00-9 00-80 9-01 14TH S TA GE ANTI-ICE ISOLA TION V ALVE
604 -97604 -1 MOS 13-MAR-2 020
326 0 HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5
36-1 2-04-9 00-80 1-01 HIG H PRESS URE BLEE D AIR DUCT
228 -56332 -101 MOS TSN:0 01-A PR-2011
114 94046 02 HRS /MSC O/C TSN:0 0
REF: AMM NO REF2 AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
131 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
36-1 2-04-9 00-80 1-02 RH 14TH S TA GE BLEE D AIR DUCT
228 -56336 -103 MOS TSN:0 01-A PR-2011
114 96913 01 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
36-1 2-04-9 00-80 2-01 LH 14TH STAGE BL EED A IR DUCT
228 -56333 -103 MOS TSN:0 01-A PR-2011
104 90078 01 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

36-2 1-00-1 01 FUNCTIONAL TEST OF THE L EADING EDGE THE RMAL SWITCHES. (CMR*)
PK G 6 400 MOS +40/-40
HRS /MSC 640 0 +40/-40 0 640 0 644 0
REF: AMM 3 6 2 1 0 7 72 0 8 01 AFL

36-2 1-04-9 00-80 1-01 LH 10TH STAGE PRES SURE TRANS DUCER
600 -59174 -9 MOS TSN:0 01-A PR-2011
783 3-8-78 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
36-2 1-04-9 00-80 1-02 RH 10TH S TA GE PRESSURE TRANSDUCE R
600 -59174 -9 MOS TSN:0 01-A PR-2011
783 3-8-79 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
36-2 1-13-9 00-80 1-01 LH LEAK BLE ED AIR CONTRO L UNIT
20-0 35008 -067 MOS TSN:0 01-A PR-2011
A36 06 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
36-2 1-13-9 00-80 1-02 RH LEA K BLEED AIR CONTROL UNIT
20-0 35008 -067 MOS TSN:0 01-A PR-2011
A35 99 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
APU Model : GTCP 36-150 (CL) Serial # P-310 Part # 3800804-1
361 022-00 1 APU - B LEED AIR CHE CK VA LVE
320 2896-1 MOS TSN:0 01-A PR-2011
273 7 HRS /MSC O/C TSN:0 0
REF: APUS TSN:0 0
CHA PTER 38 WATER /WA STE
38-1 0-65-6 01 (s) DETAIL ED INSPECTIO N OF THE AIR PRESSURE RE GULATOR. PKG
PK G 6 MOS 6 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5
38-1 0-65-6 02 (s) FUNCTIONAL TEST OF THE A IR PRESSURE REG UL ATOR. PKG
PK G 6 MOS 6 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
132 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
38-1 0-65-6 03 (s) GENERAL VISUAL INS PECTION OF THE WATER DISTRIBUTIO N LINES. PKG
PK G 1 2 MOS 12 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5
38-1 0-65-6 04 (s) GENERAL VISUAL INS PECTION OF THE WATER TA NK . PKG
PK G 1 2 MOS 12 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

38-1 0-65-6 05 (s) RESTORATIO N OF THE BLEE D AIR FIL TE R. PKG


PK G 6 MOS 6 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

38-1 0-65-6 06 (s) RESTORATIO N OF THE WATER FIL TER ASSE MB LY (REPLACE FILTER CA RTRIDGE ) PKG
PK G 6 MOS 6 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

38-1 0-65-6 07 (s) FUNCTIONAL TEST OF THE WATER HE ATER PRES SURE RELIEF V ALVE. PKG
PK G 3 6 MOS 36 21-A PR-2021
HRS /MSC 214 3.4
STLMC REF: AFL 144 9

38-1 0-65-6 09 (s) RESTORATIO N OF THE WATER FIL TER ASSE MB LY (REPLACE GAS KET S ET). PKG
PK G 4 8 MOS 48 13-MAR-2 020
HRS /MSC 192 6.4
STLMC REF: AFL 127 5

38-1 0-65-6 10 (s) OPE RA TIONAL TEST O F THE FLOO R MAT ACTIV ATED SO LENOID VAL VE. PKG
PK G 6 MOS 6 14-MAR-2 022
HRS /MSC 219 4.6
STLMC REF: AFL 147 5

38-1 1-00-9 00-80 1-01 CONTROL UNIT, WATER L EVEL CONTRO L UNIT
016 264-03 MOS 17-O CT-20 12
006 9 HRS /MSC O/C 282 .9
REF: AMM NO REF2 AFL 120

38-1 1-10-9 00-80 1-01 WATER, 10G AL TANK


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: AMM NO REF2 AFL TSN:0 0
38-1 1-10-9 00-80 2-01 LEV EL SENSOR PROBE SENSO R
016 263-01 MOS TSN:0 01-A PR-2011
488 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
38-1 1-10-9 00-80 3-01 HEATER B LANKET, 12 0W HEATER
4E3 156-03 MOS TSN:0 01-A PR-2011
575 5 HRS /MSC O/C TSN:0 0
REF: AMM NO REF2 AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
133 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
38-1 1-10-9 00-80 4-01 HEATER,B LANKET,92W HEA TER
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: AMM NO REF2 AFL TSN:0 0
38-1 1-43-9 00-80 1-01 DRA IN, WATER S YSTEM MAS T
4E3 160-1 MOS TSN:0 01-A PR-2011
MCXQ440 -3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

38-3 0-65-6 01 GENERAL VISUAL INS PECTION OF THE WAS TE DIS POSA L S YSTEM.
PK G 1 200 MOS 27-S EP-20 19
HRS /MSC 120 0 187 7.3 307 7.3
STLMC REF: AFL 123 6
38-3 0-65-6 02 CLEANING O F THE TOILET A SSEMBLY .
PK G 1 200 MOS 27-S EP-20 19
HRS /MSC 120 0 187 7.3 307 7.3
STLMC REF: AFL 123 6
383 101-09 01 AFT LA VATORY RHS ASS Y TOILET
462 0-113 MOS TSN:0 17-A PR-2012
113 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
384 011-09 01 GAL LEY TOWER AS SY WATE R HEATER
892 1082G 5 MOS TSN:71 29-MAR-2 018
N11140 05 HRS /MSC O/C TSN:15 18.1 153 4.3
REF: AFL TSN:97 8 988
384 011-09 02 LAV ATORY V ANITY ASSY WATER HEA TE R
892 1082G 5 MOS 29-MAR-2 018
N11140 07 HRS /MSC O/C 153 4.3
REF: AFL 988
CHA PTER 44 CABIN SYSTEMS
44-2 0-50 OPE RA TION CHECK OF A LL THE INTERIO R COMPONENT IAW S MM 25-30 -50-71 0-801
MOS 26-A PR-2017
HRS /MSC O/C 136 3.8
REF: AFL 883
44-2 0-50A OPE RA TION CHECK OF THE INFLIG HT ENTE RTAINME NT SYSTEM IAW SMM 44- 20-50- 710-80 1
MOS 26-A PR-2017
HRS /MSC O/C 136 3.8
REF: AFL 883
44-2 1-65-6 01 (s) OPE RA TIONAL TEST O F THE PA SSENGE R NOTIFICATION SY STEM PKG
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
STLMC REF: AFL 150 5
441 000-09 01 DADO FS 380 LH ZONE DISTRIBUTIO N EQ UIPMENT
130 8523-1 01 MOS 24-FEB -2013
3RRGY HRS /MSC O/C 456 .9
REF: AFL 187
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
134 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
441 000-09 02 DADO FS 505 RH ZO NE DISTRIBUTION EQUIP ME NT
130 8523-1 01 MOS 17-NOV -2017
1HYWD HRS /MSC O/C 142 6
REF: AFL 928
441 000-09 03 DADO FS 380 RH ZO NE DISTRIBUTION EQUIP ME NT
130 8523-1 01 MOS TSN:0 17-A PR-2012
3YRDY HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

441 005-09 01 SPA RE & LOO SE EQUIP P ORTA BLE ACCE S, SO FTWARE
810 -0032- 004 MOS TSN:0 17-A PR-2012
453 FH HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

441 009-09 01 WARDROB E IFE FA N


983 -9049- 201 MOS TSN:0 17-A PR-2012
45K OD HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

443 101-09 01 CABIN LH #1 WINDO W REVE AL


604 DX 252900 1AFY008 MOS TSN:0 17-A PR-2012
201 1 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

443 101-09 02 CABIN LH #2 WINDO W REVE AL


604 DX 252900 1AFY008 MOS TSN:0 17-A PR-2012
201 2 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

443 101-09 03 CABIN LH #3 WINDO W REVE AL


604 DX 252900 1AFY008 MOS TSN:0 17-A PR-2012
201 3 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

443 101-09 04 CABIN LH #4 WINDO W REVE AL


604 DX 252900 1AFY008 MOS TSN:0 17-A PR-2012
201 4 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

443 101-09 05 CABIN LH #5 WINDO W REVE AL


604 DX 252900 1AFY008 MOS TSN:0 17-A PR-2012
201 5 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
443 101-09 06 CABIN LH #6 WINDO W REVE AL
604 DX 252900 1AFY008 MOS TSN:0 17-A PR-2012
201 6 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
443 101-09 07 CABIN LH #7 WINDO W REVE AL
604 DX 252900 1AFY008 MOS TSN:0 17-A PR-2012
201 7 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
135 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
443 101-09 08 EMERGENCY DO OR WINDOW REVEAL
604 DX 252900 5AFY005 MOS TSN:0 17-A PR-2012
202 4 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
443 101-09 09 CABIN RH #1 WINDOW,FA LSE REVEAL
604 DX 252900 4AFY005 MOS TSN:0 17-A PR-2012
202 5 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

443 101-09 10 CABIN RH #2 WINDOW RE VEAL


604 DX 252900 1AFY007 MOS TSN:0 17-A PR-2012
201 8 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
443 101-09 11 CABIN RH #3 WINDOW RE VEAL
604 DX 252900 1AFY007 MOS TSN:0 17-A PR-2012
201 9 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
443 101-09 12 CABIN RH #4 WINDOW RE VEAL
604 DX 252900 1AFY007 MOS TSN:0 17-A PR-2012
202 0 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
443 101-09 13 CABIN RH #6 WINDOW RE VEAL
604 DX 252900 1AFY007 MOS TSN:0 17-A PR-2012
202 1 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
443 101-09 14 CABIN RH #7 WINDOW RE VEAL
604 DX 252900 1AFY007 MOS TSN:0 17-A PR-2012
202 2 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
443 101-09 15 CABIN RH #8 WINDOW RE VEAL
604 DX 252900 1AFY007 MOS TSN:0 17-A PR-2012
202 3 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
CHA PTER 46 INFORMATION SYSTEMS
46-2 0-01-9 00-80 1-01 FILE S ERV ER FSU-501 UNIT
822 -1543- 201 MOS 13-MAR-2 020
4KG YR3 HRS /MSC O/C 192 6.4
REF: See Workcard AFL 127 5
46-2 0-02-9 00-80 1-01 EXTERNAL COMPENSATION UNIT ( ECU)
822 -1200- 998 MOS TSN:0 01-A PR-2011
454 YM HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
CHA PTER 49 AIRBORNE AUXILIARY POWER

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
136 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
49-1 4-04-9 00-80 1-01 BEL LOWS ASSY , APU INLET
600 -97212 -1 MOS TSN:0 01-A PR-2011
963 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
49-4 3-13-9 00-80 1-01 BOX A SSY, A PU FAULT INDICATOR
604 -53201 -3 MOS TSN:0 01-A PR-2011
B84 19 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

49-6 1-01-9 00-80 1-01 APU ECU CONTRO L UNIT


211 9584-5 002 MOS 18-A PR-2014
75-T00 02 HRS /MSC O/C 636
REF: See Workcard AFL

497 300-09 01 APU FUEL NOZZLE 1


361 0004-5 MOS 20-A PR-2017
1BMA1 950 HRS /MSC - TSN:21 04 136 3.8
REF: AFL 883

497 300-09 02 APU FUEL NOZZLE 2


362 10004 -6 MOS 26-A PR-2017
1BL R1 562 HRS /MSC - TSN:21 04 136 3.8
REF: AFL 883

497 300-09 03 APU FUEL NOZZLE 3


361 0004-5 MOS 20-A PR-2017
1BMA1 126 HRS /MSC - TSN:21 04 136 3.8
REF: AFL 883

497 300-09 04 APU FUEL NOZZLE 4


361 0004-6 MOS 20-A PR-2017
1BL R1 564 HRS /MSC - TSN:21 04 136 3.8
REF: AFL 883

497 300-09 05 APU FUE NOZZL E 5


361 0004-5 MOS 20-A PR-2017
1BMA1 009 HRS /MSC - TSN:21 04 136 3.8
REF: AFL 883

497 300-09 06 APU FUEL NOZZLE 6


361 0004-6 MOS 20-A PR-2017
1BL R1 561 HRS /MSC - TSN:21 04 136 3.8
REF: AFL 883
497 900-09 01 APU LOP SWITCH
387 6001-8 MOS 20-A PR-2017
146 05 HRS /MSC O/C 136 3.8
REF: AFL 883
497 900-09 02 APU HOT SWITCH
388 8030-6 MOS 20-A PR-2017
090 8 HRS /MSC O/C 136 3.8
REF: AFL 883

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
137 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
497 900-09 03 HARNE SS ELECTRICAL
388 8524-3 MOS 20-A PR-2017
10-1 50262 -26561 HRS /MSC O/C TSN:21 04 136 3.8
REF: AFL 883
49A PU1 APU
380 0804-1 MOS 24-A PR-2017
49.APU1 P-3 10 HRS /MSC E/C TSN:21 09 136 3.8
REF: See Workcard AFL 883
APU Model : GTCP 36-150 (CL) Serial # P-310 Part # 3800804-1
49-1 0-20-2 01 APU - G ENERAL VIS UA L INSPECTIO N OF THE APU MO UNT S YSTEM
MOS 20-A PR-2017
HRS /MSC 200 0 210 4 410 4
MRB REF: APUS

49-1 1-00-2 01 (s) APU - O PERATIO NA L TES T OF THE APU E NCLO SURE DRAINS PKG
PK G 1 500 MOS 14-MAR-2 022
HRS /MSC 150 0 +40/-40 353 8
MRB REF: See Workcard APUS

49-1 1-00-2 02 (s) APU - DETAILED INSPE CTION O F THE AP U ENCLOSURE ASSEMBL Y PKG
PK G 7 50 MOS 14-MAR-2 022
HRS /MSC 750 +40/-40 353 8
MRB REF: See Workcard APUS

49-1 4-00-2 01 (s) APU - G ENERAL VIS UA L INSPECTIO N OF THE APU INLET DUCT SCREENS
PK G 2 250 MOS 20-A PR-2017
HRS /MSC 225 0 +40/-40 210 4 435 4 M 439 4
MRB REF: See Workcard APUS

49-1 4-00-2 02 (s) APU - G ENERAL VIS UA L INSPECTIO N OF THE APU LOWER RUBBE R BOO T PKG
PK G 2 250 MOS 20-A PR-2017
HRS /MSC 225 0 +40/-40 210 4
MRB REF: See Workcard APUS

49-1 4-00-2 03 (s) APU - G ENERAL VIS UA L INSPECTIO N OF THE APU UP PER A ND LOWER INLET DUCT
PK G 3 000 MOS 20-A PR-2017
HRS /MSC 300 0 +40/-40 210 4 510 4 M 514 4
MRB REF: See Workcard APUS

49-1 5-00-2 01 (s) APU - O PERATIO NA L TES T OF THE APU DRAINS PKG
PK G 3 000 MOS 20-A PR-2017
HRS /MSC 300 0 +40/-40 210 4
MRB REF: See Workcard APUS

49-2 2-00-2 02 APU - DETAILED INSPE CTION O F THE AP U COMPRESSO R HOUSING SHROUD
MOS 14-JAN-20 14
HRS /MSC C/C 636
MRB REF: See Workcard APUS

49-2 2-00-2 04 APU - DETAILED INSPE CTION O F THE AP U CONTA INMENT RING AND TURB INE HO US ING
MOS 14-JAN-20 14
HRS /MSC C/C 636
MRB REF: See Workcard APUS
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
138 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
49-3 1-00-2 01 (s) APU - G ENERAL VIS UA L INSPECTIO N OF THE APU FUEL SY STE M COMPONENTS PKG
PK G 7 50 MOS 14-MAR-2 022
HRS /MSC 750 +40/-40 353 8
MRB REF: See Workcard APUS

49-3 1-00-2 02 (s) APU - G ENERAL VIS UA L INSPECTIO N OF THE APU FUEL FIL TER DIFFERENTIAL PRESSURE INDICATOR PKG
PK G 7 50 MOS 14-MAR-2 022
HRS /MSC 750 +40/-40 353 8
MRB REF: See Workcard APUS

49-4 2-00-2 01 APU - DETAILED INSPE CTION O F THE AP U IG NITER P LUG


MOS 20-A PR-2017
HRS /MSC 200 0 +40/-40 210 4 410 4 414 4
MRB REF: See Workcard APUS

49-4 3-00-2 01 (s) APU - O PERATIO NA L TES T OF THE APU E XTERNA L REMOTE SWITCH PKG
PK G 1 500 MOS 14-MAR-2 022
HRS /MSC 150 0 +40/-40 353 8
MRB REF: See Workcard APUS

49-4 3-02-2 01 APU - DETAILED INSPE CTION O F THE AP U IG NITER P LUG


MOS 20-A PR-2017
HRS /MSC 200 0 210 4 410 4
MRB REF: See Workcard APUS

49-4 3-02-2 01 (MS G3) (s) APU - DETAILED INSPE CTION O F THE AP U IG NITER P LUG
MOS 20-A PR-2017
HRS /MSC N/A 210 4
REF: See Workcard APUS

49-4 4-00-2 01 APU - RES TO RA TION ( OVERHAUL) MO TO R STARTER OF THE APU STARTER MOTO R
270 4458-1 MOS 20-A PR-2017
269 5 HRS /MSC 250 0 +40/-40 210 4 460 4 464 4
OVE RHAUL REF: See Workcard APUS

49-5 1-00-3 01 (s) APU - RES TO RA TION L OAD CONTROL VALV E (O N- WING CLE ANING) OF THE AUXILIA RY PO WE R UNIT (A PU) LO AD PKG
CONTROL VA LVE FILTER
388 5091-4 PKG 500 MOS 14-MAR-2 022
053 9 HRS /MSC 500 +40/-40 353 8
OPTIONAL REF: See Workcard APUS

49-8 1-00-2 01 (s) APU - DETAILED INSPE CTION O F THE AP U EXHAUST SYSTEMS PKG
PK G 1 500 MOS 14-MAR-2 022
HRS /MSC 150 0 +40/-40 353 8
MRB REF: See Workcard APUS

49-8 1-00-2 02 APU - DETAILED INSPE CTION O F THE AP U EXHAUST NO ZZLE


MOS 14-JAN-20 14
HRS /MSC - 636
MRB REF: See Workcard APUS

49-8 1-00-2 03 (s) APU - DETAILED INSPE CTION O F THE AP U EXHAUST SHIEL D AND VISOR ASSE MB LY PKG
PK G 1 500 MOS 14-MAR-2 022
HRS /MSC 150 0 +40/-40 353 8
MRB REF: See Workcard APUS

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
139 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
49-9 1-00-2 01 (s) APU - DETAILED INSPE CTION O F THE AP U MAGNETIC CHIP DE TECTOR PKG
PK G 7 50 MOS 14-MAR-2 022
HRS /MSC 750 +40/-40 353 8
MRB REF: See Workcard APUS

49-9 1-00-2 02 (s) APU - DISCARD OF THE AUXILIA RY PO WE R UNIT ( APU) O IL FIL TER ELEMENT PKG
365 303-1 PKG 1000 MOS 14-MAR-2 022
21-6 4521 HRS /MSC 100 0 +40/-40 353 8
LIFE LIMIT REF: See Workcard APUS

49-9 1-00-2 03 (s) APU - DISCARD OF THE APU OIL PKG


PK G 1 000 MOS 14-MAR-2 022
HRS /MSC 100 0 +40/-40 353 8
MRB REF: See Workcard APUS

492 006-00 1 APU - G EARBOX


386 2083-2 MOS TSN:0 01-A PR-2011
LA0 20136 HRS /MSC O/C TSN:0 0
REF: APUS TSN:0 0
492 010-00 1 APU - P OWER S ECTION
380 1340-1 MOS TSN:0 01-A PR-2011
LA0 20134 HRS /MSC O/C TSN:0 0
REF: APUS TSN:0 0
492 200-00 1 APU - COMPRES SOR ROTOR
707 21597 -1 MOS TSN:0 20-A PR-2017
15-1 62045 -02160 HRS /MSC 200 00 +40/-40 TSN:0 210 4 221 04 221 44
LIFE LIMIT REF: See Workcard APUS

492 201-00 1 APU - TURBINE ROTOR


384 2368-1 MOS TSN:72 20-A PR-2017
10-1 56101 -07895 HRS /MSC 100 00 +40/-40 TSN:21 04 210 4 100 00 100 40
LIFE LIMIT REF: See Workcard APUS

493 008-00 1 APU - FUEL CONTROL AS SY


388 3964-3 MOS TSN:72 20-A PR-2017
355 43 HRS /MSC O/C TSN:21 04 210 4
REF: APUS

493 054-00 1 APU - S OLENOID V ALVE


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: APUS TSN:0 0
493 260-00 1 APU - WIRING HARNES S
388 8524-3 MOS TSN:0 01-A PR-2011
10-1 50262 -26561 HRS /MSC O/C TSN:0 0
REF: See Workcard APUS TSN:0 0
494 010-00 1 APU - MO TOR STARTE R
270 4458-1 MOS TSN:72 20-A PR-2017
269 5 HRS /MSC O/C TSN:21 04 210 4
REF: See Workcard APUS

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
140 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
494 033-00 1 APU - ( A) IGNITE R PLUG
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard APUS TSN:0 0
494 033-00 2 APU - ( B) IGNITE R PLUG
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard APUS TSN:0 0

494 034-00 1 APU - IGNITION UNIT


387 6280-4 MOS TSN:72 20-A PR-2017
J10430 029 HRS /MSC O/C TSN:21 04 210 4
REF: See Workcard APUS

495 010-00 1 APU - S URGE VA LVE


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard APUS TSN:0 0

495 014-00 1 APU - L OAD CONTROL VALV E


388 5091-4 MOS 13-MAR-2 020
053 9 HRS /MSC O/C
REF: APUS

496 030-00 1 APU - S ENSOR


387 6225-1 MOS TSN:72 20-A PR-2017
101 12140 6877 HRS /MSC O/C TSN:21 04 210 4
REF: APUS

496 045-00 1 APU - THERMOCOUPLE (APU)


387 6003-3 MOS TSN:0 18-A PR-2014
141 50277 00251 HRS /MSC O/C TSN:0 636
REF: See Workcard APUS TSN:0

496 100-00 1 APU - E LECTRO NIC CONTRO L UNIT


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard APUS TSN:0 0

499 100-00 1 APU - O IL FIL TE R ELEMENT


365 303-1 MOS TSN:1 14-MAR-2 022
21-6 4521 HRS /MSC O/C TSN:0 353 8
REF: See Workcard APUS TSN:0
+ 499 110-00 1 APU - S OAP CHE CK O IL
MOS 14-MAR-2 022
HRS /MSC 500 353 8 403 8
REF: APUS
CHA PTER 52 DOORS
52-1 0-00-2 01 (s) FUNCTIONAL TEST PASS ENG ER-DOOR L ATCH ME CHANISM PKG
52-1 0-00-2 01 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
MRB REF: AMM 5 2 1 1 0 4 72 0 8 01 AFL 150 5
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
141 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
52-1 0-00-2 02 (s) LUBRICATION P ASSENGE R DOOR (EXTERNAL) PKG
52-1 0-00-2 02 PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 +40/-40 224 5.8 3
REF: AMM 1 2 2 0 0 4 64 0 8 07 AFL 150 5
52-1 0-00-2 05 (s) LUBRICATION P ASSENGE R DOOR (INTERNA L) PKG
52-1 0-00-2 05 PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 +40/-40 153 4.3
REF: AMM 1 2 2 0 0 4 64 0 8 34 AFL 988

52-1 1-00-1 01 SPE CIAL DETAIL ED INSPECTIO N PAS SENGER DOO R HINGE .
52-1 1-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-52-10 -001 AFL 530 0 530 0
52-1 1-00-1 02 DETAIL ED INSPECTIO N PAS SENGER DOO R FLAP CUTOUT.
52-1 1-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 2 1 1 0 1 22 0 8 04 AFL 780 0 0 780 0
+ 52-1 1-00-1 03 DETAIL ED INSPECTIO N OF THE PASS ENG ER&#872 2;DOO R LATCH TORQUE&# 8722;TUB E, TENSIO N RODS, SUPP ORT
BRACKETS AND SURROUNDING S
MOS 01-A PR-2011
HRS /MSC 0
AIRWORTHINESS REF: AMM 5 2 1 1 0 1 22 0 8 05 AFL 780 0 0 780 0
52-1 1-00-2 02 (s) DETAIL ED INSPECTIO N FITTINGS AND ATTACHME NT OF THE P ASSENGE R DOOR PKG
52-1 1-00-2 02 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 2 1 1 0 1 22 0 8 02 AFL 127 5
52-1 1-00-2 03 DETAIL ED INSPECTIO N INTERNAL STRUCTURE OF THE P ASSE NG ER DOOR
52-1 1-00-2 03 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 2 1 1 0 1 22 0 8 03 AFL 127 5
52-1 1-07-9 00-80 1-01 PAS SENGER DO OR HANDLE
604 -38110 -7 MOS TSN:0 01-A PR-2011
770 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
52-1 1-10-9 00-80 1-01 PAS SENGER DO OR
600 -31901 -1003 MOS TSN:0 01-A PR-2011
586 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
52-1 1-19-9 00-80 1-01 CABIN DOOR MO TO R
444 -2435- 2 MOS TSN:0 01-A PR-2011
170 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

52-2 0-00-2 01 (s) OPE RA TIONAL TEST L ATCH ME CHANISM OF THE OVE RWING E ME RG ENCY -EXIT DOOR PKG
52-2 0-00-2 01 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: AMM 5 2 2 1 0 4 71 0 8 01 AFL 144 9

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
142 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
52-2 0-00-2 02 (s) FUNCTIONAL TEST EXIT-P UL L S IGN PKG
52-2 0-00-2 02 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: AMM 5 2 2 1 0 7 72 0 8 01 AFL 144 9
52-2 0-00-2 03 (s) LUBRICATION E ME RG ENCY EXIT DOO R PKG
52-2 0-00-2 03 PK G 2 4 MOS 24 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: AMM 1 2 2 0 0 4 64 0 8 05 AFL 147 5

52-2 1-00-2 03 DETAIL ED INSPECTIO N INTERNAL STRUCTURE OF OV ERWING EMERGENCY-EXIT DOOR


52-2 1-00-2 03 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 2 2 1 0 1 22 0 8 03 AFL 127 5

52-2 1-00-2 04 (s) DETAIL ED INSPECTIO N DOOR FRAME MA CHINE D FITTINGS , STOPS AND HOOK S O F THE O VERWING PKG
EMERGENCY-EX IT DO OR
52-2 1-00-2 04 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 2 2 1 0 1 22 0 8 02 AFL 127 5
52-2 1-00-7 10-80 1 OPE RA TIONAL TEST O F THE OV ER WING EMERGE NCY& #5625 6;& #56557 ;EX IT DO OR
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883
52-2 1-10-9 00-80 1-01 OVE RWING E XIT DO OR
604 -31051 -1 MOS TSN:0 01-A PR-2011
586 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

52-3 1-00-2 02 DETAIL ED INSPECTIO N STOP FITTINGS OF THE CA RG O CO MP ARTMENT DOOR


52-3 1-00-2 02 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 2 3 1 0 1 22 0 8 02 AFL 127 5

52-3 1-00-2 03 DETAIL ED INSPECTIO N INTERNAL STRUCTURE OF THE CARGO COMPA RTMENT DOOR
52-3 1-00-2 03 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 2 3 1 0 1 22 0 8 03 AFL 127 5

52-3 1-00-7 10-80 1 OPE RA TIONAL TEST O F THE CARGO COMPARTME NT DO OR


MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883

52-3 1-00-9 00-80 1-01 BAG GAGE BA Y DO OR


600 -35027 -159 MOS TSN:0 01-A PR-2011
586 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

52-3 1-07-9 00-80 1-01 BAG GAGE BA Y DO OR HANDLE


600 -35060 -13 MOS TSN:0 01-A PR-2011
280 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
143 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
52-3 1-13-9 00-80 1-01 AFT SP RING ASSY MOTOR
ML384 4-12A MOS TSN:0 19-JUN-2019
147 86 HRS /MSC O/C TSN:0 178 6
REF: See Workcard AFL TSN:0 117 2
52-3 1-13-9 00-80 1-02 FWD SPRING AS SY MO TO R
ML384 4-11A MOS TSN:1 19-JUN-2019
147 47 HRS /MSC O/C TSN:0 178 6
REF: See Workcard AFL TSN:0 117 2

52-4 0-00-2 01 (s) OPE RA TIONAL TEST A DG DOOR OPERATING MECHANIS M PKG
52-4 0-00-2 01 PK G 1 200 MOS 27-S EP-20 19
HRS /MSC 120 0 +40/-40 187 7.3
MRB REF: AMM 5 2 4 4 0 1 71 0 8 01 AFL 123 6
52-4 1-07-9 00-80 1-01 AFT EQ UIP BAY DOOR HA NDLE
601 R35 034-3 MOS TSN:0 01-A PR-2011
167 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
52-4 2-10-9 00-80 1-01 EQUIP.ASSY . DO OR
600 -35128 -75 MOS TSN:0 01-A PR-2011
586 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
52-4 4-10-9 00-80 1-01 LH ASSY,ACCESS,ELE C BAY DOOR
601 R33 028-4 7 MOS TSN:0 01-A PR-2011
F74565 8 HRS /MSC O/C TSN:0 0
REF: AMM NO REF2 AFL TSN:0 0
52-4 4-10-9 00-80 1-02 RH AS SY,ACCES S,ELEC B AY DO OR
601 R33 028-4 8 MOS TSN:0 01-A PR-2011
F32615 9 HRS /MSC O/C TSN:0 0
REF: AMM NO REF2 AFL TSN:0 0
52-4 5-00-3 01 (s) LUBRICATION O F THE SE RV ICE DO OR LO CK S PKG
PK G 6 MOS 6 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
OPTIONAL REF: AMM 1 2 2 0 0 4 64 0 8 37 AFL 147 5
52-4 5-25-9 00-80 1-01 LOWER ELEC BAY ACCESS DOOR
600 -33040 -1 MOS TSN:0 01-A PR-2011
F88706 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
52-ZL-0 0-206 (s) GENERAL VISUAL INS PECTION PASSE NG ER DOOR - EXTERNA L PKG
52-ZL-0 0-206 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
52-ZL-0 0-207 (s) GENERAL VISUAL INS PECTION PASSE NG ER DOOR - INTERNAL PKG
52-ZL-0 0-207 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
144 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
52-ZL-0 0-208 (s) GENERAL VISUAL INS PECTION OVERWING EMERGENCY EXIT DOOR - E XTE RNAL PKG
52-ZL-0 0-208 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
52-ZL-0 0-209 (s) GENERAL VISUAL INS PECTION OVERWING EMERGENCY EXIT DOOR - INTE RNAL PKG
52-ZL-0 0-209 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

52-ZL-0 0-210 (s) GENERAL VISUAL INS PECTION CA RG O COMPA RTMENT DOOR - E XTE RNAL PKG
52-ZL-0 0-210 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

52-ZL-0 0-211 (s) GENERAL VISUAL INS PECTION CA RG O COMPA RTMENT DOOR - INTE RNAL PKG
52-ZL-0 0-211 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

523 001-09 01 PAS SENGER DO OR O UTER HANDLE PROXIMITY SWITCH


8-40 5-04 MOS 13-MAR-2 020
B84 099 HRS /MSC O/C 192 6.4
REF: AFL 127 5
CHA PTER 53 FUSELAGE
53-1 0-00-1 01 DETAIL ED INSPECTIO N FUSE LAGE SK IN AT THE NLG CUTO UT - FS23 5.
53-1 0-00-1 01 MOS 26-A PR-2017
HRS /MSC 136 3.8
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 14 AFL 780 0 883 868 3
53-1 0-00-1 02 DETAIL ED INSPECTIO N FORWA RD PRESSURE BULKHEAD WEB - FS202.
53-1 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 15 AFL 690 0 0 690 0
53-1 0-00-1 03 DETAIL ED INSPECTIO N FRAME - FS 220.
53-1 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 16 AFL 780 0 0 780 0
53-1 0-00-1 04 DETAIL ED INSPECTIO N WINDOW L OWER SILL - FS 235, FS24 9 A ND FS 264.
53-1 0-00-1 04 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 17 AFL 225 0 225 0
53-1 0-00-1 05 DETAIL ED INSPECTIO N WINDOW L OWER SILL - FS 209.
53-1 0-00-1 05 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 18 AFL 225 0 225 0
53-1 0-00-1 06 DETAIL ED INSPECTIO N WINDOW UPP ER SILL - FS 234, BL 2.5 .
53-1 0-00-1 06 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 19 AFL 370 0 370 0
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
145 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-1 0-00-1 07 DETAIL ED INSPECTIO N FORWA RD PRESSURE BULKHEAD - VE RTICA L S TIFFENER BL22 .
53-1 0-00-1 07 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 20 AFL 550 0 550 0
53-1 0-00-1 10 DETAIL ED INSPECTIO N FORWA RD PRESSURE BULKHEAD V ERTICAL ME MB ER - WL79.5 AND WL93,BL22 .
53-1 0-00-1 10 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 23 AFL 780 0 0 780 0
53-1 0-00-1 11 SPE CIAL DETAIL ED INSPECTIO N FUSE LAGE FRAME - FS235 UPPE R CAP ANGLE, BL8.
53-1 0-00-1 11 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-10 -002 AFL 780 0 0 780 0
53-1 0-00-1 12 DETAIL ED INSPECTIO N OF THE FL OOR CONNECTION CL IPS - FS202.75.
53-1 0-00-1 12 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 33 AFL 780 0 0 780 0
53-1 0-00-1 13 SPE CIAL DETAIL ED INSPECTIO N FORWA RD PRESSURE BULKHEAD WEB - WL79.5 TO WL91 .7.
53-1 0-00-1 13 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0
53-1 0-00-1 14 DETAIL ED INSPECTIO N NLG BEAM, WEB BE LOW DRAG BEA M - FS 210 TO FS21 5, UPPER CA P - FS210 AND LOWER
CAP - FS2 24.
53-1 0-00-1 14 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 24 AFL 780 0 0 780 0
53-1 0-00-1 15 DETAIL ED INSPECTIO N NLG DRAG STRUT - FS2 13, AND THE NL G BEAM VERTICAL STIFFENER CLIP - FS21 5.
53-1 0-00-1 15 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 25 AFL 780 0 0 780 0
53-1 0-00-1 19 SPE CIAL DETAIL ED INSPECTIO N PILOTS FLO OR WEB ADJACENT TO THE PRESSURE BULKHEAD - FS20 3, BL1 6.
53-1 0-00-1 19 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-10 -009 AFL 780 0 780 0
53-1 0-00-1 20 DETAIL ED INSPECTIO N LOWER SIL L A ND FUSE LAGE SK IN - FS220 .
53-1 0-00-1 20 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 29 AFL 780 0 780 0
+ 53-1 0-00-1 21 DETAIL ED INSPECTIO N OF THE FO RWARD P RE SSURE&#87 22;BUL KHEAD CAP &#872 2;A NG LE AFT&# 8722;SIDE
&#8 722; FS20 2.7 5
MOS 01-A PR-2011
HRS /MSC 0
AIRWORTHINESS REF: AMM 5 3 1 0 0 1 22 0 8 34 AFL 690 0 0 690 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
146 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-1 0-00-2 01 DETAIL ED INSPECTIO N INTERNAL FUSEL AGE, FRAMES AND FORWARD BULKHEA D - FS 169.00 TO FS20 2.7 5
53-1 0-00-2 01 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 1 0 0 1 22 0 8 01 AFL 127 5
53-1 0-00-2 03 DETAIL ED INSPECTIO N INTERNAL FUSEL AGE (SKINS AND STRUCTURE ) - FS2 02.75 TO FS280 .00 BE LOW THE FL OOR
53-1 0-00-2 03 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 1 0 0 1 22 0 8 03 AFL 127 5

53-1 0-00-2 04 (s) DETAIL ED INSPECTIO N INTERNAL FUSEL AGE, SKIN AND STRUCTURE - FS202.75 TO FS 280.00 ABOV E THE FL OOR PKG
53-1 0-00-2 04 PK G 1 92 MOS 192 +1m/-1m 17-A PR-2012
HRS /MSC
MRB REF: AMM 5 3 1 0 0 1 22 0 8 04 AFL

53-1 0-00-2 08 DETAIL ED INSPECTIO N BEA MS, CROS SMEMBERS AND PANEL S O F THE FLOO R STRUCTURE - FS 16 9 TO FS280
53-1 0-00-2 08 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 1 0 0 1 22 0 8 07 AFL 127 5

53-1 0-00-2 10 DETAIL ED INSPECTIO N FORWA RD JA CKING POINT - FS 278


53-1 0-00-2 10 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 1 0 0 1 22 0 8 09 AFL 127 5

53-1 0-00-2 12 (s) DETAIL ED INSPECTIO N NLG WHEE L WEL L S TRUCTURE. PKG
53-1 0-00-2 12 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 3 1 0 0 1 22 0 8 11 AFL 127 5

53-1 0-00-2 13 (s) DETAIL ED INSPECTIO N NLG INTERNA L B OX STRUCTURE - FS1 69 TO FS235 PKG
53-1 0-00-2 13 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 3 1 0 0 1 22 0 8 12 AFL 127 5

53-1 0-00-2 18 DETAIL ED INSPECTIO N OF THE AFT SIDE OF THE PILOT BULKHEAD A ND FRAME - FS 280.00 ABOV E WL7 3.5 0 ( FLO OR
LEV EL)
53-1 0-00-2 18 MOS 240 +1m/-1m 17-A PR-2012 17-APR-20 32 17-MAY -2032
HRS /MSC
MRB REF: AMM 5 3 1 0 0 1 22 0 8 28 AFL

53-2 0-00-1 01 SPE CIAL DETAIL ED INSPECTIO N END PO ST OF THE SIDE -WINDOW - FS280 .
53-2 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-10 -001 AFL 780 0 780 0
53-2 0-00-1 02 DETAIL ED INSPECTIO N OF THE STRUCTURE AROUND THE CABIN WINDOWS
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 31 AFL 780 0 0 780 0
53-2 0-00-1 03 DETAIL ED INSPECTIO N FUSE LAGE SK IN AROUND THE OVE RWING EMERGE NCY EXIT.
53-2 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 78 AFL 780 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
147 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-2 0-00-1 04 SPE CIAL DETAIL ED INSPECTIO N CUTOUTS FOR THE CABIN WINDOWS.
53-2 0-00-1 04 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -001 AFL 460 0 460 0
53-2 0-00-1 09 SPE CIAL DETAIL ED INSPECTIO N STRUCTURE AROUND THE PA SSENGE R DOOR.
53-2 0-00-1 09 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 0 780 0
53-2 0-00-1 12 SPE CIAL DETAIL ED INSPECTIO N KEE L LO NG ERON LINKS - FS3 95.75.
53-2 0-00-1 12 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -013 AFL 780 0 780 0
53-2 0-00-1 13 DETAIL ED INSPECTIO N PAS SENGER DOO R FRAMES - FS31 0 A ND FS 349.
53-2 0-00-1 13 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 39 AFL 780 0 780 0
53-2 0-00-1 14 SPE CIAL DETAIL ED INSPECTIO N CORNE R OF THE PRESSURE SKIN - FS 409 TO FS55 9, WL73.
53-2 0-00-1 14 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -006 AFL 780 0 780 0
53-2 0-00-1 15 SPE CIAL DETAIL ED INSPECTIO N OF WING TO FUS ELAGE A TTACHME NT FRAME - FS4 24, WL73
MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0
53-2 0-00-1 16 DETAIL ED INSPECTIO N OF WING TO FUS ELAGE A TTACHME NT FRAME FS513, BL16
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 40 AFL 780 0 780 0
53-2 0-00-1 17 SPE CIAL DETAIL ED INSPECTIO N LONGITUDINA L FLO OR BE AMS FS51 3
53-2 0-00-1 17 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -014 AFL 780 0 0 780 0
53-2 0-00-1 18 DETAIL ED INSPECTIO N LONGITUDINA L FLO OR BE AMS - FS484 , BL18
53-2 0-00-1 18 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 41 AFL 780 0 0 780 0
53-2 0-00-1 19 DETAIL ED INSPECTIO N WING-TO-FUSELA GE ATTA CH LUGS FS 424, FS47 3 & FS51 3
53-2 0-00-1 19 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 42 AFL 780 0 780 0
53-2 0-00-1 21 DETAIL ED INSPECTIO N LONGERON ASSE MB LY - UNDER FLOO R, FS5 13,BL45
53-2 0-00-1 21 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 75 AFL 780 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
148 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-2 0-00-1 25 SPE CIAL DETAIL ED INSPECTIO N OF WING TO FUS ELAGE A TTACHME NT FRAME - FS5 13
MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -016 AFL 780 0 780 0
53-2 0-00-1 26 SPE CIAL DETAIL ED INSPECTIO N KEE L LO NG ERON
53-2 0-00-1 26 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0
53-2 0-00-1 28 DETAIL ED INSPECTIO N FRAME TO LONGERON CL EATS - FS43 9, FS461, FS4 84, FS49 9, FS529 AND FS54 4
53-2 0-00-1 28 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 46 AFL 665 0 665 0
53-2 0-00-1 30 DETAIL ED INSPECTIO N TENS IO N CLIP , BULB ANGLE, BEAMS AND THE A FT SKIN PANEL OF THE FORWA RD
AUXILIARY TANK
53-2 0-00-1 30 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 48 AFL 780 0 0 780 0
53-2 0-00-1 34 SPE CIAL DETAIL ED INSPECTIO N ACCESS DOORS ON THE FORWARD AUXILIARY TANK
53-2 0-00-1 34 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-30 -013 AFL 630 0 0 630 0
53-2 0-00-1 35 DETAIL ED INSPECTIO N FORWA RD PRESSURE SKIN PANEL & FORWA RD ATTA CH ANGLES OF FO RWARD A UX ILIARY
TANK
53-2 0-00-1 35 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 52 AFL 780 0 0 780 0
53-2 0-00-1 36 SPE CIAL DETAIL ED INSPECTIO N FORWA RD PRESSURE SKIN PANEL OF FO RWARD A UX ILIARY TA NK
53-2 0-00-1 36 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -019 AFL 780 0 780 0
53-2 0-00-1 47 DETAIL ED INSPECTIO N STOPS, FITTINGS AND ATTACHMENTS OF THE O VERWING EMERGENCY EXIT
53-2 0-00-1 47 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 65 AFL 780 0 780 0
53-2 0-00-1 50 GENERAL VISUAL INS PECTION OF THE S KIN AND THE S TRING ER SP LICE - STRINGER 0 .0, FS5 59
53-2 0-00-1 50 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 21 0 8 11 AFL 780 0 780 0
53-2 0-00-1 52 DETAIL ED INSPECTIO N STRUCTURE AROUND THE OV ERWING EMERGENCY E XIT.
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 67 AFL 780 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
149 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-2 0-00-1 53 SPE CIAL DETAIL ED INSPECTIO N SKIN SP LICE - STRINGER 0 .0, FS 439.
53-2 0-00-1 53 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -033 AFL 780 0 780 0
53-2 0-00-1 54 GENERAL VISUAL INS PECTION FUSEL AGE SKIN A T LIGHT FRA ME S - FS202 TO FS 621.
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 21 0 8 10 AFL 780 0 780 0
53-2 0-00-1 55 SPE CIAL DETAIL ED INSPECTIO N SKIN SP LICE - STRINGER 8 L, FS424 TO FS 439.
MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -035 AFL 780 0 780 0
53-2 0-00-1 56 DETAIL ED INSPECTIO N TIE BEA M, PRESSURE FLO OR-TO -WING - FS4 60.
53-2 0-00-1 56 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 23 AFL 760 0 760 0
53-2 0-00-1 57 DETAIL ED INSPECTIO N STRINGER SPLICE - STRINGE R 13, FS5 13.
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 44 AFL 780 0 780 0
53-2 0-00-1 58 SPE CIAL DETAIL ED INSPECTIO N PRESSURE BOX OF THE FORWA RD KEEL BE AM - FS409.00
53-2 0-00-1 58 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -018 AFL 780 0 780 0
53-2 0-00-1 59 DETAIL ED INSPECTIO N TCAS A NTENNA INSTALLA TION A ND SURROUNDING STRUCTURE.
53-2 0-00-1 59 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 56 AFL 780 0 780 0
53-2 0-00-1 60 SPE CIAL DETAIL ED INSPECTIO N LONGITUDINA L S PLICE AT THE TCA S A NTENNA LOCATIO N
53-2 0-00-1 60 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -041 AFL 780 0 780 0
53-2 0-00-1 61 DETAIL ED INSPECTIO N PAS SENGER DOO R LIGHT CUTO UT AT FS302 .90 BE TWEE N STRINGERS 14L AND 1 5L, AND
THE EMERGE NCY EXIT DOO R LIGHT CUTOUTS AT FS401 .50 , FS 416.50 AND FS491 .50 BE TWEE N STRINGERS 13R
AND 14 R.
53-2 0-00-1 61 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 69 AFL 780 0 780 0
53-2 0-00-1 62 DETAIL ED INSPECTIO N GPS ANTENNA .
53-2 0-00-1 62 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 70 AFL 780 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
150 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-2 0-00-1 63 SPE CIAL DETAIL ED INSPECTIO N WING-TO-FUSELA GE PINS .
53-2 0-00-1 63 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0
53-2 0-00-1 64 DETAIL ED INSPECTIO N FUSE LAGE SK IN AROUND THE LOWER BEACON LIG HT HA RNES S.
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 71 AFL 780 0 780 0
53-2 0-00-1 65 DETAIL ED INSPECTIO N POTABL E WATER FILL ADAPTOR CUTOUT.
53-2 0-00-1 65 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 59 AFL 780 0 780 0
53-2 0-00-1 66 DETAIL ED INSPECTIO N DRA IN MAS T CUTOUT.
53-2 0-00-1 66 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 62 AFL 780 0 780 0
53-2 0-00-1 67 DETAIL ED INSPECTIO N ARE AROUND CUTOUTS THAT FOLL OW:
1) VHF1 A NTENNA PENETRA TION, FS349 TO FS 439.
2) UPPER BEACON LIG HT PENETRATION, FS42 4 TO FS439.
3) LDS ANTE NNA INSTALL ATION, FS51 3 TO FS529.
4) VHF3 A NTENNA PENETRA TION, FS544 TO FS 559.
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 80 AFL 780 0 780 0
53-2 0-00-1 68 DETAIL ED INSPECTIO N AREA AROUND THE CUTO UTS THAT FO LLOW: 1 ) TCAS OMNI ANTE NNA PENETRATION,
FS310 TO FS 333 - 2 ) A TC ANTENNA INSTALL ATION, FS25 7.5 AND FS4 01.5 - 3) XM RADIO ANTENNA PENETRATION,
FS473 TO FS 484. - 4) ANGLE OF ATTA CK VA NE INS TA LLATIO N, FS 280 TO FS29 5.
53-2 0-00-1 68 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 77 AFL 780 0 780 0
53-2 0-00-1 69 DETAIL ED INSPECTIO N AREA AROUND THE CUTO UTS THAT FO LLOW:
1) ADF ANTENNA .
2) VHF2 A NTENNA.
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 85 AFL 780 0 0 780 0
53-2 0-00-1 70 DETAIL ED INSPECTIO N FUSE LAGE SK IN AROUND THE DME 1 A NTENNA HARNESS .
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 86 AFL 780 0 780 0
53-2 0-00-1 71 DETAIL ED INSPECTIO N DME 2 INSTALLATION
53-2 0-00-1 71 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 82 AFL 780 0 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
151 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-2 0-00-1 72 SPE CIAL DETAIL ED INSPECTIO N PRESSURE BULKHEAD AT FS559 .00
53-2 0-00-1 72 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -043 AFL 780 0 780 0
53-2 0-00-1 73 DETAIL ED INSPECTIO N OVE RWING EMERGE NCY EXIT DOO R.
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 83 AFL 780 0 780 0
53-2 0-00-1 74 GENERAL VISUAL INS PECTION AREA AROUND THECUTO UTS THA T FOLLOW: 1 ) S ECOND RADIO ALTIME TE R
ANTENNA (IF INSTA LLED) AT FS63 3.5, BL3R - 2) EL T ANTENNA INS TA LLATIO N AT FS7 23.15, BL 12.57
53-2 0-00-1 74 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 21 0 8 14 AFL 780 0 780 0
53-2 0-00-1 75 DETAIL ED INSPECTIO N SKIN - STRINGER 0, FS439 .
53-2 0-00-1 75 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 87 AFL 780 0 780 0
53-2 0-00-1 76 GENERAL VISUAL INS PECTION FUSEL AGE SKIN A T THE SP LICE OF S TRING ER 3, FS 473.
53-2 0-00-1 76 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 21 0 8 12 AFL 780 0 780 0
53-2 0-00-1 77 DETAIL ED INSPECTIO N KEE L LO NG ERON BO LTS.
53-2 0-00-1 77 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 90 AFL 780 0 780 0
53-2 0-00-1 78 DETAIL ED INSPECTIO N OVE RWING FLOO R INTERCOSTALS - FS421 TO FS5 29.
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 91 AFL 780 0 0 780 0
53-2 0-00-1 79 SPE CIAL DETAIL ED INSPECTIO N AREA AT THE CUTOUTS THAT FOLL OW: 1) VHF1 ANTENNA - 2) UPPER BEACON
LIGHT AT FS 431.5 - 3) VHF3 A NTENNA
53-2 0-00-1 79 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0
53-2 0-00-1 80 SPE CIAL DETAIL ED INSPECTIO N BAG GAGE DOOR SIL LS.
MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0
53-2 0-00-1 81 SPE CIAL DETAIL ED INSPECTIO N FUSE LAGE FRAME A T FS589.
MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
152 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-2 0-00-1 82 SPE CIAL DETAIL ED INSPECTIO N FUSE LAGE SK IN AT THE CORNERS OF THE B AGGA GE DO OR.
53-2 0-00-1 82 MOS
HRS /MSC
AIRWORTHINESS REF: AMM NO REF2 AFL 780 0 780 0
53-2 0-00-1 83 DETAIL ED INSPECTIO N IRIDIUM SA TCOM ANTE NNA INSTAL LATION, FS3 38.0 0, STRINGE R 0 TO 1R.
53-2 0-00-1 83 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 88 AFL 780 0 780 0
53-2 0-00-1 84 DETAIL ED INSPECTIO N VERTICAL PO STS O F THE PRESS URE BULKHEA D AT FS5 59.0 .
53-2 0-00-1 84 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 84 AFL 780 0 780 0
53-2 0-00-1 85 DETAIL ED INSPECTIO N KEE L LO NG ERON BO LTS - FS395 .75 .
53-2 0-00-1 85 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 89 AFL 780 0 780 0
53-2 0-00-1 87 SPE CIAL DETAIL ED INSPECTIO N OF THE DUAL PA TCH IRIDIUM ANTE NNA CUTOUT
53-2 0-00-1 87 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -038 AFL 780 0 780 0
53-2 0-00-1 88 SPE CIAL DETAIL ED INSPECTIO N OF THE UP PER L ATCH PINS OF THE PASS ENGER DOO R
53-2 0-00-1 88 MOS 14-MAR-2 022
HRS /MSC 219 4.6
AIRWORTHINESS REF: NDT MT-5 3-10-0 01 AFL 442 0 147 5 589 5
+ 53-2 0-00-1 91 DETAIL ED INSPECTIO N OF THE SEMI PRESS URE BULKHEA D (BEL OW FLOO R) FRAME CAP ANGL ES AT FS559 .00 ,
BL9 .00 AND B L18.00
MOS 01-A PR-2011
HRS /MSC 0
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 93 AFL 780 0 0 780 0
+ 53-2 0-00-1 92 SPE CIAL DETAIL ED INSPECTIO N OF THE SKIN CIRCUMFERENTIAL SP LICE AT FS5 59.00, BE TWEE N STRINGERS 10L
AND 10 R
MOS 01-A PR-2011
HRS /MSC 0
AIRWORTHINESS REF: NDT ET-53-20 -032 AFL 780 0 0 780 0
53-2 0-00-2 01 DETAIL ED INSPECTIO N SILLS, FRAMES & EXTERNAL SKIN AROUND THE PA SSENGE R DOOR CUTOUT
53-2 0-00-2 01 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 01 AFL 127 5

53-2 0-00-2 02 (s) DETAIL ED INSPECTIO N FITTINGS AND THE HINGE ON THE FUSEL AGE FOR THE P ASSENGE R DOOR PKG
53-2 0-00-2 02 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 02 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
153 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-2 0-00-2 03 DETAIL ED INSPECTIO N FLOOR SUPPORT STRUCTURE - FS280 TO FS 409, A S V ISIBLE WITH THE FLOOR PANELS
INS TAL LED
53-2 0-00-2 03 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 03 AFL 127 5
53-2 0-00-2 04 DETAIL ED INSPECTIO N FLOOR SUPPORT STRUCTURE - FS280 TO FS 409
53-2 0-00-2 04 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 30 AFL 127 5
53-2 0-00-2 05 DETAIL ED INSPECTIO N OF THE INTERNA L FUSELA GE (SKINS A ND STRUCTURE) FS280.00 TO FS6 21.00 ABOV E THE
FLOOR
53-2 0-00-2 05 MOS 240 +1m/-1m 17-A PR-2012 17-APR-20 32 17-MAY -2032
HRS /MSC
MRB REF: AMM 5 3 2 0 0 1 22 0 8 62 AFL

53-2 0-00-2 06 DETAIL ED INSPECTIO N LOWER INTERNA L S KIN AND FUS ELAG E S TRUCTURE - FS28 0 TO FS409, AS VISIBLE WITH
FLOOR PANELS INS TA LLED
53-2 0-00-2 06 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 05 AFL 127 5
53-2 0-00-2 07 DETAIL ED INSPECTIO N INTERNAL MID-FUSE LAGE (SK IN AND STRUCTURE, FS 409.00 BULKHEAD FO RWARD FACE,
AND THE EXTERNA L S URFACES OF THE FO RWARD-AUXILIA RY FUEL TA NK ) - FS280.00 TO FS4 09.00 BELO W THE
FLOOR
53-2 0-00-2 07 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 61 AFL 127 5
53-2 0-00-2 10 DETAIL ED INSPECTIO N INTERNAL FO RWARD K EEL BEAM-FS36 4 TO FS394
53-2 0-00-2 10 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 08 AFL 127 5
53-2 0-00-2 11 DETAIL ED INSPECTIO N KEE L B EAM P RES SURE BO X AND KEEL BE AM LUGS A ND LINKS - FS394 TO 4 09
53-2 0-00-2 11 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 09 AFL 127 5
53-2 0-00-2 12 (s) DETAIL ED INSPECTIO N AFT KEE L B EAM - FS51 3 TO FS559 PKG
53-2 0-00-2 12 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 10 AFL 127 5
53-2 0-00-2 16 DETAIL ED INSPECTIO N AFT FACE OF FRAME B ELOW THE FLOOR - FS40 9
53-2 0-00-2 16 MOS 96 +1m/-1m 26-A PR-2017 26-APR-20 25 26-MAY -2025
HRS /MSC 136 3.8
MRB REF: AMM 5 3 2 0 0 1 22 0 8 14 AFL 883
53-2 0-00-2 17 DETAIL ED INSPECTIO N SILLS, FRAMES & EXTERNAL SKIN AROUND THE EMERGE NCY-E XIT DOOR CUTOUT
53-2 0-00-2 17 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 15 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
154 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-2 0-00-2 18 DETAIL ED INSPECTIO N FITTINGS OF THE EMERGENCY-EXIT DOO R
53-2 0-00-2 18 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 16 AFL 127 5
53-2 0-00-2 20 DETAIL ED INSPECTIO N SILL AREA OVER THE WING BOX -FS 409 TO FS55 9
53-2 0-00-2 20 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 18 AFL 127 5

53-2 0-00-2 21 DETAIL ED INSPECTIO N WING TO FUSELA GE ATTA CHMENT LUG-FS42 4


53-2 0-00-2 21 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 19 AFL 127 5

53-2 0-00-2 22 DETAIL ED INSPECTIO N WING TO FUSELA GE ATTA CHMENT LUG - FS4 73.15
53-2 0-00-2 22 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 20 AFL 127 5

53-2 0-00-2 23 DETAIL ED INSPECTIO N FRAME BE LOW THE FL OOR - FS513


53-2 0-00-2 23 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 21 AFL 127 5

53-2 0-00-2 24 DETAIL ED INSPECTIO N WING-TO-FUSELA GE ATTA CHMENT LINK - FS513


53-2 0-00-2 24 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 22 AFL 127 5

53-2 0-00-2 25 DETAIL ED INSPECTIO N WING-TO-FLO OR TIE BE AM - FS460


53-2 0-00-2 25 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 23 AFL 127 5

53-2 0-00-2 26 DETAIL ED INSPECTIO N UPPER SURFACE OF THE PRESSURE FLO OR SK IN PANEL - FS4 09 TO FS559 AND B L36L TO
BL3 6R
53-2 0-00-2 26 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 24 AFL 127 5

53-2 0-00-2 27 DETAIL ED INSPECTIO N LOWER SURFACE OF THE PRESSURE FLO OR SK IN PANEL - FS4 09 TO FS559 AND BL36L TO
BL3 6R
53-2 0-00-2 27 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 25 AFL 127 5

53-2 0-00-2 28 DETAIL ED INSPECTIO N PRESSURE FL OOR S UP PORT BE AMS - FS409 TO FS 559 BL0.0, B L9, BL 18.6, BL2 7 A ND BL35.4
53-2 0-00-2 28 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 26 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
155 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-2 0-00-2 29 DETAIL ED INSPECTIO N UNDERFLOOR LONGERON ASSE MB LY - FS40 9 TO FS559
53-2 0-00-2 29 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 27 AFL 127 5
53-2 0-00-2 30 DETAIL ED INSPECTIO N MLG UP LOCK STRUCTURE FS 513 TO FS55 9 B ELOW WL73 (LH A ND RH)
53-2 0-00-2 30 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 28 AFL 127 5

53-2 0-00-2 32 DETAIL ED INSPECTIO N INTERNAL SKIN AND STRUCTURE O F THE FORWARD AUXILIA RY TANK
53-2 0-00-2 32 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 2 0 0 1 22 0 8 63 AFL 127 5
53-2 0-00-2 33 (s) LUBRICATION O F THE WING -TO-FUSELA GE ATTACHMENT LINKS - FS 513.00 PKG
53-2 0-00-2 33 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 1 2 2 0 0 4 64 0 8 19 AFL 127 5
53-2 2-01-9 00-80 2-01 FUS E S TRUCTURE, MID, G A STRUCTURE
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: AMM NO REF2 AFL TSN:0 0
53-2 6-04-9 00-80 1-01 LH LONGERON, FWD KEE L
600 -31072 -5 MOS TSN:0 01-A PR-2011
31A HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
53-2 6-04-9 00-80 1-02 RH LO NG ERO N, FWD K EEL
600 -31072 -6 MOS TSN:0 01-A PR-2011
31 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
53-2 6-04-9 00-80 2-01 FWD KEE L MEMBER LINK
604 -31073 -3 MOS TSN:0 01-A PR-2011
F93637 3 HRS /MSC O/C TSN:0 0
REF: AMM NO REF2 AFL TSN:0 0
53-2 6-04-9 00-80 2-02 FWD KEE L MEMBER LINK
604 -31073 -3 MOS TSN:0 01-A PR-2011
F60746 5 HRS /MSC O/C TSN:0 0
REF: AMM NO REF2 AFL TSN:0 0
53-3 0-00-1 01 DETAIL ED INSPECTIO N BULB ANGLE STIFFENER, FORWARD PRESSURE SKIN PA NE L A ND FO RWARD A TTACHME NT
ANGLE S O F THE AFT A UX ILIARY TANK .
53-3 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 22 AFL 780 0 0 780 0
53-3 0-00-1 02 DETAIL ED INSPECTIO N BEA MS AND THE FUEL SK IN P ANELS OF THE AFT AUXILIA RY TANK.
53-3 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 23 AFL 780 0 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
156 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-3 0-00-1 04 SPE CIAL DETAIL ED INSPECTIO N ACCESS DOORS ON THE A FT AUXIL IARY TANK.
53-3 0-00-1 04 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-30 -014 AFL 635 0 635 0
53-3 0-00-1 06 SPE CIAL DETAIL ED INSPECTIO N FORWA RD PRESSURE SKIN PANEL OF THE AFT AUXILIARY FUEL TANK.
53-3 0-00-1 06 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-30 -015 AFL 780 0 0 780 0
53-3 0-00-1 11 DETAIL ED INSPECTIO N FRAME AS SEMBLY PRESS URE BULKHEAD - FS6 21.
53-3 0-00-1 11 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 665 0 665 0
53-3 0-00-1 13 DETAIL ED INSPECTIO N REAR P RE SSURE BULK HE AD WEB FEED-THROUGH HO LES AND CUTO UTS.
53-3 0-00-1 13 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 31 AFL 195 0 195 0
53-3 0-00-1 14 DETAIL ED INSPECTIO N STRINGER SPLICE - FS718 , STRINGER 1L AND 1R.
53-3 0-00-1 14 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 32 AFL 780 0 780 0
53-3 0-00-1 16 DETAIL ED INSPECTIO N FUSE LAGE FRAME - VS 55.625%, STRINGER 5 .
53-3 0-00-1 16 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 34 AFL 780 0 780 0
53-3 0-00-1 18 SPE CIAL DETAIL ED INSPECTIO N SKIN, DRAG A NG LE AND CIRCUMFERENTIAL SP LICE AT FS75 5.
53-3 0-00-1 18 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0
53-3 0-00-1 19 DETAIL ED INSPECTIO N FUSE LAGE FRAME A T THE FRONT SPA R ATTACHMENT O F THE VE RTICA L S TAB ILIZER
-FS755 .
53-3 0-00-1 19 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 35 AFL 780 0 780 0
53-3 0-00-1 20 SPE CIAL DETAIL ED INSPECTIO N VERTICAL STIFFENERS OF THE REA R PRESS URE BULKHEAD
53-3 0-00-1 20 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0
53-3 0-00-1 21 SPE CIAL DETAIL ED INSPECTIO N FLOOR BEAM ATTACHMENT TO THE PRESSURE BULKHEAD - FS62 1.
53-3 0-00-1 21 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-20 -022 AFL 780 0 780 0
53-3 0-00-1 22 SPE CIAL DETAIL ED INSPECTIO N TRANSV ERSE BEAM, A FT OF THE P RE SSURE BULK HE AD - FS621, B L27.
53-3 0-00-1 22 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-30 -019 AFL 780 0 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
157 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-3 0-00-1 23 SPE CIAL DETAIL ED INSPECTIO N UPPER CA P O F THE PY LON S PAR - FS625 .3.
MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-54-50 -001 AFL 780 0 0 780 0
53-3 0-00-1 24 SPE CIAL DETAIL ED INSPECTIO N UPPER CA P O F THE PY LON S PAR A T THE FUSELAG E FRAME ATTA CHMENT -
FS672.2.
53-3 0-00-1 24 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-30 -020 AFL 780 0 780 0
53-3 0-00-1 25 SPE CIAL DETAIL ED INSPECTIO N UPPER CA P O F THE ENGINE SUP PORT BE AM - FS625.3.
53-3 0-00-1 25 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 0 780 0
53-3 0-00-1 30 SPE CIAL DETAIL ED INSPECTIO N SPLICE ANGLE OF THE OUTE R FLANGE CAP - FS625.3.
MOS (EB T)
HRS /MSC
ALI REF: NDT ET-53-30 -010 AFL 780 0 780 0
53-3 0-00-1 31 DETAIL ED INSPECTIO N INTERCOSTALS AND CLIPS - FS6 21 TO FS625 .3, PRESSURE BUL KHEAD V ERTICAL
STIFFENERS - FS62 1, AND THE STIFFE NING ANGLES ON THE ENGINE SUPP ORT BEA M - FS 625.3.
53-3 0-00-1 31 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 40 AFL 780 0 0 780 0
53-3 0-00-1 34 DETAIL ED INSPECTIO N FUSE LAGE FRAME WEB - FS755, BL5.5 AND WL131.
53-3 0-00-1 34 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 43 AFL 780 0 780 0
53-3 0-00-1 37 SPE CIAL DETAIL ED INSPECTIO N DRA G A NG LE - V S67.5%.
53-3 0-00-1 37 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-30 -006 AFL 780 0 780 0
53-3 0-00-1 38 DETAIL ED INSPECTIO N SPLICES AND STRINGE RS (L& R) BE TWEE N FRAMES - VS5 5.6 25% AND VS 67.5%.
53-3 0-00-1 38 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 46 AFL 780 0 780 0
53-3 0-00-1 40 DETAIL ED INSPECTIO N FUSE LAGE SK IN AND VERTICAL STABILIZER ALO NG THE DRAG ANGL E.
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 60 AFL 780 0 780 0
53-3 0-00-1 41 GENERAL VISUAL INS PECTION FUSEL AGE SKIN A T FRAME SP LICE - FS6 72.2, STRINGER 6.
53-3 0-00-1 41 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 21 0 8 09 AFL 780 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
158 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-3 0-00-1 42 SPE CIAL DETAIL ED INSPECTIO N LONGITUDINA L S PLICE - FS672.2, S TRING ER 6.
53-3 0-00-1 42 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-53-30 -028 AFL 780 0 780 0
53-3 0-00-1 43 DETAIL ED INSPECTIO N STRUCTURE ADJACENT TO THE OVERBO ARD LAVA TO RY SE RV ICES.
53-3 0-00-1 43 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 61 AFL 780 0 780 0
53-3 0-00-1 44 DETAIL ED INSPECTIO N STRUCTURE ADJACENT TO THE AUXIL IARY FUE L TANK CUTOUT.
53-3 0-00-1 44 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 81 AFL 780 0 780 0
53-3 0-00-1 45 GENERAL VISUAL INS PECTION PRIMARY RA DIO ALTIME TER ANTE NNA INSTAL LATIO N.
53-3 0-00-1 45 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 21 0 8 08 AFL 780 0 780 0
53-3 0-00-1 46 GENERAL VISUAL INS PECTION MA RK ER BE ACO N ANTENNA INSTALLATION.
53-3 0-00-1 46 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 21 0 8 11 AFL 780 0 780 0
53-3 0-00-1 47 DETAIL ED INSPECTIO N AREA AROUND THE VO R / ILS ANTE NNA INSTAL LATION.
53-3 0-00-1 47 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 15 AFL 780 0 780 0
53-3 0-00-1 48 GENERAL VISUAL INS PECTION STRINGER S PLICE AT THE REAR P RE SSURE B UL KHE AD - FS621
53-3 0-00-1 48 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 21 0 8 12 AFL 780 0 780 0
53-3 0-00-1 49 DETAIL ED INSPECTIO N FLOORBEA M FITTINGS AT FS 621.
53-3 0-00-1 49 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 65 AFL 780 0 0 780 0
53-3 0-00-1 50 DETAIL ED INSPECTIO N REAR P RE SSURE BULK HE AD FRAME CAP , SKIN AND S KIN DOUBLER A T FS621.
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 33 AFL 780 0 780 0
53-3 0-00-1 51 DETAIL ED INSPECTIO N CAP ANGLE OF THE FUSE LAGE FRA ME - FS755.
53-3 0-00-1 51 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 68 AFL 780 0 780 0
53-3 0-00-1 52 GENERAL VISUAL INS PECTION FUSEL AGE STRINGER SPLICE - FS62 5.3, STRINGERS 0.0 AND 1.
53-3 0-00-1 52 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 21 0 8 13 AFL 780 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
159 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-3 0-00-1 54 SPE CIAL DETAIL ED INSPECTIO N OF THE RE AR PRES SURE BULKHEA D WEB - FS6 21.00 FWD FACE
MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 0 780 0
53-3 0-00-1 55 DETAIL ED INSPECTIO N OF THE ENGINE SUPPO RT BEAM
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 07 AFL 780 0 780 0
53-3 0-00-1 56 DETAIL ED INSPECTIO N OF THE AIR-TO-G RO UND ( ATG ) A NTENNA CUTOUT
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 66 AFL 780 0 0 780 0
53-3 0-00-1 58 DETAIL ED INSPECTIO N OF THE FUSE LAGE SKIN A RO UND THE LDS A NTENNA BETWEEN FS73 6.0 0 A ND FS 755.00,
AND S TRING ERS 2 6R AND 2 6L, (PO ST SB 60 5-34-0 25) OR (P OST S B 6 05-34- 028)
MOS 01-A PR-2011
HRS /MSC 0
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 54 AFL 780 0 0 780 0
53-3 0-00-1 59 SPE CIAL DETAIL ED INSPECTIO N OF THE SPLICE S TRAP AND S KIN AT S TRING ER 20L AND 20R BE TWEE N FS559.00
AND FS62 1.0 0
MOS 01-A PR-2011
HRS /MSC 0
AIRWORTHINESS REF: NDT ET-53-30 -024 AFL 780 0 0 780 0
53-3 0-00-1 60 DETAIL ED INSPECTIO N OF THE FUSE LAGE STRUCTURE FOR HYDRAULIC SYS TE M NO.3 ACCUMULA TO R AT
FS574.00 (PO ST SB 60 5-29-0 06)
MOS 01-A PR-2011
HRS /MSC 0
AIRWORTHINESS REF: AMM 5 3 3 0 0 1 22 0 8 55 AFL 780 0 0 780 0
53-3 0-00-2 01 DETAIL ED INSPECTIO N AFT FACE OF THE P RE SSURE BULK HE AD BE LOW FLO OR -FS55 9
53-3 0-00-2 01 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 01 AFL 127 5
53-3 0-00-2 02 DETAIL ED INSPECTIO N FORWA RD FA CE OF PRESSURE BULKHEAD B ELOW THE FLOOR - FS5 59
53-3 0-00-2 02 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 02 AFL 127 5

53-3 0-00-2 03 DETAIL ED INSPECTIO N AFT FACE OF THE REAR P RE SSURE B ULK HE AD - FS621
53-3 0-00-2 03 MOS 48 +1m/-1m 12-A PR-2021 12-APR-20 25 12-MAY -2025
HRS /MSC 214 3.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 03 AFL 144 9
53-3 0-00-2 04 DETAIL ED INSPECTIO N STABILIZER DRA G A NG LES-FS70 0 TO FS820, AND STRINGER 2L AND 2R
53-3 0-00-2 04 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 04 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
160 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-3 0-00-2 05 DETAIL ED INSPECTIO N OF THE FO RWARD FACE OF THE RE AR PRES SURE BULK HEA D ABO VE THE FLOOR - FS6 21
53-3 0-00-2 05 MOS 96 +1m/-1m 26-A PR-2017 26-APR-20 25 26-MAY -2025
HRS /MSC 136 3.8
MRB REF: AMM 5 3 3 0 0 1 22 0 8 05 AFL 883
53-3 0-00-2 06 DETAIL ED INSPECTIO N PROFIL E P LATES OF THE FLO OR SUPP ORT STRUCTURE - FS 559 TO FS6 21
53-3 0-00-2 06 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 06 AFL 127 5

53-3 0-00-2 07 (s) DETAIL ED INSPECTIO N PROFIL E P LATES OF THE FLO OR SUPP ORT STRUCTURE - FS 621 PKG
53-3 0-00-2 07 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 21 AFL 127 5

53-3 0-00-2 08 DETAIL ED INSPECTIO N ENGINE SUPP ORT BEA M STRUCTURE


53-3 0-00-2 08 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 07 AFL 127 5

53-3 0-00-2 09 DETAIL ED INSPECTIO N INTERNAL AFT FUSE LAGE (SK IN AND STRUCTURE, FS 621.00 BULKHEAD FO RWARD FACE
AND THE EXTERNA L S URFACES OF THE AFT-A UX ILIARY FUEL TANK) - FS55 9.0 0 TO FS621.00 BEL OW THE FLO OR
53-3 0-00-2 09 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 52 AFL 127 5
53-3 0-00-2 11 DETAIL ED INSPECTIO N TRACK SUPPO RTS NEAR, AND THE SIL LS AND FRA ME S A RO UND, THE CARGO
COMPARTME NT DO OR CUTO UT
53-3 0-00-2 11 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 10 AFL 127 5

53-3 0-00-2 13 DETAIL ED INSPECTIO N FITTINGS OF CARGO COMPARTMENT DOOR


53-3 0-00-2 13 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 12 AFL 127 5
53-3 0-00-2 15 (s) DETAIL ED INSPECTIO N INTERNAL SKIN AND FUSELA GE STRUCTURE - FS6 21 TO FS755 PKG
53-3 0-00-2 15 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 14 AFL 127 5
53-3 0-00-2 16 DETAIL ED INSPECTIO N FORWA RD FA CE OF THE FRA ME - FS755
53-3 0-00-2 16 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 16 AFL 127 5

53-3 0-00-2 17 (s) DETAIL ED INSPECTIO N EXTERNAL SKIN AROUND THE APU EXHAUST CUTOUT PKG
53-3 0-00-2 17 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 17 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
161 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-3 0-00-2 19 DETAIL ED INSPECTIO N EXTERNAL SIDE SKIN P ANELS OF THE FUSE LAGE - FS 559 TO FS75 5 A ND STRINGER 6 L TO
20L AND 6 R TO 20R COVE RE D BY PYL ON
53-3 0-00-2 19 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 19 AFL 127 5
53-3 0-00-2 22 DETAIL ED INSPECTIO N INTERNAL SKIN AND STRUCTURE O F THE AFT A UX ILIARY TA NK
53-3 0-00-2 22 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 3 0 0 1 22 0 8 50 AFL 127 5
53-3 0-00-2 23 (s) DETAIL ED INSPECTIO N SKIN AND FUSEL AGE STRUCTURE - FS 718.00 TO FS75 5.0 0 PKG
53-3 0-00-2 23 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: NDT ET-53-30 -012 AFL 127 5
53-4 3-00-2 02 DETAIL ED INSPECTIO N AFT FACE OF THE FRAME - VS 67.5%
53-4 3-00-2 02 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 4 3 0 2 22 0 8 01 AFL 127 5

53-4 3-00-2 03 DETAIL ED INSPECTIO N INTERNAL SKIN AND FUSELA GE STRUCTURE - FS7 55 TO VS6 7.5 %
53-4 3-00-2 03 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 3 4 3 0 2 22 0 8 02 AFL 127 5
53-4 5-25-9 00-80 1-02 REAR ASSY FUS ELAG E
601 -35000 -1 MOS TSN:0 01-A PR-2011
586 6 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
53-5 0-00-2 01 DETAIL ED INSPECTIO N INTERNAL SKIN AND STRUCTURE O F THE TAIL TANK
53-5 0-00-2 01 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 6 6 0 1 22 0 8 01 AFL 127 5
53-5 0-00-2 02 DETAIL ED INSPECTIO N FLOOR STRUCTURE OF THE TAIL TA NK
53-5 0-00-2 02 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 6 6 0 1 22 0 8 02 AFL 127 5
53-5 0-00-2 03 DETAIL ED INSPECTIO N FORWA RD FA CE OF THE FUE L TAIL TA NK FORWARD BULKHEAD
53-5 0-00-2 03 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 6 6 0 1 22 0 8 03 AFL 127 5
53-5 0-00-2 04 DETAIL ED INSPECTIO N AFT FACE OF THE TAIL TA NK AFT B ULK HE AD
53-5 0-00-2 04 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 3 6 6 0 1 22 0 8 04 AFL 127 5

53-6 1-01-9 00-80 1-01 RADOME ASSEMBL Y


601 R33 036-1 11-01 MOS 26-A PR-2017
H26095 4 HRS /MSC O/C 136 3.8
REF: See Workcard AFL 883

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
162 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-ZL-0 0-201 (s) GENERAL VISUAL INS PECTION NO SE RA DO ME - EXTERNAL PKG
53-ZL-0 0-201 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
53-ZL-0 0-202 (s) GENERAL VISUAL INS PECTION NO SE RA DO ME - INTERNAL PKG
53-ZL-0 0-202 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-203 (s) GENERAL VISUAL INS PECTION NO SE CO MP ARTMENT LO WER EX TERNAL PKG
53-ZL-0 0-203 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-204 (s) GENERAL VISUAL INS PECTION NO SE CO MP ARTMENT - LOWER INTERNAL LH PKG
53-ZL-0 0-204 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-205 (s) GENERAL VISUAL INS PECTION NO SE CO MP ARTMENT - LOWER INTERNAL RH PKG
53-ZL-0 0-205 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-206 (s) GENERAL VISUAL INS PECTION NL G WHEEL WELL PKG
53-ZL-0 0-206 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-207 (s) GENERAL VISUAL INS PECTION FO RWARD A VIO NICS AND FLIG HT CO NTROLS COMPARTME NT - E XTERNAL PKG
53-ZL-0 0-207 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-208 (s) GENERAL VISUAL INS PECTION FO RWARD A VIO NICS AND FLIG HT CO NTROLS COMPARTME NT - INTE RNAL LH PKG
53-ZL-0 0-208 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-209 (s) GENERAL VISUAL INS PECTION FO RWARD A VIO NICS AND FLIG HT CO NTROLS COMPARTME NT - INTE RNAL RH PKG
53-ZL-0 0-209 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
53-ZL-0 0-210 (s) GENERAL VISUAL INS PECTION MA IN A VIONICS CO MP ARTMENT - EXTERNAL PKG
53-ZL-0 0-210 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
53-ZL-0 0-211 (s) GENERAL VISUAL INS PECTION MA IN A VIONICS CO MP ARTMENT - INTERNAL PKG
53-ZL-0 0-211 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
163 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-ZL-0 0-212 (s) GENERAL VISUAL INS PECTION MID-FUSE LAGE - LOWER EXTERNAL PKG
53-ZL-0 0-212 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
53-ZL-0 0-213 (s) GENERAL VISUAL INS PECTION LOWER S URFACE OF THE P RE SSURE FLOO R FRO M FS409 TO FS 559 PKG
53-ZL-0 0-213 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-214 (s) GENERAL VISUAL INS PECTION MA IN L ANDING GEAR WHEE L WEL L PKG
53-ZL-0 0-214 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
53-ZL-0 0-215 (s) GENERAL VISUAL INS PECTION MID-FUSE LAGE BE TWEE N THE PRES SURE FLOOR AND THE CAB IN FLO OR - LOWER PKG
INTERIOR
53-ZL-0 0-215 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-216 (s) GENERAL VISUAL INS PECTION AFT COMPARTMENT A ND AFT WING-TO- FUSEL AGE FAIRING - EXTERNAL PKG
53-ZL-0 0-216 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
53-ZL-0 0-217 (s) GENERAL VISUAL INS PECTION MID-FUSE LAGE COMPARTMENT - LOWER INTE RNAL (FS589 .0 TO FS 621.0) PKG
53-ZL-0 0-217 PK G 2 4 MOS 24 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: See Workcard AFL 147 5
53-ZL-0 0-218 (s) GENERAL VISUAL INS PECTION FO RWARD E QUIPMENT COMPA RTMENT - EXTERNAL PKG
53-ZL-0 0-218 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
53-ZL-0 0-219 (s) GENERAL VISUAL INS PECTION FO RWARD E QUIPMENT COMPA RTMENT - INTERNAL PKG
53-ZL-0 0-219 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
53-ZL-0 0-220 (s) GENERAL VISUAL INS PECTION FLIGHT COMPA RTMENT - EXTERNAL PKG
53-ZL-0 0-220 PK G 2 4 MOS 24 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: See Workcard AFL 147 5
53-ZL-0 0-221 (s) GENERAL VISUAL INS PECTION FLIGHT COMPA RTMENT - INTERNA L WITHO UT RE MO VAL OF THE HE ADLINER AND PKG
THE G LARESHIE LD
53-ZL-0 0-221 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
164 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-ZL-0 0-222 (s) GENERAL VISUAL INS PECTION PASSE NG ER COMPARTMENT - EXTERNA L PKG
53-ZL-0 0-222 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
53-ZL-0 0-223 (s) GENERAL VISUAL INS PECTION OF THE P ASSENGE R COMPARTME NT - INTE RNAL PKG
53-ZL-0 0-223 PK G 1 92 MOS 192 +1m/-1m 17-A PR-2012
HRS /MSC
MRB REF: See Workcard AFL

53-ZL-0 0-224 (s) GENERAL VISUAL INS PECTION CA RG O COMPA RTMENT - EXTERNAL PKG
53-ZL-0 0-224 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-225 (s) GENERAL VISUAL INS PECTION CA RG O COMPA RTMENT - INTERNA L WITHO UT RE MO VAL OF THE HE ADLINER PKG
53-ZL-0 0-225 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-226 (s) GENERAL VISUAL INS PECTION CA RG O COMPA RTMENT - INTERNA L WITH THE HEADLINER REMOVE D PKG
53-ZL-0 0-226 PK G 1 92 MOS 192 +1m/-1m 17-A PR-2012
HRS /MSC
MRB REF: See Workcard AFL

53-ZL-0 0-227 (s) GENERAL VISUAL INS PECTION AFT EQUIPMENT COMPARTMENT - EX TE RNAL PKG
53-ZL-0 0-227 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-228 (s) GENERAL VISUAL INS PECTION AFT EQUIPMENT COMPARTMENT - INTERNAL PKG
53-ZL-0 0-228 PK G 1 2 MOS 12 +1m/-1m 14-MAR-2 022
HRS /MSC 219 4.6
MRB REF: See Workcard AFL 147 5

53-ZL-0 0-229 (s) GENERAL VISUAL INS PECTION FUSEL AGE/STABILIZE R SECTIO N - EXTERNAL PKG
53-ZL-0 0-229 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

53-ZL-0 0-230 (s) GENERAL VISUAL INS PECTION FUSEL AGE/STABILIZE R SECTIO N - INTERNA L PKG
53-ZL-0 0-230 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
53-ZL-0 0-231 (s) GENERAL VISUAL INS PECTION TA IL CONE - EX TERNAL PKG
53-ZL-0 0-231 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
53-ZL-0 0-232 (s) GENERAL VISUAL INS PECTION TA IL CONE - INTERNAL PKG
53-ZL-0 0-232 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
165 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
53-ZL-0 0-233 (s) GENERAL VISUAL INS PECTION MID-FUSE LAGE COMPARTMENT - LOWER INTE RNAL (FS559 .0 TO FS 621.0) PKG
53-ZL-0 0-233 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
532 201-09 01 ATTACHING PART S LH P ICK UP , WING TO FUSELA GE LINK AS SY
600 -31088 -1 MOS TSN:0 17-A PR-2012
P64 428-B HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

532 201-09 02 ATTACHING PARTS RH P ICK UP , WING TO FUSELA GE LINK ASS Y


600 -31088 -1 MOS TSN:0 17-A PR-2012
P64 264-A HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10
CHA PTER 53-30 FUSELAGE
53-3 0-00-1 61 DETAIL ED INSPECTIO N O F THE SP LICE ANGLE OF THE OUTER FLANGE
CAP - FS6 25.3.
MOS
HRS /MSC
ALI REF: AMM 5 3 3 0 0 1 22 0 8 58 AFL 780 0 (EB T) 780 0
CHA PTER 54 NAC ELLES/PYLONS
54-5 0-00-1 01 DETAIL ED INSPECTIO N PYLO N UPPER SKIN - FS682.
54-5 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 4 5 0 0 1 22 0 8 05 AFL 780 0 0 780 0
54-5 0-00-1 02 DETAIL ED INSPECTIO N UPPER SPLICE O F THE PY LON CANTED RIB - FS672 .2.
54-5 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 4 5 0 0 1 22 0 8 06 AFL 780 0 780 0
54-5 0-00-1 03 SPE CIAL DETAIL ED INSPECTIO N OF THE AFT ENGINE -MO UNT UPP ER-CAP FROM FS 672.00 TO FS68 2.00
MOS 01-A PR-2011
HRS /MSC 0
AIRWORTHINESS REF: NDT ET-54-50 -002 AFL 780 0 0 780 0
54-5 0-00-2 01 DETAIL ED INSPECTIO N FORWA RD ENGINE- MO UNT S PAR A SSEMBLY
54-5 0-00-2 01 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 4 5 0 0 1 22 0 8 01 AFL 127 5
54-5 0-00-2 03 DETAIL ED INSPECTIO N INTERNAL STRUCTURE OF THE P YLON
54-5 0-00-2 03 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 4 5 0 0 1 22 0 8 03 AFL 127 5

54-5 0-00-2 04 DETAIL ED INSPECTIO N AFT ENGINE MOUNT-SUPPORT S TRUCTURE


54-5 0-00-2 04 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 4 5 0 0 1 22 0 8 04 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
166 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
54-ZL-0 0-201 (s) GENERAL VISUAL INS PECTION PYLON - E XTERNA L L H PKG
54-ZL-0 0-201 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
54-ZL-0 0-202 (s) GENERAL VISUAL INS PECTION PYLON - E XTERNA L RH PKG
54-ZL-0 0-202 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

54-ZL-0 0-203 (s) GENERAL VISUAL INS PECTION PYLON LEADING E DG E - INTERNAL LH PKG
54-ZL-0 0-203 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

54-ZL-0 0-204 (s) GENERAL VISUAL INS PECTION PYLON LEADING E DG E - INTERNAL RH PKG
54-ZL-0 0-204 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

54-ZL-0 0-205 (s) GENERAL VISUAL INS PECTION PYLON MID-SECTIO N - INTERNA L LH PKG
54-ZL-0 0-205 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

54-ZL-0 0-206 (s) GENERAL VISUAL INS PECTION PYLON MID-SECTIO N - INTERNA L RH PKG
54-ZL-0 0-206 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

54-ZL-0 0-207 (s) GENERAL VISUAL INS PECTION PYLON TRAILING E DG E - INTERNAL LH PKG
54-ZL-0 0-207 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

54-ZL-0 0-208 (s) GENERAL VISUAL INS PECTION PYLON TRAILING E DG E - INTERNAL RH PKG
54-ZL-0 0-208 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
CHA PTER 55 STA BILIZERS
55-1 0-00-1 01 DETAIL ED INSPECTIO N HORIZONTAL-STABILIZER BA THTUB FITTING
55-1 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 1 0 0 1 22 0 8 07 AFL 780 0 780 0
55-1 0-00-1 02 SPE CIAL DETAIL ED INSPECTIO N UPPER CA P A ND SKIN OF THE REAR S PAR O F THE HORIZONTAL STABILIZE R - RIB
1
55-1 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-55-10 -001 AFL 780 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
167 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
55-1 0-00-1 03 DETAIL ED INSPECTIO N CENTERLINE RIB OF THE HORIZO NTAL STAB ILIZER - FS886.
55-1 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 1 0 0 1 22 0 8 08 AFL 780 0 780 0
55-1 0-00-1 05 DETAIL ED INSPECTIO N REAR S PAR UPP ER CAP SPLICE AT BL 0.0 OF THE HORIZONTAL STABILIZER
55-1 0-00-1 05 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 1 0 0 1 22 0 8 10 AFL 780 0 780 0
55-1 0-00-1 06 SPE CIAL DETAIL ED INSPECTIO N PIVOT FITTING LUG OF THE HORIZONTAL STABILIZER ON THE HORIZO NTAL
STABILIZE R SIDE
55-1 0-00-1 06 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0
55-1 0-00-1 07 DETAIL ED INSPECTIO N OF THE UP PER CAP SP LICE OF THE FRONT S PAR O F THE HORIZO NTAL STABILIZE R - BL6.
55-1 0-00-1 07 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 1 0 0 1 22 0 8 17 AFL 780 0 780 0
55-1 0-00-1 08 DETAIL ED INSPECTIO N UPPER SKIN PANEL AT STRINGER 1 OF THE HORIZONTAL STABILIZER - B L6.
55-1 0-00-1 08 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 1 0 0 1 22 0 8 11 AFL 780 0 780 0
55-1 0-00-1 09 DETAIL ED INSPECTIO N HORIZONTAL STA BILIZER RE AR SP AR WEB SPL ICE - B L0
55-1 0-00-1 09 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 1 0 0 1 22 0 8 12 AFL 780 0 780 0
55-1 0-00-2 01 DETAIL ED INSPECTIO N OF THE UP PER FACE OF THE TO P CANTED RIB AND THE RIB FITTINGS O F THE VE RTICA L
STABILIZE R AND THE ATTACHMENT FITTINGS AND SK IN SPLICES OF THE HORIZO NTAL STAB ILIZER
55-1 0-00-2 01 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 5 0 0 0 0 22 0 8 03 AFL 127 5
55-1 0-00-2 02 DETAIL ED INSPECTIO N FRO NT SPAR OF THE HORIZO NTAL STABILIZER
55-1 0-00-2 02 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 5 1 0 0 1 22 0 8 02 AFL 127 5
55-1 0-00-2 03 DETAIL ED INSPECTIO N HORIZONTAL STA BILIZER (INTERNA L S KINS, STRUCTURE, REAR SPAR AND HINGE
FITTINGS) AND THE ELEV ATOR (FORWARD FACE O F THE FRONT SPA R, HINGE FITTINGS AND BO LTS )
55-1 0-00-2 03 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 5 0 0 0 0 22 0 8 01 AFL 127 5
55-1 0-00-2 07 (s) DETAIL ED INSPECTIO N INNER P IVO T PIN OF THE HORIZONTAL STABILIZER PKG
55-1 0-00-2 07 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 5 1 0 0 1 22 0 8 15 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
168 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
55-1 1-00-9 00-80 1-01 STABILIZE R, HO RIZONTA L A SSEMBLY
600 -23025 -1019 MOS TSN:0 01-A PR-2011
AVCH131 2 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
55-2 0-00-1 01 SPE CIAL DETAIL ED INSPECTIO N PCU FITTINGS AND THE HINGE FITTINGS OF THE ELEV ATOR.
55-2 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-55-20 -001 AFL 360 0 360 0
55-2 0-00-1 02 DETAIL ED INSPECTIO N ELEV ATOR SK INS AND FRONT SPAR.
55-2 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 1 0 0 1 22 0 8 13 AFL 780 0 780 0
55-2 0-00-1 03 DETAIL ED INSPECTIO N ELEV ATOR HING E B OLTS.
55-2 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 1 0 0 1 22 0 8 14 AFL 480 0 480 0
55-2 0-00-2 02 DETAIL ED INSPECTIO N EXTERNAL SURFACES OF THE ELE VATOR
55-2 0-00-2 02 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 5 2 0 0 1 22 0 8 02 AFL 127 5

55-2 0-00-9 00-80 1-01 LH ELEVA TO R ASS EMBLY


600 -24025 -1013 MOS TSN:0 01-A PR-2011
AVCH131 2 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

55-2 0-00-9 00-80 1-02 RH ELE VATOR A SSEMBL Y


600 -24025 -1014 MOS TSN:0 01-A PR-2011
AVCH131 2 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

55-3 0-00-1 01 SPE CIAL DETAIL ED INSPECTIO N HORIZONTAL STA BILIZER PIV OT FITTING LUGS ON THE VERTICAL STABILIZER
SIDE
55-3 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: NDT UT-55 -30-00 1 AFL 780 0 780 0
55-3 0-00-1 02 SPE CIAL DETAIL ED INSPECTIO N STRINGER EXTENSION FITTING AT VS31.875 %
55-3 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-55-30 -006 AFL 780 0 0 780 0
55-3 0-00-1 03 SPE CIAL DETAIL ED INSPECTIO N PIVOT L UG S O F THE PITCH TRIM ACTUATOR ON THE VERTICAL STAB ILIZER SIDE
55-3 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-55-30 -004 AFL 780 0 780 0
55-3 0-00-1 04 SPE CIAL DETAIL ED INSPECTIO N VERTICAL STABILIZE R FRO NT SPAR TO THE FUSEL AGE ATTACHMENT FITTING S
55-3 0-00-1 04 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
169 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
55-3 0-00-1 05 DETAIL ED INSPECTIO N VERTICAL STABILIZE R STRINGE R SPLICE - V S55.625% AT RIB 3 AND VS3 1.8 75% AT RIB 2
55-3 0-00-1 05 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 3 0 0 1 22 0 8 07 AFL 780 0 780 0
55-3 0-00-1 06 DETAIL ED INSPECTIO N OF THE SKIN CUTOUT A T THE ACCESS HOLE S B ETWE EN RIB S 1 A ND 3, VS3 1.8 75% AND
VS4 3.7 5% OF THE V ERTICAL STABILIZER
55-3 0-00-1 06 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 3 0 0 1 22 0 8 08 AFL 780 0 780 0
55-3 0-00-1 07 SPE CIAL DETAIL ED INSPECTIO N REAR S PAR CAP S O F THE VE RTICA L S TA BIL IZER
55-3 0-00-1 07 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-55-30 -007 AFL 780 0 780 0
55-3 0-00-1 08 SPE CIAL DETAIL ED INSPECTIO N OF THE FRONT S PAR CAP S A T RIB 1 AND SP LICE STRAPS LH/RH O F THE VE RTICA L
STABILIZE R.
55-3 0-00-1 08 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-55-30 -001 AFL 780 0 780 0
55-3 0-00-1 09 GENERAL VISUAL INS PECTION RE AR-SPAR WE B O F THE VE RTICA L S TA BIL IZER - RIB 7.
55-3 0-00-1 09 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 3 0 0 1 21 0 8 07 AFL 780 0 780 0
55-3 0-00-1 10 SPE CIAL DETAIL ED INSPECTIO N MID-SPA R CAPS OF THE VERTICAL STABILIZER
55-3 0-00-1 10 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-55-30 -005 AFL 780 0 780 0
55-3 0-00-1 11 SPE CIAL DETAIL ED INSPECTIO N VERTICAL STABILIZE R FRO NT SPAR TO FRAME ATTACHMENT FITTINGS AT -
FS755.00, WL 137.50.
55-3 0-00-1 11 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0
55-3 0-00-1 13 SPE CIAL DETAIL ED INSPECTIO N SKIN CUTO UT AT THE A CCES S HOL E B ETWE EN RIB S 4 AND 5, VS2 5.9 375% AND
VS3 1.8 75% OF THE VERTICAL STABILIZE R
55-3 0-00-1 13 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-55-30 -008 AFL 780 0 780 0
55-3 0-00-1 15 DETAIL ED INSPECTIO N OF THE PITCH TRIM ACTUATOR PIV OT LUGS SUPP ORT PLATES ON THE VERTICAL
STABILIZE R SIDE
MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 3 0 0 1 22 0 8 13 AFL 780 0 780 0
55-3 0-00-2 01 DETAIL ED INSPECTIO N VERTICAL STABILIZE R (FORWARD SIDE O F THE FRONT SPA R, A TTACHMENT FITTINGS AND
THE SP LICE STRAP)
55-3 0-00-2 01 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 5 3 0 0 1 22 0 8 12 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
170 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
55-3 0-00-2 06 DETAIL ED INSPECTIO N INTERNAL STRUCTURE OF THE V ERTICAL STABILIZER
55-3 0-00-2 06 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 5 3 0 0 1 22 0 8 06 AFL 127 5
55-3 2-04-9 00-80 1-01 UPPER LH VE RTICA L-TO-HORIZONTAL STABILIZER FA IRING S V ISO R ASS Y
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: AMM 5 5 3 0 4 0 00 0 8 03 AFL TSN:0 0

55-3 2-04-9 00-80 1-02 UPPER RH VERTICAL- TO- HO RIZONTA L S TAB ILIZER FAIRINGS VISOR ASSY
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: AMM 5 5 3 0 4 0 40 0 8 03 AFL TSN:0 0

55-3 2-04-9 00-80 1-03 LOWER LH V ERTICAL-TO-HORIZONTAL STABILIZE R FAIRING S V IS OR AS SY


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: AMM 5 5 3 0 4 0 00 0 8 04 AFL TSN:0 0

55-3 2-04-9 00-80 1-04 LOWER RH VERTICAL- TO -HO RIZONTA L S TA BIL IZER FAIRINGS VISOR ASSY
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: AMM 5 5 3 0 4 0 40 0 8 04 AFL TSN:0 0

55-4 0-00-1 01 DETAIL ED INSPECTIO N OF THE HINGES AND P CU BOLTS OF THE RUDDER
55-4 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 4 0 0 1 22 0 8 03 AFL 780 0 780 0
55-4 0-00-1 03 GENERAL VISUAL INS PECTION OF THE E XTERNAL SK INS AND FRONT SPA R OF THE RUDDER
55-4 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 5 4 0 0 1 21 0 8 01 AFL 780 0 780 0
55-4 0-00-1 04 SPE CIAL DETAIL ED INSPECTIO N OF THE VERTICAL STABILIZE R TO RUDDE R HINGE FITTINGS AND P CU
ATTACHMENT L UG S
MOS
HRS /MSC
ALI REF: NDT ET-55-40 -001 AFL 780 0 780 0
55-4 0-00-2 01 DETAIL ED INSPECTIO N EXTERNAL SURFACES OF THE RUDDER
55-4 0-00-2 01 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 5 4 0 0 1 22 0 8 01 AFL 127 5

55-4 0-00-2 02 DETAIL ED INSPECTIO N RUDDER (FORWARD FACE OF THE FRONT SP AR AND HINGE BOLTS) AND THE V ERTICAL
STABILIZE R (AFT FACE OF THE RE AR SP AR AND RUDDE R HINGE FITTINGS )
55-4 0-00-2 02 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 5 0 0 0 0 22 0 8 02 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
171 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
55-ZL-0 0-201 (s) GENERAL VISUAL INS PECTION VERTICAL STABILIZER ASSE MB LY - E XTERNAL PKG
55-ZL-0 0-201 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
55-ZL-0 0-202 (s) GENERAL VISUAL INS PECTION RA M AIR INTAK E A ND DO RS AL FA IRING - INTERNA L PKG
55-ZL-0 0-202 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

55-ZL-0 0-203 (s) GENERAL VISUAL INS PECTION LEADING EDGE OF THE VERTICAL STAB ILIZER - INTERNAL PKG
55-ZL-0 0-203 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
55-ZL-0 0-204 (s) GENERAL VISUAL INS PECTION VERTICAL STABILIZER - INTERNAL PKG
55-ZL-0 0-204 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
55-ZL-0 0-205 (s) GENERAL VISUAL INS PECTION TIP OF THE V ERTICAL STABILIZER - INTE RNAL PKG
55-ZL-0 0-205 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
55-ZL-0 0-206 (s) GENERAL VISUAL INS PECTION HO RIZONTA L S TAB ILIZER - EXTERNAL LH PKG
55-ZL-0 0-206 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
55-ZL-0 0-207 (s) GENERAL VISUAL INS PECTION HO RIZONTA L S TAB ILIZER - EXTERNAL RH PKG
55-ZL-0 0-207 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
55-ZL-0 0-208 (s) GENERAL VISUAL INS PECTION LEADING EDGE OF THE HORIZONTAL STABILIZER - INTE RNAL LH PKG
55-ZL-0 0-208 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
55-ZL-0 0-209 (s) GENERAL VISUAL INS PECTION LEADING EDGE OF THE HORIZONTAL STABILIZER - INTE RNAL RH PKG
55-ZL-0 0-209 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
55-ZL-0 0-210 (s) GENERAL VISUAL INS PECTION HO RIZONTA L S TAB ILIZER - INTERNAL LH PKG
55-ZL-0 0-210 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
55-ZL-0 0-211 (s) GENERAL VISUAL INS PECTION HO RIZONTA L S TAB ILIZER - INTERNAL RH PKG
55-ZL-0 0-211 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
CHA PTER 56 WINDOWS
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
172 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
56-1 0-00-1 01 DETAIL ED INSPECTIO N WINDSHIEL D AND S IDEWINDOW - LO WER T-PLA TES .
56-1 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 6 1 0 0 1 22 0 8 01 AFL 370 0 370 0
56-1 0-00-1 02 DETAIL ED INSPECTIO N SIDE WINDOW - 4 BUSHING HOLE S.
56-1 0-00-1 02 MOS 13-MAR-2 020
HRS /MSC 192 6.4
AIRWORTHINESS REF: AMM 5 6 1 0 0 1 22 0 8 02 AFL 300 127 5 157 5
56-1 0-00-1 03 DETAIL ED INSPECTIO N WINDSHIEL D AND S IDE WINDOW - BUSHING HOLES .
56-1 0-00-1 03 MOS 13-MAR-2 020
HRS /MSC 192 6.4
AIRWORTHINESS REF: AMM 5 6 1 0 0 1 22 0 8 03 AFL 600 127 5 187 5
+ 56-1 0-00-1 04 SPE CIAL DETAIL ED INSPECTIO N B OLTS AT R/H WINDSHIELD AND SIDE WINDOW T- PLATE.
56-1 0-00-1 04 MOS 14-MAR-2 022
HRS /MSC 219 4.6
AIRWORTHINESS REF: NDT PT-56-10 -001 AFL 120 0 -275 147 5 240 0
56-1 0-00-1 04 SPE CIAL DETAIL ED INSPECTIO N BOL TS AT L/H WINDSHIELD AND SIDE WINDO W T-PLATE.
56-1 0-00-1 04 MOS 14-MAR-2 022
HRS /MSC 219 4.6
AIRWORTHINESS REF: NDT PT-56-10 -001 AFL 120 0 147 5 267 5
56-1 0-00-1 05 SPE CIAL DETAIL ED INSPECTIO N ATTA CHMENT BO LTS FOR THE WINDSHIE LD AND S IDE WINDOW.
56-1 0-00-1 05 MOS
HRS /MSC
AIRWORTHINESS REF: NDT PT-56-10 -002 AFL 480 0 480 0
56-1 1-01-9 00-80 1-01 PILOT WINDS HIELD ASSE MB LY
604 -33030 -5 MOS TSN:3 09-O CT-20 19
213 1 HRS /MSC O/C TSN:0 188 3.4
REF: See Workcard AFL TSN:0 124 3

56-1 1-01-9 00-80 2-01 COPILOT WINDS HIELD ASSE MB LY


604 -33030 -6 MOS 22-JUN-2018
159 2 HRS /MSC O/C 156 7.7
REF: See Workcard AFL 101 7

56-1 2-01-9 00-80 1-01 PILOT LH SIDE WINDO W


604 -33030 -7 MOS TSN:9 13-FEB -2019
113 3 HRS /MSC O/C TSN:0 169 4.7
REF: See Workcard AFL TSN:0 110 6
56-1 2-01-9 00-80 1-02 COPILOT RH SIDE WINDOW
600 -33030 -8 MOS 22-JUN-2018
108 0 HRS /MSC O/C 156 7.7
REF: See Workcard AFL 101 7
56-2 1-01-9 00-80 1-01 NO.1 L H PANE WINDOW
604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0460 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
173 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
56-2 1-01-9 00-80 1-02 NO.2 L H PANE WINDOW
604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0471 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
56-2 1-01-9 00-80 1-03 NO.3 L H PANE WINDOW
604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0500 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

56-2 1-01-9 00-80 1-04 NO.4 L H PANE WINDOW


604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0466 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
56-2 1-01-9 00-80 1-05 NO.5 L H PANE WINDOW
604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0468 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
56-2 1-01-9 00-80 1-06 NO.6 L H PANE WINDOW
604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0478 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
56-2 1-01-9 00-80 1-07 NO.7 L H PANE WINDOW
604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0474 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
56-2 1-01-9 00-80 1-08 NO.1 RH P ANE WINDO W
604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0469 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
56-2 1-01-9 00-80 1-09 NO.2 RH P ANE WINDO W
604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0503 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
56-2 1-01-9 00-80 1-10 NO.3 RH P ANE WINDO W
604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0489 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
56-2 1-01-9 00-80 1-11 NO.4 RH P ANE WINDO W
604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0491 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
56-2 1-01-9 00-80 1-12 NO.5 RH P ANE WINDO W
604 -31056 -1 MOS TSN:0 01-A PR-2011
10-1 00051 5 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
174 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
56-2 1-01-9 00-80 1-13 NO.6 RH P ANE WINDO W
604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0498 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
56-2 1-01-9 00-80 1-14 NO.7 RH P ANE WINDO W
604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0492 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

56-2 1-01-9 00-80 1-15 NO.8 RH P ANE WINDO W


604 -31056 -1 MOS TSN:0 01-A PR-2011
10/100 0499 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F AFL TSN:0 0
CHA PTER 57 WINGS
57-1 0-00-1 01 DETAIL ED INSPECTIO N LOWER WING PLANK - CENTERLINE SP LICE, STRINGERS 15 AND 16.
57-1 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 32 AFL 640 0 640 0
57-1 0-00-1 02 DETAIL ED INSPECTIO N LOWER WING PLANK - CENTERLINE SP LICE, WS 242 AND WS264 .
57-1 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 33 AFL 780 0 0 780 0
57-1 0-00-1 03 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK - SKIN SPL ICE STRINGERS 15 AND 16.
57-1 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -031 AFL 390 0 0 390 0
57-1 0-00-1 04 DETAIL ED INSPECTIO N LOWER WING PLANK - WS 45, WS19 9 A ND WS 220.
57-1 0-00-1 04 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 34 AFL 780 0 0 780 0
57-1 0-00-1 05 DETAIL ED INSPECTIO N LOWER WING PLANK - FRONT SP AR SP LICE WS29.42.
57-1 0-00-1 05 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 35 AFL 780 0 0 780 0
57-1 0-00-1 06 DETAIL ED INSPECTIO N LOWER WING PLANK - FRONT SP AR WS45 .
57-1 0-00-1 06 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 36 AFL 780 0 0 780 0
57-1 0-00-1 07 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK - WS 45, STRINGE R 10.
57-1 0-00-1 07 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -013 AFL 305 0 305 0
57-1 0-00-1 08 DETAIL ED INSPECTIO N LOWER WING PLANK - FUEL DRA IN HO LE WS 45, STRINGE R 17.
57-1 0-00-1 08 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 37 AFL 460 0 460 0
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
175 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-1 0-00-1 09 SPE CIAL DETAIL ED INSPECTIO N OF THE LOWER WING P LANK AT THE REA R SPA R - WS 45 AND WS47
57-1 0-00-1 09 MOS
HRS /MSC
AIRWORTHINESS REF: NDT RT-57 -10-00 1 AFL 780 0 0 780 0
57-1 0-00-1 10 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK - WS 45, STRINGE RS 14 AND 1 5.
57-1 0-00-1 10 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -009 AFL 325 0 0 325 0
57-1 0-00-1 11 DETAIL ED INSPECTIO N LOWER WING PLANK - WS 65, WS94 , WS 106.4 AND WS127 .5.
57-1 0-00-1 11 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 38 AFL 780 0 0 780 0
57-1 0-00-1 12 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK - WS 65, STRINGE R 17.
57-1 0-00-1 12 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -016 AFL 275 0 275 0
57-1 0-00-1 14 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK AT THE RE AR SP AR - WS59 TO WS6 5.
57-1 0-00-1 14 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 525 0 525 0
57-1 0-00-1 15 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK NEAR THE ML G TRUNNION - WS65, AND THE AUXILIARY S PAR
ACCESS HOLE.
57-1 0-00-1 15 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0
57-1 0-00-1 17 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK - WS 85.5, STRINGERS 14 TO 1 7.
57-1 0-00-1 17 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -017 AFL 265 1 0 265 1
57-1 0-00-1 23 DETAIL ED INSPECTIO N LOWER WING PLANK AT THE RE AR SP AR - WS148.00.
57-1 0-00-1 23 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 72 AFL 395 1 0 395 1
57-1 0-00-1 24 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK - WS 148, S TRING ERS 8 TO 10 AND STRINGER 15.
57-1 0-00-1 24 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -007 AFL 170 0 170 0
57-1 0-00-1 26 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK - WS 148, S TRING ER 19.
57-1 0-00-1 26 MOS
HRS /MSC
AIRWORTHINESS REF: NDT RT-57 -20-00 1 AFL 780 0 0 780 0
57-1 0-00-1 27 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK AT THE AFT EDGE - WS 163 TO WS17 0.5 .
57-1 0-00-1 27 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -032 AFL 780 0 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
176 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-1 0-00-1 28 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK - WS 163, S TRING ER 15.
57-1 0-00-1 28 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -018 AFL 255 0 255 0
57-1 0-00-1 29 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK AT THE RE AR SP AR - WS178 AND WS18 9.
57-1 0-00-1 29 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -024 AFL 780 0 0 780 0
57-1 0-00-1 32 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK AT THE RE AR SP AR - WS166.
57-1 0-00-1 32 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -023 AFL 780 0 0 780 0
57-1 0-00-1 33 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK AT THE RE AR SP AR - WS217 AND WS22 2.
57-1 0-00-1 33 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -004 AFL 780 0 0 780 0
57-1 0-00-1 34 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK AROUND THE ACCESS HOLE - WS220, STRINGER 1 0.
57-1 0-00-1 34 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -010 AFL 220 0 220 0
57-1 0-00-1 35 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK AT THE RE AR SP AR - WS219.
57-1 0-00-1 35 MOS
HRS /MSC
AIRWORTHINESS REF: NDT RT-57 -20-00 2 AFL 780 0 0 780 0
57-1 0-00-1 37 DETAIL ED INSPECTIO N LOWER WING PLANK - WS 238 AND WS242 .
57-1 0-00-1 37 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 48 AFL 570 0 570 0
57-1 0-00-1 41 DETAIL ED INSPECTIO N LOWER WING PLANK AT THE RE AR SP AR - WS242 AND WS26 0.
57-1 0-00-1 41 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 52 AFL 780 0 0 780 0
57-1 0-00-1 45 SPE CIAL DETAIL ED INSPECTIO N LOWER WING PLANK AROUND THE ACCESS HOLE - WS112, STRINGER 1 0.
57-1 0-00-1 45 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -027 AFL 615 0 615 0
57-1 0-00-1 48 DETAIL ED INSPECTIO N WING UPPER SURFACE.
57-1 0-00-1 48 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 57 AFL 480 0 480 0
57-1 0-00-1 49 DETAIL ED INSPECTIO N INTERNAL STRUCTURE OF THE WING B OX.
57-1 0-00-1 49 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 58 AFL 480 0 480 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
177 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-1 0-00-1 52 DETAIL ED INSPECTIO N LOWER WING PLANK AT THE BUTT STRAP AT THE FRO NT AND REAR SPAR - WS31 4.5 .
57-1 0-00-1 52 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 61 AFL 780 0 780 0
57-1 0-00-1 53 DETAIL ED INSPECTIO N LOWER WING PLANK - WS 88.0.
57-1 0-00-1 53 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 74 AFL 190 0 190 0
57-1 0-00-1 54 DETAIL ED INSPECTIO N LOWER WING PLANK - WS 242.0.
57-1 0-00-1 54 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 1 0 0 0 22 0 8 75 AFL 295 0 295 0
57-1 0-00-1 55 DETAIL ED INSPECTIO N WING-TO-FUSELA GE ATTA CHMENT LUGS - FS424.0, FS47 3.0 AND FS5 13.0 .
57-1 0-00-1 55 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 3 2 0 0 1 22 0 8 42 AFL 780 0 780 0
57-1 0-00-2 01 DETAIL ED INSPECTIO N EXTERNAL CE NTER WING (FRONT S PAR A ND THE BAY ONET FITTING) - LWS50.00 TO
RWS50.00
57-1 0-00-2 01 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 66 AFL 127 5
57-1 0-00-2 02 DETAIL ED INSPECTIO N INTERNAL CE NTER WING (SPAR, RIB A ND WING PLANK SURFACES ) - LWS45 .00 TO
RWS45.00 , 510 AB,CB, 61 0 A B,CB
57-1 0-00-2 02 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 64 AFL 127 5

57-1 0-00-2 04 DETAIL ED INSPECTIO N EXTERNAL CE NTER WING (RE AR SP AR AND UPP ER WING PL ANK, MLG SIDE BRACE FITTING
ANS REAR S PAR B AYONET-FITTING - LWS48.00 TO RWS48.00
57-1 0-00-2 04 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 65 AFL 127 5
57-1 0-00-2 08 DETAIL ED INSPECTIO N FORWA RD FA CE OF THE FRO NT SPAR OF THE WING - WS50 TO WS 353
57-1 0-00-2 08 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 08 AFL 127 5

57-1 0-00-2 09 DETAIL ED INSPECTIO N INTERNAL WING (FRONT S PAR, REAR S PAR, WING PLA NK S, STRUCTURE AND THE MLG
MOUNTING FITTING S) - WS45 .00 TO CANTED WS314.50
57-1 0-00-2 09 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 67 AFL 127 5
57-1 0-00-2 11 (s) DETAIL ED INSPECTIO N AFT FACE OF THE REA R SPA R OF THE WING - WS4 8 TO WS353 PKG
57-1 0-00-2 11 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 11 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
178 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-1 0-00-2 13 DETAIL ED INSPECTIO N INTERNAL SKIN AND THE WING S TRUCTURE - CANTED WS31 4.5 TO WS353
57-1 0-00-2 13 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 13 AFL 127 5
57-1 0-00-2 17 (s) DETAIL ED INSPECTIO N INTERNAL WING (AUXIL IARY SPA R, PLANKS, SKINS , STRUCTURE AND THE MLG TRUNNIO N PKG
FITTING) - WS 48.00 TO WS13 9.9 0
57-1 0-00-2 17 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 68 AFL 127 5

57-1 0-00-2 24 DETAIL ED INSPECTIO N WING-TO-FUSELA GE ATTA CHMENT FITTINGS AND B OLTS - FS 424.00, FS 47 3.15 , FS 5 13.00
57-1 0-00-2 24 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 69 AFL 127 5

57-1 0-00-2 27 DETAIL ED INSPECTIO N A TTACHMENT FITTINGS OF THE FL AP HINGE BOX OF THE OUTBOARD FLAP - WS76.5 AND
WS127 .25
57-1 0-00-2 27 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 27 AFL 127 5

57-1 0-00-2 28 DETAIL ED INSPECTIO N ATTA CHMENT FITTINGS O F THE FLAP HINGE BO X O F THE OUTBOA RD FL AP - WS1 78,
WS220 .0 AND WS26 4.0
57-1 0-00-2 28 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 28 AFL 127 5

57-1 0-00-2 29 DETAIL ED INSPECTIO N AILERON (E XTERNA L S URFACES, WING -TO-AILERON HINGE FITTINGS, HING E B OLTS AND
ANTI-FLO AT TORSION BA R)
57-1 0-00-2 29 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 6 0 0 1 22 0 8 08 AFL 127 5
57-1 0-00-2 30 DETAIL ED INSPECTIO N HINGE FITTINGS FOR THE GROUND SPOILER
57-1 0-00-2 30 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 30 AFL 127 5
57-1 0-00-2 31 DETAIL ED INSPECTIO N HINGE FITTINGS FOR THE FLIGHT S POILER
57-1 0-00-2 31 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 1 0 0 0 22 0 8 31 AFL 127 5

+ 57-2 4-00-1 01 DIS CA RD LH MLG SIDE B RACE FITTING SHAFT OF THE LH MAIN LA NDING G EAR ( MLG ) S IDE BRACE FITTING S HA FT,
PART NO. 601R102 37-1/-3 AND PART NO 601 R1 0247-3
601 R10 237-3 MOS 01-A PR-2011
HD0 015 HRS /MSC 0
LIFE LIMIT REF: AMM 5 7 2 4 0 0 96 0 8 01 AFL 600 00 0 600 00
+ 57-2 4-00-1 01 DIS CA RD RH ML G S IDE BRACE FITTING S HA FT OF THE RH MAIN L ANDING G EAR ( ML G) SIDE BRACE FITTING S HA FT,
PART NO. 601R102 37-1/-3 AND PART NO 601 R1 0247-3
601 R10 237-3 MOS 01-A PR-2011
HD0 018 HRS /MSC 0
LIFE LIMIT REF: AMM 5 7 2 4 0 0 96 0 8 01 AFL 600 00 0 600 00

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
179 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-2 4-00-9 00-80 1-01 LH MLG S IDE BRACE FITTING
601 R10 241-7 MOS TSN:0 01-A PR-2011
515 249 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
57-2 4-00-9 00-80 1-02 RH MLG SIDE BRACE FITTING
601 R10 241-8 MOS TSN:0 01-A PR-2011
515 040 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

57-2 4-00-9 00-80 2-01 LH MLG S IDE BRACE FITTING S HAFT


57-2 4-00-1 01 601 R10 237-3 MOS TSN:0 01-A PR-2011
HD0 015 HRS /MSC H/T TSN:0 0
REF: See Workcard AFL TSN:0 0
57-2 4-00-9 00-80 2-02 RH MLG SIDE BRACE FITTING SHAFT
57-2 4-00-1 01 601 R10 237-3 MOS TSN:0 01-A PR-2011
HD0 018 HRS /MSC H/T TSN:0 0
REF: See Workcard AFL TSN:0 0
57-2 6-001 A OUTBD FLAP SHROUD ANGL E
600 -10217 -326-0 1 MOS
N91980 8 HRS /MSC -
REF: AFL

57-3 0-00-1 01 DETAIL ED INSPECTIO N EXTERNAL SURFACES OF THE WING TIP.


57-3 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 3 0 0 0 22 0 8 02 AFL 480 0 480 0
57-3 0-00-2 01 DETAIL ED INSPECTIO N SKIN, SPARS, ATTACHMENT FITTINGS, AND INTERNAL STRUCTURE OF THE WINGLET
57-3 0-00-2 01 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 3 0 0 0 22 0 8 01 AFL 127 5
57-4 1-03-9 00-80 1-01 LH WING LEADING EDGE AS SEMBLY
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
57-4 1-03-9 00-80 1-02 RH WING LEA DING EDGE ASSE MB LY
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
57-5 0-00-1 01 SPE CIAL DETAIL ED INSPECTIO N OUTBOARD FLAP FRONT SPA R.
57-5 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -011 AFL 780 0 0 780 0
57-5 0-00-1 02 SPE CIAL DETAIL ED INSPECTIO N VANE TANG S (END SUPPO RT) OF THE OUTBO ARD FLAP.
57-5 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -010 AFL 780 0 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
180 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-5 0-00-1 03 SPE CIAL DETAIL ED INSPECTIO N FORWA RD LUGS OF THE O UTBO ARD FLAP.
57-5 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -013 AFL 780 0 780 0
57-5 0-00-1 04 SPE CIAL DETAIL ED INSPECTIO N FORWA RD UP PER L UG S O F THE OUTBOA RD FL AP ARM - WS 220.
57-5 0-00-1 04 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -005 AFL 780 0 0 780 0
57-5 0-00-1 05 SPE CIAL DETAIL ED INSPECTIO N VANE MID-SUPPO RT FITTINGS OF THE OUTB OARD FLAP.
57-5 0-00-1 05 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -012 AFL 780 0 780 0
57-5 0-00-1 06 DETAIL ED INSPECTIO N VANE SUPPORT FITTING O F THE OUTBOA RD FL AP.
57-5 0-00-1 06 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 5 0 0 1 22 0 8 12 AFL 780 0 780 0
57-5 0-00-1 07 SPE CIAL DETAIL ED INSPECTIO N FORWA RD LUGS OF THE INBOARD FLA P.
57-5 0-00-1 07 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -003 AFL 780 0 780 0
57-5 0-00-1 08 SPE CIAL DETAIL ED INSPECTIO N INBO ARD FLAP HINGE BOX ES.
57-5 0-00-1 08 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -001 AFL 530 0 530 0
57-5 0-00-1 09 SPE CIAL DETAIL ED INSPECTIO N OF THE INBOA RD FL AP FRONT S PAR
57-5 0-00-1 09 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -018 AFL 780 0 780 0
57-5 0-00-1 10 SPE CIAL DETAIL ED INSPECTIO N WING/RIB BACKUP FITTING OF THE INBOA RD FL APS - WS 127.25.
57-5 0-00-1 10 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-20 -037 AFL 720 0 720 0
57-5 0-00-1 11 DETAIL ED INSPECTIO N INBO ARD FLAP - VANE SUPPORT ATTACHME NT BRACKETS.
57-5 0-00-1 11 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 5 0 0 1 22 0 8 14 AFL 720 0 720 0
57-5 0-00-1 12 SPE CIAL DETAIL ED INSPECTIO N CARRIAGE S O F THE INBOARD FLAP VA NE .
57-5 0-00-1 12 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -004 AFL 780 0 780 0
57-5 0-00-1 13 SPE CIAL DETAIL ED INSPECTIO N INBO ARD FLAP ARMS.
57-5 0-00-1 13 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -002 AFL 780 0 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
181 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-5 0-00-1 16 SPE CIAL DETAIL ED INSPECTIO N INTERMEDIATE SUPPO RT OF THE O UTBO ARD FLAP VANE.
57-5 0-00-1 16 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -015 AFL 780 0 0 780 0
57-5 0-00-1 17 SPE CIAL DETAIL ED INSPECTIO N SUPPORT STRUTS O F THE OUTBOA RD FL AP VANE.
57-5 0-00-1 17 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -016 AFL 780 0 0 780 0
57-5 0-00-1 18 SPE CIAL DETAIL ED INSPECTIO N END RAMPS OF THE OUTB OARD FLAP VA NE
57-5 0-00-1 18 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -014 AFL 780 0 780 0
57-5 0-00-1 19 SPE CIAL DETAIL ED INSPECTIO N FLAP HINGE BOL TS.
57-5 0-00-1 19 MOS
HRS /MSC
AIRWORTHINESS REF: NDT PT-57-50 -001 AFL 780 0 780 0
57-5 0-00-1 20 DIS CA RD OF THE INBOARD NO. 1 FLA P V ANE B EAM, PART NO.
600 - 14250 -15/25/27/29.
600 -14250 -29 MOS 01-A PR-2011
CLA19 14 HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 5 4 1 1 96 1 8 01 AFL 960 0 0 960 0
57-5 0-00-1 20 DIS CA RD OF THE INBOARD NO. 2 FLA P V ANE B EAM, PART NO.
600 - 14250 -15/25/27/29.
600 -14250 -29 MOS 01-A PR-2011
CLA20 34 HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 5 4 1 1 96 1 8 01 AFL 960 0 0 960 0
57-5 0-00-1 20 DIS CA RD OF THE INBOARD NO. 3 FLAP VANE BEA M, PART NO.
600 - 14250 -15/25/27/29.
600 -14250 -29 MOS 01-A PR-2011
CLA19 19 HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 5 4 1 1 96 1 8 01 AFL 960 0 0 960 0
57-5 0-00-1 20 DIS CA RD OF THE INBOARD NO. 4 FLA P V ANE B EAM, PART NO.
600 - 14250 -15/25/27/29.
600 -14250 -29 MOS 01-A PR-2011
CLA20 20 HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 5 4 1 1 96 1 8 01 AFL 960 0 0 960 0
57-5 0-00-1 20 DIS CA RD OF THE INBOARD NO. 5 FLA P V ANE B EAM, PART NO.
600 - 14250 -15/25/27/29.
600 -14250 -29 MOS 01-A PR-2011
CLA20 19 HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 5 4 1 1 96 1 8 01 AFL 960 0 0 960 0
57-5 0-00-1 20 DIS CA RD OF THE INBOARD NO. 6 FLA P V ANE B EAM, PART NO.
600 - 14250 -15/25/27/29.
600 -14250 -29 MOS 01-A PR-2011
CLA20 29 HRS /MSC 0
LIFE LIMIT REF: AMM 2 7 5 4 1 1 96 1 8 01 AFL 960 0 0 960 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
182 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-5 0-00-1 21 SPE CIAL DETAIL ED INSPECTIO N OF THE FO RWARD L UG S O F THE INBOARD FLAP HING E B OX
MOS 01-A PR-2011
HRS /MSC 0
AIRWORTHINESS REF: NDT ET-57-50 -008 AFL 780 0 0 780 0
+ 57-5 0-00-1 22 DIS CA RD OF THE INBOARD FLA P FAS TENERS - HINGE-B OX WING FO RWARD-FITTING.
MOS 01-A PR-2011
HRS /MSC 0
LIFE LIMIT REF: AMM 5 7 5 2 0 1 96 1 8 01 AFL 780 0 0 780 0
57-5 0-00-2 01 (s) DETAIL ED INSPECTIO N INBO ARD FLAP AND INB OARD FLAP VA NE (E XTE RNAL SURFACE S) PKG
57-5 0-00-2 01 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 7 5 0 0 1 22 0 8 16 AFL 127 5

57-5 0-00-2 02 DETAIL ED INSPECTIO N INBO ARD FLAP (EXTERNAL SKINS, ATTACHMENT L UG S A ND HINGE ARMS)
57-5 0-00-2 02 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 5 0 0 1 22 0 8 18 AFL 127 5

57-5 0-00-2 04 DETAIL ED INSPECTIO N VANE ACTUATOR SLIDING BEAMS AND CARRIAG ES OF THE INBOA RD FL AP
57-5 0-00-2 04 MOS +40/-40
HRS /MSC
MRB REF: AMM 5 7 5 0 0 1 22 0 8 04 AFL 700 0 +40/-40 700 0 704 0

57-5 0-00-2 06 (s) DETAIL ED INSPECTIO N OUTBOARD FLAP (E XTE RNAL SURFACES) AND THE OUTBOA RD FL AP VANE (EXTERNAL PKG
SURFA CE S A ND SUPPORT FITTING S)
57-5 0-00-2 06 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 7 5 0 0 1 22 0 8 17 AFL 127 5

57-5 0-00-2 07 DETAIL ED INSPECTIO N OUTBOARD FLAP (E XTE RNAL SK INS, A TTACHME NT LUGS AND HINGE ARMS)
57-5 0-00-2 07 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 5 0 0 1 22 0 8 19 AFL 127 5

57-5 0-00-2 10 DETAIL ED INSPECTIO N FLAP HINGE BOX ES OF THE INBOARD FLA P
57-5 0-00-2 10 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 7 5 0 0 1 22 0 8 10 AFL 127 5

57-5 0-00-2 11 DETAIL ED INSPECTIO N FLAP HINGE BOX ES OF THE O UTBO ARD FLAP
57-5 0-00-2 11 MOS 48 +1m/-1m 13-MAR-2 020 13-MAR-2024 13-A PR-2024
HRS /MSC 192 6.4
MRB REF: AMM 5 7 5 0 0 1 22 0 8 11 AFL 127 5

57-5 0-00-2 12 DETAIL ED INSPECTIO N ATTA CHMENT BO LTS FOR THE FLAP HINGE BOX ES AND THE FLAP HING E A RMS OF THE
INB OARD FLAP
57-5 0-00-2 12 MOS +40/-40
HRS /MSC
MRB REF: AMM 5 7 5 2 0 1 22 0 8 01 AFL 780 0 +40/-40 780 0 784 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
183 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-5 0-00-2 13 DETAIL ED INSPECTIO N ATTA CHMENT BO LTS FOR THE FLAP HINGE BOX ES AND THE FLAP HING E A RMS OF THE
OUTBOARD FLA P
57-5 0-00-2 13 MOS +40/-40
HRS /MSC
MRB REF: AMM 5 7 5 2 0 1 22 0 8 02 AFL 780 0 +40/-40 780 0 784 0
57-5 0-00-2 14 DETAIL ED INSPECTIO N VANE SUPPORT STRAP S O F THE O UTBOA RD FL AP
57-5 0-00-2 14 MOS +40/-40
HRS /MSC
MRB REF: AMM 5 7 5 0 0 1 22 0 8 20 AFL 780 0 +40/-40 0 780 0 784 0
57-5 0-00-2 15 DETAIL ED INSPECTIO N FRO NT SPAR OF THE O UTBO ARD FLAP
57-5 0-00-2 15 MOS +40/-40
HRS /MSC
MRB REF: AMM 5 7 5 0 0 1 22 0 8 21 AFL 780 0 +40/-40 0 780 0 784 0
57-5 2-01-1 01 SPE CIAL DETAIL ED INSPECTIO N OUTBOARD FLAP WING /HING E - FORWARD BOX FITTINGS .
57-5 2-01-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -006 AFL 780 0 780 0
57-5 2-01-1 02 SPE CIAL DETAIL ED INSPECTIO N HINGE-B OX FO RWA RD LUGS OF THE O UTBO ARD FLAP.
57-5 2-01-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -008 AFL 780 0 0 780 0
57-5 2-01-1 03 SPE CIAL DETAIL ED INSPECTIO N HINGE BOX SUPP ORTS OF THE OUTBOARD FLA P.
57-5 2-01-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-57-50 -007 AFL 780 0 780 0
57-5 3-01-9 00-80 1-01 LH INBOA RD FL AP
600 -14002 -1001 MOS TSN:0 01-A PR-2011
586 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
57-5 3-01-9 00-80 1-02 RH OUTBD FLAP
600 -14500 -806 MOS TSN:0 01-A PR-2011
586 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
57-5 3-01-9 00-80 2-02 RH INB OARD FLAP
600 -14002 -1002 MOS TSN:0 01-A PR-2011
586 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
57-5 5-05-9 00-80 1-01 LH OUTBD FL AP
600 -14500 -805 MOS TSN:0 01-A PR-2011
586 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

57-6 0-00-1 01 DETAIL ED INSPECTIO N AILERON.


57-6 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 6 0 0 1 22 0 8 01 AFL 185 0 185 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
184 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-6 0-00-1 02 DETAIL ED INSPECTIO N AILERON UPP ER AND L OWER SK INS AND FRONT SPAR.
57-6 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 6 0 0 1 22 0 8 02 AFL 780 0 780 0
57-6 0-00-1 03 DETAIL ED INSPECTIO N HINGE BOL TS OF THE AILERON.
57-6 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 6 0 0 1 22 0 8 07 AFL 480 0 480 0
57-7 0-00-1 01 SPE CIAL DETAIL ED INSPECTIO N FLIG HT SPOILER.
57-7 0-00-1 01 MOS 25-JUL-20 19
HRS /MSC 181 6.9
AIRWORTHINESS REF: NDT ET-57-70 -001 AFL 120 0 119 5 239 5
57-7 0-00-1 02 DETAIL ED INSPECTIO N UPPER AND LOWER SKINS O F THE FLIGHT SPO ILE R.
57-7 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 7 0 0 1 22 0 8 03 AFL 780 0 780 0
57-7 0-00-1 03 DETAIL ED INSPECTIO N HINGE BOL TS OF THE FLIG HT SPOILER
57-7 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 5 7 7 0 0 1 22 0 8 04 AFL 480 0 480 0
57-7 0-00-2 01 (s) DETAIL ED INSPECTIO N EXTERNAL SURFACES AND FORWARD FACE OF THE FRONT SP AR OF THE GROUND PKG
SPO ILE R
57-7 0-00-2 01 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 7 7 0 0 1 22 0 8 01 AFL 127 5

57-7 0-00-2 02 (s) SPE CIAL DETAIL ED INSPECTIO N BONDED S KINS OF THE GROUND SPOILE R PKG
57-7 0-00-2 02 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 7 7 0 0 1 28 0 8 01 AFL 127 5

57-7 0-00-2 03 (s) DETAIL ED INSPECTIO N EXTERNAL SURFACES AND FORWARD FACE OF THE FRONT SP AR OF THE FLIG HT SPOILER PKG
57-7 0-00-2 03 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 7 7 0 0 1 22 0 8 02 AFL 127 5

57-7 0-00-2 04 (s) SPE CIAL DETAIL ED INSPECTIO N BONDED S KINS OF THE FL IGHT SPOILER PKG
57-7 0-00-2 04 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: AMM 5 7 7 0 0 1 28 0 8 02 AFL 127 5

57-7 0-00-2 05 DETAIL ED INSPECTIO N HINGE BOL TS OF THE GROUND SPO ILE R
57-7 0-00-2 05 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 7 0 0 1 22 0 8 05 AFL 127 5

57-7 0-00-2 06 DETAIL ED INSPECTIO N HINGE BOL TS OF THE FLIG HT SPOILER


57-7 0-00-2 06 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 5 7 7 0 0 1 22 0 8 04 AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
185 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-7 1-01-9 00-80 1-01 LH GROUND SPOILER ASSE MB LY
600 -10502 -51 MOS TSN:0 01-A PR-2011
F98456 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
57-7 1-01-9 00-80 1-02 RH GROUND SP OIL ER AS SEMBLY
600 -10502 -52 MOS TSN:0 01-A PR-2011
F92180 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

57-7 3-01-9 00-80 1-01 LH PRO POR.SPOILER ASSEMBL Y


600 -10602 -77 MOS 26-A PR-2017
F92700 2 HRS /MSC O/C 136 3.8
REF: AMM NO REF1 AFL 883
57-7 3-01-9 00-80 1-02 RH PROP OR.SP OIL ER AS SEMBLY
600 -10602 -78 MOS 26-A PR-2017
F90977 4 HRS /MSC O/C 136 3.8
REF: AMM NO REF1 AFL 883
57-ZL-0 0-201 (s) GENERAL VISUAL INS PECTION WING CE NTER SECTION - EX TE RNAL LH PKG
57-ZL-0 0-201 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-202 (s) GENERAL VISUAL INS PECTION WING CE NTER SECTION - EX TE RNAL RH PKG
57-ZL-0 0-202 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-203 (s) GENERAL VISUAL INS PECTION FRONT S PAR O F THE WING CENTE R SECTION - EXTERNAL PKG
57-ZL-0 0-203 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-204 (s) GENERAL VISUAL INS PECTION WING CE NTER SECTION - INTE RNAL LH PKG
57-ZL-0 0-204 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-205 (s) GENERAL VISUAL INS PECTION WING CE NTER SECTION - INTE RNAL RH PKG
57-ZL-0 0-205 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-206 (s) GENERAL VISUAL INS PECTION INBOA RD LEADING EDGE O F THE WING - EXTERNAL LH PKG
57-ZL-0 0-206 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-207 (s) GENERAL VISUAL INS PECTION INBOA RD LEADING EDGE O F THE WING - EXTERNAL RH PKG
57-ZL-0 0-207 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
186 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-ZL-0 0-208 (s) GENERAL VISUAL INS PECTION INBOA RD LEADING EDGE O F THE WING - INTERNA L L H PKG
57-ZL-0 0-208 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-209 (s) GENERAL VISUAL INS PECTION INBOA RD LEADING EDGE O F THE WING - INTERNA L RH PKG
57-ZL-0 0-209 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

57-ZL-0 0-210 (s) GENERAL VISUAL INS PECTION OUTBO ARD LEA DING EDGE OF THE WING - EX TERNAL LH PKG
57-ZL-0 0-210 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

57-ZL-0 0-211 (s) GENERAL VISUAL INS PECTION OUTBO ARD LEA DING EDGE OF THE WING - EX TERNAL RH PKG
57-ZL-0 0-211 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

57-ZL-0 0-212 (s) GENERAL VISUAL INS PECTION OUTBO ARD LEA DING EDGE OF THE WING - INTERNAL LH PKG
57-ZL-0 0-212 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

57-ZL-0 0-213 (s) GENERAL VISUAL INS PECTION OUTBO ARD LEA DING EDGE OF THE WING - INTERNAL RH PKG
57-ZL-0 0-213 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

57-ZL-0 0-214 (s) GENERAL VISUAL INS PECTION WING FROM WS 47 TO WS14 8 - EX TERNAL LH PKG
57-ZL-0 0-214 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

57-ZL-0 0-215 (s) GENERAL VISUAL INS PECTION WING FROM WS 47 TO WS14 8 - EX TERNAL RH PKG
57-ZL-0 0-215 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

57-ZL-0 0-216 (s) GENERAL VISUAL INS PECTION WING FROM WS 45 TO WS14 8 - INTERNAL LH PKG
57-ZL-0 0-216 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-217 (s) GENERAL VISUAL INS PECTION WING FROM WS 45 TO WS14 8 - INTERNAL RH PKG
57-ZL-0 0-217 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-218 (s) GENERAL VISUAL INS PECTION WING FROM WS 148 TO WS3 53 - EX TE RNAL LH PKG
57-ZL-0 0-218 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
187 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-ZL-0 0-219 (s) GENERAL VISUAL INS PECTION WING FROM WS 148 TO WS3 53 - EX TE RNAL RH PKG
57-ZL-0 0-219 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-220 (s) GENERAL VISUAL INS PECTION WING FROM WS 148 TO WS3 53 - INTERNAL LH PKG
57-ZL-0 0-220 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

57-ZL-0 0-221 (s) GENERAL VISUAL INS PECTION WING FROM WS 148 TO WS3 53 - INTERNAL RH PKG
57-ZL-0 0-221 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-222 (s) GENERAL VISUAL INS PECTION WINGLET - E XTERNAL LH PKG
57-ZL-0 0-222 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-223 (s) GENERAL VISUAL INS PECTION WINGLET - E XTERNAL RH PKG
57-ZL-0 0-223 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-226 (s) GENERAL VISUAL INS PECTION INBOA RD TRAILING E DG E O F THE WING - EXTERNAL LH PKG
57-ZL-0 0-226 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-227 (s) GENERAL VISUAL INS PECTION INBOA RD TRAILING E DG E O F THE WING - EXTERNAL RH PKG
57-ZL-0 0-227 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-228 (s) GENERAL VISUAL INS PECTION WING TRAILING EDGE - INTERNAL LH PKG
57-ZL-0 0-228 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: See Workcard AFL 144 9
57-ZL-0 0-229 (s) GENERAL VISUAL INS PECTION WING TRAILING EDGE - INTERNAL RH PKG
57-ZL-0 0-229 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: See Workcard AFL 144 9
57-ZL-0 0-230 (s) GENERAL VISUAL INS PECTION OUTBO ARD TRA ILING EDGE OF THE WING - EX TE RNAL LH PKG
57-ZL-0 0-230 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-231 (s) GENERAL VISUAL INS PECTION OUTBO ARD TRA ILING EDGE OF THE WING - EX TE RNAL RH PKG
57-ZL-0 0-231 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
188 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
57-ZL-0 0-234 (s) GENERAL VISUAL INS PECTION AIL ERON SHROUD - INTERNAL LH PKG
57-ZL-0 0-234 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
57-ZL-0 0-235 (s) GENERAL VISUAL INS PECTION AIL ERON SHROUD - INTERNAL RH PKG
57-ZL-0 0-235 PK G 9 6 MOS 96 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

572 400-09 01 LH WING FITTING A SSY


604 -10031 -17 MOS TSN:0 17-A PR-2012
514 257 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

572 400-09 02 RH WING FITTING ASS Y


604 -10031 -18 MOS TSN:0 17-A PR-2012
513 937 HRS /MSC O/C TSN:0 16.2
REF: AFL TSN:0 10

572 6001 OUTBD FLAP SHROUD ANGL E


600 -10217 -326-0 1 MOS
N91980 8 HRS /MSC O/C
REF: AFL
CHA PTER 71 POWER PLA NT
71-0 0-00-8 66-81 5 OPE RA TIONAL CHE CK OF THRUST REVE RS ER
MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883
71-0 0-00-9 00-80 1-01 LH DEMO UNTABLE PO WE RP LANT
604 -60001 -1 MOS TSN:0 01-A PR-2011
586 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
71-0 0-00-9 00-80 1-02 RH DEMOUNTAB LE POWERPLA NT
604 -60001 -2 MOS TSN:0 01-A PR-2011
586 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

71-0 0-00-9 00-80 2-01 BIFURCATOR INSTL (L H) COWL


228 -50300 -807 MOS TSN:0 01-A PR-2011
SBRJ1644 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

71-1 0-00-1 01 SPE CIAL DETAIL ED INSPECTIO N ENGINE NACELLE JOINT.


71-1 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-71-10 -002 AFL 780 0 780 0
71-1 0-00-1 02 SPE CIAL DETAIL ED INSPECTIO N SUPPORT FITTING O F THE NOSE COWL ACTUATOR.
71-1 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-71-10 -001 AFL 440 0 440 0
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
189 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
71-1 0-00-1 03 SPE CIAL DETAIL ED INSPECTIO N TRACK SUPPO RT ASSE MB LY AND FLANGE OF THE SERVICE PY LON.
71-1 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-78-30 -004 AFL 780 0 780 0
71-1 1-01-9 00-80 1-01 LH LWR TRA NS COWL DO OR
228 -50208 -237 MOS TSN:0 01-A PR-2011
SBRJ1662 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

71-1 1-01-9 00-80 1-02 RH LWR TRANS CO WL DOOR


228 -50208 -238 MOS TSN:0 01-A PR-2011
SBRJ1652 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
71-1 1-01-9 00-80 2-01 LH UPP ER TR, COWL DOO R
228 -50207 -259 MOS TSN:0 01-A PR-2011
SBRJ1631 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
71-1 1-01-9 00-80 2-02 RH UPPER TR, COWL DOOR
228 -50207 -260 MOS TSN:0 01-A PR-2011
SBRJ1635 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
71-1 2-00-2 02 (s) DETAIL ED INSPECTIO N CORE B LOW-OUT DOO RS PKG
71-1 2-00-2 02 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 7 1 1 2 0 1 22 0 8 02 AFL 150 5
71-1 2-00-2 03 (s) GENERAL VISUAL INS PECTION DRAINS MAS T AND CHANNE LS PKG
71-1 2-00-2 03 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 7 1 1 2 0 1 21 0 8 04 AFL 123 6
71-1 2-00-2 04 (s) OPE RA TIONAL TEST DRAINS MAST AND CHANNEL S PKG
71-1 2-00-2 04 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
MRB REF: AMM 7 1 1 2 0 1 71 0 8 01 AFL 123 6
71-1 2-00-2 05 DETAIL ED INSPECTIO N HINGE FITTINGS OF THE CORE COWL DOOR
71-1 2-00-2 05 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 7 1 1 2 0 1 22 0 8 01 AFL 127 5
71-1 2-01-9 00-80 1-01 LH LWR CORE CWL DO OR DOO R
228 -50162 -417 MOS TSN:0 01-A PR-2011
SBRJ1654 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
71-1 2-01-9 00-80 1-02 RH LWR CORE CWL DOO R DOOR
228 -50162 -418 MOS TSN:0 01-A PR-2011
SBRJ1634 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
190 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
71-1 2-01-9 00-80 2-01 LH UPR CORE CWL DO OR DOO R
228 -50142 -893 MOS TSN:0 01-A PR-2011
SBRJ1651 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
71-1 2-01-9 00-80 2-02 RH UPR CORE CWL DOOR DOOR
228 -50142 -894 MOS TSN:0 01-A PR-2011
SBRJ1643 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

71-1 2-01-9 00-80 3-02 RH LO WE R ACCESS, NOS E COWL, PANEL


228 -50081 -142 MOS TSN:0 01-A PR-2011
SBRJ1160 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

71-1 3-00-2 01 (s) DETAIL ED INSPECTIO N THRUST REVE RS ER SL IDER B LOCKS PKG
71-1 3-00-2 01 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
MRB REF: AMM 7 8 3 4 1 0 22 0 8 01 AFL 150 5

71-1 3-00-2 02 DETAIL ED INSPECTIO N SERVICE P YLON CA STING AND SUPPO RT RA ILS
71-1 3-00-2 02 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 7 1 1 0 0 0 22 0 8 01 AFL 127 5

71-1 3-01-9 00-80 1-02 RH BIFURCATOR INSTL (RH) CO WL


228 -50300 -808 MOS TSN:0 01-A PR-2011
SBRJ1650 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

71-1 3-01-9 00-80 2-01 LH SIDE PANEL


228 -50082 -809 MOS TSN:0 01-A PR-2011
SBRJ1159 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

71-1 3-01-9 00-80 2-02 RH SIDE P ANEL


228 -50082 -810 MOS TSN:0 01-A PR-2011
SBRJ1160 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

71-1 4-01-9 00-80 1-01 LH ACCES S, NOSE COWL, P ANE L


228 -50080 -801 MOS TSN:0 01-A PR-2011
SBRJ1159 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
71-1 4-01-9 00-80 1-02 RH ACCESS, NO SE CO WL , PANEL
228 -50080 -802 MOS TSN:0 01-A PR-2011
SBRJ1159 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
71-1 4-01-9 00-80 3-01 LH LOWER A CCESS , NOSE COWL, PA NEL
228 -50081 -141 MOS TSN:0 01-A PR-2011
SBRJ1160 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
191 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
71-2 0-00-1 01 SPE CIAL DETAIL ED INSPECTIO N YOK E O F THE FORWARD ENGINE MOUNT.
71-2 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-71-20 -002 AFL 780 0 780 0
71-2 0-00-1 02 SPE CIAL DETAIL ED INSPECTIO N THRUST FITTING OF THE AFT ENGINE MO UNT.
71-2 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-71-20 -001 AFL 780 0 0 780 0
71-2 0-00-1 03 SPE CIAL DETAIL ED INSPECTIO N LINK AND B OLTS OF THE FORWARD ENGINE MO UNT.
71-2 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: See Workcard AFL 780 0 780 0
71-2 0-00-2 02 DETAIL ED INSPECTIO N OF THE FO RWARD E NG INE MOUNT YOKE AND L INK ASSE MB LY
71-2 0-00-2 02 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 7 1 2 1 0 1 22 0 8 03 AFL 127 5
71-2 0-00-2 03 DETAIL ED INSPECTIO N AFT ENGINE MOUNT AS SEMBLY
71-2 0-00-2 03 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 7 1 2 2 0 1 22 0 8 01 AFL 127 5
71-2 1-01-2 20-80 1 DETAIL ED INSPECTIO N NO. 1 FO RWA RD ENGINE MOUNTS
MOS 01-A PR-2011
HRS /MSC A/R 0
MRB REF: AMM 7 1 2 1 0 1 22 0 8 01 AFL 0
71-2 1-01-2 20-80 1 DETAIL ED INSPECTIO N NO.2 FORWARD ENGINE MOUNTS
MOS 01-A PR-2011
HRS /MSC A/R 0
MRB REF: AMM 7 1 2 1 0 1 22 0 8 01 AFL 0
71-2 1-01-9 00-80 1-01 LH ENG INE LINK
601 -37016 -5 MOS TSN:0 01-A PR-2011
170 242 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
71-2 1-01-9 00-80 1-02 RH ENGINE L INK
601 -37016 -5 MOS TSN:0 01-A PR-2011
170 235 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
71-2 1-01-9 00-80 2-01 LH ENG INE BOL T
601 -37040 -17 MOS TSN:0 01-A PR-2011
349 3 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
71-2 1-01-9 00-80 2-02 RH ENGINE B OLT
601 -37040 -17 MOS TSN:0 01-A PR-2011
348 6 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
192 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
71-2 1-01-9 00-80 3-01 LH ENG INE BOL T
601 -37040 -17 MOS TSN:0 01-A PR-2011
349 4 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
71-2 1-01-9 00-80 3-02 RH ENGINE B OLT
601 -37040 -17 MOS TSN:0 01-A PR-2011
349 8 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

71-2 1-01-9 00-80 4-01 LH FITTING A SSY, Y OKE MOUNT


601 -37015 -7PE MOS TSN:0 01-A PR-2011
CII5386 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

71-2 1-01-9 00-80 4-02 RH FITTING ASS Y, YOK E MO UNT


601 -37015 -8PE MOS TSN:0 01-A PR-2011
CII5372 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

71-2 2-01-2 20-80 2 DETAIL ED INSPECTIO N NO. 1 AFT ENGINE MOUNTS


MOS 01-A PR-2011
HRS /MSC A/R 0
MRB REF: AMM 7 1 2 2 0 1 22 0 8 01 AFL 0

71-2 2-01-2 20-80 2 DETAIL ED INSPECTIO N NO. 2 AFT ENGINE MOUNTS


MOS 01-A PR-2011
HRS /MSC A/R 0
MRB REF: AMM 7 1 2 2 0 1 22 0 8 01 AFL 0

71-2 2-01-9 00-80 1-01 LH THRUS T SHAFT


601 -37020 -7 MOS TSN:0 01-A PR-2011
CLA21 64 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

71-2 2-01-9 00-80 1-02 RH THRUST S HA FT


601 -37020 -7 MOS TSN:0 01-A PR-2011
CLA21 66 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

71-2 2-01-9 00-80 2-01 LH ENG INE MOUNT THRUST FITTING


601 -37014 -17 MOS TSN:0 01-A PR-2011
979 04 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
71-2 2-01-9 00-80 2-02 RH ENGINE MOUNT THRUST FITTING
601 -37014 -17 MOS TSN:0 01-A PR-2011
978 96 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
71-3 0-00-2 01 (s) GENERAL VISUAL INS PECTION ENGINE FIRE SEAL S PKG
71-3 0-00-2 01 PK G 3 200 MOS +40/-40
HRS /MSC 320 0 +40/-40 0
REF: AMM 7 1 3 0 0 0 21 0 8 01 AFL

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
193 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
71-6 1-00-2 02 (s) LUBRICATION B ALLSCREW A CTUATORS SUPPORT B USHINGS PKG
71-6 1-00-2 02 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
REF: AMM 1 2 2 0 0 4 64 0 8 27 AFL 150 5
71-6 1-00-2 03 (s) DETAIL ED INSPECTIO N BALL SCRE W ACTUA TO R SUPPO RT FITTINGS PKG
71-6 1-00-2 03 PK G 3 200 MOS +40/-40
HRS /MSC 320 0 +40/-40 0
REF: AMM 7 1 6 1 0 1 22 0 8 01 AFL

71-6 1-00-2 05 DETAIL ED INSPECTIO N ATTA CHMENT RING OF THE NOSE INLE T COWL
71-6 1-00-2 05 MOS +40/-40
HRS /MSC
MRB REF: AMM 7 1 6 1 0 1 22 0 8 02 AFL 780 0 +40/-40 780 0 784 0
71-6 1-01-9 00-80 1-01 LH ENG INE,INLE T COWL
228 -50020 -801 MOS TSN:0 01-A PR-2011
SBRJ3319 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
71-6 1-01-9 00-80 1-02 RH ENGINE,INLET COWL
228 -50020 -801 MOS TSN:0 01-A PR-2011
SBRJ3318 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
71-ZL-0 0-201 (s) GENERAL VISUAL INS PECTION NA CE LLE - E XTERNAL LH PKG
71-ZL-0 0-201 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
71-ZL-0 0-202 (s) GENERAL VISUAL INS PECTION NA CE LLE - E XTERNAL RH PKG
71-ZL-0 0-202 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
71-ZL-0 0-203 (s) GENERAL VISUAL INS PECTION NO SE INLET ACCE SS CO WL - INSIDE LH PKG
71-ZL-0 0-203 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: See Workcard AFL 144 9
71-ZL-0 0-204 (s) GENERAL VISUAL INS PECTION NO SE INLET ACCE SS CO WL - INSIDE RH PKG
71-ZL-0 0-204 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: See Workcard AFL 144 9
71-ZL-0 0-205 (s) GENERAL VISUAL INS PECTION TRANSLA TING COWL - INTERNA L LH PKG
71-ZL-0 0-205 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
71-ZL-0 0-206 (s) GENERAL VISUAL INS PECTION TRANSLA TING COWL - INTERNA L RH PKG
71-ZL-0 0-206 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
194 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
71-ZL-0 0-207 (s) GENERAL VISUAL INS PECTION CO RE COWL - INTE RNAL LH PKG
71-ZL-0 0-207 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: See Workcard AFL 144 9
71-ZL-0 0-208 (s) GENERAL VISUAL INS PECTION CO RE COWL - INTE RNAL RH PKG
71-ZL-0 0-208 PK G 3 6 MOS 36 +1m/-1m 21-A PR-2021
HRS /MSC 214 3.4
MRB REF: See Workcard AFL 144 9

710 000-00 1 ENGINE S TA RTING OP ERATION CHECK


MOS 26-A PR-2017
HRS /MSC - 136 3.8
REF: AFL 883

71E N1 NO. 1 ENGINE


608 9T1 1G01 MOS
71.EN1 950 967 HRS /MSC E/C
REF: See Workcard AFL

71E N2 NO. 2 ENGINE


608 9T1 1G01 MOS
71.EN2 950 968 HRS /MSC E/C
REF: See Workcard AFL
CHA PTER 72 ENGINE
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01
72-0 0-GE- 9001 NO. 1 ENGINE - DOWNLOAD OF BO TH ENGINES FOR TREND MONITO RING - E-MAIL TO
GEA EREMOTESERVICES@A E.GE.CO M - NO TE : CL5866 - RE SET MDC DATA: DISK OPS, PRESS: S KP, CHKLST, UP,
SEL , DWN & THEN CONFIRM RE SET
MOS 13-JUN-2022
HRS /MSC 50 224 5.8 3 (229 5.8 3) 2295.83
CUS TO ME R CODE REF: ENC 50 151 6 156 6
+ 72-0 0-GE- 9006 (s) NO. 1 ENGINE - VISUAL INSP ECTION O F THE DRAIN MAST A T THE 6 O'CLOCK POSITIO N FOR EV IDENCE O F OIL PKG
LEA KAGE .
PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 188 0.3
CUS TO ME R CODE REF: ENC 123 6

+ 72-0 0-GE- 9007 (s) NO. 1 ENGINE - VISUAL INSP ECTION O F THE OV ERBOARD DRAIN OF THE ENGINE COMBUSTOR O R EVIDENCE O F PKG
LEA KAGE .
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
CUS TO ME R CODE REF: ENC 151 6
+ 72-0 0-GE- 9009 (s) NO. 1 ENGINE - VISUAL CHE CK UNDER COWL - FOR S ECURITY OF TUBING, HOSE S, AND EL ECTRICA L PKG
CONNE CTORS.
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
CUS TO ME R CODE REF: ENC 151 6

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
195 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 72-0 0-GE- 9010 (s) NO. 1 ENGINE - VISUAL CHE CK UNDER COWL - FOR FUEL OR O IL LEA KS PKG
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
CUS TO ME R CODE REF: ENC 151 6
+ 72-0 0-GE- 9011 (s) NO. 1 ENGINE - VISUAL CHE CK UNDER COWL - STRUCTURA L INTE GRITY OF E NG INE CA SES AND FLANGE S PKG
(INCLUDING LOO SE, MISSING , OR BRO KEN ATTACHING HARDWARE) .
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
CUS TO ME R CODE REF: ENC 151 6
+ 72-0 0-GE- 9012 (s) NO. 1 ENGINE - VISUAL CHE CK UNDER COWL - ENGINE V ARIAB LE GEOMETRY SYSTEM FO R DAMAGED, MISSING , PKG
OR LOOS E P ARTS, AND THA T THE ROD-END BE ARINGS ARE SEATED CO RRECTLY.
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
CUS TO ME R CODE REF: ENC 151 6
+ 72-0 0-GE- 9013 (s) NO. 1 ENGINE - VISUAL INSP ECTION THE INTEGRITY OF ENGINE MOUNT SYSTEM (INCLUDING FA N STATOR PKG
FORWARD ENGINE MOUNT, FAN CASING , THRUST MOUNT ASS EMBLY, A ND THE REAR MA IN MOUNT).
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
CUS TO ME R CODE REF: ENC 151 6
+ 72-0 0-GE- 9022 (s) NO. 1 ENGINE - VISUAL CHE CK OF THE ENGINE OIL FILTER BYPAS S INDICATOR. PKG
PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3
CUS TO ME R CODE REF: ENC 151 6
+ 72-0 0-GE- 9034 (s) NO. 1 ENGINE - GE NERAL VISUAL INS PECTION OF ENGINE ACCES SORIE S FOR CONDITION AND SECURITY. PKG
PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 153 4.3
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9035 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE OIL TA NK FOR CRACKS AND LE AKAG E A RO UND THE PKG
INTERFACE FITTING S.
PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 153 4.3
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9044 (s) NO. 1 ENGINE - VISUAL INSP ECTION O F THE AFT FAN FO R CRA CK S O R DIS TO RTION, SECURITY AND CONDITION OF PKG
ATTACHING HARDWARE, AND CONDITION O F THE ANTI- CO RROSION CO ATING.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9045 (s) NO. 1 ENGINE - GE NERAL VISUAL INS PECTION OF THE E NG INE VG ACTUATORS FOR SE CURITY AT ATTACHMENT PKG
POINTS.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
196 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 72-0 0-GE- 9046 (s) NO. 1 ENGINE - GE NERAL VISUAL INS PECTION OF THE E NG INE VG FEEDBACK CA BLE FOR DAMAGE AND FOR PKG
SECURITY AT A TTACHME NT POINTS.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9049 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE FUE L P UMP HOUSING FOR E VIDENCE OF CRACKS OR PKG
STRUCTURA L DAMAG E.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

72-0 0-GE- 9050 (s) NO. 1 ENGINE - DETAIL ED VISUAL INS PECTION OF THE E NG INE FUEL CONTRO L FOR EVIDENCE OF CRACKS, PKG
STRUCTURA L DAMAG E, LOO SE FITTINGS, O R FUE L L EAKAG E
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9052 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N OF THE EXTERNA L SURFACES OF THE TURBINE TRANSITION CAS E. PKG
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9053 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE ACCESSO RY GE ARBOX SIDE A ND BOTTO M MOUNTS . PKG
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9054 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE FAN STATOR FO RWARD E NG INE MOUNTS FOR CRACKS OR PKG
DIS TO RTION, SECURITY A ND CONDITION OF THE ATTACHING HARDWARE, AND THE CONDITION OF THE
ANTI-CORROSION COA TING.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

72-0 0-GE- 9055 (s) NO. 1 ENGINE - DETAIL ED VISUAL INS PECTION OF THE E XTERNA L E NG INE FA N CASE FOR EV IDENCE O F CRA CK S PKG
OR DISTORTION, MECHANICAL DAMAGE , AND CORRO SION
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9056 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE FRO NT FRAME FOR EV IDENCE OF CRACKS OR PKG
STRUCTURA L DEFORMATIO N.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9057 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N OF A LL THE ENGINE VG A CTUATING SYSTEM CO MPONENTS . PKG
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
197 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 72-0 0-GE- 9058 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE COMPRESSO R CASE FOR E VIDENCE OF CRACKS, PKG
DIS CO LORATIO N, O R DAMAGE (ES PECIA LLY THE FLANGE AREAS )
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9059 (s) NO. 1 ENGINE - VISUAL INSP ECTION O F THE EX POSE D COMPRESSO R BLE ED AIR BO SS AREA FO R CRACK S AND PKG
SURRO UNDING AREAS FOR EVIDE NCE OF A IR LEAKA GE CA US ED BY CRACKS.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

72-0 0-GE- 9061 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N FOR THE FIELD MANAG EMENT PLA N OF COMBUSTION LINER PKG
FERRULE .MEAS URE THE COMBUSTIO N LINE R FERRULE WEAR, RECORD DIME NS IONS AND REP EAT INSPECTIO NS .
(FOR E NG INES NOT MODIFIED TO SB 72- 0059)
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

72-0 0-GE- 9062 (s) NO. 1 ENGINE - GE NERAL VISUAL INS PECTION OF ENGINE OF BLUE, BROWN, AND YELL OW CAB LES FO R SECURITY PKG
AND A TTACHME NT AT AL L CONNECTIONS.(73-2 0-00-2 04)
(FOR E NG INES NOT MODIFIED TO SB 72- 0059)
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

72-2 0-00-2 01 NO. 1 ENGINE - GE NERAL VISUAL INS PECTION OF FAN B LADES
MOS 13-JUN-2022
72.005 HRS /MSC 400 224 5.8 3 (264 5.8 3) 2645.83
REF: See Workcard ENC 151 6
72-2 0-00-2 02 NO. 1 ENGINE - GE NERAL VISUAL INS PECTION FA N SPINNE R
MOS 13-JUN-2022
72.010 HRS /MSC 400 +40/-40 34.47 224 5.8 3 (268 0.3 ) 2 680.3 272 0.3
REF: See Workcard ENC 151 6
72-2 0-00-2 07 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N ENGINE MASTER CHIP DE TECTOR INDICATOR PKG
PK G 1 00 MOS 13-JUN-2022
72.015 HRS /MSC 100 224 5.8 3
REF: See Workcard ENC 151 6
72-2 0-00-2 08 (s) NO. 1 ENGINE - GE NERAL VISUAL INS PECTION ENGINE FAN CASE FORWARD MOUNTS PKG
PK G 3 200 MOS +40/-40
72.020 HRS /MSC 320 0 +40/-40 0
REF: See Workcard ENC

72-2 0-00-2 10 NO. 1 ENGINE - GE NERAL VISUAL INS PECTION FA N SHROUD CORE MATERIAL
MOS 13-JUN-2022
72.025 HRS /MSC 400 +40/-40 34.47 224 5.8 3 (268 0.3 ) 2 680.3 272 0.3
MPD S ECTION 7 REF: See Workcard ENC 151 6
72-2 0-00-2 11 (s) NO. 1 ENGINE - GE NERAL VISUAL INS PECTION EXTERIO R OF E NG INE FA N CASE & BLA DE- CO NTAINME NT CA SE PKG
PK G 1 200 MOS 27-S EP-20 19
72.030 HRS /MSC 120 0 +40/-40 187 7.3
REF: See Workcard ENC 124 7

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
198 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
72-3 0-00-2 02 (s) NO. 1 ENGINE - SPE CIAL DETAILED INSPECTIO N (BORES CO PE) OF THE CO MP RE SSOR BLADES PKG
PK G 3 200 MOS 24-JUL-20 17
72.035 HRS /MSC 320 0 +40/-40 136 3.8
REF: See Workcard ENC 894
72-3 0-00-2 04 (s) NO. 1 ENGINE - SPE CIAL DETAILED INSPECTIO N (BORES CO PE) OF THE VARIA BLE AND STATIONARY V ANE S PKG
PK G 3 200 MOS +40/-40
72.040 HRS /MSC 320 0 +40/-40 0
REF: See Workcard ENC

72-3 0-00-2 05 (s) NO. 1 ENGINE - LUBRICATION V ARIAB LE GEOMETRY LINKA GE RO D END BE ARINGS PKG
PK G 8 00 MOS 13-JUN-2022
72.045 HRS /MSC 800 +40/-40 224 5.8 3
REF: See Workcard ENC 151 6

+ 72-3 0-00-2 07 NO. 1 ENGINE - WATER DRAIN IN THE FAN CONTAINMENT CAS E A T THE FAN B LADE RE MO VAL PORT - REMOVE THE
FAN BL ADE REMOV AL PORT COVE R. REMOVE AL L DEB RIS FO UND IN THE DRAIN AND BLADE RE MO VAL PORT
COVER AREA
MOS 04-S EP-20 20
HRS /MSC 800 199 7.9 7 (279 7.9 7) 2797.97
REF: ENC 135 5

72-4 0-00-2 01 (s) NO. 1 ENGINE - SPE CIAL DETAILED INSPECTIO N (BORES CO PE) OF THE CO MB US TOR LINE R PKG
PK G 3 200 MOS 24-JUL-20 17
72.050 HRS /MSC 320 0 +40/-40 136 3.8
REF: See Workcard ENC 894

72-4 0-00-2 02 (s) NO. 1 ENGINE - SPE CIAL DETAILED INSPECTIO N (BORES CO PE) OF THE STA GE 1 NO ZZLE PKG
PK G 3 200 MOS 24-JUL-20 17
72.055 HRS /MSC 320 0 +40/-40 136 3.8
REF: See Workcard ENC 894

72-4 0-00-2 05 NO. 1 ENGINE - GE NERAL VISUAL INS PECTION THERMAL BLANKE T
MOS 13-JUN-2022
72.065 HRS /MSC 400 +40/-40 34.47 224 5.8 3 (268 0.3 ) 2 680.3 272 0.3
REF: See Workcard ENC 151 6

72-4 0-00-2 07 (s) NO. 1 ENGINE - GE NERAL VISUAL INS PECTION RE AR MAIN MOUNT PKG
PK G 3 200 MOS +40/-40
72.070 HRS /MSC 320 0 +40/-40 0
REF: See Workcard ENC

72-5 0-00-2 01 (s) NO. 1 ENGINE - SPE CIAL DETAILED INSPECTIO N (BORES CO PE) OF THE HIGH-PRESS URE-TURBINE STAGE 1 AND 2 PKG
ROTOR B LADES
PK G 3 200 MOS 24-JUL-20 17
72.075 HRS /MSC 320 0 +40/-40 136 3.8
REF: See Workcard ENC 894

72-5 0-00-2 08 (s) NO. 1 ENGINE - VISUAL CHE CK EX HAUST CE NTERBO DY PKG
PK G 2 400 MOS 13-JUN-2022
72.080 HRS /MSC 240 0 +40/-40 224 5.8 3
REF: See Workcard ENC 151 6

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
199 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
720 000-00 1 NO. 1 ENGINE - NO. 1 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 069 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 2 NO. 1 ENGINE - NO. 2 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE79 054 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-00 3 NO. 1 ENGINE - N0. 3 FAN BL ADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE91 526 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 4 NO. 1 ENGINE - NO. 4 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE89 885 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 5 NO. 1 ENGINE - NO. 5 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 178 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 6 NO. 1 ENGINE - NO. 6 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 078 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 7 NO. 1 ENGINE - NO. 7 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 046 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 8 NO. 1 ENGINE - NO. 8 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 022 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 9 NO. 1 ENGINE - NO. 9 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 007 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-01 0 NO. 1 ENGINE - NO. 10 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 134 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-01 1 NO. 1 ENGINE - NO. 11 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 133 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
200 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
720 000-01 2 NO. 1 ENGINE - NO. 12 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 090 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-01 3 NO. 1 ENGINE - NO. 13 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 113 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 4 NO. 1 ENGINE - NO. 14 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 123 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 5 NO. 1 ENGINE - NO. 15 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 130 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 6 NO. 1 ENGINE - NO. 16 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 666 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 7 NO. 1 ENGINE - NO. 17 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 056 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 8 NO. 1 ENGINE - NO. 18 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 008 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 9 NO. 1 ENGINE - NO. 19 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 073 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-02 0 NO. 1 ENGINE - NO. 20 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE91 989 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 1 NO. 1 ENGINE - NO. 21 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE91 957 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 2 NO. 1 ENGINE - NO. 22 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE91 916 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
201 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
720 000-02 3 NO. 1 ENGINE - NO. 23 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 124 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 4 NO. 1 ENGINE - NO. 24 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE91 985 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-02 5 NO. 1 ENGINE - NO. 25 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 121 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 6 NO. 1 ENGINE - NO. 26 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 004 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 7 NO. 1 ENGINE - NO. 27 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE91 938 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 8 NO. 1 ENGINE - NO. 28 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 011 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-03 0 NO. 1 ENGINE - FAN AS SEMBLY MODULE
512 2T1 0G01 MOS TSN:0 01-A PR-2011
72.445 GEA 95096 7 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-03 1 NO. 1 ENGINE - COMPRESSO R ASS EMBLY MODUL E
512 3T1 5G01 MOS TSN:0 01-A PR-2011
72.450 GEB 95096 7 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-03 2 NO. 1 ENGINE - COMBUSTER/HPT TURBINE ASS EMBLY MODUL E
512 1T3 0G01 MOS TSN:0 01-A PR-2011
72.455 GEC95 0967 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-03 3 NO. 1 ENGINE - LOW PRESSURE TURBINE A SSEMBLY MODULE
512 1T3 1G01 MOS TSN:0 01-A PR-2011
72.460 GED95 0967 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-03 4 NO. 1 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY MODUL E
608 7T1 5G02 MOS TSN:0 01-A PR-2011
72.465 GEE 95096 7 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
202 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
720 001-00 1 NO. 1 ENGINE - CARBON SEAL
PN MOS TSN:0 01-A PR-2011
72.090 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
722 110-00 1 NO. 1 ENGINE - FAN FWD AS SEMBLY CASE
PN MOS TSN:0 01-A PR-2011
72.095 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

722 114-00 1 NO. 1 ENGINE - FAN AFT A SSEMBL Y CAS E


605 2T0 1G10 MOS TSN:0 01-A PR-2011
72.100 GEV L20A6 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

722 140-00 1 NO. 1 ENGINE - ROTOR FAN


607 8T8 3G09 MOS TSN:0 01-A PR-2011
72.105 GG FV4 889 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

722 150-00 1 NO. 1 ENGINE - FAN DISK


607 8T5 7G05 MOS TSN:0 01-A PR-2011
72.110 GEE 1GG8 J HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 300 00 TSN:0 0 300 00
722 210-00 1 NO. 1 ENGINE - FAN DRIV E S HA FT
603 6T7 8P02 MOS TSN:0 01-A PR-2011
72.115 FBKRM556 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00
722 450-00 1 NO. 1 ENGINE - NO.2 B ALL BEARING
504 2T1 1P02 MOS TSN:0 01-A PR-2011
72.120 FCA V6231 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

722 490-00 1 NO. 1 ENGINE - BAL L NO.1 BEARING


607 8T3 5P03 MOS TSN:0 01-A PR-2011
72.125 FCA S9714 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

722 520-00 1 NO. 1 ENGINE - FORWARD FAN SHAFT


607 8T5 1P02 MOS TSN:0 01-A PR-2011
72.130 GATHRE6F HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00
723 110-00 1 NO. 1 ENGINE - FRO NT CO MPRE SSOR FRAME
603 0T7 9G16 MOS TSN:0 01-A PR-2011
72.135 SPK 96N9T HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
723 120-00 1 NO. 1 ENGINE - FAN SP EED S ENSOR
402 1T5 6P04 MOS TSN:0 01-A PR-2011
72.140 EGNFM176 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
203 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
723 210-00 1 NO. 1 ENGINE - CONTA INMENT CASE
415 0T3 2G01 MOS TSN:0 01-A PR-2011
72.145 CTDD2HT8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
723 310-00 1 NO. 1 ENGINE - STAGE 9 COMPRESSO R ROTOR DISK
608 7T0 1P03 MOS TSN:0 01-A PR-2011
72.150 NCE 834HK HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
723 312-00 1 NO. 1 ENGINE - CASE ASS EMBLY COMPRESSO R
508 8T5 5G03 MOS TSN:0 01-A PR-2011
72.085 GATHT03D HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
723 314-00 1 NO. 1 ENGINE - COMPRESSO R DIS CHARGE ROTATING SEA L
401 9T3 8P01 MOS TSN:0 01-A PR-2011
72.160 TEJG1652 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 300 00 TSN:0 0 300 00
723 316-00 1 NO. 1 ENGINE - BAL L NO.3 BEARING
504 1T4 1P03 MOS TSN:0 01-A PR-2011
72.165 FCA V4895 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
723 318-00 1 NO. 1 ENGINE - COMPRESSO R FORWARD SHAFT
503 7T0 1P04 MOS TSN:0 01-A PR-2011
72.170 PAMJG35 5 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 300 00 TSN:0 0 300 00
723 322-00 1 NO. 1 ENGINE - STAGE 2 COMPRESSO R ROTOR DISK
603 6T9 1P02 MOS TSN:0 01-A PR-2011
72.175 GATHRNHK HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
723 328-00 1 NO. 1 ENGINE - STAGE 3 - 8 COMPRES SOR ROTOR SPOO L
607 8T5 6P05 MOS TSN:0 01-A PR-2011
72.180 GATHRM0 D HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
723 330-00 1 NO. 1 ENGINE - STAGE 10 - 14 COMPRESSO R ROTOR SP OOL
508 7T4 6P02 MOS TSN:0 01-A PR-2011
72.185 GATHRP7M HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
723 334-00 1 NO. 1 ENGINE - COMPRESSO R ROTOR REAR SHAFT
608 7T0 3P03 MOS TSN:0 01-A PR-2011
72.190 GEE 1GGE 3 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
723 336-00 1 NO. 1 ENGINE - ROLLE R NO.4 B EARING
504 2T1 2P02 MOS TSN:0 01-A PR-2011
72.195 FCA V4201 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
204 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
723 340-00 1 NO. 1 ENGINE - ROTOR COMPRESS OR
512 3T1 4G08 MOS TSN:0 01-A PR-2011
72.200 GG FD499 8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 103-00 1 NO. 1 ENGINE - COMBUSTIO N FRA ME
PN MOS TSN:0 01-A PR-2011
72.205 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 124-00 1 NO. 1 ENGINE - ROLLE R NO.5 B EARING


504 2T1 3P04 MOS TSN:0 01-A PR-2011
72.210 FCA V8387 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 128-00 1 NO. 1 ENGINE - BAL ANCE PISTON S TA TIONARY AIR SEA L
PN MOS TSN:0 01-A PR-2011
72.470 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 219-00 1 NO. 1 ENGINE - COMBUSTIO N FRA ME


306 3T8 2G01 MOS TSN:0 01-A PR-2011
SPK 96R5R HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 220-00 1 NO. 1 ENGINE - COMBUSTIO N LINE R


607 8T6 5G13 MOS TSN:0 01-A PR-2011
72.225 GG M9E F5 8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 221-00 1 NO. 1 ENGINE - COMBUSTIO N INNER S HE LL LINER


PN MOS TSN:0 01-A PR-2011
72.230 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 222-00 1 NO. 1 ENGINE - COMBUSTIO N OUTER SHELL LINER


PN MOS TSN:0 01-A PR-2011
72.235 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 223-00 1 NO. 1 ENGINE - COMBUSTIO N LINE R DOME


PN MOS TSN:0 01-A PR-2011
72.240 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 512-00 1 NO. 1 ENGINE - HPT INNE R CASING
509 9T0 0G05 MOS TSN:0 01-A PR-2011
72.245 CDA APYCJ HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 514-00 1 NO. 1 ENGINE - HPT, ASS Y S TATOR
509 9T0 3G11 MOS TSN:0 01-A PR-2011
72.250 GG FG5 046 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
205 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
724 517-00 1 NO. 1 ENGINE - HPT O UTER CAS ING
603 6T0 4G06 MOS TSN:0 01-A PR-2011
72.255 SPK 96N9L HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 600-00 1 NO. 1 ENGINE - STAGE 1 HPT BL ADE ( SET)
607 8T1 9P10 MOS TSN:0 01-A PR-2011
72.475 GATHRR6 T HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 600-00 2 NO. 1 ENGINE - STAGE 2 HPT BL ADE ( SET)


607 8T1 1P07 MOS TSN:0 01-A PR-2011
72.475 GATHRTL 2 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 606-00 1 NO. 1 ENGINE - HPT STAG E NO.1 FRO NT CO OLING PL ATE
507 9T6 5P06 MOS TSN:0 01-A PR-2011
72.260 NCE 273HL HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00
724 608-00 1 NO. 1 ENGINE - STAGE 1 COMPRESSO R ROTOR B LIS K
508 7T8 4P03 MOS TSN:0 01-A PR-2011
72.265 GLHTN7NG HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00
724 609-00 1 NO. 1 ENGINE - HPT ROTATING AIR SE AL
PN MOS TSN:0 01-A PR-2011
72.270 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 610-00 1 NO. 1 ENGINE - HPT STAG E NO.1 DISK
507 9T5 2P09 MOS TSN:0 01-A PR-2011
72.275 GATHRR6 T HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
724 612-00 1 NO. 1 ENGINE - HPT STAG E NO.2 DISK
507 9T7 3P02 MOS TSN:0 01-A PR-2011
72.280 GATHRTL 2 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
724 614-00 1 NO. 1 ENGINE - HPT STAG E NO.2 FRO NT CO OLING PL ATE
507 9T5 5P04 MOS TSN:0 01-A PR-2011
72.285 NCE 471HK HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
724 616-00 1 NO. 1 ENGINE - HPT STAG E NO.2 REAR COO LING PLA TE
507 9T5 6P02 MOS TSN:0 01-A PR-2011
72.290 NCE 533HK HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00
724 620-00 1 NO. 1 ENGINE - HIG H PRESS URE TURBINE ROTOR SHAFT
507 9T6 2P02 MOS TSN:0 01-A PR-2011
72.295 GEE 1GGD3 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
206 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
724 628-00 1 NO. 1 ENGINE - BAL ANCE PISTON ROTATING A IR S EAL
507 9T6 3P02 MOS TSN:0 01-A PR-2011
72.300 NCE 111HK HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
724 638-00 1 NO. 1 ENGINE - OUTER TORQUE COUPLING
507 9T6 4P05 MOS TSN:0 01-A PR-2011
72.305 NCE 700HJ HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00
724 645-00 1 NO. 1 ENGINE - HPT STAG E NO.1 AFT COOL ING PLATE
512 3T0 2P01 MOS TSN:0 01-A PR-2011
72.310 NCE 290HL HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 140 00 TSN:0 0 140 00
724 649-00 1 NO. 1 ENGINE - RUNNER SEAL
PN MOS TSN:0 01-A PR-2011
72.315 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 704-00 1 NO. 1 ENGINE - STAGE NO 1 NO ZZLE


509 9T1 2G03 MOS TSN:0 01-A PR-2011
72.320 JMN0B 4RN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 710-00 1 NO. 1 ENGINE - HIG H PRESS URE TURBINE ROTOR


507 9T6 1G11 MOS TSN:0 01-A PR-2011
72.325 GG FJ5100 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

725 110-00 1 NO. 1 ENGINE - LPT TURBINE TRANSITION A SSEMBLY


512 1T2 9G05 MOS TSN:0 01-A PR-2011
72.330 GG FA4 916 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

725 112-00 1 NO. 1 ENGINE - LPT TURBINE TRANSITION CAS E


509 9T3 1G01 MOS TSN:0 01-A PR-2011
72.335 GEV L1W71 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

725 114-00 1 NO. 1 ENGINE - TRA NS ITION TURB INE SEAL & LINE R
604 7T2 8G05 MOS TSN:0 01-A PR-2011
72.340 GG M9E 8C9 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
725 125-00 1 NO. 1 ENGINE - LPT ASSE MB LY RO TO R
507 1T4 0G04 MOS TSN:0 01-A PR-2011
72.345 GG FM503 5 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
725 210-00 1 NO. 1 ENGINE - LPT, A SSY STATOR
509 9T1 0G06 MOS TSN:0 01-A PR-2011
72.350 GG FN491 7 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
207 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
725 220-00 1 NO. 1 ENGINE - LEFT A SSEMBL Y THERMO CO UP LE
603 0T4 1P02 MOS TSN:0 01-A PR-2011
72.355 FDTE9 785 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
725 220-00 2 NO. 1 ENGINE - RIG HT ASSE MB LY THERMOCOUPLE
603 0T4 0P02 MOS TSN:0 01-A PR-2011
72.355 FDTE4 064 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0

725 314-00 1 NO. 1 ENGINE - LPT RE AR SHAFT


603 0T7 2P02 MOS TSN:0 01-A PR-2011
72.360 NCE 193HL HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 320-00 1 NO. 1 ENGINE - LPT STAGE NO.3 DISK
607 8T9 1P02 MOS TSN:0 01-A PR-2011
72.365 XAE J1 098 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 324-00 1 NO. 1 ENGINE - LPT STAGE NO.5 DISK
607 8T9 2P02 MOS TSN:0 01-A PR-2011
72.370 GATHRTG 1 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 326-00 1 NO. 1 ENGINE - LPT STAGE NO.6 DISK
607 8T8 9P03 MOS TSN:0 01-A PR-2011
72.375 GATHRT7 9 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 330-00 1 NO. 1 ENGINE - LPT STAGE NO.3 / 4 S EAL
502 3T5 9P06 MOS TSN:0 01-A PR-2011
72.380 WES52 929 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 332-00 1 NO. 1 ENGINE - LPT STAGE NO.4 / 5 S EAL
502 3T6 7P02 MOS TSN:0 01-A PR-2011
72.385 WES42 698 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 334-00 1 NO. 1 ENGINE - LPT STAGE NO.5 / 6 S EAL
502 3T6 4P04 MOS TSN:0 01-A PR-2011
72.390 WES63 082 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 338-00 1 NO. 1 ENGINE - LPT TURBINE DRIV E CONE
502 3T4 0P03 MOS TSN:0 01-A PR-2011
72.395 FDU36 65E HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 340-00 1 NO. 1 ENGINE - LPT STAGE NO.4 DISK
607 8T0 2P04 MOS TSN:0 01-A PR-2011
72.400 XAE J0 888 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
208 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
725 412-00 1 NO. 1 ENGINE - TURBINE LOW P RE SSURE CAS ING
601 7T5 5G09 MOS TSN:0 01-A PR-2011
72.405 GEV L1L2L HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
725 414-00 1 NO. 1 ENGINE - ROLLE R NO.6 B EARING
504 2T1 4P02 MOS TSN:0 01-A PR-2011
72.410 FCA V8393 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

725 416-00 1 NO. 1 ENGINE - TURBINE HIGH P RE SSURE O UTER BEARING


PN MOS TSN:0 01-A PR-2011
72.415 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

725 417-00 1 NO. 1 ENGINE - NO.7 B EARING


504 2T1 5P02 MOS TSN:0 01-A PR-2011
72.420 FCA V6798 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

726 210-00 1 NO. 1 ENGINE - ACCESSO RY GE ARBOX


515 4T9 8G01 MOS TSN:0 01-A PR-2011
72.425 SAP 1A987 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

726 410-00 1 NO. 1 ENGINE - PO WE R TAKEOFF A SSEMBL Y DRIV E


603 7T7 2G19 MOS TSN:0 01-A PR-2011
72.430 SAP 2A526 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

726 419-00 1 NO. 1 ENGINE - BAL L DUPLE X B EARING


PN MOS TSN:0 01-A PR-2011
72.435 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

726 419-00 2 NO. 1 ENGINE - PTO DUPL EX BEARING


PN MOS TSN:0 01-A PR-2011
72.440 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
72-0 0-GE- 9001 NO. 2 ENGINE - DOWNLOAD OF BO TH ENGINES FOR TREND MONITO RING - E-MAIL TO
GEA EREMOTESERVICES@A E.GE.CO M - NO TE : CL5866 - RE SET MDC DATA: DISK OPS, PRESS: S KP, CHKLST, UP,
SEL , DWN & THEN CONFIRM RE SET
MOS 13-JUN-2022
HRS /MSC 50 224 5.8 3 (229 5.8 3) 2295.83
CUS TO ME R CODE REF: ENC 50 151 5 156 5
+ 72-0 0-GE- 9006 (s) NO. 2 ENGINE - VISUAL INSP ECTION O F THE DRAIN MAST A T THE 6 O'CLOCK POSITIO N FOR EV IDENCE O F OIL PKG
LEA KAGE .
PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 188 0.3
CUS TO ME R CODE REF: ENC 123 6

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
209 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 72-0 0-GE- 9007 (s) NO. 2 ENGINE - VISUAL INSP ECTION O F THE OV ERBOARD DRAIN OF THE ENGINE COMBUSTOR O R EVIDENCE O F PKG
LEA KAGE .
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
CUS TO ME R CODE REF: ENC 151 5
+ 72-0 0-GE- 9009 (s) NO. 2 ENGINE - VISUAL CHE CK UNDER COWL - FOR S ECURITY OF TUBING, HOSE S, AND EL ECTRICA L PKG
CONNE CTORS.
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
CUS TO ME R CODE REF: ENC 151 5
+ 72-0 0-GE- 9010 (s) NO. 2 ENGINE - VISUAL CHE CK UNDER COWL - FOR FUEL OR O IL LEA KS PKG
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
CUS TO ME R CODE REF: ENC 151 5
+ 72-0 0-GE- 9011 (s) NO. 2 ENGINE - VISUAL CHE CK UNDER COWL - STRUCTURA L INTE GRITY OF E NG INE CA SES AND FLANGE S PKG
(INCLUDING LOO SE, MISSING , OR BRO KEN ATTACHING HARDWARE) .
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
CUS TO ME R CODE REF: ENC 151 5
+ 72-0 0-GE- 9012 (s) NO. 2 ENGINE - VISUAL CHE CK UNDER COWL - ENGINE V ARIAB LE GEOMETRY SYSTEM FO R DAMAGED, MISSING , PKG
OR LOOS E P ARTS, AND THA T THE ROD-END BE ARINGS ARE SEATED CO RRECTLY.
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
CUS TO ME R CODE REF: ENC 151 5
+ 72-0 0-GE- 9013 (s) NO. 2 ENGINE - VISUAL INSP ECTION THE INTEGRITY OF ENGINE MOUNT SYSTEM (INCLUDING FA N STATOR PKG
FORWARD ENGINE MOUNT, FAN CASING , THRUST MOUNT ASS EMBLY, A ND THE REAR MA IN MOUNT).
PK G 4 00 MOS 13-JUN-2022
HRS /MSC 400 224 5.8 3
CUS TO ME R CODE REF: ENC 151 5
+ 72-0 0-GE- 9022 (s) NO. 2 ENGINE - VISUAL CHE CK OF THE ENGINE OIL FILTER BYPAS S INDICATOR. PKG
PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 224 5.8 3
CUS TO ME R CODE REF: ENC 151 5

+ 72-0 0-GE- 9034 (s) NO. 2 ENGINE - GE NERAL VISUAL INS PECTION OF ENGINE ACCES SORIE S FOR CONDITION AND SECURITY. PKG
PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 153 4.3
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9035 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE OIL TA NK FOR CRACKS AND LE AKAG E A RO UND THE PKG
INTERFACE FITTING S.
PK G 1 600 MOS 29-MAR-2 018
HRS /MSC 160 0 153 4.3
CUS TO ME R CODE REF: ENC

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
210 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 72-0 0-GE- 9044 (s) NO. 2 ENGINE - VISUAL INSP ECTION O F THE AFT FAN FO R CRA CK S O R DIS TO RTION, SECURITY AND CONDITION OF PKG
ATTACHING HARDWARE, AND CONDITION O F THE ANTI- CO RROSION CO ATING.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9045 (s) NO. 2 ENGINE - GE NERAL VISUAL INS PECTION OF THE E NG INE VG ACTUATORS FOR SE CURITY AT ATTACHMENT PKG
POINTS.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9046 (s) NO. 2 ENGINE - GE NERAL VISUAL INS PECTION OF THE E NG INE VG FEEDBACK CA BLE FOR DAMAGE AND FOR PKG
SECURITY AT A TTACHME NT POINTS.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9049 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE FUE L P UMP HOUSING FOR E VIDENCE OF CRACKS OR PKG
STRUCTURA L DAMAG E.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

72-0 0-GE- 9050 (s) NO. 2 ENGINE - DETAIL ED VISUAL INS PECTION OF THE E NG INE FUEL CONTRO L FOR EVIDENCE OF CRACKS, PKG
STRUCTURA L DAMAG E, LOO SE FITTINGS, O R FUE L L EAKAG E
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9052 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N OF THE EXTERNA L SURFACES OF THE TURBINE TRANSITION CAS E. PKG
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9053 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE ACCESSO RY GE ARBOX SIDE A ND BOTTO M MOUNTS . PKG
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9054 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE FAN STATOR FO RWARD E NG INE MOUNTS FOR CRACKS OR PKG
DIS TO RTION, SECURITY A ND CONDITION OF THE ATTACHING HARDWARE, AND THE CONDITION OF THE
ANTI-CORROSION COA TING.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

72-0 0-GE- 9055 (s) NO. 2 ENGINE - DETAIL ED VISUAL INS PECTION OF THE E XTERNA L E NG INE FA N CASE FOR EV IDENCE O F CRA CK S PKG
OR DISTORTION, MECHANICAL DAMAGE , AND CORRO SION
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
211 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 72-0 0-GE- 9056 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE FRO NT FRAME FOR EV IDENCE OF CRACKS OR PKG
STRUCTURA L DEFORMATIO N.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9057 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N OF A LL THE ENGINE VG A CTUATING SYSTEM CO MPONENTS . PKG
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9058 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE COMPRESSO R CASE FOR E VIDENCE OF CRACKS, PKG
DIS CO LORATIO N, O R DAMAGE (ES PECIA LLY THE FLANGE AREAS )
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

+ 72-0 0-GE- 9059 (s) NO. 2 ENGINE - VISUAL INSP ECTION O F THE EX POSE D COMPRESSO R BLE ED AIR BO SS AREA FO R CRACK S AND PKG
SURRO UNDING AREAS FOR EVIDE NCE OF A IR LEAKA GE CA US ED BY CRACKS.
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

72-0 0-GE- 9061 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N FOR THE FIELD MANAG EMENT PLA N OF COMBUSTION LINER PKG
FERRULE .MEAS URE THE COMBUSTIO N LINE R FERRULE WEAR, RECORD DIME NS IONS AND REP EAT INSPECTIO NS .
(FOR E NG INES NOT MODIFIED TO SB 72- 0059)
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

72-0 0-GE- 9062 (s) NO. 2 ENGINE - GE NERAL VISUAL INS PECTION OF ENGINE OF BLUE, BROWN, AND YELL OW CAB LES FO R SECURITY PKG
AND A TTACHME NT AT AL L CONNECTIONS.(73-2 0-00-2 04).
(FOR E NG INES NOT MODIFIED TO SB 72- 0059)
PK G 3 200 MOS
HRS /MSC 320 0 0
CUS TO ME R CODE REF: ENC

72-2 0-00-2 01 NO. 2 ENGINE - GE NERAL VISUAL INS PECTION OF FAN B LADES
MOS 13-JUN-2022
72.005 HRS /MSC 400 224 5.8 3 (264 5.8 3) 2645.83
REF: See Workcard ENC 151 5
72-2 0-00-2 02 NO. 2 ENGINE - GE NERAL VISUAL INS PECTION FA N SPINNE R
MOS 13-JUN-2022
72.010 HRS /MSC 400 +40/-40 34.47 224 5.8 3 (268 0.3 ) 2 680.3 272 0.3
REF: See Workcard ENC 151 5
72-2 0-00-2 07 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N ENGINE MASTER CHIP DE TECTOR INDICATOR PKG
PK G 1 00 MOS 13-JUN-2022
72.015 HRS /MSC 100 224 5.8 3
REF: See Workcard ENC 151 5
72-2 0-00-2 08 (s) NO. 2 ENGINE - GE NERAL VISUAL INS PECTION ENGINE FAN CASE FORWARD MOUNTS PKG
PK G 3 200 MOS +40/-40
72.020 HRS /MSC 320 0 +40/-40 0
REF: See Workcard ENC
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
212 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
72-2 0-00-2 10 NO. 2 ENGINE - GE NERAL VISUAL INS PECTION FA N SHROUD CORE MATERIAL
MOS 13-JUN-2022
72.025 HRS /MSC 400 +40/-40 34.47 224 5.8 3 (268 0.3 ) 2 680.3 272 0.3
MPD S ECTION 7 REF: See Workcard ENC 151 5
72-2 0-00-2 11 (s) NO. 2 ENGINE - GE NERAL VISUAL INS PECTION EXTERIO R OF E NG INE FA N CASE & BLA DE- CO NTAINME NT CA SE PKG
PK G 1 200 MOS 27-S EP-20 19
72.030 HRS /MSC 120 0 +40/-40 187 7.3
REF: See Workcard ENC 124 6

72-3 0-00-2 02 (s) NO. 2 ENGINE - SPE CIAL DETAILED INSPECTIO N (BORES CO PE) OF THE CO MP RE SSOR BLADES PKG
PK G 3 200 MOS 24-JUL-20 17
72.035 HRS /MSC 320 0 +40/-40 136 3.8
REF: See Workcard ENC 893

72-3 0-00-2 04 (s) NO. 2 ENGINE - SPE CIAL DETAILED INSPECTIO N (BORES CO PE) OF THE VARIA BLE AND STATIONARY V ANE S PKG
PK G 3 200 MOS +40/-40
72.040 HRS /MSC 320 0 +40/-40 0
REF: See Workcard ENC

72-3 0-00-2 05 (s) NO. 2 ENGINE - LUBRICATION V ARIAB LE GEOMETRY LINKA GE RO D END BE ARINGS PKG
PK G 8 00 MOS 13-JUN-2022
72.045 HRS /MSC 800 +40/-40 224 5.8 3
REF: See Workcard ENC 151 5

+ 72-3 0-00-2 07 NO. 2 ENGINE - WATER DRAIN IN THE FAN CONTAINMENT CAS E A T THE FAN B LADE RE MO VAL PORT - REMOVE THE
FAN BL ADE REMOV AL PORT COVE R. REMOVE AL L DEB RIS FO UND IN THE DRAIN AND BLADE RE MO VAL PORT
COVER AREA
MOS 04-S EP-20 20
HRS /MSC 800 199 7.9 7 (279 7.9 7) 2797.97
REF: ENC 135 4

72-4 0-00-2 01 (s) NO. 2 ENGINE - SPE CIAL DETAILED INSPECTIO N (BORES CO PE) OF THE CO MB US TOR LINE R PKG
PK G 3 200 MOS 24-JUL-20 17
72.050 HRS /MSC 320 0 +40/-40 136 3.8
REF: See Workcard ENC 893

72-4 0-00-2 02 (s) NO. 2 ENGINE - SPE CIAL DETAILED INSPECTIO N (BORES CO PE) OF THE STA GE 1 NO ZZLE PKG
PK G 3 200 MOS 24-JUL-20 17
72.055 HRS /MSC 320 0 +40/-40 136 3.8
REF: See Workcard ENC 893

72-4 0-00-2 05 NO. 2 ENGINE - GE NERAL VISUAL INS PECTION THERMAL BLANKE T
MOS 13-JUN-2022
72.065 HRS /MSC 400 +40/-40 34.47 224 5.8 3 (268 0.3 ) 2 680.3 272 0.3
REF: See Workcard ENC 151 5
72-4 0-00-2 07 (s) NO. 2 ENGINE - GE NERAL VISUAL INS PECTION RE AR MAIN MOUNT PKG
PK G 3 200 MOS +40/-40
72.070 HRS /MSC 320 0 +40/-40 0
REF: See Workcard ENC

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
213 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
72-5 0-00-2 01 (s) NO. 2 ENGINE - SPE CIAL DETAILED INSPECTIO N (BORES CO PE) OF THE HIGH-PRESS URE-TURBINE STAGE 1 AND 2 PKG
ROTOR B LADES
PK G 3 200 MOS 24-JUL-20 17
72.075 HRS /MSC 320 0 +40/-40 136 3.8
REF: See Workcard ENC 893
72-5 0-00-2 08 (s) NO. 2 ENGINE - VISUAL CHE CK EX HAUST CE NTERBO DY PKG
PK G 2 400 MOS 13-JUN-2022
72.080 HRS /MSC 240 0 +40/-40 224 5.8 3
REF: See Workcard ENC 151 5
720 000-00 1 NO. 2 ENGINE - NO. 1 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 948 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 2 NO. 2 ENGINE - NO. 2 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 423 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-00 3 NO. 2 ENGINE - N0. 3 FAN BL ADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 633 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 4 NO. 2 ENGINE - NO. 4 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 422 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 5 NO. 2 ENGINE - NO. 5 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 371 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 6 NO. 2 ENGINE - NO. 6 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 547 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 7 NO. 2 ENGINE - NO. 7 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 522 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-00 8 NO. 2 ENGINE - NO. 8 FAN BL ADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 275 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-00 9 NO. 2 ENGINE - NO. 9 FAN BL ADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 152 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
214 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
720 000-01 0 NO. 2 ENGINE - NO. 10 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 437 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-01 1 NO. 2 ENGINE - NO. 11 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 411 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 2 NO. 2 ENGINE - NO. 12 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 543 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 3 NO. 2 ENGINE - NO. 13 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 641 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 4 NO. 2 ENGINE - NO. 14 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 417 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 5 NO. 2 ENGINE - NO. 15 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 788 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 6 NO. 2 ENGINE - NO. 16 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 233 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 7 NO. 2 ENGINE - NO. 17 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE92 495 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-01 8 NO. 2 ENGINE - NO. 18 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 346 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-01 9 NO. 2 ENGINE - NO. 19 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 480 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 0 NO. 2 ENGINE - NO. 20 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 616 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
215 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
720 000-02 1 NO. 2 ENGINE - NO. 21 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 545 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 2 NO. 2 ENGINE - NO. 22 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 293 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 000-02 3 NO. 2 ENGINE - NO. 23 FAN B LADE


601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 188 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 4 NO. 2 ENGINE - NO. 24 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 360 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 5 NO. 2 ENGINE - NO. 25 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 413 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 6 NO. 2 ENGINE - NO. 26 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 235 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 7 NO. 2 ENGINE - NO. 27 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 395 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-02 8 NO. 2 ENGINE - NO. 28 FAN B LADE
601 8T3 0P15 MOS TSN:0 01-A PR-2011
72.155 MAE93 428 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-03 0 NO. 2 ENGINE - FAN AS SEMBLY MODULE
512 2T1 0G01 MOS TSN:0 01-A PR-2011
72.445 GEA 95096 8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-03 1 NO. 2 ENGINE - COMPRESSO R ASS EMBLY MODUL E
512 3T1 5G01 MOS TSN:0 01-A PR-2011
72.450 GEB 95096 8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-03 2 NO. 2 ENGINE - COMBUSTER/HPT TURBINE ASS EMBLY MODUL E
512 1T3 0G01 MOS TSN:0 01-A PR-2011
72.455 GEC95 0968 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
216 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
720 000-03 3 NO. 2 ENGINE - LOW PRESSURE TURBINE A SSEMBLY MODULE
512 1T3 1G01 MOS TSN:0 01-A PR-2011
72.460 GED95 0968 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
720 000-03 4 NO. 2 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY MODUL E
608 7T1 5G02 MOS TSN:0 01-A PR-2011
72.465 GEE 95096 8 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

720 001-00 1 NO. 2 ENGINE - CARBON SEAL


PN MOS TSN:0 01-A PR-2011
72.090 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

722 110-00 1 NO. 2 ENGINE - FAN FWD AS SEMBLY CASE


PN MOS TSN:0 01-A PR-2011
72.095 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

722 114-00 1 NO. 2 ENGINE - FAN AFT A SSEMBL Y CAS E


605 2T0 1G10 MOS TSN:0 01-A PR-2011
72.100 GEV L21G R HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

722 140-00 1 NO. 2 ENGINE - ROTOR FAN


607 8T8 3G09 MOS TSN:0 01-A PR-2011
72.105 GG FV4 890 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

722 150-00 1 NO. 2 ENGINE - FAN DISK


607 8T5 7G05 MOS TSN:0 01-A PR-2011
72.110 GEE 1GGK 4 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 300 00 TSN:0 0 300 00
722 210-00 1 NO. 2 ENGINE - FAN DRIV E S HA FT
603 6T7 8P02 MOS TSN:0 01-A PR-2011
72.115 FBKRM555 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00
722 450-00 1 NO. 2 ENGINE - NO.2 B ALL BEARING
504 2T1 1P02 MOS TSN:0 01-A PR-2011
72.120 FCA S2543 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
722 490-00 1 NO. 2 ENGINE - BAL L NO.1 BEARING
607 8T3 5P03 MOS TSN:0 01-A PR-2011
72.125 FCA S9709 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
722 520-00 1 NO. 2 ENGINE - FORWARD FAN SHAFT
607 8T5 1P02 MOS TSN:0 01-A PR-2011
72.130 GATHRJTD HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
217 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
723 110-00 1 NO. 2 ENGINE - FRO NT CO MPRE SSOR FRAME
603 0T7 9G16 MOS TSN:0 01-A PR-2011
72.135 SPK 96N9U HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
723 120-00 1 NO. 2 ENGINE - FAN SP EED S ENSOR
402 1T5 6P04 MOS TSN:0 01-A PR-2011
72.140 EGNFL153 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

723 210-00 1 NO. 2 ENGINE - CONTA INMENT CASE


415 0T3 2G01 MOS TSN:0 01-A PR-2011
72.145 CTDD2G9 E HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
723 310-00 1 NO. 2 ENGINE - STAGE 9 COMPRESSO R ROTOR DISK
608 7T0 1P03 MOS TSN:0 01-A PR-2011
72.150 NCE 839HK HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
723 312-00 1 NO. 2 ENGINE - CASE ASS EMBLY COMPRESSO R
508 8T5 5G03 MOS TSN:0 01-A PR-2011
72.085 GATHRWE E HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
723 314-00 1 NO. 2 ENGINE - COMPRESSO R DIS CHARGE ROTATING SEA L
401 9T3 8P01 MOS TSN:0 01-A PR-2011
72.160 TEJG1592 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 300 00 TSN:0 0 300 00
723 316-00 1 NO. 2 ENGINE - BAL L NO.3 BEARING
504 1T4 1P03 MOS TSN:0 01-A PR-2011
72.165 FCA V7977 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
723 318-00 1 NO. 2 ENGINE - COMPRESSO R FORWARD SHAFT
503 7T0 1P04 MOS TSN:0 01-A PR-2011
72.170 PAMJG34 1 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 300 00 TSN:0 0 300 00
723 322-00 1 NO. 2 ENGINE - STAGE 2 COMPRESSO R ROTOR DISK
603 6T9 1P02 MOS TSN:0 01-A PR-2011
72.175 GATHRJA J HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
723 328-00 1 NO. 2 ENGINE - STAGE 3 - 8 COMPRES SOR ROTOR SPOO L
607 8T5 6P05 MOS TSN:0 01-A PR-2011
72.180 GATHRL72 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
723 330-00 1 NO. 2 ENGINE - STAGE 10 - 14 COMPRESSO R ROTOR SP OOL
508 7T4 6P02 MOS TSN:0 01-A PR-2011
72.185 GATHRLL0 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
218 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
723 334-00 1 NO. 2 ENGINE - COMPRESSO R ROTOR REAR SHAFT
608 7T0 3P03 MOS TSN:0 01-A PR-2011
72.190 GEE 1GG5 L HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
723 336-00 1 NO. 2 ENGINE - ROLLE R NO.4 B EARING
504 2T1 2P02 MOS TSN:0 01-A PR-2011
72.195 FCA V4188 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

723 340-00 1 NO. 2 ENGINE - ROTOR COMPRESS OR


512 3T1 4G08 MOS TSN:0 01-A PR-2011
72.200 GG FD499 9 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 103-00 1 NO. 2 ENGINE - COMBUSTIO N FRA ME


PN MOS TSN:0 01-A PR-2011
72.205 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 124-00 1 NO. 2 ENGINE - ROLLE R NO.5 B EARING


504 2T1 3P04 MOS TSN:0 01-A PR-2011
72.210 FCA V8377 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 128-00 1 NO. 2 ENGINE - BAL ANCE PISTON S TA TIONARY AIR SEA L
PN MOS TSN:0 01-A PR-2011
72.470 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 219-00 1 NO. 2 ENGINE - COMBUSTIO N FRA ME


306 3T8 2G01 MOS TSN:0 01-A PR-2011
SPK 96RM6 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 220-00 1 NO. 2 ENGINE - COMBUSTIO N LINE R


607 8T6 5G13 MOS TSN:0 01-A PR-2011
72.225 GG M9E GD5 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 221-00 1 NO. 2 ENGINE - COMBUSTIO N INNER S HE LL LINER


PN MOS TSN:0 01-A PR-2011
72.230 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 222-00 1 NO. 2 ENGINE - COMBUSTIO N OUTER SHELL LINER
PN MOS TSN:0 01-A PR-2011
72.235 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 223-00 1 NO. 2 ENGINE - COMBUSTIO N LINE R DOME
PN MOS TSN:0 01-A PR-2011
72.240 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
219 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
724 512-00 1 NO. 2 ENGINE - HPT INNE R CASING
509 9T0 0G05 MOS TSN:0 01-A PR-2011
72.245 CDA APYCR HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 514-00 1 NO. 2 ENGINE - HPT, ASS Y S TATOR
509 9T0 3G11 MOS TSN:0 01-A PR-2011
72.250 GG FG5 047 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 517-00 1 NO. 2 ENGINE - HPT O UTER CAS ING


603 6T0 4G06 MOS TSN:0 01-A PR-2011
72.255 SPK 96P1A HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 600-00 1 NO. 2 ENGINE - STAGE 1 HPT BL ADE ( SET)
607 8T1 9P10 MOS TSN:0 01-A PR-2011
72.475 GATHRWTL HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 600-00 2 NO. 2 ENGINE - STAGE 2 HPT BL ADE ( SET)
607 8T1 1P07 MOS TSN:0 01-A PR-2011
72.475 GATHT03P HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 606-00 1 NO. 2 ENGINE - HPT STAG E NO.1 FRO NT CO OLING PL ATE
507 9T6 5P06 MOS TSN:0 01-A PR-2011
72.260 NCE 275HL HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00
724 608-00 1 NO. 2 ENGINE - STAGE 1 COMPRESSO R ROTOR B LIS K
508 7T8 4P03 MOS TSN:0 01-A PR-2011
72.265 GLHTN9L1 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00
724 609-00 1 NO. 2 ENGINE - HPT ROTATING AIR SE AL
PN MOS TSN:0 01-A PR-2011
72.270 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
724 610-00 1 NO. 2 ENGINE - HPT STAG E NO.1 DISK
507 9T5 2P09 MOS TSN:0 01-A PR-2011
72.275 GATHRWTL HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
724 612-00 1 NO. 2 ENGINE - HPT STAG E NO.2 DISK
507 9T7 3P02 MOS TSN:0 01-A PR-2011
72.280 GATHT03P HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
724 614-00 1 NO. 2 ENGINE - HPT STAG E NO.2 FRO NT CO OLING PL ATE
507 9T5 5P04 MOS TSN:0 01-A PR-2011
72.285 NCE 322HJ HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
220 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
724 616-00 1 NO. 2 ENGINE - HPT STAG E NO.2 REAR COO LING PLA TE
507 9T5 6P02 MOS TSN:0 01-A PR-2011
72.290 NCE 530HK HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00
724 620-00 1 NO. 2 ENGINE - HIG H PRESS URE TURBINE ROTOR SHAFT
507 9T6 2P02 MOS TSN:0 01-A PR-2011
72.295 GEE 1GFN8 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00
724 628-00 1 NO. 2 ENGINE - BAL ANCE PISTON ROTATING A IR S EAL
507 9T6 3P02 MOS TSN:0 01-A PR-2011
72.300 NCE 666HH HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
724 638-00 1 NO. 2 ENGINE - OUTER TORQUE COUPLING
507 9T6 4P05 MOS TSN:0 01-A PR-2011
72.305 NCE 407HH HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 200 00 TSN:0 0 200 00
724 645-00 1 NO. 2 ENGINE - HPT STAG E NO.1 AFT COOL ING PLATE
512 3T0 2P01 MOS TSN:0 01-A PR-2011
72.310 NCE 656HL HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 140 00 TSN:0 0 140 00
724 649-00 1 NO. 2 ENGINE - RUNNER SEAL
PN MOS TSN:0 01-A PR-2011
72.315 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 704-00 1 NO. 2 ENGINE - STAGE NO 1 NO ZZLE


509 9T1 2G03 MOS TSN:0 01-A PR-2011
72.320 JMN0B 95C HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

724 710-00 1 NO. 2 ENGINE - HIG H PRESS URE TURBINE ROTOR


507 9T6 1G11 MOS TSN:0 01-A PR-2011
72.325 GG FJ5101 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

725 110-00 1 NO. 2 ENGINE - LPT TURBINE TRANSITION A SSEMBLY


512 1T2 9G05 MOS TSN:0 01-A PR-2011
72.330 GG FA4 915 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
725 112-00 1 NO. 2 ENGINE - LPT TURBINE TRANSITION CAS E
509 9T3 1G01 MOS TSN:0 01-A PR-2011
72.335 GEV L1TMR HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
725 114-00 1 NO. 2 ENGINE - TRA NS ITION TURB INE SEAL & LINE R
604 7T2 8G05 MOS TSN:0 01-A PR-2011
72.340 GG M9E 90W HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
221 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
725 125-00 1 NO. 2 ENGINE - LPT ASSE MB LY RO TO R
507 1T4 0G04 MOS TSN:0 01-A PR-2011
72.345 GG FM503 4 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
725 210-00 1 NO. 2 ENGINE - LPT, A SSY STATOR
509 9T1 0G06 MOS TSN:0 01-A PR-2011
72.350 GG FN491 6 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

725 220-00 1 NO. 2 ENGINE - LEFT A SSEMBL Y THERMO CO UP LE


603 0T4 1P02 MOS TSN:0 01-A PR-2011
72.355 FDTF5344 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
725 220-00 2 NO. 2 ENGINE - RIG HT ASSE MB LY THERMOCOUPLE
603 0T4 0P02 MOS TSN:0 01-A PR-2011
72.355 FDTF4802 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
725 314-00 1 NO. 2 ENGINE - LPT RE AR SHAFT
603 0T7 2P02 MOS TSN:0 01-A PR-2011
72.360 NCE 845HF HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 320-00 1 NO. 2 ENGINE - LPT STAGE NO.3 DISK
607 8T9 1P02 MOS TSN:0 01-A PR-2011
72.365 XAE J1 802 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 324-00 1 NO. 2 ENGINE - LPT STAGE NO.5 DISK
607 8T9 2P02 MOS TSN:0 01-A PR-2011
72.370 GATHRHA L HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 326-00 1 NO. 2 ENGINE - LPT STAGE NO.6 DISK
607 8T8 9P03 MOS TSN:0 01-A PR-2011
72.375 GATHRG64 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 330-00 1 NO. 2 ENGINE - LPT STAGE NO.3 / 4 S EAL
502 3T5 9P06 MOS TSN:0 01-A PR-2011
72.380 WES52 194 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 332-00 1 NO. 2 ENGINE - LPT STAGE NO.4 / 5 S EAL
502 3T6 7P02 MOS TSN:0 01-A PR-2011
72.385 WES42 783 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 334-00 1 NO. 2 ENGINE - LPT STAGE NO.5 / 6 S EAL
502 3T6 4P04 MOS TSN:0 01-A PR-2011
72.390 WES63 157 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
222 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
725 338-00 1 NO. 2 ENGINE - LPT TURBINE DRIV E CONE
502 3T4 0P03 MOS TSN:0 01-A PR-2011
72.395 FDU36 57E HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 340-00 1 NO. 2 ENGINE - LPT STAGE NO.4 DISK
607 8T0 2P04 MOS TSN:0 01-A PR-2011
72.400 XAE J0 773 HRS /MSC TSN:0 0
LIFE LIMIT REF: GENERIC NO RE F ENC 150 00 TSN:0 0 150 00
725 412-00 1 NO. 2 ENGINE - TURBINE LOW P RE SSURE CAS ING
601 7T5 5G09 MOS TSN:0 01-A PR-2011
72.405 GEV L1JG5 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

725 414-00 1 NO. 2 ENGINE - ROLLE R NO.6 B EARING


504 2T1 4P02 MOS TSN:0 01-A PR-2011
72.410 FCA V8398 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

725 416-00 1 NO. 2 ENGINE - TURBINE HIGH P RE SSURE O UTER BEARING


PN MOS TSN:0 01-A PR-2011
72.415 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

725 417-00 1 NO. 2 ENGINE - NO.7 B EARING


504 2T1 5P02 MOS TSN:0 01-A PR-2011
72.420 FCA V6797 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

726 210-00 1 NO. 2 ENGINE - ACCESSO RY GE ARBOX


515 4T9 8G01 MOS TSN:0 01-A PR-2011
72.425 SAP 0A680 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

726 410-00 1 NO. 2 ENGINE - PO WE R TAKEOFF A SSEMBL Y DRIV E


603 7T7 2G19 MOS TSN:0 01-A PR-2011
72.430 SAP 3A759 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0

726 419-00 1 NO. 2 ENGINE - BAL L DUPLE X B EARING


PN MOS TSN:0 01-A PR-2011
72.435 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
726 419-00 2 NO. 2 ENGINE - PTO DUPL EX BEARING
PN MOS TSN:0 01-A PR-2011
72.440 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
CHA PTER 73 ENGINE FUEL AN D CONTROL
73-2 1-04-9 00-80 1-01 AFT FUSE-ENGINE PYLON HARNES S
N537-2 385 MOS TSN:0 01-A PR-2011
LMD96885 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
223 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
73-2 1-04-9 00-80 2-01 AFT FUSE-ENGINE PYLON HARNES S
N537-2 385 MOS TSN:0 01-A PR-2011
LMD96630 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
73-3 1-01-9 00-80 1-01 LH FUEL FLOW METER
9-12 7-83 MOS TSN:26 04-JUN-2013
740 1 HRS /MSC O/C TSN:58 3.4 583 .4
REF: See Workcard AFL TSN:23 8 238

73-3 1-01-9 00-80 1-02 RH FUEL FLO W METER


9-12 7-83 MOS TSN:0 01-A PR-2011
AC267 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
73-3 1-04-9 00-80 1-01 LH CO NTROL AMPLIFIER
507 1T9 8P05 MOS TSN:0 01-A PR-2011
LMDK4284 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
73-3 1-04-9 00-80 1-02 RH CONTROL AMPL IFIER
507 1T9 8P05 MOS TSN:0 01-A PR-2011
LMDK4291 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
73-3 1-07-9 00-80 1-01 LH PRE SS, FUEL PUMP S WITCH
601 R60 014-5 MOS TSN:0 01-A PR-2011
382 5A HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
73-3 1-07-9 00-80 1-02 RH PRESS , FUE L P UMP SWITCH
601 R60 014-5 MOS TSN:0 01-A PR-2011
382 6A HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01
73-1 0-00-2 01 (s) NO. 1 ENGINE - DIS CA RD FUEL FIL TER ELEMENT PKG
PK G 1 600 MOS 29-MAR-2 018
73.005 HRS /MSC 160 0 +40/-40 153 4.3
LIFE LIMIT REF: See Workcard ENC

73-1 0-00-2 02 (s) NO. 1 ENGINE - VISUAL CHE CK ENG FUE L FILTE R MECH ACTUA L BYPAS S INDICATOR PKG
PK G 1 200 MOS 27-S EP-20 19
73.010 HRS /MSC 120 0 +40/-40 187 7.3
REF: See Workcard ENC 124 7
73-1 0-00-2 04 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N ENGINE FUEL MA NIFOLD PKG
PK G 2 400 MOS 13-JUN-2022
73.015 HRS /MSC 240 0 +40/-40 224 5.8 3
REF: See Workcard ENC 151 6
73-1 0-00-2 05 (s) NO. 1 ENGINE - SPE CIAL DETAILED INSPECTIO N (BORES CO PE) OF THE FUEL INJECTORS PKG
PK G 3 200 MOS 24-JUL-20 17
73.020 HRS /MSC 320 0 +40/-40 136 3.8
REF: See Workcard ENC 894
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
224 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
73-1 0-00-3 01 NO. 1 ENGINE - INS PECT & INSTAL L NEW FUEL FIL TE R ELEMENT
MOS 28-MAY -2012
73.025 HRS /MSC O/C 69.3
REF: See Workcard ENC 58
73-2 0-00-2 01 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N MAIN FUEL CONTRO L PKG
PK G 3 200 MOS +40/-40
73.030 HRS /MSC 320 0 +40/-40 0
MRB REF: See Workcard ENC

731 011-00 1 NO. 1 ENGINE - MFC MAIN FUEL CONTRO L


414 7T7 0P02 MOS TSN:0 01-A PR-2011
73.040 WYGC702 1 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0

731 014-00 1 NO. 1 ENGINE - FUE L P UMP


607 8T3 9P04 MOS TSN:0 01-A PR-2011
73.045 CGWT3756 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0

732 002-00 1 NO. 1 ENGINE - COMPRESSO R INL ET TEMPERATURE SE NS OR


407 1T7 2P01 MOS TSN:0 01-A PR-2011
73.055 WYGC721 1 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
73-1 0-00-2 01 (s) NO. 2 ENGINE - DIS CA RD FUEL FIL TER ELEMENT PKG
PK G 1 600 MOS 29-MAR-2 018
73.005 HRS /MSC 160 0 +40/-40 153 4.3
LIFE LIMIT REF: See Workcard ENC

73-1 0-00-2 02 (s) NO. 2 ENGINE - VISUAL CHE CK ENG FUE L FILTE R MECH ACTUA L BYPAS S INDICATOR PKG
PK G 1 200 MOS 27-S EP-20 19
73.010 HRS /MSC 120 0 +40/-40 187 7.3
REF: See Workcard ENC 124 6

73-1 0-00-2 04 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N ENGINE FUEL MA NIFOLD PKG
PK G 2 400 MOS 13-JUN-2022
73.015 HRS /MSC 240 0 +40/-40 224 5.8 3
REF: See Workcard ENC 151 5

73-1 0-00-2 05 (s) NO. 2 ENGINE - SPE CIAL DETAILED INSPECTIO N (BORES CO PE) OF THE FUEL INJECTORS PKG
PK G 3 200 MOS 24-JUL-20 17
73.020 HRS /MSC 320 0 +40/-40 136 3.8
REF: See Workcard ENC 893

73-1 0-00-3 01 NO. 2 ENGINE - INS PECT & INSTAL L NEW FUEL FIL TE R ELEMENT
MOS 28-MAY -2012
73.025 HRS /MSC O/C 69.3
REF: See Workcard ENC 57

73-2 0-00-2 01 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N MAIN FUEL CONTRO L PKG
PK G 3 200 MOS +40/-40
73.030 HRS /MSC 320 0 +40/-40 0
MRB REF: See Workcard ENC
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
225 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
731 011-00 1 NO. 2 ENGINE - MFC MAIN FUEL CONTRO L
414 7T7 0P02 MOS TSN:0 01-A PR-2011
73.040 WYGC678 9 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
731 014-00 1 NO. 2 ENGINE - FUE L P UMP
607 8T3 9P04 MOS TSN:0 01-A PR-2011
73.045 CGWT3772 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0

732 002-00 1 NO. 2 ENGINE - COMPRESSO R INL ET TEMPERATURE SE NS OR


407 1T7 2P01 MOS TSN:0 01-A PR-2011
73.055 WYGC699 6 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
CHA PTER 74 IGNITION
74-1 1-04-9 00-80 1-01 STATIC INVE RTER
601 R59 323-1 MOS TSN:0 01-A PR-2011
230 1 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01
74-0 0-00-2 01 NO. 1 ENGINE - DETAIL ED INSPECTIO N OF THE CE RA MIC O N THE HIG H VO LTA GE IG NITERS
PK G 1 200 MOS 27-S EP-20 19
74.005 HRS /MSC 120 0 +40/-40 187 7.3 (307 7.3 ) 3 077.3 311 7.3
REF: See Workcard ENC 124 7
740 000-00 1 NO. 1 ENGINE - ROTOR A LTE RNATOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: ENC TSN:0 0
740 000-00 2 NO. 1 ENGINE - STATOR A LTERNATOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: ENC TSN:0 0

741 002-00 1 NO. 1 ENGINE - IGNITIO N EX CITER


923 8M66P11 MOS TSN:0 01-A PR-2011
74.010 UNJWK05 4 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
741 002-00 2 NO. 1 ENGINE - IGNITIO N EX CITER
923 8M66P11 MOS TSN:0 01-A PR-2011
74.015 UNJWK05 5 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
741 015-00 1 NO. 1 ENGINE - (A) PLUG IGNITER
409 6T3 8P10 MOS TSN:21 24-JUL-20 17
74.020 UNL 84492 HRS /MSC O/C TSN:17 3.2 2 136 3.8
REF: See Workcard ENC TSN:86 894

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
226 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
741 015-00 2 NO. 1 ENGINE - (B) PLUG IGNITER
409 6T3 8P10 MOS TSN:0 07-O CT-20 15
74.030 UNL 83769 HRS /MSC O/C TSN:0 119 0.5 8
REF: See Workcard ENC TSN:0 808
743 014-00 1 NO. 1 ENGINE - FAN INLET TEMPERATURE S ENSOR
403 3T6 5P03 MOS TSN:0 01-A PR-2011
74.025 EGNL5 976 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
74-0 0-00-2 01 NO. 2 ENGINE - DETAIL ED INSPECTIO N OF THE CE RA MIC O N THE HIG H VO LTA GE IG NITERS
PK G 1 200 MOS 27-S EP-20 19
74.005 HRS /MSC 120 0 +40/-40 187 7.3 (307 7.3 ) 3 077.3 311 7.3
REF: See Workcard ENC 124 6

740 000-00 1 NO. 2 ENGINE - ROTOR A LTE RNATOR


PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: ENC TSN:0 0
740 000-00 2 NO. 2 ENGINE - STATOR A LTERNATOR
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: ENC TSN:0 0
741 002-00 1 NO. 2 ENGINE - IGNITIO N EX CITER
923 8M66P11 MOS TSN:0 01-A PR-2011
74.010 UNJWK05 8 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0

741 002-00 2 NO. 2 ENGINE - IGNITIO N EX CITER


923 8M66P11 MOS TSN:0 01-A PR-2011
74.015 UNJWK05 7 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0

741 015-00 1 NO. 2 ENGINE - (A) PLUG IGNITER


409 6T3 8P10 MOS TSN:0 07-O CT-20 15
74.020 UNL 75801 HRS /MSC O/C TSN:0 119 0.5 8
REF: See Workcard ENC TSN:0 807

741 015-00 2 NO. 2 ENGINE - (B) PLUG IGNITER


409 6T3 8P10 MOS TSN:21 24-JUL-20 17
74.030 UNL 83748 HRS /MSC O/C TSN:17 3.2 2 136 3.8
REF: See Workcard ENC TSN:86 893

743 014-00 1 NO. 2 ENGINE - FAN INLET TEMPERATURE S ENSOR


403 3T6 5P03 MOS TSN:0 01-A PR-2011
74.025 EGNL7 469 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
CHA PTER 76 ENGINE CONTROLS

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
227 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
76-1 1-00-1 01 FUNCTIONAL TEST LEFT ENGINE THROTTLE CONTRO L G EARBOX , PART NUMB ER 21 00140 -005/-007 /-01 0. (CMR**)
76-1 1-00-1 01 MOS 14-MAR-2 022
HRS /MSC 160 0 -594 .6 219 4.6 320 0
REF: AMM 7 6 1 1 1 3 72 0 8 02 AFL 147 5
+ 76-1 1-00-1 01 FUNCTIONAL TEST RIGHT ENGINE THROTTL E CONTROL GEARBO X, PART NUMBER 2 10014 0-005/-00 7/-0 10. (CMR**)
76-1 1-00-1 01 MOS 14-MAR-2 022
HRS /MSC 160 0 219 4.6 379 4.6
REF: AMM 7 6 1 1 1 3 72 0 8 02 AFL 147 5

76-1 1-01-2 04 (s) GENERAL VISUAL INS PECTION ENGINE THROTTLE PUSH/P ULL CONTRO L A SSEMBL Y PKG
76-1 1-01-2 04 PK G 1 200 MOS 27-S EP-20 19
HRS /MSC 120 0 +40/-40 187 7.3
MRB REF: AMM 7 6 1 1 1 0 21 0 8 01 AFL 123 6
76-1 1-01-9 00-80 1-01 THROTTLE QUADRANT,ENGINE QUADRANT
604 -90450 -1 MOS TSN:0 01-A PR-2011
FR0 173 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
76-1 1-01-9 00-80 2-01 QUADRANT, ENG INE THROTTLE HA NDLE
PN MOS TSN:0 01-A PR-2011
SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
76-1 1-04-9 00-80 1-01 LH PUS H PULL FWD ASSE MB LY
601 -90711 -25 MOS TSN:0 01-A PR-2011
890 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
76-1 1-04-9 00-80 1-02 RH PUSH PULL FWD A SSEMBLY
601 -90711 -25 MOS TSN:0 01-A PR-2011
894 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
76-1 1-07-9 00-80 1-01 LH PUS H- PULL AFT A SSEMBLY
601 -90711 -23 MOS TSN:0 01-A PR-2011
115 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
76-1 1-07-9 00-80 1-02 RH PUSH-PULL AFT ASS EMB LY
601 -90711 -23 MOS TSN:0 01-A PR-2011
115 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
76-1 1-10-9 00-80 1-01 LH CO NTROL ASSY , THROTTLE CA BLE
160 3730-0 07 MOS TSN:0 01-A PR-2011
212 5 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
76-1 1-10-9 00-80 1-02 RH CONTROL AS SY, THROTTLE CABL E
160 3730-0 05 MOS TSN:0 01-A PR-2011
195 6 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
228 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
76-1 1-13-9 00-80 1-01 LH GEARBOX , THROTTLE CO NTROL
210 0140-0 10 MOS TSN:0 01-A PR-2011
167 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
76-1 1-13-9 00-80 1-02 RH GE ARBOX, THROTTLE CONTRO L
210 0140-0 10 MOS TSN:0 01-A PR-2011
151 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

76-1 1-18-9 00-80 1-01 ATR-AUTO THRO TTLE RETARDE R CABLE


7-44 952-2 01 MOS TSN:0 01-A PR-2011
316 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

76-1 1-18-9 00-80 2-01 ATR-AUTO THRO TTLE RETARDE R CABLE


7-44 952-2 01 MOS TSN:0 01-A PR-2011
315 8 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

761 113-01 01A FUNCTIONAL TEST OF THE E NG INE THROTTLE CO NTROL GEA RB OX
(76- 11-00- 101)
76-1 1-00-1 01 PK G 1 600 MOS 14-MAR-2 022
HRS /MSC 160 0 219 4.6 379 4.6
CMR REF: AFL 147 5
761 113-01 02A FUNCTIONAL TEST OF THE E NG INE THROTTLE CO NTROL GEA RB OX
(76- 11-00- 101)
76-1 1-00-1 01 PK G 1 600 MOS 14-MAR-2 022
HRS /MSC 160 0 219 4.6 379 4.6
CMR REF: AFL 147 5
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01
76-1 1-00-2 01 (s) NO. 1 ENGINE - FUNCTIONAL TEST GEARBO X A SSEMBLY PKG
PK G 3 200 MOS +40/-40
76.005 HRS /MSC 320 0 +40/-40 0
REF: See Workcard ENC
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
76-1 1-00-2 01 (s) NO. 2 ENGINE - FUNCTIONAL TEST GEARBO X A SSEMBLY PKG
PK G 3 200 MOS +40/-40
76.005 HRS /MSC 320 0 +40/-40 0
REF: See Workcard ENC
CHA PTER 77 ENGINE INDICA TING
77-3 1-01-9 00-80 1-01 LH ENG V IB ACCELEROMETER
600 -59131 -1 MOS TSN:0 01-A PR-2011
216 17 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

77-3 1-01-9 00-80 1-02 RH ENG VIB ACCEL EROMETER


600 -59131 -1 MOS TSN:0 01-A PR-2011
215 12 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
229 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
77-3 1-04-9 00-80 1-01 VIBRATIO N UNIT, ENGINE CONDITIONER
601 -50910 -19 MOS TSN:0 01-A PR-2011
212 72 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01
771 002-00 1 NO. 1 ENGINE - CONTROL LER A MP LIFIER
507 1T9 8P05 MOS TSN:0 01-A PR-2011
77.005 LMDK4284 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
771 002-00 1 NO. 2 ENGINE - CONTROL LER A MP LIFIER
507 1T9 8P05 MOS TSN:0 01-A PR-2011
77.005 LMDK4291 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
CHA PTER 78 EXHAU ST
78-1 0-00-2 01 (s) DETAIL ED INSPECTIO N EXHAUST NOZZLE ASS EMBLY PKG
78-1 0-00-2 01 PK G 6 400 MOS 26-A PR-2017
HRS /MSC 640 0 +40/-40 136 3.8
REF: AMM 7 8 1 0 0 4 22 0 8 01 AFL 883
78-1 0-01-9 00-80 1-01 LH TAIL PIPE FA IRING
228 -50181 -845 MOS TSN:0 01-A PR-2011
SBRJ3371 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
78-1 0-01-9 00-80 1-02 RH TAIL P IPE FAIRING
228 -50181 -845 MOS TSN:0 01-A PR-2011
SBRJ3372 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
78-1 0-04-9 00-80 1-01 LH EXHAUST NOZZLE
228 -55030 -113 MOS TSN:0 01-A PR-2011
C3362 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

78-1 0-04-9 00-80 1-02 RH EX HAUST NO ZZLE


228 -55030 -113 MOS TSN:0 01-A PR-2011
C3356 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
78-3 0-00-1 01 SPE CIAL DETAIL ED INSPECTIO N AFT LUG OF THE MA IN TRACK OF THE THRUS T REVERSE R.
78-3 0-00-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-78-30 -001 AFL 780 0 0 780 0
78-3 0-00-1 02 SPE CIAL DETAIL ED INSPECTIO N MAIN TRACKS LO WE R FLANGE OF THE THRUST REVE RS ER.
78-3 0-00-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-78-30 -003 AFL 780 0 780 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
230 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
78-3 0-00-1 03 SPE CIAL DETAIL ED INSPECTIO N MAIN UP PER A ND LOWER PYLON TRACK.
78-3 0-00-1 03 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-78-30 -002 AFL 780 0 780 0
78-3 0-00-2 02 (s) LUBRICATION THRUST-REVE RS ER BA LLSCREW A CTUATORS PKG
78-3 0-00-2 02 PK G 8 00 MOS 13-JUN-2022
HRS /MSC 800 +40/-40 224 5.8 3
REF: AMM 1 2 2 0 0 4 64 0 8 24 AFL 150 5

78-3 0-00-2 03 (s) LUBRICATION THRUST-REVE RS ER FLEX SHA FTS PKG


78-3 0-00-2 03 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 1 2 2 0 0 4 64 0 8 14 AFL 150 5

78-3 0-00-2 04 (s) DETAIL ED INSPECTIO N FLEXSHAFT DRIV E PKG


78-3 0-00-2 04 PK G 2 400 MOS 13-JUN-2022
HRS /MSC 240 0 +40/-40 224 5.8 3
REF: AMM 7 8 3 2 0 7 22 0 8 01 AFL 150 5

78-3 0-00-2 05 (s) FUNCTIONAL TEST AUTO -THROTTL E RETARDER S YSTEM, THROTTLE LOCKS AND B ELLCRANK PKG
78-3 0-00-2 05 PK G 3 200 MOS +40/-40
HRS /MSC 320 0 +40/-40 0
REF: AMM 7 8 3 5 0 1 72 0 8 01 AFL

78-3 0-00-2 06 DETAIL ED INSPECTIO N MAIN PYLO N TRA CK S O F THE THRUST RE VERSER
78-3 0-00-2 06 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 7 8 3 4 0 7 22 0 8 02 AFL 127 5

78-3 0-00-2 07 DETAIL ED INSPECTIO N THRUST REVE RS ER MAIN TRACK S


78-3 0-00-2 07 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 7 8 3 4 0 4 22 0 8 01 AFL 127 5

78-3 0-00-2 08 DETAIL ED INSPECTIO N ATTA CHMENT FITTINGS FOR THE THRUST-RE VERSER MA IN TRACKS
78-3 0-00-2 08 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 7 8 3 4 0 4 22 0 8 02 AFL 127 5

78-3 0-00-2 09 DETAIL ED INSPECTIO N SUPPORT FITTINGS OF THE TRUST REVE RSE R BAL LSCREW ACTUATO RS
78-3 0-00-2 09 MOS 96 +1m/-1m 13-MAR-2 020 13-MAR-2028 13-A PR-2028
HRS /MSC 192 6.4
MRB REF: AMM 7 8 3 2 0 4 22 0 8 01 AFL 127 5
78-3 0-00-9 00-80 1-01 LH THRUS T REVERSE R INSTL ASS EMBLY
228 -50200 -811 MOS TSN:0 01-A PR-2011
SBRJ1671 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
78-3 0-00-9 00-80 1-02 RH THRUST REV ERSER INSTL A SSEMBL Y
228 -50200 -812 MOS TSN:0 01-A PR-2011
SBRJ1675 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
231 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
78-3 2-01-9 00-80 1-01 LH DRIVE PNEUMA TIC UNIT
228 -58110 -803 MOS TSN:0 01-A PR-2011
432 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
78-3 2-01-9 00-80 1-02 RH DRIVE PNEUMATIC UNIT
228 -58110 -803 MOS TSN:0 01-A PR-2011
432 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

+ 78-3 2-04-1 01 DIS CA RD OF LH 10 O'CL OCK E NG INE THRUST REVE RS ER BA LLSCREW ACTUATOR, PART NO. 2 28-581 11-11 1 A ND
228 -58111 -801
228 -58111 -111 MOS 01-A PR-2011
162 75 HRS /MSC 500 00 0 500 00
LIFE LIMIT REF: See Workcard AFL 0
+ 78-3 2-04-1 01 DIS CA RD OF LH 2 O 'CLO CK ENGINE THRUST RE VERSER BALLS CREW ACTUATOR, PA RT NO . 228-5 8111- 111 AND
228 -58111 -801.
228 -58111 -111 MOS 01-A PR-2011
162 71 HRS /MSC 500 00 0 500 00
LIFE LIMIT REF: See Workcard AFL 0
+ 78-3 2-04-1 01 DIS CA RD OF LH 4 O 'CLO CK ENGINE THRUS T REVERSE R BAL LSCRE W ACTUA TO R, PART NO. 22 8-5811 1-111 AND
228 -58111 -801.
228 -58111 -111 MOS 01-A PR-2011
162 74 HRS /MSC 500 00 0 500 00
LIFE LIMIT REF: See Workcard AFL 0
+ 78-3 2-04-1 01 DIS CA RD OF LH 8 O 'CLO CK ENGINE THRUS T REVERSE R BAL LSCRE W ACTUA TO R, PART NO. 22 8-5811 1-111 AND
228 -58111 -801.
228 -58111 -111 MOS 01-A PR-2011
162 70 HRS /MSC 500 00 0 500 00
LIFE LIMIT REF: See Workcard AFL 0
+ 78-3 2-04-1 01 DIS CA RD OF RH 10 O'CLOCK ENGINE THRUST RE VERSER BALLS CREW ACTUATOR, P ART NO. 228 -58111 -111 AND
228 -58111 -801.
228 -58111 -111 MOS 01-A PR-2011
162 68 HRS /MSC 500 00 0 500 00
LIFE LIMIT REF: See Workcard AFL 0

+ 78-3 2-04-1 01 DIS CA RD OF RH 2 O'CLOCK ENGINE THRUST RE VERSER B ALLS CREW ACTUATOR, PA RT NO . 228-5 8111-1 11 AND
228 -58111 -801
228 -58111 -111 MOS 01-A PR-2011
162 69 HRS /MSC 500 00 0 500 00
LIFE LIMIT REF: See Workcard AFL 0
+ 78-3 2-04-1 01 DIS CA RD OF RH 4 O'CLOCK ENGINE THRUST RE VERSER B ALLS CREW ACTUATOR, PA RT NO . 228-5 8111-1 11 AND
228 -58111 -801
228 -58111 -111 MOS 01-A PR-2011
162 65 HRS /MSC 500 00 0 500 00
LIFE LIMIT REF: See Workcard AFL 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
232 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
+ 78-3 2-04-1 01 DIS CA RD OF RH 8 O'CLOCK ENGINE THRUST RE VERSER B ALLS CREW ACTUATOR, PA RT NO . 228-5 8111-1 11 AND
228 -58111 -801.
228 -58111 -111 MOS 01-A PR-2011
162 73 HRS /MSC 500 00 0 500 00
LIFE LIMIT REF: See Workcard AFL 0

78-3 2-04-9 00-80 1-01 L/H 2 O'CLOCK THRUST REVE RSE A CTUATOR
78-3 2-04-1 01 228 -58111 -111 MOS TSN:0 01-A PR-2011
162 71 HRS /MSC H/T TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

78-3 2-04-9 00-80 1-02 L/H 4 O'CLOCK THRUST REVE RSE A CTUATOR
78-3 2-04-1 01 228 -58111 -111 MOS TSN:0 01-A PR-2011
162 74 HRS /MSC H/T TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

78-3 2-04-9 00-80 1-03 L/H 8 O'CLOCK THRUST REVE RSE A CTUATOR
78-3 2-04-1 01 228 -58111 -111 MOS TSN:0 01-A PR-2011
162 70 HRS /MSC H/T TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
78-3 2-04-9 00-80 1-04 L/H 10 O'CLOCK THRUST REVE RS E A CTUATOR
78-3 2-04-1 01 228 -58111 -111 MOS TSN:0 01-A PR-2011
162 75 HRS /MSC H/T TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
78-3 2-04-9 00-80 1-05 R/H 2 O 'CLO CK THRUST RE VERSE ACTUATOR
78-3 2-04-1 01 228 -58111 -111 MOS TSN:0 01-A PR-2011
162 69 HRS /MSC H/T TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

78-3 2-04-9 00-80 1-06 R/H 4 O 'CLO CK THRUST RE VERSE ACTUATOR


78-3 2-04-1 01 228 -58111 -111 MOS TSN:0 01-A PR-2011
162 65 HRS /MSC H/T TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

78-3 2-04-9 00-80 1-07 R/H 8 O 'CLO CK THRUST RE VERSE ACTUATOR


78-3 2-04-1 01 228 -58111 -111 MOS TSN:0 01-A PR-2011
162 73 HRS /MSC H/T TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

78-3 2-04-9 00-80 1-08 R/H 10 O'CL OCK THRUS T REVERSE ACTUA TO R
78-3 2-04-1 01 228 -58111 -111 MOS TSN:0 01-A PR-2011
162 68 HRS /MSC H/T TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

78-3 2-07-9 00-80 1-01 LH ENG INE SHAFT


121 754-2 MOS TSN:0 01-A PR-2011
111 13017 061 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

78-3 2-07-9 00-80 1-02 RH ENGINE S HA FT


121 754-2 MOS TSN:0 01-A PR-2011
111 13017 058 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
233 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
78-3 2-07-9 00-80 2-01 LH ENG INE SHAFT
121 754-6 MOS TSN:0 01-A PR-2011
610 13016 689 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
78-3 2-07-9 00-80 2-02 RH ENGINE S HA FT
121 754-6 MOS TSN:0 01-A PR-2011
610 13016 690 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

78-3 2-07-9 00-80 3-01 LH ENG INE SHAFT


121 754-3 MOS TSN:0 01-A PR-2011
101 01301 6886 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
78-3 2-07-9 00-80 3-02 RH ENGINE S HA FT
121 754-3 MOS TSN:0 01-A PR-2011
101 01301 6881 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
78-3 2-07-9 00-80 4-01 LH ENG INE SHAFT
121 754-5 MOS TSN:0 01-A PR-2011
610 13016 786 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
78-3 2-07-9 00-80 4-02 RH ENGINE S HA FT
121 754-5 MOS TSN:0 01-A PR-2011
610 13016 729 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
78-3 2-07-9 00-80 5-01 LH ENG INE SHAFT
121 754-2 MOS TSN:0 01-A PR-2011
111 13017 059 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
78-3 2-07-9 00-80 5-02 RH ENGINE S HA FT
121 754-2 MOS TSN:0 01-A PR-2011
111 13017 057 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
78-3 3-00-9 00-80 1-01 LH LOWER MODULE
228 -50100 -247 MOS TSN:0 01-A PR-2011
SBRJ1654 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
78-3 3-00-9 00-80 1-02 RH LO WE R MODUL E
228 -50100 -248 MOS TSN:0 01-A PR-2011
SBRJ1656 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
78-3 3-04-9 00-80 1-01 LH UPP ER MODULE
228 -50100 -399 MOS TSN:0 01-A PR-2011
SBRJ1654 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
234 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
78-3 3-04-9 00-80 1-02 RH UPPER MODULE
228 -50100 -400 MOS TSN:0 01-A PR-2011
SBRJ1656 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
78-3 4-07-1 01 SPE CIAL DETAIL ED INSPECTIO N ATTA CHMENT FITTING OF THE MAIN TRACK OF THE THRUST REVE RS ER.
78-3 4-07-1 01 MOS
HRS /MSC
AIRWORTHINESS REF: NDT ET-78-30 -006 AFL 780 0 780 0
78-3 4-07-1 02 DETAIL ED INSPECTIO N SUPPORT BED FOR THE UPPER AND LOWER PYLO N TRA CK ON THE SERVICE PYLON.
78-3 4-07-1 02 MOS
HRS /MSC
AIRWORTHINESS REF: AMM 7 8 3 4 0 7 22 0 8 01 AFL 780 0 780 0
78-ZL-0 0-201 (s) GENERAL VISUAL INS PECTION TO RQ UE BO X O F THE THRUST RE VERSER - INTERNAL LH PKG
78-ZL-0 0-201 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

78-ZL-0 0-202 (s) GENERAL VISUAL INS PECTION TO RQ UE BO X O F THE THRUST RE VERSER - INTERNAL RH PKG
78-ZL-0 0-202 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

78-ZL-0 0-203 (s) GENERAL VISUAL INS PECTION EXHAUST NOZZLE FA IRING - ASSE MB LY LH PKG
78-ZL-0 0-203 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5

78-ZL-0 0-204 (s) GENERAL VISUAL INS PECTION EXHAUST NOZZLE FA IRING - ASSE MB LY RH PKG
78-ZL-0 0-204 PK G 4 8 MOS 48 +1m/-1m 13-MAR-2 020
HRS /MSC 192 6.4
MRB REF: See Workcard AFL 127 5
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01
780 002-00 1 NO. 1 ENGINE - EXHAUST FRAME
508 3T6 9G10 MOS TSN:0 01-A PR-2011
78.005 GG M9E FL 5 HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
780 002-00 1 NO. 2 ENGINE - EXHAUST FRAME
508 3T6 9G10 MOS TSN:0 01-A PR-2011
78.005 GG M9E FCG HRS /MSC O/C TSN:0 0
REF: GENERIC NO RE F ENC TSN:0 0
CHA PTER 79 OIL
79-1 2-01-9 00-80 1-01 OIL TA NK AS SY DO OR
601 -63200 -77 MOS TSN:0 01-A PR-2011
F91059 7 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
235 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
79-1 2-04-9 00-80 1-01 OIL PUMP
601 -63901 -1 MOS TSN:0 01-A PR-2011
10B F43 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
79-1 2-07-9 00-80 1-01 SIGNAL, COND, OIL LEVE L CONTROL UNIT
601 -63903 -9 MOS TSN:0 01-A PR-2011
212 9 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

79-1 2-10-9 00-80 1-01 OIL RE PL SYSTEM SELECTOR V ALVE


601 -63902 -1 MOS TSN:0 01-A PR-2011
10-1 00510 2 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
79-1 2-16-9 00-80 1-01 LH CHECK VALV E
281 0044-1 01 MOS TSN:0 01-A PR-2011
454 9 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
79-1 2-16-9 00-80 1-02 RH CHECK V ALVE
281 0044-1 01 MOS TSN:0 01-A PR-2011
455 2 HRS /MSC O/C TSN:0 0
REF: AMM NO REF1 AFL TSN:0 0
79-1 2-16-9 00-80 2-01 LH OIL LE VEL PROBE
601 -63903 -15 MOS TSN:0 01-A PR-2011
415 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
79-1 2-16-9 00-80 2-02 RH OIL LEVE L P RO BE
601 -63903 -15 MOS TSN:0 01-A PR-2011
414 0 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
79-3 0-04-9 00-80 1-01 LH OIL PRES SURE, QEC S WITCH
115 3P001 2 MOS TSN:0 01-A PR-2011
535 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
79-3 0-04-9 00-80 1-02 RH OIL PRESSURE, QE C SWITCH
115 3P001 2 MOS TSN:0 01-A PR-2011
535 5 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
79-3 0-07-9 00-80 1-01 LH OIL PRES SURE TRANS DUCER
601 -50919 -9 MOS TSN:0 01-A PR-2011
761 2-7-69 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
79-3 0-07-9 00-80 1-02 RH OIL PRESSURE TRANSDUCE R
601 -50919 -9 MOS TSN:0 01-A PR-2011
772 3-6-68 4 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
236 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
79-0 0-00-2 03 (s) NO. 1 ENGINE - VISUAL CHE CK OIL FILTER IMPENDING BYP ASS INDICATOR PKG
PK G 6 00 MOS 25-S EP-20 19
79.005 HRS /MSC 600 +40/-40 188 0.3
REF: See Workcard ENC 123 6
79-0 0-00-2 04 (s) NO. 1 ENGINE - DIS CA RD OIL FILTE R ENGINE O IL FILTER ELEMENT PKG
401 2T1 6P01 PKG 1600 MOS 29-MAR-2 018
79.010 SN-UNKNOWN HRS /MSC 160 0 +40/-40 153 4.3
LIFE LIMIT REF: See Workcard ENC

79-0 0-00-2 05 (s) NO. 1 ENGINE - FUNCTIONAL TEST OIL FILTE R IMP ENDING B YPAS S S ENSOR PKG
PK G 3 200 MOS +40/-40
79.015 HRS /MSC 320 0 +40/-40 0
REF: See Workcard ENC

79-0 0-00-2 06 (s) NO. 1 ENGINE - FUNCTIONAL TEST ENGINE MASTER CHIP DETECTOR PKG
PK G 3 200 MOS 26-A PR-2017
79.020 HRS /MSC 320 0 +40/-40 136 3.8
REF: See Workcard ENC 894

79-0 0-00-2 07 (s) NO. 1 ENGINE - VISUAL CHE CK C-SUMP DRAIN OUTLET PKG
PK G 6 00 MOS 25-S EP-20 19
79.025 HRS /MSC 600 +40/-40 188 0.3
REF: See Workcard ENC 123 6

79-0 0-00-2 08 (s) NO. 1 ENGINE - DETAIL ED INSPECTIO N C-SUMP SCAV ENGE SCRE ENS (P RE G E S B-79-0 018). PKG
PK G 3 200 MOS +40/-40
79.030 HRS /MSC 320 0 +40/-40 0
REF: See Workcard ENC

79-0 0-00-3 03 NO. 1 ENGINE - RESTORATIO N (INS PECTION/CL EANING) OF THE MASTER CHIP DETECTOR
MOS 28-MAY -2012
79.100 HRS /MSC - 70
OPTIONAL REF: See Workcard ENC

79-0 0-00-3 04 NO. 1 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE OIL FILTER E LEMENT
MOS 28-MAY -2012
79.110 HRS /MSC - 70
OPTIONAL REF: See Workcard ENC

790 001-00 1 NO. 1 ENGINE - OIL FILTER


401 2T1 6P01 MOS TSN:0 26-A PR-2017
79.040 SN-UNKNOWN HRS /MSC H/T TSN:0 136 3.8
REF: See Workcard ENC TSN:0 894
791 012-00 1 NO. 1 ENGINE - LUBE & SCAVENGE PUMP
608 7T0 4P10 MOS TSN:0 01-A PR-2011
79.045 NMABL39 2 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
791 014-00 1 NO. 1 ENGINE - A-S UMP SCAVE NG E P UMP
PN MOS TSN:0 01-A PR-2011
79.050 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
237 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
791 020-00 1 NO. 1 ENGINE - HEAT E XCHA NG ER
608 7T0 5P02 MOS TSN:0 01-A PR-2011
79.055 SCKB3 633 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
792 110-00 1 NO. 1 ENGINE - OIL FILTER B YPAS S S ENS OR
PN MOS TSN:0 01-A PR-2011
79.060 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
79-0 0-00-2 03 (s) NO. 2 ENGINE - VISUAL CHE CK OIL FILTER IMPENDING BYP ASS INDICATOR PKG
PK G 6 00 MOS 25-S EP-20 19
79.005 HRS /MSC 600 +40/-40 188 0.3
REF: See Workcard ENC 123 6
79-0 0-00-2 04 (s) NO. 2 ENGINE - DIS CA RD OIL FILTE R ENGINE O IL FILTER ELEMENT PKG
401 2T1 6P01 PKG 1600 MOS 29-MAR-2 018
79.010 SN-UNKNOWN HRS /MSC 160 0 +40/-40 153 4.3
LIFE LIMIT REF: See Workcard ENC

79-0 0-00-2 05 (s) NO. 2 ENGINE - FUNCTIONAL TEST OIL FILTE R IMP ENDING B YPAS S S ENSOR PKG
PK G 3 200 MOS +40/-40
79.015 HRS /MSC 320 0 +40/-40 0
REF: See Workcard ENC

79-0 0-00-2 06 (s) NO. 2 ENGINE - FUNCTIONAL TEST ENGINE MASTER CHIP DETECTOR PKG
PK G 3 200 MOS 26-A PR-2017
79.020 HRS /MSC 320 0 +40/-40 136 3.8
REF: See Workcard ENC 893
79-0 0-00-2 07 (s) NO. 2 ENGINE - VISUAL CHE CK C-SUMP DRAIN OUTLET PKG
PK G 6 00 MOS 25-S EP-20 19
79.025 HRS /MSC 600 +40/-40 188 0.3
REF: See Workcard ENC 123 6

79-0 0-00-2 08 (s) NO. 2 ENGINE - DETAIL ED INSPECTIO N C-SUMP SCAV ENGE SCRE ENS (P RE G E S B-79-0 018). PKG
PK G 3 200 MOS +40/-40
79.030 HRS /MSC 320 0 +40/-40 0
REF: See Workcard ENC

79-0 0-00-3 03 NO. 2 ENGINE - RESTORATIO N (INS PECTION/CL EANING) OF THE MASTER CHIP DETECTOR
MOS 28-MAY -2012
79.100 HRS /MSC - 70
OPTIONAL REF: See Workcard ENC

79-0 0-00-3 04 NO. 2 ENGINE - DETAIL ED INSPECTIO N OF THE ENGINE OIL FILTER E LEMENT
MOS 28-MAY -2012
79.110 HRS /MSC - 70
OPTIONAL REF: See Workcard ENC

790 001-00 1 NO. 2 ENGINE - OIL FILTER


401 2T1 6P01 MOS TSN:0 26-A PR-2017
79.040 SN-UNKNOWN HRS /MSC H/T TSN:0 136 3.8
REF: See Workcard ENC TSN:0 893
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
238 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HRS, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNIT INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
791 012-00 1 NO. 2 ENGINE - LUBE & SCAVENGE PUMP
608 7T0 4P10 MOS TSN:0 01-A PR-2011
79.045 NMABL42 8 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
791 014-00 1 NO. 2 ENGINE - A-S UMP SCAVE NG E P UMP
PN MOS TSN:0 01-A PR-2011
79.050 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0

791 020-00 1 NO. 2 ENGINE - HEAT E XCHA NG ER


608 7T0 5P02 MOS TSN:0 01-A PR-2011
79.055 SCKB3 615 HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0

792 110-00 1 NO. 2 ENGINE - OIL FILTER B YPAS S S ENS OR


PN MOS TSN:0 01-A PR-2011
79.060 SN-UNKNOWN HRS /MSC O/C TSN:0 0
REF: See Workcard ENC TSN:0 0
CHA PTER 80 STA RTING
80-1 1-00-2 02 (s) DETAIL ED INSPECTIO N OF THE DRAIN PL UG MAG NETIC CHIP DETECTO R PKG
80-1 1-00-2 02 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
REF: AMM 8 0 1 1 0 1 22 0 8 01 AFL 123 6
80-1 1-00-2 03 (s) DIS CA RD OF THE A IR TURBINE STARTER (A TS) OIL PKG
80-1 1-00-2 03 PK G 6 00 MOS 25-S EP-20 19
HRS /MSC 600 +40/-40 188 0.3
REF: AMM 8 0 1 1 0 1 68 0 8 01 AFL 123 6

80-1 1-01-9 00-80 1-01 LH PRE SS SPEE D SWITCH


128 646-6 MOS TSN:0 01-A PR-2011
235 33 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

80-1 1-01-9 00-80 1-02 RH PRESS S PEED SWITCH


128 646-6 MOS TSN:0 01-A PR-2011
235 36 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

80-1 1-04-9 00-80 1-01 LH ATS -STARTING VALVE


898 930-10 MOS TSN:0 01-A PR-2011
452 3 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

80-1 1-04-9 00-80 1-02 RH ATS-S TARTING VA LVE


898 930-10 MOS TSN:0 01-A PR-2011
453 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

80-1 1-23-9 00-80 1-01 LH ENG INE AIR TURBINE STA RTER
350 5188-9 MOS TSN:0 01-A PR-2011
690 6 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0
?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
239 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
Status Report
CL-605 S/N 5866 (AP-HKD): 2250 .8 HR S, 1507 AFL as of 17-Jun-20 22
Owner/Operator: PRINCELY JETS ( PVT.) LTD.
Report Date: 24-JUN-2022
TASK NO TASK DESCR IPTION UNI T INTERVAL TIME SINCE ADJ WARR EXP COMPLIANC E NEXT D UE MAX
TLMC PART/SERIA L (ENG/APU) A/C LIMIT
80-1 1-23-9 00-80 1-02 RH ENGINE A IR TURBINE STARTER
350 5188-9 MOS TSN:0 01-A PR-2011
690 7 HRS /MSC O/C TSN:0 0
REF: See Workcard AFL TSN:0 0

?-Insufficient Inf ormation +- Tas k e xis ts in Inspection Ma nual (s)- Suppre ssed Requirem ent (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
240 Of 240
(ENG/APU) = E ngine/APU Units © CAMP SYSTEMS
CL-605 S/N 5866 AP-HKD
OWNER: PRINCELY JETS (PVT.) LTD. OPERATOR: PRINCELY JETS (PVT.) LTD. OPERATOR: PRINCELY JETS
ADDRESS: ATTN: TAHA ANSARI ADDRESS: ATTN: TAHA ANSARI ADDRESS: NO. 10, 3RD FLOOR
KARACHI SINDH KARACHI SINDH KARACHI 75520
PHONE: 0300-2001127 (MOBILE) PHONE: 030 0-2001127 (MOBILE) PHONE: 011-92-21 -521-54 88
FAX: FAX: FAX: 011-92-21 -521-03 60

ANALYS T: SANDRA PINILLA +1-514-63 6-7423 (OFFICE) 800-787-9 749


(EFAX-CARDS)
EMAIL: SPINILLA@CAMPSYSTEMS.COM 514-636-2020 (OFFICE) 631-980-4 222
(EFAX-CARDS)
WWW.CAMPSYSTEMS.COM

PROJECTED : 3 MOS. to 24-SEP-2022

AIRCRAFT SERIAL/REGNO: 5866/AP-HKD MODEL: CL-605 MANUFACTURER : BOMBARDIER AVIATION


DATES LAST ACTUALS PROJECTED
CERTIFICATION DATE: 01-APR-2011 2250.8 A/C HRS as of 17-JUN-20 22 2516.02
INSERVICE DATE: 17-APR-2012
MANUFACTURER DATE: 25-MAR-20 11 1507 AFL as of 17-JUN-20 22 1597

APU SERIAL/PART: P-3 10/38 00804 -1 MODEL: GTCP 36-150 (CL) MANUFACTURER : HONEYWELL
INSTALLED ON 26-APR-2 017 LAST ACTUALS PROJECTED
2109 APU HRS 3596 APU HRS as of 31-MAY-2022 3746

0 APUS 0 APUS as of 31-MAY-2022 75

ENGINE NO. 1 SERIAL/PART: 950967/6 089T11G01 MODEL: CF-34-3B (CIMMS) MANUFACTURER : GENERAL ELECTRIC
INSTALLED ON 28-FEB-20 11 LAST ACTUALS PROJECTED

0 ENG. HRS 0 A/C HRS 2250.8 ENG. HRS as of 17-JUN-20 22 2516.02

0 ENC 1518 ENC as of 17-JUN-20 22 1608

ENGINE NO. 2 SERIAL/PART: 950968/6 089T11G01 MODEL: CF-34-3B (CIMMS) MANUFACTURER : GENERAL ELECTRIC
INSTALLED ON 28-FEB-20 11 LAST ACTUALS PROJECTED

0 ENG. HRS 0 A/C HRS 2250.8 ENG. HRS as of 17-JUN-20 22 2516.02

0 ENC 1517 ENC as of 17-JUN-20 22 1607

BOM BARDIER AND CHALLENGER ARE TRADEMARKS OF BOMBARDIER, INC. 1 Of 7


Due List Report © CAMP SYSTEMS
Due List Calender Section
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 Projected To: 3 MOS. to 24-SEP-2022
Operator: PRINCELY JETS (PVT.) LTD. Repor t Date: 24-JUN-2022

TASK NO TASK DESCRIPTION DISPOSITION


UNIT INTERVAL TIME SINCE COMPLIANC E NEXT DUE MAX LIMIT TIME REMAINING EST. DUE
TLMC ( EN H ) AF H

R 256089-0901 WARDROBE FIRST AID KIT


P/N: 72505 7/7 25040 MOS 30-A PR-2020 01-J UN-20 22 M OVD
S/N: 21042 0-001 LEW HRS /MSC O/C 193 0.2 0
REF: AFL 127 7

34-00-CUS-9002 UPDATE JEPPESEN PROLINE 21 ELECTRONIC CHARTS IN FSU WITH LA TEST CYCLE
MOS 14 13-JUN-2022 29-J UN-20 22 M 6d 29-JUN-2022
HRS /MSC 224 5.8 0
REF: AFL 150 5

34-00-CUS-9003 UPDATE 1 & 2 FMS AND IFIS E-MAP WITH LATEST DATABASE
DAYS 28 17-JUN-2022 15-J UL-20 22 22d 15-JUL-20 22
HRS /MSC 225 0.8 0
REF: AFL 150 7

R 24-30-00-202 FUNCTIONAL TEST MAIN BATTERY (CAPACITY CHEC K) (MRB)


24-3 0-00-2 02 P/N: 1756- 3 MOS 6 +1 m/-1m 21-FEB -2022 21-AUG-2 022 21-S EP-20 22 59d (+31) 21-A UG -2022
S/N: 09052 00179 A6C HRS /MSC
REF: AMM 2 4 3 2 0 1 72 0 8 01 AFL

R 24-30-00-203 FUNCTIONAL TEST APU BATTERY (CAPAC ITY CHEC K) (MRB)


24-3 0-00-2 03 P/N: 40178 -26 MOS 6 +1 m/-1m 21-FEB -2022 21-AUG-2 022 21-S EP-20 22 59d (+31) 21-A UG -2022
S/N: 09052 001C003 B HRS /MSC
REF: AMM 2 4 3 2 0 4 72 0 8 01 AFL

R SB 605-35-006 MODIFICATION - OXYGEN SUPPLY SYSTEM - FLEXIBLE OXYGEN HOSE REPLACEMENT, SERVICE BULLETIN RECOMME NDED
REV 01
MOS 12 23-A UG -2021 (EFF 23-AUG-2 022 M 61d 23-A UG
HRS /MSC )
REF: BULLE TINS AFL

FAA 2022-10-10 ICE AND RAIN PROTECTION - WING ANTI-ICE (WAI) SYSTEM - WING STALL PRIOR TO TOUCHDOWN DUE TO WING LEADING MANDATO RY
EDGE ICING
DUE NEXT DAYS 60 05-JUL-20 22(EFF) 03-S EP-20 22 * New Reqmt 03-S EP-20 22
HRS /MSC
REF: AD AFL

NEW REQ UIREMENT ADDED ON 31-MAY- 2022 (EFFECTIVE: 0 5-JUL -2022) . RE VIEW BA SE TIMES TO ENSURE CO RRECT DUE TIMES.
05-00-CUS-9004 RENEWAL INSURANCE CERTIFICATE CUS TO ME R CODE
MOS 12 08-S EP-20 21 08-S EP-20 22 77d 08-S EP-20 22
HRS /MSC 219 2.3 8
REF: AFL 147 4

R-Task was due on pre vious due lists (xE XT) -Extension incorporated in the next due calcula tion (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W

2 Of 7
© CAMP SYSTEMS
Due List Calender Section
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 Projected To: 3 MOS. to 24-SEP-2022
Operator: PRINCELY JETS (PVT.) LTD. Repor t Date: 24-JUN-2022

TASK NO TASK DESCRIPTION DISPOSITION


UNIT INTERVAL TIME SINCE COMPLIANC E NEXT DUE MAX LIMIT TIME REMAINING EST. DUE
TLMC ( EN H ) AF H

34-00-CUS-9001 UPDATE LOAD MK V EGPWS TERRAIN DATABASE CUS TO ME R CODE


MOS 3 13-JUN-2022 13-S EP-20 22 82d 13-S EP-20 22
HRS /MSC 224 5.8 3
REF: AFL 150 5

05M006 6 MONTH CHECK


MOS 6 +1 m/-1m 14-MAR-2 022 14-S EP-20 22 14-O CT-20 22 83d (+30) 14-S EP-20 22
HRS /MSC 219 4.6 0
REF: MPD S ECTION 2 .2.2 AFL 147 5

11-CUS-001 INSPECT ADHESIVE DECAL TYPE REGISTRATION FOR PRESENCE AND LEGIBILITY PER SAN MARINO REGISTRATION CUS TO ME R CODE
REQUIREMENTS CAA CAP 08 APP 3 (25).
MOS 6 18-MAR-2 022 18-S EP-20 22 87d 18-S EP
HRS /MSC 500 219 5.7 0 269 5.7 0 444 .9
REF: AFL 147 6

R-Task was due on pre vious due lists (xE XT) -Extension incorporated in the next due calcula tion (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W

3 Of 7
© CAMP SYSTEMS
Due List Hours Section
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022
Operator: PRINCELY JETS (PVT.) LTD. Repor t Date: 24-JUN-2022

TASK NO TASK DESCRIPTION DISPOSITION


UNIT INTERVAL TIME SINCE COMPLIANC E NEXT DUE MAX LIMIT TIME REMAINING EST. DUE
TLMC ( EN H ) AF H

+ 12-10-00-201 NO. 1 ENGINE - SERVICE THE ENGINE OIL TANK


MOS 13-JUN-2022 28-JUN-2022
HRS /MSC 16 224 5.8 3 (226 1.8 3) 2261.83 11.03
REF: ENC 151 6

+ 12-10-00-201 NO. 2 ENGINE - SERVICE THE ENGINE OIL TANK


MOS 13-JUN-2022 28-JUN-2022
HRS /MSC 16 224 5.8 3 (226 1.8 3) 2261.83 11.03
REF: ENC 151 5

72-00-GE-9001 NO. 1 ENGINE - DOWNLOAD OF BOTH ENGINES FOR TREND MONITORING - E-MAIL TO GEAEREMOTESERVICES@AE.GE.COM - CUS TO ME R CODE
NOTE: CL5866 - RESET MDC DATA: DISK OPS, PRESS: SKP, CHKLST, UP, SEL, DWN & THEN CONFIRM RESET
CY MOS 13-JUN-2022 15-JUL
HRS /MSC 50 224 5.8 3 (229 5.8 3) 2295.83 45.03
REF: ENC 50 151 6 156 6 48

72-00-GE-9001 NO. 2 ENGINE - DOWNLOAD OF BOTH ENGINES FOR TREND MONITORING - E-MAIL TO GEAEREMOTESERVICES@AE.GE.COM - CUS TO ME R CODE
NOTE: CL5866 - RESET MDC DATA: DISK OPS, PRESS: SKP, CHKLST, UP, SEL, DWN & THEN CONFIRM RESET
CY MOS 13-JUN-2022 15-JUL
HRS /MSC 50 224 5.8 3 (229 5.8 3) 2295.83 45.03
REF: ENC 50 151 5 156 5 48

05H0100 100 HOUR CHECK


MOS 10-JUN-2022 10-A UG -2022
HRS /MSC 100 224 5.5 0 234 5.5 0 94.7
REF: See Workcard AFL 150 5

R TCCA LUBRICATION OF LEFT HAND (LH) MLG SHOCK STRUT LOWER PIN MANDATO RY
CF-2020-54 R01
PART I LH
MOS 12 14-MAR-2 022 14-MAR-2023 264 d 03-S EP-20 22
HRS /MSC 200 219 4.6 0 239 4.6 0 143 .8
REF: AD AFL 147 5

R TCCA LUBRICATION OF RIGHT HAND (RH) MLG SHOCK STRUT LOWER PIN MANDATO RY
CF-2020-54 R01
PART I RH
MOS 12 14-MAR-2 022 14-MAR-2023 264 d 03-S EP-20 22
HRS /MSC 200 219 4.6 0 239 4.6 0 143 .8
REF: AD AFL 147 5

R-Task was due on pre vious due lists (xE XT) -Extension incorporated in the next due calcula tion (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
CY - Task also due in c ycles due list
4 Of 7
© CAMP SYSTEMS
Due List Hours Section
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022
Operator: PRINCELY JETS (PVT.) LTD. Repor t Date: 24-JUN-2022

TASK NO TASK DESCRIPTION DISPOSITION


UNIT INTERVAL TIME SINCE COMPLIANC E NEXT DUE MAX LIMIT TIME REMAINING EST. DUE
TLMC ( EN H ) AF H

FAA 2021-20-13 LH REPETITIVE LUBRICATION LH MLG SHOCK STRUT LOWER PINS PN 19146-3 MANDATO RY
PARA (G)
MOS 12 13-JUN-2022 13-J UN-20 23 355 d 29-S EP
HRS /MSC 200 224 5.8 3 244 5.8 3 195 .03
REF: AD AFL 150 5

FAA 2021-20-13 RH REPETITIVE LUBRICATION RH MLG SHOCK STR UT LOWER PINS PN 19146-3 MANDATO RY
PARA (G)
MOS 12 13-JUN-2022 13-J UN-20 23 355 d 29-S EP
HRS /MSC 200 224 5.8 3 244 5.8 3 195 .03
REF: AD AFL 150 5

R 28-21-13-201 OPERATIONAL TEST LH ENGINE FIREWALL FUEL SHUTOFF VALVE


28-2 1-13-2 01 MOS 25-S EP-20 19 17-O CT-20 22
HRS /MSC 600 +4 0/- 40 188 0.3 0 248 0.3 0 252 0.3 229 .5 (+40)

REF: AMM 2 8 2 1 1 3 71 0 8 01 AFL 123 6

R 28-21-13-201 OPERATIONAL TEST RH ENGINE FIREWALL FUEL SHUTOFF VALVE


28-2 1-13-2 01 MOS 25-S EP-20 19 17-O CT-20 22
HRS /MSC 600 +4 0/- 40 188 0.3 0 248 0.3 0 252 0.3 229 .5 (+40)

REF: AMM 2 8 2 1 1 3 71 0 8 01 AFL 123 6

R 24-30-00-202-C OVERHAUL MAIN BATTERY


P/N: 1756- 3 MOS 12 14-MAR-2 022 14-MAR-2023 264 d 24-O CT-20 22
S/N: 09052 00179 A6C HRS /MSC 300 219 4.6 0 249 4.6 0 243 .8
REF: AFL 147 5

R 24-30-00-203-C OVERHAU L APU BATTERY


P/N: 40178 -26 MOS 12 14-MAR-2 022 14-MAR-2023 264 d 24-O CT-20 22
S/N: 09052 001C003 B HRS /MSC 300 219 4.6 0 249 4.6 0 243 .8
REF: AFL 147 5

R-Task was due on pre vious due lists (xE XT) -Extension incorporated in the next due calcula tion (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W

5 Of 7
© CAMP SYSTEMS
Due List AFL Section
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022
Operator: PRINCELY JETS (PVT.) LTD. Repor t Date: 24-JUN-2022

TASK NO TASK DESCRIPTION DISPOSITION


UNIT INTERVAL TIME SINCE COMPLIANC E NEXT DUE MAX LIMIT TIME REMAINING EST. DUE
TLMC ( EN H ) AF H

R 56-10-00-102 DETAILED INSPECTION SIDE WINDOW - 4 BUSHING HOLES. AIRWORTHINESS


56-1 0-00-1 02 MOS 13-MAR-2 020 30-A UG -2022
HRS /MSC 192 6.4 0
REF: AMM 5 6 1 0 0 1 22 0 8 02 AFL 300 127 5 157 5 68

R-Task was due on pre vious due lists (xE XT) -Extension incorporated in the next due calcula tion (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W

6 Of 7
© CAMP SYSTEMS
Due List ENC Section
CL-605 S/N 5866 (): 2250.8 HRS, 1507 AFL as of 17-Jun-2022
Operator: PRINCELY JETS (PVT.) LTD. Repor t Date: 24-JUN-2022

TASK NO TASK DESCRIPTION DISPOSITION


UNIT INTERVAL TIME SINCE COMPLIANC E NEXT DUE MAX LIMIT TIME REMAINING EST. DUE
TLMC ( EN H ) AF H

72-00-GE-9001 NO. 1 ENGINE - DOWNLOAD OF BOTH ENGINES FOR TREND MONITORING - E-MAIL TO GEAEREMOTESERVICES@AE.GE.COM - CUS TO ME R CODE
NOTE: CL5866 - RESET MDC DATA: DISK OPS, PRESS: SKP, CHKLST, UP, SEL, DWN & THEN CONFIRM RESET
H MOS 13-JUN-2022 15-JUL
HRS /MSC 50 224 5.8 3 229 5.8 3 45.03
REF: ENC 50 151 6 156 6 48

72-00-GE-9001 NO. 2 ENGINE - DOWNLOAD OF BOTH ENGINES FOR TREND MONITORING - E-MAIL TO GEAEREMOTESERVICES@AE.GE.COM - CUS TO ME R CODE
NOTE: CL5866 - RESET MDC DATA: DISK OPS, PRESS: SKP, CHKLST, UP, SEL, DWN & THEN CONFIRM RESET
H MOS 13-JUN-2022 15-JUL
HRS /MSC 50 224 5.8 3 229 5.8 3 45.03
REF: ENC 50 151 5 156 5 48

R-Task was due on pre vious due lists (xE XT) -Extension incorporated in the next due calcula tion (EBT)-Estima ted Base Tim e *-Estimate d Due (New Requirement) (EFF)-Effe ctiv e C/W
H - Task also due in hours due list
7 Of 7
© CAMP SYSTEMS
CL-605 S/N 5866 AP-HKD
OWNER: PRINCELY JETS (PVT.) LTD. OPERATOR: PRINCELY JETS (PVT.) LTD. OPERATOR: PRINCELY JETS
ADDRESS: ATTN: TAHA ANSARI ADDRESS: ATTN: TAHA ANSARI ADDRESS: NO. 10, 3RD FLOOR
KARACHI SINDH KARACHI SINDH KARACHI 75520
PHONE: 0300-2001127 (MOBILE) PHONE: 030 0-2001127 (MOBILE) PHONE: 011-92-21 -521-54 88
FAX: FAX: FAX: 011-92-21 -521-03 60

ANALYS T: SANDRA PINILLA +1-514-63 6-7423 (OFFICE) 800-787-9 749


EMAIL: SPINILLA@CAMPSYSTEMS.COM 514-636-2020 (OFFICE) (EFAX-CARDS)
631-980-4 222
WWW.CAMPSYSTEMS.COM (EFAX-CARDS)

PROJECTED : 2 MOS. to 24-NOV-2022


EXTENDED DUE LIST - FOR PLANNING PURPOSES ONLY - Scheduled Wor k Cards were not issued with this Report.

AIRCRAFT SERIAL/REGNO: 5866/AP-HKD MODEL: CL-605 MANUFACTURER : BOMBARDIER AVIATION


DATES LAST ACTUALS PROJECTED
CERTIFICATION DATE: 01-APR-2011 2250.8 A/C HRS as of 17-JUN-20 22 2636.02
INSERVICE DATE: 17-APR-2012
MANUFACTURER DATE: 25-MAR-20 11 1507 AFL as of 17-JUN-20 22 1657

APU SERIAL/PART: P-3 10/38 00804 -1 MODEL: GTCP 36-150 (CL) MANUFACTURER : HONEYWELL
INSTALLED ON 26-APR-2 017 LAST ACTUALS PROJECTED
2109 APU HRS 3596 APU HRS as of 31-MAY-2022 3846

0 APUS 0 APUS as of 31-MAY-2022 125

ENGINE NO. 1 SERIAL/PART: 950967/6 089T11G01 MODEL: CF-34-3B (CIMMS) MANUFACTURER : GENERAL ELECTRIC
INSTALLED ON 28-FEB-20 11 LAST ACTUALS PROJECTED

0 ENG. HRS 0 A/C HRS 2250.8 ENG. HRS as of 17-JUN-20 22 2636.02

0 ENC 1518 ENC as of 17-JUN-20 22 1668

ENGINE NO. 2 SERIAL/PART: 950968/6 089T11G01 MODEL: CF-34-3B (CIMMS) MANUFACTURER : GENERAL ELECTRIC
INSTALLED ON 28-FEB-20 11 LAST ACTUALS PROJECTED

0 ENG. HRS 0 A/C HRS 2250.8 ENG. HRS as of 17-JUN-20 22 2636.02

0 ENC 1517 ENC as of 17-JUN-20 22 1667

BOM BARDIER AND CHALLENGER ARE TRADEMARKS OF BOMBARDIER, INC. 1 Of 3


Extended Due List Report © CAMP SYSTEMS
Extended Due List - AIRFRAME(CALENDAR)
Aircraft Model - CL-605
Serial #: 5866 Reg. #: AP-HKD
Report Date 24-JUN-2022

EXTENDED DUE LIST - FOR PLANNING PURPOSE ONLY - Scheduled Work Cards w ere not issued with this Report.
TASK NO
TASK DESCRIPTION DISPOSITION AREA
TLMC
PART NUMBER/PKG UNIT INTERVAL TIME-----AT-----INSTALLATION COMPLIANCE NEXT DUE PRICE
WORK CARD
SERIAL NUMBER TSN TSO TSR TSI ADJ WARR EXP ( EN H ) AF H (x EXT )
LABOR
WORK ORDER
FAA 201 7-16-1 3 OXY GEN - REPL ACE THE EXISTING LANYARDS IN THE PASS ENGER O XYGE N BOX A SSEMBLIES WITH L ANYARDS O F THE CORRECT MANDATO RY
LENGTH
MOS 60 25-S EP-20 22
HRS /MSC 240 0 382 3.3 8
REF: AD AFL
35-0 0-00-2 06 RESTORATIO N PILOT OXYGE N REGULATOR MA SK ASSE MB LY OF MASK REGULA TO R OVE RHAUL
35-0 0-00-2 06 MF1 0-03-0 3 MOS 72 13-O CT-20 16 13-O CT-20 22
103 6711 HRS /MSC
REF: AMM 3 5 1 1 0 7 61 5 8 01 AFL
TCCA RELOCATION O F ACCUMULATORS MANDATO RY
CF- 2009-3 9 R01
PART V
MOS 60 27-O CT-20 22
HRS /MSC
REF: AD AFL 240 0 332 9

Total Labor Hours


Total Price :

R - Task w as due on previous due lists


(xEXT) - Extension incorporated in the next due calculation

© CAMP SYSTEMS 2 Of 3
Extended Due List - AIRFRAME(HOURS)
Aircraft Model - CL-605
Serial #: 5866 Reg. #: AP-HKD
Report Date 24-JUN-2022

EXTENDED DUE LIST - FOR PLANNING PURPOSE ONLY - Scheduled Work Cards w ere not issued with this Report.
TASK NO
TASK DESCRIPTION DISPOSITION AREA
TLMC
PART NUMBER/PKG UNIT INTERVAL TIME-----AT-----INSTALLATION COMPLIANCE NEXT DUE PRICE
WORK CARD
SERIAL NUMBER TSN TSO TSR TSI ADJ WARR EXP ( EN H ) AF H (x EXT )
LABOR
WORK ORDER
05H060 0 600 HOUR CHECK
MOS 25-S EP-20 19
HRS /MSC 600 40 188 0.3 0 252 0.3 0
REF: See Workcard AFL 123 6
30-2 2-00-1 01 OPE RA TIONAL TEST O F THE COWL ANTI-ICE FAILURE INDICATION - ( POST SB 605-30 -001) (CMR*)
MOS 13-MAR-2 020
HRS /MSC 600 192 6.4 0 252 6.4 0
REF: AMM 3 0 2 2 0 0 71 0 8 01 AFL 127 5
TCCA HORIZONTAL STAB TRIM ACTUA TO R (HSTA) - L OOSE BO LTS O N THE SP UR GEAR TIME LIMIT MAINTENANCE CHECKS CHA NG E - - MANDATO RY
CF- 2013-1 8 P ART PERFORM TASK 27 -41-00 -101
(II)( B)
MOS 14-MAR-2 022
HRS /MSC 400 219 4.6 0 259 4.6 0
REF: AFL 147 5
TCCA DVI OF THE LH MLG SHOCK STRUT LOWER PIN MANDATO RY
CF- 2020-5 4 R01
PART II LH
MOS 24 14-MAR-2 022 14-MAR-2024
HRS /MSC 400 219 4.6 0 259 4.6 0
REF: AD AFL 147 5
TCCA DVI OF THE RH MLG SHOCK STRUT LO WER PIN MANDATO RY
CF- 2020-5 4 R01
PART II RH
MOS 24 14-MAR-2 022 14-MAR-2024
HRS /MSC 400 219 4.6 0 259 4.6 0
REF: AD AFL 147 5
SB 605 -32-00 7 ACCOMPLISH S PECIA L CHECK - MAIN LA NDING GE AR - LUBRICATION A ND INSPE CTION OF LH/RH MAIN LA NDING G EAR (MLG ) RECOMME NDED
PART B SHOCK STRUT L OWER PIN 1 9146-3 , SERVICE B UL LETIN DV I INSPE CTION O F LH/RH MLG SHOCK STRUT LOWER PIN
MOS 24 14-MAR-2 022 14-MAR-2024
HRS /MSC 400 219 4.6 0 259 4.6 0
REF: See Workcard AFL 147 5

Total Labor Hours


Total Price :

R - Task w as due on previous due lists


(xEXT) - Extension incorporated in the next due calculation

© CAMP SYSTEMS 3 Of 3
CL-605 S/N 5866 AP-HKD
OWNER: PRINCELY JETS (PVT.) LTD. OPERATOR: PRINCELY JETS (PVT.) LTD. OPERATOR: PRINCELY JETS
ADDRESS: ATTN: TAHA ANSARI ADDRESS: ATTN: TAHA ANSARI ADDRESS: NO. 10, 3RD FLOOR
KARACHI SINDH KARACHI SINDH KARACHI 75520
PHONE: 030 0-2001127 (MOBILE) PHONE: 030 0-2001127 (MOBILE) PHONE: 011-92-21 -521-54 88
FAX: FAX: FAX: 011-92-21 -521-03 60

ANALYS T: SANDRA PINILLA +1-514-63 6-7423 (OFFICE) 800-787-9 749 (EFAX-CARDS) PLEASE RECORD CHANGES TO ADDRESS, LAST
EMAIL: SPINILLA@CAMPSYSTEMS.COM 514-636-2020 (OFFICE) 631-980-4 222 (EFAX-CARDS) ACTUALS (IF ANY) AND FAX THIS SHEET BACK TO
WWW.CAMPSYSTEMS.COM CAMP.
AIRCRAFT SERIAL/REGNO: 5866/AP-HKD MODEL: CL-605 MANUFACTURER: BOMBARDIER AVIATION
DATES LAST ACTUALS CURRENT ACTUAL
CERTIFICATION DATE: 01-APR-2011 2250.8 A/C HRS as of 17-JUN-20 22 ______________ A/C HRS as of ___ _/____/__ ______
INSERVICE DATE: 17-APR-2012
MANUFACTURER DATE: 25-MAR-20 11 1507 AFL as of 17-JUN-20 22 ______________ AFL as of ___ _/____/__ ______

APU SERIAL/PART: P-3 10/38 00804-1 MODEL: GTCP 36-15 0 (CL) MANUFACTURER: HONEYWELL
INSTALLED ON 26-APR-2 017 LAST ACTUALS CURRENT ACTUAL
2109 APU HRS 3596 APU HRS as of 31-MAY-2022 ______________ APU HRS as of ___ _/____/__ ______

0 APUS 0 APUS as of 31-MAY-2022 ______________ APUS as of ___ _/____/__ ______

ENGINE NO. 1 SERIAL/PART: 950967/6089T11G01 MODEL: CF-34-3B (CIMMS) MANUFACTURER: GENERAL ELECTRIC
INSTALLED ON 28-FEB-20 11 LAST ACTUALS CURRENT ACTUAL
0 ENG. HRS 0 A/C HRS 2250.8 ENG. HRS as of 17-JUN-20 22 ______________ ENG. HRS as of ___ _/____/__ ______

0 ENC 1518 ENC as of 17-JUN-20 22 ______________ ENC as of ___ _/____/__ ______

ENGINE NO. 2 SERIAL/PART: 950968/6089T11G01 MODEL: CF-34-3B (CIMMS) MANUFACTURER: GENERAL ELECTRIC
INSTALLED ON 28-FEB-20 11 LAST ACTUALS CURRENT ACTUAL
0 ENG. HRS 0 A/C HRS 2250.8 ENG. HRS as of 17-JUN-20 22 ______________ ENG. HRS as of ___ _/____/__ ______

0 ENC 1517 ENC as of 17-JUN-20 22 ______________ ENC as of ___ _/____/__ ______

BOM BARDIER AND CHALLENGER ARE TRADEMARKS OF BOMBARDIER, INC.

AD/Service Information Report © CAMP SYSTEMS 1 Of 318


AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

AIRFRAME - AD - 5866/AP-HKD
201 3-0106 (1 ) EQUIPMENT / FURNISHINGS - VARNIS H ON V ENEERED P ANELS - INSPECTION / RE-FURBIS HING REWO RK THE NOT A PPLICA BLE
VENEE RE D PARTS OF THE A EROPLANE INTERIOR
MOS
HRS /MSC -
AFL
201 3-0106 (2 ) EQUIPMENT / FURNISHINGS - VARNIS H ON V ENEERED P ANELS - INSPECTION / RE-FURBIS HING INSPECT AL L NOT A PPLICA BLE
VENEE RE D PARTS OF THE A EROPLANE INTERIOR
MOS
HRS /MSC -
AFL
201 3-0106 (3 ) EQUIPMENT / FURNISHINGS - VARNIS H ON V ENEERED P ANELS - INSPECTION / RE-FURBIS HING REP LACE OR REPA IR NOT A PPLICA BLE
ALL AFFECTE D VENEE RE D CABIN PA NEL S
MOS
HRS /MSC -
AFL
201 3-0106 (4 ) EQUIPMENT / FURNISHINGS - VARNIS H ON V ENEERED P ANELS - INSPECTION / RE-FURBIS HING INSPECTION OF AN NOT A PPLICA BLE
AEROP LANE ACCO MP LIS HE D BEFORE EFFE CTIVE DA TE OF THIS AD
MOS
HRS /MSC -
AFL
ANAC 2012-0 5-01 GO ODYEAR TIRES PART NUMB ER 299 K63-1 IDE NTIFIED IN G OODYEA R AVIATION SE RV ICE BULLETIN 2012 -32-00 1, NOT A PPLICA BLE
INS TAL LED O N CERTA IN TRANSPO RT CA TE GORY AIRPL ANE, INCLUDING BUT NOT L IMITED TO B OMBARDIER
CL-600 -2B19 AIRPLANES.
MOS 01-JUL-20 12
HRS /MSC -
AFL

EAS A 2 007-0 120 NAVIGATION - MODE S TRANSPONDER WIRING - MODIFICATIO N SUPERSE DE D


MOS
HRS /MSC -
AFL
EAS A 2 009-0 097 NAVIGATION - MODE S TRANSPONDER - CHECK / MO DIFICATIO N - MANDA TO RY
MOS
HRS /MSC -
AFL
EAS A 2 009-0 100 MICROTURBO S APHIR 2 A PU - EXHAUST THERMAL INSULATION - REPLA CE ME NT NOT A PPLICA BLE NOT A PPLICA BLE - APU TYP E NOT INSTALLE D
MOS 21-A PR-2014
HRS /MSC - 766 .9
AFL 313
EAS A 2 009-0 173 NAVIGATION - MODE S TRANSPONDER - MODIFICA TION / RE PLACEMENT. EAS A
MOS
HRS /MSC -
AFL
EAS A 2 009-0 173 R1 NAVIGATION – MODE S TRANSPONDER – MODIFICATION / REPLACEMENT - ROCKWELL COLL INS INC.
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 2 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 009-0 200 NAVIGATION - NARCO AV IONICS INC AT-150 MODE A/C TRA NSP ONDE R -CHECK/MODIFICATIO N (VSB AT15 0 NO. 6 , VAD
200 4-08-1 6)
MOS
HRS /MSC -
AFL
EAS A 2 009-0 251-E EMERGENCY AD - FIRE PROTECTION - P ORTAB LE FIRE E XTINGUISHERS - IDE NTIFICATION / REPLACEMENT.
MOS
HRS /MSC -
AFL
EAS A 2 009-0 262 FIRE PROTECTION - HALO N 121 1 FIRE EX TINGUIS HERS - IDENTIFICA TION / RE PLACEMENT
MOS
HRS /MSC -
AFL
EAS A 2 009-0 278 FIRE PROTECTION - P ORTAB LE HA LON 1 211 FIRE EXTINGUISHERS - IDE NTIFICATION / REPLA CE ME NT
MOS
HRS /MSC -
AFL
EAS A 2 010-0 003 R1 NAVIGATION MODE S TRANSPO NDER TY PE MO DE STRAPP ING - CHECK / MODIFICATION MANDA TO RY
MOS
HRS /MSC -
AFL
EAS A 2 010-0 062 RE V 1 FIRE PROTECTION - HALO N 121 1 FIRE EX TINGUIS HERS - IDENTIFICA TION / RE PLACEMENT MANDA TO RY
MOS
HRS /MSC -
AFL
EAS A 2 010-0 067 NAVIGATION MODE S TRANSPO NDER CHECK/MODIFICA TION AIRWO RTHINES S
MOS
HRS /MSC -
AFL
EAS A 2 010-0 152 EQUIPMENT AND FURNISHING - OXYG EN MASK REGULA TO R - MODIFICATION - INTE RTECHNIQUE
MOS
HRS /MSC -
AFL
EAS A 2 010-0 204 NAVIGATION SY STEMS – MODE-S TRA NS PONDER – MODIFICA TION / RE PLACEMENT - ROCKWELL-COL LINS INC.
MOS
HRS /MSC -
AFL
EAS A 2 011-0 090 OXY GEN MA SK RE GULATOR INFLA TA BLE HARNES S - IDENTIFICATIO N / REPLA CE ME NT EAS A
MOS
HRS /MSC -
AFL
EAS A 2 011-0 090 R1 OXY GEN – O XYGEN MASK REGULATOR INFLATABLE HARNESS – IDENTIFICATION / REP LACEMENT - MANDA TO RY
INTERTECHNIQUE (PART OF ZO DIAC A EROSPA CE ), EROS
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 3 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 011-0 093 EQUIPMENT / FURNISHINGS – EMERGENCY LOCATOR TRANSMITTER (E LT) ANTENNA – MODIFICATION / SUPERSE DE D
REPLA CE ME NT - CHELTON L IMITE D
MOS
HRS /MSC A/R
AFL
EAS A 2 011-0 103 EQUIPMENT / FURNISHINGS - EMERGENCY LOCATOR TRANSMITTER (EL T) ANTENNA - MODIFICA TION / EAS A
REPLA CE ME NT
MOS
HRS /MSC -
AFL
EAS A 2 011-0 239 NAVIGATION - RADIO ALTIME TE R INDICA TO R - MO DIFICATIO N - SMS (TRADING AS COBHAM AVIONICS), FO RMERLY MANDA TO RY NOT A PPLICA BLE - BY EQUIP ME NT INSTALL ED
NEC A ERO .
MOS 17-A PR-2012
HRS /MSC A/R 16.2
AFL 10
EAS A 2 012-0 037 FIRE PROTECTION - HAND O PERATED FIRE EX TINGUISHER - MODIFICATIO N - PART NUMBE R (P/N) 5 6412-0 01 (34H),
564 11-001 (3 5H) AND 5 6412-0 02 (38H) - MANUFA CTURER: KIDDE GRAVINER (A HAMIL TO N SUNDS TRAND COMPANY)
MOS
HRS /MSC -
AFL
EAS A 2 012-0 254 OXY GEN - FLIGHT CRE W OX YGEN MA SK RE GULATOR -IDENTIFICATION / O PERATIONAL PROCEDURE / MANDA TO RY NOT A PPLICA BLE - BY PART NUMB ER OF
REPLA CE ME NT INS TAL LED E QUIPMENT.
MOS 12-DEC-20 12
HRS /MSC - 367 .9
AFL 142
EAS A 2 012-0 254 (1) INS PECT/CHECK O XYGEN - FLIGHT CREW O XYGE N MASK REGULATOR -IDENTIFICATION / OPERATIONAL MANDA TO RY NOT A PPLICA BLE - BY PART NUMB ER OF
PROCEDURE / REP LACEMENT OXY GEN MAS K REG UL ATOR TO INDENTIFY THE P/N AND S/N INS TAL LED E QUIPMENT.
DAYS 12-DEC-20 12
HRS /MSC - 367 .9
AFL 142
EAS A 2 012-0 254 (2.1) REPLA CE OX YGEN - FLIGHT CREW OX YGEN MASK REGULATOR - IDENTIFICATION / O PERATIO NA L P RO CE DURE / MANDA TO RY NOT A PPLICA BLE - BY PART NUMB ER OF
REPLA CE ME NT AFFECTED O XYGE N MASK REGULATOR INS TAL LED E QUIPMENT.
MOS 12-DEC-20 12
HRS /MSC - 367 .9
AFL 142
EAS A 2 012-0 254 (2.2) AMEND O XYGEN - FLIGHT CREW O XYGE N MASK REGULATOR -IDENTIFICA TION / OPERATIONAL PRO CE DURE / MANDA TO RY NOT A PPLICA BLE - BY PART NUMB ER OF
REPLA CE ME NT AIRCRAFT FLIG HT MA NUAL (AFM) INS TAL LED E QUIPMENT.
MOS 12-DEC-20 12
HRS /MSC - 367 .9
AFL 142
EAS A 2 012-0 254 (3) REPLA CE OX YGEN - FLIGHT CREW OX YGEN MASK REGULATOR - IDENTIFICATION / O PERATIO NA L P RO CE DURE / MANDA TO RY NOT A PPLICA BLE - BY PART NUMB ER OF
REPLA CE ME NT EACH AFFECTE D FLIG HT CREW OXYG EN MAS K REG ULA TO R WITH A SE RV ICEAB LE PART INS TAL LED E QUIPMENT.
MOS 12-DEC-20 12
HRS /MSC - 367 .9
AFL 142

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 4 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 013-0 106 EQUIPMENT / FURNISHINGS - VARNIS H ON V ENEERED P ANELS - INSPECTION / RE-FURBIS HING MANDA TO RY NOT A PPLICA BLE - BY AIRCRAFT MODEL
MOS 05-JUN-2013
HRS /MSC -
AFL
EAS A 2 013-0 106 (1) EQUIPMENT / FURNISHINGS - VARNIS H ON V ENEERED P ANELS - INSPECTION / RE-FURBIS HING REWO RK THE MANDA TO RY NOT A PPLICA BLE - BY AIRCRAFT MODEL
VENEE RE D PARTS OF THE A EROPLANE INTERIOR
MOS 05-JUN-2013
HRS /MSC -
AFL
EAS A 2 013-0 106 (2) EQUIPMENT / FURNISHINGS - VARNIS H ON V ENEERED P ANELS - INSPECTION / RE-FURBIS HING INSPECT AL L MANDA TO RY NOT A PPLICA BLE - BY AIRCRAFT MODEL
VENEE RE D PARTS OF THE A EROPLANE INTERIOR
MOS 05-JUN-2013
HRS /MSC -
AFL
EAS A 2 013-0 106 (3) EQUIPMENT / FURNISHINGS - VARNIS H ON V ENEERED P ANELS - INSPECTION / RE-FURBIS HING REP LACE OR REPA IR MANDA TO RY NOT A PPLICA BLE - BY AIRCRAFT MODEL
ALL AFFECTE D VENEE RE D CABIN PA NEL S
MOS 05-JUN-2013
HRS /MSC -
AFL
EAS A 2 013-0 106 (4) EQUIPMENT / FURNISHINGS - VARNIS H ON V ENEERED P ANELS - INSPECTION / RE-FURBIS HING INSPECTION OF AN MANDA TO RY NOT A PPLICA BLE - BY AIRCRAFT MODEL
AEROP LANE ACCO MP LIS HE D BEFORE EFFE CTIVE DA TE OF THIS AD
MOS 05-JUN-2013
HRS /MSC -
AFL

EAS A 2 014-0 142 R0 1 P ARA ACCOMPLISH A CCOMPLISH THE ACTIONS AS SPE CIFIED IN PARAGRAP HS (1.1) AND (1.2) OF THIS A D - DE TERMINE MANDA TO RY NOT A PPLICA BLE - AD IS N/A BY PN O F OXY GEN
(1) THE DATE OF MANUFA CTURING / REPLA CE THE HARNESS INFLATION HOS E P /N 445186 O R P/N 445 952, A S MASK REGULATOR INFLATABLE HARNESS /
APP LICAB LE, WITH A S ERVICEA BLE PART, OR RE MO VE THE INFLATABL E HARNESS FROM THE MAS K REG UL ATOR INFLATION HOS E INSTALLED, HENCE NO
AND REPL ACE IT WITH A SERVICE ABLE HARNE SS FURTHER ACTIO N REQUIRE D.
MOS 08-A PR-2016
18-JUN-2014 HRS /MSC - 131 3.0 2
AFL 851
EAS A 2 018-0 259 PARA (1) MODIFY EACH A FFECTED PA RT IN ACCO RDANCE WITH THE INSTRUCTIONS OF THE APPLICABLE SB /E B MANDA TO RY NOT A PPLICA BLE - N/A DUE TO RE CE PTA CL E
PART NUMBER
MOS 29-JUL-20 20
14-DEC-20 18 HRS /MSC - (s) 196 8.0 2
AFL 132 3
EAS A 2 018-0 259 R0 1 P ARA MODIFY EACH A FFECTED PA RT MANDA TO RY NOT A PPLICA BLE - By Pa rt: N/A DUE TO
(1) RECEPTACLE PART NUMBER
MOS
07-FEB -2019 HRS /MSC -
AFL
EAS A 2 018-0 259 R0 1 P ARA AFTER MODIFICATION OF AN AEROPL ANE A S REQ UIRED B Y P ARA (1 ) O F THIS AD, DO NOT INSTALL AN AFFE CTED MANDA TO RY NOT A PPLICA BLE - By Pa rt: N/A DUE TO
(2) PART O N THA T AEROP LANE RECEPTACLE PART NUMBER
MOS
07-FEB -2019 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 5 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 1974- 08-09 R02 LAV ATORY P APER OR LINEN WAS TE RECEPTACLE FIRE PREVENTIO N (SUPERSE DE D BY FAA AD 19 74-08- 09 R3)
MOS
HRS /MSC -
AFL
FAA 1974- 08-09 R03 LAV ATORY P APER OR LINEN WAS TE RECEPTACLE FIRE PREVENTIO N MANDA TO RY COMPLIED WITH - P ERFO RMED K(1) AND NO
DEFECTS FOUND.
39-1 6951 MOS 29-NOV -2019 RECURRING
HRS /MSC 100 0 190 9.3 290 9.3
AFL 126 3
FAA 1974- 08-09 R1 NO SMOKING IN TOILET, LAV ATORY FIRE PROTECTIO N
MOS
HRS /MSC -
AFL
FAA 1981- 13-51 EMERGENCY AD - WHEEL BRAKE ASS EMBLY P/N 600 -85083 -55 MANDA TO RY NOT A PPLICA BLE - BY CO MP ONENT PART
NUMBE R INS TAL LED O N THIS AIRCRAFT
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1982- 01-01 SPO ILE R CONTROL EX CA BLES NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
DAYS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1982- 04-05 LEFT REPLA CE AILERON PCU CENTE RING SPRING MANDA TO RY NOT A PPLICA BLE - BY CO MP ONENT PART
AILERON NUMBE R INS TAL LED O N THIS AIRCRAFT
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1982- 04-05 RIG HT REPLA CE AILERON PCU CENTE RING SPRING MANDA TO RY NOT A PPLICA BLE - BY CO MP ONENT PART
AILERON NUMBE R INS TAL LED O N THIS AIRCRAFT
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1982- 06-04 CHE CK PA SSENGE R DOOR HANDLE MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1982- 06-05 PA RA 1 LANDING GE ARS MANUAL RELEAS E S YSTEM MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1982- 06-05 PA RA 2 LANDING GE ARS MANUAL RELEAS E S YSTEM MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 6 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 1982- 06-06 PA RA 1 INS PECT THE LE FT AND RIG HT FLA P DRIVE SHAFTS FOR DAMAG E B ETWE EN WS220 AND WS 264 MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1982- 06-06 PA RA 2 INS TAL L CLA MP SUPP ORTS FOR THE LEFT AND RIGHT FLAP DRIVE SHAFTS A T WS237.10 MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1982- 09-51 REV 1 EMERGENCY AD - MOD A NTI-SKID PRESS URE SWITCH MANDA TO RY NOT A PPLICA BLE - TO THIS AIRCRAFT MODEL
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1986- 10-02 REV 1 CHE CK AILERON AND EL EVATOR FLUTTE R DAMPER MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1988- 19-10 AFM CHANGES -PL ACARD FGC MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1991- 19-01 PA RT A ACCOMPLISH P REV ENT LOS S O F EMERGENCY POWER TO ES SENTIAL BUS WHE N AIR DRIVE N GENERATOR (ADG) MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
DEPLO YED NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1991- 19-01 PA RT B ACCOMPLISH P REV ENT LOS S O F EMERGENCY POWER TO ES SENTIAL BUS WHE N AIR DRIVE N GENERATOR (ADG) MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
DEPLO YED NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1992- 03-06 ENGINE FIRE EX TINGUISHER SYST. SUPERSE DE D
MOS 01-A PR-2011
HRS /MSC - 0
AFL 0
FAA 1992- 13-09 PA RT A ACCOMPLISH P REV ENT SEV ERE DAMAG E TO AN AIRPLA NE IN THE E VENT OF AN ENGINE FIRE MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1992- 13-09 PA RT B ACCOMPLISH P REV ENT SEV ERE DAMAG E TO AN AIRPLA NE IN THE E VENT OF AN ENGINE FIRE MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 7 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 1992- 20-04 TAIL CONE FUE L TANK - P RE VENT DAMAGE TO SENSING LINE NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC A/R
AFL
FAA 1992- 20-04 PA RT A/B ACCOMPLISH P REV ENT PRESE NCE OF FUEL VAP ORS IN AFT E QUIP ME NT BAY MANDA TO RY NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1992- 20-04 PA RT C ACCOMPLISH P REV ENT PRESE NCE OF FUEL VAP ORS IN AFT E QUIP ME NT BAY MANDA TO RY NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1993- 22-04 RUDDER CONTROL QUADRA NT P/N 600-9 2614- 1 SUPERSE DE D
MOS 01-A PR-2011
HRS /MSC - 0
AFL 0
FAA 1994- 08-15 SPE CIAL CHE CK /REPL SHOULDER BOLTS & FL AP ACTUATOR HOUSINGS MANDA TO RY NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1994- 14-08 PA RT A ACCOMPLISH P REV ENT LOS S O F EMERGENCY POWER TO ES SENTIAL BUS WHE N AIR DRIVE N GENERATOR (ADG) IS MANDA TO RY NOT A PPLICA BLE - PER A IRCRA FT SERIA L
DEPLO YED NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1994- 14-08 PA RT B ACCOMPLISH P REV ENT LOS S O F EMERGENCY POWER TO ES SENTIAL BUS WHE N AIR DRIVE N GENERATOR (ADG) IS MANDA TO RY NOT A PPLICA BLE - PER A IRCRA FT SERIA L
DEPLO YED NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1995- 03-06 PREVE NT INADVERTENT SHUTDOWN OF AN ENGINE WHILE AIRPLANE IS TAX IING O R IN FL IG HT NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1995- 03-06 PA RT A ACCOMPLISH P REV ENT INA DVE RTENT S HUTDOWN OF A N ENGINE WHILE AIRPLA NE IS TA XIING OR IN FLIGHT MANDA TO RY NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 8 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 1995- 03-06 PA RT C ACCOMPLISH P REV ENT INA DVE RTENT S HUTDOWN OF A N ENGINE WHILE AIRPLA NE IS TA XIING OR IN FLIGHT MANDA TO RY NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1995- 03-06 PA RT E ACCOMPLISH P REV ENT INA DVE RTENT S HUTDOWN OF A N ENGINE WHILE AIRPLA NE IS TA XIING OR IN FLIGHT MANDA TO RY NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
39-9 143 MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1995- 03-06D THROTTLE QUADRANT - IDLE STOP FUNCTION - FAILURE
MOS
HRS /MSC A/R
AFL
FAA 1995- 03-06E THROTTLE QUADRANT - REP LACE THROTTL E Q UA DRANT
MOS
HRS /MSC A/R
AFL
FAA 1995- 10-06 PREVE NT FA ILURE OF SHAFT P IN NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1995- 10-06 PA RT B1 ACCOMPLISH P REV ENT FAIL URE OF SHA FT PIN MANDA TO RY NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1995- 10-06 PA RT B2 ACCOMPLISH P REV ENT FAIL URE OF SHA FT PIN MANDA TO RY NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1995- 10-06 PA RT B3 ACCOMPLISH P REV ENT FAIL URE OF SHA FT PIN MANDA TO RY NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 1995- 18-07 PREVE NT LOSS OF RUDDER CONTRO L MODIFY RUDDER QUADRA NT MANDA TO RY
MOS 01-A PR-2011
HRS /MSC A/R 0
AFL 0
FAA 1997- 24-02 REV 1 SPE CIAL CHE CK - INS PECTION OF UNDE RFLOO R PRESS BL KHD FS 4 09 NOT A PPLICA BLE NOT A PPLICA BLE - PER A /C S/N
MOS 25-MAR-2 011
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 9 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 1997- 25-11 R1 REMOTE FUEL/DEFUE L P ANEL NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC N/A
AFL
FAA 1999- 26-16 HYDRA UL IC TUBES , MLG BAY INSTAL L NEW RE -RO UTED TUBE S NOT A PPLICA BLE NOT A PPLICA BLE - PER A /C S/N
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 2000- 01-51 EMERGENCY AD - REFUE LING ACCESS DOOR SERVICE LIGHT HAZARD NOT A PPLICA BLE NOT A PPLICA BLE - SUPERSEDED BY FAA
200 1-02-0 5
MOS 21-A PR-2014
HRS /MSC - 766 .9
AFL 313
FAA 2000- 23-02 TO DE TECT A ND CO RRECT CORROSION OF THE INBOARD FLA P A CTUATOR B EAM A SSEMBLY NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC N/A
AFL
FAA 2000- 23-02 LEFT INB OARD FLAP ACTUA TO R BEA M ASS EMBLY MANDA TO RY
MOS
HRS /MSC -
AFL
FAA 2000- 23-02 RIG HT INB OARD FLAP ACTUA TO R BEA M ASS EMBLY MANDA TO RY
MOS
HRS /MSC -
AFL
FAA 2000- 24-01 MAIN LANDING GEA R WHEEL BAY PROTECTION SHIE LDS MANDA TO RY NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 2001- 02-05 FUE L S ERVICE PANEL NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER STC INS TA LLED
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 2001- 03-52 FUE L MIGRATIO N NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 2001- 15-24 WIRING INTE RNAL FUE L / DE FUEL PA NEL NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 10 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2001- 22-14 OAS S QUIB-TO PREVE NT DA MA GE TO FIRE EX TINGUISHER SYSTEM CO MP . MANDA TO RY NOT A PPLICA BLE - NO T APP LICAB LE - PE R
AIRCRAFT SE RIAL NUMB ER
MOS 21-A PR-2014
HRS /MSC N/A 766 .9
AFL 313

FAA 2002- 08-08 INS TAL L P RO TE CTIVE TE FLO N TUB ING A ND ADDITIO NA L CLA MPS O N THE IDG CAB LE HARNESS ES NOT A PPLICA BLE - PER A IRCRA FT SERIA L
PARAG RA PH (B ) NUMBE R
MOS 25-MAR-2 011
HRS /MSC A/R
AFL
FAA 2002- 22-13 ROCKWELL COLLINS FMC NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER FMC PART NUMB ER INS TA LLED IN
AIRCRAFT (8 22-086 8-089)
MOS 25-MAR-2 011
HRS /MSC - (s)
AFL
FAA 2003- 08-12 DO A DETAILED INSPE CTION TO DETE CT CRACKS OF THE VANE BRACKETS OF THE INBOA RD FL AP ACTUATOR BEAM SUPERSE DE D
MOS
HRS /MSC -
AFL
FAA 2003- 22-12 AOA TRANSDUCER TO LERANCE CHECK NOT A PPLICA BLE - THIS A .D. IS NO T
APP LICAB LE, PS P-604 -1 A FM RE PLACED BY
PSP -605-1 AFM. SB A6 04-27- 011 RE V 1 IS NO T
APP LICAB LE PER E FFECTIV ITY: CL-60 0-2B1 6
(CL-60 4), SERIAL NO. 530 1 TO 5579 .
PART 6 00-59 154-3 COVERED BY TL MC PART 2.
MOS 25-MAR-2 011
HRS /MSC A/R
AFL

FAA 2003- 22-12 PA RA (N) SPE CIAL CHE CK /REWORK - STA LL PROTECTION S YSTEM - LEFT A NG LE-OF-ATTACK (AOA) TRANSDUCER TO LERANCE MANDA TO RY
LEFT CHE CK AND RE WO RK OF OUT-O F- TOL ERANCE AO A TRANSDUCE R ASS EMB LIES (AMOC AND TAS K 2 7-35-0 4-101 *)
MOS
HRS /MSC -
AFL
FAA 2003- 22-12 PA RA (N) SPE CIAL CHE CK /REWORK - STA LL PROTECTION S YSTEM - RIG HT ANGL E-OF-ATTACK ( AOA) TRA NS DUCER MANDA TO RY
RIG HT TOLERANCE CHECK AND REWORK OF O UT-OF-TOLE RANCE AOA TRANS DUCER A SSEMBL IES (AMO C AND TASK
27-3 5-04-1 01*)
MOS
HRS /MSC -
AFL
FAA 2004- 09-37 DETAIL ED INSPECTIO N TO DETECT CRACKS OF THE VANE BRACK ETS O F THE INBOARD FLAP A CTUATOR BE AM. NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 2004- 09-37 DETAIL ED INSPECTIO N TO DETECT CRACKS OF THE VANE BRACK ETS O F THE INBOARD FLAP A CTUATOR BE AM.
PARAG RA PH (A )(B)
MOS
HRS /MSC N/A
AFL
?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 11 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2004- 09-37 DO A DETAILED INSPE CTION TO DETE CT GAPS AT FL AP STATIONS 60.0, 98 .5, AND 137.0 BETWEEN THE VANE
PARAG RA PH (E 1-2 -3) BRACKET(S) AND A DJACENT LO WE R SKIN A ND VANE ACTUATOR BEAM AND MEASURE THE MINIMUM E DG E
DIS TANCE (MED) FOR THE FASTENER HOLE S IN A LL FLA P V ANE B RA CK ETS A ND ACTUATOR BEAMS. A ND DO A
NONDE STRUCTIVE TEST (NDT) INSPE CTION ON ALL VANE BRACKETS FOR CRACKS.
MOS
HRS /MSC N/A
AFL

FAA 2004- 09-37 REPLA CE AL L 1 2 V ANE B RACKE TS WITH NE W BRACKETS THA T MEET THE ME D REQUIREMENTS OR MEAS URE THE
PARAG RA PH (F)(1)( 2) MED FOR THE FASTENER HOLE S IN A LL RE PLACEMENT FLAP VA NE BRACKETS AND ACTUATOR BE AMS ( INCLUDING
A DETA ILE D INS PECTION FO R GAP S).
MOS
HRS /MSC N/A
AFL

FAA 2004- 25-19 ANGLE OF ATTA CK TRANSDUCER (P/N 600-5 9154- 5) - PE RFORM L INEARITY TEST MANDA TO RY NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER PARTS NO INS TA LLED. 600 -59154 -3 ARE
INS TAL LED.
MOS 25-MAR-2 011
HRS /MSC N/A
AFL

FAA 2005- 04-07 REVISION TO AIRP LANE FLIGHT MANUAL (AFM) - NEW COLD WEATHE R OP ERA TIONS LIMITATIONS. SUPERSE DE D
MOS
HRS /MSC -
AFL
FAA 2005- 11-04 IF DAMAGE THA T MAY INTERFE RE WITH THE MOVEMENT O F THE CONTRO L COL UMN IS FO UND DURING ANY VISUA L MANDA TO RY NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
CHE CK PE RFORMED IN A CCORDANCE WITH THE AFM REVISION REQ UIRED B Y P ARAGRAPH (F) OF THIS A D: MO DIFY PER STC INS TA LLED.
THE MICROP HO NE JACK ASSEMBL Y A ND DO A LL REL ATED INV ESTIG ATIVE ACTIONS A ND APPLICABLE CORRECTIVE
ACTIO NS.
MOS 25-MAR-2 011
HRS /MSC N/A
AFL

FAA 2005- 11-04 MICROPHONE JACK A SSEMBLY - AIRP LANE FL IGHT MANUAL (AFM) REV ISION - REVISE THE L IMITATIONS A ND AIRWO RTHINES S
PARAG RA PH (F) NORMAL PRO CE DURES SECTIO N
MOS
HRS /MSC -
AFL

FAA 2005- 11-04 IF DAMAGE THA T MAY INTERFE RE WITH THE MOVEMENT O F THE CONTRO L COL UMN IS FO UND DURING ANY VISUA L MANDA TO RY
PARAG RA PH (G )(1) CHE CK PE RFORMED IN A CCORDANCE WITH THE AFM REVISION REQ UIRED B Y P ARAGRAPH (F) OF THIS A D: MO DIFY
THE MICROP HO NE JACK ASSEMBL Y A ND DO A LL REL ATED INV ESTIG ATIVE ACTIONS A ND APPLICABLE CORRECTIVE
ACTIO NS.
MOS
HRS /MSC A/R
AFL

FAA 2005- 11-04 IF NO DAMAG E THAT MAY INTE RFERE WITH THE MOV EMENT OF THE CO NTROL COLUMN IS FOUND DURING A NY MANDA TO RY
PARAG RA PH (G )(2) VISUAL CHECK PERFORMED IN ACCORDANCE WITH THE AFM REVISION REQUIRED BY PA RA GRAPH (F) OF THIS AD:
MODIFY THE MICROPHONE JACK A SSEMBL Y A ND DO AL L REL ATE D INV ESTIG ATIVE ACTIO NS AND A PPLICABLE
CORRE CTIVE ACTIONS.
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 12 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2005- 15-04 MODIFICA TION - NOSE LA NDING G EAR (NLG ) A ND MA IN LANDING GEAR (ML G) SYSTEM - NLG AND MLG COMPONENT NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
SERIALIZA TION PER AIRCRAFT SERIAL NUMBER LISTED IN
PART A & B OF S B 604-32 -014, DATED MA Y 3 1,
200 2.
MOS 25-MAR-2 011
HRS /MSC N/A
AFL

FAA 2005- 15-04 MODIFICA TION - NOSE LA NDING G EAR (NLG ) A ND MA IN LANDING GEAR (ML G) SYSTEM - NLG AND MLG COMPONENT MANDA TO RY
PARAG RA PH (F)(3) SERIALIZA TION
MOS
HRS /MSC -
AFL
FAA 2005- 15-04 LANDING GE AR PA RTS - REV ISE THE AIRWORTHINESS LIMITATIO NS SE CTION (A LS) MANDA TO RY
PARAG RA PH (H)
MOS
HRS /MSC -
AFL
FAA 2006- 02-04 MODIFY AND RIG THE ADJUSTABL E RUDDE R BALA NCE SPRING A SSEMBLY FOR THE RUDDER CONTRO L S URFACE NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC N/A
AFL
FAA 2006- 18-04 HORIZONTAL STABILIZER TRIM - UNCOMMANDED MOTIO N SUPERSE DE D
MOS
HRS /MSC -
AFL
FAA 2006- 22-06 PA RA H EMERGENCY AND ABNORMAL PROCEDURE S S ECTION O F THE AFM - AP PLY AFM REVISIONS NOT A PPLICA BLE
MOS
HRS /MSC -
AFL
FAA 2007- 05-11 PA RA UNCOMMANDED TRIM MO TION; G) AIRPL ANE FLIGHT MANUAL (AFM) REVISION. I) INSTAL LATION OF CIRCUIT MANDA TO RY NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
(G)( I)(K )(M) BREAK ER IDENTIFICATIO N COLLARS. K) ADDITIONAL AFM REVISION. M) NEW REVISED AFM REVISIONS. PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 2007- 05-11 PA RA (O) UNCOMMANDED TRIM MO TION - TERMINATING ACTIO N-INSTALLA TION O F NEW, IMP RO VED P ART. MANDA TO RY NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
20-MAR-2 007 HRS /MSC -
AFL
FAA 2007- 14-02 UNCOMMANDED PA RTIAL RE TRACTIO NS OF THE NOSE LANDING GE AR - PREVENT INTERNAL LE AKAG E O F THE
SEL ECTO R VAL VE
MOS
HRS /MSC N/A
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 13 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2007- 26-11 RIS K O F HIG H-P RE SSURE O XYGEN CYLINDER TEA RING MANDA TO RY
MOS
HRS /MSC N/A
AFL
FAA 2008- 08-06 REVISION TO AIRP LANE FLIGHT MANUAL (AFM) - NEW COLD WEATHE R OP ERA TIONS LIMITATIONS. MANDA TO RY
MOS
HRS /MSC -
AFL
FAA 2008- 21-09 REVISION TO AIRP LANE FLIGHT MANUAL (AFM) - NEW COLD WEATHE R OP ERA TIONS LIMITATIONS. MANDA TO RY COMPLIED WITH
MOS 25-MAR-2 012
31-O CT-20 08 HRS /MSC -
AFL
FAA 2008- 22-01 VARIOUS TRANSPO RT CA TE GORY AIRPL ANES EQUIP PED WITH AUXILIA RY FUEL TA NK S INSTALLED IN ACCO RDANCE
WITH CERTAIN SUPPL EMENTAL TYPE CERTIFICATES
MOS
HRS /MSC -
AFL
FAA 2009- 05-08 TRIMBLE OR FREEFLIGHT SY STEMS 2 101 I/O APPROA CH PLUS GLOB AL POSITIO NING S YSTEM (G PS NAVIGATIO N MANDA TO RY
SYS TE M) -
MOS
HRS /MSC -
AFL
FAA 2009- 06-05 CRA CK ING OF THE WING ANTI-ICE PICCO LO DUCTS MANDA TO RY
MOS
HRS /MSC -
AFL

FAA 2009- 06-05 REVISE CRA CKING OF THE WING A NTI-ICE PICCOL O DUCTS THE NO RMAL AND A BNO RMAL PROCEDURES SECTIONS MANDA TO RY
PARAG RA PH (F)(1) OF THE A PPLICABLE CANADAIR CHA LLENGER AIRPL ANE FLIGHT MANUAL (AFM)
MOS
HRS /MSC -
AFL

FAA 2009- 06-05 REVIEW CRACKING OF THE WING ANTI-ICE PICCOLO DUCTS THE AIRPLANE MAINTENANCE RECORDS MANDA TO RY
PARAG RA PH (F)(2)
MOS
HRS /MSC -
AFL

FAA 2009- 06-05 VISUAL INSP ECTION CRACKING OF THE WING ANTI-ICE PICCOLO DUCTS /REP LACE PICCOLO DUCT MANDA TO RY
PARAG RA PH (F)(3)
MOS
HRS /MSC -
AFL

FAA 2009- 06-05 VISUAL INSP ECTION CRACKING OF THE WING ANTI-ICE PICCOLO DUCTS /REP LACE PICCOLO DUCT MANDA TO RY
PARAG RA PH (F)(4)
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 14 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2009- 06-05 R1 CRA CK ING OF THE WING ANTI-ICE PICCO LO DUCTS MANDA TO RY NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
AFL

FAA 2009- 06-05R1 REVISE CRA CKING OF THE WING A NTI-ICE PICCOL O DUCTS THE NO RMAL AND A BNO RMAL PROCEDURES SECTIONS MANDA TO RY
PARAG RA PH (F)(1) OF THE A PPLICABLE CANADAIR CHA LLENGER AIRPL ANE FLIGHT MANUAL (AFM)
MOS
HRS /MSC -
AFL

FAA 2009- 06-05R1 REVIEW CRACKING OF THE WING ANTI-ICE PICCOLO DUCTS THE AIRPLANE MAINTENANCE RECORDS MANDA TO RY
PARAG RA PH (F)(2)
MOS
HRS /MSC -
AFL

FAA 2009- 06-05R1 VISUAL INSP ECTION CRACKING OF THE WING ANTI-ICE PICCOLO DUCTS /REP LACE PICCOLO DUCT MANDA TO RY
PARAG RA PH (F)(3)
MOS
HRS /MSC -
AFL

FAA 2009- 06-05R1 VISUAL INSP ECTION CRACKING OF THE WING ANTI-ICE PICCOLO DUCTS /REP LACE PICCOLO DUCT MANDA TO RY
PARAG RA PH (F)(4)
MOS
HRS /MSC -
AFL
FAA 2009- 08-01 TO PREVENT A SHIFT IN THE FMS COMPUTE D POS ITION NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E,
EQUIPMENT NOT INSTALLED IN A/C
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 2009- 13-09 TO PREVENT RAPID DETERIORATION AND PHYSICAL BREAKDOWN O F THE EX HA US T THE RMAL INS UL ATION.
MOS
HRS /MSC -
AFL
FAA 2009- 14-03 STICK PUSHER CA PSTAN SHAFT FAILURES MANDA TO RY NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 2009- 14-03 (F)(1) REVISE STICK PUSHER CAP STA N SHAFT FAILURE S THE NO RMAL PROCEDURES SECTION OF THE AP PLICAB LE MANDA TO RY
AIRPLANE FL IGHT MA NUAL (AFM)
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 15 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2009- 14-03 (F)(3) REVISE STICK PUSHER CAP STA N SHAFT FAILURE S THE AIRWORTHINESS LIMITATIO NS SECTIO N OF THE MANDA TO RY
INS TRUCTIONS FO R CONTINUE D AIRWO RTHINESS
MOS
HRS /MSC -
AFL
FAA 2009- 21-03 HAMIL TOM SUNDSTRAND PO WER SY STE MS T-62T-46 C1 2 A UXILIARY POWER UNITS VENDOR NOT A PPLICA BLE - APU TYP E NOT INSTALLE D
RECOMME NDATIO
N
MOS 21-A PR-2014
HRS /MSC - 766 .9
AFL 313
FAA 2009- 21-10 AVO X SYSTEMS & B/E AE RO SPACE OXY GEN CYLINDER AS SEMBLIES - INSPE CTION TO DE TE RMINE PN/SN O F O2 MANDA TO RY
CYLINDERS FOR A PPLICA BILITY PER TAB LE 1 & 3
MOS
HRS /MSC -
AFL
FAA 2009- 23-09 TO PREVENT CHAFING OF THE ADG ( AIR DRIVEN G ENERATOR) P OWER FEEDER HA RNESS WIRE NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC N/A
AFL
FAA 2009- 24-18 PREMATURE WEAR OF THE RA CK AND P INION MECHANISM OF PA RT NUMBER (P/N) 210 0140- 005 A ND -007 ENGINE MANDA TO RY COMPLIED WITH
THROTTLE CONTROL GE ARB OX (ETCG)
MOS 25-MAR-2 012
HRS /MSC -
AFL
FAA 2010- 01-03 QUANTITY OF HEAV ILY CONTAMINATED HA LON 12 11 (BCF) TO FIRE FIGHTING ENTE RPRISES (FFE) MANDA TO RY
39-1 6159 MOS
HRS /MSC -
AFL
FAA 2010- 04-16 SICLI - TY PE H1 -10 AIR HA LON 1 211 (BCF) P ORTAB LE FIRE E XTINGUISHER VENDOR
RECOMME NDATIO
N
MOS
HRS /MSC -
AFL

FAA 2010- 07-02 PERFORM A ONE-TIME G ENE RA L V ISUAL INSPECTIO N OF THE MO DIFICATION PL ATE FOR THE HONEYWELL PRIMUS II AIRWO RTHINES S
NV-850 NAVIGATION RECEIVER MO DULE (NRM)
MOS
HRS /MSC -
AFL
FAA 2010- 09-04 LTA D- 2010-1 34 HO NE YWELL PRIMUS APEX FMS S YSTEM MANDA TO RY
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 16 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2010- 10-26 INS PECT NOSE LANDING GE AR SE LECTO R VAL VES FOR CORRECT LOCKWIRE A ND FA STE NE R TORQUE MANDA TO RY NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 2010- 11-05 PREVE NT AN OX YGEN CY LINDER FROM RUPTURING MANDA TO RY
39-1 6310 MOS
HRS /MSC -
AFL
FAA 2010- 14-02 CHE CK THE PART NUMBE R OF THE INSTALL ED ADG,INITIAL AND SUB SEQUENT REP EAT FLUORESCENT P ENETRANT MANDA TO RY NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
INS PECTIONS, RE-IDENTIFICATION (WHERE APPLICABLE ) PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 2010- 14-02 F(1 ) INS PECT CHECK THE PART NUMBE R OF THE INSTALL ED ADG,INITIAL AND SUBSEQUENT REP EAT FLUORESCENT MANDA TO RY
PENETRANT INS PECTIONS, RE- IDENTIFICATION (WHERE APPL ICABL E) TO DETERMINE THE PART NUMBER O F THE
INS TAL LED A DG .
MOS
HRS /MSC -
AFL

FAA 2010- 14-02 F(2) ACCOMPLISH CHECK THE PART NUMBER O F THE INS TA LLED ADG ,INITIAL AND SUBSEQ UE NT RE PEAT FL UO RES CE NT MANDA TO RY
PENETRANT INS PECTIONS, RE- IDENTIFICATION (WHERE APPL ICABL E) FOR AIRP LANES HA VING A STRUT AND
GENERATOR HO US ING ASSE MB LY IDENTIFIED IN PA RAG RA PH F(1)(II)(C)(1) OF THE A D, EXCEPT FO R AIRP LANES
WITH S ERIAL NUMB ER 56 11 THROUGH 5 665 - DO A FL UO RE SCENT PENETRANT INSP ECTION OF THE A DG STRUT,
AND REPL ACE THE ADG, AS AP PLICA BLE.
MOS
HRS /MSC -
AFL
FAA 2010- 14-02 F(3) CHE CK THE PART NUMBE R OF THE INSTALL ED ADG,INITIAL AND SUB SEQUENT REP EAT FLUORESCENT P ENETRANT MANDA TO RY
INS PECTIONS, RE-IDENTIFICATION (WHERE APPLICABLE ) A CCOMPL ISHMENT OF THE FLUORESCENT PENETRANT
INS PECTION BEFORE THE EFFE CTIVE DA TE OF THIS AD.
MOS
HRS /MSC -
AFL

FAA 2010- 14-02 F(4) CHE CK THE PART NUMBE R OF THE INSTALL ED ADG,INITIAL AND SUB SEQUENT REP EAT FLUORESCENT P ENETRANT MANDA TO RY
INS PECTIONS, RE-IDENTIFICATION (WHERE APPLICABLE ) B EFORE FURTHER FLIGHT AFTER E ACH TEST, DO A
FLUORESCENT PE NETRANT INS PECTION OF THE ADG S TRUT FOR CRACKS, A ND RE PLACE THE ADG IF ANY CRACK
IS FOUND.
MOS
HRS /MSC -
AFL
FAA 2010- 14-02 F(5) CHE CK THE PART NUMBE R OF THE INSTALL ED ADG,INITIAL AND SUB SEQUENT REP EAT FLUORESCENT P ENETRANT MANDA TO RY
INS PECTIONS, RE-IDENTIFICATION (WHERE APPLICABLE ) UNSCHEDULE D IN-FLIGHT ADG DEPLO YMENT OCCURS:
BEFORE FURTHER FLIGHT AFTER EA CH DE PLOYMENT, DO A G ENERAL VIS UA L INSPECTIO N OF THE ADG STRUT FOR
CRA CK S, AND REP LACE THE ADG IF A NY CRACK IS FOUND.
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 17 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2010- 14-02 F(6) CHE CK THE PART NUMBE R OF THE INSTALL ED ADG,INITIAL AND SUB SEQUENT REP EAT FLUORESCENT P ENETRANT MANDA TO RY
INS PECTIONS, RE-IDENTIFICATION (WHERE APPLICABLE ) UNSCHEDULE D IN-FLIGHT ADG DEPLO YMENT OCCURS:
BEFORE FURTHER FLIGHT AFTER EA CH DE PLOYMENT,P ERFO RM A FLUORES CE NT PENETRA NT INSPE CTION O F THE
ADG STRUT, AND REP LACE THE ADG, AS AP PLICA BLE.
MOS
HRS /MSC -
AFL

FAA 2010- 14-02 F(7) CHE CK THE PART NUMBE R OF THE INSTALL ED ADG,INITIAL AND SUB SEQUENT REP EAT FLUORESCENT P ENETRANT MANDA TO RY
INS PECTIONS, RE-IDENTIFICATION (WHERE APPLICABLE ) UNSCHEDULE D ON-GROUND ADG DEPLO YMENT OCCURS:
BEFORE FURTHER FLIGHT AFTER EA CH DE PLOYMENT, DO A G ENERAL VIS UA L INSPECTIO N OF THE ADG STRUT FOR
CRA CK S, AND REP LACE THE ADG IF A NY CRACK IS FOUND.
MOS
HRS /MSC -
AFL

FAA 2010- 14-02 F(8) CHE CK THE PART NUMBE R OF THE INSTALL ED ADG,INITIAL AND SUB SEQUENT REP EAT FLUORESCENT P ENETRANT MANDA TO RY
INS PECTIONS, RE-IDENTIFICATION (WHERE APPLICABLE ) RE-IDENTIFY THE ADG.
MOS
HRS /MSC -
AFL
FAA 2010- 14-05 HYDRA UL IC ACCUMUL ATOR END CAP S FAILURE. (SUPE RS EDE D BY FAA AD 2 019-08 -08) MANDA TO RY COMPLIED WITH
MOS 25-MAR-2 012
05-A UG -2010 HRS /MSC -
AFL
FAA 2010- 14-05 PA RA (G) (1) INS PECT HYDRA UL IC ACCUMUL ATOR END CAP S FAILURE. (SUPE RS EDE D BY FAA AD 2 019-08 -08) TO DETERMINE THE MANDA TO RY
PART NUMBERS OF THE SYSTEM A CCUMUL ATORS NUMBER 1 ,2 AND 3 AND B RAK E ACCUMUL ATOR NUMB ERS 2 AND
3.
MOS
05-A UG -2010 HRS /MSC -
AFL

FAA 2010- 14-05 PA RA REPLA CE HYDRAULIC ACCUMULATOR E ND CA PS FA ILURE. (S UPE RS EDED BY FAA AD 2 019-0 8-08) THE MANDA TO RY
(G)( 2)(3) ACCUMULATOR WITH NEW, OV ERHAULE D, OR REFURBISHED ACCUMULATOR.
MOS
05-A UG -2010 HRS /MSC -
AFL
FAA 2010- 20-03 INS PECTION TO DETERMINE THE SERIAL NUMBER OF THE INSTALLE D ADG - REP LACE ALL BALA NCE WASHER MANDA TO RY COMPLIED WITH
SCREWS IF A PPLICABLE
MOS 25-MAR-2 012
01-NOV -2010 HRS /MSC -
AFL
FAA 2011- 04-09 VARIOUS TRANSPO RT CA TE GORY AIRPL ANES EQUIP PED WITH CHE MICAL OXYG EN GE NE RA TO RS INS TA LLED IN A NOT A PPLICA BLE - BECAUSE IT IS NOT
LAV ATORY OPE RA TING UNDER 14 CFR PART 121 OR U.S:
REGISTERED AND OPERATING UNDE R 14 CFR
PART 1 29, WITH A MAX IMUM PA SSENGER
CAPACITY O F 20 OR G RE ATE R
MOS 25-MAR-2 011
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 18 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2011- 09-09 FUNCTIONAL TEST OF THE WING L EADING EDGE THE RMAL SWITCHES AND A N INSP ECTION O F THE WING ANTI-ICE MANDA TO RY COMPLIED WITH
DUCT PICCOLO TUBES
MOS 31-MAR-2 012
19-A UG -2011 HRS /MSC -
AFL
FAA 2011- 09-09 PA RA (G) REVISE FUNCTIONAL TEST O F THE WING LE ADING EDGE THERMAL SWITCHES AND AN INSPE CTION O F THE WING MANDA TO RY COMPLIED WITH
ANTI-ICE DUCT PICCO LO TUBES THE AIRWORTHINESS LIMITATIO NS SE CTION OF THE INS TRUCTIONS FOR
CONTINUE D AIRWO RTHINES S
MOS 31-MAR-2 012
19-A UG -2011 HRS /MSC - 6.4
AFL 5
FAA 2011- 09-09 PA RA (H) COMPLIANCE FUNCTIO NA L TES T OF THE WING LEADING EDGE THERMA L S WITCHES A ND AN INS PECTION OF THE MANDA TO RY
WING ANTI-ICE DUCT PICCO LO TUBES TIME S FOR THOS E TAS KS IDENTIFIE D IN PARAG RA PH (G)
MOS
19-A UG -2011 HRS /MSC -
AFL
FAA 2011- 14-08 B/E AEROSP ACE , CONTINUO US FLOW PASS ENGER O XYGE N MASK ASS EMBLY, P ART NUMBE RS 17 4006-( ), 1 74080 -( ), MANDA TO RY NOT A PPLICA BLE - AS PER O XYGE N MASKS P/N
174 085-( ), 17 4095-( ), 1 74097 -( ) , AND 174 098-( ) (MC10-13- 03 AND MF1 0-03-03 ) INSTALLED ON
A/C
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 2011- 21-08 VENDOR AD (SICMA A ERO S EAT) - SICMA AE RO S EAT 88 XX, 89 XX, 90 XX, 91 XX, 92 XX, 93 XX, 95 XX, A ND 96XX SERIES MANDA TO RY NOT A PPLICA BLE - SICMA AERO SEATS ARE
PAS SENGER SEAT ASSE MB LIE S NOT INSTALLED ON THIS A/C
MOS 31-MAR-2 012
HRS /MSC - 6.4
AFL 5
FAA 2012- 01-10 GENERAL EL ECTRIC COMPANY (GE) CF3 4-10E SE RIES TURBO FAN ENGINE S, SERIAL NUMBER (S/N) 99 4116, A ND S/NS MANDA TO RY
994 118 THROUGH 9 94187 , INCLUSIVE.
MOS
HRS /MSC -
AFL
FAA 2012- 02-08 AVIATION COMMUNICA TION & S URVE ILL ANCE SYS TE MS (A CS S) TRAFFIC A LERT AND COL LIS ION AVOIDANCE NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
SYS TE M (TCA S) UNITS AS TCA S PART NUMBE R 822 -1294- 002
INS TAL LED O N AIRCRAFT.
MOS 09-MAR-2 015
HRS /MSC - 103 1.4 7
AFL 647
FAA 2012- 04-12 REPLA CE THE A DG PO WE R FEEDER CAB LE MANDA TO RY NOT A PPLICA BLE - THIS A .D. IS NO T
APP LICAB LE PER A /C SERIA L NUMBER.
39-1 6968 MOS 31-MAR-2 012
HRS /MSC - 6.4
AFL 5
FAA 2012- 08-10 ELE CTRICAL PO WE R - RE MO VE THE ADG GCU, BOMBARDIE R PART NUMBER (P/N) 604- 90800- 7 (HAMILTON MANDA TO RY NOT A PPLICA BLE
SUNDS TRAND P /N 761341 A), AND INSTALL A NE W OR SERVICE ABLE ADG GCU BO MB ARDIER P/N 604-9 0800-2 7
(HAMIL TO N SUNDS TRAND P /N 7 61341 B)
39-1 7027 MOS (EFF)
29-MAY -2012 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 19 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2012- 08-15 ELE CTRICAL PO WE R - DE TA ILE D INSP ECTION FOR LOO SE LUG S AND FOR CRIMPED LUGS MANDA TO RY NOT A PPLICA BLE
MOS
HRS /MSC -
AFL
FAA 2012- 08-15 PA RT (G) DETAIL ED INSPECTIO N ELECTRICAL POWER - DETAILED INSP ECTION FOR LOOS E L UG S A ND FO R CRIMPED LUG S MANDA TO RY NOT A PPLICA BLE
CIRCUIT B RE AKER PANEL (CBP) CBP-1 FOR LO OSE LUGS AND FOR CRIMP ED LUGS
MOS (EFF)
HRS /MSC -
AFL
FAA 2012- 08-15 PA RT (H) DETAIL ED INSPECTIO N ELECTRICAL POWER - DETAILED INSP ECTION FOR LOOS E L UG S A ND FO R CRIMPED LUG S MANDA TO RY NOT A PPLICA BLE
FOR LO OSE LUGS AND FOR CRIMP ED LUGS
MOS (EFF)
HRS /MSC -
AFL
FAA 2012- 11-09 R01 OXY GEN - INSTA LLING A SUPPL EMENTA L O XYGEN SYSTEM IN AFFE CTED LAVATORIES MANDA TO RY NOT A PPLICA BLE - CO MP LIE D ON 30TH NOV,
201 5 A ND FO UND A D N/A BY AIRCRAFT
EQUIPMENT CONFIGURATIO N. NO CHEMICAL
OXY GEN GENERATORS A RE INSTA LLED IN THE
AIRCRAFT¿S LA VATORY
MOS 30-NOV -2015
27-JUL-20 15 HRS /MSC -
AFL

FAA 2012- 11-09 R01 PARA ACTIVA TE AL L CHEMICAL OX YGEN GENERATORS IN THE LAVA TO RIES UNTIL THE GENERATOR O XYGE N SUPPL Y IS MANDA TO RY NOT A PPLICA BLE - CO MP LIE D ON 30TH NOV,
(G) EXP ENDE D OR REMOV E THE OXYG EN G ENERA TO R (S) AND REMOV E O R RE-STOW THE OXY GEN MAS KS AND CLOSE 201 5 A ND FO UND A D N/A BY AIRCRAFT
THE MASK DISPENSER DOOR (FOR EACH CHEMICAL OX YGEN GENERATOR, AFTER THE G ENERA TO R IS E XPENDED EQUIPMENT CONFIGURATIO N. NO CHEMICAL
(OR RE MO VED)) OXY GEN GENERATORS A RE INSTA LLED IN THE
AIRCRAFT¿S LA VATORY
MOS 30-NOV -2015
27-JUL-20 15 HRS /MSC -
AFL

FAA 2012- 11-09 R01 PARA INS TAL L A SUPP LEMENTAL OXYGE N SYS TE M THA T MEETS ALL APP LICABL E S ECTIONS OF P ARTS 25 AND 12 1 O F THE MANDA TO RY NOT A PPLICA BLE - CO MP LIE D ON 30TH NOV,
(L) FEDERAL AVIATION REGULATIO NS (1 4 CFR PA RT 25 AND 14 CFR PART 121 ) IN EA CH LAVA TO RY 201 5 A ND FO UND A D N/A BY AIRCRAFT
EQUIPMENT CONFIGURATIO N. NO CHEMICAL
OXY GEN GENERATORS A RE INSTA LLED IN THE
AIRCRAFT¿S LA VATORY
MOS 30-NOV -2015
27-JUL-20 15 HRS /MSC -
AFL
FAA 2012- 17-01 GO ODYEAR AVIATION TIRES MANDA TO RY NOT A PPLICA BLE - AD 20 12-17- 01 WA S FOUND
NOT A PPLICA BLE BY TIRE PART NUMBERS
MOS 03-S EP-20 12
HRS /MSC - 255 .9
AFL 109
FAA 2012- 21-11 OXY GEN CRA, CL-6 04 VARIA NT MANDA TO RY NOT A PPLICA BLE
MOS 27-NOV -2012
04-DEC-20 12 HRS /MSC - 330 .8
AFL 135

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 20 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2012- 21-11 PA RA (G) ACCOMPLISH O XYGEN CRA , CL -604 VARIANT INSP ECTION AND REPLACEMENT O F THE OX YGEN CRA MANDA TO RY NOT A PPLICA BLE
MOS 27-NOV -2012
04-DEC-20 12 HRS /MSC - 330 .8
AFL 135
FAA 2012- 21-11 PA RA (H) ACCOMPLISH O XYGEN CRA , CL -604 VARIANT INSP ECTION AND CORRE CTIVE ACTION O F THE OX YGEN CRA WIRING MANDA TO RY NOT A PPLICA BLE - AS PER THE AIRCRAFT
HARNE SS SERIAL NUMBER CALLED OUT IN SB 605 -24-005
MOS 27-NOV -2012
04-DEC-20 12 HRS /MSC - 330 .8
AFL 135
FAA 2012- 26-15 IDE NTIFY OUT O F SPE C ADC, ADM, ADAHRS , AND DADC. MANDA TO RY NOT A PPLICA BLE - BY APPL IANCED CAL LED
OUT B Y HONEY WE LL ALERT SB
ADM/A DC-ADAHRS-34 -A01
MOS 07-MAY -2013
HRS /MSC - 553 .4
AFL 225

FAA 2012- 26-15 (G) (1) REMOVE IDE NTIFY OUT O F SPE C ADC, ADM, ADAHRS , AND DADC. AFFE CTED ADC, A DM, A DA HRS, O R DADC MANDA TO RY NOT A PPLICA BLE - BY APPL IANCED CAL LED
OUT B Y HONEY WE LL ALERT SB
ADM/A DC-ADAHRS-34 -A01
DAYS 07-MAY -2013
HRS /MSC - 553 .4
AFL 225
FAA 2012- 26-15 (G) (2) PERFORM IDENTIFY O UT OF SP EC ADC, ADM, ADAHRS, AND DADC. PITO T- STA TIC CERTIFICA TION TES T MANDA TO RY NOT A PPLICA BLE - BY APPL IANCED CAL LED
OUT B Y HONEY WE LL ALERT SB
ADM/A DC-ADAHRS-34 -A01
DAYS 07-MAY -2013
HRS /MSC - 553 .4
AFL 225
FAA 2013- 03-08 REVISE-MAINTE NA NCE PROGRAM TO DETECT AND CORRECT FATIG UE CRACKING OF THE ENGINE SUPP ORT BEAM, MANDA TO RY
39-1 7343 MOS
19-MAR-2 013 HRS /MSC -
AFL
FAA 2013- 03-08 PA RA (G) REVISE REVISE-MAINTENANCE PROGRAM TO DETECT AND CORRECT FATIGUE CRA CK ING OF THE ENGINE SUPPO RT MANDA TO RY COMPLIED WITH - FOUND AL RE ADY
BEA M, TIME LIMITS /MAINTENANCE CHECKS (TLMC) MANUAL REVISIO N COMPLIANCE A S P ER CF 20 11-33
DAYS 24-MAR-2 013
19-MAR-2 013 HRS /MSC - 502 .1
AFL 210
FAA 2013- 03-08 PA RA (H) INITIAL REVISE- MA INTENANCE PROG RAM TO DETECT A ND CO RRECT FATIGUE CRACKING OF THE ENGINE S UP PORT MANDA TO RY
BEA M, CO MP LIA NCE TIMES FOR INSPECTIO NS
MOS
19-MAR-2 013 HRS /MSC
AFL 780 0 780 0 780 0
FAA 2013- 05-06 MODIFY THE LE FT-HAND ENGINE UPP ER CORE-COWL MANDA TO RY COMPLIED WITH - INCORPORATED @
BOMBA RDIER
MOS 08-A PR-2013
HRS /MSC - 536 .7
AFL 220

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 21 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2013- 22-05 TO PREVENT PITOT STATIC TUB ING FRO M BECOMING B LOCKED BY WA TER MANDA TO RY COMPLIED WITH - A S P ER SB 60 5-34-0 27 R1
MOS 01-MAY -2014
HRS /MSC - 767 .7
AFL 314
FAA 2014- 03-17 WINGS - DO A DETAILED VIS UA L INSPECTIO N FOR INCO RRECT O RIENTATION AND ANY FRACTURING ( MISSING MANDA TO RY COMPLIED WITH - A CCOMPL ISHMENT OF AD
FASTENER HEA DS ) OF EACH INBOARD FLAP FASTENER OF THE HINGE-BO X FORWARD FITTING AT WS 76 .50 AND WS 201 4-17-5 1 TERMINATING ACTIO N FOR A D
127 .25 201 4-03-1 7
MOS 19-S EP-20 14
HRS /MSC - 854 .3
AFL 403

FAA 2014- 15-13 LANDING GE AR - ASSIGN SERIA L NUMBERS OR PA RT NUMBERS TO CERTAIN ADDITIONAL LANDING GEAR PARTS TO MANDA TO RY NOT A PPLICA BLE - BY A/C SERIAL NUMBER
ESTAB LIS H THE NUMB ER OF LANDINGS & UPDATING RE CO RDS
MOS 04-S EP-20 14
25-S EP-20 14 HRS /MSC - (s)
AFL
FAA 2014- 15-13 PA RA (G) (3) ADD S ERIAL NUMB ERS A ND PART NUMB ERS, AS APP LICAB LE, TO THE PARTS MANDA TO RY NOT A PPLICA BLE - BY A/C SERIAL NUMBER
MOS 04-S EP-20 14
25-S EP-20 14 HRS /MSC - (s)
AFL
FAA 2014- 15-13 PA RA (H) USE THE FORMULA IN THE A PPLICABLE MESSIER-DOWTY S B SPECIFIED IN TABL E 1 TO PARAGRAP H (G) OF THIS A D MANDA TO RY NOT A PPLICA BLE - BY A/C SERIAL NUMBER
TO ESTABLISH THE TS N OR CS N, A ND RE CO RD THE NEWLY CALCUL ATED TSN O R CSN IN THE A IRPLA NE LO G B OOKS
MOS 04-S EP-20 14
25-S EP-20 14 HRS /MSC - (s)
AFL
FAA 2014- 15-13 PA RA (I) REVISE THE ALS O F THE AP PLICA BLE INSTRUCTIO NS FOR CO NTINUED AIRWORTHINESS TO RE FLE CT THE NEW LIFE MANDA TO RY NOT A PPLICA BLE - BY A/C SERIAL NUMBER
LIMITS OF THE L ANDING GEAR PARTS
MOS 04-S EP-20 14
25-S EP-20 14 HRS /MSC - (s)
AFL

FAA 2014- 15-13 PA RA ADD S ERIAL NUMB ERS A ND PART NUMB ERS TO MAIN FITTING/DRAG STAY PIN O F THE NLG HAVING P/N 2 00811 721 MANDA TO RY NOT A PPLICA BLE - BY A/C SERIAL NUMBER
(L)( 1)(I)
MOS 04-S EP-20 14
25-S EP-20 14 HRS /MSC - (s)
AFL

FAA 2014- 15-13 PA RA ADD S ERIAL NUMB ERS A ND PART NUMB ERS TO NLG CROS SBEA M PINS HAVING P/N 2008 14601 AND NLG CENTER MANDA TO RY NOT A PPLICA BLE - BY A/C SERIAL NUMBER
(L)( 1)(II) HINGE PINS HAV ING P/N 200 81462 4
MOS 04-S EP-20 14
25-S EP-20 14 HRS /MSC - (s)
AFL
FAA 2014- 15-13 PA RA (N) RECORD ANY NEWLY CA LCULA TE D CSN, NE W PA RT NUMBERS, A ND NE W SE RIAL NUMBE RS IN THE AIRPLANE MANDA TO RY NOT A PPLICA BLE - BY A/C SERIAL NUMBER
TECHNICA L RECORDS AND MANUA LS (CONCURRE NTLY WITH THE ACTIONS SPE CIFIED IN PARAGRAP HS (L) AND (M)
OF THIS A D)
MOS 04-S EP-20 14
25-S EP-20 14 HRS /MSC - (s)
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 22 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2014- 15-17 REVISE THE AFM TO INCORPORATE THE AP PLICA BLE TEMPORARY REV ISIONS (TRS ) MANDA TO RY COMPLIED WITH - B Y INCORPORATIO N TR
605 /20 IN AFM
DAYS 31-JUL-20 14
31-JUL-20 14 HRS /MSC - (s)
AFL
FAA 2014- 16-06 AUTO FLIGHT - REVISE THE EMERGENCY PROCEDURES SE CTION O F THE AP PLICAB LE BOMBARDIE R AFM TO MANDA TO RY COMPLIED WITH - INCORPORATIO N PSP
INCORPO RA TE THE UNCO MMA NDED YAW MOTION P RO CEDURE 605 -1,IN A FM
DAYS 25-A UG -2014
23-S EP-20 14 HRS /MSC - (s)
AFL
FAA 2014- 17-51 WINGS - INBO ARD FLAP FASTENER(S) OF THE HINGE BOX - INSPE CTION/REPL ACEMENT (SUPERSE DE D BY FAA AD MANDA TO RY COMPLIED WITH - S EE AS RE F SB A60 5-57-0 04
201 6-08-1 5) PART B TERMINATING ACTION
MOS 19-S EP-20 14
12-NOV -2014 HRS /MSC - (s) 854 .18
AFL
FAA 2014- 17-51 PA RA (G) INS PECTION/ REPL ACEMENT (AIRP LANES NOT PREV IOUSL Y INSPECTED) COMPLIED WITH - S EE AS RE F SB A60 5-57-0 04
PART B TERMINATING ACTION
MOS 19-S EP-20 14
12-NOV -2014 HRS /MSC - (s) 854 .18
AFL 403
FAA 2014- 17-51 PA RA (H) INS PECTION/ REPL ACEMENT (AIRP LANES PREVIOUSLY INS PECTED, WITH INCORRECTLY ORIENTED FASTENER(S) ) COMPLIED WITH - S EE AS RE F SB A60 5-57-0 04
PART B TERMINATING ACTION
MOS 19-S EP-20 14
12-NOV -2014 HRS /MSC - (s) 854 .18
AFL 403
FAA 2014- 17-51- E WINGS - INBO ARD FLAP FASTENER(S) OF THE HINGE BOX - INSPE CTION/REPL ACEMENT MANDA TO RY COMPLIED WITH - TERMINATED DUE TO
ACCOMPLISHME NT OF S B 6 05-57-0 04
MOS 19-S EP-20 14
19-A UG -2014 HRS /MSC - (s) 854 .3
AFL 403
FAA 2014- 17-51- E P ARA (G ) INS PECTION/RE PLACEMENT (A IRPLANES NOT PREVIOUSLY INSP ECTED) MANDA TO RY COMPLIED WITH - TERMINATED DUE TO
ACCOMPLISHME NT OF S B 6 05-57-0 04
MOS 19-S EP-20 14
19-A UG -2014 HRS /MSC - (s) 854 .3
AFL 403
FAA 2014- 17-51- E P ARA (H) INS PECTION/RE PLACEMENT (A IRPLANES PREV IO USL Y INSPECTED, WITH INCORRE CTLY ORIENTED FA STENER(S)) MANDA TO RY COMPLIED WITH - TERMINATED DUE TO
ACCOMPLISHME NT OF S B 6 05-57-0 04
MOS 19-S EP-20 14
19-A UG -2014 HRS /MSC - (s) 854 .3
AFL 403
FAA 2014- 20-01 FUE L - INS PECT FOR A NY FUEL LEAK IN THE RIGHT-HAND L ANDING LIG HTS COMPARTMENT, AND REL ATE D MANDA TO RY NOT A PPLICA BLE - BY A/C S/N
INV ESTIG ATIVE AND CORRECTIVE ACTIO NS IF NECESSA RY . (SUPERSE DED BY FAA AD 20 16-10-1 0)
MOS 05-NOV -2014
20-O CT-20 14 HRS /MSC - (s)
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 23 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2014- 20-01 PA RA (G) GENERAL VISUAL INS PECTION FO R ANY FUEL LEA K IN THE RIGHT-HAND LANDING LIGHTS COMPARTMENT, A ND DO NOT A PPLICA BLE - BY A/C S/N
ALL AP PLICA BLE RELATED INVESTIGATIVE AND CORRE CTIVE ACTIONS
MOS 05-NOV -2014
20-O CT-20 14 HRS /MSC - (s)
AFL

FAA 2014- 20-01 PA RA (H) & DO THE TERMINATING ACTION SPECIFIED IN P ARA GRAPH ( I) OF THIS AD (IF ANY FUEL LEA K IS FOUND DURING THE NOT A PPLICA BLE - BY A/C S/N
(I) RELATED INVES TIGATIVE ACTIONS REQUIRED BY PARAGRAP H (G) OF THIS A D) / OP TIONAL TERMINATING
ACTIO N–REP LACEMENT
MOS 05-NOV -2014
20-O CT-20 14 HRS /MSC - (s)
AFL
FAA 2014- 20-01 PA RA (J) DETAIL ED INSPECTIO N FOR DAMAGE (CUTS ) O F THE CONNECTO R WIRING / REP LACE THE WIRE WITH A NEW WIRE NOT A PPLICA BLE - NA BY A/C S /N
(IF ANY DAMA GE (CUTS) IS FOUND ON THE WIRES )
MOS 05-NOV -2014
20-O CT-20 14 HRS /MSC - (s)
AFL
FAA 2015- 02-06 FLIG HT CONTROLS - REVISE THE AIRPLANE FL IGHT MANUAL, MA INTENANCE OR INSPE CTION PROG RA M, AS MANDA TO RY
APP LICAB LE, AND REP LACE THE HSTAS HA VING CERTA IN PART NUMBE RS (AD NUMBER PER DOCKET NO. ON AD)
(SUPE RSE DE D BY FAA AD 2 015-05 -07)
MOS
06-MAR-2 015 HRS /MSC -
AFL

FAA 2015- 02-06 PA RA (G) REVISE THE NORMAL PROCEDURES SECTIO N OF THE APP LICAB LE BOMBARDIER AFM MANDA TO RY COMPLIED WITH - THE RE VIS ED PROCEDURES
FOR THE STA BIL IZER TRIM SYS TE M CHE CK AS
REQUIRE D IN THE TR 605 /18 ARE INCLUDED IN
THE NORMAL PROCEDURES SE CTION O F THE
CURRENT AFM REV ISION 30 DA TE D 01OCT2014 .
AD 2015-0 2-06 PARA(G ) IS THEREFOR C/W.
DAYS 09-MAR-2 015
06-MAR-2 015 HRS /MSC - 103 1.4 7
AFL 647

FAA 2015- 02-06 PA RA (H)(1) REVISE THE MAINTENANCE OR INS PECTION PROGRAM MANDA TO RY COMPLIED WITH - E AG CL 605 MSN 58 66 AMP
REV 02 DA TE D 8TH FEB, 15 INCORPORATED
TASK 27-4 1-00-1 01. AS REQUIRE D IN FAA AD
201 5-02-0 6 P ARA H
DAYS 09-MAR-2 015
06-MAR-2 015 HRS /MSC - 103 1.4 7
AFL 647
FAA 2015- 02-06 PA RA (H)(2) ACCOMPLISH THE ACTIONS SPECIFIED IN THE MA INTENANCE OR INSPE CTION P RO GRAM MANDA TO RY
MOS
06-MAR-2 015 HRS /MSC - (EFF)
AFL
FAA 2015- 02-06 PA RA (J) REPLA CE ANY HSTA HAV ING P/N 604- 92305 -3 ( VENDO R P/N 84 5401) OR P/N 604-9 2305-5 (V ENDO R P/N 845 4-2) WITH A MANDA TO RY
HSTA HAV ING P/N 604 -92305 -7 ( VENDOR P/N 84 54-3)
MOS
06-MAR-2 015 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 24 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2015- 05-07 FLIG HT CONTROLS - REVISE THE AIRPLANE FL IGHT MANUAL, MA INTENANCE OR INSPE CTION PROG RA M, AS MANDA TO RY COMPLIED WITH
APP LICAB LE, AND REP LACEMENT OF HO RIZONTA L S TA BIL IZER TRIM ACTUATORS (HSTAS) HAVING CERTAIN PART
NUMBE RS
MOS 26-A PR-2015
16-MAR-2 015 HRS /MSC - (s) 107 0.7 7
AFL 688
FAA 2015- 05-07 PA RA (G) REVISE THE NORMAL PROCEDURES SECTIO N OF THE APP LICAB LE BOMBARDIER AFM MANDA TO RY COMPLIED WITH
DAYS 26-A PR-2015
16-MAR-2 015 HRS /MSC - (s) 107 0.7 7
AFL 688
FAA 2015- 05-07 PA RA (H)(1) REVISE THE MAINTENANCE OR INS PECTION PROGRAM MANDA TO RY COMPLIED WITH
DAYS 26-A PR-2015
16-MAR-2 015 HRS /MSC - (s) 107 0.7 7
AFL 688
FAA 2015- 05-07 PA RA (H)(2) ACCOMPLISH THE ACTIONS SPECIFIED IN THE MA INTENANCE OR INSPE CTION P RO GRAM MANDA TO RY COMPLIED WITH
MOS 26-A PR-2015
16-MAR-2 015 HRS /MSC - (s) 107 0.7 7
AFL 688
FAA 2015- 05-07 PA RA (J) REPLA CE ANY HSTA HAV ING P/N 604- 92305 -3 ( VENDO R P/N 84 54-1) OR P/N 604-9 2305-5 (VE NDOR P/N 8454 -2) WITH A MANDA TO RY COMPLIED WITH
HSTA HAV ING P/N 604 -92305 -7 ( VENDOR P/N 84 54-3) FOR A IRPLANES EQ UIPP ED WITH A HSTA HAVING P/N
604 -92305 -3 (VENDOR P/N 84 54-1) OR P/N 604-9 2305-5 (V ENDO R P/N 845 4-2)
MOS 26-A PR-2015
16-MAR-2 015 HRS /MSC - (s) 107 0.7 7
AFL 688
FAA 2015- 07-02 REVISION OF THE MAINTENANCE O R INS PECTION PROGRAM TO DETECT AND CORRECT NON-CONFORMING FLAP MANDA TO RY COMPLIED WITH - S B 6 05-57 -005 ALREADY
HINGE BO X FORWARD LUGS COMPLIED O N 18-S EP-14 BE FO RE THE
EFFECTIVE DATE O F THIE AD. CRE DIT IAW
PARA 15 OF AD 201 5-07-0 2. NO FURTHER
ACTIO N REQUIRED
MOS 19-MAY -2015
04-JUN-2015 HRS /MSC - (s) 109 2.9 3
AFL 709
FAA 2015- 25-05 ELE CTRICAL PO WE R - PERFORM A ONE-TIME DETAIL ED INS PECTION OF THE IDG POWER CA BLES FOR CHAFING MANDA TO RY NOT A PPLICA BLE - AIRCRAFT FOUND
BETWEEN THE CABLE S A ND THE ADJACENT HYDRAULIC A ND PNEUMATIC LINES, AND FO R ANY CRACKED OR COMPLIED A LRE ADY WITH BOMBA RDIER SB
BROKE N SUPPO RT BRACKET O F THE HYDRAULIC LINES / REP AIR OR REPL ACE ( IF A NY CHAFING OF THE POWER 605 -24-00 7 REV ON APR 1 5/2 014.HENCE NO
CABLE S O R ANY CRACKE D OR BROKEN SUPPORT BRACKE T IS FOUND) ACTIO N REQUIRED FO R THIS FAA AD
201 5-25-0 5.
MOS 14-A PR-2016
28-JAN-20 16 HRS /MSC - 131 3.0 2
AFL 851
FAA 2016- 08-15 WINGS - INSP ECTING THE INBO ARD FLAP FASTENERS O F THE HING E-BOX FORWARD FITTING AT WING S TATION MANDA TO RY NOT A PPLICA BLE - N/A BY PARA (I) OF THIS AD
(WS) 76.50 AND WS 127.25 TO DETERMINE THE ORIENTA TION AND CONDITION OF THE FAS TE NE RS , AS APPL ICABL E,
AND REPL ACEMENT OR REP ETITIV E INSPECTIONS O F THE FASTENERS IF NE CE SSARY
MOS 11-JUL-20 16
06-JUN-2016 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 25 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2016- 08-15 PA RA (G) ACCOMPLISH A DETAILED V ISUAL INS PECTION OF EA CH INBO ARD FLAP FASTENER OF THE HINGE -BOX FORWA RD MANDA TO RY NOT A PPLICA BLE - N/A BY PARA (I) OF THIS AD
FITTING AT WS 76.50 AND WS 127.25, ON BO TH WINGS, TO DETERMINE IF THE FA STENERS A RE CORRECTLY
ORIENTED AND INTACT (NON-FRACTURED, WITH INTA CT FA STENER HEAD) AND NO FURTHER ACTION IS REQUIRE D,
IF ALL FASTENERS ARE FOUND INTACT A ND CORRECTLY ORIE NTED. REPE AT (IF ANY INCORRECTL Y O RIENTED BUT
INTACT FASTENER IS FOUND, A ND NO FRACTURED FAS TENER IS FOUND)
MOS 11-JUL-20 16
06-JUN-2016 HRS /MSC -
AFL
FAA 2016- 08-15 PA RA (G) (2) REMOVE AND REP LACE A LL FO RWARD A ND AFT FASTENERS AT WS 76.50 AND WS 127.25, REGA RDLE SS OF MANDA TO RY NOT A PPLICA BLE - N/A BY PARA (I) OF THIS AD
CONDITIO N OR ORIENTATIO N, O N BO TH WINGS, IF ANY FASTENER IS FO UND FRACTURED
MOS 11-JUL-20 16
06-JUN-2016 HRS /MSC -
AFL
FAA 2016- 08-15 PA RA (H) ACCOMPLISH A DETAILED V ISUAL INS PECTION OF AL L INBOA RD FLA P FAS TE NE RS OF THE HINGE- BOX FORWA RD MANDA TO RY NOT A PPLICA BLE - N/A BY PARA (I) OF THIS AD
FITTING AT WS 76.50 AND WS 127.25, ON BO TH WINGS, TO DETERMINE IF THE FA STENERS A RE INTACT
(NON-FRA CTURED, WITH INTACT FAS TENER HE AD) A ND RE PEAT (IF ALL FA STENERS A RE FOUND INTACT)
MOS 11-JUL-20 16
06-JUN-2016 HRS /MSC -
AFL

FAA 2016- 08-15 PA RA (H)(2) REMOVE AND REP LACE A LL FO RWARD A ND AFT FASTENERS AT WS 76.50 AND WS 127.25, REGA RDLE SS OF MANDA TO RY NOT A PPLICA BLE - N/A BY PARA (I) OF THIS AD
CONDITIO N OR ORIENTATIO N, O N BO TH WINGS (IF ANY FAS TE NE R IS FOUND FRACTURED)
MOS 11-JUL-20 16
06-JUN-2016 HRS /MSC -
AFL
FAA 2016- 08-15 PA RA (I) TERMINATING ACTION - REP LACEMENT OF ALL FO RWARD AND AFT FASTENERS AT WS 76.50 AND WS 127.25, O N MANDA TO RY NOT A PPLICA BLE - N/A BY PARA (I) OF THIS AD
BOTH WINGS
MOS 11-JUL-20 16
06-JUN-2016 HRS /MSC -
AFL
FAA 2016- 08-15 PA RA (K) REMOVE AND REP LACE A LL FO RWARD A ND AFT FASTENERS AT WS 76.50 AND WS 127.25, REGA RDLE SS OF MANDA TO RY NOT A PPLICA BLE - N/A BY PARA (I) OF THIS AD
CONDITIO N OR ORIENTATIO N, O N AFFECTE D WINGS (FOR A IRPLA NE S O N WHICH INCO RRECTLY ORIE NTED
FASTENERS WE RE FOUND DURING A NY INS PECTION RE QUIRED BY PARA (G), (G )(3), (H), O R (H)(1), BUT NONE WERE
FOUND TO B E FRACTURED)
MOS 11-JUL-20 16
06-JUN-2016 HRS /MSC -
AFL

FAA 2016- 10-10 FUE L - INS PECT FOR A NY FUEL LEAK IN THE RIGHT-HAND L ANDING LIG HTS COMPARTMENT, AND REL ATE D MANDA TO RY NOT A PPLICA BLE - N/A BY A/C MSN
INV ESTIG ATIVE AND CORRECTIVE ACTIO NS IF NECESSA RY
MOS 01-A UG -2016
23-JUN-2016 HRS /MSC -
AFL
FAA 2016- 10-10 PA RA (G) & GENERAL VISUAL INS PECTION FO R ANY FUEL LEA K IN THE RIGHT-HAND LANDING LIGHTS COMPARTMENT, A ND DO MANDA TO RY NOT A PPLICA BLE - N/A BY A/C MSN
(H) ALL AP PLICA BLE RELATED INVESTIGATIVE AND CORRE CTIVE ACTIONS AND REPEA T THE INS PECTION
MOS 01-A UG -2016
23-JUN-2016 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 26 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2016- 10-10 PA RA (I) DETAIL ED INSPECTIO N FOR DAMAGE (CUTS ) O F THE CONNECTO R WIRING AND REP LACE THE WIRE WITH A NEW MANDA TO RY NOT A PPLICA BLE - N/A BY A/C MSN
WIRE (IF ANY DA MA GE (CUTS) IS FOUND ON THE WIRES )
MOS 01-A UG -2016
23-JUN-2016 HRS /MSC -
AFL
FAA 2016- 10-10 PA RA (J) REPLA CE THE CONNECTOR OF THE FUE L B OOST PUMP CANIS TE R OF THE APU AND DO A LL APPLICABLE RELA TE D MANDA TO RY NOT A PPLICA BLE - N/A BY A/C MSN
INV ESTIG ATIVE ACTIO NS
MOS 01-A UG -2016
23-JUN-2016 HRS /MSC -
AFL
FAA 2016- 11-20 PA RA (G) PHYSICALLY INS PECT THE P BE POUCH TO DETERMINE IF IT HAS AN INTACT V ACUUM S EAL IN ACCORDANCE WITH MANDA TO RY NOT A PPLICA BLE - N/A BY MANUFACTURER
B/E AEROSP ACE S ERV ICE BULLETIN NO. 11 9003-3 5-011, RE V .000 , DATE D FEBRUARY 4 , 2015 , PARA III.A..1 AND P ART NUMBERS. NO FURTHER A CTION
SUPERSE DE D BY FAA AD 20 17-18- 12 REQUIRE D.
MOS 12-JUN-2016
15-JUL-20 16 HRS /MSC - 136 3.5 8
AFL 882
FAA 2016- 13-09 FLIG HT CONTROLS - REVISE THE MAINTENANCE O R INS PECTION PROGRAM, AS AP PLICA BLE MANDA TO RY COMPLIED WITH - A MP AL RE ADY REV ISE D ON
08/13/16.
DAYS 02-A UG -2016
16-A UG -2016 HRS /MSC -
AFL
FAA 2016- 20-09 FUE L - FOR CERTAIN AIRPLANES, A DETAILED INSPE CTION FOR CHAFING CONDITIO NS OF THE NEGATIVE-G FUEL MANDA TO RY NOT A PPLICA BLE - NA CLOS ED SB 60 5-28-0 09
FEED DRAIN LINE O F THE AP U, AND CORRE CTIVE ACTIONS IF NE CE SSARY ALREA DY COMPLIED
MOS 21-MAY -2017
09-JAN-20 17 HRS /MSC - (s)
AFL
FAA 2016- 20-09 PA RA (G) ACCOMPLISH A DETAILED INSPECTIO N FOR CHAFING CONDITIONS OF THE NEGATIVE-G FUE L FEED DRA IN L INE OF MANDA TO RY NOT A PPLICA BLE - NA CLOS ED SB 60 5-28-0 09
THE AP U, AND DO A LL APPL ICABL E CORRECTIVE ACTIO NS ALREA DY COMPLIED
MOS 21-MAY -2017
09-JAN-20 17 HRS /MSC -
AFL
FAA 2016- 20-09 PA RA (H) REPLA CE THE A PU NEGA TIVE-G FUEL FE ED TUBE ASSE MB LY AND THE DRAIN LINE MANDA TO RY NOT A PPLICA BLE - NA CLOS ED SB 60 5-28-0 09
ALREA DY COMPLIED
MOS 21-MAY -2017
09-JAN-20 17 HRS /MSC -
AFL
FAA 2016- 21-06 WINGS - REPETITIVE INSP ECTIONS FO R FRA CTURED OR INCORRECTLY ORIENTE D FASTENERS ON THE INBOARD MANDA TO RY NOT A PPLICA BLE - CL OSED NA BY MSN
FLAP HINGE- BOX FORWA RD FITTINGS ON B OTH WINGS, AND REPLA CE MENT OF ALL FASTENERS IF NE CE SSARY
MOS 21-MAY -2017
HRS /MSC - (s)
AFL
FAA 2016- 21-06 PA RA (G) ACCOMPLISH A DETAILED V ISUAL INS PECTION FO R INCORRECT ORIENTA TION A ND ANY FRACTURED OR MISSING MANDA TO RY NOT A PPLICA BLE - CL OSED NA BY MSN
FASTENER HEA DS OF EACH INB OARD FLAP FASTENER OF THE HING E-BOX FORWARD FITTING AT WING S TA TION
(WS) 76.50 AND WS 127.25, O N BOTH WINGS (INSP ECTION O N AIRPLANES NOT PREV IO USL Y INSPECTED)
MOS 21-MAY -2017
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 27 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2016- 21-06 PA RA (H)(3) REMOVE AND REP LACE A LL FO RWARD A ND AFT FASTENERS (RE GARDLESS OF ORIENTATIO N OR CONDITION) AT WS MANDA TO RY NOT A PPLICA BLE - CL OSED NA BY MSN
76.50 AND WS 127.25, ON BO TH WINGS (IF, DURING ANY INSPE CTION REQUIRED BY PA RA GRAPH (G ) O F THIS AD, ANY
FASTENER IS FO UND FRACTURED OR HAS A MISS ING FASTENER HEAD)
MOS 21-MAY -2017
HRS /MSC - (s)
AFL
FAA 2016- 21-06 PA RA (I) ACCOMPLISH A DETAILED V ISUAL INS PECTION FO R ANY FRACTURE D OR MISSING FAS TE NE R HEADS OF EA CH MANDA TO RY NOT A PPLICA BLE - CL OSED NA BY MSN
INB OARD FLAP FASTENER O F THE HING E-BOX FORWARD FITTING AT WS 76.50 AND WS 127.25, ON BO TH WINGS
(INS PECTION FO R AIRPLANES PREVIOUSLY INSPECTED AND FOUND TO HAVE INCORRECTLY O RIENTE D
FASTENER(S))
MOS 21-MAY -2017
HRS /MSC -
AFL

FAA 2016- 21-06 PA RA (J)(2) REMOVE AND REP LACE A LL FO RWARD A ND AFT FASTENERS (RE GARDLESS OF ORIENTATIO N OR CONDITION) AT WS MANDA TO RY NOT A PPLICA BLE - CL OSED NA BY MSN
76.50 AND WS 127.25, ON BO TH WINGS (IF, DURING ANY INSPE CTION REQUIRED BY PA RA GRAPH (I) OF THIS AD, ANY
FASTENER IS FO UND FRACTURED OR HAS A MISS ING FASTENER HEAD)
MOS 21-MAY -2017
HRS /MSC - (s)
AFL

FAA 2016- 21-06 PA RA (K) REPLA CE ME NT OF AL L FORWARD AND A FT FA STE NE RS (REG ARDLE SS OF ORIENTA TION OR CONDITION) AT WS MANDA TO RY NOT A PPLICA BLE - CL OSED NA BY MSN
76.50 AND WS 127.25, ON BO TH WINGS, TERMINATES THE REQ UIREMENTS OF THIS AD (O PTIONAL TERMINATING
ACTIO N FOR INCORRECTLY ORIENTED FAS TENERS)
MOS 21-MAY -2017
HRS /MSC - (s)
AFL

FAA 2016- 21-06 PA RA (N) REPLA CE AL L FORWARD AND A FT FA STE NE RS , REGARDLESS OF CO NDITION OR O RIENTATION, AT WS 7 6.50 AND WS MANDA TO RY NOT A PPLICA BLE - CL OSED NA BY MSN
127 .25 , ON A FFECTED WING S (FOR AIRP LANES ON WHICH A NY INCO RRECTLY ORIE NTED FAS TE NE R, A ND NO
FRA CTURED OR MISS ING FA STENER, WA S DETECTED DURING ANY INSPE CTION REQUIRE D BY PARAG RA PH (G ),
(H)(2), (I), AND (J)(1) OF THIS AD)
MOS 21-MAY -2017
HRS /MSC -
AFL

FAA 2017- 16-01 PA RA (G) PERFORM GE NE RA L V ISUAL INSPECTIONS OF THE ELT FO R DISCREPA NCIES; CHECKS , TESTS AND V ERIFICATIONS NOT A PPLICA BLE - AIRCRAFT INSTAL LED EL T
AS APP LICAB LE, TO ENSURE THE ELT IS FUNCTIONING, AND ALL AP PLICA BLE CO RRECTIV E ACTIONS MODEL: C406 -N, P/N: 4 53-506 0, S/N: 1056 9. THIS
AD NO T APP LICABL E FOR THIS A/C ELT TES T
FOUND NO RMAL .
MOS 25-S EP-20 19
24-O CT-20 17 HRS /MSC - 188 0.3
AFL 123 6

FAA 2017- 16-13 OXY GEN - REPL ACE THE EXISTING LANYARDS IN THE PASS ENGER O XYGE N BOX A SSEMBLIES WITH L ANYARDS O F MANDA TO RY
THE CORRECT LENGTH
MOS 60 (EFF) 25-S EP-20 22
25-S EP-20 17 HRS /MSC 240 0 382 3.3 8
AFL
FAA 2017- 19-06 WINGS - REVISING THE MAINTE NA NCE OR INSPECTIO N PROG RAM AND AN INSPE CTION TO IDENTIFY THE SE RIAL MANDA TO RY
NUMBE R, TO SE RIALIZE, AND TO RECORD THE ACCUMULA TED LIFE OF THE SIDE BRACE FITTING SHAFT OF THE MLG
MOS
27-O CT-20 17 HRS /MSC - (s)
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 28 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2017- 19-06 PA RA (G) REVISE THE MAINTENANCE OR INS PECTION PROGRAM, AS AP PLICA BLE MANDA TO RY
DAYS (EFF)
27-O CT-20 17 HRS /MSC -
AFL
FAA 2017- 19-06 PA RA (H) INS PECT TO IDENTIFY THE SERIAL NUMBER, S ERIAL IZE, AND RECORD THE ACCUMULATED L IFE OF THE S IDE BRACE MANDA TO RY
FITTING SHAFT OF THE MLG, AS A PPLICA BLE
MOS (EFF)
27-O CT-20 17 HRS /MSC -
AFL
FAA 2017- 20-11 FUS ELAG E - REVISE THE MAINTENANCE OR INSPECTIO N PROGRAM MANDA TO RY
DAYS (EFF)
15-NOV -2017 HRS /MSC -
AFL
FAA 2017- 22-06 FUE L - REPE TITIVE INS PECTIONS FOR FUEL LEAK AGE AT THE ENGINE AND A PU FUEL PUMPS , AND RELA TED MANDA TO RY COMPLIED WITH - NO DEFECT
INV ESTIG ATIVE AND CORRECTIVE ACTIO NS IF NECESSA RY
MOS 03-S EP-20 21
30-NOV -2017 HRS /MSC - (s) 219 2.3 8
AFL 147 4
FAA 2017- 22-06 PA RA (G) (1) A GENERAL VISUAL INSP ECTION FOR TRACES OF FUEL COMING FROM THE RIGHT- HAND ENG INE BOO ST PUMP AT MANDA TO RY NOT A PPLICA BLE - DUE TO A IRCRA FT MS N
THE LO CA TION OF THE B ELLY FAIRING S CREW (FS412, BL 0.0) AND A CCOMPL ISH ALL APP LICAB LE CO RRECTIV E (586 6) EFFECTIV E FOR CL -600-2 B16, MSN:5301
ACTIO NS THROUGH 5665
MOS 03-S EP-20 21
30-NOV -2017 HRS /MSC - 219 2.3 8
AFL 147 4

FAA 2017- 22-06 PA RA (G) (2) A GENERAL VISUAL INSP ECTION FOR TRACES OF FUEL COMING FROM THE L EFT-HAND E NG INE BOOS T PUMP A T MANDA TO RY NOT A PPLICA BLE - DUE TO A IRCRA FT MS N
THE LO CA TION OF THE B ELLY FAIRING S CREW (FS412, BL 0.0) AND A CCOMPL ISH ALL APP LICAB LE CO RRECTIV E (586 6) EFFECTIV E FOR CL -600-2 B16, MSN:5301
ACTIO NS THROUGH 5665
MOS 03-S EP-20 21
30-NOV -2017 HRS /MSC - 219 2.3 8
AFL 147 4
FAA 2017- 22-06 PA RA (G) (3) A GENERAL VISUAL INSP ECTION FOR TRACES OF FUEL COMING FROM THE E FP EL ECTRICAL WIRING CO NDUIT MANDA TO RY NOT A PPLICA BLE - DUE TO A IRCRA FT MS N
OUTLET A T THE LO WE R BODY FAIRING A RE A FOR ENGINE EFPS AND A T THE RIG HT-HAND LA NDING L IGHT (586 6) EFFECTIV E FOR CL -600-2 B16, MSN:5301
COMPARTME NT FO R THE AP U EFP AND ACCOMPLISH A LL A PPLICABLE CORRECTIVE ACTIONS THROUGH 5665
MOS 03-S EP-20 21
30-NOV -2017 HRS /MSC - 219 2.3 8
AFL 147 4
FAA 2017- 22-06 PA RA (H)(1) A GENERAL VISUAL INSP ECTION FOR TRACES OF FUEL COMING FROM THE RIGHT- HAND ENG INE BOO ST PUMP AT MANDA TO RY COMPLIED WITH - NO DEFECT
THE LO CA TION OF THE B ELLY FAIRING S CREW (FS412, BL 0.0) AND A CCOMPL ISH ALL APP LICAB LE RE LATED
INV ESTIG ATIVE AND CORRECTIVE ACTIO NS
MOS 03-S EP-20 21
30-NOV -2017 HRS /MSC - 219 2.3 8
AFL 147 4

FAA 2017- 22-06 PA RA (H)(2) A GENERAL VISUAL INSP ECTION FOR TRACES OF FUEL COMING FROM THE L EFT-HAND E NG INE BOOS T PUMP A T MANDA TO RY COMPLIED WITH - NO DEFECT
THE LO CA TION OF THE B ELLY FAIRING S CREW (FS412, BL 0.0) AND A CCOMPL ISH ALL APP LICAB LE RE LATED
INV ESTIG ATIVE AND CORRECTIVE ACTIO NS
MOS 03-S EP-20 21
30-NOV -2017 HRS /MSC - 219 2.3 8
AFL 147 4

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 29 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2017- 22-06 PA RA (H)(3) A GENERAL VISUAL INSP ECTION O F THE RIGHT-HAND L ANDING L IGHT COMPA RTMENT FOR TRACES OF FUEL MANDA TO RY COMPLIED WITH - NO DEFECT
COMING FRO M THE AP U EFP AND ACCOMPLISH A LL APPLICABLE RELA TED INVE STIGA TIVE AND CORRECTIVE
ACTIO NS
MOS 03-S EP-20 21
30-NOV -2017 HRS /MSC - 219 2.3 8
AFL 147 4
FAA 2017- 22-11 NAVIGATION - REVISE THE EMERGENCY PROCEDURES SE CTION OF THE AFM MANDA TO RY COMPLIED WITH - COMPL IED WITH.
DAYS 22-JAN-20 18
20-DEC-20 17 HRS /MSC - 148 0.2
AFL 955
FAA 2017- 23-09 PERIODIC INSPE CTIONS - REVISE THE MAINTE NA NCE OR INSPECTIO N PROGRAM, A S A PPLICABLE MANDA TO RY COMPLIED WITH
DAYS 22-JAN-20 18
26-DEC-20 17 HRS /MSC - 148 0.2
AFL 955
FAA 2018- 06-06 AUTOPILOT S YSTEM - RUDDER CO NTROLS - YAW DA MP ER UNCO MMANDED MOV EMENT MANDA TO RY COMPLIED WITH - A S P ER AD NUMBE R
CF- 2016-3 8
MOS 20-A PR-2022
19-A PR-2018 HRS /MSC - 222 0.8
AFL 149 0
FAA 2018- 09-17 RUDDER CONTROL SYSTEM - CRACKING OF THE PILOT-SIDE RUDDE R PEDAL TUBES MANDA TO RY
MOS
25-JUN-2018 HRS /MSC -
AFL
FAA 2018- 09-17 PA RA (G) ACCOMPLISH A DETAILED O R EDDY CURRE NT INSPE CTION O F BOTH P ILO T-S IDE RUDDER PE DA L TUBES FOR MANDA TO RY
CRA CK ING AND CORRECTIVE ACTIONS
MOS
25-JUN-2018 HRS /MSC
AFL 900 0 (EFF) 900 0
FAA 2018- 09-17 PA RA (I) REPLA CE ME NT OF BO TH PIL OT-SIDE RUDDER BAR A SSEMBLIES IAW PA RT B OF THE A CCOMPL ISHMENT MANDA TO RY
INS TRUCTIONS OF THE A PPLICABLE SI IDENTIFIE D IN PARAS (G)( 1) - (G )(6) TE RMINA TE S THE INSPE CTIONS
REQUIRE D BY PARA (G) OF THIS A D
MOS
25-JUN-2018 HRS /MSC -
AFL

FAA 2018- 17-02 FLIG HT CONTROLS - REVISIO N OF THE MAINTENANCE O R INS PECTION PROGRAM, AS APP LICAB LE, TO INCLUDE THE MANDA TO RY COMPLIED WITH
LATES T REVISIO N OF THE AWLS, S ERIAL IZATIO N OF THE HSTA A TTACHME NT PINS AND TRUNNIONS, AND REPA IR OR
REPLA CE ME NT OF DAMAGE D HSTA A TTACHME NT PINS AND TRUNNIONS
MOS 27-S EP-20 18
19-S EP-20 18 HRS /MSC - (s) 162 5.4
AFL 107 4

FAA 2018- 17-02 PA RA (H) REVISE THE MAINTENANCE OR INS PECTION PROGRAM, AS AP PLICA BLE, TO INCORPO RATE NEW L IFE LIMIT AWL MANDA TO RY COMPLIED WITH - COMPL IED WITH
TASK 27-4 2-01-1 08 AND TASK 27-42 -01-11 2
DAYS 02-NOV -2018
19-S EP-20 18 HRS /MSC - 164 7.4
AFL 108 5

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 30 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2018- 17-02 PA RA (I) DO A G ENERAL VIS UA L INSPECTIO N FOR DAMAGE (INCL UDING L INEAR SCRA TCHES, P ITS, SP ALLING, DENTS , OR MANDA TO RY COMPLIED WITH
SURFA CE TEXTURE V ARIATIONS), AND A DD SERIA L NUMBERS TO THE HSTA TRUNNIONS, LOWER A TTACHMENT PIN,
AND UPPE R ATTACHMENT P IN
MOS 27-S EP-20 18
19-S EP-20 18 HRS /MSC - 162 5.4
AFL 107 4
FAA 2018- 20-21 FLOODLIGHTING PANEL - COCKPIT FLOO DL IG HT WA TER PENETRATION / COCKPIT FLOODLIGHT GA SKET SEAL MANDA TO RY COMPLIED WITH
INS TAL LATIO N
MOS 14-MAR-2 022
20-NOV -2018 HRS /MSC - 219 4.6
AFL 147 5
FAA 2019- 08-08 HYDRA UL IC POWER - HYDRA UL IC ACCUMULATORS S CREW CA P/END CAP FA ILURE MANDA TO RY COMPLIED WITH
MOS 27-MAY -2019
27-JUN-2019 HRS /MSC - (s) 174 7.9
AFL 114 5
FAA 2019- 08-08 PA RA (G) (1) INS PECT TO DE TERMINE THE P ART NUMBE RS OF THE SYS TEM ACCUMULATORS NUMBERS 1, 2 , AND 3, A ND BRAKE MANDA TO RY
ACCUMULATORS NUMBE RS 2 AND 3 THA T ARE INSTALL ED ON THE AIRPLANE (THIS PARA RE STATE S THE
REQUIRE ME NTS OF P ARA (G ) O F AD 2 010-1 4-05)
MOS (EFF)
27-JUN-2019 HRS /MSC -
AFL

FAA 2019- 08-08 PA RA REPLA CE THE A CCUMUL ATO R WITH A NEW, OV ERHA UL ED, OR REFURB ISHED ACCUMULATOR WITH THE SA ME PA RT MANDA TO RY
(G)( 2)&(3) NUMBE R (THIS PARA RESTATES THE REQUIRE ME NTS OF P ARA (G ) O F AD 2010-1 4-05)
MOS (EFF)
27-JUN-2019 HRS /MSC -
AFL
FAA 2019- 08-08 PA RA (I) RELOCATE THE HYDRAULIC SYSTEM ACCUMULATORS A S SPECIFIED IN PA RA GRAPHS (I)( 1) THROUGH (I)(4) OF THIS MANDA TO RY
AD, AS AP PLICA BLE
MOS 60 (EFF) 27-J UN-20 24
27-JUN-2019 HRS /MSC
AFL 240 0 358 6
FAA 2019- 08-08 PA RA (J) REVISE THE MAINTENANCE OR INS PECTION PROGRAM, AS AP PLICA BLE, TO INCORPO RATE THE TASK S S PECIFIED IN MANDA TO RY COMPLIED WITH
FIG URE 2 TO PA RA (J) OF THIS AD
MOS 27-MAY -2019
27-JUN-2019 HRS /MSC - 174 7.9
AFL 114 5
FAA 2019- 12-09 NAVIGATION - FDSA -6500 TCAS - A FM OR AFMS LIMITATIONS SECTIO N - RE VIS IO N / PLA CA RD INSTALL ATION MANDA TO RY NOT A PPLICA BLE - BY PART NUMB ER
(SUPE RSE DE D BY FAA AD 2 021-05 -17)
DAYS 14-A UG -2019
23-JUL-20 19 HRS /MSC - 183 5.2
AFL 120 7
FAA 2019- 15-01 LANDING GE AR - MAIN LANDING GEAR SIDE STAY ACTUATO RS CONTAIN NON-CO NFORMING SP LIT BALL BEA RING MANDA TO RY NOT A PPLICA BLE - DUE TO S ERIAL NUMB ER O F
THE LH AND RH SIDE S TA Y A CTUATOR
MOS 26-JUN-2020
19-S EP-20 19 HRS /MSC - 193 6.4
AFL 128 6

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 31 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2020- 10-05 NAVIGATION - ROCKWELL COLLINS P RO LINE 4 AND PRO L INE 21 FL IGHT MANAG EMENT SYS TEMS MANDA TO RY NOT A PPLICA BLE - BY INSTALL ED FMCS
MOS 04-S EP-20 20
HRS /MSC - 199 7.9 7
AFL 134 4
FAA 2021- 07-06 NAVIGATION - INERTIA L REFERENCE SYSTEM (IRS) / FLIGHT MANAGEMENT S YSTEM (FMS) - WRONG MAGNETIC MANDA TO RY COMPLIED WITH
HEADING DIS PLAY ED DUE TO OUTDA TED MAGNETIC VARIA TION (MA GVAR) TA BLES
DAYS 27-A PR-2021
11-MAY -2021 HRS /MSC -
AFL
FAA 2021- 08-07 ROCKWELL COLLINS - GL OBAL PO SITIONING SYS TEM GPS -4000S - UPGRADE MANDA TO RY NOT A PPLICA BLE - By Pa rt: This AD is not
app lica ble for T7-EZE (5866 ) d ue to
PN:822-21 89-100 is not installed on a/c any time.
MOS
HRS /MSC -
AFL

FAA 2021- 08-07 PA RA (G) (1) REPLA CE EA CH GPS-4 000S GP S P /N 8 22-21 89-100 WITH A G PS THAT DO ES NO T HAVE P/N 82 2-2189 -100 MANDA TO RY NOT A PPLICA BLE - By Pa rt: This AD is not
app lica ble for T7-EZE (5866 ) d ue to
PN:822-21 89-100 is not installed on a/c any time.
MOS
12-MAY -2021 HRS /MSC
AFL

FAA 2021- 08-07 PA RA (G) (2) DO NO T INSTAL L G PS-40 00S GPS P/N 82 2-2189 -100 ON A NY AIRPLANE MANDA TO RY NOT A PPLICA BLE - By Pa rt: This AD is not
app lica ble for T7-EZE (5866 ) d ue to
PN:822-21 89-100 is not installed on a/c any time.
MOS
12-MAY -2021 HRS /MSC
AFL

FAA 2021- 13-12 TIME LIMITS/MA INTENANCE CHECK - MAINTENANCE / INSPE CTION P LAN - RE VIS E MANDA TO RY COMPLIED WITH
DAYS 14-MAR-2 022
09-S EP-20 21 HRS /MSC - 219 4.6
AFL 147 5
FAA 2021- 20-13 MLG SHOCK STRUT LO WER PINS: REPETITIVE LUBRICA TION, DETAIL ED VISUAL INS PECTIONS (DVI) , AND MANDA TO RY COMPLIED WITH
NON-DESTRUCTIVE TEST (NDT) INSPE CTIONS; REPLA CE ME NT IF NE CES SARY
MOS 14-MAR-2 022
18-NOV -2021 HRS /MSC - 219 4.6
AFL 147 5
FAA 2021- 20-13 PA RA (G) LH REP ETITIVE LUB RICATIO N LH MLG SHOCK STRUT LOWER P INS PN 1 9146-3 MANDA TO RY COMPLIED WITH
MOS 12 13-JUN-2022 13-J UN-20 23 RECURRING
18-NOV -2021 HRS /MSC 200 224 5.8 3 244 5.8 3
AFL 150 5
FAA 2021- 20-13 PA RA (G) RH REPETITIVE LUBRICA TION RH MLG S HO CK STRUT LOWER PINS PN 1 9146- 3 MANDA TO RY COMPLIED WITH
MOS 12 13-JUN-2022 13-J UN-20 23 RECURRING
18-NOV -2021 HRS /MSC 200 224 5.8 3 244 5.8 3
AFL 150 5
FAA 2021- 20-13 PA RA (H) LH DVI OF THE L H MLG SHOCK STRUT LO WER PINS HAV ING PN 1 9146-3 MANDA TO RY COMPLIED WITH
MOS 14-MAR-2 022
18-NOV -2021 HRS /MSC - 219 4.6
AFL 147 5

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 32 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2021- 20-13 PA RA (H) RH DVI OF THE RH MLG SHOCK STRUT L OWER PINS HAV ING PN 1 9146-3 MANDA TO RY COMPLIED WITH
MOS 14-MAR-2 022
18-NOV -2021 HRS /MSC - 219 4.6
AFL 147 5
FAA 2021- 20-13 PA RA (I) RH NDT INSP ECTION FOR CRACKING AND DAMAGE OF THE RH MLG SHOCK S TRUT LOWE R PINS HAVING PN 19 146-3 MANDA TO RY COMPLIED WITH
MOS 14-MAR-2 022 RECURRING
18-NOV -2021 HRS /MSC 219 4.6
AFL 900 147 5 237 5
FAA 2021- 20-13 PA RA (I) LH NDT INSPECTIO N FOR CRACKING AND DAMAG E O F THE LH ML G S HO CK STRUT LOWER PINS HAVING P N 191 46-3 MANDA TO RY COMPLIED WITH
MOS 14-MAR-2 022 RECURRING
18-NOV -2021 HRS /MSC 219 4.6
AFL 900 147 5 237 5
FAA 2021- 25-13 TIME LIMITS/MA INTENANCE CHECK S - MAINTENANCE OR INSPECTIO N PROGRAM - REV ISE MANDA TO RY
DAYS (EFF)
15-FEB -2022 HRS /MSC -
AFL
FAA 2021- 26-23 FUE L - ENGINE AND AUXILIA RY PO WE R UNIT E LECTRICA L FUEL PUMP CARTRIDGE/CANIS TER FUEL LE AKAG E MANDA TO RY
MOS
25-FEB -2022 HRS /MSC -
AFL
FAA 2021- 26-23 PA RA (G) & DO A G ENERAL VIS UA L INSPECTIO N FOR TRACES OF FUEL CO MING FROM THE LEFT-HAND AND RIGHT-HAND MANDA TO RY
(H) ENGINE B OOST PUMP S A T THE LO CA TION O F THE BE LLY FAIRING S CREW AND THE EFP ELE CTRICAL WIRING
CONDUIT OUTLET A T THE LO WER BO DY FAIRING ARE A FOR ENGINE EFPS AND A T THE RIGHT-HAND L ANDING L IGHT
COMPARTME NT FO R THE AP U EFP (RETA INED ACTIONS FROM 2017- 22-06)
MOS (EFF)
25-FEB -2022 HRS /MSC -
AFL
FAA 2021- 26-23 PA RA (I) DO A G ENERAL VIS UA L INSPECTIO N FOR ANY FUE L L EAK FRO M THE ENGINE AND APU EFP E LECTRICAL WIRING MANDA TO RY
CONDUIT OUTLETS; IF ANY LEA K IS FOUND, BE FO RE FURTHER FLIGHT CORRECT THE LEA K
MOS 12 (EFF) 25-FEB-20 23 RECURRING
25-FEB -2022 HRS /MSC 600 305 4.7 3
AFL
FAA 2021- 26-23 PA RA (J) DO A DETAILED VIS UA L INSPECTIO N OF THE APU FO R ANY DA MA GE OR DEFORMATIONS, AND MODIFY THE ENGINE MANDA TO RY
EFP INSTALL ATION; IF ANY DAMAGE OR DE FORMATIONS A RE FOUND, B EFORE FURTHER FLIGHT, DO THE RE PAIR
MOS 60 (EFF) 25-FEB-20 27
25-FEB -2022 HRS /MSC
AFL
FAA 2022- 09-01 ICE AND RAIN P RO TECTIO N - POTABL E WATER LINE RIB BON HEA TER FIRE RISK MANDA TO RY
MOS
31-MAY -2022 HRS /MSC -
AFL
FAA 2022- 09-01 PA RA (G) ACCOMPLISH A N INSP ECTION O F THE PO TA BLE WATER-LINE RIB BON HEA TER INSTALL ATION AND INS UL ATION TO MANDA TO RY
DETECT ANY DISCREPANCY, AND ALL APPL ICABL E CORRECTIVE ACTIO NS AND OTHER SPECIFIED ACTIONS (FO R
AIRPLANES WITH A SE RIAL NUMBE R LISTED IN SE CTION 1.A OF THE APPL ICABLE S ERV ICE INFORMATION SPECIFIED
IN FIGURE 1 TO PA RA (G) )
MOS 72 (EFF) 31-MAY-2 028
31-MAY -2022 HRS /MSC
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 33 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2022- 09-01 PA RA (H) ACCOMPLISH A PPLICA BLE ACTIONS INCLUDING AN INSPECTIO N FOR DISCRE PANCIES OF THE POTAB LE MANDA TO RY
WATER-LINE RIB BON HEA TE R AND REPA IR OF ANY DISCREPA NT POTABLE WATER-LINE RIBBON HE ATERS USING A
METHO D APP RO VED ( FO R AIRP LANES WITH A SE RIAL NUMBE R THA T IS NOT LIS TED IN SECTION 1.A O F THE SE RV ICE
INFORMATIO N SPE CIFIED IN FIGURE 1 TO PARA (G), A ND FO R BO MB ARDIER MODEL CL-60 0-1A11 AIRPLANES )
MOS 72 (EFF) 31-MAY-2 028
31-MAY -2022 HRS /MSC
AFL

FAA 2022- 10-10 ICE AND RAIN P RO TECTIO N - WING ANTI-ICE (WAI) SYSTEM - WING S TAL L P RIOR TO TOUCHDOWN DUE TO WING MANDA TO RY
LEA DING EDGE ICING
DAYS 60 (EB T) 03-S EP-20 22
05-JUL-20 22 HRS /MSC
AFL
NEW REQ UIREMENT ADDED ON 31-MAY- 2022 (EFFECTIVE: 0 5-JUL -2022) . RE VIEW BA SE TIMES TO ENSURE CO RRECT DUE TIMES.
FAA 72-19 -04 NI-CAD BATTERY CHARGER COMPLIED WITH - A T COMPLETION
MOS 25-MAR-2 011
HRS /MSC -
AFL
FAA 94-01 -04 TRA FFIC ALE RT + CO LLISIO N AVO IDANCE SYSTEM - VE RS IO N 6.04A LOG IC S B 4 06601 0-34-S W1 6 NOT A PPLICA BLE - PER A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC N/A
AFL
FAA 94-08 -15 TO PREVENT AS YMME TRIC DEPLO YMENT OR RETRACTION OF THE FLA PS
MOS
HRS /MSC N/A
AFL
FAA 94-14 -08 TO PREVENT LO SS OF EMERG PO WE R TO THE ESSE NTIAL BUS WHEN THE ADG IS DEPLO YED
MOS
HRS /MSC N/A
AFL
FAA 95-03 -06 TO PREVENT INADV ERTE NT SHUTDOWN OF AN ENGINE WHILE TA XIING
MOS
HRS /MSC N/A
AFL
FAA 97-24 -02 UNDERFLOO R PRESS URE BULKHEAD OF FUSELA GE SUPERSE DE D
39-1 0209 MOS
HRS /MSC N/A
AFL

FAA 97-24 -02 R1 DETAIL ED INSPECTIO N TO DETECT CRACKS AT FS 409.00 OF THE BULKHEAD WE B ( P/N 600-3 2014-1 05/-137)
PARAG RA PH (B )
MOS
HRS /MSC N/A
AFL

FAA 97-24 -02 R1 PRESS URE BULKHEAD - OPTIO NAL TERMINATING MODIFICATION MANDA TO RY
PARAG RA PH (C)
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 34 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 97-24 -02 R1 PRESS URE BULKHEAD - REP AIR THE CRACK . MANDA TO RY
PARAG RA PH (D)
MOS
HRS /MSC -
AFL
FAA 97-25 -11 R1 TO PREVENT THE CIRCUIT BREAK ERS O N THE BA TTERY BUS FROM OPENING DURING FLIGHT
MOS
HRS /MSC N/A
AFL
FAA 99-09 -52 CONCURRENT CHA FFING OF IDG HARNE SS
MOS
HRS /MSC A/R
AFL

FAA 99-09 -52 PARAGRAP H EMERGENCY AD - PERFORM A ONE-TIME VISUAL INS PECTION OF THE IDG CA BLE HARNES S IN THE RIGHT E NG INE MANDA TO RY
(C) NACELLE TO VERIFY CLEARANCES
MOS
HRS /MSC -
AFL

FAA 99-09 -52 PARAGRAP H EMERGENCY AD - FUE L MANIFO LD AND IDG WIRE - REP AIR THE CABLE JACKET MANDA TO RY
(C)(4)(I)
MOS
HRS /MSC -
AFL

FAA 99-09 -52 PARAGRAP H EMERGENCY AD - FUE L MANIFO LD AND IDG WIRE - REPLA CE THE CAB LE WITH A NEW CABLE MANDA TO RY
(C)(4)(II)
MOS
HRS /MSC -
AFL

FAA 99-09 -52 PARAGRAP H EMERGENCY AD - PERFORM A ONE-TIME VISUAL INS PECTION OF BO TH THE LEFT A ND RIGHT ENGINE NA CE LLES OF MANDA TO RY
(D) THE AREA SURROUNDING THE 10TH STAGE BL EED A IR CHECK VALV E A ND THE TOP AND BO TTOM PIG TA ILS OF THE
FUE L MANIFO LD TO VERIFY CLEARANCES AND DETECT CHAFING
MOS
HRS /MSC -
AFL

FAA 99-26 -16 PERFORM A GE NERAL VISUAL INS PECTION OF THE ROUTING OF THE MLG HY DRAULIC AND FUEL LINE S. MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 1996-2 1 NICAD BATTE RY OV ERHE AT NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E,
AIRCRAFT IS EQUIP PED WITH THE RMAL
RUNAWAY P ROTECTIO N PROVISION.
MOS 25-MAR-2 011
HRS /MSC N/A
AFL
TCCA CF- 1997-1 6 R1 PRESS URE BULKHEAD FRAME CRACK ING
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 35 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 1997-1 6 R2 LTA 1997- 343 R3 PRES SURE BULK HEA D FRA ME CRACKING NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 1997-1 6 REV 2 PRESS URE BULKHEAD FRAME CRACK ING
MOS
HRS /MSC N/A
AFL
TCCA CF- 1999-0 9 LTA 1999- 161 FUEL MANIFOL D AND IDG WIRE
MOS
HRS /MSC -
AFL
TCCA CF- 1999-0 9 R1 IDG CABL E NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC N/A
AFL
TCCA CF- 1999-1 4 TO PREVENT MLG FUE L L INE NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC N/A
AFL
TCCA CF- 2000-0 1 R1 LTA 2000- 038 R2 FUEL SERVICE PA NE L L IGHT WIRING NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER APPL ICABILITY REQ UIREMENTS. US FAA
STC SA 8060NM-D, SA8 072NM-D OR SA80 86NM- D
NOT INCO RP ORATE D
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 2000-0 1 R1 PART A REMOVAL OF ELECTRICAL POWER FROM REFUEL FLOO DL IGHT
MOS
HRS /MSC -
AFL
TCCA CF- 2000-0 1 R1 PART B RESTORATIO N OF POWER TO REFUE L FLOO DL IGHT MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2000-1 6 WOOD VENEER INSTALLA TIONS NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC N/A
AFL
TCCA CF- 2000-1 8 BOMBA RDIER - FLAP VANE CORRO SIO N MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 36 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2000-3 0 AILERON QUADRANTS ICE/SNOW A CCUMUL ATION - NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 2001-0 6 IDG CABL ES CHAFING ON CO WL DOO R - NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC N/A
AFL
TCCA CF- 2001-0 6 P ART A IDG CABL ES CHAFING ON CO WL DOO R - INSPE CTION AND REP AIR
MOS
HRS /MSC N/A
AFL
TCCA CF- 2001-0 6 P ART B IDG CABL ES CHAFING ON CO WL DOO R - INSTALLA TION OF PROTECTIV E HARDWARE
MOS
HRS /MSC N/A
AFL
TCCA CF- 2001-0 6 P ART C IDG CABL ES CHAFING ON CO WL DOO R - RE PORTING RE QUIREMENTS
MOS
HRS /MSC N/A
AFL
TCCA CF- 2001-0 7 C O F G SHIFT DUE TO FUEL MIGRATIO N NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 2002-0 5 AOA TRANSDUCER
MOS
HRS /MSC -
AFL
TCCA CF- 2002-0 5 R1 SPE CIAL CHE CK O F ANGLE OF ATTACK TRA NS DUCER NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
PART 6 00-59 154-3 COVERED BY TL MC PART 2.
MOS 25-MAR-2 011
HRS /MSC N/A
AFL

TCCA CF- 2002-0 5 R1 PART A SPE CIAL CHE CK O F ANGLE OF ATTACK TRA NS DUCER
MOS
HRS /MSC N/A
AFL
TCCA CF- 2002-0 5 R1 PART B TRA NS DUCER A SSEMBLY REWORK
MOS
HRS /MSC N/A
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 37 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2002-0 5 R1 PART C INTRODUCTION OF THE TLMC REPEA T INSP ECTIONS
MOS
HRS /MSC N/A
AFL
TCCA CF- 2002-3 7 BOMBA RDIER CHALLE NG ER (CL-60 4 ) - FLAP VANE BRACKETS MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 2002-3 7 P ART A SPE CIAL CHE CK - VISUAL INSP ECTION O F FLAP VANE BRACKETS
MOS
HRS /MSC N/A
AFL
TCCA CF- 2002-3 7 P ART B SPE CIAL CHE CK / MODIFICATIO N OF FLA P V ANE B RA CK ETS
MOS
HRS /MSC N/A
AFL
TCCA CF- 2002-3 7 P ART C VANE BRACKET RE PLACEMENT
MOS
HRS /MSC N/A
AFL
TCCA CF- 2002-4 3 BOMBA RDIER CHALLE NG ER (CL-60 4 ) - MAIN LANDING GEA R SIDE - SIDE-BRACE FITTING S HA FT MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 2002-4 3 P ART A REWORK - MLG SIDE-BRACE FITTING SHAFT RE PLACEMENT
MOS
HRS /MSC N/A
AFL
TCCA CF- 2002-4 3 P ART B SPE CIAL CHE CK / REWORK - MA IN LANDING GEAR SIDE -BRACE FITTING SHAFT INSPECTIO N
MOS
HRS /MSC N/A
AFL
TCCA CF- 2003-0 7 ANTI-ICE DUCT SYS TE M
MOS
HRS /MSC -
AFL
TCCA CF- 2003-2 0 BOMBA RDIER CL-6 00-2B1 6 ( CL- 604) (CHA LLENGER) - LIFE LIMITED LA NDING G EAR P ARTS MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 38 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2003-2 0R1 LIFE LIMITED LANDING GEAR PARTS NOT SERIALIZED MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2003-2 0R1 P ART A ADD LIFE LIMITE D LANDING GE AR PA RTS NOT SE RIALIZED SE RIAL NUMBE RS AND P ART NUMBE RS MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2003-2 0R1 P ART D REVISE LIFE LIMITED LANDING GEAR PARTS NOT SERIA LIZED TRANSPO RT CA NA DA AP PROVED MA INTENANCE MANDA TO RY
SCHEDUL E
MOS
HRS /MSC -
AFL
TCCA CF- 2003-2 0R1 P ART E ADD LIFE LIMITE D LANDING GE AR PA RTS NOT SE RIALIZED SE RIAL NUMBE RS AND P ART NUMBE RS MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2003-2 1 R2 LIFE LIMITED LDG P ARTS
MOS
HRS /MSC A/R
AFL
TCCA CF- 2003-2 1R2 LIFE LIMITED LANDING GEAR PARTS NOT SERIALISED MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2003-2 1R2 P ART A ADD LIFE LIMITE D LANDING GE AR PA RTS NOT SE RIALISED SERIA L NUMBERS AND PART NUMBERS MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2003-2 1R2 P ART B ADD LIFE LIMITE D LANDING GE AR PA RTS NOT SE RIALISED SERIA L NUMBERS AND PART NUMBERS MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2003-2 1R2 P ART E REVISE LIFE LIMITED LANDING GEAR PARTS NOT SERIA LIS ED TRANSPORT CANADA APPROV ED MAINTENANCE MANDA TO RY
SCHEDUL E
MOS
HRS /MSC -
AFL
TCCA CF- 2003-2 1R2 P ART F ADD LIFE LIMITE D LANDING GE AR PA RTS NOT SE RIALISED SERIA L NUMBERS AND PART NUMBERS MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2003-2 1R2 P ART G ADD LIFE LIMITE D LANDING GE AR PA RTS NOT SE RIALISED SERIA L NUMBERS AND PART NUMBERS MANDA TO RY
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 39 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2004-2 2 ANGLE OF ATTA CK VA NE - P/N 600 -59154 -5 NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C PER PARTS NUMBER INSTALLED.
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 2004-2 2 P ART B TRA NS DUCER L INEARITY CHECK ( 600-59 154-5) MANDA TO RY
MOS
HRS /MSC N/A
AFL
TCCA CF- 2005-0 3 COLD WE ATHER OPERATION - AFM CHANGE NOT A PPLICA BLE - THIS A D. IS NOT
APP LICAB LE, PS P-604 -1 A FM RE PLACED BY
PSP -605-1 AFM
MOS 25-MAR-2 011
HRS /MSC -
AFL

TCCA CF- 2005-0 6 CORRO SION PREV ENTION A ND CO NTROL PROGRAM (CPCP )
MOS
HRS /MSC N/A
AFL
TCCA CF- 2005-2 0 HORIZONTAL STABILIZER TRIM ACTUATO R (HSTA) - L OWER GIMB AL PIN NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC A/R
AFL
TCCA CF- 2005-2 1 RUDDER BALANCE SPRING ASS EMBLY
MOS
HRS /MSC -
AFL
TCCA CF- 2005-2 1 R1 RUDDER BALANCE SPRING ASS EMBLY MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC N/A
AFL
TCCA CF- 2006-1 6 NOSE LANDING GE AR (NLG) AND NOS E G EAR DOO R SE LECTO R VAL VES MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2006-1 6 R1 NOSE LANDING GE AR (NLG) AND NOS E G EAR DOO R SE LECTO R VAL VES MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2006-1 6 R2 UNCOMMANDED PA RTIAL RE TRACTIO NS OF THE NOSE LANDING GE AR - PREVENT INTERNAL LE AKAG E O F THE
SEL ECTO R VAL VE
MOS
HRS /MSC A/R
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 40 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2006-2 1 HORIZONTAL STABILIZER TRIM UNCO MMANDED MOTION


MOS
HRS /MSC -
AFL
TCCA CF- 2006-2 1 REV 1 HORIZONTAL STABILIZER TRIM - UNCOMMANDED MOTIO N NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC N/A
AFL

TCCA CF- 2006-2 1 REV 1 HORIZONTAL STABILIZER TRIM - UNCOMMANDED MOTIO N


PART 1
MOS
HRS /MSC -
AFL

TCCA CF- 2006-2 1 REV 1 HORIZONTAL STABILIZER TRIM - UNCOMMANDED MOTIO N


PART 2
MOS
HRS /MSC -
AFL
TCCA CF- 2008-1 2 STICK PUSHER CA PSTAN FAILURE MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 2008-1 6 P ART I ENHANCE ME NT TO TAKE OFF OPE RATIONAL SAFETY MA RG INS - A FM CHANGE S SUPERSE DE D
MOS
HRS /MSC -
AFL
TCCA CF- 2008-1 6 P ART II ENHANCE ME NT TO TAKE OFF OPE RATIONAL SAFETY MA RG INS - O PERATOR'S P ILO T'S CHE CK LIS T SUPERSE DE D
MOS
HRS /MSC -
AFL

TCCA CF- 2008-1 6 R01 PA RT ENHANCE ME NT TO TAKE OFF OPE RATIONAL SAFETY MA RG INS - A FM CHANGE S. MANDA TO RY COMPLIED WITH - INSERTIO N OF TR 6 05/1-2, IN
I AFM P SP 605-1
MOS 25-MAR-2 012
HRS /MSC -
AFL

TCCA CF- 2008-1 6 R01 PA RT ENHANCE ME NT TO TAKE OFF OPE RATIONAL SAFETY MA RG INS - O PERATOR'S P ILO T'S CHE CK LIS T. MANDA TO RY COMPLIED WITH
II
MOS 25-MAR-2 012
HRS /MSC -
AFL
TCCA CF- 2008-1 8 P ARA (A ) WING ANTI-ICE P ICCOLO DUCTS - AME ND THE AFM NORMAL AND AB NO RMAL PROCEDURE . MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 41 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2008-1 8 P ARA (B ) WING ANTI-ICE P ICCOLO DUCTS - CHECK AIRCRAFT MAINTENANCE RECORDS TO DETERMINE IF ANY A NTI-ICE MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PICCO LO DUCTS O R COMPLETE LEADING E DG E S ECTIONS HA VE BEEN RE PLACE SINCE 1 AUGUST 20 00. PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 2008-1 8 P ARA (C) WING ANTI-ICE P ICCOLO DUCTS - VIS UA LLY CHECK THE PICCO LO DUCTS AND REPLACE THE M, AS DE TERMINE MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
NECESSA RY . PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 2008-3 2 R2 LTA 2008- 392 ENGINE THRO TTLE GEA RB OX WE AR INSPECTIO N COMPLIED WITH - CH605 TLMC COMPLIES WITH
INTENT O F THIS AD.
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 2008-3 2 REV 2 ENGINE THROTTLE CONTRO L G EARBOX WEAR INSP ECTION MANDA TO RY COMPLIED WITH
MOS 25-MAR-2 012
HRS /MSC -
AFL
TCCA CF- 2009-2 1 NOSE LANDING GE AR SE LECTO R VAL VE & NOS E GEAR SELECTOR V ALVE END CAP S - INCORRECT AS SEMBLY - MANDA TO RY
INS PECT VAL VES ON A/C & REP LACE/RE WO RK /IDENTIFY A S REQ UIRED
MOS
HRS /MSC -
AFL
TCCA CF- 2009-2 1R1 NOSE LANDING GE AR SE LECTO R VAL VE AND NOSE GEA R DOOR SELECTOR VALVE END CAP S - INCORRECT MANDA TO RY NOT A PPLICA BLE - THIS A D. SUPERSEDES AND
ASS EMBLY CANCE LS AD. CF-2 006-16 R1 DATED 4 JUNE 200 7
AND CF-2009 -21. THIS AD IS NOT A PPLICABLE
PER A/C S/N
MOS 25-MAR-2 011
HRS /MSC -
AFL

TCCA CF- 2009-2 4 AIR DRIVE N GENERATOR - S TRUT CRACKING. MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 2009-2 4 P ART I PERFORM AIR DRIV EN GE NE RA TO R - STRUT CRACKING . IDENTIFICA TION CHECK MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2009-2 4 P ART II PERFORM AIR DRIV EN GE NE RA TO R - STRUT CRACKING . INITIAL FLUORESCENT PENETRANT INS PECTION. MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2009-2 4 P ART III PERFORM AIR DRIV EN GE NE RA TO R - STRUT CRACKING . RE PEAT FL UO RE SCE NT PENETRANT INSP ECTIONS. MANDA TO RY
MOS
HRS /MSC A/R
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 42 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2009-2 4 P ART IV PERFORM AIR DRIV EN GE NE RA TO R - STRUT CRACKING . INSP ECTION A FTER AN UNSCHEDULED IN-FLIGHT ADG MANDA TO RY
DEPLO YMENT.
MOS
HRS /MSC A/R
AFL
TCCA CF- 2009-2 4 P ART V PERFORM AIR DRIV EN GE NE RA TO R - STRUT CRACKING . INSP ECTION A FTER AN UNSCHEDULED ON-GROUND ADG MANDA TO RY
DEPLO YMENT.
MOS
HRS /MSC A/R
AFL
TCCA CF- 2009-2 4 P ART VI PERFORM AIR DRIV EN GE NE RA TO R - STRUT CRACKING . RE -IDENTIFICA TION MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2009-2 4 P ART VII PERFORM AIR DRIV EN GE NE RA TO R - STRUT CRACKING . RE PLACEMENT P ARTS. MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2009-3 9 HYDRA UL IC ACCUMUL ATORS - SCREW CAP /END CAP FAILURE MANDA TO RY COMPLIED WITH
MOS 25-MAR-2 012
10-NOV -2009 HRS /MSC -
AFL
TCCA CF- 2009-3 9 P ART I IDE NTIFICATION HY DRAULIC ACCUMULA TO RS - SCRE W CAP/END CAP FAIL URE AND RECORDS CHECK MANDA TO RY NOT A PPLICA BLE - A. NOT A PPLICABLE PER A/C
SERIAL NUMBER.
B. A T THIS TIME THE ACCUMULATORS FL IG HT
CYCLES ARE EQUIVALENT IN A /C CYCLE S.
MOS 25-MAR-2 011
10-NOV -2009 HRS /MSC -
AFL

TCCA CF- 2009-3 9 P ART II & PERFORM HYDRAULIC ACCUMULATORS - S CREW CA P/E ND CA P FAILURE INITIAL RE PLACEMENT / REP EAT MANDA TO RY
III REPLA CE ME NT
MOS
10-NOV -2009 HRS /MSC -
AFL
TCCA CF- 2009-3 9 R01 HYDRA UL IC POWER - HYDRA UL IC ACCUMULATORS S CREW CA P/END CAP FA ILURE MANDA TO RY
MOS
27-O CT-20 17 HRS /MSC - (s)
AFL
TCCA CF- 2009-3 9 R01 PA RT IDE NTIFICATION AND RECORDS CHECK MANDA TO RY
I
MOS
27-O CT-20 17 HRS /MSC -
AFL
TCCA CF- 2009-3 9 R01 PA RT INITIAL REPL ACEMENT & RE PEAT REP LACEMENT MANDA TO RY
II & III
MOS (EFF) RECURRING
27-O CT-20 17 HRS /MSC
AFL 375 0 467 9

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 43 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2009-3 9 R01 PA RT TERMINATIO N OF REP ETITIV E REP LACEMENT MANDA TO RY
IV
MOS
27-O CT-20 17 HRS /MSC - (s)
AFL

TCCA CF- 2009-3 9 R01 PA RT RELOCATION O F ACCUMULATORS MANDA TO RY


V
MOS 60 (EFF) 27-O CT-20 22
27-O CT-20 17 HRS /MSC
AFL 240 0 332 9
TCCA CF- 2009-4 4 EMERGENCY LOCATOR TRANSMITTER - PO TENTIA L FAILURE TO TRA NS MIT THE RE QUIRED 4 06MHZ CODED SIGNAL MANDA TO RY
MOS
HRS /MSC -
AFL
TCCA CF- 2009-4 9 WING LEA DING EDG E THERMAL SWITCHES AND WING ANTI-ICE DUCT PICCOL O TUBES - AIRWORTHINESS MANDA TO RY
LIMITATIO N TASKS
MOS
25-JAN-20 10 HRS /MSC -
AFL
TCCA CF- 2009-4 9 R01 WING LEA DING EDG E THERMAL SWITCHES AND WING ANTI-ICE DUCT PICCOL O TUBES - AIRWORTHINESS MANDA TO RY COMPLIED WITH - THE INCORPORATED O F NEW
LIMITATIO N TASKS CMRT TAS KS 30-11 -00-10 1 A ND 36-21- 00-101
INTO TLMC
MOS 25-MAR-2 012
HRS /MSC -
AFL

TCCA CF- 2009-5 0 AIR-DRIVEN GENERATOR (A DG ) - NON-CONFORMING BA LANCE WAS HE R SCREWS MANDA TO RY COMPLIED WITH
MOS 25-MAR-2 012
25-JAN-20 10 HRS /MSC -
AFL
TCCA CF- 2009-5 0 P ART I IDE NTIFICATION AIR-DRIV EN GE NE RA TO R (ADG) - NO N-CONFORMING BALA NCE WASHER SCREWS CHECK MANDA TO RY NOT A PPLICA BLE - NO T APP LICAB LE PER A /C
SERIAL NUMBER.
MOS 25-MAR-2 011
25-JAN-20 10 HRS /MSC -
AFL
TCCA CF- 2009-5 0 P ART II REPLA CE ME NT AIR-DRIV EN GE NE RATOR (ADG) - NON-CONFORMING BALA NCE WASHER S CREWS OF THE BALA NCE MANDA TO RY NOT A PPLICA BLE - NO T APP LICAB LE PER A /C
WASHER SCREWS AND IDENTIFICATION OF THE ADG SERIAL NUMBER.
MOS 25-MAR-2 011
25-JAN-20 10 HRS /MSC -
AFL
TCCA CF- 2010-2 5 AC ELECTRICAL LOAD DISTRIB UTION MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
PER A/C SERIAL NUMBER.
MOS 25-MAR-2 011
24-A UG -2010 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 44 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2010-2 5 P ART (A) INS PECTION AC EL ECTRICA L L OAD DISTRIBUTION OF LO OSE AND IMPROPERLY CRIMPED TE RMINA L L UG MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
CONNE CTIONS AND FORFOD IN CB P-1 AND REPLA CE ME NT OR RELO CA TION OF BUS BARS: - AP PLICA BLE TO SERIA L PER A/C SERIAL NUMBER.
NUMBE RS 57 01 THROUGH 5 752, 57 54 THROUGH 5 775, 5 777, 57 80 THROUGH 5 781, 5 783 THROUGH 5 790, 5 792, 57 94
THROUGH 5796 , 5798, 5801, AND 5804
MOS 25-MAR-2 011
24-A UG -2010 HRS /MSC -
AFL
TCCA CF- 2010-2 5 P ART (B) INS PECTION AC EL ECTRICA L L OAD DISTRIBUTION OF LO OSE AND IMPROPERLY CRIMPED TE RMINA L L UG MANDA TO RY NOT A PPLICA BLE - THIS A D. IS NOT A PPLICA BLE
CONNE CTIONS AND FOR FOD IN CBP -2, CBP-3, CB P-4, JB17 AND JB1 8: -APP LICAB LE TO SE RIAL NUMBE RS 57 01 PER A/C SERIAL NUMBER.
THROUGH 5752 , 5754 THROUGH 5756 , 5758 THRO UG H 5775 , 5779 , 5781, 5788, 5789, 5792, 5 795, 5 798, 5 801 AND 580 4
MOS 25-MAR-2 011
24-A UG -2010 HRS /MSC -
AFL
TCCA CF- 2011-0 3 SECURITY CONCERNS WITH CHEMICAL OXY GEN G ENERATORS INSTALLED IN THE LAV ATORIES NOT INSTALLED NOT A PPLICA BLE - THIS A .D. IS NO T
APP LICAB LE. LA VATORY OXYG EN GE NE RA TOR
NOT INSTALLED.
MOS 25-MAR-2 011
HRS /MSC N/A
AFL

TCCA CF- 2011-0 3 R1 SECURITY CONCERNS WITH THE CHEMICAL OX YGEN GENERATORS INSTALL ED IN THE LA VATORIE S NOT A PPLICA BLE - DUE TO E QUIPMENT NO T
INS TAL LED IN THE LAV
MOS 07-MAY -2013
HRS /MSC - 553 .4
AFL 225
TCCA CF- 2011-0 3 R2 SECURITY CONCERNS WITH THE CHEMICAL OX YGEN GENERATORS INSTALL ED IN THE LA VATORIE S NOT A PPLICA BLE - DUE TO E QUIPMENT NO T
INS TAL LED IN THE LAV
MOS 07-MAY -2013
HRS /MSC - 553 .4
AFL 225
TCCA CF- 2011-0 8 AIR-DRIVEN GENERATOR EL ECTRICA L P OWER FEEDER CA BLE – POTENTIAL FAILURE DUE TO CORRO SIO N MANDA TO RY NOT A PPLICA BLE - THIS A .D. IS NO T
APP LICAB LE PER A /C SERIA L NUMBER.
MOS 31-MAR-2 012
HRS /MSC - 6.4
AFL 5
TCCA CF- 2011-1 1 OXY GEN SUP PLY SYS TE M - DE FORMATION OF THE PRESS URE REGULATOR O N THE O XYGE N CYLINDER AND MANDA TO RY NOT A PPLICA BLE - THIS A .D. IS NO T
REGULATOR ASSE MB LY AND INSTAL LATION OF P RO TECTION ON THE ELE CTRICAL WIRING HARNESS APP LICAB LE PER A /C SERIA L NUMBER.
MOS 31-MAR-2 012
17-JUN-2011 HRS /MSC - 6.4
AFL 5
TCCA CF- 2011-1 1 P ART I & II INS PECTION OXYG EN SUPP LY SYSTEM - DEFORMATION OF THE PRE SSURE REG UL ATOR ON THE OXY GEN MANDA TO RY NOT A PPLICA BLE - THIS A .D. IS NO T
CYLINDER AND REGULATOR ASSE MB LY AND INSTAL LATIO N OF P RO TE CTION ON THE ELE CTRICAL WIRING HARNESS APP LICAB LE PER A /C SERIA L NUMBER.
OF THE OXY GEN P RES SURE REGULA TO R SERIAL NUMBER - REP LACEMENT OF THE AFFE CTED OXYG EN CRA
MOS 31-MAR-2 012
17-JUN-2011 HRS /MSC - 6.4
AFL 5

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 45 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2011-1 1 P ART III INS PECTION OXYG EN SUPP LY SYSTEM - DEFORMATION OF THE PRE SSURE REG UL ATOR ON THE OXY GEN MANDA TO RY NOT A PPLICA BLE - THIS A .D. IS NO T
CYLINDER AND REGULATOR ASSE MB LY AND INSTAL LATIO N OF P RO TE CTION ON THE ELE CTRICAL WIRING HARNESS APP LICAB LE PER A /C SERIA L NUMBER.
OF THE ELECTRICAL HARNE SS, AP PLICA BLE TO A EROPLANE SERIAL NUMBE RS 570 1 THROUGH 57 78, 578 0 THROUGH
579 6, 579 8, 5800 THRO UG H 580 2, 5804 , 5805 , 5808 , 5811 , AND 581 3
MOS 31-MAR-2 012
17-JUN-2011 HRS /MSC - 6.4
AFL 5

TCCA CF- 2011-1 6 NUISA NCE INDICATION O F FAIL ED WING ANTI-ICE SYSTEM MANDA TO RY NOT A PPLICA BLE - THIS A .D. IS NO T
APP LICAB LE PER A /C SERIA L NUMBER.
MOS 31-MAR-2 012
HRS /MSC - 6.4
AFL 5
TCCA CF- 2011-2 5 AIR DRIVE N GENERATOR FA ILURE TO PO WER ES SENTIAL BUSES MANDA TO RY NOT A PPLICA BLE - THIS A .D. IS NO T
APP LICAB LE PER A /C SERIA L NUMBER.
MOS 31-MAR-2 012
13-A UG -2011 HRS /MSC - 6.4
AFL 5
TCCA CF- 2011-3 3 ENGINE S UP PORT BE AM - CRACKING ON THE UPP ER AND L OWER WEB MANDA TO RY COMPLIED WITH
MOS 31-MAR-2 012
HRS /MSC - 6.4
AFL 5
TCCA CF- 2011-3 7 LEFT HAND E NG INE FUEL CONTRO L INPUT LEV ER JAMMING MANDA TO RY COMPLIED WITH - INCORPORATED @
BOMBA RDIER
MOS 08-A PR-2013
10-NOV -2011 HRS /MSC - 536 .7
AFL 220
TCCA CF- 2011-4 5 HORIZONTAL STABILIZER TRIM ACTUATO R ATTACHMENT P INS AND TRUNNIO NS NOT S ERIAL IZED
MOS
HRS /MSC -
AFL
TCCA CF- 2011-4 5 P ART A INS PECT HORIZONTAL STABILIZER TRIM ACTUATO R ATTACHMENT P INS AND TRUNNIO NS NOT S ERIAL IZED A ND ADD
SERIAL NUMBERS AND NEW PART NUMB ERS
MOS
HRS /MSC -
AFL
TCCA CF- 2011-4 5 P ART B AMEND HORIZO NTAL STABILIZE R TRIM A CTUATOR A TTACHME NT PINS AND TRUNNIONS NOT SERIA LIZED
TRA NS PORT CANADA APPROVE D MAINTENANCE SCHEDULE
MOS
HRS /MSC -
AFL
TCCA CF- 2012-3 0 AIR DATA CO MP UTER - E RRONEOUS AIRSPEED AND AL TITUDE INDICATIONS MANDA TO RY COMPLIED WITH - A S P ER SB 60 5-34-0 27 R1
MOS 21-FEB -2013
21-DEC-20 12 HRS /MSC - 457 .2
AFL 188
TCCA CF- 2013-1 8 HORIZONTAL STAB TRIM ACTUA TO R (HSTA) - L OOSE BO LTS O N THE SP UR GEAR MANDA TO RY COMPLIED WITH
MOS 29-MAR-2 018
30-JUL-20 13 HRS /MSC - 153 4.3
AFL 988

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 46 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2013-1 8 P ART HORIZONTAL STAB TRIM ACTUA TO R (HSTA) - L OOSE BO LTS O N THE SP UR GEAR TIME LIMIT MAINTENANCE CHECKS MANDA TO RY NOT A PPLICA BLE
(II)( A) CHA NG E - AMEND THE TRANSP ORT CANADA A PPROVED MAINTENANCE S CHEDULE
DAYS 29-S EP-20 13
30-JUL-20 13 HRS /MSC - 766 .9
AFL 313

TCCA CF- 2013-1 8 P ART HORIZONTAL STAB TRIM ACTUA TO R (HSTA) - L OOSE BO LTS O N THE SP UR GEAR TIME LIMIT MAINTENANCE CHECKS MANDA TO RY COMPLIED WITH
(II)( B) CHA NG E - - P ERFO RM TA SK 27-41 -00-10 1
MOS 14-MAR-2 022 RECURRING
30-JUL-20 13 HRS /MSC 400 219 4.6 259 4.6
AFL 147 5
TCCA CF- 2013-1 8 P ART I HORIZONTAL STAB TRIM ACTUA TO R (HSTA) - L OOSE BO LTS O N THE SP UR GEAR AIRPL ANE FLIGHT MANUAL CHANGE MANDA TO RY
DAYS 29-S EP-20 13
30-JUL-20 13 HRS /MSC - 766 .9
AFL 313
TCCA CF- 2013-1 8 P ART III HORIZONTAL STAB TRIM ACTUA TO R (HSTA) - L OOSE BO LTS O N THE SP UR GEAR HS TA REPL ACE ME NT MANDA TO RY COMPLIED WITH
MOS 26-A PR-2015
30-JUL-20 13 HRS /MSC - 107 0.7 7
AFL 688
TCCA CF- 2013-2 2 RUDDER CONTROLS - YAW DAMPE R UNCOMMANDED MOV EMENT MANDA TO RY COMPLIED WITH - A FM AMENDE D, CREW ARE
HAS BEEN ADVISED TO REVIEW THE AD AND
AFM
DAYS 18-A UG -2013
23-A UG -2013 HRS /MSC - 724 .4
AFL 294

TCCA CF- 2013-3 9 INB OARD FLAP HINGE BO X - MISSING FASTENER HEA D ON FO RWARD A TTACHME NT FITTING (SUPERSEDED BY TCCA MANDA TO RY NOT A PPLICA BLE - SUPERSEDED BY TCCA AD
AD CF-201 4-27) CF- 2014-2 7
MOS 10-A PR-2014
HRS /MSC - 766 .9
AFL 313
TCCA CF- 2013-3 9 P ARA DETAIL ED VISUAL INS PECTION OF EA CH INBOA RD FL AP FA STENER OF THE HINGE- BOX FORWA RD FITTING A T WS MANDA TO RY COMPLIED WITH - S B A 605-5 7-004 R2 PART A ,B
(A)( B) 76.50 AND WS 127.25, ON BO TH WINGS
MOS 10-A PR-2014
HRS /MSC - 766 .9
AFL 313
TCCA CF- 2013-3 9 P ARA (C) REMOVE AND REP LACE A LL INCORRE CTLY ORIENTE D FORWA RD AND AFT FASTENERS AT WS 76.50 & WS 1 27.2 5, ON MANDA TO RY NOT A PPLICA BLE - SUPERSEDED BY TCCA AD
BOTH WINGS CF- 2014-2 7
MOS 10-A PR-2014
HRS /MSC - 766 .9
AFL 313
TCCA CF- 2014-0 1 FLAP HINGE BO X - NON-CONFO RMING FORWARD LUGS EDGE DIS TA NCE MANDA TO RY COMPLIED WITH
MOS 15-A PR-2014
17-JAN-20 14 HRS /MSC - 766 .9
AFL 313
TCCA CF- 2014-0 1 P ARA AMEND THE TRANSPO RT CA NA DA AP PROVED MA INTENANCE SCHEDUL E B Y INCORPORATING THE AP PLICA BLE MANDA TO RY COMPLIED WITH
(A)( B) TLMC AWL TA SK
DAYS 15-A PR-2014
17-JAN-20 14 HRS /MSC - 766 .9
AFL 313

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 47 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2014-0 1 P ARA MEASURE THE FORWA RD LUG EDGE DISTANCE O F ALL FLAP HINGE BO XES & CO NTACT B OMBARDIER CUSTOMER MANDA TO RY COMPLIED WITH
(C)(D) SUPPO RT ENGINEE RING FO R AN A PPROVE D REPAIR AND INCORPORATE THE REPAIR, IF THE LUG EDGE DISTANCE
IS B ELOW THE LIMIT S PECIFIED / A CRACK / DAMAGE IS FO UND
MOS 15-A PR-2014
17-JAN-20 14 HRS /MSC - 766 .9
AFL 313
TCCA CF- 2014-0 5 INTEG RATED DRIVE GENERATOR WIRE CHAFING IN AFT EQ UIPMENT BA Y MANDA TO RY COMPLIED WITH
MOS 15-A PR-2014
03-FEB -2014 HRS /MSC - 766 .9
AFL 313
TCCA CF- 2014-0 5 R01 ELE CTRICAL PO WE R – INTEGRATED DRIVE GENERATOR WIRE CHAFING IN AFT EQUIPMENT BAY MANDA TO RY COMPLIED WITH - B Y O RIGINAL ISS UE
MOS 05-NOV -2014
03-FEB -2014 HRS /MSC -
AFL
TCCA CF- 2014-1 5 HYDRA UL IC POWER - MAIN LANDING GE AR ALTERNATE EXTENSION SY STE M RESERVO IR – L EAKAG E DUE TO MANDA TO RY NOT A PPLICA BLE - BY A/C MODEL
INCORRECT LID AS SEMBLY
MOS 26-JUN-2014
HRS /MSC -
AFL
TCCA CF- 2014-1 7 EMERGENCY AD - ADDITIONAL LIMITA TION FOR LANDING/TAXI LIGHT O PERATIONS ON GROUND DUE TO POTENTIAL MANDA TO RY COMPLIED WITH - A FM RE VISED
FUE L L EAKA GE
DAYS 18-JUN-2014
17-JUN-2014 HRS /MSC - 776 .3
AFL 317
TCCA CF- 2014-2 1 EMERGENCY AD - FUE L - FUEL LEAK FRO M THE A UX ILIARY POWER UNIT FUE L B OOST PUMP EL ECTRICAL CONDUIT MANDA TO RY NOT A PPLICA BLE - BY A/C MSN.
IN THE RIGHT LANDING LIGHT COMPARTME NT
MOS 10-JUL-20 14
10-JUL-20 14 HRS /MSC - 805 .03
AFL 341
TCCA CF- 2014-2 1 P ART I INS PECT THE RIGHT HAND LANDING LIGHTS COMPARTMENT FOR ANY FUE L L EAKS FROM THE A PU FUEL BP MANDA TO RY NOT A PPLICA BLE - BY A/C MSN.
CONDUIT OUTLET
MOS 10-JUL-20 14
10-JUL-20 14 HRS /MSC - 805 .03
AFL 341
TCCA CF- 2014-2 1 P ART II INS PECT AND REP LACE THE CO NNECTOR O N THE A PU FUE L B P CANISTER MANDA TO RY NOT A PPLICA BLE - BY A/C MSN.
MOS 10-JUL-20 14
10-JUL-20 14 HRS /MSC - 805 .03
AFL 341
TCCA CF- 2014-2 7 EMERGENCY AD - WINGS - INBO ARD FLAP HINGE BO X – MIS SING FASTENER HEA D ON FO RWARD A TTACHME NT MANDA TO RY COMPLIED WITH - P ART A ONLY INSP ECTION
FITTING
MOS 20-A UG -2014
15-A UG -2014 HRS /MSC -
AFL

TCCA CF- 2014-2 7 P ARA DETAIL ED VISUAL INS PECTION OF EA CH INBOA RD FL AP FA STENER OF THE HINGE- BOX FORWA RD FITTING A T WS MANDA TO RY COMPLIED WITH
(A)( B) 76.50 AND WS 127.25, ON BO TH WINGS
MOS 09-S EP-20 14
15-A UG -2014 HRS /MSC - 846 .63
AFL 393

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 48 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2014-2 7 P ARA (C) REMOVE AND REP LACE A LL INCORRE CTLY ORIENTE D FORWA RD AND AFT FASTENERS AT WS 76.50 & WS 1 27.2 5, ON MANDA TO RY COMPLIED WITH - S EE AS RE F SB A60 5-57-0 04
BOTH WINGS PART B TERMINATING ACTION
MOS 19-S EP-20 14
15-A UG -2014 HRS /MSC - 854 .18
AFL
TCCA CF- 2014-2 7 R01 EMERGENCY AD - WINGS - INBO ARD FLAP HINGE BO X – MIS SING FASTENER HEA D ON FO RWARD A TTACHME NT MANDA TO RY COMPLIED WITH - B Y TERMINATION A CTION
FITTING DUE TO ACCOMPLISHME NT SB A605-5 7-004
MOS 18-S EP-20 14
29-A UG -2014 HRS /MSC - 854 .3
AFL 403

TCCA CF- 2014-2 7 R01 PA RA DVI OF EACH INBOARD FLAP FASTENER OF THE HING E-BO X FORWARD FITTING AT WS 76 .50 AND WS 127 .25 , ON MANDA TO RY COMPLIED WITH - B Y TERMINATION A CTION
(A)( B) BOTH WINGS /REMOV E A ND RE PLACE IF FA STENE R IS FOUND FRACTURED AND AL L FORWARD AND A FT DUE TO ACCOMPLISHME NT SB A605-5 7-004
FASTENERS AT WS 76.50 & WS 127 .25 , ON B OTH WINGS / REPE AT AS NECESS ARY PART B
MOS 18-S EP-20 14
29-A UG -2014 HRS /MSC - 854 .3
AFL 403

TCCA CF- 2014-2 7 R01 PA RA REMOVE AND REP LACE A LL FO RWARD A ND AFT FASTENERS AT WS 76.50 & WS 127 .25 , ON B OTH WINGS MANDA TO RY COMPLIED WITH - B Y TERMINATION A CTION
(C) DUE TO ACCOMPLISHME NT SB A605-5 7-004
PART B
MOS 18-S EP-20 14
29-A UG -2014 HRS /MSC - 854 .3
AFL 403
TCCA CF- 2014-3 0 FLIG HT CONTROLS - HORIZONTAL STABILIZER TRIM ACTUA TO R (HSTA) - INCO RP ORATION OF NEW AIRWORTHINESS MANDA TO RY COMPLIED WITH
LIMITATIO NS
DAYS 19-S EP-20 14
19-S EP-20 14 HRS /MSC - 854 .3
AFL 403
TCCA CF- 2015-0 9 NACELLE /PY LON - NON-CONFO RMING BUSHING HOL ES ON THE E NG INE MOUNT RIB MANDA TO RY COMPLIED WITH - TLMC A IRWORTHINESS
LIMITATIO NS (AWL) TASK 54 -50-00 -103 ALREADY
INCORPO RA TED IN APPROV ED AMP, NO
FUTHER A CTION REQUIRED
DAYS 19-MAY -2015
19-MAY -2015 HRS /MSC - 109 2.9 3
AFL 709

TCCA CF- 2015-0 9 R01 NACELLE /PY LON – NON-CONFO RMING B US HING HOL ES ON THE E NG INE MOUNT RIB MANDA TO RY NOT A PPLICA BLE - PERFORMED AD CF-2015 -09
REV1 NACELLED /P YLON - NON-CONFORMING
BUSHING HOLE S O N THE ENGINE MO UNT RIB -
REV 1 ISS UE D TO REMOV E CL-6 00-1A 11
AIRCRAFT FROM A PPLICABILITY. NO ACTIO N
REQUIRE D FOR R1.AS PER CUSTOMER'S
ATTACHE D SHEET TLMC ALREADY AMME NDED
AND TASK 54 -50-00 -103 INCLUDED IN THE A MP
DATED-
08/02/15
DAYS 14-A PR-2016
13-JUL-20 15 HRS /MSC - 131 3.0 2
AFL 851

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 49 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2015-2 6 FUE L - CHAFFING O F THE AUXILIARY POWER UNIT NE GATIV E-G FUE L FEED DRAIN L INE MANDA TO RY COMPLIED WITH - C/W AD CF-20 15-26 BY
PERFORMED SB 60 5-28-0 09 PART A AND B FOR
SPE CIAL CHE CK / MODIFICATIO N - APU
FUE L-FEED S YSTEM - PO SSIBLE CHA FING O F
THE AP U NEGATIVE-G FUEL-FEED DRAIN LINE.
THE AP U NEGATIVE-G FUEL-FEED DRAIN LINE
REPLA CE D WITH NEW HO SE IA W SB 605 -28-009
PART B WITH SB KIT PN: 605 K-28-0 09A. G RN#
108 615/12.
MOS 08-A PR-2016
14-S EP-20 15 HRS /MSC - 131 3.0 2
AFL 851
TCCA CF- 2016-1 5 PAS SENGER OXYG EN SY STEM - INCORRECT LENGTH O F PAS SENGER OXYGE N MASK LANYA RDS MANDA TO RY NOT A PPLICA BLE - N/A TO A 6-ELD. NIL FURTHER
ACTIO N REQUIRED.
MOS 15-JUN-2016
01-JUN-2016 HRS /MSC -
AFL
TCCA CF- 2016-1 7 WINGS - LIFE LIMIT INTRO DUCTION FO R SIDE B RA CE FITTING SHAFT INSTA LLED ON MAIN LA NDING GE AR (MLG ) MANDA TO RY NOT A PPLICA BLE - BY A/C MSN
MOS 11-JUL-20 16
10-JUN-2016 HRS /MSC -
AFL
TCCA CF- 2016-1 7 P ART I TIME LIMITS / MA INTENANCE CHECKS CHANGE MANDA TO RY NOT A PPLICA BLE - BY A/C MSN
MOS 11-JUL-20 16
10-JUN-2016 HRS /MSC -
AFL
TCCA CF- 2016-1 7 P ART II INS PECTION, IDENTIFY , SERIALIZE AND RECORD THE ACCUMULATED L IFE OF THE S IDE BRACE FITTING S HA FT MANDA TO RY NOT A PPLICA BLE - BY A/C MSN
MOS 11-JUL-20 16
10-JUN-2016 HRS /MSC -
AFL
TCCA CF- 2016-1 7 R01 WINGS - LIFE LIMIT INTRO DUCTION FO R SIDE B RA CE FITTING SHAFT INSTA LLED ON MAIN LA NDING GE AR (MLG ) MANDA TO RY NOT A PPLICA BLE - BY A/C MSN
MOS 11-JUL-20 16
10-JUN-2016 HRS /MSC -
AFL
TCCA CF- 2016-1 7 R01 PA RT TIME LIMITS / MA INTENANCE CHECKS CHANGE MANDA TO RY NOT A PPLICA BLE - BY A/C MSN
I
MOS 11-JUL-20 16
10-JUN-2016 HRS /MSC -
AFL
TCCA CF- 2016-1 7 R01 PA RT INS PECTION, IDENTIFY , SERIALIZE AND RECORD THE ACCUMULATED L IFE OF THE S IDE BRACE FITTING S HA FT MANDA TO RY NOT A PPLICA BLE - BY A/C MSN
II
MOS 11-JUL-20 16
10-JUN-2016 HRS /MSC -
AFL
TCCA CF- 2016-1 7 R02 WINGS - LIFE LIMIT INTRO DUCTION FO R SIDE B RA CE FITTING SHAFT INSTA LLED ON MAIN LA NDING GE AR (MLG ) MANDA TO RY NOT A PPLICA BLE - BY A/C MSN
MOS 25-S EP-20 16
05-JUL-20 16 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 50 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2016-1 7 R02 PA RT AMMEND TIME LIMITS / MAINTENANCE CHECKS CHANGE MANDA TO RY NOT A PPLICA BLE - BY A/C MSN
I
DAYS 25-S EP-20 16
05-JUL-20 16 HRS /MSC -
AFL

TCCA CF- 2016-1 7 R02 PA RT INS PECT, IDENTIFY, S ERIALIZE AND RECORD THE ACCUMULA TED LIFE OF THE SIDE BRACE FITTING SHAFT MANDA TO RY NOT A PPLICA BLE - BY A/C MSN
II
MOS 25-S EP-20 16
05-JUL-20 16 HRS /MSC -
AFL
TCCA CF- 2016-3 2 FUE L - ENGINE AND AUXILIA RY PO WE R UNIT E LECTRICA L FUEL PUMP CARTRIDGE / CANIS TE R FUE L L EAKAG E MANDA TO RY COMPLIED WITH - NEX T DUE AT 1963.8 HOURS
(SUPE RSE DE D BY CF- 2016-3 2 R01 ) OR 21 DE C 2017
MOS 26-A PR-2017
13-O CT-20 16 HRS /MSC - 136 3.8
AFL 883
TCCA CF- 2016-3 2 R01 FUE L - ENGINE AND AUXILIA RY PO WE R UNIT E LECTRICA L FUEL PUMP CARTRIDGE/CANIS TER FUEL LE AKAG E MANDA TO RY COMPLIED WITH
(SUPE RSE DE D BY CF- 2016-3 2 R02 )
MOS 27-S EP-20 18
13-O CT-20 16 HRS /MSC - 162 5.4
AFL 107 4
TCCA CF- 2016-3 2 R02 FUE L - ENGINE AND AUXILIA RY PO WE R UNIT E LECTRICA L FUEL PUMP CARTRIDGE/CANIS TER FUEL LE AKAG E
(SUPE RSE DE D BY CF- 2016-3 2 R03 )
MOS
06-DEC-20 18 HRS /MSC -
AFL
TCCA CF- 2016-3 2 R03 FUE L - ENGINE AND AUXILIA RY PO WE R UNIT E LECTRICA L FUEL PUMP CARTRIDGE/CANIS TER FUEL LE AKAG E COMPLIED WITH
MOS 04-S EP-20 20
05-JUN-2019 HRS /MSC - 199 7.9 7
AFL 134 4
TCCA CF- 2016-3 2 R04 FUE L - ENGINE AND AUXILIA RY PO WE R UNIT E LECTRICA L FUEL PUMP CARTRIDGE/CANIS TER FUEL LE AKAG E MANDA TO RY COMPLIED WITH
MOS 12-A PR-2021
27-O CT-20 20 HRS /MSC - 214 3.4
AFL 144 9

TCCA CF- 2016-3 2 R04 PA RA INS PECT FOR A ND RE CTIFY ANY FUE L L EAK FROM THE ENGINE A ND APU EFP EL ECTRICA L WIRING CO NDUIT MANDA TO RY NOT A PPLICA BLE
(A)( 1) & (A )(3) OUTLETS, IN ACCORDANCE WITH ACCOMPL ISHMENT INSTRUCTIONS IN BA SB 604-2 8-022 REV 03, DATED 31 AUGUST
201 8 O R LATER RE VIS IONS (SN 5301 - 5665)
MOS 12-A PR-2021
27-O CT-20 20 HRS /MSC - 214 3.4
AFL 144 9

TCCA CF- 2016-3 2 R04 PA RA INCORPO RA TE SB 604 -28-02 2 REV 03 REQUIRE ME NTS (SN 5301 - 5665) MANDA TO RY NOT A PPLICA BLE
(A)( 2)
MOS 12-A PR-2021
27-O CT-20 20 HRS /MSC - 214 3.4
AFL 144 9

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 51 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2016-3 2 R04 PA RA INS PECT FOR A ND RE CTIFY ANY FUE L L EAK FROM THE ENGINE A ND APU EFP EL ECTRICA L WIRING CO NDUIT MANDA TO RY COMPLIED WITH
(B)( 1) & (B )(3) OUTLETS, IN ACCORDANCE WITH ACCOMPL ISHMENT INSTRUCTIONS IN BA SB 605-2 8-010 REV 03 DATED 31 AUGUST
201 8 O R LATER RE VIS IONS (570 1 - 59 55, 595 7, 596 0 - 596 6, 596 8 - 597 1, 598 1)
MOS 12-A PR-2021
27-O CT-20 20 HRS /MSC - 214 3.4
AFL 144 9

TCCA CF- 2016-3 2 R04 PA RA INCORPO RA TE SB 605 -28-01 0 REV 03 REQUIRE ME NTS (570 1 - 595 5, 595 7, 5960 - 596 6, 5968 - 597 1, 5981 ) MANDA TO RY NOT A PPLICA BLE
(B)( 2)
MOS 12-A PR-2021
27-O CT-20 20 HRS /MSC - 214 3.4
AFL 144 9

TCCA CF- 2016-3 2 R04 PA RA INS PECT FOR A ND RE CTIFY ANY FUE L L EAK FROM THE ENGINE A ND APU EFP EL ECTRICA L WIRING CO NDUIT MANDA TO RY NOT A PPLICA BLE
(C) OUTLETS, IN ACCORDANCE WITH ACCOMPL ISHMENT INSTRUCTIONS IN BA SB 605-2 8-010 REV 03, DATED 31 AUGUST
201 8 O R LATER RE VIS IONS (595 6, 595 8, 595 9, 5967 , 5972 - 5980 , 5982 - 5990 )
MOS 12-A PR-2021
27-O CT-20 20 HRS /MSC - 214 3.4
AFL 144 9

TCCA CF- 2016-3 2 R04 PA RA INS PECT FOR A ND RE CTIFY ANY FUE L L EAK FROM THE ENGINE A ND APU EFP EL ECTRICA L WIRING CO NDUIT MANDA TO RY NOT A PPLICA BLE
(D)(1) & (D)(3) OUTLETS, IN ACCORDANCE WITH ACCOMPL ISHMENT INSTRUCTIONS IN BA SB 650-2 8-001 REV 03, DATED 3 JANUARY
201 9 O R LATER RE VIS IONS (605 0 - 61 24)
MOS 12-A PR-2021
27-O CT-20 20 HRS /MSC - 214 3.4
AFL 144 9

TCCA CF- 2016-3 2 R04 PA RA INCORPO RA TE SB 650 -28-00 1 REV 03 REQUIRE ME NTS (605 0 - 612 4) MANDA TO RY NOT A PPLICA BLE
(D)(2)
MOS 12-A PR-2021
27-O CT-20 20 HRS /MSC - 214 3.4
AFL 144 9

TCCA CF- 2016-3 2 R04 PA RA INS PECT FOR A ND RE CTIFY ANY FUE L L EAK FROM THE ENGINE A ND APU EFP EL ECTRICA L WIRING CO NDUIT MANDA TO RY NOT A PPLICA BLE
(E)( 1) & (E )(3) OUTLETS, IN ACCORDANCE WITH ACCOMPL ISHMENT INSTRUCTIONS IN BA SB 650-2 8-001 REV 03, DATED 3 JANUARY
201 9 O R LATER RE VIS IONS (612 5 - 61 63)
MOS 12-A PR-2021
27-O CT-20 20 HRS /MSC - 214 3.4
AFL 144 9

TCCA CF- 2016-3 2 R04 PA RA INCORPO RA TE SB 650 -28-00 1 REV 03 REQUIRE ME NTS MANDA TO RY NOT A PPLICA BLE
(E)( 2)
MOS 12-A PR-2021
27-O CT-20 20 HRS /MSC - 214 3.4
AFL 144 9
TCCA CF- 2016-3 2 R04 PA RA COMPLIANCE WITH AD CF-2020 -38 ISS UE D ON 13 OCTOB ER 20 20 CO NS TITUTES TERMINATING ACTION FO R ABO VE MANDA TO RY NOT A PPLICA BLE
(F) SECTIO N A. THROUGH E. RE QUIREMENTS
MOS 12-A PR-2021
27-O CT-20 20 HRS /MSC - 214 3.4
AFL 144 9
TCCA CF- 2016-3 4 FUS ELAG E - IMP RO PERLY INSTAL LED SHIMS A T THE WING TIE BE AM BUMPER PADS MANDA TO RY NOT A PPLICA BLE - N/A BY MSN. NO FURTHER
ACTIO N REQUIRED.
DAYS 13-FEB -2017
28-O CT-20 16 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 52 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2016-3 7 FUS ELAG E - SP ECIAL DETAILED INSPECTIO N OF THE UP PER L ATCH PINS OF THE FO RWA RD PASSE NG ER DOOR MANDA TO RY COMPLIED WITH - CLO SED A MP UPDATED
DAYS 21-MAY -2017
09-DEC-20 16 HRS /MSC -
AFL
TCCA CF- 2016-3 8 AUTO FLIGHT - RUDDER CONTROLS - YAW DAMPE R UNCOMMANDED MOVE ME NT MANDA TO RY NOT A PPLICA BLE - N/A BY YAW DA MP ER
ACTUA TO R P/N
MOS 19-MAR-2 017
12-DEC-20 16 HRS /MSC -
AFL
TCCA CF- 2016-4 0 FLOODLIGHTING PANEL – COCK PIT FLOODLIGHT GA SKET S EAL INSTAL LATIO N MANDA TO RY COMPLIED WITH
MOS 14-MAR-2 022
29-DEC-20 16 HRS /MSC - 219 4.6
AFL 147 5
TCCA CF- 2017-0 1 NAVIGATION - FLIG HT INSTRUMENTS - UNRE LIA BLE AIR DATA IN THE CO CK PIT MANDA TO RY COMPLIED WITH
DAYS 26-A PR-2017
20-JAN-20 17 HRS /MSC - 136 3.8
AFL 883
TCCA CF- 2017-0 7 COLD WE ATHER OPERATIONS - INTRODUCTION O F LOW TE MP ERATURE GROUND WING ANTI-ICE S YSTEM MANDA TO RY
MOS
22-FEB -2017 HRS /MSC -
AFL
TCCA CF- 2017-0 7 P ART I AIRCRAFT FLIGHT MANUA L ( AFM) CHA NG E MANDA TO RY COMPLIED WITH
DAYS 26-A PR-2017
22-FEB -2017 HRS /MSC - 136 3.8
AFL 883
TCCA CF- 2017-0 7 P ART II TIME LIMITS MA INTENANCE CHECK S (TL MC) CHANGE MANDA TO RY COMPLIED WITH
DAYS
22-FEB -2017 HRS /MSC -
AFL
TCCA CF- 2017-0 7 P ART III INS TAL LATIO N OF SUP PLEMENTAL LOW TE MP ERA TURE GROUND-WING ANTI-ICING SY STE M (LTGWAIS) FOR - TO BE COMPLIED BE FO RE 22 -FE B-2022
TAKE-O FF SAFETY ENHA NCEMENT (TOS E)
MOS
22-FEB -2017 HRS /MSC -
AFL
TCCA CF- 2017-0 7 R01 COLD WE ATHER OPERATIONS - INTRODUCTION O F LOW TE MP ERATURE GROUND WING ANTI-ICE S YSTEM MANDA TO RY COMPLIED WITH
MOS 13-MAR-2 020
22-FEB -2017 HRS /MSC - (s) 192 6.4
AFL 127 5
TCCA CF- 2017-0 7 R01 PA RT AIRCRAFT FLIGHT MANUA L ( AFM) CHA NG E MANDA TO RY COMPLIED WITH
I
DAYS 13-MAR-2 020
22-FEB -2017 HRS /MSC - 192 6.4
AFL 127 5

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 53 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2017-0 7 R01 PA RT TIME LIMITS MA INTENANCE CHECK S (TL MC) CHANGE MANDA TO RY COMPLIED WITH
II
DAYS 13-MAR-2 020
22-FEB -2017 HRS /MSC - 192 6.4
AFL 127 5

TCCA CF- 2017-0 7 R01 PA RT INS TAL LATIO N OF SUP PLEMENTAL LOW TE MP ERA TURE GROUND-WING ANTI-ICING SY STE M (LTGWAIS) FOR MANDA TO RY COMPLIED WITH
III TAKE-O FF SAFETY ENHA NCEMENT (TOS E)
MOS 13-MAR-2 020
22-FEB -2017 HRS /MSC - 192 6.4
AFL 127 5
TCCA CF- 2017-0 9 PROPO SED A D - RUDDER CONTRO L S YSTEM - CRACKING OF THE PILOT-SIDE RUDDER PEDAL TUB ES MANDA TO RY
MOS
08-MAR-2 017 HRS /MSC - (s)
AFL
TCCA CF- 2017-0 9 P ART I & II ACCOMPLISH A DETAILED V ISUAL INS PECTION (DVI) OR EDDY CURRENT INSPECTIO N OF BOTH PILOT-SIDE RUDDE R MANDA TO RY
PEDAL TUBES AND REPE AT THE INSPECTIO NS (IF NO CRACKS OR DAMAGE ARE FO UND), REPLA CE BO TH RUDDER
BAR ASSE MB LIE S ( IF A CRACK IS FOUND AROUND THE AFT TAPE RE D HOLES) / CONTACT THE B OMBARDIER (IF ANY
OTHER DAMAGE IS FO UND)
MOS (EFF) RECURRING
08-MAR-2 017 HRS /MSC
AFL 900 0 900 0
TCCA CF- 2017-0 9 P ART III REPLA CE ME NT OF BO TH PIL OT-SIDE RUDDER BAR A SSEMBLIES IN ACCORDA NCE WITH THE ACCO MP LIS HMENT MANDA TO RY
INS TRUCTIONS IN P ART B OF THE SBS MENTIONED IN P ART I TABLE A AND PA RT II TAB LE C ABO VE CO NS TITUTES
THE TERMINATING ACTIO N FOR THE INSPECTIONS IN PA RT I & II OF THIS AD
MOS
08-MAR-2 017 HRS /MSC - (s)
AFL

TCCA CF- 2017-2 4 HORIZONTAL STABILIZER TRIM ACTUATO R - ATTA CHMENT PINS A ND TRUNNIONS NOT SE RIALIZED MANDA TO RY COMPLIED WITH
MOS
26-JUL-20 17 HRS /MSC - (s)
AFL
TCCA CF- 2017-2 4 P ART I MAINTENANCE S CHEDULE AMENDME NT MANDA TO RY COMPLIED WITH - TAS KS 27-42- 01-108 AND
27-4 2-01-1 12 ADDE D TO THE MA INTENANCE
PROGRAM.
DAYS 10-O CT-20 17
26-JUL-20 17 HRS /MSC - 140 8.5
AFL 913
TCCA CF- 2017-2 4 P ART II HSTA A TTACHMENT PINS & TRUNNIO NS SE RIALIZATION MANDA TO RY COMPLIED WITH - S B 6 05-27 -005, FOUND
COMPLIED A S DATE 26.4.15, W/O 2 5549
CARD:502 , DUE THIS COMPLETION IT MEETS
THE INTE NT OF PA RT II
MOS 27-S EP-20 18
26-JUL-20 17 HRS /MSC - 162 5.4
AFL 107 4

TCCA CF- 2017-2 4 P ART III SPA RE S MANDA TO RY COMPLIED WITH - 2 7-42-0 1-108
MOS
26-JUL-20 17 HRS /MSC - (s)
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 54 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2018-2 6 LANDING GE AR - MAIN LANDING GEAR SIDE STAY ACTUATO RS CONTAIN NON-CO NFORMING SP LIT BALL BEA RING MANDA TO RY
MOS 01-A PR-2011
19-O CT-20 18 HRS /MSC -
AFL
TCCA CF- 2018-2 6 R01 LANDING GE AR - MAIN LANDING GEAR SIDE STAY ACTUATO RS CONTAIN NON-CO NFORMING SP LIT BALL BEA RING MANDA TO RY NOT A PPLICA BLE - DUE TO S ERIAL NUMB ER O F
THE LH AND RH SIDE S TA Y A CTUATOR
MOS 26-JUN-2020
05-JUN-2019 HRS /MSC - 193 6.4
AFL 128 6
TCCA CF- 2019-1 0 AVIONIC SYS TE M - AIRPL ANE FLIGHT MANUAL NA VIG ATION SYSTEM LIMITATIONS – PROHIBIT E DITING CL IMB TO MANDA TO RY COMPLIED WITH - A FM RE VISIO N PROCESS ED
ALTITUDES AND USE OF TEMPE RA TURE CO MP ENSATIO N ON FLIGHT MANAGE ME NT SYSTEM (FMS) WITH B OMBADIE R FLIG HT DECK O N PAD.
DAYS 07-A PR-2019
21-MAR-2 019 HRS /MSC - 171 6.2
AFL 112 5
TCCA CF- 2019-2 6 OXY GEN SYSTEM - INS UFFICIENT ACCESSIBILITY TO THE PORTABLE O XYGEN BOTTLE MANDA TO RY
MOS 60 (EFF) 17-APR-20 24 M
23-JUL-20 19 HRS /MSC
AFL
TCCA CF- 2020-0 2 AUTO FLIGHT S YSTEM - AIRP LANE FL IGHT MANUAL (AFM) L IMITATIONS AND PROCEDURE S - VEL OCITY DE CA Y MANDA TO RY COMPLIED WITH - A FM UP DA TE D THRU
DURING L OW LE VEL ALTITUDES CAPTURE (ALTSE L, ASE L O R ALTS CAP) IN ONE ENGINE INO PERATIVE CONDITIONS BOMBA RDIER FLIGHTDECK APP .
DAYS 27-MAR-2 020
27-FEB -2020 HRS /MSC - 193 0.2
AFL 127 7
TCCA CF- 2020-2 4 NAVIGATION - INERTIA L REFERENCE SYSTEM (IRS) / FLIGHT MANAGEMENT S YSTEM (FMS) - WRONG MAGNETIC MANDA TO RY COMPLIED WITH
HEADING DIS PLAY ED DUE TO OUTDA TED MAGNETIC VARIA TION (MA GVAR) TA BLES
DAYS 22-S EP-20 20
24-JUL-20 20 HRS /MSC -
AFL
TCCA CF- 2020-3 8 FUE L - ENGINE AND AUXILIA RY PO WE R UNIT E LECTRICA L FUEL PUMP CARTRIDGE/CANIS TER FUEL LE AKAG E MANDA TO RY COMPLIED WITH
MOS 12-A PR-2021
27-O CT-20 20 HRS /MSC - 214 3.4
AFL 144 9
TCCA CF- 2020-4 4 FUS ELAG E - FUSELAG E S TA TION ( FS) 55 9 CIRCUMFE RE NTIAL JOINT - INTERFACE METAL CHIPS FROM IMPRO PER MANDA TO RY COMPLIED WITH - P RE VIO US LY CO MP LIE D
HOLE DE BURRING WITH: AD IS ALREA DY IN COMPLIANCE WITH
REV.00 OF THE SAN MARINO CH-605
MAINTENANCE MANUAL. TLMC TAS K #
53-2 0-00-1 92 ADDE D ACCORDINGLY.
DAYS 26-O CT-20 20
06-NOV -2020 HRS /MSC -
AFL
TCCA CF- 2020-5 4 LANDING GE AR - MAIN LANDING GEAR (MLG) SHOCK STRUT LO WER PIN CRACKING (SUPE RS EDED BY TCCA AD MANDA TO RY
CF- 2020-5 4 R01)
MOS (EFF)
05-JAN-20 21 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 55 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2020-5 4 P ART I LH L/H LUBRICA TION O F LEFT HAND ( LH) MLG SHOCK STRUT L OWER PIN MANDA TO RY
MOS (EFF)
05-JAN-20 21 HRS /MSC -
AFL
TCCA CF- 2020-5 4 P ART I RH RH LUBRICA TION O F RIG HT HA ND (RH) MLG SHOCK S TRUT LO WE R PIN MANDA TO RY
MOS (EFF)
05-JAN-20 21 HRS /MSC -
AFL
TCCA CF- 2020-5 4 P ART II LH LH DVI OF THE L H MLG SHOCK STRUT LO WER PIN MANDA TO RY
MOS
05-JAN-20 21 HRS /MSC -
AFL
TCCA CF- 2020-5 4 P ART II RH RH DVI OF THE RH MLG SHOCK STRUT L OWER PIN MANDA TO RY
MOS (EFF)
05-JAN-20 21 HRS /MSC -
AFL

TCCA CF- 2020-5 4 P ART III LH NDT INSPECTIO N OF THE LH MLG SHOCK STRUT L OWER P IN MANDA TO RY
LH
MOS (EFF)
05-JAN-20 21 HRS /MSC -
AFL

TCCA CF- 2020-5 4 P ART III RH NDT INSP ECTION O F THE RH MLG SHOCK STRUT LOWER P IN MANDA TO RY
RH
MOS (EFF)
05-JAN-20 21 HRS /MSC -
AFL
TCCA CF- 2020-5 4 P ART IV CRA CK S O R DAMAGE FINDINGS O N THE MLG SHOCK STRUT L OWER PIN MANDA TO RY
MOS (EFF)
05-JAN-20 21 HRS /MSC -
AFL
TCCA CF- 2020-5 4 R01 LANDING GE AR - MAIN LANDING GEAR (MLG) SHOCK STRUT LO WER PIN CRACKING MANDA TO RY COMPLIED WITH
MOS 14-MAR-2 022
05-JAN-20 21 HRS /MSC - 219 4.6
AFL 147 5

TCCA CF- 2020-5 4 R01 PA RT LUBRICATION O F LEFT HAND (L H) MLG SHOCK STRUT LO WER PIN MANDA TO RY COMPLIED WITH
I LH
MOS 12 14-MAR-2 022 14-MAR-2023 RECURRING
05-JAN-20 21 HRS /MSC 200 219 4.6 239 4.6
AFL 147 5

TCCA CF- 2020-5 4 R01 PA RT LUBRICATION O F RIGHT HAND (RH) MLG SHOCK S TRUT LO WE R PIN MANDA TO RY COMPLIED WITH
I RH
MOS 12 14-MAR-2 022 14-MAR-2023 RECURRING
05-JAN-20 21 HRS /MSC 200 219 4.6 239 4.6
AFL 147 5

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 56 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 2020-5 4 R01 PA RT DVI OF THE LH MLG SHOCK STRUT LOWER PIN MANDA TO RY COMPLIED WITH
II LH
MOS 24 14-MAR-2 022 14-MAR-2024 RECURRING
05-JAN-20 21 HRS /MSC 400 219 4.6 259 4.6
AFL 147 5

TCCA CF- 2020-5 4 R01 PA RT DVI OF THE RH MLG SHOCK STRUT LO WER PIN MANDA TO RY COMPLIED WITH
II RH
MOS 24 14-MAR-2 022 14-MAR-2024 RECURRING
05-JAN-20 21 HRS /MSC 400 219 4.6 259 4.6
AFL 147 5

TCCA CF- 2020-5 4 R01 PA RT NDT INSP ECTION O F THE LH ML G SHO CK S TRUT LOWER PIN MANDA TO RY COMPLIED WITH
III L H
MOS 14-MAR-2 022 RECURRING
05-JAN-20 21 HRS /MSC 219 4.6
AFL 900 147 5 237 5
TCCA CF- 2020-5 4 R01 PA RT NDT INSP ECTION O F THE RH MLG SHOCK STRUT LOWER P IN MANDA TO RY COMPLIED WITH
III RH
MOS 14-MAR-2 022 RECURRING
05-JAN-20 21 HRS /MSC 219 4.6
AFL 900 147 5 237 5
TCCA CF- 2020-5 4 R01 PA RT CRA CK S O R DAMAGE FINDINGS O N THE MLG SHOCK STRUT L OWER PIN MANDA TO RY COMPLIED WITH
IV
MOS 14-MAR-2 022
05-JAN-20 21 HRS /MSC - 219 4.6
AFL 147 5
TCCA CF- 2021-0 6 ICE AND RAIN P RO TECTIO N - WING ANTI-ICE (WAI) SYSTEM - WING S TAL L P RIOR TO TOUCHDOWN DUE TO WING MANDA TO RY COMPLIED WITH
LEA DING EDGE ICING
DAYS 12-MAR-2 021
12-MAR-2 021 HRS /MSC -
AFL
TCCA CF- 2021-1 3 ICE AND RAIN P RO TECTIO N - POTABL E WATER LINE RIB BON HEA TER FIRE RISK MANDA TO RY NOT A PPLICA BLE - FO R MSN 58 66 DUE TO
EQUIPMENT IS NOT INSTALL ED.
MOS 15-A PR-2021
15-A PR-2021 HRS /MSC -
AFL
TCCA CF- 2022-1 0 EQUIPMENT/FURNISHINGS - CO CK PIT SMOKE HOOD MANDA TO RY
MOS 12 (EFF) 24-MAR-2023
24-MAR-2 022 HRS /MSC
AFL
TCCA CF- 2022-3 4 OXY GEN - SUPP LY SYSTEM FLE XIBLE OXYG EN HOSE DETERIO RA TION OVER TIME MANDA TO RY
MOS 7 (EB T) 04-FEB-20 23
04-JUL-20 22 HRS /MSC
AFL
NEW REQ UIREMENT ADDED ON 21-JUN-2 022 (EFFECTIVE: 0 4-JUL- 2022). RE VIE W BAS E TIMES TO ENSURE CO RRECT DUE TIMES.

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 57 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

TCCA CF- 86-04 R1 AILERON / ELEV ATOR FLUTTER DA MP ERS MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 91-22 R3 TAIL CONE FUE L TANK MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 92-23 R1 ENGINE S HUT-DOWN IN FLIG HT MANDA TO RY NOT A PPLICA BLE - PAR A IRCRA FT SERIA L
NUMBE R
MOS 25-MAR-2 011
HRS /MSC -
AFL
TCCA CF- 99-09 REV 1 IDG CABL E HARNESS
MOS
HRS /MSC N/A
AFL
TCCA CF- 99-14 HYDRA UL IC AND FUEL LINE MO DS
MOS
HRS /MSC N/A
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 58 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

APPLIANCE - 5866/AP-HKD
CAA UK G -2021- 0003 APP LIA NCE AD - EQ UIPMENT / FURNISHING S - LIFE JACKET - INSPECTIO N MANDA TO RY NOT A PPLICA BLE - By Pa rt: DUE TO INSTA LLED
PN
MOS
HRS /MSC
AFL
EAS A 2 007-0 256-CN APP LIA NCE AD - ATA 25 – CA NCEL LED: EQUIPMENT / FURNISHINGS - SEAT RE STRA INT SY STEM PL ASTIC RO TARY CANCE LLED NOT A PPLICA BLE - Super sed ed: EA SA CA NCELE S
BUCKLE HANDL E - INS PECTION / REPLACEMENT THE EA SA AD 20 07-02 56 A CCORDING TO FA A A D
202 1-07-1 3.
MOS
11-MAY -2021 HRS /MSC -
AFL
EAS A 2 010-0 003 R0 2 APP LIA NCE AD - NAVIGATION - MODE S TRANSPO NDER AIRCRAFT TYPE MODE S TRAPP ING - CHECK / MODIFICA TION MANDA TO RY NOT A PPLICA BLE - BY TRANSP ONDER P/N
MOS 05-NOV -2014
14-O CT-20 14 HRS /MSC - (s)
AFL
EAS A 2 010-0 003 R0 2 P ARA VERIFY A IRCRA FT TYP E MO DE STRAPPING CO DE S SET TO ‘0’ (ZERO) OR ‘ 1’, AS DEFINED IN ROCKWEL L-COLLINS MANDA TO RY NOT A PPLICA BLE - BY TRANSP ONDER P/N
(1) SERVICE LETTE R TDR-94 ( ) SIL 07-2.
MOS 05-NOV -2014
14-O CT-20 14 HRS /MSC - (s)
AFL
EAS A 2 010-0 003 R0 2 P ARA EXE MP TIONS: DAS SAULT AE RO PLANES MANDA TO RY NOT A PPLICA BLE - BY TRANSP ONDER P/N
(2)
MOS 05-NOV -2014
14-O CT-20 14 HRS /MSC - (s)
AFL
EAS A 2 010-0 003 R0 2 P ARA EXE MP TIONS: A TR 42 AND ATR 72 AE RO PLANES MANDA TO RY NOT A PPLICA BLE - BY TRANSP ONDER P/N
(3)
MOS 05-NOV -2014
14-O CT-20 14 HRS /MSC - (s)
AFL
EAS A 2 010-0 003 R0 2 P ARA EXE MP TIONS: S AAB 2000 AE RO PLANES MANDA TO RY NOT A PPLICA BLE - NA BY TRANSPONDER P /N
(4)
MOS 05-NOV -2014
14-O CT-20 14 HRS /MSC - (s)
AFL
EAS A 2 010-0 003 R0 2 P ARA EXE MP TIONS: B OMBARDIER AEROSP ACE (CANADAIR) A EROPLANES : CL-600- 2B16 (604 VA RIANT) A ND CL -600-2B 19 MANDA TO RY NOT A PPLICA BLE - NA BY TRANSPONDER P /N
(5) (RJ100 AND RJ2 00)
MOS 05-NOV -2014
14-O CT-20 14 HRS /MSC - (s)
AFL
EAS A 2 010-0 003 R0 2 P ARA EXE MP TIONS: CES SNA A IRCRA FT CO MP ANY A EROPLANES : CESSNA MODE L 525, 52 5A, 52 5B; AND CES SNA MODEL MANDA TO RY NOT A PPLICA BLE - NA BY TRANSPONDER P /N
(6) 525 , 525A , 525B , 560; 5 60XL
MOS 05-NOV -2014
14-O CT-20 14 HRS /MSC - (s)
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 59 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 010-0 003 R0 2 P ARA EXE MP TIONS: P IAG GIO A ERO INDUSTRIE S A EROPLA NE S: P.180 (AVA NTI) A ND P.180 (AVANTI II) MANDA TO RY NOT A PPLICA BLE - NA BY TRANSPONDER P /N
(7)
MOS 05-NOV -2014
14-O CT-20 14 HRS /MSC - (s)
AFL
EAS A 2 012-0 254 R0 1 APP LIA NCE AD - OX YGEN - FLIGHT CREW O XYGEN MASK REGULATOR - IDENTIFICATIO N / OP ERATIONAL MANDA TO RY NOT A PPLICA BLE - BY P/N OF INSTALLED UNITS
PROCEDURE / REP LACEMENT
MOS 21-FEB -2013
21-DEC-20 12 HRS /MSC - 457 .2
AFL 188

EAS A 2 012-0 254 R0 1 P ARA INS PECT OX YGEN - FLIGHT CRE W OX YGEN MA SK RE GULATOR - IDE NTIFICATION / OPE RA TIONAL PROCEDURE / MANDA TO RY NOT A PPLICA BLE - BY P/N INSTALL ED
(1) REPLA CE ME NT EACH FLIGHT CRE W OXY GEN MAS K REG UL ATOR TO IDENTIFY THE P/N AND S /N
DAYS 21-FEB -2013
21-DEC-20 12 HRS /MSC - 457 .2
AFL 188

EAS A 2 012-0 254 R0 1 P ARA REPLA CE OX YGEN - FLIGHT CREW OX YGEN MASK REGULATOR - IDE NTIFICATIO N / OP ERA TIONAL PROCEDURE / MANDA TO RY NOT A PPLICA BLE - BY P/N INSTALL ED
(2.1) REPLA CE ME NT EACH AFFECTE D FLIG HT CREW OXYG EN MAS K REG ULA TO R WITH A SE RV ICEAB LE PART
DAYS 21-FEB -2013
21-DEC-20 12 HRS /MSC - 457 .2
AFL 188

EAS A 2 012-0 254 R0 1 P ARA AMEND O XYGEN - FLIGHT CREW O XYGE N MASK REGULATOR - IDENTIFICATIO N / OP ERATIONAL PROCEDURE / MANDA TO RY NOT A PPLICA BLE - BY INSTALL ED P/N
(2.2) REPLA CE ME NT THE AIRCRAFT FLIGHT MANUA L (A FM) AND INS TA LL A P LACARD
DAYS 21-FEB -2013
21-DEC-20 12 HRS /MSC - 457 .2
AFL 188

EAS A 2 012-0 254 R0 1 P ARA REPLA CE OX YGEN - FLIGHT CREW OX YGEN MASK REGULATOR - IDE NTIFICATIO N / OP ERA TIONAL PROCEDURE / MANDA TO RY NOT A PPLICA BLE
(3) REPLA CE ME NT EACH AFFECTE D FLIG HT CREW OXYG EN MAS K REG ULA TO R
MOS 21-FEB -2013
21-DEC-20 12 HRS /MSC - 457 .2
AFL 188
EAS A 2 013-0 020 APP LIA NCE AD - EQ UIPMENT & FURNISHINGS - SAFETY BELTS / TORSO RE STRAINT SY STE MS - INS PECTION / MANDA TO RY NOT A PPLICA BLE - BY MA NUFACTURER OF
REPLA CE ME NT EQUIPMENT INS TA LLED
MOS 25-MAR-2 013
14-FEB -2013 HRS /MSC - 502 .1
AFL 210
EAS A 2 013-0 020 PARA (1) INS PECT EQ UIPMENT & FURNIS HINGS - S AFETY B ELTS / TO RS O RES TRAINT SYS TE MS - INSP ECTION / RE PLACEMENT MANDA TO RY NOT A PPLICA BLE - BY MA NUFACTURER OF
THE MARKINGS OF SA FE TY BEL TS AND/O R TORSO RESTRA INT S YSTEMS, TO DE TE RMINE IF THE Y HAV E BEEN EQUIPMENT INS TA LLED
MAINTAINED OR RE PAIRE D BY ORGA NISATIONS O THER THAN THE DESIGN AP PROVAL HOLDER
MOS 25-MAR-2 013
14-FEB -2013 HRS /MSC - 502 .1
AFL 210
EAS A 2 013-0 020 PARA (2) VERIFY E QUIPMENT & FURNISHINGS - SAFETY BELTS / TORSO RE STRA INT SY STEMS - INS PECTION / REPLACEMENT MANDA TO RY NOT A PPLICA BLE
IF THE ORGA NISATION IS LIS TE D AMONG THE AUTHO RIZED MAINTE NANCE OR REP AIR ORGANIS ATION REFE RE NCE
DOCUMENTS QUOTED IN THE REF. PUBL ICATIO NS SE CTION O F THIS AD
MOS 25-MAR-2 013
14-FEB -2013 HRS /MSC - 502 .1
AFL 210

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 60 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 013-0 020 PARA (3) REMOVE EQ UIPMENT & FURNIS HINGS - S AFETY B ELTS / TO RS O RES TRAINT SYS TE MS - INSP ECTION / RE PLACEMENT MANDA TO RY NOT A PPLICA BLE
AND REPL ACE B ELTS NO T MEETING THE CERTIFICATION REQ UIREMENTS OR MA KE RE LEVA NT SEAT INOPE RA TIVE
MOS 25-MAR-2 013
14-FEB -2013 HRS /MSC - 502 .1
AFL 210
EAS A 2 013-0 020 R0 1 APP LIA NCE AD - EQ UIPMENT & FURNISHINGS - SAFETY BELTS / TORSO RE STRAINT SY STE MS - INS PECTION / MANDA TO RY NOT A PPLICA BLE - SAFETY BELTS / TORSO
REPLA CE ME NT RESTRAINT INSPECTED, NO FURTHER ACTION
REQUIRE D.
MOS 25-MAR-2 013
12-MAR-2 013 HRS /MSC - (s) 502 .1
AFL 210

EAS A 2 013-0 020 R0 1 P ARA EQUIPMENT & FURNIS HINGS - S AFETY B ELTS / TO RS O RES TRAINT SYS TEMS - INSP ECTION / RE PLACEMENT INS PECT MANDA TO RY NOT A PPLICA BLE - BY MA NUFATURER OF
(1) THE MARKINGS OF SA FE TY BEL TS AND/O R TORSO RESTRA INT S YSTEMS, TO DE TE RMINE IF THE Y HAV E BEEN EQUIPMENT INS TA LLED
MAINTAINED OR RE PAIRE D BY ORGA NISATIONS O THER THAN THE DESIGN AP PROVAL HOLDER
MOS 25-MAR-2 013
12-MAR-2 013 HRS /MSC - (s) 502 .1
AFL 210

EAS A 2 013-0 020 R0 1 P ARA EQUIPMENT & FURNIS HINGS - S AFETY B ELTS / TO RS O RES TRAINT SYS TEMS - INSP ECTION / RE PLACEMENT VE RIFY MANDA TO RY NOT A PPLICA BLE
(2) IF THE ORGA NISATION IS LIS TE D AMONG THE AUTHO RIZED MAINTE NANCE OR REP AIR ORGANIS ATION REFE RE NCE
DOCUMENTS QUOTED IN THE REF. PUBL ICATIO NS SE CTION O F THIS AD
MOS 25-MAR-2 013
12-MAR-2 013 HRS /MSC - (s) 502 .1
AFL 210

EAS A 2 013-0 020 R0 1 P ARA EQUIPMENT & FURNIS HINGS - S AFETY B ELTS / TO RS O RES TRAINT SYS TEMS - INSP ECTION / RE PLACEMENT REMOVE MANDA TO RY NOT A PPLICA BLE
(3) AND REPL ACE B ELTS NO T MEETING THE CERTIFICATION REQ UIREMENTS OR MA KE RE LEVA NT SEAT INOPE RA TIVE
MOS 25-MAR-2 013
12-MAR-2 013 HRS /MSC - (s) 502 .1
AFL 210

EAS A 2 013-0 020 R0 1 P ARA EQUIPMENT & FURNIS HINGS - S AFETY B ELTS / TO RS O RES TRAINT SYS TEMS - INSP ECTION / RE PLACEMENT AFTER MANDA TO RY NOT A PPLICA BLE
(4) 14 FEBRUARY 2 013 [THE EFFECTIV E DATE OF THE ORIG INAL ISSUE OF THIS AD], DO NOT INSTALL SAFETY BELTS OR
TORSO RESTRA INT SY STEMS O N ANY AIRCRAFT, UNLES S INSPE CTED AND CORRE CTED IN COMPL IANCE WITH THE
REQUIRE ME NTS OF THIS AD.
MOS 25-MAR-2 013
12-MAR-2 013 HRS /MSC - (s) 502 .1
AFL 210
EAS A 2 013-0 020 R0 2 APP LIA NCE AD - EQ UIPMENT & FURNISHINGS - SAFETY BELTS / TORSO RE STRAINT SY STE MS - INS PECTION / MANDA TO RY NOT A PPLICA BLE - BY MA NUFACTURE OF
REPLA CE ME NT INS TAL LED UNITS
MOS 07-A UG -2013
11-JUL-20 13 HRS /MSC - 696 .8
AFL 284
EAS A 2 013-0 020 R0 2 P ARA EQUIPMENT & FURNIS HINGS - S AFETY B ELTS / TO RS O RES TRAINT SYS TEMS - INSP ECTION / RE PLACEMENT INS PECT MANDA TO RY NOT A PPLICA BLE - BY MA NUFACTURER OF
(1) THE MARKINGS OF SA FE TY BEL TS AND/O R TORSO RESTRA INT S YSTEMS, TO DE TE RMINE IF THE Y HAV E BEEN INS TAL LED UNITS
MAINTAINED OR RE PAIRE D BY ORGA NISATIONS O THER THAN THE DESIGN AP PROVAL HOLDER
MOS 07-A UG -2013
11-JUL-20 13 HRS /MSC - 696 .8
AFL 284

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 61 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 013-0 020 R0 2 P ARA EQUIPMENT & FURNIS HINGS - S AFETY B ELTS / TO RS O RES TRAINT SYS TEMS - INSP ECTION / RE PLACEMENT VE RIFY MANDA TO RY NOT A PPLICA BLE - BY MA NUFACTURER OF
(2) IF THE ORGA NISATION IS LIS TE D AMONG THE AUTHO RIZED MAINTE NANCE OR REP AIR ORGANIS ATION REFE RE NCE INS TAL LED UNITS
DOCUMENTS QUOTED IN THE REF. PUBL ICATIO NS SE CTION O F THIS AD
MOS 06-A UG -2013
11-JUL-20 13 HRS /MSC - 696 .8
AFL 286

EAS A 2 013-0 020 R0 2 P ARA EQUIPMENT & FURNIS HINGS - S AFETY B ELTS / TO RS O RES TRAINT SYS TEMS - INSP ECTION / RE PLACEMENT REMOVE MANDA TO RY NOT A PPLICA BLE - BY MA NUFACTURER OF
(3) AND REPL ACE B ELTS NO T MEETING THE CERTIFICATION REQ UIREMENTS OR MA KE RE LEVA NT SEAT INOPE RA TIVE INS TAL LED UNITS
MOS 06-A UG -2013
11-JUL-20 13 HRS /MSC - 696 .8
AFL 286

EAS A 2 013-0 020 R0 2 P ARA EQUIPMENT & FURNIS HINGS - S AFETY B ELTS / TO RS O RES TRAINT SYS TEMS - INSP ECTION / RE PLACEMENT AFTER MANDA TO RY NOT A PPLICA BLE - BY MA NUFACTURER OF
(4) 14 FEBRUARY 2 013 [THE EFFECTIV E DATE OF THE ORIG INAL ISSUE OF THIS AD], DO NOT INSTALL SAFETY BELTS OR INS TAL LED UNITS
TORSO RESTRA INT SY STEMS O N ANY AIRCRAFT, UNLES S INSPE CTED AND CORRE CTED IN COMPL IANCE WITH THE
REQUIRE ME NTS OF THIS AD
MOS 07-A UG -2013
11-JUL-20 13 HRS /MSC - 696 .8
AFL 284

EAS A 2 013-0 020 R0 4 APP LIA NCE AD - EQ UIPMENT & FURNISHINGS - SAFETY BELTS / TORSO RE STRAINT SY STE MS - INS PECTION / MANDA TO RY NOT A PPLICA BLE - CO MP LIE D PREVIOUSLY
REPLA CE ME NT
MOS 23-S EP-20 14
11-JUL-20 14 HRS /MSC -
AFL

EAS A 2 013-0 020 R0 4 P ARA INS PECT THE MARKINGS OF SA FE TY BE LTS AND/OR TORSO RESTRA INT S YSTEMS, TO DE TE RMINE IF THEY HA VE MANDA TO RY NOT A PPLICA BLE - CO MP LIE D PREVIOUSLY
(1) BEE N MAINTAINED OR RE PAIRE D BY ORGA NISATIONS O THER THAN THE DESIGN AP PROVAL HOLDER
MOS 23-S EP-20 14
11-JUL-20 14 HRS /MSC -
AFL

EAS A 2 013-0 020 R0 4 P ARA VERIFY IF THE O RG ANISA TION IS LISTED AMONG THE A UTHORIZED MA INTENANCE OR RE PAIR ORGANISATION MANDA TO RY NOT A PPLICA BLE - CO MP LIE D PREVIOUSLY
(2) REFERENCE DOCUME NTS QUOTED IN THE REF. P UB LICATIONS S ECTION O F THIS AD
MOS 23-S EP-20 14
11-JUL-20 14 HRS /MSC - (s)
AFL

EAS A 2 013-0 020 R0 4 P ARA REMOVE AND REP LACE B ELTS NO T MEETING THE CERTIFICATION REQ UIREMENTS OR MA KE RE LEVA NT SEAT MANDA TO RY NOT A PPLICA BLE - CO MP LIE D PREVIOUSLY
(3) INO PERATIV E
MOS 23-S EP-20 14
11-JUL-20 14 HRS /MSC - (s)
AFL

EAS A 2 013-0 020 R0 4 P ARA AFTER 14 FEBRUARY 2013 [THE EFFE CTIVE DA TE OF THE ORIGINAL ISSUE OF THIS AD], DO NOT INSTALL SA FE TY MANDA TO RY NOT A PPLICA BLE - CO MP LIE D PREVIOUSLY
(4) BEL TS OR TO RS O RES TRAINT SYS TE MS ON ANY AIRCRAFT, UNLESS INSPECTED AND CO RRECTED IN COMPLIANCE
WITH THE RE QUIREMENTS O F THIS AD
MOS 23-S EP-20 14
11-JUL-20 14 HRS /MSC -
AFL

EAS A 2 014-0 019 APP LIA NCE AD - EQ UIPMENT / FURNISHING S - CRASH P OSITION INDICATOR - MODIFICA TION AIRCRAFT FLIG HT MANDA TO RY NOT A PPLICA BLE - EQUIP ME NT NO T INS TAL LED
MANUA L - AMENDMENT (SUPERSE DE D BY EAS A 2 014-00 95) IN AIRCRAFT
MOS 21-A PR-2014
31-JAN-20 14 HRS /MSC - 766 .9
AFL 313

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 62 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 014-0 019 PARA (1) AMEND THE AFM OF THE AFFECTED A IRCRAFT MANDA TO RY NOT A PPLICA BLE
DAYS 21-A PR-2014
31-JAN-20 14 HRS /MSC - 766 .9
AFL 313
EAS A 2 014-0 019 PARA (2) REPLA CE THE S YSTEM INTE RFACE UNIT P/N 5 03-24-( ) O R 503- 42-() MANDA TO RY NOT A PPLICA BLE
MOS 21-A PR-2014
31-JAN-20 14 HRS /MSC - 766 .9
AFL 313
EAS A 2 014-0 019 PARA (3) DO NO T INSTAL L A HR SMITH (TECHNICA L DEV ELOPMENTS) CPI SYS TE M SERIES 15-50 3-134 OR 15-50 3-134-1 MANDA TO RY NOT A PPLICA BLE
EQUIPPED WITH CONTRO L P ANEL P/N 503-2 2-(), B EACON RELE ASE UNIT P /N 5 03-21 AND S YSTEM INTE RFACE UNIT
P/N 50 3-24-() OR P/N 503- 42-(), E XCLUDING S YSTEM INTE RFACE UNIT P/N 5 03-24- A, OR 503-24 -()-A, O R 503 -24-G, OR
503 -24-()-G , OR 503-42 -A O R 503 -42-()- A O R 503 -42-G OR 503-42 -()-G, O N AN AIRCRAFT, UNLES S IN COMPLIANCE WITH
THE REQUIREMENTS OF THIS A D
MOS 21-A PR-2014
31-JAN-20 14 HRS /MSC - 766 .9
AFL 313
EAS A 2 014-0 019 PARA (4) REMOVE AFM A ME NDMENT AND P LACARD AS REQUIRE D BY PARAG RA PH (1) OF THIS A D MANDA TO RY NOT A PPLICA BLE
MOS 21-A PR-2014
31-JAN-20 14 HRS /MSC - 766 .9
AFL 313
EAS A 2 014-0 142 APP LIA NCE AD - OX YGEN - O XYGE N MASK REGULATOR INFLATABLE HARNESS / INFLA TION HOS E - IDE NTIFICATIO N / MANDA TO RY
REPLA CE ME NT
MOS
18-JUN-2014 HRS /MSC -
AFL
EAS A 2 014-0 142 PARA (1) ACCOMPLISH A CCOMPLISH THE ACTIONS AS SPE CIFIED IN PARAGRAP HS (1.1) AND (1.2) OF THIS A D - DE TERMINE MANDA TO RY
THE DATE OF MANUFA CTURING / REPLA CE THE HARNESS INFLATION HOS E P /N 445952 WITH A SERVICEA BLE PART,
OR RE MO VE THE INFLATABL E HARNESS FROM THE MAS K REG UL ATOR AND REP LACE IT WITH A SERVICE ABLE
HARNE SS
MOS (EFF)
18-JUN-2014 HRS /MSC -
AFL

EAS A 2 014-0 142 PARA (2) ACCOMPLISH A N OXY GEN MAS K REG UL ATO R EQ UIPPE D WITH A P/N MXH21-1 INFLA TA BLE HARNES S HAV ING A DMF MANDA TO RY
CODE OF NOVE MB ER 200 8 ( 0845-S OR 08/45-S) OR EARLIER, AND THOSE WITH A DMF OF JANUARY 2011 (110 1-S OR
11/01-S ) O R LATER, IS EXCLUDE D FRO M THE INSPECTIO N AND REPL ACEMENT REQUIREMENTS OF PA RA GRAPH (1 )
OF THIS A D
MOS
18-JUN-2014 HRS /MSC -
AFL
EAS A 2 014-0 142 PARA (3) ACCOMPLISH IT IS ALLOWED TO INSTALL ON A N AEROP LANE A FLIGHT CREW O XYGEN MASK REGULATOR, HAVING A MANDA TO RY
P/N AS IDENTIFIED IN SECTION 1.A .(1) OF ZO DIAC AEROTECHNICS S B MC10-3 5-274, PROVIDE D IT HAS BEEN
DETERMINED THAT A P/N MXH21-3 1 INFL ATABLE HARNE SS IS INS TA LLED, OR THAT THE P/N MXH21-1 INFLATAB LE
HARNE SS INSTALL ED ON THAT FL IGHT CREW OXYGE N MASK REGULATOR HA S B EEN CORRECTED, AS REQUIRED BY
THIS AD.
MOS
18-JUN-2014 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 63 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 014-0 142 R0 1 APP LIA NCE AD - OX YGEN – OXYGE N MASK REGULATOR INFLATABL E HARNESS / INFLA TION HO SE – IDENTIFICATIO N / MANDA TO RY NOT A PPLICA BLE - AD IS N/A BY PN O F OXY GEN
REPLA CE ME NT MASK REGULATOR INFLATABLE HARNESS /
INFLATION HOS E INSTALLED, HENCE NO
FURTHER ACTIO N REQUIRE D.
MOS 08-A PR-2016
18-JUN-2014 HRS /MSC - 131 3.0 2
AFL 851

EAS A 2 014-0 142 R0 1 P ARA ACCOMPLISH A N OXY GEN MAS K REG UL ATO R EQ UIPPE D WITH A P/N MXH20-1 O R P/N MXH21-1 INFLATAB LE MANDA TO RY NOT A PPLICA BLE - AD IS N/A BY PN O F OXY GEN
(2) HARNE SS HA VING A DMF CO DE OF NOVEMBER 2008 (08 45-S OR 0 8/4 5-S) OR E ARLIE R, AND THO SE WITH A DMF OF MASK REGULATOR INFLATABLE HARNESS /
JANUA RY 20 11 ( 1101-S O R 11/01-S ) OR LATER, IS E XCLUDE D FRO M THE INSPECTION AND REPLA CE ME NT INFLATION HOS E INSTALLED, HENCE NO
REQUIRE ME NTS OF P ARA GRAPH ( 1) O F THIS AD FURTHER ACTIO N REQUIRE D.
MOS 08-A PR-2016
18-JUN-2014 HRS /MSC - 131 3.0 2
AFL 851

EAS A 2 014-0 142 R0 1 P ARA ACCOMPLISH IT IS ALLOWED TO INSTALL ON A N AEROP LANE A FLIGHT CREW O XYGEN MASK REGULATOR, HAVING A MANDA TO RY NOT A PPLICA BLE - AD IS N/A BY PN O F OXY GEN
(3) P/N AS IDENTIFIED IN SECTION 1.A .(1) OF ZO DIAC AEROTECHNICS S B MC10-3 5-274, PROVIDE D IT HAS BEEN MASK REGULATOR INFLATABLE HARNESS /
DETERMINED THAT A P/N MXH21-3 1 INFL ATABLE HARNE SS IS INS TA LLED, OR THAT THE P/N MXH20-1 OR P/N INFLATION HOS E INSTALLED, HENCE NO
MXH21-1 INFLATAB LE HA RNESS INSTALLED ON THAT FLIGHT CRE W OX YGEN MA SK RE GULATOR HAS BE EN FURTHER ACTIO N REQUIRE D.
CORRE CTED, AS REQ UIRED BY THIS AD
MOS 08-A PR-2016
18-JUN-2014 HRS /MSC - 131 3.0 2
AFL 851
EAS A 2 014-0 187 APP LIA NCE AD - EQ UIPMENT & FURNISHINGS - SAFETY BELT A TTACHMENT BOLTS - INSPE CTION / REP LACEMENT MANDA TO RY NOT A PPLICA BLE - N/A TO A /C S /N
MOS 31-A UG -2014
03-S EP-20 14 HRS /MSC - 843 .08
AFL 388
EAS A 2 014-0 187 PARA (1) INS PECT THE S AFE TY BE LT ATTACHMENT B OLTS MANDA TO RY NOT A PPLICA BLE - N/A TO A /C S /N
MOS 31-A UG -2014
03-S EP-20 14 HRS /MSC - 843 .08
AFL 388
EAS A 2 014-0 187 PARA (2) IF, DURING THE INS PECTION AS REQUIRED BY PARAGRAPH (1) OF THIS AD, DETACHED O R LOO SENED S AFE TY BE LT MANDA TO RY NOT A PPLICA BLE - N/A TO A /C S /N
ATTACHMENT B OLTS ARE FOUND, BEFORE NE XT FLIGHT, RE- TORQUE THE A FFECTED BO LTS TO THE VA LUE A S
DEFINED IN, AND IN ACCORDANCE WITH THE INSTRUCTIONS O F, GEVE N SB NO. D103-2 5-004 REVISION 2.
MOS 31-A UG -2014
03-S EP-20 14 HRS /MSC - 843 .08
AFL 388

EAS A 2 014-0 187 PARA (3) FOR S PECIFIC D1-03 SEA T ASS EMBLIES (P/N AS IDENTIFIED IN TABL E 1 .1.1 OF G EVEN SB NO . D1 03-25 -004 REVISIO N MANDA TO RY NOT A PPLICA BLE - N/A TO A /C S /N
2, E FF CO DE FROM AA A TO AUC), WITHIN 6 MO NTHS AFTER THE EFFECTIVE DATE O F THIS AD, MODIFY THE SEA T
BEL T ATTACHMENT AS SEMBLY ON THE AISLE SIDE S PREADER O F STANDARD AND LAS T ROW S EATS IN
ACCORDA NCE WITH THE INSTRUCTIO NS OF GEVE N SB NO. D103 -25-00 4 REVISION 2 .
MOS 31-A UG -2014
03-S EP-20 14 HRS /MSC - 843 .08
AFL 388

EAS A 2 014-0 187 PARA (4) AS AN ALTERNA TIVE TO THE CORRECTIV E ACTIONS AS RE QUIRED B Y PARAGRAPH (1) OR (2 ) O F THIS AD, AS MANDA TO RY NOT A PPLICA BLE - N/A TO A /C S /N
APP LICAB LE, BE FO RE NEXT FL IGHT, BLO CK EA CH AFFE CTED SEAT FO R OCCUP ANCY, PENDING ACCO MP LIS HMENT
OF THE APPL ICABL E CORRECTIVE ACTIO N( S).
MOS 31-A UG -2014
03-S EP-20 14 HRS /MSC - 843 .08
AFL 388

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 64 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 015-0 093 APP LIA NCE AD - NAVIGATION - ATTITUDE HEADING REFERENCE SYSTEM - MODIFICATION / REPLACEMENT MANDA TO RY
MOS (EFF)
10-JUN-2015 HRS /MSC -
AFL
EAS A 2 015-0 093 PARA (1) AMEND THE AFM OF THE AIRCRAFT BY INSE RTING A TEMPORARY REVISIO N (TR) TO THE AFM (S UP PLEMENT) MANDA TO RY
MOS
10-JUN-2015 HRS /MSC -
AFL
EAS A 2 015-0 093 PARA (2) MODIFY THE AIRCRAFT B Y REP LACING EACH A HRS UNIT HAVING A P /N SPECIFIED A S ‘OLD’ IN TAB LE 2 O F THIS AD MANDA TO RY
WITH A MODIFIED UNIT, HAV ING A P/N SPECIFIED AS ‘NE W’ IN TABLE 2 OF THIS A D
MOS
10-JUN-2015 HRS /MSC -
AFL
EAS A 2 015-0 093 PARA (3) CONCURRENT WITH MODIFICATIO N OF A N AIRCRAFT AS REQUIRED BY PA RA GRAPH (2 ) O F THIS AD, THE AFM MANDA TO RY
CHA NG E, IF REQUIRED BY PARAG RAP H (1) OF THIS A D (SE E NOTE 1 OF THIS AD), CAN BE RE MO VED FROM THAT
AIRCRAFT
MOS
10-JUN-2015 HRS /MSC -
AFL

EAS A 2 015-0 093 PARA (4) DO NO T INSTAL L O N ANY AIRCRAFT A LCR- 100 AHRS UNIT, HAVING A P /N S PECIFIED A S ‘O LD’ IN TABL E 1 OF THIS AD MANDA TO RY
MOS
10-JUN-2015 HRS /MSC -
AFL
EAS A 2 016-0 024 APP LIA NCE AD - FIRE PROTECTIO N - OPTICAL AND A MB IENT S MO KE DE TE CTORS - IDENTIFICATION / REP LACEMENT MANDA TO RY NOT A PPLICA BLE - FO UND S MO KE DE TE CTORS
N/A BY INSTA LLED AND MANUFACTURER
AFT LA VATORY ;
P/N: 47359 7-2, /IN: 1 156 , KIDDE AE RO SPACE &
DEFENCE
BAG GAGE :
P/N 61 423, S/N: 195 3, KIDDE AE ROS PACE &
DEFENCE
MOS 09-FEB -2016
01-FEB -2016 HRS /MSC - 126 5.6 7
AFL 824
EAS A 2 016-0 024 PARA (1) INS PECT EACH SIE ME NS SMOK E DETECTOR TO DETERMINE WHETHER IT IS A N AFFECTE D PART MANDA TO RY NOT A PPLICA BLE - FO UND S MO KE DE TE CTORS
N/A BY INSTA LLED AND MANUFACTURER
DAYS 09-FEB -2016
01-FEB -2016 HRS /MSC - 126 5.6 7
AFL 824
EAS A 2 016-0 024 PARA (2.1) REPLA CE CARGO COMPARTME NT SMOKE DETECTORS, IDENTIFIED IN PARAG RA PH (1) , IN ACCORDANCE WITH MANDA TO RY NOT A PPLICA BLE - FO UND S MO KE DE TE CTORS
TABLE 1 OR TAB LE 2 N/A BY INSTA LLED AND MANUFACTURER
MOS 09-FEB -2016
01-FEB -2016 HRS /MSC - 126 5.6 7
AFL 824
EAS A 2 016-0 024 PARA (2.2) REPLA CE PA SSENGER, CAB IN OR ANY OTHER ON BOARD L OCATION SMOKE DETECTO RS , IDENTIFIED IN MANDA TO RY NOT A PPLICA BLE - FO UND S MO KE DE TE CTORS
PARAG RA PH (1) , IN A CCORDANCE WITH TA BLE 3 N/A BY INSTA LLED AND MANUFACTURER
MOS 09-FEB -2016
01-FEB -2016 HRS /MSC - 126 5.6 7
AFL 824

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 65 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 016-0 024 PARA (2.3) REPLA CE REPA IRED S MO KE DE TE CTOR IDENTIFIED IN APP ENDIX 1 MANDA TO RY NOT A PPLICA BLE - FO UND S MO KE DE TE CTORS
N/A BY INSTA LLED AND MANUFACTURER
MOS 09-FEB -2016
01-FEB -2016 HRS /MSC - 126 5.6 7
AFL 824
EAS A 2 016-0 024 PARA (3) FRO M THE E FFECTIVE DATE OF THIS AD, DO NOT INS TA LL ON ANY AEROP LANE AN AFFECTE D P/N SMOK E MANDA TO RY NOT A PPLICA BLE - FO UND S MO KE DE TE CTORS
DETECTO R UNL ESS THE UNIT ( GMC ONLY) IS MARKE D 'SIL P MC-26 -002' N/A BY INSTA LLED AND MANUFACTURER
MOS 09-FEB -2016
01-FEB -2016 HRS /MSC - 126 5.6 7
AFL 824
EAS A 2 016-0 044 APP LIA NCE AD - ATA 26 - FIRE P RO TE CTION - ENGINE A ND AUXIL IARY POWER UNIT AUTOMATIC FIRE MANDA TO RY NOT A PPLICA BLE - N/A BY P/N
EXTING UISHERS - INSPECTION/OV ERHA UL
MOS 15-MAR-2 016
22-MAR-2 016 HRS /MSC - 129 8.8 8
AFL 840
EAS A 2 016-0 044 PARA (1) INS PECT EACH FIRE E XTINGUIS HE R, EXCEPT THOSE HAVING P/N 57333 SE RIES, INSTALL ED ON BAE1 46 A ND RJ MANDA TO RY NOT A PPLICA BLE - N/A BY P/N
AEROP LANES, A ND THOS E HAV ING P/N 571 83 SERIE S, INSTAL LED O N ATP AEROPL ANE S, AND DEP ENDING O N
FINDINGS , ACCO MP LIS H CORRECTIVE ACTIONS IN ACCO RDANCE WITH THE INSTRUCTIONS OF KG SB 26-08 0
REVISION 1
MOS 15-MAR-2 016
22-MAR-2 016 HRS /MSC - 129 8.8 8
AFL 840

EAS A 2 016-0 044 PARA (2) ACCOMPLISHME NT OF A N OVE RHAUL (SEE NOTE 2 O F THIS AD) O F A FIRE EXTINGUISHER BY K IDDE G RA VINER OR MANDA TO RY NOT A PPLICA BLE - N/A BY P/N
HUG EN, OR IN A CCORDANCE WITH THE INS TRUCTIONS OF KG SIL 01-10 O R IN ACCO RDANCE WITH KG CMM 26- 21-40
REVISION 14 OR LATER O R KG CMM 26-2 1-52 REVISIO N 13 OR LATER (A S A PPLICABLE TO FIRE E XTINGUISHE R P/N) IS
ACCEPTABLE TO COMPLY WITH THE REQ UIREMENT OF PARAGRAPH (1).
MOS 15-MAR-2 016
22-MAR-2 016 HRS /MSC - 129 8.8 8
AFL 840

EAS A 2 016-0 044 PARA (3) FRO M THE E FFECTIVE DATE OF THIS AD DO NOT INSTALL ON ANY A IRCRA FT AN AFFECTE D FIRE EXTING UISHER, MANDA TO RY NOT A PPLICA BLE - N/A BY P/N
UNL ESS IT IS NEW, OR HA S PASSE D AN INSPE CTION IN ACCORDA NCE WITH THE INSTRUCTIO NS O F KG SB 26-0 80
REVISION 1, OR IT HAS BEEN OVE RHAULED (SEE NOTE 2) B Y K G, OR BY HUG EN OR IN ACCO RDANCE WITH THE
INS TRUCTIONS OF KG SIL 01-10 OR IN ACCO RDANCE WITH THE INSTRUCTIONS OF K G CMM 2 6-21-4 0 REV ISION 14, OR
OF KG CMM 2 6-21-5 2 REV ISION 13, AS AP PLICA BLE TO FIRE EX TINGUIS HER P/N
MOS 15-MAR-2 016
22-MAR-2 016 HRS /MSC - 129 8.8 8
AFL 840
EAS A 2 016-0 163 APP LIA NCE AD - EQ UIPMENT / FURNISHING S – CABIN ATTENDANT SEAT – MO DIFICATIO N / REPL ACEMENT MANDA TO RY NOT A PPLICA BLE - NA TO THE CABIN
ATTENDA NT SEAT BY PN OF THE SEA T
INS TAL LED
MOS 26-A PR-2017
24-A UG -2016 HRS /MSC - (s) 136 3.8
AFL 883
EAS A 2 016-0 163 PARA (1) MODIFY AND RE-IDENTIFY E ACH AFFE CTED CA BIN ATTE NDANT S EAT MANDA TO RY NOT A PPLICA BLE - NA TO THE CABIN
ATTENDA NT SEAT BY PN OF THE SEA T
INS TAL LED
MOS 26-A PR-2017
24-A UG -2016 HRS /MSC - (s) 136 3.8
AFL 883

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 66 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 016-0 163 PARA (2) DO NO T INSTAL L A N AFFE CTED CA BIN ATTE NDANT S EAT O N ANY AEROPL ANE MANDA TO RY NOT A PPLICA BLE - NA TO THE CABIN
ATTENDA NT SEAT BY PN OF THE SEA T
INS TAL LED
MOS 26-A PR-2017
24-A UG -2016 HRS /MSC - (s) 136 3.8
AFL 883
EAS A 2 016-0 164 APP LIA NCE AD - EQ UIPMENT / FURNISHING S - CABIN ATTENDA NT SEAT - INSPECTIO N (SUPE RSE DE D BY EAS A AD MANDA TO RY
201 7-0001 )
MOS
24-A UG -2016 HRS /MSC -
AFL
EAS A 2 016-0 164 PARA (1) VISUAL INSP ECTION O F EACH A FFECTED CABIN A TTENDANT SEA T NOT A PPLICA BLE - NA TO THE CABIN
ATTENDA NT SEAT BY PN OF THE SEA T
INS TAL LED
DAYS 26-A PR-2017
24-A UG -2016 HRS /MSC - 136 3.8
AFL 883
EAS A 2 016-0 164 PARA (2) REPLA CE THE S EAT P AN OF THE AFFECTED SEAT (IF DURING ANY INSP ECTION AS RE QUIRED B Y P ARA ( 1) O F THIS MANDA TO RY
AD, ANY DAMAGED SEAT PAN IS FOUND)
MOS
24-A UG -2016 HRS /MSC BF/F (s)
AFL
EAS A 2 016-0 164 PARA (3) REPLA CE ME NT OF A SEA T PAN ON A SE AT, AS RE QUIRED BY PARA (2) OF THIS AD, DOES NOT CONSTITUTE MANDA TO RY
TERMINATING ACTION FO R THE REPE TITIVE INSPECTIO NS REQUIRE D BY PARA (1) OF THIS A D FOR THAT SE AT
MOS
24-A UG -2016 HRS /MSC - (s)
AFL
EAS A 2 016-0 164 PARA (4) TEMPORARIL Y S TO WING AND SECURING AN A TTENDANT SEA T IN RETRACTED P OSITION TO PREV ENT OCCUPA NCY, MANDA TO RY
IN ACCORDA NCE WITH THE PROVISIO NS AND L IMITA TIONS OF THE A PPLICABLE MASTER MINIMUM EQ UIPMENT LIST
ITE M, IS AN A CCEP TAB LE ALTERNATIVE METHOD TO DE FE R COMPLIANCE WITH THE REQUIREMENTS OF PA RA (1)
OR (2) OF THIS AD
MOS
24-A UG -2016 HRS /MSC - (s)
AFL

EAS A 2 016-0 164 PARA (5) FRO M THE E FFECTIVE DATE OF THIS AD, IT IS ALLOWED TO INSTALL ON A NY AE RO PLANE AN A FFECTED SE AT, MANDA TO RY
HAVING A CCUMULA TE D MORE THAN 2,5 00 FC SINCE FIRST INS TA LLATION ON AN AE RO PLANE, P RO VIDED THAT,
BEFORE INS TAL LATIO N, THE SEAT HA S P ASSE D AN INSPECTION IN ACCORDA NCE WITH THE INSTRUCTIO NS OF
ZODIA C SB 536- 25-003
MOS
24-A UG -2016 HRS /MSC - (s)
AFL
EAS A 2 016-0 167 APP LIA NCE AD - ATA 25 - EQUIP ME NT / FURNIS HINGS - REA R CABIN ATTENDA NT SEAT - INSPECTIO N / REPA IR MANDA TO RY
MOS
31-A UG -2016 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 67 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 016-0 167 PARA (1) REMOVE SEA T FRO M THE A ERO PLANE AND ACCOMPLISH A DETAILED VIS UA L INSPECTIO N IN ACCORDA NCE WITH MANDA TO RY NOT A PPLICA BLE - NA TO THE CABIN
THE INSTRUCTIONS OF S ECTION 2 , SUBPART B O F ZODIAZ SEATS FRANCE SB NO. 536 -25-00 2 ATTENDA NT SEAT BY PN OF THE SEA T
INS TAL LED
MOS 26-A PR-2017
31-A UG -2016 HRS /MSC - 136 3.8
AFL 883
EAS A 2 016-0 167 PARA (2) WITHIN 3 MO NTHS AFTER THE INS PECTION AS RE QUIRED B Y PARAGRAPH (1) AND THE RE AFTER AT INVALS NOT TO MANDA TO RY NOT A PPLICA BLE - NA TO THE CABIN
EXCEE D 3 MONTHS, A CCOMPLISH A DETAILED VIS UA L INSPECTIO N (DVI) IN A CCORDANCE WITH THE INS TRUCTIONS ATTENDA NT SEAT BY PN OF THE SEA T
OF SECTION 2 O F ZODIAC SEATS FRA NCE SB NO. 53 6-25-00 2. INS TAL LED
MOS 26-A PR-2017
31-A UG -2016 HRS /MSC - 136 3.8
AFL 883

EAS A 2 016-0 167 PARA (3) IF DURING ANY INS PECTION RE QUIRED BY PARAGRAPH (1) OR (2 ) O F THIS AD, AS APP LICAB LE, CORROSION OR ANY MANDA TO RY
OTHER DAMAGE IS FO UND, BEFORE NEXT FLIGHT, OR B EFORE REINSTALLATION O F THE SE AT ON AN AE RO PLANE,
AS APP LICAB LE, A CCOMPLISH THE APPL ICABL E TEMPO RA RY CORRECTIVE ACTIONS IN ACCORDA NCE WITH THE
INS TRUCTIONS OF ZODIA C SEA TS FRANCE SB NO. 53 6-25-0 02 SECTION 2 S UB PART B AND C,
MOS
31-A UG -2016 HRS /MSC BF/F
AFL

EAS A 2 016-0 167 PARA (4) TEMPORARIL Y S TO WING AND SECURING A DA MA GED A TTENDANT SEA T IN RETRACTED P OSITION TO PREV ENT MANDA TO RY
OCCUP ANCY , IN ACCO RDANCE WITH THE P RO VIS IONS AND LIMITATIONS O F THE AP PLICA BLE MASTER MINIMUM
EQUIPMENT LIST ITEM, IS AN ACCE PTABLE ALTERNATIV E METHOD TO DEFER COMPLIANCE WITH THE
REQUIRE ME NTS OF P ARA GRAPH ( 3) O F THIS AD.
MOS
31-A UG -2016 HRS /MSC -
AFL
EAS A 2 016-0 167 PARA (5) FRO M THE E FFECTIVE DATE OF THIS AD, IT IS ALLOWED TO INSTALL (SEE NOTE OF THIS AD) ON ANY AEROP LANE MANDA TO RY
AN AFFECTED S EAT, HAVING A CCUMULA TE D MORE THAN 1 4 MONTHS S INCE FIRST INS TA LLATION ON AN
AEROP LANE, PROV IDED THAT, BE FO RE (RE)INSTA LLATION, IT HA S P ASSE D AN INSPECTIO N IN ACCORDA NCE WITH
THE INSTRUCTIONS OF S ECTION 2 , SUBPART B , OF ZODIAC SE ATS FRANCE S B NO. 536-25 -002.
MOS
31-A UG -2016 HRS /MSC -
AFL

EAS A 2 016-0 210 APP LIA NCE AD - EQ UIPMENT / FURNISHING S - SEA T ENERGY ABS ORBER A SSEMBL Y - REPLA CE ME NT MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
& CABIN ATTENDANT S EAT B Y P N OF THE SEA T
INS TAL LED.
MOS 26-A PR-2017
07-NOV -2016 HRS /MSC - (s) 136 3.8
AFL 883

EAS A 2 016-0 210 PARA (1) REPLA CE THE E A A SSEMBL IES ON EACH AFFECTED SE AT WITH S ERVICEA BLE ASS EMBLIES IN ACCORDANCE WITH MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
THE INSTRUCTIONS OF B /E AEROS PACE FISCHER SB 99 11-001 & CABIN ATTENDANT S EAT B Y P N OF THE SEA T
INS TAL LED.
DAYS 26-A PR-2017
07-NOV -2016 HRS /MSC - (s) 136 3.8
AFL 883

EAS A 2 016-0 210 PARA (2) INS TAL LATIO N OF AN AFFECTE D SEA T ON A N AIRCRAFT IS ALLOWE D, P RO VIDED THAT, P RIOR TO INS TAL LATIO N, IT MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
IS DETERMINED THAT THE EA ASS EMBLIES HA VE BEEN RE PLACED IN A CCORDANCE WITH THE INS TRUCTIONS OF & CABIN ATTENDANT S EAT B Y P N OF THE SEA T
B/E AEROSP ACE FISCHE R SB 9911 -001 INS TAL LED.
MOS 26-A PR-2017
07-NOV -2016 HRS /MSC - (s) 136 3.8
AFL 883

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 68 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 016-0 256 APP LIA NCE AD - EQ UIPMENT / FURNISHING S - PILOT AND CO-PILOT SEATS - MODIFICATIO N (SUPERSE DE D BY EAS A MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
AD 2018-0 262) & CABIN ATTENDANT S EAT B Y P N OF THE SEA T
INS TAL LED.
MOS 26-A PR-2017
30-DEC-20 16 HRS /MSC - 136 3.8
AFL 883
EAS A 2 016-0 256 PARA (1) MODIFY AND RE-IDENTIFY E ACH AFFE CTED SEAT MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
& CABIN ATTENDANT S EAT B Y P N OF THE SEA T
INS TAL LED.
MOS 26-A PR-2017
30-DEC-20 16 HRS /MSC - 136 3.8
AFL 883
EAS A 2 016-0 256 PARA (2) DO NO T INSTAL L A N AFFE CTED SEAT ON ANY AEROP LANE MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
& CABIN ATTENDANT S EAT B Y P N OF THE SEA T
INS TAL LED.
MOS 26-A PR-2017
30-DEC-20 16 HRS /MSC - 136 3.8
AFL 883
EAS A 2 017-0 001 APP LIA NCE AD - EQ UIPMENT / FURNISHING S - CABIN ATTENDA NT SEAT - INSPECTIO N MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
& CABIN ATTENDANT S EAT B Y P N OF THE SEA T
INS TAL LED.
MOS 26-A PR-2017
20-JAN-20 17 HRS /MSC - (s) 136 3.8
AFL 883

EAS A 2 017-0 001 PARA (1) VISUAL INSP ECTION O F EACH G RO UP 1 CABIN ATTENDA NT SEAT MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
& CABIN ATTENDANT S EAT B Y P N OF THE SEA T
INS TAL LED.
MOS 26-A PR-2017
20-JAN-20 17 HRS /MSC 136 3.8
AFL 100 (s) 883
EAS A 2 017-0 001 PARA (2) REPLA CE THE A FFECTED SE AT PA N WITH A PRE MOD S EAT P AN P/N F0433 453 OR MODIFY THE SEAT BY INSTALLING MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
A REINFORCED SE AT PA N P/N F05115 30 & CABIN ATTENDANT S EAT B Y P N OF THE SEA T
INS TAL LED.
MOS 26-A PR-2017
20-JAN-20 17 HRS /MSC - (s) 136 3.8
AFL 883
EAS A 2 017-0 001 PARA (3) TEMPORARIL Y S TO WING AND SECURING AN A TTENDANT SEA T IN RETRACTED P OSITION TO PREV ENT OCCUPA NCY, MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
IN ACCORDA NCE WITH THE PROVISIO NS AND L IMITA TIONS OF THE A PPLICABLE MASTER MINIMUM EQ UIPMENT LIST & CABIN ATTENDANT S EAT B Y P N OF THE SEA T
ITE M, IS AN A CCEP TAB LE ALTERNATIVE METHOD TO DE FE R COMPLIANCE WITH THE REQUIREMENTS OF PA RA (1) INS TAL LED.
OR (2) OF THIS AD
MOS 26-A PR-2017
20-JAN-20 17 HRS /MSC - (s) 136 3.8
AFL 883
EAS A 2 017-0 001 PARA (4) REPLA CE ME NT OF A SEA T PAN WITH A PRE-MOD SEAT PAN P /N F04 33453 DOES NOT CONSTITUTE TE RMINA TING MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
ACTIO N FOR THE REP ETA TIVE INS PECTIONS REQUIRED BY PARA (1). IF A NEW P RE -MO D SE AT PAN P/N F04334 53 IS & CABIN ATTENDANT S EAT B Y P N OF THE SEA T
INS TAL LED O N A SEAT THE NEXT V IS UAL INSPECTIO N REQUIRED BY PARA (1) MAY BE DE FFERED UNTIL 250 0 FC A T INS TAL LED.
THA T INS TAL LATIO N
MOS 26-A PR-2017
20-JAN-20 17 HRS /MSC - (s) 136 3.8
AFL 883

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 69 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 017-0 001 PARA (5) MODIFICA TION O F A SEA T BY INSTAL LING A RE INFORCE D SEA T PAN P/N F05115 30 A ND UP DA TING THE SEAT P/N MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
CONSTITUTE S TERMINATING A CTION FOR THE RE PETATIV E INSPECTIO NS REQUIRE D BY PARA (1) & CABIN ATTENDANT S EAT B Y P N OF THE SEA T
INS TAL LED.
MOS 26-A PR-2017
20-JAN-20 17 HRS /MSC - (s) 136 3.8
AFL 883
EAS A 2 017-0 001 PARA (6) IT IS A LLOWED TO INS TA LL (SEE NOTE 2 ) O N ANY AEROPLA NE A GROUP 1 CA BIN ATTE NDANT S EAT (S EE NO TE 1) MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
HAVING A CCUMULA TE D MORE THAN 2500 FC SINCE FIRST INSTALLA TION ON AN AEROPL ANE P RO VIDED THAT, & CABIN ATTENDANT S EAT B Y P N OF THE SEA T
BEFORE INS TAL LATIO N, THE SEAT HA S P ASSE D AN INSPECTION IAW ZODIAC SE ATS FRANCE S B 5 36-25-0 03 INS TAL LED.
MOS 26-A PR-2017
20-JAN-20 17 HRS /MSC - (s) 136 3.8
AFL 883

EAS A 2 017-0 001 PARA (7) FOR G RO UP 2 CABIN ATTENDA NT SEATS, FROM THE EFFECTIVE DA TE OF THIS A D DO NO T INSTAL L A PRE-MOD MANDA TO RY NOT A PPLICA BLE - N/A TO THE PIL OT, CO -PILOT
SEA T PAN P/N F04334 53 & CABIN ATTENDANT S EAT B Y P N OF THE SEA T
INS TAL LED.
MOS 26-A PR-2017
20-JAN-20 17 HRS /MSC - (s) 136 3.8
AFL 883

EAS A 2 018-0 259 APP LIA NCE AD - INFO RMATION SY STE MS - ELE CTRONIC FL IGHT B AG UNIVERSAL SE RIAL BUS RECEPTACLE - MANDA TO RY NOT A PPLICA BLE - N/A DUE TO RE CE PTA CL E
MODIFICA TION PART NUMBER
MOS 29-JUL-20 20
14-DEC-20 18 HRS /MSC - (s) 196 8.0 2
AFL 132 3
EAS A 2 018-0 259 PARA (2) AFTER MODIFICATION OF AN AEROPL ANE A S REQ UIRED B Y P ARAGRAPH (1) O F THIS AD, DO NO T INSTAL L A N MANDA TO RY NOT A PPLICA BLE - N/A DUE TO RE CE PTA CL E
AFFECTE D PART O N THA T AEROP LANE. PART NUMBER
MOS 29-JUL-20 20
14-DEC-20 18 HRS /MSC - (s) 196 8.0 2
AFL 132 3
EAS A 2 018-0 259 R0 1 APP LIA NCE AD - INFO RMATION SY STE MS - ELE CTRONIC FL IGHT B AG UNIVERSAL SE RIAL BUS RECEPTACLE - MANDA TO RY NOT A PPLICA BLE - By Pa rt: N/A DUE TO
MODIFICA TION RECEPTACLE PART NUMBER
MOS
07-FEB -2019 HRS /MSC -
AFL
EAS A 2 020-0 272 APP LIA NCE AD - EQ UIPMENT / FURNISHING S - BUCKLE - MO DIFICATION / REP LACEMENT MANDA TO RY NOT A PPLICA BLE - No t Equip ped: N/A
EQUIPMENT IS NOT INSTALL ED ON A/C
MOS
23-DEC-20 20 HRS /MSC -
AFL
EAS A 2 020-0 272 PARA (1) MODIFY EACH A FFECTED BUCKLE OR RE PLACE THE AFFECTE D BUCKLE WITH A SE RV ICEAB LE BUCKL E MANDA TO RY NOT A PPLICA BLE - No t Equip ped: N/A
EQUIPMENT IS NOT INSTALL ED ON A/C
MOS
23-DEC-20 20 HRS /MSC
AFL
EAS A 2 020-0 272 PARA (2) REPLA CE EA CH AFFE CTED B UCKL E WITH A SERVICE ABLE BUCKLE (IF POS T- MO DIFICATIO N AND P RE- RE PLACEMENT MANDA TO RY NOT A PPLICA BLE - No t Equip ped: N/A
PER PARA (1)) EQUIPMENT IS NOT INSTALL ED ON A/C
MOS
23-DEC-20 20 HRS /MSC
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 70 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

EAS A 2 021-0 137 APP LIA NCE AD - EQ UIPMENT / FURNISHING S - PILOT AND CO-PILOT SEATS / LONGITUDINA L L OCKING SYS TE M PINS - MANDA TO RY NOT A PPLICA BLE - By Pa rt: DUE TO INSTA LLED
MEASUREMENT / A DJUSTME NT PN
MOS
22-JUN-2021 HRS /MSC
AFL
EAS A 2 021-0 185 R0 1 APP LIA NCE AD - FIRE PROTECTIO N - HAND-OP ERATE D FIRE EXTING UISHERS - INSPECTIO N / REPL ACE ME NT NOT A PPLICA BLE - By Pa rt: DUE TO INSTA LLED
PN
DAYS
19-A UG -2021 HRS /MSC
AFL
FAA 2011- 01-09 APP LIA NCE AD - B/E AEROS PACE PRO TE CTIVE BREATHING EQUIPMENT (PBE ) P ART NUMBER 1190 03-11 INS TAL LED MANDA TO RY NOT A PPLICA BLE - NO T APP LICAB LE PER P /N
AND S /N INSTALLE D ON THE A/C
MOS 31-MAR-2 012
09-FEB -2011 HRS /MSC - 6.4
AFL 5
FAA 2012- 11-09 APP LIA NCE AD - THIS AD WA S P RO MP TE D BY THE DETERMINATIO N THA T THE CURRENT DES IGN OF CHEMICAL AIRWO RTHINES S NOT A PPLICA BLE
OXY GEN GENERATORS P RE SENTS A HAZARD THAT COULD JEOP ARDIZE FLIGHT SA FE TY . DIRECTIV E
MOS 01-JUL-20 12
HRS /MSC -
AFL
FAA 2012- 26-15 R01 APP LIA NCE AD - AIR DATA PRESSURE TRANSDUCERS, AS INS TAL LED IN A IR DATA COMPUTE RS (ADC), AIR DATA MANDA TO RY
MODULES (ADM), AIR DATA A TTITUDE HE ADING REFE RE NCE SYS TE MS (ADAHRS), A ND DIGITAL AIR DA TA
COMPUTE RS (DADC)
MOS (EFF)
03-DEC-20 14 HRS /MSC -
AFL
FAA 2014- 18-01 APP LIA NCE AD - NAVIGATION - ROCKWELL COLLINS, INC. MODE S TRANSP ONDE RS - INSP ECTION / MO DIFICATION MANDA TO RY NOT A PPLICA BLE - NA BY TRANSPONDER P /N
MOS 05-NOV -2014
14-O CT-20 14 HRS /MSC -
AFL
FAA 2015- 08-07 APP LIA NCE AD - OX YGEN - ZODIAC A ERO TE CHNICS (FORMERLY INTERTECHNIQ UE AIRCRAFT S YSTEMS) MANDA TO RY NOT A PPLICA BLE - N/A BY REGULATOR DATE
FLIG HTCREW O XYGEN MASK REGULATORS - INSPECTIO N / REPL ACEMENT OF INFL ATA BLE HARNE SSES OF MA NUFACTURE
MOS 06-JUN-2015
16-JUN-2015 HRS /MSC - (s) 111 1.5 3
AFL 733
FAA 2015- 08-07 PA RA (G) INS PECT THE INFLA TA BLE HARNE SS FITTED TO E ACH FLIG HTCREW OX YGEN MA SK RE GULATOR TO DETERMINE IF MANDA TO RY NOT A PPLICA BLE - N/A BY REGULATOR DATE
THE INFLA TA BLE HARNE SS IS INS TAL LED WITH A PART NUMB ER AND A BA TCH NUMBER IDENTIFIE D IN APPE NDIX I OF MA NUFACTURE
OF ZO DIAC A EROSPACE SERVICE BULLETIN MXH-35-240 , REVISIO N 7, DATED SEPTEMBER 1, 20 11 ( FO R ALL
AIRPLANES OTHER THAN BO MB ARDIER AIRPLA NE S); OR APPE NDIX I OF ZODIAC AE RO SPACE SERVICE B ULL ETIN
MXH-35-2 41, REVISION 3, DA TE D JUNE 23, 2 011 (FOR BO MB ARDIER A IRPLA NE S)
MOS 06-JUN-2015
16-JUN-2015 HRS /MSC - (s) 111 1.5 3
AFL 733
FAA 2015- 08-07 PA RA (H) REPLA CE THE INFL ATABLE HARNE SS IDENTIFIED IN PAP RG RA PH G WITH A NEW OR RE-IDENTIFIED HA RNES SES MANDA TO RY NOT A PPLICA BLE - N/A BY REGULATOR DATE
OF MA NUFACTURE
MOS 06-JUN-2015
16-JUN-2015 HRS /MSC - (s) 111 1.5 3
AFL 733

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 71 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2015- 10-02 APP LIA NCE AD - EQ UIPMENT/FURNISHINGS - ZODIAC SEATS FRA NCE - INSPE CTION/REPL ACE ME NT MANDA TO RY NOT A PPLICA BLE - AD N/A B Y P N
MOS 11-JUN-2015
12-JUN-2015 HRS /MSC - (s) 111 9.1 8
AFL 737
FAA 2015- 10-02 PA RA (G) GENERAL VISUAL INS PECTION FO R CRA CK ING OF SE AT BA CK RE ST LINKS HA VING PART NUMBER (P/N) MANDA TO RY NOT A PPLICA BLE - AD N/A B Y P N
90-0 00200 -104-1 , P/N 90-0 00200 -104-2 , P/N 90-0 00202- 104-1 AND P /N 9 0-000 202-10 4-2
MOS 11-JUN-2015
12-JUN-2015 HRS /MSC - (s) 111 9.1 8
AFL 737
FAA 2015- 10-02 PA RA (H) CORRE CTIVE ACTIONS - CRACKING IS FO UND ON THE L INK MANDA TO RY NOT A PPLICA BLE - AD N/A B Y P N
MOS 11-JUN-2015
12-JUN-2015 HRS /MSC - (s) 111 9.1 8
AFL 737
FAA 2015- 10-02 PA RA (I) REPLA CE AL L S EAT B ACK RE ST LINKS, HAV ING P/N 90-0 00200- 104-1, P/N 90-00 0200-1 04-2, P/N 90-00 0202-1 04-1 AND P/N MANDA TO RY NOT A PPLICA BLE - AD N/A B Y P N
90-0 00202 -104-2 , WITH NEW LINKS
MOS 11-JUN-2015
12-JUN-2015 HRS /MSC - (s) 111 9.1 8
AFL 737
FAA 2015- 10-51 APP LIA NCE AD - AV IDYNE INTEGRATED FLIGHT DISPLAY (IFD) - INCO RP ORA TE OP ERATIONAL LIMITATIONS INTO MANDA TO RY NOT A PPLICA BLE - N/A TO THIS A/C. AVIDYNE
LIMITATIO NS SE CTION OF THE AFM O R AFMS IFDS NOT FITTED.
MOS 11-JUN-2015
01-JUL-20 15 HRS /MSC - 111 9.1 8
AFL 737
FAA 2015- 10-51- E APP LIA NCE/EMERGENCY AD - AVIDYNE INTEGRATED FLIGHT DIS PLAY (IFD)- INCORPORATE OPE RA TIONAL MANDA TO RY NOT A PPLICA BLE - BY INSTALL ED P/N
LIMITATIO NS INTO LIMITATIO NS SE CTION O F THE AFM O R AFMS.
MOS 10-JUN-2015
18-MAY -2015 HRS /MSC -
AFL
FAA 2015- 16-04 APP LIA NCE AD - FIRE PROTECTIO N - MO DIFY A LL KIDDE GRAVINE R HAND- OPERATED FIRE E XTINGUIS HE RS HAVING MANDA TO RY NOT A PPLICA BLE - N/A BY P/N
PART NUMBERS 56412 -001 (34H), 5 6411-0 01 (35H), AND 5 6412- 002 (38H)
MOS 15-MAR-2 016
15-S EP-20 15 HRS /MSC - (s) 129 8.8 8
AFL 840
FAA 2015- 23-09 APP LIA NCE AD - OX YGEN - ZODIAC A ERO TE CHNICS (FORMERLY INTERTECHNIQ UE AIRCRAFT S YSTEMS) FLIGHT MANDA TO RY NOT A PPLICA BLE - CO MP LIE D ON 26TH NOV,
CRE W OX YGEN MA SK RE GULATORS - INSPECTIO N / REPLA CE ME NT OF OX YGEN MA SK RE GULATORS 201 5 A ND FO UND B OTH CRE W O2 MASKS A RE
UN- AFFECTED B Y FAA AD 2015 -23-029 .
MOS 26-NOV -2015
28-DEC-20 15 HRS /MSC -
AFL

FAA 2015- 23-09 PA RA (G) INS PECT EACH FLIGHTCREW OXY GEN MAS K REG UL ATO R TO IDENTIFY THE PART NUMBER A ND SERIA L NUMBER MANDA TO RY NOT A PPLICA BLE - CO MP LIE D ON 26TH NOV,
201 5 A ND FO UND B OTH CRE W O2 MASKS A RE
UN- AFFECTED B Y FAA AD 2015 -23-029 .
DAYS 26-NOV -2015
28-DEC-20 15 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 72 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2015- 23-09 PA RA (H)(1) REPLA CE EA CH AFFE CTED FLIGHTCREW OXYG EN MASK WITH A PART IDE NTIFIED IN P ARAGRAPH (H) (1)(I) O R MANDA TO RY NOT A PPLICA BLE - CO MP LIE D ON 26TH NOV,
(H)(1)(II). 201 5 A ND FO UND B OTH CRE W O2 MASKS A RE
UN- AFFECTED B Y FAA AD 2015 -23-029 .
DAYS 26-NOV -2015
28-DEC-20 15 HRS /MSC -
AFL
FAA 2015- 23-09 PA RA (H)(2.I) REVISE THE EMERGE NCY PROCEDURES SE CTION O F THE AIRPLANE FLIG HT MA NUAL (AFM) BY INSERTING THE MANDA TO RY NOT A PPLICA BLE - CO MP LIE D ON 26TH NOV,
STATEMENT PROV IDED IN FIGURE 1 201 5 A ND FO UND B OTH CRE W O2 MASKS A RE
UN- AFFECTED B Y FAA AD 2015 -23-029 .
DAYS 26-NOV -2015
28-DEC-20 15 HRS /MSC -
AFL

FAA 2015- 23-09 PA RA FABRICATE AND INSTA LL A PLACARD ON THE FLIG HTCREW O XYGEN MASK CONTAINER THAT S TATES : "USE MANDA TO RY NOT A PPLICA BLE - CO MP LIE D ON 26TH NOV,
(H)(2.II) SEL ECTO R ON 1 00% OR EMERG ENCY ONLY ." 201 5 A ND FO UND B OTH CRE W O2 MASKS A RE
UN- AFFECTED B Y FAA AD 2015 -23-029 .
DAYS 26-NOV -2015
28-DEC-20 15 HRS /MSC -
AFL
FAA 2015- 23-09 PA RA (I) REGULATOR RE PLACEMENT MANDA TO RY NOT A PPLICA BLE - CO MP LIE D ON 26TH NOV,
201 5 A ND FO UND B OTH CRE W O2 MASKS A RE
UN- AFFECTED B Y FAA AD 2015 -23-029 .
MOS 26-NOV -2015
28-DEC-20 15 HRS /MSC -
AFL

FAA 2016- 11-20 APP LIA NCE AD - OX YGEN - INSPECTIO N AND REP LACEMENT OF B /E AE RO SPACE PROTECTIVE BREATHING MANDA TO RY NOT A PPLICA BLE - N/A BY MANUFACTURER
EQUIPMENT (PB E), PA RT NUMBER 11900 3-11 THAT ARE INSTALLE D ON AIRPL ANE S. SUPE RSE DE D BY FAA AD AND P ART NUMBERS. NO FURTHER A CTION
201 7-18-1 2 REQUIRE D.
MOS 12-JUN-2016
15-JUL-20 16 HRS /MSC - 136 3.5 8
AFL 882
FAA 2016- 11-20 PA RA (H)(1) REPLA CE ME NT OF A PBE PO UCH, FO UND DURING THE INS PECTION IN PARAGRAPH (G) OF THIS AD, THAT DOE S NOT MANDA TO RY NOT A PPLICA BLE - N/A BY MANUFACTURER
HAVE AN INTACT VACUUM SEA L. SUPERSEDED BY FAA AD 201 7-18-1 2 AND P ART NUMBERS. NO FURTHER A CTION
REQUIRE D.
MOS 12-JUN-2016
15-JUL-20 16 HRS /MSC - 136 3.5 8
AFL 882
FAA 2016- 11-20 PA RA (H)(2) REPLA CE ME NT OF A PBE PO UCH, FOUND DURING THE INSPECTION IN PARAG RA PH (G ) O F THIS AD, WHE RE THE MANDA TO RY NOT A PPLICA BLE - N/A BY MANUFACTURER
VACUUM SEA L IS INTACT. SUPERSEDED BY FA A A D 201 7-18-1 2 AND P ART NUMBERS. NO FURTHER A CTION
REQUIRE D.
MOS 12-JUN-2016
15-JUL-20 16 HRS /MSC - 136 3.5 8
AFL 882
FAA 2017- 04-06 APP LIA NCE AD - CABIN S YSTEMS - REPL ACEMENT OF UNITED INSTRUMENTS INC. 5934 SE RIES ALTIMETE RS MANDA TO RY NOT A PPLICA BLE - SINCE UNITE D
MANUFACTURE D BETWEEN JANUARY 2015 AND FEB RUARY 2016 INS TRUME NTS, INC. 5934 SE RIES ALTIME TE RS
NOT INSTALLED ON THIS AIRCRAFT
MOS 26-A PR-2017
07-A PR-2017 HRS /MSC - (s) 136 3.8
AFL 883

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 73 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2017- 09-09 APP LIA NCE AD - PA SSENGE R COMPARTME NT EQUIP ME NT - REP LACEMENT OF ZODIAC S EATS CAL IFORNIA LLC MANDA TO RY NOT A PPLICA BLE - N/A AS PER SEAT P/N
SEA TING SYSTEMS
MOS 20-JUN-2017
28-JUN-2017 HRS /MSC - (s)
AFL
FAA 2017- 16-01 APP LIA NCE AD - EQ UIPMENT / FURNISHING S - AMERI-KING CORPORATION MODEL AK-4 50() AND AK -451() SE RIES MANDA TO RY COMPLIED WITH
EMERGENCY LOCATOR TRANSMITTERS - REPE TA TIVE INSP ECTIONS, CHECKS, TES TS AND V ERIFICATIONS
MOS 27-S EP-20 18
24-O CT-20 17 HRS /MSC - (s) 162 5.4
AFL 107 4
FAA 2017- 16-01 PA RA (J) OPTIONAL TE RMINATING ACTION: REPLA CE EL T WITH A SE RV ICEAB LE FAA -APPROV ED EL T MANDA TO RY
MOS
24-O CT-20 17 HRS /MSC - (s)
AFL
FAA 2017- 18-12 APP LIA NCE AD - OX YGEN - INSPECTIO N AND REP LACEMENT OF B /E AE RO SPACE PROTECTIVE BREATHING MANDA TO RY NOT A PPLICA BLE
EQUIPMENT (PB E), PA RT NUMBER 11900 3-11 AND 11 9003-2 1 THAT A RE INS TA LLED O N AIRPLANES
MOS 29-MAR-2 018
16-O CT-20 17 HRS /MSC - (s) 153 4.3
AFL 988
FAA 2017- 18-12 PA RA (G) INS PECTION RE TAINED FROM A D 201 6-11-2 0 FOR AIRPL ANES WITH PBE , P/N 119 003-11 , INSTALL ED MANDA TO RY
MOS
16-O CT-20 17 HRS /MSC - (s)
AFL
FAA 2017- 18-12 PA RA (H) REPLA CE ME NT RE TAINED FROM A D 201 6-11-20 FOR AIRPL ANE S WITH PBE , P/N 119 003-11 , INSTALL ED MANDA TO RY
MOS
16-O CT-20 17 HRS /MSC - (s)
AFL

FAA 2017- 18-12 PA RA (I) & INS PECT TO DE TERMINE IF THE S/N O F THE INSTA LLED PBE, P /N 11900 3-21, IS WITHIN THE RANGE OF 00 4-1476 8M NOT A PPLICA BLE
(J) THROUGH 004-2 1093M OR 0 04-023 93M THRO UG H 004 -03033 M AND IF FOUND WITHIN THE S/N RANGE REPLA CE IT.
MOS 29-MAR-2 018
16-O CT-20 17 HRS /MSC - 153 4.3
AFL 988
FAA 2019- 15-10 APP LIA NCE AD - EQ UIPMENT / FURNISHING - LIFE JACKET - REMOVA L / RE PAIR MANDA TO RY
MOS
19-S EP-20 19 HRS /MSC - (s)
AFL
FAA 2019- 15-10 PA RA (G) REMOVE EACH AFFECTED L IFE JA CK ET FRO M THE A IRPLA NE AND REP LACE THE LIFE JACKET WITH A LIFE JACKET MANDA TO RY NOT A PPLICA BLE - LIFE JACKETS INSPE CTED
ELIGIBLE FOR INSTALLATION AND FOUND NOT FALL INTO AFFECTE D
EQUIPMENT OF SAFRA N SB 25- 65-33 R2
MOS 13-MAR-2 020
19-S EP-20 19 HRS /MSC - 192 6.4
AFL 127 5

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 74 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2019- 15-10 PA RA (H) DO NO T INSTAL L O N ANY AIRPL ANE A N AFFECTED LIFE JACKET UNLES S IT HAS BE EN REPAIRED A ND MA RK ED TO MANDA TO RY
INDICA TE COMPLIANCE WITH SUCH REPAIR IN ACCORDANCE WITH ZODIAC A EROSPACE SERVICES SB 25-65 -34,
REVISION 01 , DA TE D MARCH 15, 2 019, O R ORIG INAL ISSUE, DATED JANUARY 8, 2019 ; OR A METHOD A PPROVED BY
THE FAA
MOS
19-S EP-20 19 HRS /MSC - (s)
AFL
FAA 2019- 20-03 APP LIA NCE AD - INFO RMATION SY STE MS - ELE CTRONIC FL IGHT B AG UNIVERSAL SE RIAL BUS RECEPTACLE - MANDA TO RY NOT A PPLICA BLE - TO TIS A IRCRA FT
MODIFICA TION
MOS 04-S EP-20 20
19-NOV -2019 HRS /MSC - 199 7.9 7
AFL 134 4
FAA 2020- 16-08 APP LIA NCE AD - AS PEN A VIO NICS, INC. - EFD1000 FLIGHT DIS PLAY SYS TE MS - AIRP LANE FLIGHT MANUAL - REV IS ION MANDA TO RY NOT A PPLICA BLE - By Pa rt: DUE TO INSTA LLED
PN AND MODEL
MOS
17-A UG -2020 HRS /MSC -
AFL
FAA 2020- 18-51 APP LIA NCE AD - SA NDIA AEROSPA CE - AIRP LANE FL IGHT MANUAL - SECTION LIMITATIONS - AMENDMENT MANDA TO RY NOT A PPLICA BLE - By Pa rt: DUE TO MODEL AND
PN
MOS
28-S EP-20 20 HRS /MSC -
AFL
FAA 2020- 18-51- E APP LIA NCE/EMERGENCY AD - SANDIA A ERO SPACE - AIRPL ANE FLIGHT MANUAL - S ECTION L IMITATIONS - MANDA TO RY NOT A PPLICA BLE - By Pa rt: DUE TO PN
AMENDME NT
MOS
31-A UG -2020 HRS /MSC -
AFL
FAA 2020- 21-02 APP LIA NCE AD - FIRE PROTECTIO N - KIDDE AEROSP ACE & DEFENSE CARG O FIRE E XTINGUIS HE R HALON BOTTLES - MANDA TO RY NOT A PPLICA BLE - No t Equip ped: DUE TO
REPLA CE ME NT EQUIPMENT NOT INSTALLED ON A /C
MOS
19-NOV -2020 HRS /MSC -
AFL
FAA 2020- 21-02 PA RA (H) & DO AN INS PECTION TO DETERMINE THE PA RT NUMBER AND SERIAL NUMBER OF THE CARGO FIRE EX TINGUISHER MANDA TO RY NOT A PPLICA BLE - No t Equip ped: DUE TO
(I) HALON BOTTLES INSTAL LED IN THE CARGO COMPARTMENT AND REPL ACE WITH A SERVICE ABLE PART A S EQUIPMENT NOT INSTALLED ON A /C
REQUIRE D
MOS
HRS /MSC -
AFL
FAA 2020- 21-02 PA RA (J) NO PERSON MA Y INSTALL ON A NY AIRPLANE AN A FFECTED P ART AS IDENTIFIED IN PA RA GRAPH (G )(3) OF THIS AD MANDA TO RY NOT A PPLICA BLE - No t Equip ped: DUE TO
UNL ESS THA T PART HAS A CIRCLED L ETTE R “G” STAMPED AT A DISTANCE 8 O F APP RO XIMA TEL Y O NE INCH FROM EQUIPMENT NOT INSTALLED ON A /C
THE LE FT EDGE OF THE P LACARD, INDICATING THAT THE CARGO FIRE EX TINGUISHER HA LON B OTTLE HAS BE EN
TESTED A ND RE FILLE D
MOS
HRS /MSC -
AFL
FAA 2021- 05-17 APP LIA NCE AD - NAVIGATION - ROCKWELL COLLINS FDSA- 6500 FLIG HT DISPL AY SYSTEM - OPE RA TING L IMITIATIO NS MANDA TO RY NOT A PPLICA BLE - No t Equip ped: DUE TO
/ SO FTWARE UP GRADE INS TAL LED TCAS-II PN
MOS
29-A PR-2021 HRS /MSC -
AFL
?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 75 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2021- 05-17 PA RA (G) (1) REVISE THE AIRCRAFT FLIGHT MANUAL (AFM) OR AFM SUPPL EMENT (AFMS), FABRICA TE A PLACARD FOR EACH MANDA TO RY NOT A PPLICA BLE - No t Equip ped: DUE TO
& (G)(2 ) PRIMA RY FLIGHT DISP LAY AND INS TA LL THE PLACARD ON THE B OTTOM OF E ACH PRIMARY FLIGHT DISP LAY BEZEL INS TAL LED TCAS-II PN
(RESTATEMENT OF FA A A D 201 9-12-0 9)
MOS
29-A PR-2021 HRS /MSC -
AFL
FAA 2021- 05-17 PA RA (G) (3) UPGRADE THE FDS A-650 0 FIELD L OADABLE SO FTWARE MANDA TO RY NOT A PPLICA BLE - No t Equip ped: DUE TO
INS TAL LED TCAS-II PN
MOS
29-A PR-2021 HRS /MSC
AFL
FAA 2021- 05-17 PA RA (G) (5) AS OF THE EFFE CTIVE DATE OF THIS AD, DO NOT INSTALL A ROCKWELL COLLINS FLIGHT DIS PLAY SY STEM MANDA TO RY NOT A PPLICA BLE - No t Equip ped: DUE TO
APP LICATION FDSA-65 00 P/N 810-0 234-1 H00 01, 81 0-0234 -1H0002, 810-02 34-1H000 3, 810 -0234- 2H0 001, 8 10-023 4-2C0001 , INS TAL LED TCAS-II PN
810 -0234- 2C0 002, O R 810 -0234- 4B000 1 O N ANY AIRPL ANE
MOS
29-A PR-2021 HRS /MSC -
AFL

FAA 2021- 08-15 APP LIA NCE AD - NAVIGATION - GA RMIN INTERNATIONAL GMN-009 62 GTS P RO CE SSOR UNITS , PART NUMBER MANDA TO RY NOT A PPLICA BLE - By Pa rt: DUE TO INSTA LLED
011 -02571 -0() - S OFTWARE UPATE TCA S P RO CCES SOR MODEL AND P N
MOS
17-MAY -2021 HRS /MSC
AFL
FAA 2021- 23-12 APP LIA NCE AD - INDICATING / RECORDING / NA VIG ATIO N - RA DIO (RADA R) AL TIMETER - AFM REVISION TO MANDA TO RY COMPLIED WITH
INCORPO RA TE LIMITATIO NS
MOS 14-MAR-2 022
09-DEC-20 21 HRS /MSC - 219 4.6
AFL 147 5
TCCA CF- 2013-2 5 APP LIA NCE AD - EMERGE NCY LOCATOR TRANSMITTER - B ATTERY WIRING INSTA LLATION DISCREP ANCIES MANDA TO RY NOT A PPLICA BLE - BY ELT MAK E
FOUND NO T APP LICAB LE TO THE P RE SENT
CAMO MA INTAINED FL EET.
DAYS 29-A UG -2013
26-A UG -2013 HRS /MSC -
AFL

TCCA CF- 2021-5 2 APP LIA NCE AD - NAVIGATION - AE RO PLANE - P RO HIBITION OF OP ERATIONS REQUIRING RADIO ALTIMETER IN THE MANDA TO RY COMPLIED WITH
PRESE NCE OF 5 G C-B AND WIRELE SS BROADBAND INTE RFERENCE
MOS 14-MAR-2 022
04-JAN-20 22 HRS /MSC - 219 4.6
AFL 147 5

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 76 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

AIRFRAME - SB - 5866/AP-HKD
ASB A605- 28-008 SPE CIAL CHE CK /MODIFICATION - FUEL - AUXIL IARY POWER UNIT (AP U) FUEL PUMP CANIS TE R, A LERT SE RV ICE RECOMME NDED NOT A PPLICA BLE
BULLE TIN
MOS
21-A PR-2014 HRS /MSC -
AFL
ASB A605- 28-008 PA RT A SPE CIAL CHE CK SP ECIAL CHECK/MO DIFICATIO N - FUEL - AUXILIA RY PO WE R UNIT (A PU) FUEL PUMP CANISTER, RECOMME NDED NOT A PPLICA BLE
ALE RT SERVICE BULL ETIN - INS PECTION OF THE APU-FUEL -PUMP CANISTER
MOS
21-A PR-2014 HRS /MSC -
AFL
ASB A605- 28-008 PA RT B MODIFICA TION S PECIA L CHECK/MODIFICATION - FUE L - AUXILIARY P OWER UNIT (APU) FUEL PUMP CA NISTER, ALE RT RECOMME NDED NOT A PPLICA BLE
SERVICE BULLETIN - REP LACEMENT OF THE CONNE CTOR ON THE A PU-FUEL -PUMP CANIS TE R
MOS
21-A PR-2014 HRS /MSC -
AFL
ASB A605- 28-008 REV 01 SPE CIAL CHE CK /MODIFICATION - FUEL - AUXIL IARY POWER UNIT (AP U) FUEL PUMP CANIS TE R, A LERT SE RV ICE RECOMME NDED NOT A PPLICA BLE
BULLE TIN
MOS
28-MAY -2014 HRS /MSC -
AFL
ASB A605- 28-008 REV 01 SPE CIAL CHE CK SP ECIAL CHECK/MO DIFICATIO N - FUEL - AUXILIA RY PO WE R UNIT (A PU) FUEL PUMP CANISTER, RECOMME NDED NOT A PPLICA BLE
PART A ALE RT SERVICE BULL ETIN - INS PECTION OF THE APU-FUEL -PUMP CANISTER
MOS
28-MAY -2014 HRS /MSC -
AFL
ASB A605- 28-008 REV 01 MODIFICA TION S PECIA L CHECK/MODIFICATION - FUE L - AUXILIARY P OWER UNIT (APU) FUEL PUMP CA NISTER, ALE RT RECOMME NDED NOT A PPLICA BLE
PART B SERVICE BULLETIN - REP LACEMENT OF THE CONNE CTOR ON THE A PU-FUEL -PUMP CANIS TE R
MOS
28-MAY -2014 HRS /MSC -
AFL
ASB A605- 28-008 REV 02 SPE CIAL CHE CK /MODIFICATION - FUEL - AUXIL IARY POWER UNIT (AP U) FUEL PUMP CANIS TE R, A LERT SE RV ICE RECOMME NDED NOT A PPLICA BLE - PER A /C SERIA L NUMBER
BULLE TIN
MOS
09-JUL-20 14 HRS /MSC -
AFL
ASB A605- 28-008 REV 02 SPE CIAL CHE CK SP ECIAL CHECK/MO DIFICATIO N - FUEL - AUXILIA RY PO WE R UNIT (A PU) FUEL PUMP CANISTER, RECOMME NDED NOT A PPLICA BLE - PER A /C SERIA L NUMBER
PART A ALE RT SERVICE BULL ETIN - INS PECTION OF THE APU-FUEL -PUMP CANISTER
MOS
09-JUL-20 14 HRS /MSC -
AFL
ASB A605- 28-008 REV 02 MODIFICA TION S PECIA L CHECK/MODIFICATION - FUE L - AUXILIARY P OWER UNIT (APU) FUEL PUMP CA NISTER, ALE RT RECOMME NDED NOT A PPLICA BLE - PER A /C SERIA L NUMBER
PART B SERVICE BULLETIN - REP LACEMENT OF THE CONNE CTOR ON THE A PU-FUEL -PUMP CANIS TE R
MOS
09-JUL-20 14 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 77 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB A605- 57-004 SPE CIAL CHE CK /MODIFICATION - INBOARD FLA P HINGE BOX - FO RWARD A TTACHME NT FITTINGS FASTENERS, ALE RT RECOMME NDED COMPLIED WITH - IAW SB A605- 57-004
SERVICE BULLETIN
MOS 25-S EP-20 13
20-DEC-20 12 HRS /MSC - 766 .9
AFL 313
ASB A605- 57-004 PA RT A SPE CIAL CHE CK SP ECIAL CHECK/MO DIFICATIO N - INBO ARD FL AP HINGE BOX - FORWA RD ATTACHMENT FITTINGS RECOMME NDED COMPLIED WITH - IAW ASB A60 5-57-00 4 P ART A
FASTENERS, AL ERT SERVICE B UL LETIN - INBO ARD FLAP FASTENERS O N THE HING E B OX WING FO RWARD FITTING
MOS 25-S EP-20 13
20-DEC-20 12 HRS /MSC - 766 .9
AFL 313
ASB A605- 57-004 PA RT B MODIFICA TION S PECIA L CHECK/MODIFICATION - INBO ARD FLAP HINGE BO X - FORWARD ATTACHMENT FITTING S RECOMME NDED DEFERRE D
FASTENERS, AL ERT SERVICE B UL LETIN - INBO ARD FLAP FASTENERS O N THE HING E B OX WING FO RWARD FITTING
MOS 29-S EP-20 13
20-DEC-20 12 HRS /MSC - 766 .9
AFL 313
ASB A605- 57-004 REV 01 SPE CIAL CHE CK /MODIFICATION - INBOARD FLA P HINGE BOX - FO RWARD A TTACHME NT FITTINGS FASTENERS, ALE RT RECOMME NDED COMPLIED WITH
SERVICE BULLETIN
MOS 21-A PR-2014
HRS /MSC - 766 .9
AFL 313

ASB A605- 57-004 REV 01 SPE CIAL CHE CK SP ECIAL CHECK/MO DIFICATIO N - INBO ARD FL AP HINGE BOX - FORWA RD ATTACHMENT FITTINGS RECOMME NDED COMPLIED WITH
PART A FASTENERS, AL ERT SERVICE B UL LETIN - INBOARD FLAP FASTENERS ON THE HINGE BOX WING FORWARD FITTING
MOS 10-A PR-2014
HRS /MSC - 766 .9
AFL 313

ASB A605- 57-004 REV 01 MODIFICA TION S PECIA L CHECK/MODIFICATION - INBO ARD FLAP HINGE BO X - FORWARD ATTACHMENT FITTING S RECOMME NDED DEFERRE D
PART B FASTENERS, AL ERT SERVICE B UL LETIN - INCO RRECTLY ORIE NTED INBOA RD FL AP FAS TE NE RS ON THE HINGE BO X
WING FORWA RD FITTING
MOS 21-A PR-2014
HRS /MSC - 766 .9
AFL 313

ASB A605- 57-004 REV 01 SPE CIAL CHE CK /MODIFICATION - INBOARD FLA P HINGE BOX - FO RWARD A TTACHME NT FITTINGS FASTENERS, ALE RT RECOMME NDED DEFERRE D
PART C SERVICE BULLETIN CO RRECTLY ORIE NTED INBOA RD FL AP FA STENERS O N THE HINGE BO X WING FORWARD
FITTING
MOS 21-A PR-2014
HRS /MSC - 766 .9
AFL 313

ASB A605- 57-004 REV 02 SPE CIAL CHE CK /MODIFICATION - INBOARD FLA P HINGE BOX - FO RWARD A TTACHME NT FITTINGS FASTENERS, ALE RT RECOMME NDED COMPLIED WITH
SERVICE BULLETIN
MOS 21-A PR-2014
HRS /MSC - 766 .9
AFL 313

ASB A605- 57-004 REV 02 SPE CIAL CHE CK SP ECIAL CHECK/MO DIFICATIO N - INBO ARD FL AP HINGE BOX - FORWA RD ATTACHMENT FITTINGS RECOMME NDED COMPLIED WITH
PART A FASTENERS, AL ERT SERVICE B UL LETIN - INBOARD FLAP FASTENERS ON THE HINGE BOX WING FORWARD FITTING
MOS 10-A PR-2014
HRS /MSC - 766 .9
AFL 313

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 78 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB A605- 57-004 REV 02 MODIFICA TION S PECIA L CHECK/MODIFICATION - INBO ARD FLAP HINGE BO X - FORWARD ATTACHMENT FITTING S RECOMME NDED DEFERRE D
PART B FASTENERS, AL ERT SERVICE B UL LETIN - INCO RRECTLY ORIE NTED INBOA RD FL AP FAS TE NE RS ON THE HINGE BO X
WING FORWA RD FITTING
MOS 21-A PR-2014
HRS /MSC - 766 .9
AFL 313

ASB A605- 57-004 REV 02 CONFIRM SP ECIAL CHECK/MODIFICATIO N - INBOA RD FL AP HINGE BOX - FO RWARD ATTACHMENT FITTINGS RECOMME NDED NOT A PPLICA BLE
PART C FASTENERS, AL ERT SERVICE B UL LETIN - CORRECTL Y O RIENTED INBOARD FLAP FASTENERS ON THE HINGE BOX
WING FORWA RD FITTING
MOS 21-A PR-2014
HRS /MSC - 766 .9
AFL 313
ASB A605- 57-004 REV 03 SPE CIAL CHE CK /MODIFICATION - INBOARD FLA P HINGE BOX - FO RWARD A TTACHME NT FITTINGS FASTENERS, ALE RT RECOMME NDED COMPLIED WITH - TERMINATION A CTION PA RT
SERVICE BULLETIN B
MOS 31-A UG -2014
19-A UG -2014 HRS /MSC - 843 .08
AFL 388
ASB A605- 57-004 REV 03 SPE CIAL CHE CK SP ECIAL CHECK/MO DIFICATIO N - INBO ARD FL AP HINGE BOX - FORWA RD ATTACHMENT FITTINGS RECOMME NDED COMPLIED WITH - C/W PA RT A, UNLESS PART B
PART A FASTENERS, AL ERT SERVICE B UL LETIN - INBO ARD FLAP FASTENERS O N THE HING E B OX WING FO RWARD FITTING IS C/O PART A HAS TO BE REPE ATED WITIN THE
NEXT 1 0 FLIGHTS
MOS 14-S EP-20 14
19-A UG -2014 HRS /MSC -
AFL

ASB A605- 57-004 REV 03 MODIFICA TION S PECIA L CHECK/MODIFICATION - INBO ARD FLAP HINGE BO X - FORWARD ATTACHMENT FITTING S RECOMME NDED COMPLIED WITH - MODIFICATIO N
PART B FASTENERS, AL ERT SERVICE B UL LETIN - INCORRECTL Y O RIENTED INB OARD FLAP FASTENERS ON THE HINGE BOX
WING FORWA RD FITTING
MOS 19-S EP-20 14
19-A UG -2014 HRS /MSC - 854 .3
AFL 403

ASB A605- 57-004 REV 03 CONFIRM SP ECIAL CHECK/MODIFICATIO N - INBOA RD FL AP HINGE BOX - FO RWARD ATTACHMENT FITTINGS RECOMME NDED
PART C FASTENERS, AL ERT SERVICE B UL LETIN - CORRE CTLY ORIENTED INBO ARD FLAP FASTENERS O N THE HING E B OX
WING FORWA RD FITTING
MOS (EFF)
19-A UG -2014 HRS /MSC -
AFL
ASB A605- 57-004 REV 04 SPE CIAL CHE CK /MODIFICATION - INBOARD FLA P HINGE BOX - FO RWARD A TTACHME NT FITTINGS FASTENERS, ALE RT RECOMME NDED COMPLIED WITH - S B:A 605-5 7-004 REV.3 PART B
SERVICE BULLETIN .NO FURTHER A CTION IS RE QUIRED
MOS 13-NOV -2014
12-NOV -2014 HRS /MSC -
AFL
ASB A605- 57-004 REV 04 SPE CIAL CHE CK /MODIFICATION - INBOARD FLA P HINGE BOX - FO RWARD A TTACHME NT FITTINGS FASTENERS, ALE RT RECOMME NDED COMPLIED WITH - S B:A 605-5 7-004 REV.3 PART B
PART A SERVICE BULLETIN SPECIAL CHECK - INBOA RD FL AP FA STENERS O N THE HINGE B OX WING FORWARD FITTING .NO FURTHER A CTION IS RE QUIRED
MOS 13-NOV -2014
12-NOV -2014 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 79 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB A605- 57-004 REV 04 SPE CIAL CHE CK /MODIFICATION - INBOARD FLA P HINGE BOX - FO RWARD A TTACHME NT FITTINGS FASTENERS, ALE RT RECOMME NDED COMPLIED WITH - S B:A 605-5 7-004 REV.3 PART B
PART B SERVICE BULLETIN MODIFICATION - INCORRECTL Y O RIENTED INBOARD FLAP FASTENERS ON THE HING E B OX WING .NO FURTHER A CTION IS RE QUIRED
FORWARD FITTING
MOS 13-NOV -2014
12-NOV -2014 HRS /MSC -
AFL

ASB A605- 57-004 REV 04 SPE CIAL CHE CK /MODIFICATION - INBOARD FLA P HINGE BOX - FO RWARD A TTACHME NT FITTINGS FASTENERS, ALE RT RECOMME NDED COMPLIED WITH - S B:A 605-5 7-004 REV.3 PART B
PART C SERVICE BULLETIN CO NFIRM - CO RRECTLY ORIE NTED INBOA RD FLA P FAS TE NE RS ON THE HINGE BO X WING .NO FURTHER A CTION IS RE QUIRED
FORWARD FITTING
MOS 13-NOV -2014
12-NOV -2014 HRS /MSC -
AFL

AW AW000-00 -0001 SAHARAN DUST CL OUD, ADV IS ORY WIRE COMPLIED WITH - INFO RMATIONAL ONLY:
FLIG HT OPS DEPARTMENT WAS INFORMED.
MOS 12-A UG -2020
08-JUL-20 20 HRS /MSC -
AFL
AW AW000-00 -0004 WIL DFIRE AS HE S A ND CL OUDS , ADVISORY WIRE COMPLIED WITH - INFO RMATIONAL ONLY:
AW000 -00-00 04 WA S S ENT TO A LL CHALL ENGER
A/C FLIGHT CRE W VIA EMAIL .
MOS 06-NOV -2020
05-NOV -2020 HRS /MSC -
AFL

AW AW000-00 -0005 COLD WE ATHER OPERATIONS, ADVISORY WIRE COMPLIED WITH - INFO RMATIONAL ONLY: A W
AND RELA TE D DOCUMENT WERE SENT TO ALL
CHA LLENGE R FLIG HT CREWS AND
TECHNICIANS FOR REVIEW VIA EMAIL.
MOS 26-O CT-20 20
13-O CT-20 20 HRS /MSC -
AFL

AW AW000-00 -0006 COMPLIANCE A ND DUE DILIGENCE, A DV ISO RY WIRE COMPLIED WITH - INFO RMATIONAL ONLY:
MOS 10-DEC-20 20
08-DEC-20 20 HRS /MSC -
AFL
AW AW000-00 -0007 CHA LLENGE R 605 ACCIDENT, ADVISORY WIRE NOT A PPLICA BLE - INFORMA TIONALY ONLY .
REPORTED TO CHA LLENGER 605 CRE WS
MOS
27-JUL-20 21 HRS /MSC -
AFL
AW AW000-02 -0003 AIRPLANE UP SET P RE VENTION AND RECOVERY TRA INING , ADVIS ORY WIRE COMPLIED WITH - INFO RMATIONAL ONLY:
TRA NS MITTE D TO FLIGHT O PERATIONS
MANAGER V IA EMAIL
MOS 19-MAY -2020
14-MAY -2020 HRS /MSC -
AFL

AW AW000-02 -0005 CICADA INFESTATION CAUSING AP U ISSUES, A DV ISO RY WIRE NOT A PPLICA BLE - INFORMA TIONALY ONLY
MOS
15-JUN-2021 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 80 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

AW AW000-10 -0002 REV PARKING RE CO MMENDATIO NS DURING THE INTERNA TIONAL FLIG HT RE STRICTIONS, A DV ISO RY WIRE COMPLIED WITH
01
DAYS 08-MAY -2021
24-A PR-2020 HRS /MSC - 216 7.2 2
AFL 146 2

AW AW000-25 -0001 REV 201 9 NOV EL CO RO NA VIRUS (CO VID-1 9), ADVISORY WIRE
06
MOS (EFF)
27-MAY -2020 HRS /MSC -
AFL

AW AW000-25 -0001 REV 201 9 NOV EL CO RO NA VIRUS (CO VID-1 9), ADVISORY WIRE COMPLIED WITH - INFO RMATIONAL ONLY:
07
MOS 06-O CT-20 20
15-S EP-20 20 HRS /MSC -
AFL

AW AW000-25 -0001 REV 201 9 NOV EL CO RO NA VIRUS (CO VID-1 9), ADVISORY WIRE COMPLIED WITH - INFO RMATIONAL ONLY:
08
MOS 14-NOV -2020
11-NOV -2020 HRS /MSC -
AFL

AW AW000-25 -0001 REV 201 9 NOV EL CO RO NA VIRUS (CO VID-1 9), ADVISORY WIRE NOT A PPLICA BLE - INFORMA TIONALY ONLY
09
MOS
11-DEC-20 20 HRS /MSC -
AFL
AW AW600-00 -2600 NEW S MA RTPUBS/SMARTFIX PLUS SOLUTIO N AND A CCESS MANAGE ME NT - MAY 20 20 WE BINARS, ADVIS ORY WIRE COMPLIED WITH - INFO RMATIONAL ONLY:
MOS 03-JUL-20 20
23-JUN-2020 HRS /MSC -
AFL
AW AW600-00 -2601 NEW S MA RTPUBS/SMARTFIX PLUS SOLUTIO N AND A CCESS MANAGE ME NT - V ALID EMAIL RE QUIRED FOR RE CE IVING
CONTA CT, ADVISO RY WIRE
MOS (EFF)
23-JUN-2020 HRS /MSC -
AFL
AW AW600-00 -2619 OPE RA TIONAL LANDING DIS TANCE OLD, ADVISORY WIRE NOT A PPLICA BLE - OPERATIONAL AW
MOS
09-A UG -2021 HRS /MSC -
AFL
AW AW600-29 -2589 HYDRA UL IC SYSTEMS NO . 1,2 & 3 - HY DRAULIC FLUID QUANTITY INDICATIO N , ADVISORY WIRE NOT A PPLICA BLE - INFORMA TIONALY ONLY ,
REPORTED TO CL-605 FLIGHT AND
MAINTENNACE CREWS
MOS
10-FEB -2021 HRS /MSC -
AFL

AW AW600-31 -2608 DIG ITAL CLOCK OBSO LESCENCE, ADVISORY WIRE


MOS (EFF)
14-DEC-20 20 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 81 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

AW AW600-32 -2612 MLG SHOCK STRUT LO WER PIN INSPECTIO N, A DV ISO RY WIRE COMPLIED WITH - INFO RMATIONAL ONLY:
FOLLO WE D BY SB 605 -32-00 7 A ND AD
CF- 2020-5 4
MOS 03-MAR-2 021
12-FEB -2021 HRS /MSC -
AFL

AW AW600-33 -2603 REV MAIN DOOR E XIT SIGN FUSE RE LOCATIO N PROPO SAL, A DV ISO RY WIRE COMPLIED WITH - INFO RMATIONAL ONLY:
01
MOS 17-FEB -2021
15-FEB -2021 HRS /MSC -
AFL

AW AW600-34 -2570 REV WORLD MAG NE TIC MODEL (WMM) UPDATE, ADVISORY WIRE NOT A PPLICA BLE - By Pa rt: FMC 62 00
02 (822 -0868 -110) INSTAL LED
MOS
05-A UG -2021 HRS /MSC -
AFL

AW AW600-34 -2588 REV COLLINS AEROSPA CE GP S-400 0S P/N 822-2 189-10 0 L PV APPROA CHES IN ALA SKA, A DV ISO RY WIRE NOT A PPLICA BLE - By Pa rt: P N:822 -2189-0 04
02 INS TAL LED O N A/C
MOS
30-S EP-20 20 HRS /MSC -
AFL
AW AW600-34 -2613 FMS FLT L OG ON FMS-62 00, ADVISORY WIRE NOT A PPLICA BLE - info rmatio nal only
MOS
24-FEB -2021 HRS /MSC -
AFL
AW AW600-44 -2610 REV KA- BAND SO FTWARE BLV 8.1 RELE ASE, ADVIS ORY WIRE NOT A PPLICA BLE - NO T EQUIPPED: DUE TO SB
01 605 -44-00 8 DID NOT AP PLIED TO A/C
MOS
31-MAR-2 021 HRS /MSC -
AFL
MODSUM IS6 00-11 -0001 KIT-RE GIS TRATION PL ATE INSTL. PAX DOOR SURRO UND, MODIFICA TION S UMMARY
REV A
MOS
HRS /MSC -
AFL
MODSUM IS6 00-11 -0001 KIT - REGISTRATION P LATE INSTL. PA X DOO R SURRO UND, MODIFICA TION SUMMARY
REV B
MOS
HRS /MSC A/R
AFL
MODSUM IS6 00-23 -0001 KIT - DEACTIVATION O F CVR BULK ERAS E FUNCTION, MODIFICATION SUMMARY NOT A PPLICA BLE
REV A
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 82 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

MODSUM IS6 00-29 -0002 KIT, INTRO E LBOW FITTING O N ECOLO GY BOTTLE FO R HYDRA UL IC RES ERVOIR #3., MODIFICATION SUMMARY
REV A
MOS
HRS /MSC A/R
AFL

MODSUM IS6 00-34 -0001 KIT, INTRO DUCTION OF A LTE RNATE ANTENNA INS TA LLATIO NS WITH CO NDUCTIVE GAS KETS., MODIFICATION
REV A SUMMARY
MOS
HRS /MSC A/R
AFL

MODSUM IS6 00-52 -0001 INS TL - ALTERNATIVE FASTNERS FOR LOWER ELECTRO NICS B AY ACCE SS DO OR, NOSE COMPARTME NT.,
REV A MODIFICA TION S UMMARY
MOS
HRS /MSC A/R
AFL
MODSUM IS6 00-52 -0004 MAIN PAS SENGER DO OR SE AL - INTRODUCTION O F DRA IN HO LES, MODIFICATIO N SUMMA RY MODIFICA TION COMPLIED WITH
MOS 08-A PR-2016
HRS /MSC - 131 3.0 2
AFL 851

MODSUM IS6 00-52 -0004 MAIN PAS SENGER DO OR SE AL - INTRODUCTION O F DRA IN HO LES, MODIFICATIO N SUMMA RY
REV A
MOS
HRS /MSC A/R
AFL

MODSUM IS6 04-52 -0001 KIT-WA TE R INGRES S P RE VENTION-O VERWING EMERGENCY E XIT DO OR, MODIFICA TION S UMMARY NOT A PPLICA BLE - SUPERSEDED BY RE V B
REV A
MOS 24-MAY -2016
HRS /MSC - 135 2.4 5
AFL 874

MODSUM IS6 04-52 -0001 KIT-WA TE R INGRES S P RE VENTION-O VERWING EMERGENCY E XIT DO OR, MODIFICA TION S UMMARY NOT A PPLICA BLE - SUPERSEDED BY RE V C
REV B
MOS 24-MAY -2016
HRS /MSC - 135 2.4 5
AFL 874

MODSUM IS6 04-52 -0001 KIT-WA TE R INGRES S P RE VENTION-O VERWING EMERGENCY E XIT DO OR, MODIFICA TION S UMMARY COMPLIED WITH - DOO R SEA L A ND MATING
REV C SURFA CE S WERE
CONTA MINATED WITH DUST AND SAND. HENCE
CLEANED AND LUBRICATED IAW CL605
AMM TAS K 1 2-20-04 -640-8 05.
LUBE USED: MS-12 2AD G RN:10750 3/7
FOUND NO E VIDENCE OF WATER INGRESS.
SIMUL ATE D HEAVY RAIN TEST CARRIED OUT
SATISFACTO RILY.
MOS 08-A PR-2016
HRS /MSC - 131 3.0 2
AFL 851

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 83 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605-35 -003 REV 2 ACCOMPLISH, SERVICE B UL LETIN RE PLACE THE LANYA RDS AND RE-IDENTIFY THE OXYG EN BO X A SSEMBL IES RECOMME NDED NOT A PPLICA BLE - RE V 1 COMPLIED WITH - NO
PART A FURTHER ACTIO N REQUIRE D.
MOS 26-MAY -2016
18-A PR-2016 HRS /MSC -
AFL

SB 605-35 -003 REV 2 ACCOMPLISH, SERVICE B UL LETIN RE PLACE THE LANYA RDS OF THE OXYG EN MASK S IN THE LAVA TORY ONLY AND RECOMME NDED NOT A PPLICA BLE - RE V 1 COMPLIED WITH - NO
PART B RE-IDE NTIFY THE O XYGE N BOX AS SEMBLY WITH NE W PLA CARD FURTHER ACTIO N REQUIRE D.
MOS 26-MAY -2016
18-A PR-2016 HRS /MSC -
AFL

SB 605-35 -003 REV 2 ACCOMPLISH, SERVICE B UL LETIN RE PLACE THE LANYA RDS OF THE OXYG EN MASK S FOR THE OX YGEN BOX RECOMME NDED NOT A PPLICA BLE - RE V 1 COMPLIED WITH - NO
PART C ASS EMBLIES SITUATED A BOVE THE DIVAN AND IN THE LAV ATORY / RE -IDENTIFY ONLY THE OXY GEN B OX FURTHER ACTIO N REQUIRE D.
ASS EMBLIES ABOV E THE DIVAN WITH NEW PLACARDS
MOS 26-MAY -2016
18-A PR-2016 HRS /MSC -
AFL
SB 0 ICA - SPE CIAL CHE CK /MODIFICA TION - E ME RG ENCY AC GENERATOR SY STEM - ADG HA RNES S CHAFING ON RECOMME NDED NOT A PPLICA BLE - BY A/C S/N
FORWARD 40 CUBIC FEE T OXY GEN B OTTLE , SERVICE B UL LETIN
MOS 17-JUN-2013
04-MAR-2 013 HRS /MSC - 608 .5
AFL 247
SB 140 6-25-0 01 REV C AMI HEADREST-FIX ED, SERVICE B ULL ETIN VENDOR COMPLIED WITH
RECOMME NDATIO
N
MOS 31-MAR-2 012
HRS /MSC - 6.4
AFL 5

SB 604 -30-00 7 REV 01 SPE CIAL CHE CK /MODIFICATION - P OTABLE WATER S YSTEM/WATER LINE HEATERS - WATER LINE RIBB ON HEATERS RECOMME NDED NOT A PPLICA BLE - DUE TO A /C MS N
WIRING , SERVICE B UL LETIN
MOS 15-A PR-2021
HRS /MSC -
AFL

SB 604 -30-00 7 REV 01 ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - POTABL E WATER SYSTEM/WA TE R LINE HEATERS - WA TE R LINE RECOMME NDED NOT A PPLICA BLE - DUE TO A /C MS N
PART A RIB BON HEA TERS WIRING , SERVICE B UL LETIN INSPE CTION O F RIBB ON HEATER INSTALLA TION AND INSULA TION
(MANDATO RY )
MOS 15-A PR-2021
HRS /MSC -
AFL

SB 604 -30-00 7 REV 01 ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - POTABL E WATER SYSTEM/WA TE R LINE HEATERS - WA TE R LINE RECOMME NDED NOT A PPLICA BLE - DUE TO A /C MS N
PART B RIB BON HEA TERS WIRING , SERVICE B UL LETIN RE MO VAL OF RIBBON HEATER INSULATION (IF NECESSARY)
MOS 15-A PR-2021
HRS /MSC -
AFL

SB 604 -30-00 7 REV 01 ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - POTABL E WATER SYSTEM/WA TE R LINE HEATERS - WA TE R LINE RECOMME NDED NOT A PPLICA BLE - DUE TO A /C MS N
PART C RIB BON HEA TERS WIRING , SERVICE B UL LETIN RE PLACEMENT O F RIBB ON HEATER (IF NE CE SSARY)
MOS 15-A PR-2021
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 84 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 604 -30-00 7 REV 01 ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - POTABL E WATER SYSTEM/WA TE R LINE HEATERS - WA TE R LINE RECOMME NDED NOT A PPLICA BLE - DUE TO A /C MS N
PART D RIB BON HEA TERS WIRING , SERVICE B UL LETIN INSTALL ATION OF NEW RIBBO N HEATER INSULATIO N (IF NECESSARY)
MOS 15-A PR-2021
HRS /MSC -
AFL

SB 604 -30-00 7 REV 01 ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - POTABL E WATER SYSTEM/WA TE R LINE HEATERS - WA TE R LINE RECOMME NDED NOT A PPLICA BLE - DUE TO A /C MS N
PART E RIB BON HEA TERS WIRING , SERVICE B UL LETIN ADDITIO N OF RIBBON HE ATER PIGTAIL WIRE IDENTIFICATION
(MANDATO RY )
MOS 15-A PR-2021
HRS /MSC -
AFL

SB 604 -30-00 7 REV 01 ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - POTABL E WATER SYSTEM/WA TE R LINE HEATERS - WA TE R LINE RECOMME NDED NOT A PPLICA BLE - DUE TO A /C MS N
PART F RIB BON HEA TERS WIRING , SERVICE B UL LETIN FUSE INS TA LLATION (MANDATORY)
MOS 15-A PR-2021
HRS /MSC -
AFL
SB 604 -30-00 7 REV 01 ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - POTABL E WATER SYSTEM/WA TE R LINE HEATERS - WA TE R LINE RECOMME NDED NOT A PPLICA BLE - DUE TO A /C MS N
PART G RIB BON HEA TERS WIRING , SERVICE B UL LETIN TE STING (MANDATORY)
MOS 15-A PR-2021
HRS /MSC -
AFL
SB 605 -00-00 2 REV 03 SERVICE BULLETIN DE SCRIPTION AND P OLICY , SERVICE B ULL ETIN INFORMATIO NA L NOT A PPLICA BLE - ONLY INFORMA TION
MOS
11-JUN-2021 HRS /MSC -
AFL
SB 605 -11-00 1 MODIFICA TION - NOSE LA NDING G EAR (NLG ) - TOWING STRAP PLACARD INSTALLATION, SERVICE B UL LETIN OPTIONAL NOT A PPLICA BLE - SUPERSEDED BY RE V 0 1
MOS 24-MAY -2016
30-JUN-2008 HRS /MSC - 135 2.4 5
AFL 874
SB 605 -11-00 1 REV 01 MODIFICA TION - NOSE LA NDING G EAR (NLG ) - TOWING STRAP PLACARD INSTALLATION, SERVICE B UL LETIN OPTIONAL COMPLIED WITH - A S P ER ATTACHED SB SA TIS.
KIT PN: 60 0K074 3 G RN: 10 8581/11.
MOS 08-A PR-2016
28-O CT-20 15 HRS /MSC - 131 3.0 2
AFL 851
SB 605 -11-00 1 REV 02 MODIFICA TION - NOSE LA NDING G EAR (NLG ) - TOWING STRAP PLACARD INSTALLATION, SERVICE B UL LETIN OPTIONAL NOT A PPLICA BLE - N/A AS REV 1 HAS BE EN
CARRIED OUT
MOS 20-O CT-20 16
14-O CT-20 16 HRS /MSC -
AFL
SB 605 -11-00 2 MODIFICA TION - SE RV ICE DO ORS AND FLIG HT CO MP ARTMENT, PLA CARDS AND MARKING S - INS TA LL FUEL SPILLA GE OPTIONAL
PREVE NTION PL ACARD FOR THE REFUEL/DEFUEL CONTRO L P ANEL(S), SERVICE BULL ETIN
MOS
03-MAY -2010 HRS /MSC -
AFL
SB 605 -11-00 3 STAGE 4 NOISE LEVEL S S TA NDARDS - CERTIFICA TION ( SUPERSEDED B Y 6 05-11 -003 REV 01), SE RV ICE BULLETIN OPTIONAL
MOS
29-MAY -2014 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 85 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -11-00 3 REV 01 STAGE 4 NOISE LEVEL S S TA NDARDS - CERTIFICA TION ( SUPERSEDED B Y 6 05-11 -003 REV 02), SE RV ICE BULLETIN OPTIONAL COMPLIED WITH
MOS 15-O CT-20 18
21-O CT-20 15 HRS /MSC - 164 0.6
AFL 108 1
SB 605 -11-00 3 REV 02 STAGE 4 NOISE LEVEL S S TA NDARDS - CERTIFICA TION, SERVICE BULLETIN OPTIONAL
MOS
28-JAN-20 20 HRS /MSC -
AFL
SB 605 -21-00 1 MODIFICA TION - PA SSENGE R COMPARTMENT DISTRIBUTIO N - INSTALLA TION OF THE E NV IRONMENTA L CONTROL RECOMME NDED
SYS TE M (ECS) DUCTING PROVISION, SE RVICE BULLETIN
MOS
18-JAN-20 07 HRS /MSC -
AFL
SB 605 -21-00 1 REV 01 MODIFICA TION - PA SSENGE R COMPARTMENT DISTRIBUTIO N - INSTALLA TION OF THE E NV IRONMENTA L CONTROL RECOMME NDED
SYS TE M (ECS) DUCTING PROVISION, SE RVICE BULLETIN
MOS
28-MAY -2007 HRS /MSC -
AFL
SB 605 -21-00 2 MODIFICA TION - TEMPERATURE CONTRO L - PREV ENTION O F ICE FORMATION DOWNSTRE AM O F AIR CONDITIO NING OPTIONAL
UNITS (ACU), SERVICE BULL ETIN
MOS
08-MAR-2 010 HRS /MSC -
AFL
SB 605 -21-00 2 REV 01 MODIFICA TION - TEMPERATURE CONTRO L - PREV ENTION O F ICE FORMATION DO WNSTREAM OF AIR CONDITIONING OPTIONAL - O N ATTRIBUTION BASIS (ONLY IF
UNITS (ACU), SERVICE BULL ETIN EXP ERIENCING ISSUES WITH ICE FORMATIO N
DURING A CU START UP)
MOS 02-JUN-2016
28-O CT-20 15 HRS /MSC -
AFL

SB 605 -21-00 3 SPE CIAL CHE CK /REWORK - CO RROSION PREVENTIO N - ACU EXHAUST DUCT FLANGE & FUSE LAGE SK IN MA TING SUPERSE DE D
SURFA CE S, SERVICE BULLETIN
MOS
31-MAY -2010 HRS /MSC -
AFL
SB 605 -21-00 3 REV 01 SPE CIAL CHE CK /REWORK - CO RROSION PREVENTIO N - ACU EXHAUST DUCT FLANGE & FUSE LAGE SK IN MA TING RECOMME NDED
SURFA CE S, SERVICE BULLETIN
MOS
14-JUL-20 10 HRS /MSC -
AFL
SB 605 -21-00 3 REV 02 SPE CIAL CHE CK /REWORK - CO RROSION PREVENTIO N - ACU EXHAUST DUCT FLANGE & FUSE LAGE SK IN MA TING RECOMME NDED NOT A PPLICA BLE
SURFA CE S, SERVICE BULLETIN
MOS (EFF)
24-JUL-20 15 HRS /MSC -
AFL
SB 605 -21-00 4 MODIFICA TION - TEMPERATURE CONTRO L A ND INDICATION - WIRING RELO CA TION, SE RV ICE BULLETIN RECOMME NDED DEFERRE D
MOS 21-A PR-2014
17-DEC-20 12 HRS /MSC - 766 .9
AFL 313

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 86 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -22-00 1 MODIFICA TION - AUTOMATIC FL IGHT CONTROL SYSTEM - INTRODUCTION O F FLIG HT CONTROL COMPUTE R (FCC) RECOMME NDED NOT A PPLICA BLE
822 -0809- 710 TO DECREASE THE TAK EOFF PITCH ANGLE, S ERVICE BULLE TIN
MOS
30-O CT-20 08 HRS /MSC -
AFL
SB 605 -22-00 2 SPE CIAL CHE CK / MODIFICATIO N - YAW DAMPE R SYS TE M - AUTO MA TIC FLIGHT CONTROL SY STEM (AFCS) WIRING RECOMME NDED NOT A PPLICA BLE - N/A BY INSTALL YD ACT P/N.
CHA NG E TO PREVE NT UN-COMMANDED YA W DAMPER/L INEAR ACTUATOR MO TION AFTER POWER SUPPLY FAIL URE,
SERVICE BULLETIN
MOS 21-JUL-20 15
23-JUN-2015 HRS /MSC - 115 7.4 2
AFL 766
SB 605 -22-00 2 P ART A INS PECT SPE CIAL CHECK / MODIFICATIO N - YAW DAMPE R SYS TE M - AUTO MA TIC FLIGHT CONTROL SY STEM (AFCS) RECOMME NDED NOT A PPLICA BLE - N/A BY INSTALL YD ACT P/N.
WIRING CHANGE TO P RE VENT UN-CO MMANDED Y AW DAMPER/LINE AR ACTUA TO R MOTIO N AFTE R PO WE R SUPPLY
FAILURE, SERVICE BULLE TIN L OG BOOK TO VERIFY THE PA RT NUMBER OF THE EMBODIE D YAW DAMP ER LINEAR
ACTUA TO R
MOS 21-JUL-20 15
23-JUN-2015 HRS /MSC - 115 7.4 2
AFL 766
SB 605 -22-00 2 P ART B ACCOMPLISH S PECIA L CHECK / MODIFICATION - YAW DAMPER S YSTEM - AUTOMATIC FLIGHT CONTRO L S YSTEM RECOMME NDED NOT A PPLICA BLE - N/A BY INSTALL YD ACT P/N.
(AFCS) WIRING CHA NG E TO PREVE NT UN-COMMANDED YA W DAMPER/L INEAR ACTUATOR MO TION AFTER POWER
SUPPL Y FAILURE, SERVICE BULLETIN WIRING MODIFICA TION REL ATED TO AUTO MA TIC FLIGHT CONTROL SY STEM
(AFCS), A ND DO THE NECES SARY OPERATIONAL AND FUNCTIONAL TESTS TO MAKE SURE THAT THE SYS TE M
OPE RA TE S CORRECTLY.
MOS 21-JUL-20 15
23-JUN-2015 HRS /MSC - 115 7.4 2
AFL 766
SB 605 -22-00 2 REV 01 SPE CIAL CHE CK / MODIFICATIO N - YAW DAMPE R SYS TE M - AUTO MA TIC FLIGHT CONTROL SY STEM (AFCS) WIRING RECOMME NDED NOT A PPLICA BLE - N/A BY YAW DA MP ER
CHA NG E TO PREVE NT UN-COMMANDED YA W DAMPER/L INEAR ACTUATOR MO TION AFTER POWER SUPPLY FAIL URE, ACTUA TO R P/N 622 -9968- 102
SERVICE BULLETIN
MOS 06-S EP-20 16
25-JUL-20 16 HRS /MSC -
AFL

SB 605 -22-00 2 REV 01 ACCOMPLISH S PECIA L CHECK / MODIFICATION - YAW DAMPER S YSTEM - AUTOMATIC FLIGHT CONTRO L S YSTEM RECOMME NDED NOT A PPLICA BLE - N/A BY YAW DA MP ER
PART A (AFCS) WIRING CHA NG E TO PREVE NT UN-COMMANDED YA W DAMPER/L INEAR ACTUATOR MO TION AFTER POWER ACTUA TO R P/N 622 -9968- 102
SUPPL Y FAILURE, SERVICE BULLETIN THE PART NUMBER V ERIFICA TION FOR BOTH YA W DAMPER LINEA R
ACTUA TO RS TO VISUA LLY WITNESS THE PA RT NUMBER, IF THE P ART NUMBE R OF BOTH YAW DAMPER L INEAR
ACTUA TO RS CAN NOT BE VERIFIED B Y A LO G BOOK ENTRY .
MOS 06-S EP-20 16
25-JUL-20 16 HRS /MSC -
AFL
SB 605 -22-00 2 REV 01 ACCOMPLISH S PECIA L CHECK / MODIFICATION - YAW DAMPER S YSTEM - AUTOMATIC FLIGHT CONTRO L S YSTEM RECOMME NDED NOT A PPLICA BLE - N/A BY YAW DA MP ER
PART B (AFCS) WIRING CHA NG E TO PREVE NT UN-COMMANDED YA W DAMPER/L INEAR ACTUATOR MO TION AFTER POWER ACTUA TO R P/N 622 -9968- 102
SUPPL Y FAILURE, SERVICE BULLETIN WIRING MODIFICA TION REL ATED TO AUTO MA TIC FLIGHT CONTROL SY STEM
(AFCS), A ND THE NECESSARY OPE RA TIONAL AND FUNCTIO NA L TES TS TO MA KE SURE THAT THE S YSTEM
OPE RA TE S CORRECTLY
MOS 06-S EP-20 16
25-JUL-20 16 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 87 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -22-00 3 MODIFICA TION - INTEG RA TE D AVIONICS PROCESS OR S YSTEM (IAPS ) - REPLA CE THE INPUT/OUTPUT RECOMME NDED
CONCE NTRATORS (IO C'S) TO CO RRECT THE DATAL INK DE STINATIO N AIRPORT IDE NTIFIER CO DE REPO RTING ,
SERVICE BULLETIN
MOS (EFF)
16-JUN-2014 HRS /MSC -
AFL
SB 605 -23-00 1 MODIFICA TION - VE RY HIGH FREQUENCY (V HF) CO MMUNICATION SY STEM - INSTAL LATION OF THE THIRD VHF SUPERSE DE D
COMMUNICA TION S YSTEM ( A/C 5701 - 5990) , SERVICE B ULL ETIN
MOS
12-MAR-2 007 HRS /MSC -
AFL
SB 605 -23-00 1 REV 01 MODIFICA TION - VE RY HIGH FREQUENCY (V HF) CO MMUNICATION SY STEM - INSTAL LATION OF THE THIRD VHF OPTIONAL COMPLIED WITH
COMMUNICA TION S YSTEM ( A/C 5701 - 5990) , SERVICE B ULL ETIN
MOS 31-MAR-2 012
19-NOV -2007 HRS /MSC A/R 6.4
AFL 5
SB 605 -23-00 1 REV 02 MODIFICA TION - VE RY HIGH FREQUENCY (V HF) CO MMUNICATION SY STEM - INSTAL LATION OF THE THIRD VHF OPTIONAL
COMMUNICA TION S YSTEM ( VHF 3), SE RV ICE BULLETIN
MOS
16-JAN-20 12 HRS /MSC -
AFL
SB 605 -23-00 1 REV 03 MODIFICA TION - VE RY HIGH FREQUENCY (V HF) CO MMUNICATION SY STEM - INSTAL LATION OF THE THIRD VHF OPTIONAL
COMMUNICA TION S YSTEM ( VHF 3), SE RV ICE BULLETIN
MOS
03-O CT-20 13 HRS /MSC -
AFL
SB 605 -23-00 1 REV 04 MODIFICA TION - VE RY HIGH FREQUENCY (V HF) CO MMUNICATION SY STEM - INSTAL LATION OF THE THIRD VHF OPTIONAL NOT A PPLICA BLE - R1 AL RE ADY C/W. RE V 4 IS
COMMUNICA TION S YSTEM ( VHF 3), SE RV ICE BULLETIN N/A AS 60 5-23-0 01 REV 1 HAS BEE N
PRODUCTION INCO RP ORATED ON 31-MAR-17,
NO ACTION REQ .
MOS 11-NOV -2015
29-O CT-20 15 HRS /MSC -
AFL

SB 605 -23-00 1 REV 05 MODIFICA TION - VE RY HIGH FREQUENCY (V HF) CO MMUNICATION SY STEM - INSTAL LATION OF THE THIRD VHF OPTIONAL NOT A PPLICA BLE - R1 COMPLIED WITH. R5 N/A .
COMMUNICA TION S YSTEM ( VHF 3), SE RV ICE BULLETIN
MOS 21-S EP-20 16
29-A UG -2016 HRS /MSC -
AFL
SB 605 -23-00 1 REV 06 MODIFICA TION - VE RY HIGH FREQUENCY (V HF) CO MMUNICATION SY STEM - INSTAL LATION OF THE THIRD VHF OPTIONAL NOT A PPLICA BLE - N/A TO A 6-ELD AS RE V 1 C/W
COMMUNICA TION S YSTEM ( VHF 3), SE RV ICE BULLETIN BY BO MB ARDIER
MOS 31-MAY -2017
02-MAY -2017 HRS /MSC -
AFL
SB 605 -23-00 2 MODIFICA TION - DATALINK S YSTEM - INS TA LLATIO N OF THE DATA LINK SYS TE M (A/C 57 01 - 59 90), S ERVICE BULLETIN SUPERSE DE D COMPLIED WITH
MOS 14-MAR-2 022
HRS /MSC - 219 4.6
AFL 147 5

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 88 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -23-00 2 REV 01 MODIFICA TION - DATALINK S YSTEM - INS TA LLATIO N OF THE DATA LINK SYS TE M (A/C 57 01 - 59 90), S ERVICE BULLETIN OPTIONAL COMPLIED WITH
MOS 14-MAR-2 022
02-S EP-20 08 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -23-00 2 REV 02 MODIFICA TION - DATALINK S YSTEM - INS TA LLATIO N OF THE DATA LINK SYS TE M, SERVICE BULLE TIN OPTIONAL COMPLIED WITH
MOS 14-MAR-2 022
16-JAN-20 12 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -23-00 2 REV 03 MODIFICA TION - DATALINK S YSTEM - INS TA LLATIO N OF THE DATA LINK SYS TE M, SERVICE BULLE TIN OPTIONAL COMPLIED WITH
MOS 14-MAR-2 022
15-DEC-20 15 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -23-00 2 REV 04 MODIFICA TION - DATALINK S YSTEM - INS TA LLATIO N OF THE DATA LINK SYS TE M, SERVICE BULLE TIN OPTIONAL COMPLIED WITH
MOS 14-MAR-2 022
19-S EP-20 16 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -23-00 2 REV 05 MODIFICA TION - DATALINK S YSTEM - INS TA LLATIO N OF THE DATA LINK SYS TE M, SERVICE BULLE TIN OPTIONAL COMPLIED WITH
MOS 14-MAR-2 022
04-A PR-2019 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -23-00 3 MODIFICA TION – INSTALLATION OF THE AIR TO GROUND ANTE NNAS FOR THE AIRCELL COMMUNICATION SYSTEM, OPTIONAL - S UPE RS EDED BY REV 1
SERVICE BULLETIN
MOS 17-JUN-2013
11-A PR-2011 HRS /MSC - 608 .5
AFL 247
SB 605 -23-00 3 REV 01 MODIFICA TION - INSTA LLATION OF THE AIR TO GROUND ANTE NNAS FOR THE AIRCELL COMMUNICA TION SYSTEM, OPTIONAL
SERVICE BULLETIN
MOS
16-JAN-20 13 HRS /MSC -
AFL
SB 605 -23-00 3 REV 02 MODIFICA TION - INSTA LLATION OF THE AIR TO GROUND ANTE NNAS FOR THE AIRCELL COMMUNICA TION SYSTEM, OPTIONAL - TO BE C/W AT OP ERATO R PREFERENCE
SERVICE BULLETIN
MOS 02-JUN-2016
28-O CT-20 15 HRS /MSC -
AFL
SB 605 -23-00 4 MODIFICA TION – INSTALL THE DUA L-CHA NNEL IRIDIUM COMMUNICATIO N SYS TE M ANTENNA, SERVICE BULL ETIN OPTIONAL
MOS
11-A PR-2011 HRS /MSC -
AFL
SB 605 -23-00 4 REV 01 MODIFICA TION - INSTA LL THE DUA L-CHA NNEL IRIDIUM COMMUNICATIO N SYS TEM ANTE NNA, SERVICE BULLE TIN OPTIONAL
MOS
03-A UG -2011 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 89 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -23-00 4 REV 02 MODIFICA TION - INSTA LL THE DUA L-CHA NNEL IRIDIUM COMMUNICATIO N SYS TEM ANTE NNA, SERVICE BULLE TIN OPTIONAL
MOS
05-A PR-2012 HRS /MSC -
AFL
SB 605 -23-00 4 REV 03 MODIFICA TION - INSTA LL THE DUA L-CHA NNEL IRIDIUM COMMUNICATIO N SYS TEM ANTE NNA, SERVICE BULLE TIN OPTIONAL
MOS
19-MAR-2 013 HRS /MSC -
AFL
SB 605 -23-00 4 REV 04 MODIFICA TION - INSTA LL THE DUA L-CHA NNEL IRIDIUM COMMUNICATIO N SYS TEM ANTE NNA, SERVICE BULLE TIN OPTIONAL
MOS
18-DEC-20 13 HRS /MSC -
AFL
SB 605 -23-00 4 REV 05 MODIFICA TION - INSTA LL THE DUA L- CHANNEL IRIDIUM COMMUNICA TION S YSTEM A NTENNA, SE RV ICE BULLETIN OPTIONAL - TO BE C/W AT OP ERATO R PREFERENCE
MOS 02-JUN-2016
19-FEB -2015 HRS /MSC -
AFL
SB 605 -23-00 4 REV 06 MODIFICA TION - INSTA LL THE DUA L - CHANNEL IRIDIUM CO MMUNICATIO N SYS TE M ANTENNA , SERVICE B ULL ETIN OPTIONAL COMPLIED WITH
MOS 13-MAR-2 020
03-O CT-20 16 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -23-00 5 REWORK - AUDIO INTE GRATING SYSTEM - E NL ARGE THE CONTROL COLUMN, HA ND-HELD MICROPHONE HA RNESS RECOMME NDED NOT A PPLICA BLE
FEEDTHROUGH TO REDUCE THE RISK OF CHAFING, SERVICE BULLE TIN
MOS
01-NOV -2010 HRS /MSC -
AFL
SB 605 -23-00 6 MODIFICA TION – COCKPIT V OICE RECORDE R (CVR) S YSTEM – INSTA LLATION OF RE CO RDER INDEPENDENT PO WE R OPTIONAL COMPLIED WITH
SUPPL Y ( RIPS) FOR CVR, SE RV ICE BULLETIN
MOS 31-MAR-2 012
18-A PR-2011 HRS /MSC - 6.4
AFL 5
SB 605 -23-00 6 REV 01 MODIFICA TION - COCKPIT VO ICE RECORDE R (CVR) S YSTEM - INSTALLA TION OF RECORDER INDEP ENDE NT POWER OPTIONAL NOT A PPLICA BLE - SB 605-2 3-006 REV 1 IS N/A
SUPPL Y ( RIPS) FOR CVR, SE RV ICE BULLETIN TO A6-ELD AS BAS IC ISSUE OF SB 605-23 -006
HAS BEEN PRODUCTIO N INCORPO RA TE D ON
31/03/12.
NO FURTHER ACTION RE Q
MOS 11-NOV -2015
29-O CT-20 15 HRS /MSC -
AFL
SB 605 -23-00 6 REV 02 MODIFICA TION - COCKPIT VO ICE RECORDE R (CVR) S YSTEM - INS TAL LATIO N OF RECORDER INDEPENDENT POWER OPTIONAL COMPLIED WITH - P RE VIO US LY CO MP LIE D
SUPPL Y ( RIPS) FOR CVR, SE RV ICE BULLETIN WITH: BAS IC ISS UE IN PRODUCTION
MOS 09-JUL-20 21
08-JUL-20 21 HRS /MSC -
AFL
SB 605 -23-00 7 MODIFICA TION - DATALINK S YSTEM - UPGRADE THE DATALINK SY STEM TO MEET THE EUROCONTROL'S LINK 200 0+ OPTIONAL
REQUIRE ME NT (C2 3-440) , SERVICE BULL ETIN
MOS
03-JAN-20 13 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 90 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -23-00 7 REV 01 MODIFICA TION - DATALINK S YSTEM - UPGRADE THE DATALINK SY STEM TO MEET THE EUROCONTROL'S LINK 200 0+ OPTIONAL
REQUIRE ME NT, SE RV ICE BULLETIN
MOS
04-MAR-2 013 HRS /MSC -
AFL
SB 605 -23-00 7 REV 02 MODIFICA TION - DATALINK S YSTEM - UPGRADE THE DATALINK SY STEM TO MEET THE EUROCONTROL'S LINK 200 0+ OPTIONAL - NOT RE CO MMENDED
REQUIRE ME NT, SE RV ICE BULLETIN
MOS
14-DEC-20 15 HRS /MSC -
AFL
SB 605 -23-00 7 REV 03 MODIFICA TION - DATALINK S YSTEM - UPGRADE THE DATALINK SY STEM TO MEET THE EUROCONTROL'S LINK 200 0+ OPTIONAL COMPLIED WITH
REQUIRE ME NT, SE RV ICE BULLETIN
MOS 13-MAR-2 020
19-S EP-20 16 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -23-00 8 MODIFICA TION - FUTURE AIR NA VIGATIO N SYS TEM (FANS) - UPLO AD OF ENCRYP TION APPLICATION KEYS , SERVICE OPTIONAL - NOT RE CO MMENDED
BULLE TIN
MOS
15-DEC-20 15 HRS /MSC -
AFL
SB 605 -23-00 8 REV 01 MODIFICA TION - FUTURE AIR NA VIGATIO N SYS TEM (FANS) - UPLO AD OF ENCRYP TION APPLICATION KEYS , SERVICE OPTIONAL - NOT RE QUIRED FOR NO W
BULLE TIN
MOS
21-MAR-2 016 HRS /MSC -
AFL
SB 605 -23-00 8 REV 02 MODIFICA TION - FUTURE AIR NA VIGATIO N SYS TEM (FANS) - UPLO AD OF ENCRYP TION APPLICATION KEYS , SERVICE OPTIONAL - A PPLICA BLE, NO T RECOMME NDED
BULLE TIN
MOS
18-A PR-2016 HRS /MSC -
AFL
SB 605 -23-00 8 REV 03 MODIFICA TION - FUTURE AIR NA VIGATIO N SYS TEM (FANS) - UPLO AD OF ENCRYP TION APPLICATION KEYS , SERVICE OPTIONAL COMPLIED WITH
BULLE TIN
MOS 13-MAR-2 020
22-MAR-2 018 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -23-00 9 MODIFICA TION - SA TE LLITE COMMUNICA TION ( SATCO M) SY STEM - INSTAL LATION OF THE SATELLITE OPTIONAL - NOT RE CO MMENDED
COMMUNICA TION ( SATCO M) SA T-2 00 SYSTEM, SE RV ICE BULLETIN
MOS 11-FEB -2016
15-DEC-20 15 HRS /MSC -
AFL
SB 605 -23-00 9 REV 01 MODIFICA TION - SA TE LLITE COMMUNICA TION ( SATCO M) SY STEM - INSTAL LATION OF THE SATELLITE OPTIONAL - NOT RE QUIRED FOR NO W
COMMUNICA TION ( SATCO M) SA T-2 200 SYSTEM, S ERV ICE BULLETIN
MOS 07-JAN-20 16
21-MAR-2 016 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 91 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -23-00 9 REV 02 MODIFICA TION - SA TE LLITE COMMUNICA TION ( SATCO M) SY STEM - INSTAL LATION OF THE SATELLITE OPTIONAL COMPLIED WITH
COMMUNICA TION ( SATCO M) SA T-2 200 SYSTEM, S ERV ICE BULLETIN
MOS 14-MAR-2 022
04-MAY -2017 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -23-01 0 - SPECIAL CHECK/REWORK FOR VERY HIGH FREQ UE NCY (VHF) COMMUNICATION SYSTEM - E LIMINATION OF RECOMME NDED NOT A PPLICA BLE
POS SIBLE NO IS E, SERVICE BUL LETIN
MOS
17-DEC-20 12 HRS /MSC -
AFL
SB 605 -23-01 0 P ART A SPE CIAL CHE CK - SPE CIAL CHE CK /REWORK FO R VE RY HIG H FRE QUENCY (VHF) CO MMUNICATIO N SY STE M - RECOMME NDED NOT A PPLICA BLE
ELIMINATION OF POSS IBL E NOISE , SERVICE BULL ETIN
MOS (EFF)
17-DEC-20 12 HRS /MSC -
AFL
SB 605 -23-01 0 P ART B REWORK - SP ECIAL CHECK/REWO RK FOR V ERY HIGH FREQUENCY ( VHF) COMMUNICA TION S YSTEM - ELIMINATION RECOMME NDED NOT A PPLICA BLE
OF POSSIBLE NOISE, SERVICE BULLE TIN
MOS (EFF)
17-DEC-20 12 HRS /MSC -
AFL
SB 605 -23-01 1 MODIFICA TION - SA TE LLITE COMMUNICA TION S YSTEM ( SATCO M) - INSTAL LATION OF IRIDIUM SATELLITE OPTIONAL - NOT RE CO MMENDED
COMMUNICA TION S YSTEM, SERVICE BULLETIN
MOS
15-DEC-20 15 HRS /MSC -
AFL
SB 605 -23-01 1 REV 01 MODIFICA TION - SA TE LLITE COMMUNICA TION S YSTEM ( SATCO M) - INSTAL LATION OF IRIDIUM SATELLITE OPTIONAL - A PPLICA BLE, NO T RECOMME NDED
COMMUNICA TION S YSTEM, SERVICE BULLETIN
MOS
23-MAR-2 016 HRS /MSC -
AFL
SB 605 -23-01 1 REV 02 MODIFICA TION - SA TE LLITE COMMUNICA TION S YSTEM ( SATCO M) - INSTAL LATION OF IRIDIUM SATELLITE OPTIONAL
COMMUNICA TION S YSTEM, SERVICE BULLETIN
MOS (EFF)
21-DEC-20 16 HRS /MSC -
AFL
SB 605 -23-01 1 REV 03 MODIFICA TION - SA TE LLITE COMMUNICA TION S YSTEM ( SATCO M) - INSTAL LATION OF IRIDIUM SATELLITE OPTIONAL COMPLIED WITH
COMMUNICA TION S YSTEM, SERVICE BULLETIN
MOS 13-MAR-2 020
13-A PR-2017 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -23-01 2 MODIFICA TION - VHF COMMUNICATIO N SYS TEM - UP GRA DE THE THIRD VHF TRA NSCEIVER (VHF 3) TO ME ET LINK RECOMME NDED COMPLIED WITH
200 0+ CERTIFICATIO N REQUIREMENT, SERVICE BULLETIN
MOS 13-MAR-2 020
14-S EP-20 15 HRS /MSC - 192 6.4
AFL 127 5

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 92 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -23-01 3 MODIFICA TION - DATALINK S YSTEM - REPLA CE THE COMMUNICATIO N MANAGEMENT UNIT (CMU) TO CORRECT THE RECOMME NDED COMPLIED WITH
SOFTWARE RES ET, SERVICE B ULL ETIN
MOS 13-MAR-2 020
19-S EP-20 16 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -23-01 4 MODIFICA TION - SA TE LLITE COMMUNICA TION S YSTEM ( SATCO M) - INSTAL LATION OF S ATCO M INMARSAT OPTIONAL COMPLIED WITH
DIS CO NNECT SWITCH, SE RV ICE BULLETIN
MOS 14-MAR-2 022
28-NOV -2017 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -24-00 1 SPE CIAL CHE CK /MODIFICATION - E ME RG ENCY AC GENERATIO N SYS TE M - RE PLACE SUSPECT B ALANCE SCRE WS RECOMME NDED NOT A PPLICA BLE
ON ADG, SERVICE BULLETIN
MOS
HRS /MSC -
AFL
SB 605 -24-00 2 INS PECTION/RE WO RK - AC E LECTRICAL LOAD DISTRIBUTIO N - INSPE CTION O F LOO SE AND IMPROP ERLY CRIMPED RECOMME NDED NOT A PPLICA BLE
TERMINAL LUG CO NNECTIO NS IN CBP-2, CB P-3, CBP -4, JB17 AND JB18, SERVICE BULLE TIN
MOS
HRS /MSC -
AFL
SB 605 -24-00 3 MODIFICA TION - EMERGE NCY AC G ENERATION SYSTEM - REP LACE THE AIR DRIVEN GENERATOR ( ADG) RECOMME NDED NOT A PPLICA BLE
GENERATOR CO NTROL UNIT (G CU), S ERVICE BULLE TIN
MOS
HRS /MSC -
AFL
SB 605 -24-00 4 INS PECTION/MO DIFICATION - AC E LECTRICA L LOAD DISTRIBUTIO N - INSPE CTION OF LOOS E AND IMPROP ERLY RECOMME NDED NOT A PPLICA BLE
CRIMPED TE RMINA L L UG CONNECTIONS IN CB P-1 AND REPLA CE ME NT/RE LOCATION OF B US BA RS , SERVICE
BULLE TIN
MOS
HRS /MSC -
AFL
SB 605 -24-00 5 MODIFICA TION - OX YGEN SUPPLY SY STE M - INSTALL ATION OF PROTECTIO N ON ELECTRICAL WIRING HARNESS, RECOMME NDED NOT A PPLICA BLE
SERVICE BULLETIN
MOS
HRS /MSC -
AFL
SB 605 -24-00 7 SPE CIAL CHE CK /REWORK - INTEGRATED DRIV E G ENERATO R (IDG ) A ND HY DRAULIC SY STEMS NO.1 AND NO. 2 - AFT RECOMME NDED COMPLIED WITH
EQUIPMENT BA Y RIGHT IDG PO WE R CABLE AND A DJACENT HYDRAULIC LINE S S UP PORT BRACKETS, SERVICE
BULLE TIN
MOS 12-DEC-20 12
18-S EP-20 12 HRS /MSC - 367 .9
AFL 142
SB 605 -24-00 7 REV 01 SPE CIAL CHE CK /REWORK - INTEGRATED DRIV E G ENERATO R (IDG ) A ND HY DRAULIC SY STEMS NO. 1 A ND NO . 2 - A FT RECOMME NDED COMPLIED WITH
EQUIPMENT BA Y RIGHT IDG PO WE R CABLE AND A DJACENT HYDRAULIC LINE S S UP PORT BRACKETS, SERVICE
BULLE TIN
MOS 15-A PR-2014
18-S EP-20 12 HRS /MSC - 766 .9
AFL 313

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 93 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -24-00 9 SPE CIAL CHE CK /REWORK - INTEGRATED DRIV E G ENERATO R (IDG ) A ND ELECTRICAL HARNE SS PO SSIBLE FOULING RECOMME NDED COMPLIED WITH - CLA MP RE-PO SITIONED
BETWEEN THE RIG HT ENGINE IDG PO WE R CABLE AND THE FUEL FLOW ME TE R, SERVICE BULLE TIN
MOS 21-FEB -2013
19-FEB -2013 HRS /MSC - 457 .5
AFL 188
SB 605 -24-00 9 REV 01 SPE CIAL CHE CK /REWORK - INTEGRATED DRIV E G ENERATO R (IDG ) A ND ELECTRICAL HARNE SS - PO SSIBLE FOULING RECOMME NDED
BETWEEN THE RIG HT ENGINE IDG PO WE R CABLE AND THE FUEL FLOW ME TE R, SERVICE BULLE TIN
MOS (EFF)
HRS /MSC -
AFL
SB 605 -25-00 1 REV 01 MODIFICA TION - INSUL ATION - INSTALLA TION O F THE ENTRY HEA DL INER S TRUCTURE, THE CAB IN PRIMARY RECOMME NDED
INS ULA TION BLANKETS AND THE TOP COVE R (A/C 57 05 - 59 00), S ERVICE BULLETIN
MOS
18-MAY -2007 HRS /MSC A/R
AFL
SB 605 -25-00 1 REV 02 MODIFICA TION - INSUL ATION - INSTALLA TION O F THE ENTRY HEA DL INER S TRUCTURE, THE CAB IN PRIMARY RECOMME NDED
INS ULA TION BLANKETS AND THE TOP COVE R, SERVICE BULLE TIN
MOS
23-FEB -2009 HRS /MSC -
AFL
SB 605 -25-00 1 REV 03 MODIFICA TION - INSUL ATION - INSTALLA TION O F THE ENTRY HEA DL INER S TRUCTURE, THE CAB IN PRIMARY SUPERSE DE D
INS ULA TION BLANKETS AND THE TOP COVE R, SERVICE BULLE TIN
MOS
10-JUN-2009 HRS /MSC -
AFL
SB 605 -25-00 1 REV 04 MODIFICA TION - INSUL ATION - INSTALLA TION O F THE ENTRY HEA DL INER S TRUCTURE, THE CAB IN PRIMARY RECOMME NDED COMPLIED WITH
INS ULA TION BLANKETS AND THE TOP COVE R, SERVICE BULLE TIN
MOS 31-MAR-2 012
17-MAY -2010 HRS /MSC - 6.4
AFL 5
SB 605 -25-00 1 REV 05 MODIFICA TION - INSUL ATION - INSTALLA TION O F THE ENTRY HEA DL INER S TRUCTURE, THE CAB IN PRIMARY RECOMME NDED NOT A PPLICA BLE - WA S P RE VIO US LY C/W WITH
INS ULA TION BLANKETS AND THE TOP COVE R, SERVICE BULLE TIN REV. 4
MOS 04-JUN-2012
15-MAY -2012 HRS /MSC -
AFL
SB 605 -25-00 1 REV 06 MODIFICA TION - INSUL ATION - INSTALLA TION O F THE ENTRY HEA DL INER S TRUCTURE, THE CAB IN PRIMARY RECOMME NDED COMPLIED WITH - IAW SB 605-2 5-001 REV 4 @
INS ULA TION BLANKETS AND THE TOP COVE R, SERVICE BULLE TIN BOMBA RDIER O N 31-MAR-12
MOS 17-A PR-2013
21-JAN-20 13 HRS /MSC - 536 .7
AFL 220
SB 605 -25-00 1 REV 07 MODIFICA TION - INSUL ATION - INSTALLA TION O F THE ENTRY HEA DL INER S TRUCTURE, THE CAB IN PRIMARY RECOMME NDED
INS ULA TION BLANKETS AND THE TOP COVE R, SERVICE BULLE TIN
MOS (EFF)
26-MAY -2014 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 94 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -25-00 1 REV 08 MODIFICA TION - INSUL ATION - INSTALLA TION O F THE ENTRY HEA DL INER S TRUCTURE, ATHE CA BIN PRIMARY RECOMME NDED NOT A PPLICA BLE - THIS S B IS N/A TO A6- ELD
INS ULA TION BLANKETS AND THE TOP COVE R, SERVICE BULLE TIN AS SB 605 -25-00 1 REV 4 HAS BEEN
PRODUCTION INCO RP ORATED ON 31-MAR-12
NO ACTION REQ
MOS 11-NOV -2015
29-O CT-20 15 HRS /MSC -
AFL
SB 605 -25-00 2 MODIFICA TION - FERRY FLIGHT KIT - REMOVAL OF THE FERRY FLIGHT KIT (A/C 5 703 - 5 990), S ERVICE BULLE TIN OPTIONAL
MOS
HRS /MSC A/R
AFL
SB 605 -25-00 2 REV 01 MODIFICA TION - FERRY FLIGHT KIT - REMOVAL OF THE FERRY FLIGHT KIT (A/C 5 701, 57 03 TO 59 90), SE RV ICE OPTIONAL
BULLE TIN
MOS
HRS /MSC A/R
AFL
SB 605 -25-00 2 REV 02 MODIFICA TION - FERRY FLIGHT KIT - REMOVAL OF THE FERRY FLIGHT KIT, SERVICE BULL ETIN OPTIONAL
MOS
16-MAR-2 009 HRS /MSC -
AFL
SB 605 -25-00 2 REV 03 MODIFICA TION - FERRY FLIGHT KIT - REMOVAL OF THE FERRY FLIGHT KIT, SERVICE BULL ETIN OPTIONAL
MOS
08-FEB -2010 HRS /MSC -
AFL
SB 605 -25-00 2 REV 04 MODIFICA TION - FERRY FLIGHT KIT - REMOVAL OF THE FERRY FLIGHT KIT, SERVICE BULL ETIN OPTIONAL COMPLIED WITH
MOS 31-MAR-2 012
HRS /MSC - 6.4
AFL 5
SB 605 -25-00 2 REV 05 MODIFICA TION - FERRY FLIGHT KIT - REMOVAL OF THE FERRY FLIGHT KIT, SERVICE BULL ETIN OPTIONAL
MOS
05-S EP-20 13 HRS /MSC -
AFL
SB 605 -25-00 2 REV 06 MODIFICA TION - FERRY FLIGHT KIT - REMOVAL OF THE FERRY FLIGHT KIT, SERVICE BULL ETIN OPTIONAL NOT A PPLICA BLE - SB 605-2 5-002 IS N/A TO
A6- ELD 60 5-25-0 02 RE V 4 HAS BEE N
PRODUCTION INCO RP ORATED ON 31-MAR-12.
NO ACTION REQ
MOS 11-NOV -2015
29-O CT-20 15 HRS /MSC -
AFL
SB 605 -25-00 4 MODIFICA TION - CABIN TRIM - INTRODUCTION OF IMP RO VED WINDO W SHADE, SE RV ICE BULLETIN OPTIONAL NOT A PPLICA BLE
MOS
26-JAN-20 11 HRS /MSC -
AFL
SB 605 -25-00 4 REV 01 MODIFICA TION - CABIN TRIM - INTRODUCTION OF IMP RO VED WINDO W SHADE, SE RV ICE BULLETIN OPTIONAL NOT A PPLICA BLE
MOS
27-S EP-20 12 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 95 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -25-00 5 MODIFICA TION - PA SSENGE R SEA T - OBSERVE R JUMPS EAT MODIFICATION OR REP LACEMENT TO ME ET FAR 13 5 RECOMME NDED NOT A PPLICA BLE - BY A/C SERIAL NUMBER
DESIGN REQ UIREMENT, S ERVICE BULLE TIN
MOS 02-JUN-2014
02-JUL-20 14 HRS /MSC -
AFL
SB 605 -25-00 5 P ART A MODIFICA TION MO DIFICATIO N - PASS ENGER S EAT - OBS ERVER JUMPSEA T MODIFICATION O R REPLACEMENT TO RECOMME NDED NOT A PPLICA BLE - BY A/C SERIAL NUMBER
MEET FAR 135 DESIGN REQ UIREMENT, S ERVICE BULLE TIN OB SERVER JUMPSEA T WITH TRACK AND SWIV EL
MOS 02-JUN-2014
02-JUL-20 14 HRS /MSC -
AFL
SB 605 -25-00 5 P ART B MODIFICA TION MO DIFICATIO N - PASS ENGER S EAT - OBS ERVER JUMPSEA T MODIFICATION O R REPLACEMENT TO RECOMME NDED NOT A PPLICA BLE - BY A/C SERIAL NUMBER
MEET FAR 135 DESIGN REQ UIREMENT, S ERVICE BULLE TIN OB SERVER JUMPSEA T WITHOUT TRACK A ND SWIVE L
MOS 02-JUN-2014
02-JUL-20 14 HRS /MSC -
AFL
SB 605 -25-00 5 P ART C REPLA CE ME NT MO DIFICATIO N - PASS ENGER S EAT - OB SERVER JUMPSEA T MODIFICA TION O R REPLA CE ME NT TO RECOMME NDED NOT A PPLICA BLE - BY A/C SERIAL NUMBER
MEET FAR 135 DESIGN REQ UIREMENT, S ERVICE BULLE TIN OB SERVER JUMPSEA T
MOS 02-JUN-2014
02-JUL-20 14 HRS /MSC -
AFL
SB 605 -25-00 6 MODIFICA TION - PA SSENGE R SEA T - JUMPSEA T BRACKETS BONDING REQUIREMENT, SERVICE BULLETIN RECOMME NDED NOT A PPLICA BLE
MOS
04-JAN-20 11 HRS /MSC -
AFL
SB 605 -25-00 7 MODIFICA TION - MISCELLANEO US EQ UIPMENT - MICROWAVE OV EN VE NTILATION DUCTING IMP RO VEMENT, SERVICE RECOMME NDED NOT A PPLICA BLE - FO UND NOT APPL ICABLE B Y
BULLE TIN AIRCRAFT SE RIAL NUMB ER
MOS 23-A UG -2012
20-A UG -2012 HRS /MSC - 237 .4
AFL 104
SB 605 -25-00 7 REV 01 MODIFICA TION - MISCELLANEO US EQ UIPMENT - MICROWAVE OV EN VE NTILATION DUCTING IMP RO VEMENT, SERVICE RECOMME NDED NOT A PPLICA BLE - FO UND NOT APPL ICABLE B Y
BULLE TIN AIRCRAFT SE RIAL NUMB ER
MOS 21-A PR-2014
03-O CT-20 12 HRS /MSC - 766 .9
AFL 313
SB 605 -25-00 9 RETURN S HE LF LIFE L IMITED PARTS TO SE RVICE BEFORE AIRCRAFT DELIVERY, SE RV ICE BULLETIN RECOMME NDED NOT A PPLICA BLE
MOS
12-DEC-20 12 HRS /MSC -
AFL
SB 605 -25-00 9 REV 01 RETURN S HE LF LIFE L IMITED PARTS TO SE RVICE BEFORE AIRCRAFT DELIVERY, SE RV ICE BULLETIN RECOMME NDED NOT A PPLICA BLE
MOS (EFF)
05-S EP-20 13 HRS /MSC -
AFL
SB 605 -25-00 9 REV 02 RETURN S HE LF LIFE L IMITED PARTS TO SE RVICE BEFORE AIRCRAFT DELIVERY, SE RV ICE BULLETIN RECOMME NDED NOT A PPLICA BLE - THIS S B IS N/A TO A6-EL D BY
A/C MSN ( 5866) NO ACTION REQ
MOS 11-NOV -2015
29-O CT-20 15 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 96 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -25-01 0 MODIFICA TION - GA LLEY - REPLACEMENT O F THE MICROWAV E O VEN TO CORRE CT THE WI-FI CONNECTIVITY, RECOMME NDED NOT A PPLICA BLE
ELE CTROMAGNETIC INTERFERENCE, SERVICE BULL ETIN
MOS
08-O CT-20 14 HRS /MSC -
AFL
SB 605 -25-01 0 REV 01 MODIFICA TION - GA LLEY - REPLACEMENT O F THE MICROWAV E O VEN TO CORRE CT THE WI-FI CONNECTIVITY, RECOMME NDED NOT A PPLICA BLE
ELE CTROMAGNETIC INTERFERENCE, SERVICE BULL ETIN
MOS (EFF)
22-DEC-20 14 HRS /MSC -
AFL
SB 605 -25-01 1 MODIFICA TION - TABL ES - PULL -OUT TABLE S L OCKING MECHA NISM REPL ACE ME NT, S ERVICE BULLETIN RECOMME NDED - S CHEDULE-17 /AP RIL/2016.
MOS (EFF)
16-JUL-20 15 HRS /MSC -
AFL
SB 605 -25-01 1 REV 01 MODIFICA TION - TABL ES - PULL -OUT TABLE S L OCKING MECHA NISM RE PLACEMENT, SERVICE B ULL ETIN RECOMME NDED COMPLIED WITH - CUSTOMER IS REQUIRED TO
INS ERT THE SUPPL EMENTA L ILLUSTRATED
PARTS CA TA LOG ADDENDUM (S IP CA)
DOCUMENT A DJACENT TO THE AFFECTE D
SECTIO N IN THE COMPLE TION SUP PLEMENTAL
ILLUSTRA TE D PARTS CA TAL OG (SIPC) A ND
RECORD THE INCO RP ORATION OF THE S IPCA
DOCUMENT O N THE S IPC RE CO RD OF
ADDENDA (RCA) SHEET.
REFER TO SECTION (E) FOR RECORDING
DETAIL S.
MOS 08-A PR-2016
31-JUL-20 15 HRS /MSC - 131 3.0 2
AFL 851
SB 605 -25-01 2 MODIFICA TION - CABIN B ULK HE AD DOORS - LAVA TO RY AND B AGGA GE DO ORS HING ES, S ERVICE BULLETIN OPTIONAL
MOS (EFF)
06-FEB -2017 HRS /MSC -
AFL
SB 605 -25-01 2 REV 01 MODIFICA TION - CABIN B ULK HE AD DOORS - LAVA TO RY AND B AGGA GE DO OR HING ES, SE RV ICE BULLETIN OPTIONAL
MOS (EFF)
13-MAR-2 017 HRS /MSC -
AFL
SB 605 -25-01 3 MODIFICA TION - CABIN B ULK HE AD DOORS - POCKET DO OR FOOTER PIN REPLACEMENT, SERVICE BULLETIN RECOMME NDED
MOS (EFF)
20-FEB -2017 HRS /MSC -
AFL
SB 605 -25-01 4 REV 01 SPE CIAL CHE CK /MODIFICATION - E ME RG ENCY EQ UIPMENT - REMOVAL OF ESSE X S MO KE HO OD (P ART NO. RECOMME NDED
MR-10008 N) AND REPL ACEMENT OF P LACARDS , SERVICE B UL LETIN
MOS
07-JUN-2022 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 97 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -26-00 1 MODIFICA TION - ENGINE FIRE / OVERHEAT DETECTIO N SYS TE M - INTRO DUCTION OF FIRE SE NS ING ELEMENT P ART OPTIONAL
NO. 74 4-1164 5 WITH OPTIONAL CO NNECTORS, SE RV ICE BULLETIN
MOS
25-S EP-20 12 HRS /MSC -
AFL
SB 605 -26-00 1 REV 01 MODIFICA TION - ENGINE FIRE / OVERHEAT DETECTIO N SYS TE M - INTRODUCTION O F FIRE SENSING E LEMENT PART OPTIONAL - TO BE C/W AT OP ERATO R PREFERENCE
NO. 74 4-1164 5 WITH O PTIONAL CONNECTO RS , SERVICE BULL ETIN
MOS 02-JUN-2016
05-MAY -2015 HRS /MSC -
AFL
SB 605 -27-00 1 MODIFICA TION - STAL L P RO TECTIO N SY STE M - INTRO DUCTIO N OF A NEW CO NFIGURA TION A NG LE-OF-ATTACK OPTIONAL NOT A PPLICA BLE
SENSO R, SERVICE BULLE TIN
MOS
27-JAN-20 10 HRS /MSC -
AFL
SB 605 -27-00 1 REV 01 MODIFICA TION - STAL L P RO TECTIO N SY STE M - INTRO DUCTIO N OF A NEW CO NFIGURA TION A NG LE-OF-ATTACK OPTIONAL NOT A PPLICA BLE
SENSO R, SERVICE BULLE TIN
MOS
04-MAR-2 010 HRS /MSC -
AFL
SB 605 -27-00 2 MODIFICA TION - HORIZONTAL STABILIZE R TRIM-ACTUATING S YSTEM - REPLA CE THE HORIZO NTAL STABILIZER TRIM RECOMME NDED NOT A PPLICA BLE - SUPERSEDED BY RE V 1
ACTUA TO R (HSTA) PART NUMB ER 604 -9230 5-3 OR -5 (84 54-1 OR 8 454-2) WITH PART NUMB ER 604 -9230 5-7 (8454- 3),
SERVICE BULLETIN
MOS 17-JUN-2013
10-S EP-20 12 HRS /MSC - 608 .5
AFL 247
SB 605 -27-00 2 REV 01 MODIFICA TION - HORIZONTAL STABILIZE R TRIM-ACTUATING S YSTEM - REPLA CE THE HORIZO NTAL STABILIZER TRIM RECOMME NDED NOT A PPLICA BLE
ACTUA TO R (HSTA) PART NUMB ER 604 -9230 5-3 OR -5 (84 54-1 OR 8 454-2) WITH PART NUMB ER 604 -9230 5-7 (8454- 3),
SERVICE BULLETIN
MOS 29-S EP-20 13
10-S EP-20 12 HRS /MSC - 766 .9
AFL 313

SB 605 -27-00 2 REV 02 MODIFICA TION - HORIZONTAL STABILIZE R TRIM-ACTUATING S YSTEM - REPLA CE THE HORIZO NTAL STABILIZER TRIM RECOMME NDED COMPLIED WITH
ACTUA TO R (HSTA) PART NUMB ER 604 -9230 5-3 OR -5 (84 54-1 OR 8 454-2) WITH PART NUMB ER 604 -9230 5-7 (8454- 3),
SERVICE BULLETIN
MOS 26-A PR-2015
10-S EP-20 12 HRS /MSC - 107 0.7 7
AFL 688

SB 605 -27-00 3 SPE CIAL CHE CK /MODIFICATION - FLA PS - RELO CA TION OF INB OARD STOP BRACKE TS, SERVICE BULL ETIN OPTIONAL NOT A PPLICA BLE - BY AIRCRAFT SERIAL
NUMBE R
MOS
30-A PR-2012 HRS /MSC -
AFL
SB 605 -27-00 5 MODIFICA TION - HORIZONTAL STABILIZE R TRIM-ACTUATING S YSTEM (HSTA) - SERIA LIZATION OF THE ACTUA TO R RECOMME NDED COMPLIED WITH
PINS A ND TRUNNIONS, S ERV ICE BULLETIN
MOS 26-A PR-2015
25-FEB -2013 HRS /MSC - 107 0.7 7
AFL 688

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 98 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -27-00 5 REV 01 MODIFICA TION - HORIZONTAL STABILIZE R TRIM-ACTUATING S YSTEM (HSTA) - SERIA LIZATION OF THE ACTUA TO R RECOMME NDED COMPLIED WITH - G ET ACCESS TO THE HSTA
PINS A ND TRUNNIONS, S ERV ICE BULLETIN AND FOUND THE P ARTS ALREA DY SE RIALIZED.
GENERAL INSPECTION PERFORME D TO THE
AREA.OPE RA TIONAL TEST P ERFO RMED.FO UND
OK ALL ACCESS CLOS ED,SB 60 5-27-0 05 BASIC
ISSUE FO UND COMPL IED AT DATE 26-4-1 5,WO
255 49 CARD:502, NO FURTHER ACTIO N
REQUIRE D.
MOS 27-S EP-20 18
21-A PR-2017 HRS /MSC - 162 5.4
AFL 107 4
SB 605 -27-00 6 MODIFICA TION - FLAP PO SITION A ND INDICATING SY STE M - INSTALL ATION FO R THE FLAP ON-BO ARD RECORDE R OPTIONAL - S UPE RS EDED BY REV 1
(FOBR), S ERV ICE BULLETIN
MOS 02-JUN-2016
17-DEC-20 15 HRS /MSC -
AFL
SB 605 -27-00 6 REV 01 MODIFICA TION - FLAP PO SITION A ND INDICATING SY STE M - INSTALL ATION FO R THE FLAP ON-BO ARD RECORDE R OPTIONAL - A PPLICA BLE, BUT NOT RECOMMENDED
(FOBR), S ERV ICE BULLETIN
MOS (EFF)
26-A PR-2016 HRS /MSC -
AFL
SB 605 -27-00 6 REV 02 MODIFICA TION - FLAP PO SITION A ND INDICATING SY STE M - INSTALL ATION FO R THE FLAP ON-BO ARD RECORDE R OPTIONAL
(FOBR), S ERV ICE BULLETIN
MOS (EFF)
05-JUN-2017 HRS /MSC -
AFL
SB 605 -27-00 6 REV 03 MODIFICA TION - FLAP PO SITION A ND INDICATING SY STE M - INSTALL ATION FO R THE FLAP ON-BO ARD RECORDE R OPTIONAL
(FOBR), S ERV ICE BULLETIN
MOS
25-FEB -2019 HRS /MSC -
AFL
SB 605 -27-00 8 SPE CIAL CHE CK /MODIFICATION - RUDDE R CONTROL SY STEM - REPLACE THE PILOT'S RUDDER PE DA L B AR RECOMME NDED - A PPLICA BLE AND RECOMMENDE D.
ASS EMBLY OR RUDDE R PEDAL AS SEMBLY, SERVICE BULL ETIN
MOS (EFF)
31-MAR-2 016 HRS /MSC -
AFL 800 0 M
SB 605 -27-00 8 P ART A ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - RUDDER CONTRO L S YSTEM - REPLA CE THE PIL OT'S RUDDER PEDAL RECOMME NDED
BAR ASSE MB LY OR RUDDER PEDAL ASS EMBLY, S ERVICE BULLE TIN SP ECIAL CHECK - DVI O R EDDY CURRE NT
INS PECTION OF PILOT'S RUDDER PE DA L TUBES , FO R CRA CK S
MOS
31-MAR-2 016 HRS /MSC
AFL 900 0 (EFF) 800 0 M
SB 605 -27-00 8 P ART B ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - RUDDER CONTRO L S YSTEM - REPLA CE THE PIL OT'S RUDDER PEDAL RECOMME NDED
BAR ASSE MB LY OR RUDDER PEDAL ASS EMBLY, S ERVICE BULLE TIN MODIFICATION - REP LACEMENT OF B OTH PILOT
RUDDER PEDAL BAR A SSEMBL IES OR PILOT RUDDER PEDAL AND B AR AS SEMBLIES
MOS
31-MAR-2 016 HRS /MSC BF/F (s)
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 99 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -27-00 9 MODIFICA TION - HORIZONTAL STABILIZE R TRIM-ACTUATING S YSTEM - REPLA CE ME NT OF MOTOR CONTROL UNIT RECOMME NDED
(MCU) WITH L ONGER FIXATION SCREWS, SE RV ICE BULLETIN
MOS (EFF)
13-MAY -2019 HRS /MSC -
AFL
SB 605 -27-01 0 SPE CIAL CHE CK /MODIFICATION - RUDDE R CONTROL SY STEM - INSP ECTION O F RUDDER L OAD L IMITE R, S ERVICE RECOMME NDED
BULLE TIN
MOS (EFF)
07-DEC-20 20 HRS /MSC -
AFL
SB 605 -27-01 0 P ART A ACCOMPLISH, SERVICE B UL LETIN SPECIAL CHECK - TE MPO RA RY PE RIODIC TESTING OF THE RUDDER P CU LOAD RECOMME NDED
LIMITERS
MOS (EFF) RECURRING
07-DEC-20 20 HRS /MSC 100 0 307 8.9 2
AFL
SB 605 -27-01 0 P ART B ACCOMPLISH, SERVICE B UL LETIN SPECIAL CHECK - ONE-TIME VISUAL INSPE CTION OF THE RUDDER P CU LOAD RECOMME NDED
LIMITERS AND REPLA CE THE L OAD L IMITER (IF THE NUT AND END CAP OF THE RUDDER P CU LOAD LIMITER IS NOT
CRIMPED PROPERLY)
MOS (EFF)
07-DEC-20 20 HRS /MSC 340 0 547 8.9 2
AFL
SB 605 -27-01 0 P ART C ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - RUDDER CONTRO L S YSTEM - INS PECTION OF RUDDER LOAD RECOMME NDED
LIMITER, SERVICE BULLETIN MO DIFICATION - REPLA CEMENT O F THE RUDDER PCU LO AD LIMITER(S)
MOS (EFF)
07-DEC-20 20 HRS /MSC -
AFL
SB 605 -28-00 1 SPE CIAL CHE CK /MODIFICATION - FUEL QUANTITY INDICATING SY STEM - REPLACE THE FUEL QUANTITY G AUGING RECOMME NDED NOT A PPLICA BLE
COMPUTE R (FQGC) PART NUMB ER 73 6847-1 5 WITH PART NUMBER 7 36847 -16, SE RV ICE BULLETIN
MOS
HRS /MSC A/R
AFL
SB 605 -28-00 2 MODIFICA TION - VE NT SYSTEM ENHA NCEMENT, SERVICE B UL LETIN OPTIONAL
MOS
29-MAY -2009 HRS /MSC -
AFL
SB 605 -28-00 2 REV 01 MODIFICA TION - VE NT SYSTEM ENHA NCEMENT, SERVICE B UL LETIN OPTIONAL NOT A PPLICA BLE
MOS
28-S EP-20 09 HRS /MSC -
AFL
SB 605 -28-00 3 MODIFICA TION - FUEL QUANTITY INDICATING SYS TEM - RE PLACE THE FUE L Q UA NTITY GA UG ING COMPUTER (FQGC) RECOMME NDED NOT A PPLICA BLE
PART NUMBER 7 36847 -16 WITH PA RT NUMBER 73684 7-17, S ERVICE BULLE TIN
MOS
01-NOV -2010 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 100 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -28-00 4 MODIFICA TION – MAIN, CENTER AND TAIL FUEL TA NK S – REPL ACEMENT OF B ALANCE PIP E TUBES AND TAIL TA NK RECOMME NDED NOT A PPLICA BLE
CONNE CTORS, SERVICE BULLE TIN
MOS
21-JUN-2011 HRS /MSC -
AFL
SB 605 -28-00 5 SPE CIAL CHE CK /REWORK - PRE SSURE REFUEL/DEFUEL SY STEM - REFUE L/DEFUEL DRAIN L INE IN THE RIGHT L IGHT RECOMME NDED NOT A PPLICA BLE - N/A BY AIRCRAFT SERIAL
COMPARTME NT, SE RV ICE BULLETIN NUMBE R
MOS 22-O CT-20 12
26-JUN-2012 HRS /MSC - 285 .3
AFL 121
SB 605 -28-00 5 REV 01 SPE CIAL CHE CK /REWORK - PRE SSURE REFUEL/DEFUEL SY STEM - REFUE L/DEFUEL DRAIN L INE IN THE RIGHT L IGHT RECOMME NDED NOT A PPLICA BLE
COMPARTME NT, SE RV ICE BULLETIN
MOS (EFF)
18-MAR-2 013 HRS /MSC -
AFL
SB 605 -28-00 6 SPE CIAL CHE CK /MODIFICATION - MOTIVE FLOW S YSTEM - COLLE CTOR TA NK EJECTOR LINE INSIDE O F THE RECOMME NDED - S CHEDULED MODIFICATIO N IN PRODUCTION
AUXILIARY CENTER FUEL TA NK S, SERVICE BULLETIN
MOS (EFF)
HRS /MSC -
AFL
SB 605 -28-00 7 SPE CIAL CHE CK /REWORK - FUEL QUANTITY INDICATING SY STEM – ELE CTRICAL HARNESSES INSTALLATION INSIDE RECOMME NDED NOT A PPLICA BLE - BY AIRCRAFT SERIAL
THE MAIN AND CENTER FUEL TANKS, SE RV ICE BULLETIN NUMBE R
MOS
02-A PR-2012 HRS /MSC -
AFL
SB 605 -28-00 7 REV 01 SPE CIAL CHE CK /REWORK - FUEL QUANTITY INDICATING SY STEM - ELE CTRICAL HARNE SSES INSTA LLATION INS IDE RECOMME NDED NOT A PPLICA BLE
THE MAIN AND CENTER FUEL TANKS, SE RV ICE BULLETIN
MOS
02-A PR-2012 HRS /MSC -
AFL
SB 605 -28-00 7 REV 02 SPE CIAL CHE CK /REWORK - FUEL QUANTITY INDICATING SY STEM - ELE CTRICAL HARNE SSES INSTA LLATION INS IDE RECOMME NDED NOT A PPLICA BLE
THE MAIN AND CENTER FUEL TANKS, SE RV ICE BULLETIN
MOS (EFF)
21-FEB -2017 HRS /MSC -
AFL
SB 605 -28-00 9 SPE CIAL CHE CK /MODIFICATION - A UX ILIARY POWER UNIT (AP U) FUE L-FEED S YSTEM - PO SSIBLE CHAFING O F THE RECOMME NDED COMPLIED WITH - P ERFO RMED SB 605-2 8-009
APU NEGATIVE-G FUE L-FEED DRAIN LINE , SERVICE B UL LETIN PART A A ND B. THE AP U NEGATIVE-G
FUE L-FEED DRAIN LINE REP LACED WITH NE W
HOSE LAW SB 605- 28-009 PA RT B WITH KIT P/N:
605 K-28-0 09A. G RN#: 1 08615 /12 .
MOS 08-A PR-2016
19-MAY -2015 HRS /MSC - 131 3.0 2
AFL 851
SB 605 -28-01 0 SPE CIAL CHE CK /REWORK - STA NDBY FUEL FE ED SY STE M AND A UX ILIARY POWER UNIT (APU) FUE L FEED SYSTEM - RECOMME NDED COMPLIED WITH
ENGINE A ND APU E LECTRICAL FUEL PUMP CA RTRIDGE /CANIS TE R FUE L LE AKAG E, SE RVICE BULLETIN
MOS 26-S EP-20 18
19-O CT-20 15 HRS /MSC - 162 5.4
AFL 107 4

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 101 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -28-01 0 P ART A SPE CIAL CHE CK SP ECIAL CHECK/REWO RK - STANDB Y FUEL FEED S YSTEM A ND AUXIL IARY POWER UNIT (AP U) FUEL RECOMME NDED COMPLIED WITH - INSPECTIO N WAS
FEED S YSTEM - ENGINE A ND APU ELECTRICAL FUEL PUMP CA RTRIDGE /CANISTE R FUE L L EAKA GE, SE RV ICE PERFORMED, NO FOUND AND L EAKG E. SB
BULLE TIN INSPECTION OF THE ENGINES AND A PU EL ECTRIC FUE L P UMPS CARTRIDGES/CANISTERS CONDUIT AREA 605 -28-01 0 WAS PE RFORMED
WITHOUT REMOVING THE FA IRING
MOS 26-S EP-20 18
19-O CT-20 15 HRS /MSC - 162 5.4
AFL 107 4

SB 605 -28-01 0 P ART B REWORK SPECIAL CHECK/REWORK - STANDBY FUEL FEED SYSTEM AND AUXILIA RY PO WER UNIT ( APU) FUEL FEED RECOMME NDED NOT A PPLICA BLE
SYS TE M - ENGINE AND A PU ELE CTRICAL FUEL PUMP CARTRIDGE/CA NISTER FUEL LEA KAGE , SERVICE BULL ETIN
ENGINES AND/OR A PU EL ECTRIC FUE L P UMP CARTRIDG E O -RINGS REPLA CE ME NT
MOS 08-A PR-2016
19-O CT-20 15 HRS /MSC - 131 3.0 2
AFL 851

SB 605 -28-01 0 P ART C REWORK SPECIAL CHECK/REWORK - STANDBY FUEL FEED SYSTEM AND AUXILIA RY PO WER UNIT ( APU) FUEL FEED RECOMME NDED NOT A PPLICA BLE
SYS TE M - ENGINE AND A PU ELE CTRICAL FUEL PUMP CARTRIDGE/CA NISTER FUEL LEA KAGE , SERVICE BULL ETIN
ENGINES AND/OR A PU EL ECTRIC FUE L P UMP CANISTER ASSE MB LY LEAK TEST AND CARTRIDG E REP LACEMENT
MOS 08-A PR-2016
19-O CT-20 15 HRS /MSC - 131 3.0 2
AFL 851

SB 605 -28-01 0 REV 01 SPE CIAL CHE CK - STANDBY FUEL FEED SYSTEM A ND AUXILIA RY PO WE R UNIT (A PU) FUEL FE ED SY STEM - ENGINE RECOMME NDED
AND A PU ELE CTRICAL FUEL PUMP CARTRIDGE/CA NISTER FUEL LEA KAGE , SERVICE BULL ETIN
MOS
03-NOV -2017 HRS /MSC -
AFL
SB 605 -28-01 0 REV 02 SPE CIAL CHE CK - STANDBY FUEL FEED SYSTEM A ND AUXILIA RY PO WE R UNIT (A PU) FUEL FE ED SY STEM - ENGINE
AND A PU ELE CTRICAL FUEL PUMP CARTRIDGE/CA NISTER FUEL LEA KAGE , SERVICE BULL ETIN
MOS
14-MAY -2018 HRS /MSC -
AFL
SB 605 -28-01 0 REV 03 SPE CIAL CHE CK - STANDBY FUEL FEED SYSTEM A ND AUXILIA RY PO WE R UNIT (A PU) FUEL FE ED SY STEM - ENGINE COMPLIED WITH
AND A PU ELE CTRICAL FUEL PUMP CARTRIDGE/CA NISTER FUEL LEA KAGE , SERVICE BULL ETIN
MOS 04-S EP-20 20
31-A UG -2018 HRS /MSC - 199 7.9 7
AFL 134 4
SB 605 -28-01 1 SPE CIAL CHE CK /REWORK - VENT SYS TE M - VENT TUBE CO UP LING SAMPL ING, S ERVICE BULLETIN OPTIONAL
MOS
13-MAR-2 018 HRS /MSC -
AFL
SB 605 -28-01 1 REV 01 SPE CIAL CHE CK /REWORK - VENT SYS TE M - VENT TUBE CO UP LING SAMPL ING, S ERVICE BULLETIN OPTIONAL
MOS
18-S EP-20 18 HRS /MSC -
AFL
SB 605 -28-01 2 MODIFICA TION - FUEL SYSTEM - E NG INE AND APU FUEL BO OST P UMP SEA LING IMP RO VEMENT, SERVICE BULL ETIN RECOMME NDED COMPLIED WITH
MOS 12-A PR-2021
16-JUN-2020 HRS /MSC - 214 3.4
AFL 144 9

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 102 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -28-01 2 P ART A ACCOMPLISH MODIFICATION - FUEL SYS TE M - ENGINE AND AP U FUE L B OOST PUMP SE ALING IMPROVEMENT, RECOMME NDED COMPLIED WITH
SERVICE BULLETIN HA RNES S INSPECTIO N AND S LEEVE REMOVA L O N THE FUEL BOOS T PUMP CANISTER, PART NO.
601 R62 181-1
MOS 12-A PR-2021
16-JUN-2020 HRS /MSC - 214 3.4
AFL 144 9
SB 605 -28-01 2 P ART B ACCOMPLISH MODIFICATION - FUEL SYS TE M - ENGINE AND AP U FUE L B OOST PUMP SE ALING IMPROVEMENT, RECOMME NDED NOT A PPLICA BLE - THERE IS NO DAMAGE OF
SERVICE BULLETIN MODIFICATION OF THE ELE CTRIC FUEL BO OST P UMP CANIS TER PART NO. 6 01R62181 -1 OR -95 1 THE CONNECTO R WIRES
AFTER INSPECTION (LH, RH AND A PU)
MOS 12-A PR-2021
16-JUN-2020 HRS /MSC - 214 3.4
AFL 144 9
SB 605 -28-01 2 P ART C ACCOMPLISH MODIFICATION - FUEL SYS TE M - ENGINE AND AP U FUE L B OOST PUMP SE ALING IMPROVEMENT, RECOMME NDED COMPLIED WITH
SERVICE BULLETIN MODIFICATION OF THE ELE CTRIC FUEL BO OST P UMP CARTRIDG E PART NO. 60 1R6 2181- 5
(VE NDOR PART NO. 22 6114- 3) A ND PART NO. 6 01R62181 -7 ( VENDOR PA RT NO . P99C25- 603)
MOS 12-A PR-2021
16-JUN-2020 HRS /MSC - 214 3.4
AFL 144 9

SB 605 -29-00 1 (B RA KE SPE CIAL CHE CK /REWORK - HYDRAULIC PO WE R AND LA NDING GE AR - INS PECTION AND POS SIB LE RE PLACEMENT
NO. 2) OF SYSTEM ACCUMUL ATORS NO. 1, NO. 2 AND NO. 3 AND B RA KE ACCUMULATORS NO . 2 A ND NO. 3 FO R PART NOS .
08-6 0163- 001/002 AND 08 -60164 -001/002, SERVICE BULLE TIN
MOS
HRS /MSC -
AFL

SB 605 -29-00 1 (B RA KE SPE CIAL CHE CK /REWORK - HYDRAULIC PO WE R AND LA NDING GE AR - INS PECTION AND POS SIB LE RE PLACEMENT
NO. 3) OF SYSTEM ACCUMUL ATORS NO. 1, NO. 2 AND NO. 3 AND B RA KE ACCUMULATORS NO . 2 A ND NO. 3 FO R PART NOS .
08-6 0163- 001/002 AND 08 -60164 -001/002, SERVICE BULLE TIN
MOS
HRS /MSC -
AFL

SB 605 -29-00 1 SPE CIAL CHE CK /REWORK - HYDRAULIC PO WE R AND LA NDING GE AR - INS PECTION AND POS SIB LE RE PLACEMENT
(HYDRAULIC NO . 1) OF SYSTEM ACCUMUL ATORS NO. 1, NO. 2 AND NO. 3 AND B RA KE ACCUMULATORS NO . 2 A ND NO. 3 FO R PART NOS .
08-6 0163- 001/002 AND 08 -60164 -001/002, SERVICE BULLE TIN
MOS
HRS /MSC -
AFL

SB 605 -29-00 1 SPE CIAL CHE CK /REWORK - HYDRAULIC PO WE R AND LA NDING GE AR - INS PECTION AND POS SIB LE RE PLACEMENT
(HYDRAULIC NO . 2) OF SYSTEM ACCUMUL ATORS NO. 1, NO. 2 AND NO. 3 AND B RA KE ACCUMULATORS NO . 2 A ND NO. 3 FO R PART NOS .
08-6 0163- 001/002 AND 08 -60164 -001/002, SERVICE BULLE TIN
MOS
HRS /MSC -
AFL

SB 605 -29-00 1 SPE CIAL CHE CK /REWORK - HYDRAULIC PO WE R AND LA NDING GE AR - INS PECTION AND POS SIB LE RE PLACEMENT
(HYDRAULIC NO . 3) OF SYSTEM ACCUMUL ATORS NO. 1, NO. 2 AND NO. 3 AND B RA KE ACCUMULATORS NO . 2 A ND NO. 3 FO R PART NOS .
08-6 0163- 001/002 AND 08 -60164 -001/002, SERVICE BULLE TIN
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 103 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -29-00 1 REV 01 MODIFICA TION - HYDRAULIC POWER AND LANDING GEA R - RE PLACEMENT OF SYSTEM ACCUMULATORS NO . 1, NO. 2 SUPERSE DE D
AND NO. 3 AND BRAKE ACCUMULATORS NO . 2 AND NO. 3 FOR PA RT NO S. 08- 60163- 001/002 AND 08 -60164 -001/002,
SERVICE BULLETIN
MOS
06-JUL-20 09 HRS /MSC -
AFL

SB 605 -29-00 1 REV 01 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS SUPERSE DE D
(BRAK E NO. 2) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-001 /00 2 A ND
08-6 0164- 001/002, S ERVICE BULLE TIN BRAK E A CCUMUL ATO R NO. 2
MOS
06-JUL-20 09 HRS /MSC -
AFL

SB 605 -29-00 1 REV 01 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS SUPERSE DE D
(BRAK E NO. 3) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-001 /00 2 A ND
08-6 0164- 001/002, S ERVICE BULLE TIN BRAK E A CCUMUL ATO R NO. 3
MOS
06-JUL-20 09 HRS /MSC -
AFL

SB 605 -29-00 1 REV 01 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS SUPERSE DE D
(SY STE M NO. 1) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-001 /00 2 A ND
08-6 0164- 001/002, S ERVICE BULLE TIN SY STEM ACCUMULATOR NO. 1
MOS
06-JUL-20 09 HRS /MSC -
AFL

SB 605 -29-00 1 REV 01 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS SUPERSE DE D
(SY STE M NO. 2) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-001 /00 2 A ND
08-6 0164- 001/002, S ERVICE BULLE TIN SY STEM ACCUMULATOR NO. 2
MOS
06-JUL-20 09 HRS /MSC -
AFL

SB 605 -29-00 1 REV 01 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS SUPERSE DE D
(SY STE M NO. 3) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-001 /00 2 A ND
08-6 0164- 001/002, S ERVICE BULLE TIN SY STEM ACCUMULATOR NO. 3
MOS
06-JUL-20 09 HRS /MSC -
AFL
SB 605 -29-00 1 REV 02 MODIFICA TION - HYDRAULIC POWER AND LANDING GEA R - RE PLACEMENT OF SYSTEM ACCUMULATORS NO . 1, NO. 2 RECOMME NDED
AND NO. 3 AND BRAKE ACCUMULATORS NO . 2 AND NO. 3 FOR PA RT NO S. 08- 60163- 001/002 AND 08 -60164 -001/002,
SERVICE BULLETIN
MOS
10-MAY -2010 HRS /MSC -
AFL

SB 605 -29-00 1 REV 02 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(BRAK E NO. 2) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-001 /00 2 A ND
08-6 0164- 001/002, S ERVICE BULLE TIN BRAK E A CCUMUL ATO R NO. 2
MOS
10-MAY -2010 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 104 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -29-00 1 REV 02 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(BRAK E NO. 3) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-001 /00 2 A ND
08-6 0164- 001/002, S ERVICE BULLE TIN BRAK E A CCUMUL ATO R NO. 3
MOS
10-MAY -2010 HRS /MSC -
AFL

SB 605 -29-00 1 REV 02 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(SY STE M NO. 1) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-001 /00 2 A ND
08-6 0164- 001/002, S ERVICE BULLE TIN SY STEM ACCUMULATOR NO. 1
MOS
10-MAY -2010 HRS /MSC -
AFL

SB 605 -29-00 1 REV 02 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(SY STE M NO. 2) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-001 /00 2 A ND
08-6 0164- 001/002, S ERVICE BULLE TIN SY STEM ACCUMULATOR NO. 2
MOS
10-MAY -2010 HRS /MSC -
AFL

SB 605 -29-00 1 REV 02 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(SY STE M NO. 3) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-001 /00 2 A ND
08-6 0164- 001/002, S ERVICE BULLE TIN SY STEM ACCUMULATOR NO. 3
MOS
10-MAY -2010 HRS /MSC -
AFL

SB 605 -29-00 1 REV 03 MODIFICA TION - HYDRAULIC POWER AND LANDING GEA R - RE PLACEMENT OF SYSTEM ACCUMULATORS NO . 1, NO. 2
AND NO. 3 AND BRAKE ACCUMULATORS NO . 2 AND NO. 3 FOR PA RT NO S. 08- 60163- 002 AND 08-6 0164- 002, S ERV ICE
BULLE TIN
MOS
10-A PR-2012 HRS /MSC -
AFL

SB 605 -29-00 1 REV 03 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(BRAK E NO. 2) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-002 AND
08-6 0164- 002, S ERV ICE BULLETIN (BRAK E A CCUMULA TO R NO. 2)
MOS
10-A PR-2012 HRS /MSC -
AFL

SB 605 -29-00 1 REV 03 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(BRAK E NO. 3) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-002 AND
08-6 0164- 002, S ERV ICE BULLETIN (BRAK E A CCUMULA TO R NO. 3)
MOS
10-A PR-2012 HRS /MSC -
AFL

SB 605 -29-00 1 REV 03 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(SY STE M NO. 1) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-002 AND
08-6 0164- 002, S ERV ICE BULLETIN (SY STE M ACCUMULATOR NO . 1)
MOS
10-A PR-2012 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 105 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -29-00 1 REV 03 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(SY STE M NO. 2) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-002 AND
08-6 0164- 002, S ERV ICE BULLETIN (SY STE M ACCUMULATOR NO . 2)
MOS
10-A PR-2012 HRS /MSC -
AFL
SB 605 -29-00 1 REV 04 MODIFICA TION - HYDRAULIC POWER AND LANDING GEA R - RE PLACEMENT OF SYSTEM ACCUMULATORS NO . 1, NO. 2 RECOMME NDED - S CHEDULE DURING 12/24/48 MO/N8 1
AND NO. 3 AND BRAKE ACCUMULATORS NO . 2 AND NO. 3 FOR PA RT NO S. 08- 60163- 002 AND 08-6 0164- 002, S ERV ICE (17- APRIL -2016) .
BULLE TIN
MOS
10-JUN-2015 HRS /MSC -
AFL

SB 605 -29-00 1 REV 04 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(BRAK E NO. 2) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-002 AND
08-6 0164- 002, S ERV ICE BULLETIN (BRAK E A CCUMULA TO R NO. 2)
MOS (EFF)
10-JUN-2015 HRS /MSC
AFL 375 0 365 0 M

SB 605 -29-00 1 REV 04 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(BRAK E NO. 3) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-002 AND
08-6 0164- 002, S ERV ICE BULLETIN (BRAK E A CCUMULA TO R NO. 3)
MOS (EFF)
10-JUN-2015 HRS /MSC
AFL 375 0 365 0 M

SB 605 -29-00 1 REV 04 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(SY STE M NO. 1) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-002 AND
08-6 0164- 002, S ERV ICE BULLETIN (SY STE M ACCUMULATOR NO . 1)
MOS (EFF)
10-JUN-2015 HRS /MSC
AFL 375 0 365 0 M

SB 605 -29-00 1 REV 04 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(SY STE M NO. 2) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-002 AND
08-6 0164- 002, S ERV ICE BULLETIN (SY STE M ACCUMULATOR NO . 2)
MOS (EFF)
10-JUN-2015 HRS /MSC
AFL 375 0 365 0 M

SB 605 -29-00 1 REV 04 REPLA CE MODIFICATION - HYDRAULIC POWER AND LANDING GE AR - REPLACEMENT O F SYS TEM ACCUMULATORS RECOMME NDED
(SY STE M NO. 3) NO. 1, NO . 2 AND NO. 3 AND BRAKE A CCUMULA TO RS NO. 2 AND NO. 3 FOR PART NOS. 08-601 63-002 AND
08-6 0164- 002, S ERV ICE BULLETIN (SY STE M ACCUMULATOR NO . 3)
MOS (EFF)
10-JUN-2015 HRS /MSC
AFL 375 0 365 0 M
SB 605 -29-00 2 MODIFICA TION - HYDRAULIC SYSTEM NO . 1 AND NO. 2 - RE PLACEMENT OF THE HYDRA UL IC S YSTEM NO. 1 OPTIONAL
ACCUMULATOR, SE RV ICE BULLETIN
MOS (EFF)
07-MAY -2012 HRS /MSC -
AFL 375 0 M

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 106 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -29-00 3 MODIFICA TION - HYDRAULIC SYSTEM NO . 1 AND NO. 2 - RE PLACEMENT OF THE HYDRA UL IC S YSTEM NO. 2 OPTIONAL
ACCUMULATOR, SE RV ICE BULLETIN
MOS (EFF)
07-MAY -2012 HRS /MSC -
AFL
SB 605 -29-00 4 MODIFICA TION - HYDRAULIC SYSTEM NO . 3 - REPL ACEMENT OF THE HY DRAULIC SY STEM NO. 3 ACCUMULATOR, OPTIONAL COMPLIED WITH - 1 . CARRIED O UT
SERVICE BULLETIN MODIFICA TION O F NO.3 HYDRAULIC SYS TE M
ACCUMULATOR IAW SB NO.6 05-29 -004
P/N OFF: 601 R75 138-3
S/N OFF: 801 64-250 8
P/N ON: 6 01R75139 -3
S/N ON: 1 1094-3 185
GRN: 1086 15/11
CALIBRATED TOOL USED;
1. TRQ. WRENCH EJME # 323 6
CARRIED OUT #3 HYDRAULIC S YS
ACCUMULATOR SERVICING IAW CL 60 5 A MM
TASK 12-1 2-29-6 14-801 .
#3 HYDRA UL IC S YS ACCUMULATOR CHARGE TO
160 0 P SI
CARRIED OUT LEA K CHECK AFTER SERVICING.
FOUND SATIS FA CTORY
MOS 08-A PR-2016
07-MAY -2012 HRS /MSC - 131 3.0 2
AFL 851
SB 605 -29-00 5 MODIFICA TION - HYDRAULIC SYSTEM RE PLENISHING AND HYDRA UL IC POWER - INTRODUCTION OF HY DRAULIC OPTIONAL
SERVICING PLA CA RDS WITH VA LUES AT DIFFERENT AMBIENT TEMPERATURE S, SE RVICE BULLETIN
MOS
04-MAR-2 013 HRS /MSC -
AFL
SB 605 -29-00 6 MODIFICA TION - HYDRAULIC SYSTEM NO . 3 - RELO CA TION OF THE HYDRAULIC SYS TEM NO. 3 ACCUMULATOR, RECOMME NDED
SERVICE BULLETIN
MOS
30-A PR-2015 HRS /MSC -
AFL
SB 605 -29-00 6 REV 01 MODIFICA TION - HYDRAULIC SYSTEM NO . 3 - RELO CA TION OF THE HYDRAULIC SYS TEM NO. 3 ACCUMULATOR, RECOMME NDED - RECOMMENDE D DURING 9 6 MOS INSP.
SERVICE BULLETIN
MOS 11-NOV -2015
30-A PR-2015 HRS /MSC -
AFL
SB 605 -29-00 6 REV 02 MODIFICA TION - HYDRAULIC SYSTEM NO . 3 - RELO CA TION OF THE HYDRAULIC SYS TEM NO. 3 ACCUMULATOR, RECOMME NDED COMPLIED WITH
SERVICE BULLETIN
MOS 13-MAR-2 020
19-A PR-2016 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -29-00 7 REWORK - HYDRAULIC SYSTEM NO . 3 - CLA MP REPL ACE ME NT OF THE ACCUMUL ATOR HYDRAULIC TUBE S, SERVICE RECOMME NDED NOT A PPLICA BLE
BULLE TIN
MOS (EFF)
25-O CT-20 16 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 107 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -29-00 8 MODIFICA TION - HYDRAULIC SYSTEM NO . 1 AND NO. 2 - RE PLACEMENT OF THE HYDRA UL IC TUBE SUPPO RT RECOMME NDED
BRACKETS AND CLAMPS IN THE A FT EQUIP ME NT CO MP ARTMENT, SERVICE B UL LETIN
MOS (EFF)
24-O CT-20 16 HRS /MSC -
AFL
SB 605 -29-00 8 REV 01 MODIFICA TION - HYDRAULIC SYSTEM NO . 1 AND NO. 2 - RE PLACEMENT OF THE HYDRA UL IC TUBE SUPPO RT RECOMME NDED
BRACKETS AND CLAMPS IN THE A FT EQUIP ME NT CO MP ARTMENT, SERVICE B UL LETIN
MOS
23-O CT-20 17 HRS /MSC -
AFL
SB 605 -30-00 1 ICE AND RAIN P RO TECTIO N - TA KE OFF SAFETY ENHANCEMENT (TO SE), INTRODUCTION O F SUPPL EMENTAL - A PPLICA BLE. SMART PARTS WILL PAY FOR
GROUND WING ANTI-ICING, SERVICE BULLE TIN PARTS IF SCHE DULED WITHIN 4 8 MONTHS O F
BAS IC ISS UE RELE ASE DATE .
MOS
29-MAR-2 016 HRS /MSC -
AFL
SB 605 -30-00 1 REV 01 ICE AND RAIN P RO TECTIO N - TA KE OFF SAFETY ENHANCEMENT (TO SE), INTRODUCTION O F SUPPL EMENTAL RECOMME NDED - A PPLICA BLE. SMART PARTS WILL PAY FOR
GROUND WING ANTI-ICING, SERVICE BULLE TIN KIT IF SCHEDUL ED BE FO RE 29- MA R-2 020.
MOS
09-JUN-2016 HRS /MSC -
AFL
SB 605 -30-00 1 REV 02 ICE AND RAIN P RO TECTIO N - TA KE OFF SAFETY ENHANCEMENT (TO SE), INTRODUCTION O F SUPPL EMENTAL RECOMME NDED - A PPLICA BLE AND RECOMMENDE D
GROUND WING ANTI-ICING, SERVICE BULLE TIN
MOS
18-O CT-20 16 HRS /MSC -
AFL
SB 605 -30-00 1 REV 03 ICE AND RAIN P RO TECTIO N - TA KE OFF SAFETY ENHANCEMENT (TO SE), INTRODUCTION O F SUPPL EMENTAL RECOMME NDED NOT A PPLICA BLE - AIRCRAFT IS PO ST SB
GROUND WING ANTI-ICING, SERVICE BULLE TIN 605 -30-00 1 REV 04
MOS 13-MAR-2 020
09-MAR-2 017 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -30-00 1 REV 04 ICE AND RAIN P RO TECTIO N - TA KE OFF SAFETY ENHANCEMENT (TO SE), INTRODUCTION O F SUPPL EMENTAL RECOMME NDED COMPLIED WITH
GROUND WING ANTI-ICING, SERVICE BULLE TIN
MOS 13-MAR-2 020
09-NOV -2017 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -30-00 2 MODIFICA TION - ENGINE CO WL DUCTING SY STEM - INSTAL LATIO N OF S UP PORT BRACKET AND CLAMPS ON T2 RECOMME NDED DEFERRE D - TO BE COMPLIED WITH AT O WNER
SENSO R ANTI-ICE TUBE, SERVICE BULLE TIN DIS CRETION (AT NE XT MAINTENANCE).
MOS (EFF)
17-S EP-20 14 HRS /MSC -
AFL
SB 605 -30-00 2 REV 01 MODIFICA TION - ENGINE CO WL DUCTING SY STEM - INSTAL LATIO N OF S UP PORT BRACKET AND CLAMPS ON T2 RECOMME NDED - A PPLICA BLE AND RECOMMENDE D. TO BE C/W
SENSO R ANTI-ICE TUBE, SERVICE BULLE TIN AT OWNE R DISCRETIO N
MOS 04-MAY -2016
20-A PR-2016 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 108 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -30-00 2 REV 02 MODIFICA TION - ENGINE CO WL DUCTING SY STEM - INSTAL LATIO N OF S UP PORT BRACKET AND CLAMPS ON T2 RECOMME NDED
SENSO R ANTI-ICE TUBE, SERVICE BULLE TIN
MOS (EFF)
28-MAR-2 017 HRS /MSC -
AFL
SB 605 -30-00 3 ICE AND RAIN P RO TECTIO N - TA KE OFF SAFETY ENHANCEMENT (TO SE), S UPP LEMENTAL GROUND WING ANTI-ICING, RECOMME NDED - A PPLICA BLE, RECOMMENDED. BOMBA RDIER
DIV IDED P ARTS INS TA LLATION, SERVICE BULL ETIN DOES NOT P AY FO R LAB OUR.
MOS
21-S EP-20 16 HRS /MSC -
AFL
SB 605 -30-00 3 P ART A ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - COCKPIT WIRING PROV ISION INSTALLA TION RECOMME NDED
MOS
21-S EP-20 16 HRS /MSC -
AFL
SB 605 -30-00 3 P ART B ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - CABIN-WING WIRING PROVISION INSTA LLATION RECOMME NDED
MOS
21-S EP-20 16 HRS /MSC -
AFL
SB 605 -30-00 3 P ART C ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - INSTALL ATION OF THE WING TEMPE RA TURE SWITCHE S RECOMME NDED
MOS
21-S EP-20 16 HRS /MSC -
AFL
SB 605 -30-00 3 P ART D ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - COCKPIT CONTROL PA NEL INSTALLATION RECOMME NDED
MOS
21-S EP-20 16 HRS /MSC -
AFL
SB 605 -30-00 3 P ART E ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - INSTALL ATION OF JUNCTIO N BO X JB19 RECOMME NDED
MOS
21-S EP-20 16 HRS /MSC -
AFL
SB 605 -30-00 3 P ART F ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - LTGWAIS A CTIVATIO N RECOMME NDED
MOS
21-S EP-20 16 HRS /MSC -
AFL
SB 605 -30-00 3 REV 01 ICE AND RAIN P RO TECTIO N - TA KE OFF SAFETY ENHANCEMENT (TO SE), S UPP LEMENTAL GROUND WING ANTI-ICING, RECOMME NDED
DIV IDED P ARTS INS TA LLATION, SERVICE BULL ETIN
MOS
09-MAR-2 017 HRS /MSC -
AFL
SB 605 -30-00 3 REV 01 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - COCKPIT WIRING PROV ISION INSTALLA TION RECOMME NDED
PART A
MOS
09-MAR-2 017 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 109 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -30-00 3 REV 01 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - CABIN-WING WIRING PROVISION INSTA LLATION RECOMME NDED
PART B
MOS
09-MAR-2 017 HRS /MSC -
AFL

SB 605 -30-00 3 REV 01 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - INSTALL ATION OF THE WING TEMPE RA TURE SWITCHE S RECOMME NDED
PART C
MOS
09-MAR-2 017 HRS /MSC -
AFL

SB 605 -30-00 3 REV 01 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - COCKPIT CONTROL PA NEL INSTALLATION RECOMME NDED
PART D
MOS
09-MAR-2 017 HRS /MSC -
AFL

SB 605 -30-00 3 REV 01 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - INSTALL ATION OF JUNCTIO N BO X JB19 RECOMME NDED
PART E
MOS
09-MAR-2 017 HRS /MSC -
AFL

SB 605 -30-00 3 REV 01 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - LTGWAIS A CTIVATIO N RECOMME NDED
PART F
MOS
09-MAR-2 017 HRS /MSC -
AFL
SB 605 -30-00 3 REV 02 ICE AND RAIN P RO TECTIO N - TA KE OFF SAFETY ENHANCEMENT (TO SE), S UPP LEMENTAL GROUND WING ANTI-ICING, RECOMME NDED NOT A PPLICA BLE - AIRCRAFT IS PO ST SB
DIV IDED P ARTS INS TA LLATION, SERVICE BULL ETIN 605 -30-00 1 REV 04
MOS 13-MAR-2 020
09-NOV -2017 HRS /MSC - 192 6.4
AFL 127 5

SB 605 -30-00 3 REV 02 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - COCKPIT WIRING PROV ISION INSTALLA TION RECOMME NDED NOT A PPLICA BLE - AIRCRAFT IS PO ST SB
PART A 605 -30-00 1 REV 04
MOS 13-MAR-2 020
09-NOV -2017 HRS /MSC - 192 6.4
AFL 127 5

SB 605 -30-00 3 REV 02 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - CABIN-WING WIRING PROVISION INSTA LLATION RECOMME NDED NOT A PPLICA BLE - AIRCRAFT IS PO ST SB
PART B 605 -30-00 1 REV 04
MOS 13-MAR-2 020
09-NOV -2017 HRS /MSC - 192 6.4
AFL 127 5

SB 605 -30-00 3 REV 02 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - INSTALL ATION OF THE WING TEMPE RA TURE SWITCHE S RECOMME NDED NOT A PPLICA BLE - AIRCRAFT IS PO ST SB
PART C 605 -30-00 1 REV 04
MOS 13-MAR-2 020
09-NOV -2017 HRS /MSC - 192 6.4
AFL 127 5

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 110 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -30-00 3 REV 02 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - COCKPIT CONTROL PA NEL INSTALLATION RECOMME NDED NOT A PPLICA BLE - AIRCRAFT IS PO ST SB
PART D 605 -30-00 1 REV 04
MOS 13-MAR-2 020
09-NOV -2017 HRS /MSC - 192 6.4
AFL 127 5

SB 605 -30-00 3 REV 02 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - INSTALL ATION OF JUNCTIO N BO X JB19 RECOMME NDED NOT A PPLICA BLE - AIRCRAFT IS PO ST SB
PART E 605 -30-00 1 REV 04
MOS 13-MAR-2 020
09-NOV -2017 HRS /MSC - 192 6.4
AFL 127 5

SB 605 -30-00 3 REV 02 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - LTGWAIS A CTIVATIO N RECOMME NDED NOT A PPLICA BLE - AIRCRAFT IS PO ST SB
PART F 605 -30-00 1 REV 04
MOS 13-MAR-2 020
09-NOV -2017 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -31-00 1 MODIFICA TION - FLIGHT DATA RECORDING SYS TE M - INSTALL ATION OF THE FAR 135 ENHANCEMENT PACKAGE SUPERSE DE D
(AIRCRAFT, SERIAL NO . 5701 TO 5990 ), SERVICE B UL LETIN
MOS
HRS /MSC -
AFL
SB 605 -31-00 1 REV 01 MODIFICA TION - FLIGHT DATA RECORDING SYS TE M - INSTALL ATION OF THE FAR 135 ENHANCEMENT PACKAGE , OPTIONAL COMPLIED WITH
SERVICE BULLETIN
MOS 31-MAR-2 012
14-JUL-20 09 HRS /MSC - 6.4
AFL 5
SB 605 -31-00 1 REV 02 MODIFICA TION - FLIGHT DATA RECORDING SYS TE M - INSTALL ATION OF THE FAR 135 ENHANCEMENT PACKAGE , OPTIONAL
SERVICE BULLETIN
MOS
11-NOV -2013 HRS /MSC -
AFL
SB 605 -31-00 1 REV 03 MODIFICA TION - FLIGHT DATA RECORDING SYS TE M - INSTALL ATION OF THE FAR 135 ENHANCEMENT PACKAGE , OPTIONAL
SERVICE BULLETIN
MOS
16-A PR-2014 HRS /MSC -
AFL
SB 605 -31-00 1 REV 04 MODIFICA TION - FLIGHT DATA RECORDING SYS TE M - INSTALL ATION OF THE FAR 135 ENHANCEMENT PACKAGE , OPTIONAL NOT A PPLICA BLE - THIS S B IS N/A TO A6-EL D AS
SERVICE BULLETIN SB 605 -31-00 1 REV 1 HAS BEEN ALREADY
COMPLIED WITH ON 3 1/03 /12 , NO A CTION REQ
MOS 11-NOV -2015
29-O CT-20 15 HRS /MSC -
AFL
SB 605 -31-00 1 REV 05 MODIFICA TION - FLIGHT DATA RECORDING SYS TE M - INSTALL ATION OF THE FAR 135 ENHANCEMENT PACKAGE , OPTIONAL NOT A PPLICA BLE - RE V 1 AL RE ADY C/W
SERVICE BULLETIN
MOS 19-MAR-2 017
24-NOV -2016 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 111 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -31-00 1 REV 06 MODIFICA TION - FLIGHT DATA RECORDING SYS TE M - INSTALL ATION OF THE FAR 135 ENHANCEMENT PACKAGE , OPTIONAL NOT A PPLICA BLE - SB 605-3 1-001 REV 1
SERVICE BULLETIN ALREA DY C/W
MOS 19-MAR-2 017
31-JAN-20 17 HRS /MSC -
AFL
SB 605 -31-00 1 REV 07 MODIFICA TION - FLIGHT DATA RECORDING (FDR) SYS TE M - INSTALL ATION OF THE FAR 135 ENHANCEMENT OPTIONAL
PACKA GE, S ERV ICE BULLETIN
MOS
16-A PR-2018 HRS /MSC -
AFL
SB 605 -31-00 2 MODIFICA TION - HEAD-UP DISP LAY (HUD) OR HEA D-UP DIS PLAY/ENHANCE D VISION SY STEM (HUD/EVS ) COMPA TIBLE OPTIONAL NOT A PPLICA BLE - PER A /C SERIA L NUMBER
LINE REP LACEABL E UNITS (LRUS) - A VIO NICS UPG RA DE , SERVICE B UL LETIN
MOS 04-A UG -2014
HRS /MSC -
AFL
SB 605 -31-00 2 REV 01 MODIFICA TION - HEAD-UP DISP LAY (HUD) OR HEA D-UP DIS PLAY/ENHANCE D VISION SY STEM (HUD/EVS ) COMPA TIBLE OPTIONAL NOT A PPLICA BLE - BY A/C MSN 58 66
LINE REP LACEABL E UNITS (LRUS) - A VIO NICS UPG RA DE , SERVICE B UL LETIN
MOS 12-MAR-2 016
15-FEB -2016 HRS /MSC -
AFL
SB 605 -31-00 3 MODIFICA TION - EL ECTRONIC FLIG HT DISPL AY (EFD) SY STEM - UPGRADE THE ADAPTIV E FLIGHT DISPLAY S (AFD) TO RECOMME NDED COMPLIED WITH - C/W BY BO MB ARDIER
"-2 04" AND INCO RPO RA TION OF ROCKWELL COLLINS SERVICE BULLE TINS FOR RELIABILITY IMPROV EMENTS ,
SERVICE BULLETIN
MOS
28-JAN-20 10 HRS /MSC -
AFL
SB 605 -31-00 4 MODIFICA TION - EL ECTRONIC FLIG HT DISPL AY (EFD) SY STEM - INSTALL ATION OF INSULATIO N BLA NKE TS TO RECOMME NDED NOT A PPLICA BLE
CONTROL CONDENSATIO N, SERVICE BULLE TIN
MOS
28-S EP-20 09 HRS /MSC A/R
AFL
SB 605 -31-00 6 MODIFICA TION - CVR/FDR - TO MEE T NEW FAR 135 REQUIREMENTS, SE RV ICE BULLETIN OPTIONAL COMPLIED WITH
MOS 31-MAR-2 012
28-NOV -2011 HRS /MSC - 6.4
AFL 5
SB 605 -31-00 6 REV 01 MODIFICA TION - CVR/FDR - TO MEE T NEW FAR 135 REQUIREMENTS, SE RV ICE BULLETIN OPTIONAL
MOS
11-NOV -2013 HRS /MSC -
AFL
SB 605 -31-00 6 REV 02 MODIFICA TION - CVR/FDR - TO MEE T NEW FAR 135 E QUIREMENTS, SERVICE BUL LETIN OPTIONAL NOT A PPLICA BLE - RE V 2 IS N/A TO A 6-ELD AS
SB 605 -31-00 6 REV 0 HAS BEEN PRODUCTIO N
INCORPO RA TED ON 3 1-MAR-12.
NO ACTION REQ
MOS 11-NOV -2015
02-NOV -2015 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 112 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -31-00 6 REV 03 MODIFICA TION - CVR/FDR - TO MEE T NEW FAR 135 REQUIREMENTS, SE RV ICE BULLETIN OPTIONAL NOT A PPLICA BLE - BASIC ISSUE CARRIED O UT
MOS 18-O CT-20 16
05-O CT-20 16 HRS /MSC -
AFL
SB 605 -31-00 6 REV 04 MODIFICA TION - CVR/FDR - TO MEE T NEW FAR 135 REQUIREMENTS, SE RV ICE BULLETIN OPTIONAL
MOS (EFF)
08-JUN-2017 HRS /MSC -
AFL
SB 605 -31-00 7 MODIFICA TION - INSTA LLATION OF NO ME X S LEEV ES ON THE A FD ELECTRICAL HARNE SSES, SERVICE BULLE TIN RECOMME NDED NOT A PPLICA BLE
MOS
26-A PR-2010 HRS /MSC -
AFL
SB 605 -32-00 1 MODIFICA TION - GE NE RA L - HARD LA NDING INDICATION SYSTEM (HL IS) INS TA LLATION, SERVICE BULL ETIN OPTIONAL
MOS
27-JUL-20 09 HRS /MSC -
AFL
SB 605 -32-00 1 REV 01 MODIFICA TION - GE NE RA L - HA RD LANDING INDICATION SY STEM (HLIS) INSTALL ATION, S ERV ICE BULLETIN OPTIONAL - TO BE C/W AT OP ERATO R PREFERENCE
MOS 18-JUN-2016
02-NOV -2015 HRS /MSC -
AFL
SB 605 -32-00 2 SPE CIAL CHE CK /MODIFICATION - NOS EWHE EL STEERING - RE PLACE THE NOSEWHEEL STEE RING SENSOR RECOMME NDED - A PPLICA BLE, TO BE C/W AT O WNER'S
ROTARY-VARIABLE TRANSDUCER (RV T), SERVICE BULL ETIN DIS CRETION.
MOS
12-O CT-20 10 HRS /MSC -
AFL
SB 605 -32-00 3 SPE CIAL CHE CK /REWORK - MA IN L ANDING GEAR (ML G) SYSTEM - IMPROVED OUTE R BUSHING AT THE MA IN RECOMME NDED
FITTING/TRA ILING A RM JO INT, SERVICE BUL LETIN
MOS
09-O CT-20 13 HRS /MSC -
AFL
SB 605 -32-00 3 P ART A MODIFICA TION S PECIA L CHECK/RE WORK - MAIN LANDING GEA R (MLG) SY STE M - IMPROV ED OUTER B US HING A T RECOMME NDED
THE MAIN FITTING/TRA ILING ARM JOINT, SE RV ICE BULLETIN OF B US HING
MOS
09-O CT-20 13 HRS /MSC -
AFL
SB 605 -32-00 3 P ART B REPLA CE ME NT SPECIAL CHECK/REWORK - MAIN LANDING GE AR (MLG) SY STEM - IMPROV ED OUTER B US HING AT RECOMME NDED
THE MAIN FITTING/TRA ILING ARM JOINT, SE RV ICE BULLETIN OF FITTING S
MOS
09-O CT-20 13 HRS /MSC -
AFL
SB 605 -32-00 3 REV 01 SPE CIAL CHE CK /REWORK - MA IN L ANDING GEAR (ML G) SYSTEM - IMPROVED OUTE R BUSHING AT THE MA IN RECOMME NDED
FITTING/TRA ILING A RM JO INT, SERVICE BUL LETIN
MOS
28-JUL-20 14 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 113 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -32-00 3 REV 01 MODIFICA TION S PECIA L CHECK/RE WORK - MAIN LANDING GEA R (MLG) SY STE M - IMPROV ED OUTER B US HING A T RECOMME NDED
PART A THE MAIN FITTING/TRA ILING ARM JOINT, SE RV ICE BULLETIN OF B US HING
MOS
28-JUL-20 14 HRS /MSC -
AFL

SB 605 -32-00 3 REV 01 REPLA CE ME NT SPECIAL CHECK/REWORK - MAIN LANDING GE AR (MLG) SY STEM - IMPROV ED OUTER B US HING AT RECOMME NDED
PART B THE MAIN FITTING/TRA ILING ARM JOINT, SE RV ICE BULLETIN OF FITTING S
MOS
28-JUL-20 14 HRS /MSC -
AFL
SB 605 -32-00 3 REV 02 SPE CIAL CHE CK /REWORK - MA IN L ANDING GEAR (ML G) SYSTEM - IMPROVED OUTE R BUSHING AT THE MA IN RECOMME NDED COMPLIED WITH
FITTING/TRA ILING A RM JO INT, SERVICE BUL LETIN
MOS 08-A PR-2016
26-FEB -2015 HRS /MSC -
AFL

SB 605 -32-00 3 REV 02 MODIFICA TION S PECIA L CHECK/RE WORK - MAIN LANDING GEA R (MLG) SY STE M - IMPROV ED OUTER B US HING A T RECOMME NDED COMPLIED WITH - L H MLG FITTING INSTALL ED:
PART A THE MAIN FITTING/TRA ILING ARM JOINT, SE RV ICE BULLETIN OF B US HING PN: 19 090-10 7 S N: 10MDT054 1 ( NO T AFFE CTED
BY SN)
RH MLG FITTING INSTALL ED: PN: 1909 0-108 SN:
10MDT0537 (AFFECTE D BY SN, REPLA CE ME NT
WOULD B E RECOMMENDED)
RH MLG FITTING NO T AVA ILA BLE AT THIS
DOWNTIME. CUS TO ME R ADVISED AND ORDER
PLA CE D.
MOS 26-A PR-2015
26-FEB -2015 HRS /MSC - 107 0.7 7
AFL 688

SB 605 -32-00 3 REV 02 REPLA CE ME NT SPECIAL CHECK/REWORK - MAIN LANDING GE AR (MLG) SY STEM - IMPROV ED OUTER B US HING AT RECOMME NDED COMPLIED WITH - P ERFO RMED SB 605-3 2-003
PART B THE MAIN FITTING/TRA ILING ARM JOINT, SE RV ICE BULLETIN OF FITTING S REV 2 PART B: S PECIA L CHECK / REWORK MAIN
LANDING GE AR (MLG) SY STE M- IMPROVED
OUTER BUSHING A T THE MAIN FITTING /
TRA ILING ARM JOINT
CARRIED OUT REPLACEMENT O F MAIN
LANDING GE AR MAIN FITTING ASS Y RH IAW CL
605 AMM TAS K 3 2-11-0 0-000- 801 AND
32-1 1-00-4 00-80 1.
MAIN FITTING ASSY
PN OFF-1 9064-1 04 (60 4-8500 1-41)
SN OFF- 09S PP000 23
PN ON-19064 -106 (604 -85001 -61)
SN ON- 13 SPP00 191
GRN -1 08628 /3
T/W US ED - EJME 2 800 AND 325 8
MOS 08-A PR-2016
26-FEB -2015 HRS /MSC - 131 3.0 2
AFL 851

SB 605 -32-00 4 MODIFICA TION - MAIN LA NDING GE AR BRAK E S YSTEM - REPLA CE ME NT OF THE HYDRAULIC SYS TE M NO. 2 BRAKE OPTIONAL
ACCUMULATOR, SE RV ICE BULLETIN
MOS (EFF)
07-MAY -2012 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 114 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -32-00 5 MODIFICA TION - MAIN LA NDING GE AR BRAK E S YSTEM - REPLA CE ME NT OF THE HYDRAULIC SYS TE M NO. 3 BRAKE OPTIONAL COMPLIED WITH - CARRIE D OUT REP LACEMENT
ACCUMULATOR, SE RV ICE BULLETIN OF HY DRAULIC SY STE M NO.3 B RA KE
ACCUMULATOR IAW CL 6 05 AMM TASK
32-4 3-07-0 00-80 1 A ND 32-43- 07-400 -801.
P/N OFF: 601 R75 139-1
S/N OFF: 601 63-780 9TNA
P/N ON: 6 01R75139 -1
S/N ON: 1 1093-6 532
GRN: 1086 15/3
CARRIED OUT SERVICING OF#3 BREAK
ACCUMULATOR IAW CL 6 05 AMM TASK
12-1 2-32-6 14-80 6.
#3 ACCUMULATOR CHARGE TO 800 PSI
MOS 08-A PR-2016
07-MAY -2012 HRS /MSC - 131 3.0 2
AFL 851
SB 605 -32-00 6 SPE CIAL CHE CK /MODIFICATION - E XTENSIO N AND RETRACTION, MAIN GEA R - INSPE CTION A ND RE PLACEMENT IF RECOMME NDED
NECESSA RY OF THE SIDE S TAY ACTUATOR SP LIT BALL BE ARING, S ERV ICE BULLETIN
MOS
18-DEC-20 17 HRS /MSC -
AFL
SB 605 -32-00 6 P ART A ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - EXTENSION AND RE TRACTION, MAIN G EAR - INS PECTION AND RECOMME NDED
REPLA CE ME NT IF NECES SARY OF THE S IDE STAY ACTUATOR SPLIT BA LL BEARING , SERVICE B ULL ETIN S PECIA L
CHE CK
MOS
18-DEC-20 17 HRS /MSC -
AFL (EFF)
SB 605 -32-00 6 P ART B ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - EXTENSION AND RE TRACTION, MAIN G EAR - INS PECTION AND RECOMME NDED
REPLA CE ME NT IF NECES SARY OF THE S IDE STAY ACTUATOR SPLIT BA LL BEARING , SERVICE B ULL ETIN
MODIFICA TION - REPL ACEMENT OF THE SPLIT BA LL BEARING
MOS
18-DEC-20 17 HRS /MSC - (s)
AFL
SB 605 -32-00 6 REV 01 SPE CIAL CHE CK /MODIFICATION - E XTENSIO N AND RETRACTION, MAIN GEA R - INSPE CTION A ND RE PLACEMENT IF RECOMME NDED
NECESSA RY OF THE SIDE S TAY ACTUATOR SP LIT BALL BE ARING, S ERV ICE BULLETIN
MOS
05-FEB -2018 HRS /MSC -
AFL
SB 605 -32-00 6 REV 01 ACCOMPLISH, SERVICE B UL LETIN SPECIAL CHECK RECOMME NDED
PART A
MOS
05-FEB -2018 HRS /MSC -
AFL (EFF)
SB 605 -32-00 6 REV 01 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - REPLACEMENT O F THE SP LIT BALL BE ARING RECOMME NDED
PART B
MOS
05-FEB -2018 HRS /MSC - (s)
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 115 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -32-00 6 REV 02 SPE CIAL CHE CK /MODIFICATION - E XTENSIO N AND RETRACTION, MAIN GEA R - INSPE CTION A ND RE PLACEMENT IF RECOMME NDED COMPLIED WITH
NECESSA RY OF THE SIDE S TAY ACTUATOR SP LIT BALL BE ARING, S ERV ICE BULLETIN
MOS 08-A PR-2019
10-MAY -2018 HRS /MSC - 171 6.2
AFL 112 5

SB 605 -32-00 6 REV 02 ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - EXTENSION AND RE TRACTION, MAIN G EAR - INS PECTION AND RECOMME NDED COMPLIED WITH
PART A REPLA CE ME NT IF NECES SARY OF THE S IDE STAY ACTUATOR SPLIT BA LL BEARING , SERVICE B ULL ETIN S PECIA L
CHE CK
MOS 08-A PR-2019
10-MAY -2018 HRS /MSC - 171 6.2
AFL 112 5

SB 605 -32-00 6 REV 02 ACCOMPLISH S PECIA L CHECK/MO DIFICATIO N - EXTENSION AND RE TRACTION, MAIN G EAR - INS PECTION AND RECOMME NDED NOT A PPLICA BLE - SERIA L NUMBERS ARE NOT
PART B REPLA CE ME NT IF NECES SARY OF THE S IDE STAY ACTUATOR SPLIT BA LL BEARING , SERVICE B ULL ETIN LISTED IN THE TAB LE -1 A ND TA BLE -2, NO
MODIFICA TION - REPL ACEMENT OF THE SPLIT BA LL BEARING FURTHER ACTIO N REQUIRE D.
MOS 08-A PR-2019
10-MAY -2018 HRS /MSC - 171 6.2
AFL 112 5

SB 605 -32-00 7 SPE CIAL CHE CK - MAIN LANDING GEA R - LUBRICATIO N AND INSPECTIO N OF L H/RH MAIN LANDING GEA R (MLG) RECOMME NDED COMPLIED WITH
SHOCK STRUT L OWER PIN 1 9146-3 , SERVICE B UL LETIN
MOS 14-MAR-2 022
30-JUN-2020 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -32-00 7 P ART A ACCOMPLISH S PECIA L CHECK - MAIN LA NDING GE AR - LUBRICATION A ND INSPE CTION OF LH/RH MAIN LA NDING COMPLIED WITH
GEA R (MLG) SHOCK STRUT LOWER P IN 1 9146- 3, SERVICE B UL LETIN LUBRICATIO N OF L H/RH MLG SHOCK STRUT
LOWER PIN
MOS 13-JUN-2022
30-JUN-2020 HRS /MSC - 224 5.8 3
AFL 150 5

SB 605 -32-00 7 P ART B ACCOMPLISH S PECIA L CHECK - MAIN LA NDING GE AR - LUBRICATION A ND INSPE CTION OF LH/RH MAIN LA NDING RECOMME NDED COMPLIED WITH
GEA R (MLG) SHOCK STRUT LOWER P IN 1 9146- 3, SERVICE B UL LETIN DV I INSP ECTION O F LH/RH MLG S HO CK STRUT
LOWER PIN
MOS 24 14-MAR-2 022 14-MAR-2024 RECURRING
30-JUN-2020 HRS /MSC 400 219 4.6 259 4.6
AFL 147 5

SB 605 -32-00 7 P ART C ACCOMPLISH S PECIA L CHECK - MAIN LA NDING GE AR - LUBRICATION A ND INSPE CTION OF LH/RH MAIN LA NDING RECOMME NDED COMPLIED WITH
GEA R (MLG) SHOCK STRUT LOWER P IN 1 9146- 3, SERVICE B UL LETIN NO NDES TRUCTIVE TE STING (NDT) INSP ECTION
OF LH/RH MLG SHOCK STRUT L OWER PIN
MOS 14-MAR-2 022 RECURRING
30-JUN-2020 HRS /MSC 219 4.6
AFL 900 147 5 237 5
SB 605 -32-00 7 P ART D ACCOMPLISH S PECIA L CHECK - MAIN LA NDING GE AR - LUBRICATION A ND INSPE CTION OF LH/RH MAIN LA NDING RECOMME NDED
GEA R (MLG) SHOCK STRUT LOWER P IN 1 9146- 3, SERVICE B UL LETIN RE PLACEMENT OF THE LH/RH ML G S HO CK
STRUT LOWER P IN
MOS (EFF)
30-JUN-2020 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 116 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -33-00 1 MODIFICA TION - NAVIGATION L IGHTS - INTRODUCTION O F WING TIP AND L OWER TAIL HAL OGEN NA VIG ATION LIGHTS OPTIONAL NOT A PPLICA BLE
TO IMPROVE RELIABILITY (A /C 5 701 - 5990), SERVICE BULLE TIN
MOS
17-S EP-20 07 HRS /MSC -
AFL
SB 605 -33-00 1 P ART A PERFORM MODIFICATION - NAV IGA TION LIG HTS - INTRO DUCTION OF WING TIP A ND LOWER TAIL HA LOGE N OPTIONAL NOT A PPLICA BLE
NAVIGATION LIGHTS TO IMP RO VE RE LIA BIL ITY (A/C 5701 - 599 0), SERVICE BULLETIN MODIFICATION - NAVIGATIO N
LIGHTS - WING TIP NAVIGATION LIGHTS MO DIFICATIO N.
MOS
17-S EP-20 07 HRS /MSC -
AFL
SB 605 -33-00 1 P ART B PERFORM MODIFICATION - NAV IGA TION LIG HTS - INTRO DUCTION OF WING TIP A ND LOWER TAIL HA LOGE N OPTIONAL NOT A PPLICA BLE
NAVIGATION LIGHTS TO IMP RO VE RE LIA BIL ITY (A/C 5701 - 599 0), SERVICE BULLETIN MODIFICATION - NAVIGATIO N
LIGHTS - LOWER TA IL NAVIGATION/ANTI- CO LLISIO N LIGHT MODIFICA TION.
MOS
17-S EP-20 07 HRS /MSC -
AFL
SB 605 -33-00 1 P ART C PERFORM MODIFICATION - NAV IGA TION LIG HTS - INTRO DUCTION OF WING TIP A ND LOWER TAIL HA LOGE N OPTIONAL NOT A PPLICA BLE
NAVIGATION LIGHTS TO IMP RO VE RE LIA BIL ITY (A/C 5701 - 599 0), SERVICE BULLETIN MODIFICATION - NAVIGATIO N
LIGHTS - CIRCUIT B RE AKER MO DIFICATION
MOS
17-S EP-20 07 HRS /MSC -
AFL
SB 605 -33-00 1 REV 01 MODIFICA TION - NAVIGATION L IGHTS - INTRODUCTION O F WING TIP AND L OWER TAIL HAL OGEN NA VIG ATION LIGHTS OPTIONAL NOT A PPLICA BLE
TO IMPROVE RELIABILITY , SERVICE B UL LETIN
MOS
09-JAN-20 12 HRS /MSC -
AFL

SB 605 -33-00 1 REV 01 ACCOMPLISH MODIFICATION - NAV IG ATION LIG HTS - INTRO DUCTION OF WING TIP A ND LOWER TAIL HA LOGE N OPTIONAL NOT A PPLICA BLE
PART A NAVIGATION LIGHTS TO IMP RO VE RE LIA BIL ITY, SE RV ICE BULLETIN WING TIP NAVIGATION LIGHTS MO DIFICATIO N
MOS
09-JAN-20 12 HRS /MSC -
AFL

SB 605 -33-00 1 REV 01 ACCOMPLISH MODIFICATION - NAV IG ATION LIG HTS - INTRO DUCTION OF WING TIP A ND LOWER TAIL HA LOGE N OPTIONAL NOT A PPLICA BLE
PART B NAVIGATION LIGHTS TO IMP RO VE RE LIA BIL ITY, SE RV ICE BULLETIN LOWER TAIL NAVIGATION/ANTI- CO LLISIO N LIGHT
MODIFICA TION
MOS
09-JAN-20 12 HRS /MSC -
AFL

SB 605 -33-00 1 REV 01 ACCOMPLISH MODIFICATION - NAV IG ATION LIG HTS - INTRO DUCTION OF WING TIP A ND LOWER TAIL HA LOGE N OPTIONAL NOT A PPLICA BLE
PART C NAVIGATION LIGHTS TO IMP RO VE RE LIA BIL ITY, SE RV ICE BULLETIN CIRCUIT B RE AKER MO DIFICATION
MOS
09-JAN-20 12 HRS /MSC -
AFL
SB 605 -33-00 2 SPE CIAL CHE CK /REWORK - UPP ER BE ACON LIGHT WIRE HARNESS, SERVICE BULLE TIN RECOMME NDED NOT A PPLICA BLE
MOS
07-DEC-20 09 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 117 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -33-00 3 MODIFICA TION - PA SSENGE R COMPARTMENTS - MODIFICATIO N OF THE RE ADING/TABLE LIGHT RELAY S, SE RVICE RECOMME NDED NOT A PPLICA BLE
BULLE TIN
MOS (EFF)
02-JUL-20 13 HRS /MSC -
AFL
SB 605 -33-00 4 SPE CIAL CHE CK /MODIFICATION - INTE GRAL LIG HTING P ANEL - WIRING RE LOCATION, S ERVICE BULLE TIN RECOMME NDED NOT A PPLICA BLE - BY A/C S/N
MOS 17-JUN-2013
23-A PR-2013 HRS /MSC - 608 .5
AFL 247
SB 605 -33-00 5 MODIFICA TION - FLOO DL IGHTING PANEL - COCKPIT FLOODLIGHT GA SKET INSTALLA TION TO PREVE NT WATE R RECOMME NDED
ING RE SS, SE RV ICE BULLETIN
MOS
29-S EP-20 15 HRS /MSC -
AFL
SB 605 -33-00 5 REV 01 MODIFICA TION - FLOO DL IGHTING PANEL - COCKPIT FLOODLIGHT GA SKET INSTALLA TION TO PREVE NT WATE R RECOMME NDED COMPLIED WITH
ING RE SS, SE RV ICE BULLETIN
MOS 14-MAR-2 022
29-S EP-20 15 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -33-00 5 REV 02 MODIFICA TION - FLOO DL IGHTING PANEL - COCKPIT FLOODLIGHT GA SKET INSTALLA TION TO PREVE NT WATE R RECOMME NDED COMPLIED WITH
ING RE SS, SE RV ICE BULLETIN
MOS 14-MAR-2 022
02-O CT-20 17 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -34-00 1 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM - INS TA LLATIO N OF THE THIRD FLIG HT MA NA GEMENT COMPUTER OPTIONAL
(FMC) (A/C 57 01 - 5 990), S ERVICE BULLETIN
MOS
12-MAR-2 007 HRS /MSC A/R
AFL
SB 605 -34-00 1 REV 01 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM - INS TA LLATIO N OF THE THIRD FLIG HT MA NA GEMENT COMPUTER OPTIONAL
(FMS), SE RVICE BULLETIN
MOS
20-A PR-2009 HRS /MSC -
AFL
SB 605 -34-00 1 REV 02 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM - INS TA LLATIO N OF THE THIRD FLIG HT MA NA GEMENT SY STEM OPTIONAL
(FMS), SE RVICE BULLETIN
MOS
19-DEC-20 11 HRS /MSC -
AFL
SB 605 -34-00 1 REV 03 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM - INS TA LLATIO N OF THE THIRD FLIG HT MA NA GEMENT SY STEM OPTIONAL - TO BE C/W AT OP ERATO R PREFERENCE
(FMS), SE RVICE BULLETIN
MOS 02-JUN-2016
14-DEC-20 15 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 118 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-00 1 REV 04 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM - INS TA LLATIO N OF THE THIRD FLIG HT MA NA GEMENT SY STEM OPTIONAL
(FMS), SE RVICE BULLETIN
MOS
31-O CT-20 17 HRS /MSC -
AFL
SB 605 -34-00 1 REV 05 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM - INS TA LLATIO N OF THE THIRD FLIG HT MA NA GEMENT SY STEM OPTIONAL
(FMS), SE RVICE BULLETIN
MOS
25-MAR-2 019 HRS /MSC -
AFL
SB 605 -34-00 2 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INSTALLA TION OF THE 3 D MAP AND LONG RANGE CRUISE OPTIONAL COMPLIED WITH
(LRC) ( A/C 5701 - 5990 ), SERVICE B UL LETIN
MOS 31-MAR-2 012
HRS /MSC A/R 6.4
AFL 5
SB 605 -34-00 2 REV 01 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INSTALLA TION OF THE 3 D MAP AND LONG RANGE CRUISE OPTIONAL NOT A PPLICA BLE - FO R THIS RE VISIO N
(LRC), SE RVICE BULLETIN
MOS 11-FEB -2016
15-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-00 3 MODIFICA TION- FLIGHT MANAG EMENT SYSTEM (FMS ) - INS TAL LATIO N OF S EARCH PATTERNS (A /C 5701 - 5990), OPTIONAL
SERVICE BULLETIN
MOS
12-MAR-2 007 HRS /MSC A/R
AFL
SB 605 -34-00 3 REV 01 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INSTALLA TION OF SE ARCH PATTE RNS, S ERVICE BULLE TIN OPTIONAL - NOT RE CO MMENDED
MOS 11-FEB -2016
14-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-00 4 MODIFICA TION - INERTIAL REFE RE NCE SYS TE M - INSTALLA TION OF THE THIRD INERTIAL REFERENCE SY STEM (IRS) SUPERSE DE D
(A/C 57 01 - 59 90), S ERVICE BULLETIN
MOS
HRS /MSC -
AFL
SB 605 -34-00 4 REV 01 MODIFICA TION - INERTIAL REFE RE NCE SYS TE M - INSTALLA TION OF THE THIRD INERTIAL REFERENCE SY STEM (IRS) SUPERSE DE D
(A/C 57 01 - 59 90), S ERVICE BULLETIN
MOS
HRS /MSC -
AFL
SB 605 -34-00 4 REV 02 MODIFICA TION - INERTIAL REFE RE NCE SYS TE M - INSTALLA TION OF THE THIRD INERTIAL REFERENCE SY STEM (IRS) OPTIONAL
(A/C 57 01 - 59 90), S ERVICE BULLETIN
MOS
03-NOV -2008 HRS /MSC A/R
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 119 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-00 4 REV 03 MODIFICA TION - INERTIAL REFE RE NCE SYS TE M - INSTALLA TION OF THE THIRD INERTIAL REFERENCE SY STEM (IRS OPTIONAL COMPLIED WITH
3), S ERVICE BULLE TIN
MOS 31-MAR-2 012
08-FEB -2010 HRS /MSC - 6.4
AFL 5
SB 605 -34-00 4 REV 04 MODIFICA TION - INERTIAL REFE RE NCE SYS TE M - INSTALLA TION OF THE THIRD INERTIAL REFERENCE SY STEM (IRS OPTIONAL COMPLIED WITH - P RE VIO US LY BY RE V.3 .NO
3), S ERVICE BULLE TIN ACTIO N IS REQUIRED BY REV.4
MOS 06-A UG -2014
29-JUL-20 14 HRS /MSC -
AFL
SB 605 -34-00 4 REV 05 MODIFICA TION - INERTIAL REFE RE NCE SYS TE M - INSTALLA TION OF THE THIRD INERTIAL REFERENCE SY STEM (IRS OPTIONAL NOT A PPLICA BLE - RE V 5 N/A, AS REV 3 HAS
3), S ERVICE BULLE TIN BEE N INCORPO RTED
MOS 20-JAN-20 16
14-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-00 4 REV 06 MODIFICA TION - INERTIAL REFE RE NCE SYS TE M - INSTALLA TION OF THE THIRD INERTIAL REFERENCE SY STEM (IRS OPTIONAL NOT A PPLICA BLE - RE V 6 IS N/A DUE TO RE V 3
3), S ERVICE BULLE TIN HAVING B EEN INCO RP ORATED.
MOS 07-A PR-2016
21-MAR-2 016 HRS /MSC - 131 3.0 2
AFL 851
SB 605 -34-00 4 REV 07 MODIFICA TION - INERTIAL REFE RE NCE SYS TE M (IRS ) - INSTAL LATIO N OF THE THIRD INERTIA L REFERENCE S YSTEM OPTIONAL
(IRS 3) , SERVICE B ULL ETIN
MOS
04-JUL-20 18 HRS /MSC -
AFL
SB 605 -34-00 5 MODIFICA TION - RADIO A LTIMETER S YSTEM - INSTAL LATIO N OF THE SECOND RADIO A LTIMETER (A /C 5701 - 5990), SUPERSE DE D
SERVICE BULLETIN
MOS
HRS /MSC -
AFL
SB 605 -34-00 5 REV 01 MODIFICA TION - RADIO A LTIMETER S YSTEM - INSTAL LATIO N OF THE SECOND RADIO A LTIMETER (A /C 5701 - 5990), OPTIONAL
SERVICE BULLETIN
MOS
04-A UG -2008 HRS /MSC A/R
AFL
SB 605 -34-00 5 REV 02 MODIFICA TION - RADIO A LTIMETER S YSTEM - INSTAL LATIO N OF THE SECOND RADIO A LTIMETER, SERVICE B UL LETIN OPTIONAL COMPLIED WITH
MOS 31-MAR-2 012
26-O CT-20 09 HRS /MSC - 6.4
AFL 5
SB 605 -34-00 5 REV 03 MODIFICA TION - RADIO A LTIMETER S YSTEM - INSTAL LATIO N OF THE SECOND RADIO A LTIMETER, SERVICE B UL LETIN OPTIONAL
MOS
16-MAY -2011 HRS /MSC -
AFL
SB 605 -34-00 5 REV 04 MODIFICA TION - RADIO A LTIMETER S YSTEM - INSTAL LATIO N OF THE SECOND RADIO A LTIMETER, SERVICE B UL LETIN OPTIONAL
MOS
06-NOV -2013 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 120 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-00 5 REV 05 MODIFICA TION - RADIO A LTIMETER S YSTEM - INSTAL LATIO N OF THE SECOND RADIO A LTIMETER, SERVICE B UL LETIN OPTIONAL
MOS
15-A PR-2014 HRS /MSC -
AFL
SB 605 -34-00 5 REV 06 MODIFICA TION - RADIO A LTIMETER S YSTEM - INSTAL LATIO N OF THE SECOND RADIO A LTIMETER, SERVICE B UL LETIN OPTIONAL NOT A PPLICA BLE - RE V 2 HAS BEE N C/W.
RETRO ACTIVE ACTION FO R REV 6 ONLY FO R
POS T- SB 605-34 -019 AIRCRAFT. AIRCRAFT 588 6
IS P RE -SB 605-3 4-019.
MOS 27-JAN-20 16
14-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-00 5 REV 07 MODIFICA TION - RADIO A LTIMETER S YSTEM - INSTAL LATIO N OF THE SECOND RADIO A LTIMETER, SERVICE B UL LETIN OPTIONAL - NOT RE CO MMENDED. REV 2 HAS BE EN C/W
BY BO MB ARDIER.
MOS 07-A PR-2016
23-MAR-2 016 HRS /MSC -
AFL
SB 605 -34-00 5 REV 08 MODIFICA TION - RADIO A LTIMETER S YSTEM - INSTAL LATIO N OF THE SECOND RADIO A LTIMETER, SERVICE B UL LETIN OPTIONAL
MOS (EFF)
25-NOV -2016 HRS /MSC -
AFL
SB 605 -34-00 5 REV 09 MODIFICA TION - RADIO A LTIMETER S YSTEM - INSTAL LATIO N OF THE SECOND RADIO A LTIMETER, SERVICE B UL LETIN OPTIONAL
MOS (EFF)
04-A PR-2017 HRS /MSC -
AFL
SB 605 -34-00 5 REV 10 MODIFICA TION - RADIO A LTIMETER S YSTEM - INSTAL LATIO N OF THE SECOND RADIO A LTIMETER, SERVICE B UL LETIN OPTIONAL COMPLIED WITH
MOS 13-MAR-2 020
15-NOV -2019 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -34-00 6 MODIFICA TION - LIGHTNING DE TECTIO N SY STE M (LDS) - INSTALL ATION OF THE L DS (A /C 5 701 - 5 990), SERVICE OPTIONAL
BULLE TIN
MOS
HRS /MSC A/R
AFL
SB 605 -34-00 6 REV 01 MODIFICA TION - LIGHTNING DE TECTIO N SY STE M (LDS) - INSTALL ATION OF THE L DS (A /C 5 701 - 5 990), SERVICE OPTIONAL
BULLE TIN
MOS
24-NOV -2008 HRS /MSC A/R
AFL
SB 605 -34-00 6 REV 02 MODIFICA TION - LIGHTNING DE TECTIO N SY STE M (LDS) - INSTALL ATION OF THE L DS (S UPE RS EDED BY SB OPTIONAL COMPLIED WITH
605 -34-02 5), SERVICE BULLETIN
MOS 31-MAR-2 012
05-O CT-20 09 HRS /MSC - 6.4
AFL 5
SB 605 -34-00 7 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM - INS TA LLATIO N OF THE FAA VSPEE D DATABAS E (A /C 5701 - 5990) , SUPERSE DE D - S UPE RS EDED BY REV 1
SERVICE BULLETIN
MOS
12-MAR-2 007 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 121 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-00 7 REV 01 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM - INS TA LLATIO N OF THE FAA VSPEE D DATABAS E (A /C 5701 - 5990) , OPTIONAL - TO BE C/W AT OP ERATO R PREFERENCE
SERVICE BULLETIN
MOS 02-JUN-2016
16-JUN-2008 HRS /MSC A/R
AFL
SB 605 -34-00 7 REV 02 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM - INS TA LLATIO N OF THE FAA V-SPE ED DATABAS E, SE RVICE OPTIONAL - TO BE C/W AT OP ERATO R PREFERENCE
BULLE TIN
MOS 02-JUN-2016
14-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-00 7 REV 03 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM - INS TA LLATIO N OF THE FAA V-SPE ED DATABAS E, SE RVICE OPTIONAL COMPLIED WITH - NO DEFECTS NOTED.
BULLE TIN
MOS 03-S EP-20 21
25-MAR-2 019 HRS /MSC - 219 2.3 8
AFL 147 4
SB 605 -34-00 8 MODIFICA TION - TERRAIN AWARENESS WARNING SYSTEM (TA WS ) - INTRODUCTION OF THE STEEP AP PROACH PUSH OPTIONAL NOT A PPLICA BLE
BUTTO N ANNUNCIA TO R (PB A), SERVICE BULLETIN
MOS
HRS /MSC -
AFL
SB 605 -34-00 8 REV 01 MODIFICA TION - TERRAIN AWARENESS WARNING SYSTEM (TA WS ) - INTRODUCTION OF THE STEEP AP PROACH PUSH OPTIONAL NOT A PPLICA BLE
BUTTO N ANNUNCIA TO R (PB A), SERVICE BULLETIN
MOS
26-O CT-20 09 HRS /MSC -
AFL
SB 605 -34-00 8 REV 02 MODIFICA TION - TERRAIN AWARENESS WARNING SYSTEM (TA WS ) - INTRODUCTION OF THE STEEP AP PROACH PUSH OPTIONAL NOT A PPLICA BLE
BUTTO N ANNUNCIA TO R (PB A), SERVICE BULLETIN
MOS
06-JUN-2011 HRS /MSC -
AFL
SB 605 -34-00 8 REV 03 MODIFICA TION - TERRAIN AWARENESS WARNING SYSTEM (TA WS ) - INTRO DUCTION OF THE STE EP APPROA CH, OPTIONAL NOT A PPLICA BLE - N/A BY AIRCRAFT MSN
SERVICE BULLETIN
MOS 01-JUN-2016
14-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-00 8 REV 04 MODIFICA TION - TERRAIN AWARENESS WARNING SYSTEM (TA WS ) - INTRODUCTION OF THE STEEP AP PROACH, OPTIONAL
SERVICE BULLETIN
MOS (EFF)
13-MAR-2 017 HRS /MSC -
AFL
SB 605 -34-00 8 REV 05 MODIFICA TION - TERRAIN AWARENESS WARNING SYSTEM (TA WS ) - INTRODUCTION OF THE STEEP AP PROACH, OPTIONAL
SERVICE BULLETIN
MOS (EFF)
18-MAY -2017 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 122 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-00 8 REV 05 ACCOMPLISH MODIFICATION - TERRAIN AWARENESS WARNING SYS TE M (TAWS) - INTRODUCTION O F THE STEE P OPTIONAL
PART A APP RO ACH, SERVICE BULLE TIN MODIFICATION FO R AIRCRAFT P RE- SB 605-3 4-022
MOS
18-MAY -2017 HRS /MSC -
AFL

SB 605 -34-00 8 REV 05 ACCOMPLISH MODIFICATION - TERRAIN AWARENESS WARNING SYS TE M (TAWS) - INTRODUCTION O F THE STEE P OPTIONAL
PART B APP RO ACH, SERVICE BULLE TIN MODIFICATION FO R AIRCRAFT P OST-SB 605- 34-022
MOS
18-MAY -2017 HRS /MSC -
AFL
SB 605 -34-00 9 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INSTALLA TION OF THE DBU-50 00, SE RVICE BULLETIN OPTIONAL NOT A PPLICA BLE
MOS
26-A PR-2010 HRS /MSC -
AFL
SB 605 -34-00 9 REV 01 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INSTALLA TION OF THE DBU-50 00, SE RVICE BULLETIN OPTIONAL NOT A PPLICA BLE
MOS
30-A PR-2010 HRS /MSC -
AFL
SB 605 -34-00 9 REV 02 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INSTALLA TION OF THE DBU-50 00, SE RVICE BULLETIN OPTIONAL NOT A PPLICA BLE
MOS
20-S EP-20 10 HRS /MSC -
AFL
SB 605 -34-00 9 REV 03 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INSTALLA TION OF THE DBU-50 00, SE RVICE BULLETIN OPTIONAL NOT A PPLICA BLE
MOS
15-DEC-20 10 HRS /MSC -
AFL
SB 605 -34-00 9 REV 04 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INSTALLA TION OF THE DBU-50 00, SE RVICE BULLETIN OPTIONAL NOT A PPLICA BLE
MOS
14-NOV -2011 HRS /MSC -
AFL
SB 605 -34-00 9 REV 05 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INSTALLA TION OF THE DBU-50 00, SE RVICE BULLETIN OPTIONAL NOT A PPLICA BLE - NO T FURTHER ACTIO N
REQUIRE D
MOS 21-JUL-20 15
17-JUN-2015 HRS /MSC - 115 7.4 2
AFL 766
SB 605 -34-00 9 REV 05 MODIFICA TION MO DIFICATIO N - FL IGHT MANAG EMENT SYS TEM (FMS ) - INS TA LLATIO N OF THE DBU-5000, SERVICE OPTIONAL NOT A PPLICA BLE - NO T FURTHER ACTIO N
PART A BULLE TIN (A PPLICA BLE TO A IRCRAFT, S ERIAL NO. 57 01 TO 58 03) REQUIRE D
MOS 21-JUL-20 15
17-JUN-2015 HRS /MSC - 115 7.4 2
AFL 766
SB 605 -34-00 9 REV 05 MODIFICA TION MO DIFICATIO N - FL IGHT MANAG EMENT SYS TEM (FMS ) - INS TA LLATIO N OF THE DBU-5000, SERVICE OPTIONAL NOT A PPLICA BLE - NO T FURTHER ACTIO N
PART B BULLE TIN (A PPLICA BLE TO A IRCRAFT, S ERIAL NO. 57 01 TO 58 27) REQUIRE D
MOS 21-JUL-20 15
17-JUN-2015 HRS /MSC - 115 7.4 2
AFL 766

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 123 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-00 9 REV 06 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INSTALLA TION OF THE DBU-50 00, SE RVICE BULLETIN OPTIONAL NOT A PPLICA BLE
MOS (EFF)
16-MAR-2 017 HRS /MSC -
AFL

SB 605 -34-00 9 REV 06 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION (AP PLICA BLE TO A IRCRA FT, SE RIAL NO. 57 01 TO 580 3) OPTIONAL NOT A PPLICA BLE
PART A
MOS (EFF)
16-MAR-2 017 HRS /MSC -
AFL

SB 605 -34-00 9 REV 06 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION (AP PLICA BLE TO A IRCRA FT, SE RIAL NO. 57 01 TO 582 7) OPTIONAL NOT A PPLICA BLE
PART B
MOS (EFF)
16-MAR-2 017 HRS /MSC -
AFL
SB 605 -34-01 0 MODIFICA TION - ENHANCED VISION S YSTEM (E VS) - S TRUCTURAL AND EL ECTRICAL PROV ISIONS, S ERVICE OPTIONAL
BULLE TIN
MOS
11-MAR-2 013 HRS /MSC -
AFL
SB 605 -34-01 0 REV 01 MODIFICA TION - ENHANCED VISION S YSTEM (E VS) - S TRUCTURAL AND EL ECTRICAL PROV ISIONS, S ERVICE OPTIONAL
BULLE TIN
MOS
04-S EP-20 13 HRS /MSC -
AFL
SB 605 -34-01 0 REV 02 MODIFICA TION - ENHANCED VISION S YSTEM (E VS) - S TRUCTURAL AND EL ECTRICAL PROV ISIONS, S ERVICE OPTIONAL
BULLE TIN
MOS
03-FEB -2014 HRS /MSC -
AFL
SB 605 -34-01 0 REV 03 MODIFICA TION - ENHANCED VISION S YSTEM (E VS) - S TRUCTURAL AND EL ECTRICAL PROV ISIONS, S ERVICE OPTIONAL DECLINED
BULLE TIN
MOS 04-A UG -2014
17-JUL-20 14 HRS /MSC -
AFL
SB 605 -34-01 0 REV 04 MODIFICA TION - ENHANCED VISION S YSTEM (E VS) - S TRUCTURAL AND EL ECTRICAL PROV ISIONS, S ERVICE OPTIONAL - TO BE C/W AT OP ERATO R PREFERENCE
BULLE TIN
MOS 01-JUN-2016
14-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-01 0 REV 05 MODIFICA TION - ENHANCED VISION S YSTEM (E VS) - S TRUCTURAL AND EL ECTRICAL PROV ISIONS, S ERVICE OPTIONAL DECLINED - NO PREVIOUS REVISIO N IS DONE.
BULLE TIN OPE RA TO R DOES NOT EL ECT TO E MB ODY.
MOS 20-O CT-20 16
17-O CT-20 16 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 124 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-01 0 REV 05 ACCOMPLISH MODIFICATION - E NHANCED V ISION SYSTEM (EVS) - STRUCTURAL AND E LECTRICAL PRO VISIO NS , OPTIONAL DECLINED - NO PREVIOUS REVISIO N IS DONE.
PART A SERVICE BULLETIN MODIFICATION - PILOT CONTROL WHEE L ( APPLICABLE TO AIRCRAFT, SERIA L NO. 5701 TO OPE RA TO R DOES NOT EL ECT TO E MB ODY.
582 7)/HUD/EV S WIRES AND GROUND STUDS (A PPLICABLE TO AIRCRAFT, S ERIAL NO. 5 775 TO 58 27 PRE S B
605 -34-01 7)/HUD/EV S V IDEO CABLE A ND EVS FILTER (APPL ICABL E TO AIRCRAFT, SERIA L NO. 5701 TO 5990)/EVS
FAIRING A ND RO D INS TA LLATIO N (AP PLICA BLE TO A IRCRA FT, SE RIAL NO. 570 1 TO 599 0)/CONFIG URATION
STRAPPING UNIT (CSU)
MOS 20-O CT-20 16
17-O CT-20 16 HRS /MSC -
AFL

SB 605 -34-01 0 REV 05 ACCOMPLISH MODIFICATION - E NHANCED V ISION SYSTEM (EVS) - STRUCTURAL AND E LECTRICAL PRO VISIO NS , OPTIONAL DECLINED - NO PREVIOUS REVISIO N IS DONE.
PART B SERVICE BULLETIN MODIFICATION – EVS CAMERA IDENTIFICA TION TAG INSTALLATION AND VIDEO CABL E “FF30A” OPE RA TO R DOES NOT EL ECT TO E MB ODY.
CONNE CTION
MOS 20-O CT-20 16
17-O CT-20 16 HRS /MSC -
AFL

SB 605 -34-01 0 REV 06 MODIFICA TION - ENHANCED VISION S YSTEM (E VS) - S TRUCTURAL AND EL ECTRICAL PROV ISIONS, S ERVICE OPTIONAL - NO PREVIOUS RE VIS IO N IS DONE. O PERATOR
BULLE TIN DOES NOT E LECT TO EMBODY.
MOS (EFF)
11-NOV -2020 HRS /MSC -
AFL
SB 605 -34-01 0 REV 06 (B) ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - PILOT CONTROL WHEE L (A PPLICABLE TO AIRCRAFT, S ERIAL NO. OPTIONAL
PART A 570 1 TO 5827 )
MOS (EFF)
11-NOV -2020 HRS /MSC -
AFL
SB 605 -34-01 0 REV 06 (C) ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - HUD/EVS WIRES AND G RO UND S TUDS (APPL ICABL E TO OPTIONAL
PART A AIRCRAFT, SERIAL NO . 5775 TO 5827 PRE SB 605- 34-017 )
MOS (EFF)
11-NOV -2020 HRS /MSC -
AFL
SB 605 -34-01 1 MODIFICA TION - GL OBAL PO SITIONING SYS TEM (GPS ) - INS TA LL WIDE A RE A A UG ME NTATION SY STEM (WAA S) OPTIONAL NOT A PPLICA BLE
CAPAB LE GPS SYS TE M (SUPERSE DE D BY 605- 34-011 REV 01), SERVICE BULL ETIN
MOS
14-DEC-20 09 HRS /MSC -
AFL
SB 605 -34-01 1 REV 01 MODIFICA TION - GL OBAL PO SITIONING SYS TEM (GPS ) - INS TA LL WIDE A RE A A UG ME NTATION SY STEM (WAA S) OPTIONAL NOT A PPLICA BLE
CAPAB LE GPS SYS TE M (SUPERSE DE D BY 605- 34-011 REV 02), SERVICE BULL ETIN
MOS
06-JUN-2011 HRS /MSC -
AFL
SB 605 -34-01 1 REV 02 MODIFICA TION - GL OBAL PO SITIONING SYS TEM (GPS ) - INS TA LL WIDE A RE A A UG ME NTATION SY STEM (WAA S) OPTIONAL NOT A PPLICA BLE
CAPAB LE GPS SYS TE M (SUPERSE DE D BY 605- 34-011 REV 03), SERVICE BULL ETIN
MOS
28-MAY -2012 HRS /MSC -
AFL
SB 605 -34-01 1 REV 03 MODIFICA TION - GL OBAL PO SITIONING SYS TEM (GPS ) - INS TA LL WIDE A RE A A UG ME NTATION SY STEM (WAA S) OPTIONAL NOT A PPLICA BLE
CAPAB LE GPS SYS TE M (SUPERSE DE D BY 605- 34-011 REV 04), SERVICE BULL ETIN
MOS
29-JAN-20 13 HRS /MSC -
AFL
?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 125 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-01 1 REV 04 MODIFICA TION - GL OBAL PO SITIONING SYS TEM (GPS ) - INS TA LL WIDE A RE A A UG ME NTATION SY STEM (WAA S) OPTIONAL
CAPAB LE GPS SYS TE M (SUPERSE DE D BY 605- 34-011 REV 05), SERVICE BULL ETIN
MOS
17-JAN-20 18 HRS /MSC -
AFL
SB 605 -34-01 1 REV 05 MODIFICA TION - GL OBAL PO SITIONING SYS TEM (GPS ) - INS TA LL WIDE A RE A A UG ME NTATION SY STEM (WAA S) OPTIONAL NOT A PPLICA BLE - By Se rial: N/A DUE TO MSN
CAPAB LE GPS SYS TE M, S ERVICE BULLE TIN
MOS
04-JUN-2020 HRS /MSC -
AFL
SB 605 -34-01 2 MODIFICA TION - HEAD-UP DISP LAY (HUD) SYSTEM AND ENHANCE D VISION SY STEM (EV S) - INSTALLATION O F THE OPTIONAL NOT A PPLICA BLE - PER A /C SERIA L NUMBER
PRE-P RO DUCTION PROVISIO N, SERVICE BULL ETIN
MOS 04-A UG -2014
14-DEC-20 09 HRS /MSC -
AFL
SB 605 -34-01 3 MODIFICA TION - AIR TRAFFIC CONTRO L TRANSPO NDER SYSTEM (ATC) - INCORPORATION OF ATC TRA NS PONDER OPTIONAL NOT A PPLICA BLE
PART NO. 622-9 210-40 9 WITH AUTO MA TIC DEPE NDANT S URVE ILL ANCE BROA DCAST (ADS-B) OUT CAP ABILITY,
SERVICE BULLETIN
MOS
19-A PR-2010 HRS /MSC -
AFL
SB 605 -34-01 3 REV 01 MODIFICA TION - AIR TRAFFIC CONTRO L (ATC) TRA NS PONDER SY STE M -INCO RPO RA TION OF ATC TRANSPONDER OPTIONAL COMPLIED WITH
PART NO. 622-9 210-40 9 WITH AUTO MA TIC DEPE NDANT S URVE ILL ANCE- BROADCAST (A DS -B) OUT CAPABILITY,
SERVICE BULLETIN
MOS 31-MAR-2 012
03-A UG -2011 HRS /MSC - 6.4
AFL 5

SB 605 -34-01 3 REV 02 MODIFICA TION - AIR TRAFFIC CONTRO L (ATC) TRA NS PONDER SY STE M - INCORPORATION OF ATC TRA NS PONDER OPTIONAL
PART NO. 622-9 210-40 9 WITH AUTO MA TIC DEPE NDANT S URVE ILL ANCE- BROADCAST (A DS -B) OUT CAPABILITY,
SERVICE BULLETIN
MOS
10-JUN-2013 HRS /MSC -
AFL

SB 605 -34-01 4 SPE CIAL CHE CK /MODIFICATION – FLIGHT MANAG EMENT SYSTEM (FMS ) – REPLA CE THE CONTROL DISPL AY UNITS RECOMME NDED NOT A PPLICA BLE
(CDU) TO IMPROVE KE YBOA RD RE LIA BIL ITY, S ERV ICE BULLETIN
MOS
20-S EP-20 10 HRS /MSC -
AFL
SB 605 -34-01 5 MODIFICA TION - HEAD-UP DISP LAY/ENHA NCED VISIO N SYS TE M (HUD/EVS) - INSTAL LATIO N AND ACTIV ATION, OPTIONAL
SERVICE BULLETIN
MOS
11-MAR-2 013 HRS /MSC -
AFL
SB 605 -34-01 5 REV 01 MODIFICA TION - HEAD-UP DISP LAY/ENHA NCED VISIO N SYS TE M (HUD/EVS) - INSTAL LATIO N AND ACTIV ATION, OPTIONAL NOT A PPLICA BLE
SERVICE BULLETIN
MOS
02-A PR-2013 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 126 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-01 5 REV 02 MODIFICA TION - HEAD-UP DISP LAY/ENHA NCED VISIO N SYS TE M (HUD/EVS) - INSTAL LATIO N AND ACTIV ATION, OPTIONAL NOT A PPLICA BLE
SERVICE BULLETIN
MOS
03-FEB -2014 HRS /MSC -
AFL
SB 605 -34-01 5 REV 03 MODIFICA TION - HEAD-UP DISP LAY/ENHA NCED VISIO N SYS TE M (HUD/EVS) - INSTAL LATIO N AND ACTIV ATION, OPTIONAL NOT A PPLICA BLE - N/A BY AIRCRAFT MSN
SERVICE BULLETIN
MOS 01-JUN-2016
14-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-01 5 REV 04 MODIFICA TION - HEAD-UP DISP LAY/ENHA NCED VISIO N SYS TE M (HUD/EVS) - INSTAL LATIO N AND ACTIV ATION, OPTIONAL - A PPLICA BLE, NO T RECOMME NDED.
SERVICE BULLETIN BOMBA RDIER DOE S NOT PAY FOR LA BORAND
KITS O R PARTS TO DO THIS MO DIFICATIO N.
MOS (EFF)
15-FEB -2016 HRS /MSC -
AFL
SB 605 -34-01 5 REV 05 MODIFICA TION - HEAD-UP DISP LAY/ENHA NCED VISIO N SYS TE M (HUD/EVS) - INSTAL LATIO N AND ACTIV ATION, OPTIONAL - A PPLICA BLE, NO T RECOMME NDED.
SERVICE BULLETIN BOMBA RDIER DOE S NOT PAY FOR LA BORAND
KITS O R PARTS TO DO THIS MO DIFICATIO N.
MOS (EFF)
02-MAY -2017 HRS /MSC -
AFL
SB 605 -34-01 5 REV 06 MODIFICA TION - HEAD-UP DISP LAY/ENHA NCED VISIO N SYS TE M (HUD/EVS) - INSTAL LATIO N AND ACTIV ATION, OPTIONAL COMPLIED WITH - INFO RMATIONAL ONLY: THIS
SERVICE BULLETIN IS A COLL ECTO R SB TO A PPLY SB 60 5-34-01 0
HUD/EVS SY STE M
MOS 18-O CT-20 20
08-O CT-20 20 HRS /MSC -
AFL
SB 605 -34-01 6 MODIFICA TION - HEAD-UP DISP LAY (HUD) - INSTALLA TION A ND ACTIVATION, SERVICE B UL LETIN OPTIONAL
MOS
11-MAR-2 013 HRS /MSC -
AFL
SB 605 -34-01 6 REV 01 MODIFICA TION - HEAD-UP DISP LAY (HUD) - INSTALLA TION A ND ACTIVATION, SERVICE B UL LETIN OPTIONAL NOT A PPLICA BLE
MOS
02-A PR-2013 HRS /MSC -
AFL
SB 605 -34-01 6 REV 02 MODIFICA TION - HEAD-UP DISP LAY (HUD) - INSTALLA TION A ND ACTIVATION, SERVICE B UL LETIN OPTIONAL NOT A PPLICA BLE
MOS
03-FEB -2014 HRS /MSC -
AFL
SB 605 -34-01 6 REV 03 MODIFICA TION - HEAD-UP DISP LAY (HUD) - INSTALLA TION A ND ACTIVATION, SERVICE B UL LETIN OPTIONAL NOT A PPLICA BLE - N/A BY AIRCRAFT MSN
MOS 01-JUN-2016
14-DEC-20 15 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 127 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-01 6 REV 04 MODIFICA TION – INSTAL LATION AND ACTIV ATION OF HEAD-UP DISP LAY (HUD), S ERVICE BULLE TIN OPTIONAL - A PPLICA BLE, NO T RECOMME NDED.
BOMBA RDIER DOE S NOT PAY FOR LA BOR. KITS
AND P ARTS TO DO THIS MODIFICA TION.
MOS 12-MAR-2 016
16-FEB -2016 HRS /MSC -
AFL
SB 605 -34-01 7 MODIFICA TION - HEAD-UP DISP LAY (HUD) - WIRES AND GROUND STUDS RELO CA TION, SE RVICE BULLETIN OPTIONAL NOT A PPLICA BLE
MOS
11-MAR-2 013 HRS /MSC -
AFL
SB 605 -34-01 8 MODIFICA TION - TRAFFIC AL ERT AND COLLISION A VOIDANCE SYS TE M (TCAS) - “CHANGE 7.1” UP GRADE TO MEET OPTIONAL COMPLIED WITH
THE NEW RE GULATIO N REQUIREMENT, SERVICE BUL LETIN
MOS 26-A PR-2015
03-JAN-20 12 HRS /MSC - 107 0.7 7
AFL 688
SB 605 -34-01 9 MODIFICA TION - NAVIGATION - INS TAL LATIO N OF THE PRO LINE 21 ADVANCED UPG RA DE, SERVICE BULL ETIN OPTIONAL - A PPLICA BLE, NO T FREE O F CHA RG E
MOS
15-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-01 9 REV 01 MODIFICA TION - NAVIGATION - INS TAL LATIO N OF THE PRO LINE 21 ADVANCED UPG RA DE, SERVICE BULL ETIN OPTIONAL - A PPLICA BLE, NO T FREE O F CHA RG E
MOS
29-MAR-2 016 HRS /MSC -
AFL
SB 605 -34-01 9 REV 02 MODIFICA TION - NAVIGATION - INS TAL LATIO N OF THE PRO LINE 21 ADVANCED UPG RA DE, SERVICE BULL ETIN OPTIONAL - A PPLICA BLE, NO T FREE O F CHA RG E
MOS
06-JUN-2016 HRS /MSC -
AFL
SB 605 -34-01 9 REV 03 MODIFICA TION - NAVIGATION - INS TAL LATIO N OF THE PRO LINE 21 ADVANCED UPG RA DE, SERVICE BULL ETIN OPTIONAL - A PPLICA BLE, NO T FREE O F CHA RG E
MOS
19-MAR-2 018 HRS /MSC -
AFL
SB 605 -34-01 9 REV 04 MODIFICA TION - NAVIGATION - INS TAL LATIO N OF THE PRO LINE 21 ADVANCED UPG RA DE, SERVICE BULL ETIN OPTIONAL
MOS
25-MAR-2 019 HRS /MSC -
AFL
SB 605 -34-01 9 REV 05 MODIFICA TION - NAVIGATION - INS TAL LATIO N OF THE PRO LINE 21 ADVANCED UPG RA DE, SERVICE BULL ETIN OPTIONAL COMPLIED WITH
MOS 13-MAR-2 020
12-A PR-2019 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -34-02 0 MODIFICA TION - SY NTHETIC VIS IO N SYS TEM (SVS ) - INS TAL LATIO N OF THE SYNTHE TIC VISION S YSTEM, SERVICE OPTIONAL - NOT RE CO MMENDED
BULLE TIN
MOS 11-FEB -2016
15-DEC-20 15 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 128 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-02 0 REV 01 MODIFICA TION - SY NTHETIC VIS IO N SYS TEM (SVS ) - INS TAL LATIO N OF THE SYNTHE TIC VISION S YSTEM, SERVICE OPTIONAL - A PPLICA BLE, NO T RECOMME NDED.
BULLE TIN
MOS 07-A PR-2016
23-MAR-2 016 HRS /MSC -
AFL
SB 605 -34-02 0 REV 02 MODIFICA TION - SY NTHETIC VIS IO N SYS TEM (SVS ) - INS TAL LATIO N OF THE SYNTHE TIC VISION S YSTEM, SERVICE OPTIONAL - A PPLICA BLE, OPTIO NA L.
BULLE TIN
MOS 13-MAY -2016
13-MAY -2016 HRS /MSC -
AFL
SB 605 -34-02 0 REV 03 MODIFICA TION - SY NTHETIC VIS IO N SYS TEM (SVS ) - INS TAL LATIO N OF THE SYNTHE TIC VISION S YSTEM, SERVICE OPTIONAL - A PPLICA BLE
BULLE TIN
MOS (EFF)
29-A UG -2016 HRS /MSC -
AFL
SB 605 -34-02 0 REV 04 MODIFICA TION - SY NTHETIC VIS IO N SYS TEM (SVS ) - INS TAL LATIO N OF THE SYNTHE TIC VISION S YSTEM, SERVICE OPTIONAL
BULLE TIN
MOS
09-NOV -2017 HRS /MSC -
AFL
SB 605 -34-02 0 REV 05 MODIFICA TION - SY NTHETIC VIS IO N SYS TEM (SVS ) - INS TAL LATIO N OF THE SYNTHE TIC VISION S YSTEM, SERVICE OPTIONAL
BULLE TIN
MOS
09-A PR-2018 HRS /MSC -
AFL
SB 605 -34-02 0 REV 06 MODIFICA TION - SY NTHETIC VIS IO N SYS TEM (SVS ) - INS TAL LATIO N OF THE SYNTHE TIC VISION S YSTEM, SERVICE OPTIONAL
BULLE TIN
MOS
11-DEC-20 18 HRS /MSC -
AFL
SB 605 -34-02 1 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INTRO DUCTION OF REQUIRED NAVIGATION PE RFORMANCE OPTIONAL - NOT RE CO MMENDED
(RNP) AR 0.3 CA PABILITY , SERVICE B ULL ETIN
MOS 11-FEB -2016
15-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-02 1 REV 01 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INTRO DUCTION OF REQUIRED NAVIGATION PE RFORMANCE OPTIONAL - NOT RE QUIRED FOR NO W
(RNP) AR 0.3 CA PABILITY , SERVICE B ULL ETIN
MOS 07-A PR-2016
23-MAR-2 016 HRS /MSC -
AFL
SB 605 -34-02 2 MODIFICA TION - TERRAIN AWARENESS WARNING SYSTEM (TA WS ) - INTRODUCTION OF THE RUNWAY AWARENESS OPTIONAL - NOT RE CO MMENDED A T THIS TIME
AND A DVISO RY SY STE M (RAAS ), SERVICE B UL LETIN
MOS 11-FEB -2016
16-DEC-20 15 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 129 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-02 2 P ART A MODIFICA TION MO DIFICATIO N - TE RRAIN AWARENES S WARNING SY STE M (TAWS) - INTRO DUCTION OF THE RUNWA Y OPTIONAL - NOT RE CO MMENDED A T THIS TIME
AWARENESS AND ADV IS ORY S YSTEM (RAA S), SE RVICE BULLETIN - MO DIFICATIO N - INSTALL ATION OF RAAS OP TION,
WITHOUT THE S TE EP APPROACH OPTIO N (PRE SB 605-3 4-008 )
MOS 11-FEB -2016
16-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-02 2 P ART B MODIFICA TION MO DIFICATIO N - TE RRAIN AWARENES S WARNING SY STE M (TAWS) - INTRO DUCTION OF THE RUNWA Y OPTIONAL - NOT RE CO MMENDED A T THIS TIME
AWARENESS AND ADV IS ORY S YSTEM (RAA S), SE RVICE BULLETIN - MO DIFICATIO N - INSTALL ATION OF RAAS OP TION
WITH THE STEEP APP RO ACH OPTION INSTA LLED (POST SB 605-3 4-008)
MOS 11-FEB -2016
16-DEC-20 15 HRS /MSC -
AFL

SB 605 -34-02 2 REV 01 MODIFICA TION - TERRAIN AWARENESS WARNING SYSTEM (TA WS ) - INTRODUCTION OF THE RUNWAY AWARENESS OPTIONAL - NOT RE CO MMENDED A T THIS TIME
AND A DVISO RY SY STE M (TRODUCTIO N OF THE RUNWAY AWARENESS AND A DV ISO RY SY STEM (RAAS ), SERVICE
BULLE TIN
MOS 07-A PR-2016
28-MAR-2 016 HRS /MSC -
AFL

SB 605 -34-02 2 REV 01 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - INSTALL ATION OF RAA S O PTION, WITHOUT THE STEEP OPTIONAL - NOT RE CO MMENDED A T THIS TIME
PART A APP RO ACH OPTION (P RE SB 60 5-34-0 08)
MOS 07-A PR-2016
28-MAR-2 016 HRS /MSC -
AFL

SB 605 -34-02 2 REV 01 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - INSTALL ATION OF RAA S O PTION WITH THE S TE EP APPROACH OPTIONAL - NOT RE CO MMENDED A T THIS TIME
PART B OPTION INSTALLED (POS T SB 605- 34-008 )
MOS 07-A PR-2016
28-MAR-2 016 HRS /MSC -
AFL
SB 605 -34-02 2 REV 02 MODIFICA TION - TERRAIN AWARENESS WARNING SYSTEM (TA WS ) - INTRODUCTION OF THE RUNWAY AWARENESS OPTIONAL
AND A DVISO RY SY STE M (RAAS ), SERVICE B UL LETIN
MOS
05-MAR-2 018 HRS /MSC -
AFL

SB 605 -34-02 2 REV 02 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - INSTALL ATION OF RAA S O PTION, WITHOUT THE STEEP OPTIONAL
PART A APP RO ACH OPTION (P RE SB 60 5-34-0 08)
MOS
05-MAR-2 018 HRS /MSC -
AFL

SB 605 -34-02 2 REV 02 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - INSTALL ATION OF RAA S O PTION WITH THE S TE EP APPROACH OPTIONAL
PART B OPTION INSTALLED (POS T SB 605- 34-008 )
MOS
05-MAR-2 018 HRS /MSC -
AFL
SB 605 -34-02 3 MODIFICA TION - WEATHER RADAR SYSTEM - INTRODUCTION O F MULTISCAN WE ATHER RA DA R, SERVICE BULLE TIN OPTIONAL - NOT RE CO MMENDED
MOS 11-FEB -2016
15-DEC-20 15 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 130 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-02 3 REV 01 MODIFICA TION - WEATHER RADAR SYSTEM - INTRODUCTION O F MULTISCAN WE ATHER RA DA R, SERVICE BULLE TIN OPTIONAL - A PPLICA BLE, NO T RECOMME NDED
MOS 07-A PR-2016
29-MAR-2 016 HRS /MSC -
AFL
SB 605 -34-02 3 REV 02 MODIFICA TION - WEATHER RADAR SYSTEM - INTRODUCTION O F MULTISCAN WE ATHER RA DA R, SERVICE BULLE TIN OPTIONAL NOT A PPLICA BLE
MOS (EFF)
15-NOV -2016 HRS /MSC -
AFL
SB 605 -34-02 3 REV 03 MODIFICA TION - WEATHER RADAR SYSTEM - INTRODUCTION O F MULTISCAN WE ATHER RA DA R, SERVICE BULLE TIN OPTIONAL
MOS
05-MAR-2 018 HRS /MSC -
AFL
SB 605 -34-02 3 REV 04 MODIFICA TION - WEATHER RADAR SYSTEM - INTRODUCTION O F MULTISCAN WE ATHER RA DA R, SERVICE BULLE TIN OPTIONAL
MOS
04-JUL-20 18 HRS /MSC -
AFL
SB 605 -34-02 5 MODIFICA TION - LIGHTNING DE TECTIO N SY STE M (LDS) - INSTALL ATION OF THE L DS , SERVICE B ULL ETIN OPTIONAL NOT A PPLICA BLE - SB 605-3 4-006 REV 2
ALREA DY C/W
MOS 13-JUL-20 14
25-JUN-2013 HRS /MSC - 806 .53
AFL 343
SB 605 -34-02 5 REV 01 MODIFICA TION - LIGHTNING DE TECTIO N SY STE M (LDS) - INSTALL ATION OF THE L DS , SERVICE B ULL ETIN OPTIONAL
MOS (EFF)
25-JAN-20 17 HRS /MSC -
AFL
SB 605 -34-02 6 MODIFICA TION - GL OBAL PO SITIONING SYS TEM (GPS ) - UPGRADE THE WIDE AREA AUGMENTATION SYSTEM (WAAS) RECOMME NDED COMPLIED WITH
CAPAB LE GPS SYS TE M TO P RE VENT SIGNAL LOS S DURING FL IG HT (SUPERSEDED BY 60 5-34-0 26 REV 01 ), SERVICE
BULLE TIN
MOS 17-O CT-20 12
28-MAY -2012 HRS /MSC - 282 .9
AFL 120

SB 605 -34-02 6 REV 01 MODIFICA TION - GL OBAL PO SITIONING SYS TEM (GPS ) - UPGRADE THE WIDE AREA AUGMENTATION SYSTEM (WAAS) RECOMME NDED NOT A PPLICA BLE - BY BASIC AL RE ADY
CAPAB LE GPS SYS TE M TO P RE VENT SIGNAL LOS S DURING FL IG HT (SUPERSEDED BY 60 5-34-0 26 REV 02 ), SERVICE COMPLIED WITH
BULLE TIN
MOS 17-JUN-2013
29-JAN-20 13 HRS /MSC - 608 .5
AFL 247
SB 605 -34-02 6 REV 02 MODIFICA TION - GL OBAL PO SITIONING SYS TEM (GPS ) - UPGRADE THE WIDE AREA AUGMENTATION SYSTEM (WAAS) RECOMME NDED NOT A PPLICA BLE - BASS IC ISSUE WAS
CAPAB LE GPS SYS TE M TO P RE VENT SIGNAL LOS S DURING FL IG HT (SUPERSEDED BY 605-34 -026 REV 03), S ERVICE IMP LEMENTE D BEFORE
BULLE TIN
MOS
17-JAN-20 18 HRS /MSC -
AFL
SB 605 -34-02 6 REV 03 MODIFICA TION - GL OBAL PO SITIONING SYS TEM (GPS ) - UPGRADE THE WIDE AREA AUGMENTATION SYSTEM (WAAS) RECOMME NDED COMPLIED WITH - P RE VIO US LY CO MP LIE D
CAPAB LE GPS SYS TE M TO P RE VENT SIGNAL LOS S DURING FL IG HT, SE RV ICE BULLETIN WITH: BAS IC ISS UE WAS IMP LEMETED B EFO RE
MOS 27-JUN-2020
22-JUN-2020 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 131 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-02 7 MODIFICA TION - PITOT-STATIC AND TEMPERATURE SENSING SYSTEM - REPL ACE ME NT OF P ITOT-STATIC VIS UA L RECOMME NDED
DRA IN BOTTL ES TO LA RG ER CAPA CITY B OTTL ES, SE RV ICE BULLETIN
MOS (EFF)
HRS /MSC -
AFL
SB 605 -34-02 7 REV 01 MODIFICA TION - PITOT-STATIC AND TEMPERATURE SENSING SYSTEM - REPL ACE ME NT OF P ITOT-STATIC VIS UA L RECOMME NDED COMPLIED WITH
DRA IN BOTTL ES TO LA RG ER CAPA CITY B OTTL ES, SE RV ICE BULLETIN
MOS 18-NOV -2012
31-JUL-20 12 HRS /MSC - 330 .8
AFL 135
SB 605 -34-02 7 REV 02 MODIFICA TION - PITOT-STATIC AND TEMPERATURE SENSING SYSTEM - REPL ACE ME NT OF P ITOT-STATIC VIS UA L RECOMME NDED COMPLIED WITH
DRA IN BOTTL ES TO LA RG ER CAPA CITY B OTTL ES, SE RV ICE BULLETIN
MOS 22-A PR-2015
HRS /MSC -
AFL
SB 605 -34-02 8 MODIFICA TION - LIGHTNING DE TECTIO N SY STE M (LDS) - RE LOCATIO N OF THE LDS, SE RVICE BULLETIN RECOMME NDED NOT A PPLICA BLE - PER S B 605 -34-00 6 HAS
BEE N COMPLIED WTH BE FO RE
MOS 13-JUL-20 14
25-JUN-2013 HRS /MSC - 806 .53
AFL 343
SB 605 -34-02 8 REV 01 MODIFICA TION - LIGHTNING DE TECTIO N SY STE M (LDS) - RE LOCATIO N OF THE LDS, SE RVICE BULLETIN RECOMME NDED NOT A PPLICA BLE - CL OSED SUPERSEDED B Y
REV 2
MOS 21-MAY -2017
25-JAN-20 17 HRS /MSC -
AFL
SB 605 -34-02 8 REV 02 MODIFICA TION - LIGHTNING DE TECTIO N SY STE M (LDS) - RE LOCATIO N OF THE LDS, SE RVICE BULLETIN RECOMME NDED COMPLIED WITH
MOS 13-MAR-2 020
07-A PR-2017 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -34-02 9 MODIFICA TION - RADIO A LTIMETER S YSTEM - PROTECTIVE COVE R INSTAL LATIO N, S ERVICE BULLE TIN RECOMME NDED
MOS (EFF)
31-MAR-2 014 HRS /MSC -
AFL
SB 605 -34-03 0 MODIFICA TION - AIR TRAFFIC CONTRO L (ATC) TRA NS PONDER SY STE M - INCORPORATION OF ATC TRA NS PONDER OPTIONAL - TO BE SCHEDULE D IN 201 9 B EFO RE MANDATE
WITH A UTOMATIC DEPENDENT SURVEILLANCE-BROA DCAS T (ADS-B ) OUT V 2 CAP ABILITY, SERVICE BULL ETIN
MOS (EFF)
15-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-03 0 REV 01 MODIFICA TION - AIR TRAFFIC CONTRO L (ATC) TRA NS PONDER SY STE M - INCORPORATION OF ATC TRA NS PONDER OPTIONAL COMPLIED WITH
WITH A UTOMATIC DEPENDENT SURVEILLANCE-BROA DCAS T (ADS-B ) OUT V 2 CAP ABILITY, SERVICE BULL ETIN
MOS 13-MAR-2 020
24-MAR-2 016 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -34-03 1 MODIFICA TION - ENHANCED VISION S YSTEM (E VS) - E VS FILTER INSTALLA TION, SERVICE BULLETIN RECOMME NDED NOT A PPLICA BLE - N/A BY AIRCRAFT MSN
MOS 20-O CT-20 16
17-O CT-20 16 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 132 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-03 2 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INSTALLA TION OF THE L ONG RANGE CRUISE (LRC), SERVICE OPTIONAL - NOT RE CO MMENDED
BULLE TIN
MOS 11-FEB -2016
15-DEC-20 15 HRS /MSC -
AFL
SB 605 -34-03 2 REV 01 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - INSTALLA TION OF THE L ONG RANGE CRUISE (LRC), SERVICE OPTIONAL COMPLIED WITH
BULLE TIN
MOS 13-MAR-2 020
24-MAR-2 016 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -34-03 3 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM (FMS) - CO RRECT THE ERRO NEO US DISPLAY O F THE SINGLE RECOMME NDED COMPLIED WITH - P CW - SB:605-34 -019 REV.05
ENGINE E N ROUTE CLIMB SP EED ( VERC), SERVICE B UL LETIN AT 13 MAR 2020 , FMC-6200 PN:822-24 88-110 IS
INS TAL LED O N A/C
MOS 13-MAR-2 020
25-MAR-2 019 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -34-03 4 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM - INS TA LLATIO N OF THE DOT/TC V-S PEED DA TA BASE, SERVICE OPTIONAL
BULLE TIN
MOS
04-A PR-2019 HRS /MSC -
AFL
SB 605 -34-03 5 MODIFICA TION - INSTRUMENT, STA NDBY PNEUMATIC - A CTIVATIO N OF THE METRIC INTEG RA TE D STANDBY OPTIONAL
INS TRUME NT (IS I), SERVICE BULLE TIN
MOS
10-DEC-20 18 HRS /MSC -
AFL
SB 605 -34-03 6 SPE CIAL CHE CK /MODIFICATION - G LOBA L P OSITIONING SY STEM (GP S) - INTRODUCTION O F NEW G PS-40 00S PART RECOMME NDED NOT A PPLICA BLE - By Pa rt: P N:822 -2189-0 04 GPS
NUMBE R 822 -2189- 101, S ERV ICE BULLETIN INS TAL LED O N 586 6
MOS
13-JUL-20 20 HRS /MSC -
AFL
SB 605 -34-03 6 IS 02 SPE CIAL CHE CK /MODIFICATION - G LOBA L P OSITIONING SY STEM (GP S) - INTRODUCTION O F NEW G PS-40 00S PART RECOMME NDED NOT A PPLICA BLE - No t Equip ped: DUE TO
NUMBE R 822 -2189- 101, S ERV ICE BULLETIN 822 -2189- 004 GPS INS TAL LED
MOS
10-MAY -2021 HRS /MSC -
AFL
SB 605 -34-03 6 P ART A ACCOMPLISH, SERVICE B UL LETIN INSPE CTION RECOMME NDED NOT A PPLICA BLE - By Pa rt: P N:822 -2189-0 04 GPS
INS TAL LED O N 586 6
MOS
13-JUL-20 20 HRS /MSC -
AFL
SB 605 -34-03 6 P ART B ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION RECOMME NDED NOT A PPLICA BLE - By Pa rt: P N:822 -2189-0 04 GPS
INS TAL LED O N 586 6
MOS
13-JUL-20 20 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 133 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -34-03 7 MODIFICA TION - SY STEM, WEATHE R RADAR - RTA -4114 - DIGITAL SIG NA L P RO CE SSOR (DS P) CO MMUNICATION (COM) RECOMME NDED NOT A PPLICA BLE - By Pa rt: N/A DUE TO
FAULT RELIABILITY IMPROVEMENT COLL INS SB RTA- 41XX- 34-8, S ERVICE BULLETIN INS TAL LED P N: 622-84 400-00 4 A ND
MODEL:RTA- 854
MOS
03-S EP-20 20 HRS /MSC -
AFL
SB 605 -35-00 1 SPE CIAL CHE CK /MODIFICATION - O XYGE N SUPPL Y S YSTEM - INS PECTION AND REPLA CEMENT OF OX YGEN RECOMME NDED NOT A PPLICA BLE
CYLINDER AND REGULATOR ASSE MB LY (CRA) AND REG UL ATO R AS SEMBLIES WITH SP ECIFIC SERIAL NUMBERS,
SERVICE BULLETIN
MOS
31-JAN-20 11 HRS /MSC -
AFL

SB 605 -35-00 1 REV 01 SPE CIAL CHE CK /MODIFICATION – OXYGE N SUPPL Y S YSTEM – INSPECTION AND REPLA CE ME NT OF OX YGEN RECOMME NDED NOT A PPLICA BLE
CYLINDER AND REGULATOR ASSE MB LY (CRA) AND REG UL ATO R AS SEMBLIES WITH SP ECIFIC SERIAL NUMBERS,
SERVICE BULLETIN
MOS
HRS /MSC -
AFL

SB 605 -35-00 2 SPE CIAL CHE CK /MODIFICATION - CREW OXYG EN SY STE M - VERIFICATION AND REPLA CEMENT O F CREW OX YGEN RECOMME NDED NOT A PPLICA BLE
MASK INFLATAB LE HA RNES S, SERVICE B UL LETIN
DAYS
15-A UG -2011 HRS /MSC -
AFL
SB 605 -35-00 3 MODIFICA TION - PA SSENGE R OXY GEN S YSTEM - REPLA CE ME NT OF THE P ASSE NG ER OX YGEN MA SK LANYARD, RECOMME NDED - A PPLICA BLE - RE VIE WE D BY EAG CAMO ON
SERVICE BULLETIN 10-FEB -2016
MOS (EFF)
28-JAN-20 16 HRS /MSC -
AFL
SB 605 -35-00 3 P ART A REPLA CE MODIFICATION - P ASSENGE R OXY GEN SYSTEM - REPL ACEME NT OF THE PASSE NG ER OX YGEN MA SK RECOMME NDED COMPLIED WITH
LANYA RD, SE RV ICE BULLETIN THE LA NY ARDS AND RE-IDENTIFY THE OXY GEN B OX ASSE MB LIE S
MOS 29-MAR-2 018
28-JAN-20 16 HRS /MSC - 153 4.3
AFL 988
SB 605 -35-00 3 P ART B REPLA CE MODIFICATION - P ASSENGE R OXY GEN SYSTEM - REPL ACEME NT OF THE PASSE NG ER OX YGEN MA SK RECOMME NDED NOT A PPLICA BLE - N/A BY AIRCRAFT S/N
LANYA RD, SE RV ICE BULLETIN THE LA NY ARDS OF THE OXY GEN MAS KS IN THE LAV ATO RY ONLY AND RE-IDENTIFY
THE O XYGEN BOX AS SEMBLY WITH NEW PLACARD
MOS (EFF)
28-JAN-20 16 HRS /MSC -
AFL

SB 605 -35-00 3 P ART C REPLA CE MODIFICATION - P ASSENGE R OXY GEN SYSTEM - REPL ACEME NT OF THE PASSE NG ER OX YGEN MA SK RECOMME NDED NOT A PPLICA BLE - N/A BY AIRCRAFT S/N
LANYA RD, SE RV ICE BULLETIN THE LA NY ARDS OF THE OXY GEN MAS KS FO R THE OX YGEN BOX ASS EMBLIES
RE-IDE NTIFY ONLY THE O XYGE N BOX AS SEMBLIES ABO VE THE DIVA N WITH NEW P LACARDS .
MOS (EFF)
28-JAN-20 16 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 134 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -35-00 3 REV 01 MODIFICA TION - PA SSENGE R OXY GEN S YSTEM - REPLA CE ME NT OF THE P ASSE NG ER OX YGEN MA SK LANYARD, RECOMME NDED COMPLIED WITH - B OMA SB 605-35 -003, REV 01 ,
SERVICE BULLETIN PART A : PERFORMED MODIFICA TION -
PAS SENGER OXYG EN SY STEM - REPLACEMENT
OF
THE PA SSENGE R OXY GEN MAS K L ANYARD.
PART B & C A RE NOT A PPLICABLE BY AIRCRAFT
SERIAL NUMBER.
NOTE:- CUSTOMER IS RE QUIRED TO INS ERT
THE SUPP LEMENTAL ILLUSTRATED P ARTS
CATALOG ADDENDUM (SIPCA) DOCUMENT
ADJACENT TO THE AFFECTED S ECTION IN THE
COMPLETION S UPP LEMENTAL ILL USTRATED
PARTS CA TA LOG (SIPC) A ND RE CO RD THE
INCORPO RA TION O F THE SIPCA DOCUMENT O N
THE SIPC RE CO RD OF ADDENDA ( RO A) S HE ET.
REFER TO SECTION (D) FOR RE CO RDING
DETAIL S.
MOS 08-A PR-2016
10-FEB -2016 HRS /MSC - 131 3.0 2
AFL 851
SB 605 -35-00 3 REV 01 REPLA CE MODIFICATION - P ASSENGE R OXY GEN SYSTEM - REPL ACEME NT OF THE PASSE NG ER OX YGEN MA SK RECOMME NDED COMPLIED WITH
PART A LANYA RD, SE RV ICE BULLETIN THE LA NY ARDS AND RE-IDENTIFY THE OXY GEN B OX ASSE MB LIE S.
MOS 08-A PR-2016
10-FEB -2016 HRS /MSC - 131 3.0 2
AFL 851
SB 605 -35-00 3 REV 01 REPLA CE MODIFICATION - P ASSENGE R OXY GEN SYSTEM - REPL ACEME NT OF THE PASSE NG ER OX YGEN MA SK RECOMME NDED NOT A PPLICA BLE - N/A BY A/C SN
PART B LANYA RD, SE RV ICE BULLETIN THE LA NY ARDS OF THE OXY GEN MAS KS IN THE LAV ATO RY ONLY AND RE- IDENTIFY
THE O XYGEN BOX AS SEMBLY WITH NEW PLACARD.
MOS 08-A PR-2016
10-FEB -2016 HRS /MSC - 131 3.0 2
AFL 851

SB 605 -35-00 3 REV 01 REPLA CE MODIFICATION - P ASSENGE R OXY GEN SYSTEM - REPL ACEME NT OF THE PASSE NG ER OX YGEN MA SK RECOMME NDED NOT A PPLICA BLE - N/A BY A/C SN
PART C LANYA RD, SE RV ICE BULLETIN THE LA NY ARDS OF THE OXY GEN MAS KS FO R THE OX YGEN BOX ASS EMBLIES
SITUATED ABOV E THE DIVAN AND IN THE LA VATORY / RE-IDENTIFY ONLY THE O XYGEN BOX AS SEMBLIES ABOV E
THE DIVAN WITH NEW PL ACARDS
MOS 08-A PR-2016
10-FEB -2016 HRS /MSC - 131 3.0 2
AFL 851
SB 605 -35-00 3 REV 02 MODIFICA TION - PA SSENGE R OXY GEN S YSTEM - REPLA CE ME NT OF THE P ASSE NG ER OX YGEN MA SK LANYARD, RECOMME NDED NOT A PPLICA BLE - RE V 1 COMPLIED WITH - NO
SERVICE BULLETIN FURTHER ACTIO N REQUIRE D.
MOS 26-MAY -2016
18-A PR-2016 HRS /MSC -
AFL
SB 605 -35-00 4 MODIFICA TION - PO RTAB LE OXYG EN BO TTLE - UP PER B RA CK ET ASS EMBLY REPLA CEMENT, SE RV ICE BULLETIN RECOMME NDED - REVIEWED BY EAG CAMO ON 11 TH DE C, 1 5
AND TO BE CARRIED O UT DURING 60 0 HOURS
CHE CK
MOS 13-DEC-20 15
30-NOV -2015 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 135 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -35-00 4 REV 01 MODIFICA TION - PO RTAB LE OXYG EN BO TTLE - UP PER B RA CK ET ASS EMBLY REPLA CEMENT (ON HOLD), S ERVICE ON HO LD COMPLIED WITH - NOTE:- CUSTOMER IS
BULLE TIN REQUIRE D TO INSERT THE S UP PLEMENTAL
ILLUSTRA TE D PARTS CA TAL OG ADDE NDUM
(SIPCA) DOCUMENT
ADJACENT TO THE AFFECTED S ECTION IN THE
COMPLETION S UPP LEMENTALLJLUSTRA TE D
PARTS CA TA LOG (SIPC) A ND RE CO RD THE
INCORPO RA TION O F THE SIPCA DOCUMENT O N
THE SIPC RE CO RD OF ADDENDA ( RO A) S HE ET.
REFER TO SECTION (D) FOR RE CO RDING
DETAIL S.
MOS 08-A PR-2016
30-NOV -2015 HRS /MSC - (s) 131 3.0 2
AFL 851
SB 605 -35-00 5 MODIFICA TION - PO RTAB LE OXYG EN BO TTLE - BRACKET REPL ACEMENT, S ERVICE BULLE TIN RECOMME NDED
MOS 17-APR-20 24 M
29-JUN-2018 HRS /MSC -
AFL
SB 605 -35-00 5 P ART A ACCOMPLISH MODIFICATION - P ORTA BLE OXY GEN B OTTLE - BRACKET RE PLACEMENT, SERVICE B ULL ETIN SPECIAL RECOMME NDED
CHE CK
MOS 60 (EFF) 17-APR-20 24 M
29-JUN-2018 HRS /MSC
AFL
SB 605 -35-00 5 P ART B ACCOMPLISH MODIFICATION - P ORTA BLE OXY GEN B OTTLE - BRACKET RE PLACEMENT, SERVICE B ULL ETIN RECOMME NDED
MODIFICA TION
MOS 60 (s) 17-APR-20 24 M
29-JUN-2018 HRS /MSC
AFL
SB 605 -35-00 6 MODIFICA TION - OX YGEN SUPPLY SY STE M - FL EXIBLE OXY GEN HOS E REP LACEMENT, SERVICE BULL ETIN RECOMME NDED
MOS
23-A UG -2021 HRS /MSC -
AFL
SB 605 -35-00 6 REV 01 MODIFICA TION - OX YGEN SUPPLY SY STE M - FL EXIBLE OXY GEN HOS E REP LACEMENT, SERVICE BULL ETIN RECOMME NDED
MOS 12 (EFF) 23-AUG-2 022 M
28-JAN-20 22 HRS /MSC
AFL
SB 605 -36-00 1 MODIFICA TION - BL EED-AIR LEA K DETECTIO N SYS TE M - 10 STAGE BLEE D- AIR PRESSURE TRANSDUCE RS RECOMME NDED
RELOCATION, SERVICE B UL LETIN
MOS
02-FEB -2009 HRS /MSC -
AFL
SB 605 -36-00 1 REV 01 MODIFICA TION - BL EED-AIR LEA K DETECTIO N SYS TE M - 10TH STAGE BL EED-AIR PRES SURE TRA NS DUCERS RECOMME NDED NOT A PPLICA BLE
RELOCATION, SERVICE B UL LETIN
MOS
15-JUL-20 09 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 136 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -36-00 1 REV 02 MODIFICA TION - BL EED-AIR LEA K DETECTIO N SYS TE M - 10TH STAGE BL EED-AIR PRES SURE TRA NS DUCERS RECOMME NDED NOT A PPLICA BLE
RELOCATION, SERVICE B UL LETIN
MOS (EFF)
12-S EP-20 12 HRS /MSC -
AFL
SB 605 -36-00 1 REV 03 MODIFICA TION - BL EED-AIR LEA K DETECTIO N SYS TE M - 10TH STAGE BL EED-AIR PRES SURE TRA NS DUCERS RECOMME NDED NOT A PPLICA BLE
RELOCATION, SERVICE B UL LETIN
MOS (EFF)
02-MAY -2017 HRS /MSC -
AFL
SB 605 -38-00 2 MODIFICA TION - PO TA BLE WATER SY STE M - WATE R TANK PLUMB ING LINE S MODIFICATIO N, S ERVICE BULLE TIN OPTIONAL NOT A PPLICA BLE
MOS
09-JAN-20 12 HRS /MSC -
AFL
SB 605 -38-00 4 MODIFICA TION - WATER S YSTEM - WATER S YSTEM THERMOSTATIC SWITCH RELOCATION, SERVICE B ULL ETIN OPTIONAL
MOS
05-S EP-20 19 HRS /MSC -
AFL
SB 605 -44-00 2 MODIFICA TION - CABIN E LECTRONIC SYS TE M (CES) - VERSION 6.5.1 SOFTWA RE UPDATE, SE RVICE BULLETIN OPTIONAL NOT A PPLICA BLE
MOS
26-A PR-2010 HRS /MSC -
AFL
SB 605 -44-00 4 MODIFICA TION - CABIN E LECTRONIC SYS TE M (CES) - SOFTWA RE UPDATE TO IMP RO VE THE WATER LE VEL OPTIONAL NOT A PPLICA BLE
INDICA TION A ND THE TEMPERATURE CONTRO L S ETTING, SERVICE BUL LETIN
MOS
30-NOV -2010 HRS /MSC -
AFL
SB 605 -44-00 5 MODIFICA TION - CABIN E LECTRONIC SYS TE M (CES) - ELIMINATE FREEZE UP O F THE COCKPIT TOUCH SCREEN RECOMME NDED NOT A PPLICA BLE
EQUIPMENT (CTSE) DURING GE NE RA TOR SWITCHING, S ERVICE BULLE TIN
MOS
01-FEB -2011 HRS /MSC -
AFL
SB 605 -44-00 5 REV 01 MODIFICA TION - CABIN E LECTRONIC SYS TE M (CES) - ELIMINATE FREEZE UP O F THE COCKPIT TOUCH SCREEN RECOMME NDED NOT A PPLICA BLE
EQUIPMENT (CTSE) DURING GE NE RA TOR SWITCHING, S ERVICE BULLE TIN
MOS
04-A PR-2011 HRS /MSC -
AFL
SB 605 -44-00 5 REV 02 MODIFICA TION - CABIN E LECTRONIC SYS TE M (CES) - ELIMINATE FREEZE UP O F THE COCKPIT TOUCH SCREEN RECOMME NDED NOT A PPLICA BLE
EQUIPMENT (CTSE) DURING GE NE RA TOR SWITCHING, S ERVICE BULLE TIN
MOS
12-S EP-20 11 HRS /MSC -
AFL
SB 605 -44-00 5 REV 03 MODIFICA TION – CABIN E LECTRONIC SY STE M (CES) – ELIMINATE FREE ZE UP OF THE COCKP IT TOUCH SCREEN RECOMME NDED NOT A PPLICA BLE - AS PER A IRCRA FT SERIA L
EQUIPMENT (CTSE) DURING GE NE RA TOR SWITCHING, S ERVICE BULLE TIN NUMBE R
MOS 17-JUN-2012
11-JUN-2012 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 137 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -44-00 5 REV 04 MODIFICA TION - CABIN E LECTRONIC SYS TE M (CES) - ELIMINATE FREEZE UP O F THE COCKPIT TOUCH SCREEN RECOMME NDED NOT A PPLICA BLE
EQUIPMENT (CTSE) DURING GE NE RA TOR SWITCHING, S ERVICE BULLE TIN
MOS (EFF)
30-JAN-20 14 HRS /MSC -
AFL
SB 605 -44-00 6 MODIFICA TION - CABIN E LECTRONIC SYS TE M (CES) - ELIMINATE FREEZE UP O F THE COCKPIT TOUCH SCREEN RECOMME NDED COMPLIED WITH - FOUND AL RE ADY
EQUIPMENT (CTSE) DURING GE NE RA TOR SWITCHING (DUA L JUNCTION BO X WIRING - JB1 4 A ND JB1 5), SE RV ICE INCORPO RA TED
BULLE TIN
MOS 10-DEC-20 12
28-MAY -2012 HRS /MSC -
AFL
SB 605 -44-00 6 REV 01 MODIFICA TION - CABIN E LECTRONIC SYS TE M (CES) - ELIMINATE FREEZE UP O F THE COCKPIT TOUCH SCREEN RECOMME NDED COMPLIED WITH
EQUIPMENT (CTSE) DURING GE NE RA TOR SWITCHING (DUA L JUNCTION BO X WIRING - JB1 4 A ND JB1 5), SE RV ICE
BULLE TIN
MOS 12-DEC-20 12
20-A UG -2012 HRS /MSC - 367 .9
AFL 142

SB 605 -44-00 6 REV 02 MODIFICA TION - CABIN E LECTRONIC SYS TE M (CES) - ELIMINATE FREEZE UP O F THE COCKPIT TOUCH SCREEN RECOMME NDED NOT A PPLICA BLE
EQUIPMENT (CTSE) DURING GE NE RA TOR SWITCHING (DUA L JUNCTION BO X WIRING - JB1 4 A ND JB1 5), SE RV ICE
BULLE TIN
MOS (EFF)
05-FEB -2013 HRS /MSC -
AFL

SB 605 -44-00 7 MODIFICA TION - CABIN S YSTEMS - ROCKWELL COLL INS CE S S ERVICE PACK UPDATE, SERVICE BULLETIN OPTIONAL - S CHEDULED 1 7/A PRIL/201 6
MOS (EFF)
06-JUL-20 15 HRS /MSC -
AFL
SB 605 -44-00 8 MODIFICA TION - SA TE LLITE COMMUNICA TION S YSTEM - INS TA LLATION OF THE HONEYWELL JETWA VE KA BAND OPTIONAL
SATEL LITE DATA S YSTEM, SERVICE B UL LETIN
MOS
27-S EP-20 19 HRS /MSC -
AFL
SB 605 -44-00 8 REV 01 MODIFICA TION - SA TE LLITE COMMUNICA TION S YSTEM - INS TA LLATION OF THE HONEYWELL JETWA VE KA BAND OPTIONAL
SATEL LITE DATA S YSTEM, SERVICE B UL LETIN
MOS
05-MAR-2 021 HRS /MSC -
AFL
SB 605 -44-00 8 REV 02 MODIFICA TION - SA TE LLITE COMMUNICA TION S YSTEM - INS TA LLATION OF THE HONEYWELL JETWA VE KA BAND OPTIONAL
SATEL LITE DATA S YSTEM, SERVICE B UL LETIN
MOS
09-MAR-2 022 HRS /MSC -
AFL
SB 605 -46-00 1 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE INTEG RATED FL IGHT INFORMA TION OPTIONAL
SYS TE M (A/C 57 01 - 59 90), S ERV ICE BULLETIN
MOS
12-MAR-2 007 HRS /MSC A/R
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 138 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -46-00 2 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE UNIVE RSA L G RA PHICAL WEATHER SUPERSE DE D - NOT RE CO MMENDED
ON THE MUL TI-FUNCTION DISP LAY (MFD) (A/C 570 1 - 599 0), SE RVICE BULLETIN
MOS 11-FEB -2016
HRS /MSC -
AFL
SB 605 -46-00 2 REV 01 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE UNIVE RSA L G RA PHICAL WEATHER OPTIONAL
ON THE MUL TI-FUNCTION DISP LAY (MFD), S ERVICE BULLETIN
MOS
31-MAR-2 008 HRS /MSC A/R
AFL
SB 605 -46-00 2 REV 02 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE UNIVE RSA L G RA PHICAL WEATHER OPTIONAL COMPLIED WITH
ON THE MUL TI-FUNCTON DIS PLAY (MFD) , SERVICE B ULL ETIN
MOS 31-MAR-2 012
29-A UG -2011 HRS /MSC - 6.4
AFL 5
SB 605 -46-00 2 REV 03 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE UNIVE RSA L G RA PHICAL WEATHER OPTIONAL
ON THE MUL TI-FUNCTON DIS PLAY (MFD) , SERVICE B ULL ETIN
MOS
21-MAY -2013 HRS /MSC -
AFL
SB 605 -46-00 2 REV 04 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE UNIVE RSA L G RA PHICAL WEATHER OPTIONAL - TO BE C/W AT OP ERATO R PREFERENCE
ON THE MUL TI-FUNCTON DIS PLAY (MFD) , SERVICE B ULL ETIN
MOS 01-JUN-2016
14-DEC-20 15 HRS /MSC -
AFL
SB 605 -46-00 2 REV 05 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE UNIVE RSA L G RA PHICAL WEATHER OPTIONAL COMPLIED WITH
ON THE MUL TI-FUNCTON DIS PLAY (MFD) , SERVICE B ULL ETIN
MOS 13-MAR-2 020
20-JAN-20 17 HRS /MSC - 192 6.4
AFL 127 5
SB 605 -46-00 3 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE XM GRAPHICAL WEATHER O PTION SUPERSE DE D
(A/C 57 01 - 59 90), S ERVICE BULLETIN
MOS
HRS /MSC -
AFL
SB 605 -46-00 3 P ART A PERFORM MODIFICATION - FLIGHT DECK INFORMATION SYSTEMS - INSTALLA TION O F THE XM GRAPHICA L WEA THER OPTIONAL
OPTION (A /C 5701 - 5990) , SERVICE BULL ETIN MODIFICATIO N - FL IGHT DECK INFORMATION SYSTEMS - INSTALL ATION
OF THE XM WEA THER ANTE NNA.
MOS
HRS /MSC -
AFL
SB 605 -46-00 3 P ART B PERFORM MODIFICATION - FLIGHT DECK INFORMATION SYSTEMS - INSTALLA TION O F THE XM GRAPHICA L WEA THER OPTIONAL
OPTION (A /C 5701 - 5990) , SERVICE BULL ETIN MODIFICATIO N - FL IGHT DECK INFORMATION SYSTEMS - INSTALL ATION
OF THE XM WEA THER CIRCUIT BREAK ER AND INSTALLA TION O F THE X M WEATHER RECEIVER.
MOS
HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 139 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -46-00 3 REV 01 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE XM GRAPHICAL WEATHER O PTION OPTIONAL
(A/C 57 01 - 59 90), S ERVICE BULLETIN
MOS
26-MAY -2008 HRS /MSC -
AFL

SB 605 -46-00 3 REV 01 PERFORM MODIFICATION - FLIGHT DECK INFORMATION SYSTEMS - INSTALLA TION O F THE XM GRAPHICA L WEA THER OPTIONAL
PART A OPTION (A /C 5701 - 5990) , SERVICE BULL ETIN MODIFICATIO N - FL IGHT DECK INFORMATION SYSTEMS - INSTALL ATION
OF THE XM WEA THER ANTE NNA.
MOS
26-MAY -2008 HRS /MSC -
AFL

SB 605 -46-00 3 REV 01 PERFORM MODIFICATION - FLIGHT DECK INFORMATION SYSTEMS - INSTALLA TION O F THE XM GRAPHICA L WEA THER OPTIONAL
PART B OPTION (A /C 5701 - 5990) , SERVICE BULL ETIN MODIFICATIO N - FL IGHT DECK INFORMATION SYSTEMS - INSTALL ATION
OF THE XM WEA THER CIRCUIT BREAK ER AND INSTALLA TION O F THE X M WEATHER RECEIVER.
MOS
26-MAY -2008 HRS /MSC -
AFL

SB 605 -46-00 3 REV 02 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE XM GRAPHICAL WEATHER O PTION, OPTIONAL
SERVICE BULLETIN
MOS
21-MAY -2013 HRS /MSC -
AFL

SB 605 -46-00 3 REV 02 MODIFICA TION MO DIFICATIO N - FL IGHT DECK INFORMATIO N SYS TEMS - INSTALL ATION OF THE X M GRAP HICAL OPTIONAL
PART A WEATHER OP TION, SE RV ICE BULLETIN - INSTALLA TION OF THE X M WEATHER ANTENNA
MOS
21-MAY -2013 HRS /MSC -
AFL

SB 605 -46-00 3 REV 02 MODIFICA TION MO DIFICATIO N - FL IGHT DECK INFORMATIO N SYS TEMS - INSTALL ATION OF THE X M GRAP HICAL OPTIONAL
PART B WEATHER OP TION, SE RV ICE BULLETIN - INSTALLA TION OF THE X M WEATHER RECEIVER / CIRCUIT BREA KER
MOS
21-MAY -2013 HRS /MSC -
AFL
SB 605 -46-00 3 REV 03 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE XM GRAPHICAL WEATHER O PTION, OPTIONAL - TO BE C/W AT OP ERATO R PREFERENCE
SERVICE BULLETIN
MOS 02-JUN-2016
15-DEC-20 15 HRS /MSC -
AFL

SB 605 -46-00 3 REV 03 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE XM GRAPHICAL WEATHER O PTION, OPTIONAL - A T OPE RATOR PREFERENCE
PART A SERVICE BULLETIN MODIFICATION - INSTAL LATIO N OF THE XM WEA THER ANTENNA
MOS (EFF)
15-DEC-20 15 HRS /MSC -
AFL

SB 605 -46-00 3 REV 03 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE XM GRAPHICAL WEATHER O PTION, OPTIONAL - A T OPE RATOR PREFERENCE
PART B SERVICE BULLETIN MODIFICATION - INSTAL LATIO N OF THE XM WEA THER RECEIVER
MOS (EFF)
15-DEC-20 15 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 140 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -46-00 3 REV 03 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE XM GRAPHICAL WEATHER O PTION, OPTIONAL - A T OPE RATOR PREFERENCE
PART C SERVICE BULLETIN MODIFICATION - REPLA CEMENT OF THE FILE SERVER UNIT (FSU)
MOS (EFF)
15-DEC-20 15 HRS /MSC -
AFL
SB 605 -46-00 3 REV 04 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE XM GRAPHICAL WEATHER O PTION, OPTIONAL - O PTIONAL. BOMBARDIE R DOES NOT P AY FO R
SERVICE BULLETIN KIT AND P ARTS .
MOS (EFF)
30-A UG -2016 HRS /MSC -
AFL

SB 605 -46-00 3 REV 04 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - INSTALL ATION OF THE XM WEATHER A NTENNA OPTIONAL
PART A
MOS (EFF)
30-A UG -2016 HRS /MSC -
AFL

SB 605 -46-00 3 REV 04 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - INSTALL ATION OF THE XM WEATHER CIRCUIT OPTIONAL
PART B BREAK ER/RECEIVER
MOS (EFF)
30-A UG -2016 HRS /MSC -
AFL

SB 605 -46-00 3 REV 04 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - REPLACEMENT O F THE FIL E S ERVER UNIT (FSU) (A PPLICABLE TO OPTIONAL
PART C AIRCRAFT SE RIAL NO. 57 01 TO 592 5, PO ST SB 605 -34-01 9)
MOS (EFF)
30-A UG -2016 HRS /MSC -
AFL
SB 605 -46-00 3 REV 05 MODIFICA TION - FLIGHT DECK INFO RMATION S YSTEMS - INSTA LLATION OF THE XM GRAPHICAL WEATHER O PTION, OPTIONAL
SERVICE BULLETIN
MOS
19-S EP-20 18 HRS /MSC -
AFL

SB 605 -46-00 3 REV 05 ACCOMPLISH MODIFICATION - FLIGHT DECK INFORMATION SYSTEMS - INSTALLA TION O F THE X M GRAPHICA L OPTIONAL
PART A WEATHER OP TION, SE RV ICE BULLETIN MODIFICA TION - INS TA LLATIO N OF THE XM WEA THER ANTE NNA
MOS
19-S EP-20 18 HRS /MSC -
AFL

SB 605 -46-00 3 REV 05 ACCOMPLISH MODIFICATION - FLIGHT DECK INFORMATION SYSTEMS - INSTALLA TION O F THE X M GRAPHICA L OPTIONAL
PART B WEATHER OP TION, SE RV ICE BULLETIN MODIFICA TION - INS TA LLATIO N OF THE XM WEA THER CIRCUIT
BREAK ER/RECEIVER
MOS
19-S EP-20 18 HRS /MSC -
AFL

SB 605 -46-00 3 REV 05 ACCOMPLISH MODIFICATION - FLIGHT DECK INFORMATION SYSTEMS - INSTALLA TION O F THE X M GRAPHICA L OPTIONAL
PART C WEATHER OP TION, SE RV ICE BULLETIN MODIFICA TION - REPLA CE ME NT OF THE FILE SERVER UNIT (FSU)
(AP PLICA BLE TO A IRCRA FT SERIA L NO. 5 701 TO 5 925, P OST S B 6 05-34- 019)
MOS
19-S EP-20 18 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 141 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -46-00 5 MODIFICA TION - AIRCRAFT HEA LTH MANAGEMENT INFO RMATION SY STEM - INSTAL LATION OF THE LEARJET INC. S TC OPTIONAL
AIRCRAFT HEAL TH MA NA GEMENT SY STE M, SERVICE BULL ETIN
MOS
13-MAY -2022 HRS /MSC -
AFL
SB 605 -46-00 5 P ART A ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - AHMS S TRUCTURAL AND WIRE PROVISIONS OPTIONAL
MOS
13-MAY -2022 HRS /MSC -
AFL
SB 605 -46-00 5 P ART B ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - CABIN ROUTE R OPTION PROV IS IONS OPTIONAL
MOS
13-MAY -2022 HRS /MSC -
AFL
SB 605 -46-00 5 P ART C ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - AHMS COMPL ETIONS OPTIONAL
MOS
13-MAY -2022 HRS /MSC -
AFL
SB 605 -49-00 1 MODIFICA TION - EX HA US T - INTRO DUCTION OF THE 3 6-150 (CL) AUXILIA RY PO WE R UNIT (A PU) S TA INLESS S TEE L OPTIONAL
EXHAUST EXTENSION (A/C 5 701 TO 5 990) , SERVICE BULLE TIN
MOS
17-MAR-2 008 HRS /MSC -
AFL
SB 605 -49-00 1 REV 01 MODIFICA TION - EX HA US T - INTRO DUCTION OF THE 3 6-150 (CL) AUXILIA RY PO WE R UNIT (A PU) S TA INLESS S TEE L OPTIONAL - TO BE C/W AT OP ERATO R PREFERENCE
EXHAUST EXTENSION, SERVICE B ULL ETIN
MOS 13-JUN-2016
03-NOV -2015 HRS /MSC -
AFL
SB 605 -49-00 2 SPE CIAL CHE CK /MODIFICATION - A UX ILIARY POWER UNIT (AP U) ENGINE O IL SYS TE M - RE PLACEMENT OF THE APU RECOMME NDED NOT A PPLICA BLE
OIL FILTER E LEMENT, SERVICE BULL ETIN
MOS
HRS /MSC -
AFL
SB 605 -52-00 1 SPE CIAL CHE CK /MODIFICATION - P ASSE NG ER DOOR - E POXY RAMP RE MO VAL AND CORROSION P RE VENTION, RECOMME NDED NOT A PPLICA BLE - SUPERSEDED BY RE V 2
SERVICE BULLETIN
MOS 17-JUN-2013
18-JUN-2012 HRS /MSC - 608 .5
AFL 247
SB 605 -52-00 1 REV 01 SPE CIAL CHE CK /MODIFICATION - P ASSE NG ER DOOR - E POXY RAMP RE MO VAL AND CORROSION P RE VENTION, RECOMME NDED NOT A PPLICA BLE - SUPERSEDED BY RE V 2
SERVICE BULLETIN
MOS 17-JUN-2013
31-O CT-20 12 HRS /MSC - 608 .5
AFL 247
SB 605 -52-00 1 REV 02 SPE CIAL CHE CK /MODIFICATION - P ASSE NG ER DOOR - REMOV AL OF EP OXY RAMP A ND CO RROS IO N PREVENTION, RECOMME NDED NOT A PPLICA BLE - SUPERSEDED BY RE V 3
SERVICE BULLETIN
MOS
22-JAN-20 13 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 142 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -52-00 1 REV 03 SPE CIAL CHE CK /MODIFICATION - P ASSE NG ER DOOR - REMOV AL OF EP OXY RAMP A ND CO RROS IO N PREVENTION, RECOMME NDED COMPLIED WITH
SERVICE BULLETIN
MOS 08-A PR-2016
24-S EP-20 13 HRS /MSC - 131 3.0 2
AFL 851
SB 605 -52-00 2 SPE CIAL CHE CK /REWORK - PASSE NG ER DOOR - S POT FACES ON MAIN DO OR LA TCH FRAME FITTING AT FS 339.60, RECOMME NDED NOT A PPLICA BLE - BY AIRCRAFT S/N
STR 3, SERVICE BULL ETIN
MOS (EFF)
HRS /MSC -
AFL
SB 605 -52-00 2 REV 01 SPE CIAL CHE CK /REWORK - PASSE NG ER DOOR - S POT FACES ON MAIN DO OR LA TCH FRAME FITTING AT FS 339.60, RECOMME NDED NOT A PPLICA BLE
STR 3, SERVICE BULL ETIN
MOS (EFF)
12-JAN-20 17 HRS /MSC -
AFL
SB 605 -52-00 3 MODIFICA TION - PA SSENGE R DOOR - IMP RO VE THE SUPPO RT LEG MECHA NISM, SE RV ICE BULLETIN RECOMME NDED
MOS
05-JAN-20 18 HRS /MSC -
AFL
SB 605 -52-00 5 MODIFICA TION - DOOR, P ASSENGE R - RE PLACEMENT O F PAS SENGER DO ORS A LTE RNATE STEP PANELS , SERVICE OPTIONAL
BULLE TIN
MOS
12-MAY -2020 HRS /MSC -
AFL
SB 605 -52-00 5 P ART A ACCOMPLISH, SERVICE B UL LETIN UP PER S TE P P ANEL REP LACEMENT (K6 00-319 83-1) OPTIONAL
MOS
12-MAY -2020 HRS /MSC -
AFL
SB 605 -52-00 5 P ART B ACCOMPLISH, SERVICE B UL LETIN BOTTOM STEP PA NEL REPL ACEMENT (K60 0-3198 3-15) OPTIONAL
MOS
12-MAY -2020 HRS /MSC -
AFL
SB 605 -53-00 1 SPE CIAL CHE CK /REWORK - FLO OR - INS PECT THE UNDE R FLOOR SUPPPO RT CHANNEL FOR FOD A ND CL EAN THE RECOMME NDED NOT A PPLICA BLE
AREA, SERVICE BULLE TIN
MOS
21-JUL-20 08 HRS /MSC -
AFL
SB 605 -53-00 2 SPE CIAL CHE CK / MODIFICATION - AFT FUSELA GE - INSPECTIO N OF THE SADDLE TA NK SHROUD AS SEMBLY ROOF RECOMME NDED NOT A PPLICA BLE
AND A PPLICA TION OF CORROSION INHIBITING CO MP OUND, SE RV ICE BULLETIN
MOS
14-JUL-20 09 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 143 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -53-00 2 P ART A ACCESS SPE CIAL CHE CK / MODIFICATION - AFT FUSELA GE - INSPECTIO N OF THE SADDLE TA NK SHROUD AS SEMBLY RECOMME NDED NOT A PPLICA BLE
ROOF AND APP LICATION OF CO RROS ION INHIB ITING COMPOUND, SERVICE B UL LETIN LEFT AND RIGHT HAND
SADDLE TANK S HROUD A SSEMBL IES . - INS PECT THE S ADDLE TANK SHRO UD ASSE MB LIE S FOR SEAL ING AND
DYNATRO L. - IF NECESS ARY , INSP ECT THE SA DDLE TANK SHRO UD ASSEMBL IES FOR CO RROS ION
MOS
14-JUL-20 09 HRS /MSC -
AFL

SB 605 -53-00 2 P ART B REWORK SPECIAL CHECK/ MODIFICATIO N - AFT FUSE LAGE - INSP ECTION OF THE S ADDLE TANK SHRO UD ASSE MB LY RECOMME NDED NOT A PPLICA BLE
ROOF AND APP LICATION OF CO RROS ION INHIB ITING COMPOUND, SERVICE B UL LETIN REWO RK THE S ADDLE TANK
SHROUD ASS EMBLIES, A NG LES AND STIFFENERS.
MOS
14-JUL-20 09 HRS /MSC -
AFL

SB 605 -53-00 2 REV 01 SPE CIAL CHE CK /MODIFICATION - A FT FUSE LAGE - INSPE CTION O F THE SA DDLE TANK SHROUD ASSEMBL Y ROO F RECOMME NDED NOT A PPLICA BLE
AND A PPLICA TION OF CORROSION INHIBITING CO MP OUND, SE RV ICE BULLETIN
MOS
19-S EP-20 11 HRS /MSC -
AFL

SB 605 -53-00 2 REV 01 SPE CIAL CHE CK SP ECIAL CHECK/MO DIFICATIO N - AFT FUS ELAGE - INS PECTION OF THE S ADDL E TANK SHRO UD RECOMME NDED NOT A PPLICA BLE
PART A ASS EMBLY ROOF A ND APPL ICATIO N OF CO RROS ION INHIB ITING COMPOUND, SERVICE BULL ETIN - CHECK SADDLE
TANK ROO F FOR P RES ENCE OF SEAL ING AND DYNATRO L
MOS
19-S EP-20 11 HRS /MSC -
AFL

SB 605 -53-00 2 REV 01 REWORK SPECIAL CHECK/MODIFICATION - AFT FUSELA GE - INSPECTIO N OF THE SADDLE TA NK SHROUD AS SEMBLY RECOMME NDED NOT A PPLICA BLE
PART B ROOF AND APP LICATION OF CO RROS ION INHIB ITING COMPOUND, SERVICE B UL LETIN - REMOVAL OF CO RROS ION
AND A PPLICA TION OF CORROSION INHIBITE R
MOS
19-S EP-20 11 HRS /MSC -
AFL

SB 605 -53-00 3 SPE CIAL CHE CK - FLOOR STRUCTURE - INSPE CTION AND TORQUING , IF RE QUIRED, OF THE BOL TS ATTACHING THE RECOMME NDED NOT A PPLICA BLE
FLOOR BEAM ASSE MB LY INSTALL ED OV ER THE FWD AND A FT AUXIL LARY FUEL TANKS, S ERVICE BULLETIN
MOS
05-JUL-20 11 HRS /MSC -
AFL
SB 605 -53-00 4 MODIFICA TION - FLOO RS - INSP ECTION O F SEA T TRA CK S FOR CO RROS ION, S ERVICE BULLE TIN RECOMME NDED DEFERRE D
MOS 21-A PR-2014
22-MAY -2012 HRS /MSC - 766 .9
AFL 313
SB 605 -53-00 4 P ART A INS PECTION MO DIFICATION - FLOORS - INSPECTIO N OF SEAT TRACKS FOR CORROSION, SERVICE BULLETIN RECOMME NDED DEFERRE D
/SURFACE FINIS H OF S EAT TRACK AT SE AT ATTACHMENT L OCATIONS
MOS 21-A PR-2014
22-MAY -2012 HRS /MSC - 766 .9
AFL 313

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 144 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -53-00 4 P ART B INS PECTION MO DIFICATION - FLOORS - INSPECTIO N OF SEAT TRACKS FOR CORROSION, SERVICE BULLETIN OF RECOMME NDED DEFERRE D
SEA T TRA CK AT INTERIO R FURNITURE A TTACHME NT LOCATIO NS (A LL ATTACHMENT LOCATIONS O THER THAN
SEA TS )
MOS 21-A PR-2014
22-MAY -2012 HRS /MSC - 766 .9
AFL 313
SB 605 -53-00 4 P ART C INS PECTION MO DIFICATION - FLOORS - INSPECTIO N OF SEAT TRACKS FOR CORROSION, SERVICE BULLETIN OF RECOMME NDED DEFERRE D
SEA T TRA CK AT ALL OTHER LO CA TIONS
MOS 21-A PR-2014
22-MAY -2012 HRS /MSC - 766 .9
AFL 313
SB 605 -53-00 4 REV 01 MODIFICA TION - FLOO RS - INSP ECTION O F SEA T TRA CK S FOR CO RROS ION, S ERVICE BULLE TIN RECOMME NDED NOT A PPLICA BLE
MOS
19-DEC-20 13 HRS /MSC -
AFL
SB 605 -53-00 4 REV 01 INS PECTION MO DIFICATION - FLOORS - INSPECTIO N OF SEAT TRACKS FOR CORROSION, SERVICE BULLETIN RECOMME NDED NOT A PPLICA BLE
PART A /SURFACE FINIS H OF S EAT TRACK AT SE AT ATTACHMENT L OCATIONS
MOS
19-DEC-20 13 HRS /MSC -
AFL
SB 605 -53-00 4 REV 01 INS PECTION MO DIFICATION - FLOORS - INSPECTIO N OF SEAT TRACKS FOR CORROSION, SERVICE BULLETIN OF RECOMME NDED NOT A PPLICA BLE
PART B SEA T TRA CK AT INTERIO R FURNITURE A TTACHME NT LOCATIO NS (A LL ATTACHMENT LOCATIONS O THER THAN
SEA TS )
MOS (EFF)
19-DEC-20 13 HRS /MSC -
AFL

SB 605 -53-00 4 REV 01 INS PECTION MO DIFICATION - FLOORS - INSPECTIO N OF SEAT TRACKS FOR CORROSION, SERVICE BULLETIN OF RECOMME NDED NOT A PPLICA BLE
PART C SEA T TRA CK AT ALL OTHER LO CA TIONS
MOS (EFF)
19-DEC-20 13 HRS /MSC -
AFL
SB 605 -53-00 5 SPE CIAL CHE CK /REWORK - AFT FUSE LAGE - DINITROL MIS SING ON REA R FUS ELAG E FLO OR SUPP ORT STRUCTURE, RECOMME NDED NOT A PPLICA BLE
SERVICE BULLETIN
MOS (EFF)
24-MAR-2 014 HRS /MSC -
AFL
SB 605 -53-00 6 MODIFICA TION - GE NE RA L - CLEAR COAT A PPLICA TION, SE RV ICE BULLETIN OPTIONAL
MOS
05-JUL-20 19 HRS /MSC -
AFL
SB 605 -55-00 1 MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM OPTIONAL COMPLIED WITH
RADOME ASSEMBL Y, SERVICE BULLETIN
MOS 14-MAR-2 022
15-DEC-20 15 HRS /MSC - 219 4.6
AFL 147 5

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 145 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -55-00 1 P ART A MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM OPTIONAL COMPLIED WITH
RADOME ASSEMBL Y, SERVICE BULLETIN MODIFICATION - (REMOVAL O F VERTICAL STABILIZE R VISORS AND
FAIRINGS) RE PLACEMENT O F UPPER MID FAIRING ASSE MB LY/SATCOM RADOME ASSE MB LY AND SHELF ASSEMBL Y
MOS 14-MAR-2 022
15-DEC-20 15 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -55-00 1 P ART B MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM OPTIONAL COMPLIED WITH
RADOME ASSEMBL Y, SERVICE BULLETIN MODIFICATION - REPLA CE ME NT OF SHELF ASSE MB LY ONLY
MOS 14-MAR-2 022
15-DEC-20 15 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -55-00 1 REV 01 MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM OPTIONAL COMPLIED WITH
RADOME ASSEMBL Y, SERVICE BULLETIN
MOS 14-MAR-2 022
28-MAR-2 016 HRS /MSC - 219 4.6
AFL 147 5

SB 605 -55-00 1 REV 01 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - (REMOVAL OF VERTICAL STABILIZE R VISORS AND FAIRINGS) OPTIONAL COMPLIED WITH
PART A REPLA CE ME NT OF UPPE R MID FAIRING ASS EMBLY / SA TCOM RA DO ME AS SEMBLY AND S HEL F ASS EMBLY
MOS 14-MAR-2 022
28-MAR-2 016 HRS /MSC - 219 4.6
AFL 147 5

SB 605 -55-00 1 REV 01 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - REPLACEMENT O F SHELF ASSE MBL Y O NL Y OPTIONAL COMPLIED WITH
PART B
MOS 14-MAR-2 022
28-MAR-2 016 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -55-00 1 REV 02 MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM OPTIONAL COMPLIED WITH
RADOME ASSEMBL Y, SERVICE BULLETIN
MOS 14-MAR-2 022
12-DEC-20 16 HRS /MSC - 219 4.6
AFL 147 5

SB 605 -55-00 1 REV 02 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - (REMOVAL OF VERTICAL STABILIZE R VISORS AND FAIRINGS) OPTIONAL COMPLIED WITH
PART A REPLA CE ME NT OF UPPE R MID FAIRING ASS EMBLY/SATCOM RADOME ASS EMBLY AND SHELF ASSE MB LY
MOS 14-MAR-2 022
12-DEC-20 16 HRS /MSC - 219 4.6
AFL 147 5

SB 605 -55-00 1 REV 02 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - REPLACEMENT O F SHELF ASSE MBL Y O NL Y OPTIONAL COMPLIED WITH
PART B
MOS 14-MAR-2 022
12-DEC-20 16 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -55-00 1 REV 03 MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM OPTIONAL COMPLIED WITH
RADOME ASSEMBL Y, SERVICE BULLETIN
MOS 14-MAR-2 022
19-S EP-20 17 HRS /MSC - 219 4.6
AFL 147 5

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 146 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -55-00 1 REV 03 ACCOMPLISH, SERVICE B UL LETIN MODIFICATION - ( REMO VAL OF V ERTICA L S TA BIL IZER V IS ORS A ND FA IRINGS ) OPTIONAL COMPLIED WITH
PART A REPLA CE ME NT OF UPPE R MID FAIRING ASS EMBLY/SATCOM RADOME ASS EMBLY AND SHELF ASSE MB LY
MOS 14-MAR-2 022
19-S EP-20 17 HRS /MSC - 219 4.6
AFL 147 5

SB 605 -55-00 1 REV 03 ACCOMPLISH, SERVICE B UL LETIN MODIFICATION - REP LACEMENT OF SHE LF AS SEMBLY ONLY OPTIONAL COMPLIED WITH
PART B
MOS 14-MAR-2 022
19-S EP-20 17 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -55-00 1 REV 04 MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM OPTIONAL COMPLIED WITH
RADOME ASSEMBL Y, SERVICE BULLETIN
MOS 14-MAR-2 022
11-JUN-2018 HRS /MSC - 219 4.6
AFL 147 5

SB 605 -55-00 1 REV 04 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - (REMOVAL OF VERTICAL STABILIZE R VISORS AND FAIRINGS) OPTIONAL COMPLIED WITH
PART A REPLA CE ME NT OF UPPE R MID FAIRING ASS EMBLY/SATCOM RADOME ASS EMBLY AND SHELF ASSE MB LY
MOS 14-MAR-2 022
11-JUN-2018 HRS /MSC - 219 4.6
AFL 147 5

SB 605 -55-00 1 REV 04 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - REPLACEMENT O F SHELF ASSE MBL Y O NL Y OPTIONAL COMPLIED WITH
PART B
MOS 14-MAR-2 022
11-JUN-2018 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -55-00 1 REV 05 MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM OPTIONAL COMPLIED WITH
RADOME ASSEMBL Y, SERVICE BULLETIN
MOS 14-MAR-2 022
21-S EP-20 18 HRS /MSC - 219 4.6
AFL 147 5

SB 605 -55-00 1 REV 05 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - (REMOVAL OF VERTICAL STABILIZE R VISORS AND FAIRINGS) OPTIONAL COMPLIED WITH
PART A REPLA CE ME NT OF UPPE R MID FAIRING ASS EMBLY/SATCOM RADOME ASS EMBLY AND SHELF ASSE MB LY
MOS 14-MAR-2 022
21-S EP-20 18 HRS /MSC - 219 4.6
AFL 147 5

SB 605 -55-00 1 REV 05 ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - REPLACEMENT O F SHELF ASSE MBL Y O NL Y OPTIONAL COMPLIED WITH
PART B
MOS 14-MAR-2 022
21-S EP-20 18 HRS /MSC - 219 4.6
AFL 147 5
SB 605 -56-00 1 SPE CIAL CHE CK /MODIFICATION - WINDS HIELD - INSTALLATION O F A FA CE PLY VOLTAG E DRAIN TAB, S ERVICE RECOMME NDED
BULLE TIN
MOS
30-JAN-20 18 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 147 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -57-00 1 SPE CIAL CHE CK – INB OARD FLAPS – FORWARD LUGS, S ERVICE BULLE TIN RECOMME NDED NOT A PPLICA BLE
MOS
HRS /MSC -
AFL
SB 605 -57-00 1 REV 01 SPE CIAL CHE CK – INB OARD FLAPS – FORWARD LUGS, S ERVICE BULLE TIN RECOMME NDED NOT A PPLICA BLE
MOS
HRS /MSC -
AFL
SB 605 -57-00 2 REWORK/MO DIFICATIO N - AILERONS AND ELEV ONS - ADDITION O F DRA IN HO LES ON A ILE RO N PCU ACCESS PA NE LS, RECOMME NDED COMPLIED WITH - A ILE RO NS AND ELEVO NS
SERVICE BULLETIN ADDITION OF DRAIN HOL ES ON AILERON PCU
ACCESS PANEL S S B605- 57-002 EMBO DIED
MOS 17-O CT-20 12
19-MAR-2 012 HRS /MSC - 282 .9
AFL 120

SB 605 -57-00 2 REV 01 REWORK/MO DIFICATIO N - AILERONS AND ELEV ONS - ADDITION O F DRA IN HO LES ON A ILE RO N PCU ACCESS PA NE LS, RECOMME NDED NOT A PPLICA BLE - SB 605-5 7-002 REV 1 IS N/A
SERVICE BULLETIN TO A6-ELD AS SB 605- 57-002 BA SIC IS SUE HAS
BEE N PRODUCTION INCO RP ORATED ON
17-O CT-12
NO ACTION REQ
MOS 11-NOV -2015
03-NOV -2015 HRS /MSC -
AFL
SB 605 -57-00 3 SPE CIAL CHE CK /REWORK - ATTACHMENT FITTINGS - SERIA LIZATION O F MAIN LANDING GEAR (MLG) SIDE -BRACE RECOMME NDED NOT A PPLICA BLE - BY MS N
FITTING-S HA FT PART NO. 60 1R10237- 1/ -3, S ERVICE BULLE TIN
MOS 16-A PR-2015
09-S EP-20 14 HRS /MSC -
AFL
SB 605 -57-00 5 SPE CIAL CHE CK - FLAP HINGE BO X - FORWARD LUGS EDGE TO E DG E DISTANCE , SERVICE B ULL ETIN RECOMME NDED COMPLIED WITH - FOUND WITHIN LIMITS
MOS 18-S EP-20 14
26-S EP-20 13 HRS /MSC - 854 .3
AFL 403
SB 605 -57-00 5 REV 01 SPE CIAL CHE CK - FLAP HINGE BO X - FORWARD LUGS EDGE TO E DG E DISTANCE , SERVICE B ULL ETIN RECOMME NDED COMPLIED WITH - B ASIC ISSUE. NO ACTION
REQUIRE D BY THIS RE V.
MOS 13-NOV -2014
12-NOV -2014 HRS /MSC -
AFL

SB 605 -57-00 5 REV 01 MEASUREMENT SP ECIAL CHECK - FLAP HINGE BO X - FORWARD LUGS EDGE TO EDGE DISTANCE, SERVICE B UL LETIN RECOMME NDED COMPLIED WITH - B ASIC ISSUE. NO ACTION
PART A OF THE INBO ARD FORWA RD-LUG EDGE TO EDGE DISTANCE O F THE FLAP- HINGE-BO XES, PART NO. 60 0-1011 6, REQUIRE D BY THIS RE V.
600 -10117
MOS 13-NOV -2014
12-NOV -2014 HRS /MSC -
AFL

SB 605 -57-00 5 REV 01 MEASUREMENT SP ECIAL CHECK - FLAP HINGE BO X - FORWARD LUGS EDGE TO EDGE DISTANCE, SERVICE B UL LETIN RECOMME NDED COMPLIED WITH - B ASIC ISSUE. NO ACTION
PART B OF THE OUTB OARD FORWARD- LUG E DG E TO EDGE DIS TANCE OF THE FLA P-HINGE -BOXE S, PART NO. 600-10 118, REQUIRE D BY THIS RE V.
600 -10119 , AND 600 -1012 0
MOS 13-NOV -2014
12-NOV -2014 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 148 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -71-00 1 MODIFICA TION - COWLINGS - A DDITION O F WARNING PLACARDS TO CORRECTLY INSTALL FA STENERS , SERVICE RECOMME NDED NOT A PPLICA BLE
BULLE TIN
MOS
HRS /MSC -
AFL
SB 605 -71-00 2 MODIFICA TION - CORE CO WL DOO RS - INSTALL ATION OF A HOLD OPEN RO D BRACKET TO PREV ENT MALFUNCTIO N RECOMME NDED COMPLIED WITH - INCORPORATED @
OF THE L/H ENGINE FUEL CO NTROL UNIT, SERVICE B UL LETIN BOMBA RDIER S ECTION 1 TECH LO G
MOS 08-A PR-2013
HRS /MSC - 536 .7
AFL 220
SB 605 -73-00 1 SPE CIAL CHE CK /MODIFICATION - FUEL SYS TEM - RUSSIAN AND UKRAINIAN FUEL RE QUIREMENT, SERVICE B UL LETIN RECOMME NDED COMPLIED WITH
MOS 22-A PR-2015
08-S EP-20 09 HRS /MSC -
AFL
SB 605 -73-00 1 P ART A REMOVE SPE CIAL CHECK /MODIFICATION - FUEL SYS TE M - RUSSIAN AND UKRAINIAN FUEL REQUIREMENT, SERVICE RECOMME NDED
BULLE TIN AND INSTALL THE CENTER FUEL CO LLECTOR TANK PACKING S
MOS
08-S EP-20 09 HRS /MSC -
AFL
SB 605 -73-00 1 P ART B REFER SP ECIAL CHECK/MODIFICATIO N - FUEL SY STE M - RUSS IAN AND UKRAINIAN FUEL REQUIREMENT, SE RVICE RECOMME NDED COMPLIED WITH
BULLE TIN TO GE AIRCRAFT ENGINES, SE RV ICE BULLETIN CF3 4-BJ S /B 73-0 060
MOS 22-A PR-2015
08-S EP-20 09 HRS /MSC -
AFL
SB 605 -73-00 1 REV 01 SPE CIAL CHE CK /MODIFICATION - FUEL SYS TEM - RUSSIAN AND UKRAINIAN FUEL RE QUIREMENT, SERVICE B UL LETIN RECOMME NDED NOT A PPLICA BLE - THIS S B IS N/A TO A6- ELD
AS THIS SB IS FOR RUSS IAN AND UKRAINIAN
FUE L REQ UIREMENT.
NO ACTION REQ
MOS 11-NOV -2015
03-NOV -2015 HRS /MSC -
AFL

SB 605 -73-00 1 REV 01 SPE CIAL CHE CK /MODIFICATION - FUEL SYS TEM - RUSSIAN AND UKRAINIAN FUEL RE QUIREMENT, SERVICE B UL LETIN RECOMME NDED NOT A PPLICA BLE - THIS S B IS N/A TO A6- ELD
PART A SPE CIAL CHE CK /MODIFICATION - FUEL SYS TEM - CO LLECTOR TANK AS THIS SB IS FOR RUSS IAN AND UKRAINIAN
FUE L REQ UIREMENT.
NO ACTION REQ
MOS 11-NOV -2015
03-NOV -2015 HRS /MSC -
AFL

SB 605 -73-00 1 REV 01 SPE CIAL CHE CK /MODIFICATION - FUEL SYS TEM - RUSSIAN AND UKRAINIAN FUEL RE QUIREMENT, SERVICE B UL LETIN RECOMME NDED NOT A PPLICA BLE - THIS S B IS N/A TO A6- ELD
PART B SPE CIAL CHE CK /MODIFICATION - FUEL REQUIREMENT O F THE CF34-3B ENGINES AS THIS SB IS FOR RUSS IAN AND UKRAINIAN
FUE L REQ UIREMENT.
NO ACTION REQ
MOS 11-NOV -2015
03-NOV -2015 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 149 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 605 -79-00 1 MODIFICA TION - ENGINE OIL INDICATION BOARD - ADD A N ON/OFF POWER SWITCH FOR THE ENGINE OIL INDICATING OPTIONAL COMPLIED WITH - O PERATOR HAS DECLINE D
BOA RD IN JUNCTION B OX JB 5, SERVICE BULLETIN INCORPO RA TION
MOS 07-FEB -2015
15-S EP-20 14 HRS /MSC - 100 2.6 2
AFL 607
SBIS 605-28 -012 IS 0 1 MODIFICA TION - FUEL SYSTEM - E NG INE AND APU FUEL BO OST P UMP SEA LING IMP RO VEMENT, SERVICE BULL ETIN RECOMME NDED COMPLIED WITH - P RE VIO US LY CO MP LIE D
INFORMATIO N SHEET WITH: WO:T7 -EZE-33, MNG JET, 12-AP R-2 021
MOS 04-JUN-2021
10-DEC-20 20 HRS /MSC -
AFL
SBIS 605-32 -007 IS 0 4 SPE CIAL CHE CK - MAIN LANDING GEA R - LUBRICATIO N AND INSPECTIO N OF L H/RH MAIN LANDING GEA R (MLG) RECOMME NDED COMPLIED WITH
SHOCK STRUT L OWER PIN 1 9146-3 , SERVICE B UL LETIN INFORMA TION S HE ET
MOS 14-MAR-2 022
08-A PR-2021 HRS /MSC - 219 4.6
AFL 147 5
SB MXH-35-2 40 REV 7 ZODIA C SERVICES - O XYGEN MASK INFLATABL E HARNESS PNR MXH SERIES, SE RV ICE BULLETIN NOT A PPLICA BLE
MOS 17-JUN-2012
HRS /MSC -
AFL
SIB EASA 2009-2 8 FLIG HT DATA RECORDER AND CO CKP IT VOICE RECORDER DORMANT FAIL URES , SAFETY INFORMA TION BUL LETIN
MOS
HRS /MSC -
AFL
SIL 98 ZODIA C SERVICES - FULL FA CE QUICK DONNING O2 MASK HARNE SS, S ERVICE INFORMATION LETTER NOT A PPLICA BLE
MOS 17-JUN-2012
HRS /MSC -
AFL
VSB 2012-3 2-001 GO ODYEAR AVIATION TIRE P ART NUMBE R 299 K63-1, SIZE H29X9.0-1 5, 16P R, 2 10MPH, PRODUCE D IN BRAZIL ., NOT A PPLICA BLE
VENDOR SERVICE BULLE TIN
MOS 01-JUL-20 12
HRS /MSC -
AFL
VSB 21199 18 AIR CONDITIONING-CABIN P RES SURE CONTRO LLER, MODIFICATION OF THE CAB IN PRESSURE CONTROLLE R P/N CUS TO ME R CODE NOT A PPLICA BLE - AS CA BIN PRESSURE
211 9918-1 , SERIES 1 TO P/N 211 9918- 1 S ERIES 1 MR3 , VENDOR S ERV ICE BULLETIN CONTROL LER S /N 100-A0 492 IS INS TA LLED IN
THE AIRCRA FT
MOS 25-JAN-20 15
HRS /MSC -
AFL

VSB FMC-XX0 0-34-2 5 REV NAVIGATION - FLIG HT MA NA GEMENT COMPUTE R (FMC-3 000 / FMC-4 200 / FMC-50 00 / FMC-600 0) NAV IGA TION CIRCUIT RECOMME NDED
01 CARD ASS EMBLY A2 MODIFICA TION TO EXTEND B ATTERY LIFE , VENDOR S ERVICE BULLE TIN
MOS
04-MAY -2009 HRS /MSC -
AFL
VSB FMC-XX0 0-34-2 7 NAVIGATION - FLIG HT MA NA GEMENT COMPUTE R (FMC-3 000 / FMC-4 200 / FMC-50 00 / FMC-600 0) NAV PROCES SOR OPTIONAL
CIRCUIT CARD A 2 UPDATE TO IMPROVE BA TTERY LIFE, VENDO R SE RVICE BULLETIN
MOS
27-JAN-20 14 HRS /MSC -
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 150 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

APU - SB - P-310/3800804-1
SB 270 4458-4 9-2383 APU - A UX ILIARY POWER UNIT - STARTE R MOTOR - REWORK S TA RTER MO TO R PART NO. 270445 8-1 SERIES 2 TO OPTIONAL
PART NO. 27044 58-1 SERIES 3 B Y REP LACING THE MOTOR TE RMINA L WITH A LONGER MO TO R TERMINAL., SERVICE
BULLE TIN
MOS
31-MAY -2007 HRS /MSC -
AFL
SB 270 4458-4 9-2396 R03 APU - A IRBO RNE AUXILIA RY PO WE R - STARTER MOTOR AS SEMBLY - MO DIFICATION OF THE STARTER MOTOR RECOMME NDED - S B WAS RECOMMENDE D BY HONEYWELL
ASS EMBLY FRO M PN 270445 8-1 SERIES 3 TO PN 2 70445 8-2, INSTRUCTIONS ARE FO R THE REPLA CE ME NT OF THE WIL L B E DONE AT THE NE XT OV ERHA UL OR
BRUSH AS SEMBLIES, SERVICE BULLE TIN REPAIR.
MOS
05-MAY -2021 HRS /MSC DUE
APUS
SB 36-4 9-792 4 APU - INSTALL WASHER, PA RT NO . NA S1149 C0 363R B EHIND THE IGNITION UNIT BRACKET TO INCREAS E THE OPTIONAL COMPLIED WITH
IGNITIO N UNITL MO UNT B OLT CLE ARA NCE, SERVICE BULLE TIN
MOS 17-A PR-2014
02-FEB -2007 HRS /MSC -
APUS
SB 36-4 9-802 1 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE PLACE THE SEA L, PN 36065 14-3 WITH PN 3617 897-1, OPTIONAL
SERVICE BULLETIN
MOS
18-O CT-20 10 HRS /MSC -
APUS
SB 36-4 9-811 6 R02 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE PLACE THE STARTER MOTOR, PN 27044 58-1 WITH RECOMME NDED - S B WAS RECOMMENDE D BY HONEYWELL
PN 270445 8-2, S ERVICE BULLETIN WIL L B E DONE AT THE NE XT AP U SHOP VISIT
MOS (EFF)
05-MAY -2021 HRS /MSC ESV
APUS
SB 36-4 9-817 6 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - GROUP B ALANCE AND ASSE MB LY OF THE POWER RECOMME NDED COMPLIED WITH - E MB ODIED THIS SHOP VISIT.
SECTIO N FOR 3 6-150[CL] AP U, P N 380 0804-1 AND -2, SERVICE BULLETIN
MOS 20-A PR-2017
22-S EP-20 16 HRS /MSC - 210 4
APUS
SB 36-4 9-817 6 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - GROUP B ALANCE AND ASSE MB LY OF THE POWER RECOMME NDED
SECTIO N FOR 3 6-150[CL] AP U, P N 380 0804-1 AND -2, SERVICE BULLETIN
MOS
04-O CT-20 17 HRS /MSC -
APUS
SB 36-4 9-817 8 REV 1 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE WO RK AND REP AIR OF E NG INE 36-15 0(CL), P/N OPTIONAL DEFERRE D - OPTIO NA L, TO BE C/W A T
380 0804-1 , FOR INCORPO RA TION O F IMP RO VED COMPRES SOR CARBO N SEA L A ND RE LATED COMPONENTS, OPE RA TO R CONVENIE NCE
SERVICE BULLETIN
MOS
HRS /MSC A/R
APUS
SB 36-4 9-821 0 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - INSPE CT AND REPLA CE FUE L S HUTOFF VA LVE (FSOV), RECOMME NDED NOT A PPLICA BLE - WITH THE S N OF THE APU
PN 692545 -18, O N 36-1 50 APUS (EXPO RT CO NTROLLE D) , SERVICE BULL ETIN AND S N OF THE FS OV
MOS 26-A PR-2017
04-A PR-2016 HRS /MSC -
APUS
?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 151 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 36-4 9-830 9 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE PLACE STARTE R CLUTCH A SSEMBLY , PN 3 861147 -2, RECOMME NDED - P LANNE D WITH TAS K # 49 -44-00- 201
WITH S TA RTER CLUTCH ASS EMBLY, P N 386 1147-3 , ON THE 36-15 0[CL] A ND 36-15 0[G ] APUS, S ERVICE BULLE TIN
MOS
10-A UG -2020 HRS /MSC DUE 460 4 M
APUS
SB 36-4 9-830 9 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE PLACE STARTE R CLUTCH A SSEMBLY , PN 3 861147 -2, RECOMME NDED
WITH S TA RTER CLUTCH ASS EMBLY, P N 386 1147-3 , ON THE 36-15 0[CL] A ND 36-15 0[G ] APUS, S ERVICE BULLE TIN
MOS
23-JUN-2021 HRS /MSC - 460 4 M
APUS
SB 36-4 9-836 1 R02 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE PLACE RIVE T PN M24 243/6A401 H WITH RIVET P N CATEGORY 2
627 -504-9 209 ON 36 -150 ENGINE MODELS , SERVICE B UL LETIN
MOS
30-MAR-2 022 HRS /MSC -
APUS
SB 36-4 9-836 1 R03 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE PLACE RIVE T PN M24 243/6A401 H WITH RIVET P N CATEGORY 2
627 -504-9 209 ON 36 -150 ENGINE MODELS , SERVICE B UL LETIN
MOS
14-A PR-2022 HRS /MSC -
APUS
SB 361 5880-4 9-8149 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF THE TURBINE ROTORS, PN RECOMME NDED
361 5880-1 , PN 3 615880 -002, PN 361 5880- 3, AND PN 36158 80-4, ON MULTIPL E A PUS, SERVICE B UL LETIN
MOS (EFF)
20-O CT-20 15 HRS /MSC -
APUS
SB 361 5880-4 9-8149 R02 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF THE TURBINE ROTORS, PN RECOMME NDED NOT A PPLICA BLE - NO ACTIO N REQUIRE D NA
361 5880-1 , PN 3 615880 -002, PN 361 5880- 3, AND PN 36158 80-4, ON MULTIPL E A PUS, SERVICE B UL LETIN BY APU PN S N CLOSE D
MOS 21-MAY -2017
25-O CT-20 16 HRS /MSC -
APUS
SB 382 2101-4 9-8148 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF CO MP RE SSOR RO TO RS , PN RECOMME NDED
382 2101-1 , ON MULTIP LE APUS, SE RV ICE BULLETIN
MOS (EFF)
20-O CT-20 15 HRS /MSC -
APUS
SB 382 2101-4 9-8148 R02 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF CO MP RE SSOR RO TO RS , PN RECOMME NDED
382 2101-1 , ON MULTIP LE APUS, SE RV ICE BULLETIN
MOS
10-JAN-20 17 HRS /MSC -
APUS
SB 382 2632-4 9-8146 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF CO MP RE SSOR RO TO R, P N RECOMME NDED
382 2632-1 , ON MULTIP LE APUS, SE RV ICE BULLETIN
MOS
12-JUN-2015 HRS /MSC -
APUS

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 152 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 382 2632-4 9-8146 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF CO MP RE SSOR RO TO R, P N RECOMME NDED
382 2632-1 , ON MULTIP LE APUS, SE RV ICE BULLETIN
MOS
24-JUL-20 15 HRS /MSC -
APUS
SB 382 2632-4 9-8146 R02 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF CO MP RE SSOR RO TO R, P N RECOMME NDED
382 2632-1 , ON MULTIP LE APUS, SE RV ICE BULLETIN
MOS
31-A UG -2015 HRS /MSC -
APUS
SB 384 2368-4 9-8147 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF THE DUA L P ILO T TURBINE RECOMME NDED
ROTOR, PN 3 84236 8-1, ON MUL TIPLE APUS, SERVICE BULL ETIN
MOS
12-JUN-2015 HRS /MSC -
APUS
SB 384 2368-4 9-8147 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF THE DUA L P ILO T TURBINE RECOMME NDED
ROTOR, PN 3 84236 8-1, ON MUL TIPLE APUS, SERVICE BULL ETIN
MOS
24-JUL-20 15 HRS /MSC -
APUS
SB 384 2368-4 9-8147 R02 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF THE DUA L P ILO T TURBINE RECOMME NDED COMPLIED WITH - E MB ODIED THIS SHOP VISIT.
ROTOR, PN 3 84236 8-1, ON MUL TIPLE APUS, SERVICE BULL ETIN
MOS 20-A PR-2017
31-A UG -2015 HRS /MSC - 210 4
APUS
SB 386 1147-4 9-8301 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE WO RK STARTER CLUTCH ASSE MB LY, PN 3861 147-2, RECOMME NDED - P LANNE D TOGETHER WITH 36-49 -8309
TO STA RTER CL UTCH AS SEMBLY, PN 38 61147- 3, ON THE 36-15 0[CL] AND 36-1 50[G ] APUS, SERVICE BULLE TIN
MOS
10-A UG -2020 HRS /MSC DUE 460 4 M
APUS
SB 386 2090-4 9-8200 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE WO RK THE G ENERATOR ADAP TER, P N 3862 090-4 TO RECOMME NDED COMPLIED WITH - E MB ODIED THIS SHOP VISIT.
PN 707222 98-2, FO R USE ON THE G TCP3 6-150[CL] AP U (EXP ORT CONTROL LED), SERVICE BULLETIN
MOS 20-A PR-2017
20-A PR-2016 HRS /MSC - 210 4
APUS
SB 388 0021-4 9-8206 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE WO RK FLUID PRESSURE RE GULATING VAL VE, PN RECOMME NDED
388 0021-2 , -5 THRU -17 TO PN 7 07215 87-4, O N MUL TIPLE AP US (EX PORT CONTRO LLED), S ERV ICE BULLETIN
MOS
07-A PR-2016 HRS /MSC -
APUS
SB 388 3964-4 9-7977 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - INSTALL FUE L FLO W DEFLECTOR, PN 70 72000 1-1 ON SUPERSE DE D
THE FUEL CO NTROL DIFFERENTIAL PRESSURE (DELTA P) S LEEV E, SERVICE BUL LETIN
MOS
25-FEB -2009 HRS /MSC -
APUS

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 153 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 388 3964-4 9-7977 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - INSTALL FUE L FLO W DEFLECTOR, PN 70 72000 1-1 ON RECOMME NDED
THE FUEL CO NTROL DIFFERENTIAL PRESSURE (DELTA P) S LEEV E, SERVICE BUL LETIN
MOS
10-A PR-2009 HRS /MSC -
APUS
SB 388 3964-4 9-7977 R02 APU - A IRBO RNE AUXILIA RY PO WE R - MA IN FUEL CONTROL UNIT (FCU) - CHECK NA MEP LATE FO R LATEST CHANGE RECOMME NDED
NUMBE R. INSTALL FUE L FLO W DEFLECTOR, PN 70 72000 1-1, O N THE FUEL CO NTROL DIFFE RE NTIAL PRESSURE
(DELTA P) SLEE VE AS RE QUIRED A T NEXT A UX ILIARY POWER UNIT (AP U) SHOP VISIT, SERVICE BULLE TIN
MOS
11-MAY -2019 HRS /MSC -
APUS
SB 388 3964-4 9-7977 R03 APU - A IRBO RNE AUXILIA RY PO WE R - MA IN FUEL CONTROL UNIT (FCU) - CHECK NA MEP LATE FO R LATEST CHANGE RECOMME NDED - WILL BE APLIED A T NEXT S HO P VIS IT
NUMBE R. INSTALL FUE L FLO W DEFLECTOR, PN 70 72000 1-1, O N THE FUEL CO NTROL DIFFE RE NTIAL PRESSURE
(DELTA P) SLEE VE AS RE QUIRED A T NEXT A UX ILIARY POWER UNIT (AP U) SHOP VISIT, SERVICE BULLE TIN
MOS (EFF)
28-O CT-20 20 HRS /MSC -
APUS

SB 49-7 933 APU - A PPROVE D OILS, S ERVICE BULLETIN RECOMME NDED


MOS
24-A PR-2007 HRS /MSC -
APUS
SB 49-7 933 R01 APU - A PPROVE D OILS, S ERVICE BULLETIN RECOMME NDED
MOS
04-JUN-2007 HRS /MSC -
APUS
SB 49-7 933 R02 APU - A PPROVE D OILS, S ERVICE BULLETIN RECOMME NDED
MOS
09-A PR-2010 HRS /MSC -
APUS
SB 49-7 933 R03 APU - A IRBO RNE AUXILIA RY PO WE R UNIT (A PU) - OIL - G ENERAL - AP PROVED OILS, SE RV ICE BULLETIN
MOS
31-O CT-20 11 HRS /MSC -
APUS
SB 49-7 933 R04 APU - O IL - GENERAL - APPROV ED OILS, SERVICE BULLE TIN
MOS
12-A UG -2014 HRS /MSC -
APUS
SB 49-7 933 R05 APU - O IL - GENERAL - APPROV ED OILS, SERVICE BULLE TIN NOT A PPLICA BLE - INFORMA TIONAL ONLY
MOS 23-O CT-20 14
23-O CT-20 14 HRS /MSC -
APUS
SB 49-7 933 R06 APU - A IRBO RNE AUXILIA RY PO WE R UNIT (A PU) - OIL - G ENERAL - AP PROVED OILS, SE RV ICE BULLETIN COMPLIED WITH - REV IEWED BY EAG CAMO ON
10TH FEB , 16 AND IS FOR INFORMA TIONAL
ONLY.
MOS 10-FEB -2016
26-JAN-20 16 HRS /MSC -
APUS

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 154 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 49-7 933 R07 APU - A IRBO RNE AUXILIA RY PO WE R UNIT (A PU) - OIL - G ENERAL - AP PROVED OILS, SE RV ICE BULLETIN
MOS (EFF)
09-FEB -2017 HRS /MSC -
APUS
SB 49-7 933 R08 APU - A IRBO RNE AUXILIA RY PO WE R UNIT (A PU) - OIL - G ENERAL - AP PROVED OILS, SE RV ICE BULLETIN
MOS
27-JUL-20 17 HRS /MSC -
APUS
SB 49-7 997 APU - G AS TURBINE E NG INE - S TA NDARD S TORAG E AND PRESERVA TION GUIDE LINES , SERVICE B ULL ETIN
MOS
16-S EP-20 09 HRS /MSC -
APUS
SB 49-7 997 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - STANDARD S TO RA GE AND PRESE RV ATION
GUIDE LINES , SERVICE BULL ETIN
MOS
11-FEB -2010 HRS /MSC -
APUS
SB 49-7 997 R02 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - STANDARD S TO RA GE AND PRESE RV ATION
GUIDE LINES , SERVICE BULL ETIN
MOS
22-DEC-20 10 HRS /MSC -
APUS
SB 49-7 997 R03 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - STANDARD S TO RA GE AND PRESE RV ATION COMPLIED WITH
GUIDE LINES , SERVICE BULL ETIN
MOS 17-A PR-2014
HRS /MSC -
APUS
SB 49-7 997 R04 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - STANDARD S TO RA GE AND PRESE RV ATION COMPLIED WITH - E MB ODIED THIS SHOP VISIT.
GUIDE LINES , SERVICE BULL ETIN
MOS 20-A PR-2017
12-JAN-20 15 HRS /MSC - 210 4
APUS
SB 49-7 997 R05 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - STANDARD S TO RA GE AND PRESE RV ATION
GUIDE LINES , SERVICE BULL ETIN
MOS
03-FEB -2017 HRS /MSC -
APUS
SB 707 21587 -49-820 9 APU - A IRBO RNE AUXILIA RY PO WE R (AP U) - GAS TURBINE ENG INE - RE WO RK FLUID PRESSURE RE GULATING VAL VE, RECOMME NDED
PN 707215 87-3 TO PN 707 21587 -4 O N MULTIPLE AP US (E XPORT CONTRO LLED), S ERVICE BULLETIN
MOS
06-A PR-2016 HRS /MSC -
APUS
SB 707 21598 -49-816 8 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF CO MP RE SSOR RO TO R, P N RECOMME NDED
707 21598 -1, ON MULTIPLE APUS, S ERVICE BULLE TIN
MOS (EFF)
20-O CT-20 15 HRS /MSC -
APUS

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 155 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 707 21598 -49-816 8 R02 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF CO MP RE SSOR RO TO R, P N RECOMME NDED
707 21598 -1, ON MULTIPLE APUS, S ERVICE BULLE TIN
MOS
10-JAN-20 17 HRS /MSC -
APUS
SB 707 21725 -49-815 2 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF THE DUA L P ILO T TURBINE RECOMME NDED
ROTORS, PN 70721 725-2 AND P N 7072 1725- 5, ON MULTIP LE APUS, S ERV ICE BULLETIN
MOS (EFF)
24-A UG -2015 HRS /MSC -
APUS
SB 707 21725 -49-815 2 R02 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - BALANCE RE PAIR OF THE DUA L P ILO T TURBINE RECOMME NDED
ROTORS, PN 70721 725-2 AND P N 7072 1725- 5, ON MULTIP LE APUS, S ERV ICE BULLETIN
MOS
25-O CT-20 16 HRS /MSC -
APUS
SB GTCP36-4 9-7885 APU - CONVE RS ION OF E NG INE GTCP 36-100 [E ], P N 3800 050-1/-2/-3/-4/-5 TO 36 -150[CL], P N 380 0804-1 ENGINE RECOMME NDED
CONFIGURATIO N, S ERVICE BULLE TIN
MOS
15-FEB -2006 HRS /MSC -
APUS
SB GTCP36-4 9-7886 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE PLACE TURBINE NOZZLE PART NO. 3 613101 -8 WITH RECOMME NDED
TURBINE NO ZZLE PART NO. 38467 79-1, S ERVICE BULLE TIN
MOS
23-FEB -2006 HRS /MSC O/C
APUS
SB GTCP36-4 9-7970 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE PLACE THE COMBUSTION CHA MB ER (COMBUSTOR), OPTIONAL
PART NUMBER 3 83045 0-1 WITH COMBUSTOR, PART NUMBER 3 83045 0-2, SE RV ICE BULLETIN
MOS
24-A PR-2008 HRS /MSC -
APUS
SB GTCP36-4 9-8021 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE PLACE THE SEA L, PN 36065 14-3 WITH PN 3617 897-1, OPTIONAL
SERVICE BULLETIN
MOS
18-O CT-20 10 HRS /MSC -
APUS
SB GTCP36-4 9-8048 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE PLACE THE LOA D CONTROL VA LVE COUPLING , PN RECOMME NDED
234 -517-9 051 OR P N 234- 538-96 50, WITH LOAD CO NTROL VALV E COUPL ING, P N 234- 517-92 44, SE RV ICE BULLETIN
MOS
26-A PR-2012 HRS /MSC -
APUS
SB GTCP36-4 9-8048 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE PLACE THE LOA D CONTROL VA LVE COUPLING ,PN RECOMME NDED
234 -517-9 051 OR P N 234- 538-96 50, WITH LOAD CO NTROL VALV E COUPL ING, P N 234- 517-92 44, SE RV ICE BULLETIN
MOS
04-MAY -2012 HRS /MSC -
APUS

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 156 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB GTCP36-4 9-8121 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RO TA TING G RO UP BA LANCE P RO CE DURE, SE RV ICE OPTIONAL
BULLE TIN
MOS
30-A UG -2013 HRS /MSC -
APUS
SB GTCP36-4 9-8121 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RO TA TING G RO UP BA LANCE P RO CE DURE, SE RV ICE OPTIONAL COMPLIED WITH
BULLE TIN
MOS 17-A PR-2014
13-JAN-20 14 HRS /MSC -
APUS
SB GTCP36-4 9-8121 R02 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RO TA TING G RO UP BA LANCE P RO CE DURE, SE RV ICE OPTIONAL
BULLE TIN
MOS
16-A PR-2014 HRS /MSC -
APUS
SB GTCP36-4 9-8121 R03 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RO TA TING G RO UP BA LANCE P RO CE DURE ON OPTIONAL NOT A PPLICA BLE - NA CLOS ED IN CAMP
36-1 50[G], [CL], AND [FN] A UX ILIARY POWER UNITS (A PUS), SERVICE BULLETIN
MOS 21-MAY -2017
04-A PR-2017 HRS /MSC -
APUS
SB GTCP36-4 9-8178 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE WO RK AND REP AIR OF E NG INE 36-15 0[CL], PN OPTIONAL
380 0804-1 , FOR INCORPO RA TION O F IMP RO VED COMPRES SOR CARBO N SEA L A ND RE LATED COMPONENTS,
SERVICE BULLETIN
MOS
02-S EP-20 16 HRS /MSC -
APUS
SB GTCP36-4 9-8178 R01 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE WO RK AND REP AIR OF E NG INE 36-15 0[CL], PN OPTIONAL COMPLIED WITH - E MB ODIED THIS SHOP VISIT.
380 0804-1 , FOR INCORPO RA TION O F IMP RO VED COMPRES SOR CARBO N SEA L A ND RE LATED COMPONENTS,
SERVICE BULLETIN
MOS 20-A PR-2017
30-S EP-20 16 HRS /MSC - 210 4
APUS
SB GTCP36-4 9-8178 R02 APU - A IRBO RNE AUXILIA RY PO WE R - GAS TURBINE ENG INE - RE WO RK AND REP AIR OF E NG INE 36-15 0[CL], PN OPTIONAL
380 0804-1 , FOR INCORPO RA TION O F IMP RO VED COMPRES SOR CARBO N SEA L A ND RE LATED COMPONENTS,
SERVICE BULLETIN
MOS
15-JUN-2017 HRS /MSC -
APUS
SIL APU-49 R07 APU - MPL EMENTA TION O F THE HONEYWEL L S PECTRO ME TRIC OIL A ND FILTER ANALY SIS P RO GRAM (SO AP) FOR
HONEYWELL AUXILIARY POWER UNITS (APU’S ), SERVICE INFO RMATION LE TTER
MOS
05-MAY -2003 HRS /MSC A/R
APUS
SIL APU-49 R08 APU - IMPLEMENTATIO N OF THE HONEYWELL SPE CTROMETRIC O IL AND FILTER ANALY SIS P RO GRAM (SO AP) FOR RECOMME NDED COMPLIED WITH - P ERFO RMED INSTUCTION
HONEYWELL AUXILIARY POWER UNITS (APU’S ), SERVICE INFO RMATION LE TTER IAW SO AP KIT REF SILAP U-4 9 REV 8
MOS 07-A PR-2013
11-A PR-2008 HRS /MSC - 474
APUS 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 157 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SIL APU-49 R09 APU - IMPLEMENTATIO N OF THE HONEYWELL SPE CTROMETRIC O IL AND FILTER ANALY SIS P RO GRAM (SO AP) FOR RECOMME NDED COMPLIED WITH
HONEYWELL AUXILIARY POWER UNITS (APU'S), SERVICE INFORMATIO N LETTER
MOS 13-MAR-2 020
12-JUL-20 13 HRS /MSC - 305 5
APUS
SIL APU-49 R10 APU - IMPLEMENTATIO N OF THE HONEYWELL SPE CTROMETRIC O IL AND FILTER ANALY SIS P RO GRAM (SO AP) FOR RECOMME NDED COMPLIED WITH
HONEYWELL AUXILIARY POWER UNITS (APUS) , SERVICE INFO RMATION LE TTER
MOS 14-MAR-2 022
12-JAN-20 18 HRS /MSC - 353 8
APUS
SIL APU-49 R11 APU - IMPLEMENTATIO N OF THE HONEYWELL SPE CTROMETRIC O IL AND FILTER ANALY SIS P RO GRAM (SO AP) FOR
HONEYWELL AUXILIARY POWER UNITS (APUS) , SERVICE INFO RMATION LE TTER
MOS
21-FEB -2022 HRS /MSC -
APUS
SIL APU-49 R12 APU - IMPLEMENTATIO N OF THE HONEYWELL SPE CTROMETRIC O IL AND FILTER ANALY SIS P RO GRAM (SO AP) FOR RECOMME NDED
HONEYWELL AUXILIARY POWER UNITS (APUS) , SERVICE INFO RMATION LE TTER
MOS
02-JUN-2022 HRS /MSC -
APUS
SIL D20210 50017 89 APU - TO MITIGATE PREMATURE FAIL URE OF THE SHUTOFF V ALVE, PN 388 5091- 4: REFERRED TO A S THE LOAD
CONTROL VA LVE (LCV), S ERVICE INFORMATIO N LETTER
MOS (EFF)
31-MAY -2021 HRS /MSC 100 0 452 3 456 3
APUS

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 158 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ENGINE NO. 1 - AD - 950967/6089T11G01


FAA 1999- 09-52 PA RA C NO. 1 ENGINE - FUE L MANIFO LD AND IDG WIRE NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
APUS
FAA 1999- 09-52 PA RA D NO. 1 ENGINE - FUE L MANIFO LD AND IDG WIRE NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
ENC
FAA 1999- 23-26 PA RA (C) NO. 1 ENGINE - MAIN FUE L CONTROL (MFC)
MOS
HRS /MSC -
ENC
FAA 1999- 23-26 R01 NO. 1 ENGINE - MAIN FUE L CONTROL (MFC) NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2001- 10-03 NO. 1 ENGINE - RUP TURE OF FAN DISKS DUE TO CRA CK S THAT INITIATE A T AN E LECTRICAL ARC-O UT SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

FAA 2001- 10-03 PA RA NO. 1 ENGINE - REPLA CE RUPTURE OF FAN DISKS DUE TO CRACKS THAT INITIATE A T AN ELECTRICAL ARC-O UT NOT A PPLICA BLE - SUPERSEDED
(A)& (B) AFFECTE D FAN DIS KS
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2001- 10-03 PA RA (C) NO. 1 ENGINE - INS PECT RUPTURE OF FAN DISKS DUE TO CRA CK S THAT INITIATE A T AN E LECTRICAL ARC-O UT NOT A PPLICA BLE - SUPERSEDED
AFFECTE D FAN DIS KS
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2001- 12-06 PA RT A1 NO. 1 ENGINE - CHE CK MAG NETIC CHIP DETECTO R INDICA TORS (REDUCE D INTERVAL) NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC N/A 0
ENC 0
FAA 2001- 12-06 PA RT D1 NO. 1 ENGINE - REPLA CE #5 BE ARING RO TA TING AIR SEAL PN 4019T60 G01 WITH PN 4019T60 G03 (TERMINATING NOT A PPLICA BLE
ACTIO N)
MOS 01-A PR-2011
HRS /MSC N/A 0
ENC 0
FAA 2001- 19-02 NO. 1 ENGINE - TO PREVENT B- SUMP SCAV ENG E SCREE N BLO CK AGE DUE TO COKING SUPERSE DE D
39-1 2441 MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 159 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2002- 08-08 PA RT A NO. 1 ENGINE - TO PREVENT EL ECTRICA L A RCING BE TWEE N THE INTEG RA TE D DRIVE GE NE RATOR (IDG) CABL E A ND MANDA TO RY
THE ENGINE CO WL ING, WHICH CO UL D RESULT IN IN- FLIGHT FIRE AND/O R LO SS OF EL ECTRICAL PO WER
39-1 2716 MOS
07-MAY -2002 HRS /MSC -
ENC
FAA 2002- 08-08 PA RT B NO. 1 ENGINE - TO PREVENT EL ECTRICA L A RCING BE TWEE N THE INTEG RA TE D DRIVE GE NE RATOR (IDG) CABL E A ND MANDA TO RY
THE ENGINE CO WL ING, WHICH CO UL D RESULT IN IN- FLIGHT FIRE AND/O R LO SS OF EL ECTRICAL PO WER
MOS
07-MAY -2002 HRS /MSC -
ENC

FAA 2003- 05-10 PA RA (A) & NO. 1 ENGINE - TO PREVENT B- SUMP SCAV ENG E SCREE N BLO CK AGE DUE TO COKING (REPEA T INSP ECTION)
(B)
39-1 3086 MOS
01-A PR-2003 HRS /MSC -
ENC
FAA 2003- 05-10 PA RA (C) NO. 1 ENGINE - TO PREVENT B- SUMP SCAV ENG E SCREE N BLO CK AGE DUE TO COKING (TERMINATING ACTION)
39-1 3086 MOS
HRS /MSC -
ENC

FAA 2003- 05-10 R01 PARA NO. 1 ENGINE - PERFORM VISUAL INS PECTION AND CLEANING (REP EAT INSPECTIO N) NOT A PPLICA BLE
(A) & (B)
39-1 3337 MOS 01-A PR-2011
18-NOV -2003 HRS /MSC - 0
ENC 0

FAA 2003- 05-10 R01 PARA NO. 1 ENGINE - TO PREVENT B- SUMP SCAV ENG E SCREE N BLO CK AGE DUE TO COKING (TERMINATING ACTIO N) MANDA TO RY NOT A PPLICA BLE
(C)
39-1 3337 MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2004- 26-02 NO. 1 ENGINE - REWORK FROM SERVICE HPC FWD S POOLS P /N 6 078T56P 04 NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2006- 04-12 NO. 1 ENGINE - VISUALLY INSPECT AND EDDY CURRENT INSPECT/ REPLACE STAGE 5 LPT AND/OR 6 L PT DIS KS COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2006- 05-04 NO. 1 ENGINE - FAN DISK SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2006- 05-04 PA RT A NO. 1 ENGINE - REMOVE FAN DISK SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 160 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2006- 05-04 PA RT B NO. 1 ENGINE - INS PECT FAN DISK SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2007- 04-51 NO. 1 ENGINE - INS PECTION OF FAN DISK - VIS UA L & TACTILE INS PECTION OF THE B ORE ARE A ON THE 3 1 FAN DISKS SUPERSE DE D
LISTED IN TABL E 1 OF AD - PER GE SB-72 -A021 3
MOS
HRS /MSC N/A
ENC
FAA 2007- 05-16 NO. 1 ENGINE - INS PECTION OF THE FAN DISK (THIS AD HA S B EEN S UP ERCEDED BY AD 2 009-26 -09) MANDA TO RY NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2007- 07-07 NO. 1 ENGINE - FAN DISKS SUPERSE DE D
MOS
HRS /MSC -
ENC
FAA 2007- 07-07 PA RA (F) NO. 1 ENGINE - REMOVE FAN DISKS SUPERSE DE D
MOS
HRS /MSC -
ENC
FAA 2007- 07-07 PA RA (I) NO. 1 ENGINE - INS PECT FAN DISKS SUPERSE DE D
MOS
HRS /MSC -
ENC
FAA 2007- 07-07 R01 NO. 1 ENGINE - PREVE NT AN UNCO NTAINED FAN DISK FAIL URE AND AIRPLANE DAMAGE (THIS A D HAS BEEN SUPERSE DE D NOT A PPLICA BLE
SUPERSE DE D BY AD 2 009-2 6-09)
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2007- 07-07 R01 PARA NO. 1 ENGINE - REMOVE PREVE NT AN UNCO NTAINED FAN DISK FAIL URE AND AIRPLANE DAMAGE (THIS A D HAS SUPERSE DE D NOT A PPLICA BLE
(F) BEE N SUPERSE DE D BY AD 2 009-2 6-09)
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2007- 07-07 R01 PARA (I) NO. 1 ENGINE - INS PECT PREVE NT AN UNCO NTAINED FAN DISK FAIL URE AND AIRPLANE DAMAGE (THIS A D HAS SUPERSE DE D NOT A PPLICA BLE
BEE N SUPERSE DE D BY AD 2 009-2 6-09)
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 07-12 NO. 1 ENGINE - REMOVE THE 4- STEP SEALS , P/N 492 3T5 4G01, 6019T90G 03, 60 37T99G0 1, 6037 T9 9G02, 6037T99G 03 MANDA TO RY COMPLIED WITH - A T MANUFACTURE
AND INCO RP ORATE A N 8-STEP SE AL
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 161 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2009- 24-11 NO. 1 ENGINE - FAN BL ADE (THIS AD HA S B EEN S UP ERS EDED BY AD 2010 -01-04 ) SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

FAA 2009- 24-11 PA RA NO. 1 ENGINE - ACCOMPLISH FAN BLADE (THIS A D HAS BEEN SUPERSEDED BY AD 201 0-01-0 4) REP LACE SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
(L)( 1,2)
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 24-11 PA RA (L)( 12) NO. 1 ENGINE - ACCOMPLISH FAN BLADE (THIS A D HAS BEEN SUPERSEDED BY AD 201 0-01-0 4) INSPE CTION OF THE SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
AFT ACTUATOR HEAD HO SE FITTING
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

FAA 2009- 24-11 PA RA NO. 1 ENGINE - ACCOMPLISH FAN BLADE (THIS A D HAS BEEN SUPERSEDED BY AD 201 0-01-0 4) EDDY CURRENT SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
(L)( 3,4,6) INS PECTION
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 24-11 PA RA (L)( 5) NO. 1 ENGINE - ACCOMPLISH FAN BLADE (THIS A D HAS BEEN SUPERSEDED BY AD 201 0-01-0 4) IF Y OU FIND A CRACK SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
IN THE RETAINING PIN HO LES OF THE FA N BLA DE , REMO VE THE BLA DE FROM S ERV ICE.
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

FAA 2009- 24-11 PA RA NO. 1 ENGINE - ACCOMPLISH FAN BLADE (THIS A D HAS BEEN SUPERSEDED BY AD 201 0-01-0 4) VIS UA L INSPECTIO N SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
(L)( 8)(10) OF THE FA N BLA DE AB RA DA BLE RUB STRIP FOR WE AR (INITIA L / RE PEAT)
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 24-11 PA RA (L)( 9) NO. 1 ENGINE - ACCOMPLISH FAN BLADE (THIS A D HAS BEEN SUPERSEDED BY AD 201 0-01-0 4) FOR ENGINE S WITH SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
FAN BL ADES, P/N 6 018T30P1 4, INS TAL LED, IF YOU HA VE PERFORME D AN E CI OF THE FAN BLADE, Y OU DON'T NEED
TO INSPE CT THE FAN BLA DE AB RA DA BLE RUB STRIP FOR WE AR.
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

FAA 2009- 26-09 NO. 1 ENGINE - FAN DISK MANDA TO RY NOT A PPLICA BLE
39-1 6144 MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 26-09 PA RA (F)(G) NO. 1 ENGINE - ACCOMPLISH FAN DISK REMOVE FAN DISKS FROM SERVICE MANDA TO RY NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 26-09 PA RA (K) NO. 1 ENGINE - ACCOMPLISH FAN DISK INSP ECTIONS OF TIER 1 MANDA TO RY NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 162 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2009- 26-09 PA RA (L) NO. 1 ENGINE - ACCOMPLISH FAN DISK INSPE CTIONS O F TIER 2 MANDA TO RY NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 26-09 PA RA (M) NO. 1 ENGINE - ACCOMPLISH FAN DISK INSP ECTIONS OF TIER 3 MANDA TO RY NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 26-09 PA RA (O) NO. 1 ENGINE - ACCOMPLISH FAN DISK REMOVE FRO M SERVICE, TIE R 1 AND TIE R 2 FA N DIS KS MANDA TO RY NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2010- 01-04 NO. 1 ENGINE - ENGINE - FAN B LADES - INSPECTIO NS MANDA TO RY COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2010- 01-04 PA RA (L)( 1) NO. 1 ENGINE - REMOVE ENGINE - FAN B LADES - INSPECTIONS L ISTED FAN BLADES , P/N 601 8T3 0P14 FRO M SE RVICE MANDA TO RY COMPLIED WITH - A T MANUFACTURE
MOS
HRS /MSC -
ENC
FAA 2010- 01-04 PA RA (L)( 12) NO. 1 ENGINE - INS PECTION ENGINE - FA N BLA DE S - INS PECTIONS OF THE AFT ACTUA TOR HEAD HOS E FITTING MANDA TO RY COMPLIED WITH - A T MANUFACTURE
MOS
HRS /MSC -
ENC
FAA 2010- 01-04 PA RA (L)( 2) NO. 1 ENGINE - REMOVE ENGINE - FAN B LADES - INSPECTIONS L ISTED FAN BLADES , P/N 492 3T5 6G08, FROM SERVICE MANDA TO RY COMPLIED WITH - A T MANUFACTURE
MOS
HRS /MSC -
ENC
FAA 2010- 01-04 PA RA NO. 1 ENGINE - EDDY CURRE NT INSP ECTION E NG INE - FAN BLADES - INSP ECTIONS OF THE FAN BLADES MANDA TO RY COMPLIED WITH - A T MANUFACTURE
(L)( 3)(4)(6 )
MOS
HRS /MSC -
ENC
FAA 2010- 01-04 PA RA NO. 1 ENGINE - ACCOMPLISH E NG INE - FAN BLADES - INSP ECTIONS IF Y OU FIND A CRACK IN THE RETAINING PIN MANDA TO RY COMPLIED WITH - A T MANUFACTURE
(L)( 5)(7) HOLES OF THE FAN BL ADE, REMOVE THE B LADE FROM SERVICE .
MOS
HRS /MSC -
ENC
FAA 2010- 01-04 PA RA NO. 1 ENGINE - VISUAL INSP ECTION E NG INE - FAN BLADES - INSP ECTIONS OF THE FAN BLADE ABRADAB LE RUB MANDA TO RY COMPLIED WITH - A T MANUFACTURE
(L)( 8)(10) STRIP FOR WEA R
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 163 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2010- 01-04 PA RA (L)( 9) NO. 1 ENGINE - ACCOMPLISH E NG INE - FAN BLADES - INSP ECTIONS FO R ENGINE S WITH FAN BL ADE S, P/N MANDA TO RY COMPLIED WITH - A T MANUFACTURE
601 8T3 0P14, INSTALLE D, IF Y OU HAVE P ERFORMED AN ECI OF THE AN BLADE, Y OU DON'T NEED TO INS PECT THE
FAN BL ADE A BRADABLE RUB S TRIP FOR WE AR.
MOS
HRS /MSC -
ENC
FAA 2020- 08-01 NO. 1 ENGINE - ENGINE - AFFECTE D FAN BL ADE - REMOVE / REPL ACE MANDA TO RY NOT A PPLICA BLE - DUE TO S ERIAL NUMB ERS
OF THE FA N BLA DE S
DAYS 24-JUN-2020
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 164 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ENGINE NO. 2 - AD - 950968/6089T11G01


FAA 1999- 09-52 PA RA C NO. 2 ENGINE - FUE L MANIFO LD AND IDG WIRE NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
ENC
FAA 1999- 09-52 PA RA D NO. 2 ENGINE - FUE L MANIFO LD AND IDG WIRE NOT A PPLICA BLE - THIS A D IS NOT APPL ICABL E
PER AIRCRAFT SERIAL NUMBER
MOS 25-MAR-2 011
HRS /MSC -
ENC
FAA 1999- 23-26 PA RA (C) NO. 2 ENGINE - MAIN FUE L CONTROL (MFC)
MOS
HRS /MSC -
ENC
FAA 1999- 23-26 R01 NO. 2 ENGINE - MAIN FUE L CONTROL (MFC) NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2001- 10-03 NO. 2 ENGINE - RUP TURE OF FAN DISKS DUE TO CRA CK S THAT INITIATE A T AN E LECTRICAL ARC-O UT SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

FAA 2001- 10-03 PA RA NO. 2 ENGINE - REPLA CE RUPTURE OF FAN DISKS DUE TO CRACKS THAT INITIATE A T AN ELECTRICAL ARC-O UT NOT A PPLICA BLE - SUPERSEDED
(A)& (B) AFFECTE D FAN DIS KS
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2001- 10-03 PA RA (C) NO. 2 ENGINE - INS PECT RUPTURE OF FAN DISKS DUE TO CRA CK S THAT INITIATE A T AN E LECTRICAL ARC-O UT NOT A PPLICA BLE - SUPERSEDED
AFFECTE D FAN DIS KS
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2001- 12-06 PA RT A1 NO. 2 ENGINE - CHE CK MAG NETIC CHIP DETECTO R INDICA TORS (REDUCE D INTERVAL) NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC N/A 0
ENC 0
FAA 2001- 12-06 PA RT D1 NO. 2 ENGINE - REPLA CE #5 BE ARING RO TA TING AIR SEAL PN 4019T60 G01 WITH PN 4019T60 G03 (TERMINATING NOT A PPLICA BLE
ACTIO N)
MOS 01-A PR-2011
HRS /MSC N/A 0
ENC 0
FAA 2001- 19-02 NO. 2 ENGINE - TO PREVENT B- SUMP SCAV ENG E SCREE N BLO CK AGE DUE TO COKING SUPERSE DE D
39-1 2441 MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 165 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2002- 08-08 PA RT A NO. 2 ENGINE - TO PREVENT EL ECTRICA L A RCING BE TWEE N THE INTEG RA TE D DRIVE GE NE RATOR (IDG) CABL E A ND MANDA TO RY
THE ENGINE CO WL ING, WHICH CO UL D RESULT IN IN- FLIGHT FIRE AND/O R LO SS OF EL ECTRICAL PO WER
39-1 2716 MOS
07-MAY -2002 HRS /MSC -
ENC
FAA 2002- 08-08 PA RT B NO. 2 ENGINE - TO PREVENT EL ECTRICA L A RCING BE TWEE N THE INTEG RA TE D DRIVE GE NE RATOR (IDG) CABL E A ND MANDA TO RY
THE ENGINE CO WL ING, WHICH CO UL D RESULT IN IN- FLIGHT FIRE AND/O R LO SS OF EL ECTRICAL PO WER
MOS
07-MAY -2002 HRS /MSC -
ENC

FAA 2003- 05-10 PA RA (A) & NO. 2 ENGINE - TO PREVENT B- SUMP SCAV ENG E SCREE N BLO CK AGE DUE TO COKING (REPEA T INSP ECTION)
(B)
39-1 3086 MOS
01-A PR-2003 HRS /MSC -
ENC
FAA 2003- 05-10 PA RA (C) NO. 2 ENGINE - TO PREVENT B- SUMP SCAV ENG E SCREE N BLO CK AGE DUE TO COKING (TERMINATING ACTION)
39-1 3086 MOS
HRS /MSC -
ENC

FAA 2003- 05-10 R01 PARA NO. 2 ENGINE - PERFORM VISUAL INS PECTION AND CLEANING (REP EAT INSPECTIO N) NOT A PPLICA BLE
(A) & (B)
39-1 3337 MOS 01-A PR-2011
18-NOV -2003 HRS /MSC - 0
ENC 0

FAA 2003- 05-10 R01 PARA NO. 2 ENGINE - TO PREVENT B- SUMP SCAV ENG E SCREE N BLO CK AGE DUE TO COKING (TERMINATING ACTIO N) MANDA TO RY NOT A PPLICA BLE
(C)
39-1 3337 MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2004- 26-02 NO. 2 ENGINE - REWORK FROM SERVICE HPC FWD S POOLS P /N 6 078T56P 04 NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2006- 04-12 NO. 2 ENGINE - VISUALLY INSPECT AND EDDY CURRENT INSPECT/ REPLACE STAGE 5 LPT AND/OR 6 L PT DIS KS COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2006- 05-04 NO. 2 ENGINE - FAN DISK SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2006- 05-04 PA RT A NO. 2 ENGINE - REMOVE FAN DISK SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 166 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2006- 05-04 PA RT B NO. 2 ENGINE - INS PECT FAN DISK SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2007- 04-51 NO. 2 ENGINE - INS PECTION OF FAN DISK - VIS UA L & TACTILE INS PECTION OF THE B ORE ARE A ON THE 3 1 FAN DISKS SUPERSE DE D
LISTED IN TABL E 1 OF AD - PER GE SB-72 -A021 3
MOS
HRS /MSC N/A
ENC
FAA 2007- 05-16 NO. 2 ENGINE - INS PECTION OF THE FAN DISK (THIS AD HA S B EEN S UP ERCEDED BY AD 2 009-26 -09) MANDA TO RY NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2007- 07-07 NO. 2 ENGINE - FAN DISKS SUPERSE DE D
MOS
HRS /MSC -
ENC
FAA 2007- 07-07 PA RA (F) NO. 2 ENGINE - REMOVE FAN DISKS SUPERSE DE D
MOS
HRS /MSC -
ENC
FAA 2007- 07-07 PA RA (I) NO. 2 ENGINE - INS PECT FAN DISKS SUPERSE DE D
MOS
HRS /MSC -
ENC
FAA 2007- 07-07 R01 NO. 2 ENGINE - PREVE NT AN UNCO NTAINED FAN DISK FAIL URE AND AIRPLANE DAMAGE (THIS A D HAS BEEN SUPERSE DE D NOT A PPLICA BLE
SUPERSE DE D BY AD 2 009-2 6-09)
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2007- 07-07 R01 PARA NO. 2 ENGINE - REMOVE PREVE NT AN UNCO NTAINED FAN DISK FAIL URE AND AIRPLANE DAMAGE (THIS A D HAS SUPERSE DE D NOT A PPLICA BLE
(F) BEE N SUPERSE DE D BY AD 2 009-2 6-09)
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2007- 07-07 R01 PARA (I) NO. 2 ENGINE - INS PECT PREVE NT AN UNCO NTAINED FAN DISK FAIL URE AND AIRPLANE DAMAGE (THIS A D HAS SUPERSE DE D NOT A PPLICA BLE
BEE N SUPERSE DE D BY AD 2 009-2 6-09)
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 07-12 NO. 2 ENGINE - REMOVE THE 4- STEP SEALS , P/N 492 3T5 4G01, 6019T90G 03, 60 37T99G0 1, 6037 T9 9G02, 6037T99G 03 MANDA TO RY COMPLIED WITH - A T MANUFACTURE
AND INCO RP ORATE A N 8-STEP SE AL
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 167 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2009- 24-11 NO. 2 ENGINE - FAN BL ADE (THIS AD HA S B EEN S UP ERS EDED BY AD 2010 -01-04 ) SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

FAA 2009- 24-11 PA RA NO. 2 ENGINE - ACCOMPLISH FAN BLADE (THIS A D HAS BEEN SUPERSEDED BY AD 201 0-01-0 4) REP LACE SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
(L)( 1,2)
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 24-11 PA RA (L)( 12) NO. 2 ENGINE - ACCOMPLISH FAN BLADE (THIS A D HAS BEEN SUPERSEDED BY AD 201 0-01-0 4) INSPE CTION OF THE SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
AFT ACTUATOR HEAD HO SE FITTING
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

FAA 2009- 24-11 PA RA NO. 2 ENGINE - ACCOMPLISH FAN BLADE (THIS A D HAS BEEN SUPERSEDED BY AD 201 0-01-0 4) EDDY CURRENT SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
(L)( 3,4,6) INS PECTION
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 24-11 PA RA (L)( 5) NO. 2 ENGINE - ACCOMPLISH FAN BLADE (THIS A D HAS BEEN SUPERSEDED BY AD 201 0-01-0 4) IF Y OU FIND A CRACK SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
IN THE RETAINING PIN HO LES OF THE FA N BLA DE , REMO VE THE BLA DE FROM S ERV ICE.
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

FAA 2009- 24-11 PA RA NO. 2 ENGINE - ACCOMPLISH FAN BLADE (THIS A D HAS BEEN SUPERSEDED BY AD 201 0-01-0 4) VIS UA L INSPECTIO N SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
(L)( 8)(10) OF THE FA N BLA DE AB RA DA BLE RUB STRIP FOR WE AR (INITIA L / RE PEAT)
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 24-11 PA RA (L)( 9) NO. 2 ENGINE - ACCOMPLISH FAN BLADE (THIS A D HAS BEEN SUPERSEDED BY AD 201 0-01-0 4) FOR ENGINE S WITH SUPERSE DE D NOT A PPLICA BLE - SUPERSEDED
FAN BL ADES, P/N 6 018T30P1 4, INS TAL LED, IF YOU HA VE PERFORME D AN E CI OF THE FAN BLADE, Y OU DON'T NEED
TO INSPE CT THE FAN BLA DE AB RA DA BLE RUB STRIP FOR WE AR.
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

FAA 2009- 26-09 NO. 2 ENGINE - FAN DISK MANDA TO RY NOT A PPLICA BLE
39-1 6144 MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 26-09 PA RA (F)(G) NO. 2 ENGINE - ACCOMPLISH FAN DISK REMOVE FAN DISKS FROM SERVICE MANDA TO RY NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 26-09 PA RA (K) NO. 2 ENGINE - ACCOMPLISH FAN DISK INSP ECTIONS OF TIER 1 MANDA TO RY NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 168 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2009- 26-09 PA RA (L) NO. 2 ENGINE - ACCOMPLISH FAN DISK INSPE CTIONS O F TIER 2 MANDA TO RY NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 26-09 PA RA (M) NO. 2 ENGINE - ACCOMPLISH FAN DISK INSP ECTIONS OF TIER 3 MANDA TO RY NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2009- 26-09 PA RA (O) NO. 2 ENGINE - ACCOMPLISH FAN DISK REMOVE FRO M SERVICE, TIE R 1 AND TIE R 2 FA N DIS KS MANDA TO RY NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2010- 01-04 NO. 2 ENGINE - ENGINE - FAN B LADES - INSPECTIO NS MANDA TO RY COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
FAA 2010- 01-04 PA RA (L)( 1) NO. 2 ENGINE - REMOVE ENGINE - FAN B LADES - INSPECTIONS L ISTED FAN BLADES , P/N 601 8T3 0P14 FRO M SE RVICE MANDA TO RY COMPLIED WITH - A T MANUFACTURE
MOS
HRS /MSC -
ENC
FAA 2010- 01-04 PA RA (L)( 12) NO. 2 ENGINE - INS PECTION ENGINE - FA N BLA DE S - INS PECTIONS OF THE AFT ACTUA TOR HEAD HOS E FITTING MANDA TO RY COMPLIED WITH - A T MANUFACTURE
MOS
HRS /MSC -
ENC
FAA 2010- 01-04 PA RA (L)( 2) NO. 2 ENGINE - REMOVE ENGINE - FAN B LADES - INSPECTIONS L ISTED FAN BLADES , P/N 492 3T5 6G08, FROM SERVICE MANDA TO RY COMPLIED WITH - A T MANUFACTURE
MOS
HRS /MSC -
ENC
FAA 2010- 01-04 PA RA NO. 2 ENGINE - EDDY CURRE NT INSP ECTION E NG INE - FAN BLADES - INSP ECTIONS OF THE FAN BLADES MANDA TO RY COMPLIED WITH - A T MANUFACTURE
(L)( 3)(4)(6 )
MOS
HRS /MSC -
ENC
FAA 2010- 01-04 PA RA NO. 2 ENGINE - ACCOMPLISH E NG INE - FAN BLADES - INSP ECTIONS IF Y OU FIND A CRACK IN THE RETAINING PIN MANDA TO RY COMPLIED WITH - A T MANUFACTURE
(L)( 5)(7) HOLES OF THE FAN BL ADE, REMOVE THE B LADE FROM SERVICE .
MOS
HRS /MSC -
ENC
FAA 2010- 01-04 PA RA NO. 2 ENGINE - VISUAL INSP ECTION E NG INE - FAN BLADES - INSP ECTIONS OF THE FAN BLADE ABRADAB LE RUB MANDA TO RY COMPLIED WITH - A T MANUFACTURE
(L)( 8)(10) STRIP FOR WEA R
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 169 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

FAA 2010- 01-04 PA RA (L)( 9) NO. 2 ENGINE - ACCOMPLISH E NG INE - FAN BLADES - INSP ECTIONS FO R ENGINE S WITH FAN BL ADE S, P/N MANDA TO RY COMPLIED WITH - A T MANUFACTURE
601 8T3 0P14, INSTALLE D, IF Y OU HAVE P ERFORMED AN ECI OF THE AN BLADE, Y OU DON'T NEED TO INS PECT THE
FAN BL ADE A BRADABLE RUB S TRIP FOR WE AR.
MOS
HRS /MSC -
ENC
FAA 2020- 08-01 NO. 2 ENGINE - ENGINE - AFFECTE D FAN BL ADE - REMOVE / REPL ACE MANDA TO RY NOT A PPLICA BLE - DUE TO S ERIAL NUMB ERS
OF THE FA N BLA DE S
DAYS 24-JUN-2020
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 170 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ENGINE NO. 1 - SB - 950967/6089T11G01


ASB 72-A0 088 NO. 1 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK FIEL D MANAGE ME NT PLAN, AL ERT SERVICE
BULLE TIN
MOS
HRS /MSC A/R
ENC
ASB 72-A0 076 PART 1 NO. 1 ENGINE - ENGINE - VISUAL INSP ECTION O F THE TOTAL TEMPERATURE AND P RE SSURE BO SS CAP., ALERT CATEGORY 1 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 076 PART 2 NO. 1 ENGINE - ENGINE - TORQUE INSPE CTION OF THE TOTAL TE MP ERATURE AND PRESS URE BOS S CAP ., A LERT CATEGORY 1 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 088 R0 1 NO. 1 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK FIEL D MANAGEMENT P LAN, ALE RT SERVICE
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 088 R0 2 NO. 1 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK FIEL D MANAGEMENT P LAN, ALE RT SERVICE
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 088 R0 3 NO. 1 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK FIEL D MANAGEMENT P LAN, ALE RT SERVICE CATEGORY 1
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 088 R0 4 NO. 1 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK FIEL D MANAGEMENT P LAN, ALE RT SERVICE CATEGORY 9 NOT A PPLICA BLE - SUPERSEDED
BULLE TIN
MOS 01-A PR-2011
13-MAR-2 007 HRS /MSC - 0
ENC 0
ASB 72-A0 097 NO. 1 ENGINE - ONE-TIME INSPECTIO N OF HPT BORESCOP E P LUG S, AL ERT SERVICE B UL LETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
16-JUL-20 01 HRS /MSC - 0
ENC 0
ASB 72-A0 136 NO. 1 ENGINE - AG B A SSEMBLY (72-62 -00) - REL OCATION OF AX IS K LANYA RD AND PLUG ASS EMBLY FO R HIG HE R CATEGORY 2 NOT A PPLICA BLE - SUPERSEDED BY RE V.1
VISIBIL ITY FO R CF3 4-3A1 /-3B TURB OFAN ENGINES, A LERT SERVICE BULLETIN
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 171 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 72-A0 136 R0 1 NO. 1 ENGINE - AG B A SSEMBLY (72-62 -00) - REL OCATION OF AX IS K LANYA RD AND PLUG ASS EMBLY FO R HIG HE R CATEGORY 2
VISIBIL ITY FO R CF3 4-3A1 /-3B TURB OFAN ENGINES, A LERT SERVICE BULLETIN
MOS
10-FEB -2004 HRS /MSC -
ENC
ASB 72-A0 136 R0 2 NO. 1 ENGINE - AG B A SSEMBLY (72-62 -00) - REL OCATION OF AX IS K LANYA RD AND PLUG ASS EMBLY FO R HIG HE R CATEGORY 2
VISIBIL ITY FO R CF3 4-3A1 /-3B TURB OFAN ENGINES, A LERT SERVICE BULLETIN
MOS
10-FEB -2004 HRS /MSC -
ENC
ASB 72-A0 136 R0 3 NO. 1 ENGINE - RELOCATION O F AXIS K L ANYARD AND P LUG A SSEMBL Y FOR HIGHER V IS IBILITY FOR CF34-3 A1/-3B CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
TURBO FA N ENGINE S - EFF SN 872001 THRU 8738 78, 873 880 & 87388 1, ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 136 R0 4 NO. 1 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - RELOCATION O F AXIS K LANYARD AND P LUG A SSEMBL Y FOR HIGHER CATEGORY 2 COMPLIED WITH - REV 3 ALREA DY
VISIBIL ITY FO R CF3 4-3A1 /-3B TURB OFAN ENGINES, A LERT SERVICE BULLETIN ACCOMPLISHED AP R 01 201 1. NO FURTHER
ACTIO N REQUIRED.
MOS 18-A PR-2015
07-JAN-20 15 HRS /MSC -
ENC
ASB 72-A0 136 R0 5 NO. 1 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - RELOCATION O F AXIS K LANYARD AND P LUG A SSEMBL Y FOR HIGHER CATEGORY 2 NOT A PPLICA BLE - BY ENGINES S/N
VISIBIL ITY FO R CF3 4-3A1 /-3B TURB OFAN ENGINES, A LERT SERVICE BULLETIN
MOS 27-JUL-20 15
29-MAY -2015 HRS /MSC -
ENC
ASB 72-A0 140 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - COMPRESS OR ROTOR S POOL STAG ES 3 THRU 8, FIELD CATEGORY 1
MANAGEMENT P LAN, ALE RT SERVICE BULL ETIN
MOS
HRS /MSC -
ENC
ASB 72-A0 140 R0 1 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - COMPRESS OR ROTOR S POOL STAG ES 3 THRU 8, FIELD CATEGORY 1 COMPLIED WITH - A T MANUFACTURE
MANAGEMENT P LAN, ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 148 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE (LP T) ROTOR (72 -53-00 ) - REPLA CE ME NT OR INSP ECTION O F CATEGORY 3
STAGE S 5 AND 6 LP T ROTOR DISKS, A ND INSP ECTION O F STAGE S 3 AND 4 LPT DISK ARMS FOR ARC OUT, ALE RT
SERVICE BULLETIN
MOS
02-S EP-20 04 HRS /MSC -
ENC

ASB 72-A0 148 R0 1 NO. 1 ENGINE - LOW PRESSURE TURBINE (L PT) ROTOR - REPL ACEMENT OR INSPECTIO N OF STA GES 5 AND 6 LPT CATEGORY 5
ROTOR DISKS, AND INSPECTIO N OF STA GES 3 AND 4 LPT DISK ARMS FOR ARC OUT, ALE RT SERVICE BULLE TIN
MOS
10-MAR-2 005 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 172 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 72-A0 148 R0 2 NO. 1 ENGINE - REPLA CE ME NT OR INSPECTION OF S TAG ES 5 AND 6 LPT ROTOR DISKS , AND INS PECTION OF STAG ES CATEGORY 5
3 AND 4 LPT DISK ARMS FOR ARC OUT, ALE RT SERVICE BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 148 R0 3 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE ( LPT) ROTOR (72-53 -00) - REP LACEMENT OR INSPE CTION OF CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
STAGE S 5 AND 6 LP T ROTOR DISKS, A ND INSP ECTION O F STAGE S 3 AND 4 LP T DISK A RMS FOR ARC O UT, A LERT
SERVICE BULLETIN
DAYS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 152 NO. 1 ENGINE - REMOVAL PL AN TO RE PLACE OR INSPECT LPT DISKS FOR ARC-OUT INDICATIONS, ALERT SE RV ICE CATEGORY 1
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 152 R0 1 NO. 1 ENGINE - REMOVAL PL AN TO RE PLACE OR INSPECT LPT DISKS FOR ARC-OUT INDICATIONS, ALERT SE RV ICE CATEGORY 1
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 152 R0 2 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE ROTOR (72-53 -00) - REMO VAL PLAN TO REPL ACE O R INS PECT LPT CATEGORY 1 COMPLIED WITH - A T MANUFACTURE
DIS KS FO R ARC-OUT INDICA TIONS, A LERT SERVICE BUL LETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 200 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE ( 72-53-0 0) - INSPECTIO N OF L PT MODULES, A LERT SE RV ICE CATEGORY 2
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 200 R0 1 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE ( 72-53-0 0) - INSPECTIO N OF L PT MODULES, A LERT SE RV ICE CATEGORY 2
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 200 R0 2 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE ( 72-53-0 0) - INSPECTIO N OF L PT MODULES, A LERT SE RV ICE CATEGORY 2
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 200 R0 3 NO. 1 ENGINE - LOW PRESSURE TURBINE (7 2-52-0 0) - INSPECTION OF L PT MODULES, A LERT SERVICE BULLETIN CATEGORY 2
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 173 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 72-A0 200 R0 4 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE ( 72-52-0 0) - INSPECTIO N OF L PT MODULES, A LERT SE RV ICE CATEGORY 2
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 200 R0 5 NO. 1 ENGINE - LOW PRESSURE TURBINE (7 2-52-0 0) - INSPECTION OF L PT MODULES, A LERT SERVICE BULLETIN CATEGORY 2 NOT A PPLICA BLE - N/A BY ENGINE STAG E 3
SHROUD P/N (50 99T3240)
MOS 31-MAY -2016
03-MAY -2016 HRS /MSC -
ENC
ASB 72-A0 212 NO. 1 ENGINE - SHOP LEV EL INSPE CTION FOR FA N DISK ARC-OUT, ALE RT SERVICE BULLE TIN CATEGORY 1 COMPLIED WITH
MOS 01-A PR-2011
HRS /MSC -
ENC
ASB 72-A0 212 R0 1 NO. 1 ENGINE - SHOP LEV EL INSPE CTION FOR FA N DISK ARC-OUT, ALE RT SERVICE BULLE TIN CATEGORY 1 COMPLIED WITH
MOS 01-A PR-2011
HRS /MSC -
ENC
ASB 72-A0 212 R0 2 NO. 1 ENGINE - SHOP LEV EL INSPE CTION FOR FA N DISK ARC-OUT, ALE RT SERVICE BULLE TIN CATEGORY 1 COMPLIED WITH
MOS 01-A PR-2011
HRS /MSC -
ENC
ASB 72-A0 212 R0 3 NO. 1 ENGINE - SHOP LEV EL INSPE CTION FOR FA N DISK ARC-OUT INDICATIONS, ALERT S ERV ICE BULLETIN CATEGORY 1 COMPLIED WITH
MOS 01-A PR-2011
HRS /MSC -
ENC
ASB 72-A0 212 R0 4 NO. 1 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - S HO P L EVEL INS PECTION FO R FAN DISK ARC-O UT CATEGORY 1 NOT A PPLICA BLE
INDICA TIONS, A LERT SERVICE BUL LETIN
DAYS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 212 R0 5 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - S HO P L EVEL INS PECTION FO R FAN DIS K A RC-O UT INDICATIO NS , CATEGORY 1 NOT A PPLICA BLE - AS DISK SERIAL NO IS NOT
ALE RT SERVICE BULL ETIN MENTIONED IN TAB LE 1 O R TABLE 2. INSTALLE D
UNIT O N A/C = P/N (FAN DISK) - 6078 T57 G05,
DIS K S /N FOR ENG 1 = G EE1G G8J, DISK S/N FOR
ENG 2 = GEE1 GGK4.
MOS 27-JUL-20 15
HRS /MSC -
ENC
ASB 72-A0 212 R0 6 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - S HO P L EVEL INS PECTION FO R FAN DIS K A RC-O UT INDICATIO NS , CATEGORY 1 NOT A PPLICA BLE - NA BY DISK PN, CL OSED
ALE RT SERVICE BULL ETIN
MOS 21-MAY -2017
13-MAR-2 017 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 174 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 72-A0 213 NO. 1 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK BORE TACTILE AND VISUAL INS PECTION, CATEGORY 1
ALE RT SERVICE BULL ETIN
MOS
HRS /MSC -
ENC
ASB 72-A0 213 R0 1 NO. 1 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK BORE TACTILE AND VISUAL INS PECTION, CATEGORY 1 NOT A PPLICA BLE
ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 234 NO. 1 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - S HO P L EVEL EDDY CURRENT AND REDUNDANT TACTILE CATEGORY 3 NOT A PPLICA BLE
ENHANCE D VISUAL INSP ECTION FOR FA N DISK ARC-OUT INDICATIO NS, ALERT S ERVICE BULLETIN
MOS 01-A PR-2011
27-O CT-20 08 HRS /MSC - 0
ENC 0
ASB 72-A0 234 R0 1 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - S HO P L EVEL EDDY CURRE NT AND REDUNDANT TACTILE CATEGORY 3 NOT A PPLICA BLE - NA TO BY FA N DIS K P N
ENHANCE D VISUAL INSP ECTION FOR FA N DISK ARC-OUT INDICATIO NS, ALERT S ERVICE BULLETIN CLOSE D
MOS 21-MAY -2017
22-MAR-2 017 HRS /MSC -
ENC
ASB 72-A0 235 NO. 1 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - O N WING REPETITIVE EDDY CURRE NT INSPE CTION FOR CATEGORY 2 NOT A PPLICA BLE
FAN DISK ARC-O UT INDICATIONS, ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 235 R0 1 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - O N WING REPETITIVE EDDY CURRE NT INSPE CTION FOR FAN DISK CATEGORY 2 NOT A PPLICA BLE - AS DISK S/N IS NO T
ARC-OUT INDICATIONS, A LERT SE RVICE BULLETIN MENTIONED IN TAB LE 1. INS TAL LED UNIT ON
A/C, FA N DIS K P /N: 607 8T57G05 , DISK S/N FOR
ENG 1: GE E1GG 8J, DISK S/N FOR E NG 2:
GEE 1GGK 4.
MOS 27-JUL-20 15
HRS /MSC -
ENC
ASB 72-A0 235 R0 2 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - O N WING REPETITIVE EDDY CURRE NT INSPE CTION FOR FAN DISK CATEGORY 2 NOT A PPLICA BLE - NA BY ENGINE MS N CLOSE D
ARC-OUT INDICATIONS, A LERT SE RVICE BULLETIN
MOS 21-MAY -2017
22-MAR-2 017 HRS /MSC -
ENC
ASB 72-A0 245 NO. 1 ENGINE - ENGINE - HIG H PRESS URE TURBINE ROTOR (72-4 6-00) - RE MO VAL O F STAGE 1 HPTR REAR COO LING CATEGORY 3 NOT A PPLICA BLE
PLA TE , ALERT S ERVICE BULLE TIN
MOS 01-A PR-2011
13-A UG -2009 HRS /MSC - 0
ENC 0
ASB 72-A0 285 NO. 1 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - IDENTIFICA TION A ND RE PLACEMENT O F SUSPECT CATEGORY 1 NOT A PPLICA BLE - BY A/C S/N
AGB , ALE RT SERVICE BULLE TIN
MOS 30-O CT-20 14
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 175 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 72-A0 285 R0 1 NO. 1 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - IDENTIFICA TION A ND RE PLACEMENT O F SUSPECT CATEGORY 1 NOT A PPLICA BLE - ASB 72-A 0285 R1 N/A BY
AGB , ALE RT SERVICE BULLE TIN INS TAL LED A GB AND SB 72- 0085 IS PO ST SB
MOS 18-A PR-2015
08-JAN-20 15 HRS /MSC -
ENC
ASB 72-A0 286 NO. 1 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INS PECTION OF AG B ASSEMBL IES P/N 6 014T81G2 6, P/N 60 14T81G27 , AND CATEGORY 2 NOT A PPLICA BLE - SB:72-00 85 HAS BE EN
P/N 60 14T81G28 , ALERT S ERVICE BULLE TIN COMPLIED IN PRODUCTION
MOS 30-O CT-20 14
HRS /MSC -
ENC
ASB 72-A0 286 R0 1 NO. 1 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INS PECTION OF AG B ASSEMBL IES P/N 6 014T81G2 6, P/N 60 14T81G27 , AND CATEGORY 2 NOT A PPLICA BLE - N/A TO THIS A/C B Y
P/N 60 14T81G28 , ALERT S ERVICE BULLE TIN INS TAL LED A GB AND SB 72- 0085 IS PO ST SB
FOR E NG INES.
MOS 18-A PR-2015
HRS /MSC -
ENC
ASB 72-A0 286 R0 2 NO. 1 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INS PECTION OF AG B ASSEMBL IES P/N 6 014T81G2 6, P/N 60 14T81G27 , AND CATEGORY 2 NOT A PPLICA BLE - THIS S B IS N/A TO E6-EL D BY
P/N 60 14T81G28 , ALERT S ERVICE BULLE TIN INS TAL LED A GB PN & SN
MOS 18-A PR-2015
HRS /MSC -
ENC
ASB 73-A0 032 R0 2 NO. 1 ENGINE - FUE L S YSTEM - REWORK OF MAIN FUEL CO NTROL TO A DD FO WA RD FL ANGE VENT GROO VES.,
ALE RT SERVICE BULL ETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 033 NO. 1 ENGINE - FUE L S YSTEM - REWORK OF MAIN FUEL CO NTROL FOR OV ERSPEED PROTECTION, AL ERT SERVICE
BULLE TIN
MOS
21-NOV -1997 HRS /MSC -
ENC
ASB 73-A0 033 R0 1 NO. 1 ENGINE - FUE L S YSTEM - REWORK OF MAIN FUEL CO NTROL FOR OV ERSPEED PROTECTION, AL ERT SERVICE
BULLE TIN
MOS
29-MAY -1998 HRS /MSC -
ENC
ASB 73-A0 033 R0 3 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REWORK OF MAIN FUEL CO NTROL FOR
OVE RS PEED PROTECTION, ALE RT SERVICE BULL ETIN
MOS
09-S EP-19 99 HRS /MSC -
ENC
ASB 73-A0 033 R0 4 NO. 1 ENGINE - FUE L S YSTEM- REWO RK OF MA IN FUEL CONTROL FOR OVERSPE ED PROTECTIO N., AL ERT SERVICE
BULLE TIN
MOS
01-NOV -1999 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 176 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 73-A0 033 R0 5 NO. 1 ENGINE - REWORK OF MAIN FUEL CO NTROL FOR OVERSPE ED PROTECTIO N, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 033 R0 6 NO. 1 ENGINE - REWORK OF MAIN FUEL CO NTROL FO R OVE RS PEED PROTECTION - EFF SN 8 72001 THRU 87227 8 & CATEGORY 3
872 280, A LERT SERVICE BUL LETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 033 R0 7 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REWORK OF MAIN FUEL CO NTROL FOR CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
OVE RS PEED PROTECTION, ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
06-MAY -2009 HRS /MSC - 0
ENC 0
ASB 73-A0 037 NO. 1 ENGINE - FUE L S YSTEM - REPLA CE ME NT OF SE LECTED CF34 FUEL CONTROL S., ALERT SE RV ICE BULLETIN CATEGORY 1 NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 73-A0 039 NO. 1 ENGINE - FUE L S YSTEM - INS PECTION AND REPLA CE ME NT OF MAIN FUEL FILTER PN 4106 T62 P01, A LERT CATEGORY 2 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
26-MAR-1 999 HRS /MSC - 0
ENC 0
ASB 73-A0 040 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF B UNA-N MATE RIAL CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
PREFORMED PA CK ING., ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
07-JUL-19 99 HRS /MSC - 0
ENC 0
ASB 73-A0 050 NO. 1 ENGINE - INS PECTION OF MAIN FUEL CO NTROL INPUT DRIV E S HA FT SPLINE, MAIN FUE L P UMP CONTROL CATEGORY 2
DRIVE SHAFT S PLINE, AND MAIN FUE L P UMP SECONDARY DRIVE SHAFT SPLINE, AL ERT SERVICE B UL LETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 050 R0 1 NO. 1 ENGINE - INS PECTION OF MAIN FUEL CO NTROL INPUT DRIV E S HA FT SPLINE, MAIN FUE L P UMP CONTROL CATEGORY 2
DRIVE SHAFT S PLINE AND MAIN FUEL PUMP SE CO NDARY DRIVE SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 050 R0 2 NO. 1 ENGINE - INS PECTION OF MAIN FUEL CO NTROL INPUT DRIV E S HA FT SPLINE, MAIN FUE L P UMP CONTROL CATEGORY 2
DRIVE SHAFT S PLINE AND MAIN FUEL PUMP SE CO NDARY DRIVE SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 050 R0 3 NO. 1 ENGINE - INS PECTION OF MAIN FUEL CO NTROL INPUT DRIV E S HA FT SPLINE, MAIN FUE L P UMP CONTROL CATEGORY 2
DRIVE SHAFT S PLINE, AND MAIN FUE L P UMP SECONDARY DRIVE SHAFT SPLINE, AL ERT SERVICE B UL LETIN
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 177 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 73-A0 050 R0 4 NO. 1 ENGINE - INS PECTION OF MAIN FUEL CO NTROL INPUT DRIV E S HA FT SPLINE, MAIN FUE L P UMP CONTROL CATEGORY 2
DRIVE SHAFT S PLINE, AND MAIN FUE L P UMP SECONDARY DRIVE SHAFT SPLINE, AL ERT SERVICE B UL LETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 050 R0 5 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INSPECTIO N OF MAIN FUEL CONTROL INP UT
DRIVE SHAFT S PLINE, MA IN FUEL PUMP CO NTROL DRIVE SHAFT SPL INE, A ND MA IN FUEL PUMP SECONDARY DRIV E
SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 050 R0 6 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INSPECTIO N OF MAIN FUEL CONTROL INP UT CATEGORY 2
DRIVE SHAFT S PLINE, MA IN FUEL PUMP CO NTROL DRIVE SHAFT SPL INE, A ND MA IN FUEL PUMP SECONDARY DRIV E
SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC

ASB 73-A0 050 R0 7 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INSPECTIO N OF MAIN FUEL CONTROL INP UT CATEGORY 2
DRIVE SHAFT S PLINE, MA IN FUEL PUMP CO NTROL DRIVE SHAFT SPL INE, A ND MA IN FUEL PUMP SECONDARY DRIV E
SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC - 0
ENC

ASB 73-A0 050 R0 8 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INSPECTIO N OF MAIN FUEL CONTROL INP UT
DRIVE SHAFT S PLINE, MA IN FUEL PUMP CO NTROL DRIVE SHAFT SPL INE, A ND MA IN FUEL PUMP SECONDARY DRIV E
SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC

ASB 73-A0 050 R0 9 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INSPECTIO N OF MAIN FUEL CONTROL INP UT - TO BE COMPLIED BE FO RE 10 000 HRS
DRIVE SHAFT S PLINE, MA IN FUEL PUMP CO NTROL DRIVE SHAFT SPL INE, A ND MA IN FUEL PUMP SECONDARY DRIV E
SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC - 100 00 M
ENC

ASB 73-A0 050 R1 0 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INSPECTIO N OF MAIN FUEL CONTROL INP UT CATEGORY 2 - A PPLICA BLE
DRIVE SHAFT S PLINE, MA IN FUEL PUMP CO NTROL DRIVE SHAFT SPL INE, A ND MA IN FUEL PUMP SECONDARY DRIV E
SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS (EFF) RECURRING
05-A UG -2016 HRS /MSC 100 00 100 00 M
ENC
ASB 73-A0 068 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - GE NERAL (7 3-00-00 ) - SUSPE NS IO N OF THE US E O F KATHON FP 1.5 CATEGORY 2
BIOCIDE TRE ATME NT, AL ERT SERVICE B UL LETIN
MOS
16-MAR-2 020 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 178 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 79-A0 015 NO. 1 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - FEILD MANAG EMENT PROGRAM TO PREV ENT
B-S UMP OIL REL EASE EV ENTS., AL ERT SERVICE B UL LETIN
MOS
HRS /MSC -
ENC
ASB 79-A0 015 R0 1 NO. 1 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - FIELD MANAG EMENT PROGRAM TO PREV ENT
B-S UMP OIL REL EASE EV ENTS, ALERT S ERVICE BULLETIN
MOS
HRS /MSC -
ENC
ASB 79-A0 015 R0 2 NO. 1 ENGINE - FIE LD MANAGEMENT PRO GRAM TO PREVENT B-SUMP O IL RELEA SE EVENTS, AL ERT SERVICE CATEGORY 1
BULLE TIN
MOS
12-JUL-20 02 HRS /MSC -
ENC
ASB 79-A0 015 R0 3 NO. 1 ENGINE - OIL-LUBE AND S CA VENGE COMPONENTS (7 9-00-0 0) - FIE LD MANAGE ME NT PROGRAM TO PREVE NT CATEGORY 1 NOT A PPLICA BLE
B-S UMP OIL REL EASE EV ENTS., AL ERT SERVICE B UL LETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 79-A0 015 R0 4 NO. 1 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - FIELD MANAG EMENT PROGRAM TO PREV ENT CATEGORY 1 COMPLIED WITH - S B 7 9-A00 17 HA S B EEN C/W
B-S UMP OIL REL EASE EV ENTS, ALERT S ERVICE BULLETIN ON 01-AP R-1 1 INTE NT OF THIS SB HAS BEEN
ACCOMPLISHED.
MOS 18-A PR-2015
HRS /MSC -
ENC
ASB 79-A0 015 R0 5 NO. 1 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - FIELD MANAG EMENT P RO GRAM TO PREVENT CATEGORY 1 COMPLIED WITH - A PPLICABLE FOR A 6-ELD BY
B-S UMP OIL REL EASE EV ENTS, ALERT S ERVICE BULLETIN ENGINE MODEL . RE FE RE NCE SB 79-A 0017 HAS
BEE N ALREA DY COMPLIED WITH. NO FURTHER
ACTIO N REQUIRED
MOS 27-JUL-20 15
HRS /MSC -
ENC
ASB 79-A0 017 NO. 1 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - B -SUMP SCAV ENGE SCRE ENLESS FITTINGS -
FIE LD REWORK PROGRAM A LERT, ALERT S ERVICE BULLETIN
MOS
HRS /MSC -
ENC
ASB 79-A0 017 R0 1 NO. 1 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - B -SUMP SCAV ENGE SCRE ENLESSFITTING S - CATEGORY 1
FIE LD REWORK PROGRAM, ALE RT SERVICE BULL ETIN
MOS
09-O CT-20 02 HRS /MSC -
ENC
ASB 79-A0 017 R0 2 NO. 1 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - B -SUMP SCAV ENGE SCRE ENLESS FITTINGS - CATEGORY 1 COMPLIED WITH - A T MANUFACTURE
FIE LD REWORK PROGRAM, ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
06-MAY -2009 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 179 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 79-A0 017 R0 3 NO. 1 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - B -SUMP SCAV ENGE SCRE ENLESS FITTINGS - CATEGORY 1
FIE LD REWORK PROGRAM, ALE RT SERVICE BULL ETIN
MOS (EFF)
27-A PR-2015 HRS /MSC -
ENC
SB 71-0 000 NO. 1 ENGINE - PO WE R PLANT - GE NE RA L ( 71-00-0 0) - CONSOL IDATED O N- WING INSPE CTION RECOMMENDA TIONS CATEGORY 9
AND S ERV ICING TASK S L IST, S ERV ICE BULLETIN
MOS
14-JAN-20 20 HRS /MSC -
ENC
SB 71-0 000 R01 NO. 1 ENGINE - PO WE R PLANT - GE NE RA L ( 71-00-0 0) - CONSOL IDATED O N- WING INSPE CTION RECOMMENDA TIONS CATEGORY 9 - A /C IS UNDER PPI. SB 71-0 000 R1 WILL BE
AND S ERV ICING TASK S L IST, S ERV ICE BULLETIN EVA LUATED BY NEW O WNER CAMO
ACCORDING TO ENVIRONME NTAL CONDITIO N.
MOS (EFF)
28-JUN-2021 HRS /MSC -
ENC
AFL
SB 72-0 000 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - RECOMMENDED ENGINE MAINTENANCE ACTIONS TO B E TAKE N WHEN AN CATEGORY 3
ENGINE IS IN A SERVICE CENTE R, SERVICE BULLE TIN
MOS
09-JAN-20 20 HRS /MSC ESV
ENC
SB 72-0 000 R01 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - RECOMMENDED ENGINE MAINTENANCE ACTIONS TO B E TAKE N WHEN AN CATEGORY 3
ENGINE IS IN A SERVICE CENTE R, SERVICE BULLE TIN
MOS (EFF)
04-DEC-20 20 HRS /MSC ESV
ENC
AFL
SB 72-0 014 R3 NO. 1 ENGINE - ACCESSO RY DRIVE G EARBOX (AG B): REPL ACE ME NT OF AX IS -A DUPLE X B EARING AND AX IS -BB BALL RECOMME NDED NOT A PPLICA BLE - N/A BY ENGINE MODEL. NO
BEA RING, SE RV ICE BULLETIN FURTHER ACTIO N REQUIRE D.
MOS 10-MAY -2015
HRS /MSC -
ENC
SB 72-0 027 R01 NO. 1 ENGINE - INS PECTION OF LO W- PRESSURE TURBINE (LP T) BORES CO PE PLUGS PN 5 071T39G0 2 A ND CATEGORY 2 NOT A PPLICA BLE
INS TAL LATIO N OF LPT BO RE SCOPE PLUG COVERS PN 3 904T92P 01, SE RVICE BULLETIN
MOS 01-A PR-2011
24-JAN-19 94 HRS /MSC - 0
ENC 0
SB 72-0 028 R1 NO. 1 ENGINE - ACCESSO RY DRIVE G EARBOX (AG B): IMPRO VED AXIS-BB REAR B ALL BEA RING, SERVICE BULLETIN RECOMME NDED NOT A PPLICA BLE - N/A BY ENGINE MODEL. NO
FURTHER ACTIO N REQUIRE D.
MOS 10-MAY -2015
HRS /MSC -
ENC
SB 72-0 030 REV 03 NO. 1 ENGINE - ASB ESTOS ELIMINATION, SERVICE BULL ETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 180 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 035 R01 NO. 1 ENGINE - REAR MA IN MOUNT: REWORK O F ADDITIONAL HO LE FO R FIRE DE TE CTION SY STEM HARNESS, CATEGORY 3 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
27-JAN-20 03 HRS /MSC - 0
ENC 0
SB 72-0 037 REV 01 NO. 1 ENGINE - REWORK BORESCOPE P LUG B OSSES , SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 72-0 040 REV 01 NO. 1 ENGINE - REWORK OF THE COMPRES SOR ROTOR ASSE MB LY, SE RV ICE BULLETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 72-0 041 NO. 1 ENGINE - REPLA CE B- SCO PE PLUG IN HP T CASING , SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 72-0 043 NO. 1 ENGINE - REPLA CE ME NT OF ENGINE IDENT PL ATE , SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 72-0 046 NO. 1 ENGINE - VISUAL AND TORQUE INSPE CT BOSS CAP, SERVICE BULLE TIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 72-0 048 R06 NO. 1 ENGINE - HARDWARE EXP OSED TO A BNO RMAL O PERATING EVENTS, S ERV ICE BULLETIN CATEGORY 9 NOT A PPLICA BLE
MOS 01-A PR-2011
18-MAY -2006 HRS /MSC - 0
ENC 0
SB 72-0 048 R07 NO. 1 ENGINE - HARDWARE EXP OSED TO A BNO RMAL O PERATING EVENTS, S ERV ICE BULLETIN CATEGORY 9
MOS
23-A PR-2012 HRS /MSC -
ENC
SB 72-0 048 R08 NO. 1 ENGINE - ENGINE - GE NE RAL - HARDWARE EXP OSED TO AB NO RMAL OP ERATING EVENTS, SE RV ICE BULLETIN CATEGORY 9
MOS
05-NOV -2013 HRS /MSC -
ENC
SB 72-0 048 R09 NO. 1 ENGINE - GE NERAL - HARDWARE EXP OSED TO AB NO RMAL OP ERATING EVENTS, SE RV ICE BULLETIN CATEGORY 9
MOS
12-S EP-20 17 HRS /MSC -
ENC
SB 72-0 048 R10 NO. 1 ENGINE - GE NERAL - HARDWARE EXP OSED TO AB NO RMAL OP ERATING EVENTS, SE RV ICE BULLETIN CATEGORY 9
MOS
13-JUN-2019 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 181 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 048 R11 NO. 1 ENGINE - GE NERAL - HARDWARE EXP OSED TO AB NO RMAL OP ERATING EVENTS, SE RV ICE BULLETIN CATEGORY 9 COMPLIED WITH - INFO RMATIONAL ONLY:
MOS 23-A UG -2021
18-A UG -2021 HRS /MSC -
ENC
SB 72-0 048 R12 NO. 1 ENGINE - GE NERAL - HARDWARE EXP OSED TO AB NO RMAL OP ERATING EVENTS, SE RV ICE BULLETIN CATEGORY 9
MOS
15-NOV -2021 HRS /MSC -
ENC
SB 72-0 049 REV 01 NO. 1 ENGINE - INTRO KALREZ O-RING, S ERVICE BULLE TIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 72-0 050 R07 NO. 1 ENGINE - INTRODUCTION OF THE IMP RO VED DESIGN HIGH-PRESS URE TURBINE RO TO R ASS EMBLIES PN CATEGORY 2 NOT A PPLICA BLE
507 9T6 1G02/G0 4 A ND ASSO CIATED HARDWARE, SERVICE B UL LETIN
MOS 01-A PR-2011
05-JAN-20 07 HRS /MSC - 0
ENC 0
SB 72-0 051 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - COMPLIANCE A ND INTERCHANGE ABILITY STATEMENTS USED IN CATEGORY 9
CF3 4-BJ S ERVICE BULLE TINS, SERVICE BUL LETIN
MOS
15-JUN-1995 HRS /MSC -
ENC
SB 72-0 051 R01 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - COMPLIANCE A ND INTERCHANGE ABILITY STATEMENTS USED IN CATEGORY 1
CF3 4-BJ S ERVICE BULLETINS, SERVICE BULLE TIN
MOS
11-MAY -2012 HRS /MSC -
ENC
SB 72-0 054 R03 NO. 1 ENGINE - REWORK OF THE HIGH-PRESSURE TURBINE S TATOR BORESCOP E P LUGS TO THRE ADED CATEGORY 3 NOT A PPLICA BLE
CONFIGURATIO N, S ERVICE BULLE TIN
MOS 01-A PR-2011
14-MAR-2 007 HRS /MSC - 0
ENC 0
SB 72-0 055 R01 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D LCF FAN DISKS , SERVICE BULL ETIN CATEGORY 2
MOS
17-JAN-20 03 HRS /MSC -
ENC
SB 72-0 058 NO. 1 ENGINE - ENGINE - COMPRESSO R VA NE- TO -BLADE AXIAL CLEARANCE INCRE ASE, S ERVICE BULLETIN
MOS
08-A PR-1997 HRS /MSC -
ENC
SB 72-0 058 R01 NO. 1 ENGINE - ENGINE - COMPRESSO R VA NE- TO -BLADE AXIAL CLEARANCE INCRE ASE, S ERVICE BULLETIN
MOS
22-NOV -1999 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 182 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 058 R02 NO. 1 ENGINE - ENGINE - COMPRESSO R VA NE- TO -BLADE AXIAL CLEARANCE INCRE ASE, S ERVICE BULLETIN CATEGORY 6
MOS
13-JAN-20 04 HRS /MSC -
ENC
SB 72-0 058 R03 NO. 1 ENGINE - COMPRESSO R VANE- TO- BLADE AXIAL CLEARANCE INCREA SE, S ERVICE BULLETIN CATEGORY 6 NOT A PPLICA BLE
MOS 01-A PR-2011
27-A PR-2006 HRS /MSC - 0
ENC 0
SB 72-0 059 NO. 1 ENGINE - INTRODUCTION OF NE W COMBUSTIO N LINE R WITH IMPROVED WEAR-COATED IGNITER FE RRULE
HARDWARE AND IGNITER WITH WEAR-COATED TIP, S ERVICE BULLE TIN
MOS
12-FEB -1997 HRS /MSC -
ENC
SB 72-0 059 R01 NO. 1 ENGINE - INTRODUCTION OF NE W COMBUSTIO N LINE R WITH IMPROVED WEAR-COATED IG NITER FERRUL E
HARDWARE AND IGNITER WITH WEAR-COATED TIP, S ERVICE BULLE TIN
MOS
30-MAY -1997 HRS /MSC -
ENC
SB 72-0 059 R02 NO. 1 ENGINE - INTRODUCTION OF NE W COMBUSTIO N LINE R WITH IMPROVED WEAR-COATED IGNITER FE RRULE
HARDWARE AND IGNITER WITH WEAR-COATED TIP, S ERVICE BULLE TIN
MOS
19-FEB -1998 HRS /MSC -
ENC
SB 72-0 059 R03 NO. 1 ENGINE - INTRODUCTION OF NE W COMBUSTIO N LINE R WITH IMPROVED WEAR-COATED IGNITER FE RRULE CATEGORY 3
HARDWARE AND IGNITER WITH WEAR-COATED TIP, S ERVICE BULLE TIN
MOS
20-A UG -2008 HRS /MSC -
ENC
SB 72-0 059 R04 NO. 1 ENGINE - ENGINE - COMBUSTIO N LINE R AND S TAG E 1 NOZZLE (72-42 -00) - INTRO DUCTION OF NEW CATEGORY 3
COMBUSTION LINE R WITH IMPROVED WE AR-COATED IGNITER FE RRULE HARDWARE AND IGNITER WITH
WEAR-COATED TIP, SE RV ICE BULLETIN
MOS
14-JAN-20 09 HRS /MSC -
ENC

SB 72-0 059 R05 NO. 1 ENGINE - ENGINE - COMBUSTIO N LINE R AND S TAG E 1 NOZZLE (72-42 -00) - INTRO DUCTION OF NEW CATEGORY 3 NOT A PPLICA BLE
COMBUSTION LINE R WITH IMPROVED WE AR-COATED IGNITER FE RRULE HARDWARE AND IGNITER WITH
WEAR-COATED TIP, SE RV ICE BULLETIN
MOS 01-A PR-2011
18-FEB -2009 HRS /MSC - 0
ENC 0
SB 72-0 060 NO. 1 ENGINE - ENGINE - REWORK OF THE P OWER TAKE OFF (PTO) ASS EMBLIES PN 60 37T72G12 /G1 6/G 17 AND
INTRODUCTION OF PTO A SSEMBL Y P N 6037 T7 2G18, SERVICE BULLE TIN
MOS
16-A PR-1997 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 183 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 060 R01 NO. 1 ENGINE - ENGINE - REWORK OF THE P OWER TAKE OFF (PTO) ASS EMBLIES PN 60 37T72G12 /G1 6/G 17 AND
INTRODUCTION OF PTO A SSEMBL Y P N 6037 T7 2G18, SERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 060 R02 NO. 1 ENGINE - ENGINE - REWORK OF THE P OWER TAKE OFF (PTO) ASS EMBLIES PN 60 37T72G12 /G1 6/G 17 AND CATEGORY 3
INTRODUCTION OF PTO A SSEMBL Y P N 6037 T7 2G18, SERVICE BULLE TIN
MOS
08-JUN-2000 HRS /MSC -
ENC
SB 72-0 060 R03 NO. 1 ENGINE - REWORK OF THE P OWER TAKE OFF (PTO) ASS EMBLIES PN 603 7T72G12 /G1 6/G 17 AND INTRODUCTIO N CATEGORY 3 NOT A PPLICA BLE
OF PTO A SSEMBLY PN 6037 T72 G18, S ERVICE BULLE TIN
MOS 01-A PR-2011
11-MAR-2 003 HRS /MSC - 0
ENC 0
SB 72-0 062 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D HIG H-P RE SSURE TURBINE (HPT) S TA GE 1 B LADES WITH INTERNAL CATEGORY 7 NOT A PPLICA BLE
COATING , SERVICE BULL ETIN
MOS 01-A PR-2011
18-JUN-1997 HRS /MSC - 0
ENC 0
SB 72-0 063 NO. 1 ENGINE - REWORK OF COMPRESS OR FORWARD SHAFT PN 5037T01P 03 TO PN 5037 T01 P04, A ND CATEGORY 3
INTRODUCTION OF NE W COMPRESSO R FORWARD SHAFT PN 5037T01P 04, SE RV ICE BULLETIN
MOS
09-O CT-19 97 HRS /MSC -
ENC
SB 72-0 063 R01 NO. 1 ENGINE - REWORK CO MP RE SSOR FO RWARD S HA FT PN 503 7T01P03 TO P04, & INTRODUCTION O F NEW CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
COMPRESSO R FORWA RD SHAFT PN 5037T01P 04 - EFF S N 872 001 THRU 87 2069, SERVICE BULLE TIN
MOS 01-A PR-2011
17-JAN-20 03 HRS /MSC A/R 0
ENC 0
SB 72-0 064 NO. 1 ENGINE - ELIMINATION OF SPLITLINE PINS FROM COMPRES SOR INNER SHROUDS, SERVICE B UL LETIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
23-O CT-19 97 HRS /MSC - 0
ENC 0
SB 72-0 065 NO. 1 ENGINE - INTERCHA NG EABL ITY OF CF34-3B AND CF34-3 B1 ENGINE MODELS, SERVICE BULLE TIN CATEGORY 7
MOS
27-MAR-1 998 HRS /MSC -
ENC
SB 72-0 065 R01 NO. 1 ENGINE - INTERCHA GEAB ILITY OF CF34-3B AND CF34-3B 1 E NG INE MODELS, S ERVICE BULLETIN CATEGORY 7
MOS
10-JUN-2003 HRS /MSC -
ENC
SB 72-0 066 NO. 1 ENGINE - FORWARD FAN SHAFT DESIGN CHANGE , SERVICE BULL ETIN CATEGORY 4 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
19-FEB -1998 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 184 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 067 NO. 1 ENGINE - ENGINE - CF34-3B FLEET LEADER SAMPLING P RO GRAM, SERVICE B ULL ETIN CATEGORY 2
MOS
19-FEB -1998 HRS /MSC -
ENC
SB 72-0 067 R01 NO. 1 ENGINE - ENGINE - CF34-3B FLEET LEADER SAMPLING P RO GRAM, SERVICE B ULL ETIN CATEGORY 2
MOS
HRS /MSC -
ENC
SB 72-0 067 R02 NO. 1 ENGINE - CF3 4-3B FLEET LEADER S AMPLING P RO GRAM, SERVICE BULL ETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
11-DEC-19 98 HRS /MSC -
ENC
SB 72-0 068 NO. 1 ENGINE - ENGINE S ERVICE RECORD (LO GBOO K) E NTRY FO R THE CF34-3B HPT B ALANCE PIS TO N SEA L, CATEGORY 7 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
23-A PR-1998 HRS /MSC - 0
ENC 0
SB 72-0 069 NO. 1 ENGINE - ENGINE - TURBINE TRANSITION ASSE MB LY - REPL ACEMENT OF THE SELF-LO CK ING BUTS ON THE CATEGORY 3
THE RMOCOUPL E P RO BES AND ON THE PT5 PRESSURE PROBE OR P LUG, SE RVICE BULLETIN
MOS
29-MAY -1998 HRS /MSC -
ENC
SB 72-0 069 R01 NO. 1 ENGINE - REPLA CE ME NT OF THE S ELF-LOCKING NUTS O N THE THERMO CO UP LE PROBES AND O N THE PT5 CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
PRESS URE PROBE OR PLUG, S ERVICE BULLETIN
MOS 01-A PR-2011
04-MAR-1 999 HRS /MSC - 0
ENC 0
SB 72-0 070 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR - INSPECTION AND REWORK OF VG A CTUATOR BE LLCRANK CLEV IS,
SERVICE BULLETIN
MOS
01-O CT-19 98 HRS /MSC -
ENC
SB 72-0 070 R01 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR - INSPECTION AND REWORK OF VG A CTUATOR BE LLCRANK CLEV IS,
SERVICE BULLETIN
MOS
06-A PR-1999 HRS /MSC -
ENC
SB 72-0 070 R02 NO. 1 ENGINE - COMPRESSO R STATOR-INS PECTION AND REWORK O F VG ACTUA TO R BEL LCRANK CLEVIS, S ERVICE
BULLE TIN
MOS
09-JUN-1999 HRS /MSC -
ENC
SB 72-0 070 R03 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR - INSPECTION AND REWORK OF VG A CTUATOR BE LLCRANK CLEV IS, CATEGORY 2 COMPLIED WITH - -
SERVICE BULLETIN
MOS 01-A PR-2011
05-JAN-20 11 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 185 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 070 R04 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR - INSPECTION AND REWORK OF VG A CTUATOR BE LLCRANK A ND CATEGORY 2
CLEVIS BUSHING, S ERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 070 R05 NO. 1 ENGINE - COMPRESSO R STATOR - INS PECTION AND EWORK OF V G ACTUATOR B ELLCRANK A ND CLEVIS RECOMME NDED NOT A PPLICA BLE - THIS S B IS N/A TO AG ELD
BUSHING , SERVICE BULL ETIN ENGINES BY ENGINE S/N.
INS TAL LED E NG 1 S /N = 95096 7 A ND ENG 2 S/N =
950 968
NO ACTION REQ
MOS 11-NOV -2015
HRS /MSC -
ENC
SB 72-0 071 NO. 1 ENGINE - INTRODUCTION OF STAGE 5 THROUGH 9 COMPRESS OR ROTOR B LADES WITH IMPROVED CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
WEAR-RESISTANT DOVETAIL COATING, S ERVICE BULLE TIN
MOS 01-A PR-2011
09-NOV -1998 HRS /MSC - 0
ENC 0
SB 72-0 072 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR - INTRODUCTION O F IMPROV ED VG A CTUATOR RING S, SERVICE
BULLE TIN
MOS
19-NOV -1998 HRS /MSC -
ENC
SB 72-0 072 R01 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR - INTRODUCTION O F IMPROV ED VG A CTUATOR RING S., SERVICE CATEGORY 3
BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 072 R02 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D VG ACTUATO R RING - EFF S N 872 001 THRU 87 2373, SERVICE CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
BULLE TIN
MOS 01-A PR-2011
30-MAR-2 004 HRS /MSC A/R 0
ENC 0
SB 72-0 074 NO. 1 ENGINE - ENGINE - COMPRESSO R - INTRODUCTIO N OF IMPROVED VG ACTUATOR SHAFT AND BE LLCRANK
ASS EMBLY, S ERVICE BULLE TIN
MOS
24-NOV -1998 HRS /MSC -
ENC
SB 72-0 074 R01 NO. 1 ENGINE - ENGINE - COMPRESSO R - INTRODUCTIO N OF IMPROVED VG ACTUATOR SHAFT AND BE LLCRANK
ASS EMBLY, S ERVICE BULLE TIN
MOS
06-A PR-1999 HRS /MSC -
ENC
SB 72-0 074 R02 NO. 1 ENGINE - ENGINE - COMPRESSO R (72 -30-00 ) - INTRODUCTIO N OF IMPROVE D VG ACTUA TO R SHAFT AND
BEL LCRA NK AS SEMBLY, SERVICE BULLE TIN
MOS
30-S EP-19 99 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 186 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 074 R03 NO. 1 ENGINE - ENGINE - COMPRESSO R (72 -30-00 ) - INTRODUCTIO N OF IMPROVE D VG ACTUA TO R SHA FT AND
BEL LCRA NK AS SEMBLY, SERVICE BULLE TIN
MOS
02-A UG -2006 HRS /MSC -
ENC
SB 72-0 074 R04 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D VG ACTUATO R SHAFT AND B ELLCRANK ASSEMBL Y, SERVICE CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
BULLE TIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 074 R05 NO. 1 ENGINE - COMPRESSO R (72- 30-00) - INTRODUCTIO N OF IMPROVE D VG ACTUA TO R SHAFT AND B ELLCRANK CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
ASS EMBLY, S ERVICE BULLE TIN
MOS 02-JUN-2014
02-JUL-20 14 HRS /MSC -
ENC
SB 72-0 075 NO. 1 ENGINE - ENGINE - COMBUSTIO N SECTIO N - IMPROVE D REAR MA IN MOUNT FIRE WA LL SEALS , SERVICE
BULLE TIN
MOS
14-JAN-19 99 HRS /MSC -
ENC
SB 72-0 075 R01 NO. 1 ENGINE - IMP RO VED REA R MAIN MOUNT FIREWALL SEA LS, SE RV ICE BULLETIN
MOS
19-FEB -1999 HRS /MSC -
ENC
SB 72-0 075 R02 NO. 1 ENGINE - IMP RO VED REA R MAIN MOUNT FIREWALL SEA LS - EFF SN 87200 1 THRU 8723 36, SE RV ICE BULLETIN CATEGORY 5
MOS
14-MAR-2 003 HRS /MSC A/R
ENC
SB 72-0 075 R03 NO. 1 ENGINE - IMP RO VED REA R MAIN MOUNT FIREWALL SEA LS - EFF S N 872 001 THRU 87 2336, SERVICE BULLE TIN CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
05-MAY -2008 HRS /MSC - 0
ENC 0
SB 72-0 077 REV 05 NO. 1 ENGINE - REWORK SEAL AND IMPROVED SEAL PIN, SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 72-0 078 NO. 1 ENGINE - IMP RO VED L PT ROTOR A SSEMBLY , SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 72-0 079 NO. 1 ENGINE - ENGINE - TURBINE SECTION - IMPROVED HP T STATOR A SSEMBL Y A ND TURBINE TRANSITION CATEGORY 6
ASS EMBLY, S ERVICE BULLE TIN
MOS
11-FEB -1999 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 187 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 079 R01 NO. 1 ENGINE - IMP RO VED HPT STATO R AS SEMBLY AND TURB INE TRANSITIO N ASS EMBLY, S ERVICE BULLETIN CATEGORY 6 NOT A PPLICA BLE
MOS 01-A PR-2011
08-JUN-2000 HRS /MSC - 0
ENC 0
SB 72-0 080 NO. 1 ENGINE - ENGINE - FAN ROTOR - REP LACEMENT OF NO. 1 B ALL BEARING MANUFACTURING LOT, SE RV ICE CATEGORY 2
BULLE TIN
MOS
31-MAR-1 999 HRS /MSC -
ENC
SB 72-0 080 R01 NO. 1 ENGINE - REPLA CE ME NT OF NO. 1 BA LL BEARING MANUFA CTURING LOT, SERVICE B UL LETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
09-JUN-1999 HRS /MSC - 0
ENC 0
SB 72-0 081 NO. 1 ENGINE - CF3 4 COMBUSTION LINER S HE LL A ND DOME P ART NUMBE R AND SE RIAL NUMBE R TRA CK ING, CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
07-JUN-1999 HRS /MSC - 0
ENC 0
SB 72-0 082 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR ASSEMBL Y (7 2-32-0 0) - CF34 CO MP RE SSOR VARIA BLE VANE
ACTUA TING ARM WEAR A R THE COMPRESS OR SP LITLINE, SE RVICE BULLETIN
MOS
23-JUN-1999 HRS /MSC -
ENC
SB 72-0 082 R01 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR ASSEMBL Y (7 2-32-0 0) - CF34 CO MP RE SSOR VARIA BLE VANE
ACTUA TING ARM WEAR A R THE COMPRESS OR SP LITLINE, SE RVICE BULLETIN
MOS
20-A UG -1999 HRS /MSC -
ENC
SB 72-0 082 R02 NO. 1 ENGINE - CF2 3 COMPRES SOR V ARIAB LE VANE ACTUATING ARM WEA R AT THE COMPRESSOR SPLITLINE, CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
12-NOV -1999 HRS /MSC - 0
ENC 0
SB 72-0 083 NO. 1 ENGINE - ENGINE - HIG H PRESS URE TURBINE S TA TO R (72-4 5-00) - RE WORK O F HPT STATOR ASSEMBL Y A ND CATEGORY 7
INTRODUCTION OF IMPROVE D DURAB ILITY STA GE 2 HP T NOZZLE AND HPT INNER CAS E A ND SPLINE S EALS .,
SERVICE BULLETIN
MOS
HRS /MSC A/R
ENC

SB 72-0 083 R01 NO. 1 ENGINE - REWORK OF HPT S TA TO R ASS EMB LY AND INTRODUCTION OF IMPROVE D DURAB ILITY STAGE 2 HP T CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
NOZZE L A ND HP T INNER CA SE AND SPLINE SEALS , SERVICE B UL LETIN
MOS 01-A PR-2011
27-A PR-2005 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 188 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 085 NO. 1 ENGINE - ENGINE - AG B A SSEMBLY (7 2-62-0 0) - INTRODUCTION OF IMPROV ED ACCESS ORY G EARBOX- P
GEA RS , SERVICE B UL LETIN
MOS
08-JUN-2000 HRS /MSC -
ENC
SB 72-0 085 R01 NO. 1 ENGINE - ENGINE - AG B A SSEMBLY (7 2-62-0 0) - INTRODUCTION OF IMPROV ED ACCESS ORY G EARBOX- P
GEA RS , SERVICE B UL LETIN
MOS
11-O CT-20 00 HRS /MSC -
ENC
SB 72-0 085 R02 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D ASS ESSO RY GE ARBOX AXIS-P GE ARS, SERVICE BUL LETIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 085 R03 NO. 1 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INTRODUCTION OF IMPROV ED ACCESSO RY G EARBOX AXIS-P GE ARS CATEGORY 2 NOT A PPLICA BLE - SUPERSEDED BY RE V 4
AND A LTE RNATE AXIS-B, -K SPUR GE ARS A ND AXIS-BB, -J, -L S PUR GEA RS HA FTS, S ERVICE BULLE TIN
MOS 22-A PR-2015
07-O CT-20 14 HRS /MSC -
ENC
SB 72-0 085 R04 NO. 1 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INTRODUCTION OF IMPROV ED ACCESSO RY G EARBOX AXIS-P GE ARS CATEGORY 2 COMPLIED WITH - FACTORY INCORPORATED.
AND A LTE RNATE AXIS-B, -K SPUR GE ARS A ND AXIS-BB, -J, -L S PUR GEA RS HA FTS, S ERVICE BULLE TIN NO FURTHER ACTION RE QUIRED.
MOS 16-A PR-2015
HRS /MSC -
ENC
SB 72-0 085 R05 NO. 1 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INTRODUCTION OF IMPROV ED ACCESSO RY G EARBOX AXIS-P GE ARS CATEGORY 2 NOT A PPLICA BLE - TO A6 -ELD E NG INES
AND A LTE RNATE AXIS-B, -K SPUR GE ARS A ND AXIS-BB, -J, -L S PUR GEA RS HA FTS, S ERVICE BULLE TIN
MOS 27-JUL-20 15
09-JUL-20 15 HRS /MSC -
ENC
SB 72-0 085 R06 NO. 1 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INTRODUCTION OF IMPROV ED ACCESSO RY G EARBOX AXIS-P GE ARS CATEGORY 2 NOT A PPLICA BLE - RE VIE WE D BY EAG CAMO
AND A LTE RNATE AXIS-B, -K SPUR GE ARS A ND AXIS-BB, -J, -L S PUR GEA RS HA FTS, S ERVICE BULLE TIN ON 23RD NOV, 1 5 A ND FO UND NOT APPL ICABL E
BY ENGINE S /N AND INSTAL LED AG B.
MOS 13-DEC-20 15
16-NOV -2015 HRS /MSC -
ENC

SB 72-0 086 NO. 1 ENGINE - ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B - SUMP ASSE MB LY (72-41 -00) - ONE-TIME
BORES CO PE INSPE CTION O F THE COMBUSTIO N CHA MB ER FRAME S CA VENGE TUB E B RA ZE JOINTS, S ERVICE
BULLE TIN
MOS
23-MAR-2 000 HRS /MSC -
ENC
SB 72-0 086 R01 NO. 1 ENGINE - ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP ASSEMBL Y ( 72-41- 00) - O NE -TIME
BORES CO PE INSPE CTION O F THE COMBUSTIO N CHA MB ER FRAME S CA VENGE TUB E B RA ZE JOINTS, S ERVICE
BULLE TIN
MOS
17-JAN-20 03 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 189 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 086 R02 NO. 1 ENGINE - ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP ASSEMBL Y ( 72-41- 00) - ONE-TIME CATEGORY 3
BORES CO PE INSPE CTION O F THE COMBUSTIO N CHA MB ER FRAME S CA VENGE TUB E BRAZE JO INTS, SERVICE
BULLE TIN
MOS
26-FEB -2004 HRS /MSC -
ENC
SB 72-0 086 R03 NO. 1 ENGINE - ONE-TIME BO RE SCOPE INSP ECTION OF COMBUSTIO N CHA MB ER FRAME S CA VENGE BRAZE JOINTS - CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
EFF SN 8720 04 THRU 872 642, S ERV ICE BULLETIN
MOS 01-A PR-2011
23-MAR-2 005 HRS /MSC A/R 0
ENC 0
SB 72-0 087 NO. 1 ENGINE - ENGINE - COMBUSTIO N LINE R AND S TAG E 1 NOZZLE (72-42 -00) - INTRO DUCTION OF IMPROVED
COMBUSTION LINE R, S ERVICE BULLE TIN
MOS
02-O CT-20 00 HRS /MSC -
ENC
SB 72-0 087 R01 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D COMBUSTIO N LINE R - EFF S N 872 001 THRU 87 2810, SERVICE CATEGORY 7
BULLE TIN
MOS
21-O CT-20 04 HRS /MSC A/R
ENC
SB 72-0 087 R02 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D COMBUSTIO N LINE R, SERVICE BULLE TIN CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
02-JAN-20 07 HRS /MSC - 0
ENC 0
SB 72-0 089 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D STAGE 2 HPT B LADES, S ERV ICE BULLETIN CATEGORY 7 NOT A PPLICA BLE
MOS 01-A PR-2011
03-NOV -2000 HRS /MSC - 0
ENC 0
SB 72-0 090 NO. 1 ENGINE - ADD S AFE TY WIRE AT THE TOTAL TEMPE RA TURE AND PRESS URE BOS S CAP , SERVICE B ULL ETIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
28-FEB -2001 HRS /MSC - 0
ENC 0
SB 72-0 091 NO. 1 ENGINE - FAN SE CTION MODULE (72-1 2-00) - FA N BLA DE PIN HOLE INSPECTIO N, S ERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 091 R01 NO. 1 ENGINE - ENGINE - FAN S ECTION MODULE (72- 21-00) - FA N BLA DE PIN HOL E INSPECTIO N, SERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 091 R02 NO. 1 ENGINE - ENGINE - FAN S ECTION MODULE (72- 21-00) - FA N BLA DE PIN HOL E INSPECTIO N - TO BE C/W PRIOR TO CATEGORY 2
ACCUMULATION O F 1800 0 CYC, SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 190 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 091 R03 NO. 1 ENGINE - ENGINE - FAN S ECTION MODULE (72- 21-00) - FA N BLA DE PIN HOL E INSPECTIO N, SERVICE BULLE TIN CATEGORY 2
MOS
HRS /MSC -
ENC
SB 72-0 091 R04 NO. 1 ENGINE - ENGINE - FAN S ECTION MODULE (72- 21-00) - FA N BLA DE PIN HOL E INSPECTIO N, SERVICE BULLE TIN CATEGORY 2
MOS
HRS /MSC -
ENC
SB 72-0 091 R05 NO. 1 ENGINE - ENGINE - FAN S ECTION MODULE (72- 21-00) - FAN BLADE PIN HOLE INSP ECTION, SE RV ICE BULLETIN CATEGORY 2
MOS
HRS /MSC -
ENC
SB 72-0 091 R06 NO. 1 ENGINE - FAN SE CTION MODULE (72-2 1-00) - FA N BLA DE PIN HOLE INSPECTIO N, S ERVICE BULLE TIN CATEGORY 2
MOS
HRS /MSC -
ENC
SB 72-0 091 R07 NO. 1 ENGINE - FAN SE CTION MODULE (72-2 1-00) - FA N BLA DE PIN HOLE INSPECTIO N, S ERVICE BULLE TIN CATEGORY 2 - A PPLICA BLE TO A 6-ELD BY FA N BLA DE P/N
601 8T3 0P15
(04- 16-201 5)
MOS RECURRING
HRS /MSC
ENC 180 00 0 180 00 M
SB 72-0 092 NO. 1 ENGINE - ENGINE - HPT S TATOR ASSE MB LY - INTRODUCTION O F IMP RO VED B ORESCOPE PLUG, SERVICE CATEGORY 5
BULLE TIN
MOS
28-NOV -2000 HRS /MSC -
ENC
SB 72-0 092 R01 NO. 1 ENGINE - HPT STATOR ASSE MB LY-INTRODUCTION OF IMPROV ED BO RE SCOPE PLUG, S ERVICE BULLE TIN CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
14-DEC-20 01 HRS /MSC - 0
ENC 0
SB 72-0 093 NO. 1 ENGINE - ENGINE - HPT ROTOR ASSE MB LY (72-46- 00) - INTRODUCTION O F IMP RO VED NO.5 BEARING ROTATING CATEGORY 4
AIR SE AL., SERVICE B ULL ETIN
MOS
HRS /MSC -
ENC
SB 72-0 093 R01 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D NO.5 B EARING ROTATING AIR SEA L, SERVICE BUL LETIN CATEGORY 4 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 093 R02 NO. 1 ENGINE - HPT ROTOR ASSEMBL Y ( 72-46- 00) - INTRODUCTION O F IMP RO VED NO. 5 B EARING ROTATING AIR CATEGORY 4 NOT A PPLICA BLE - TO A6 -ELD B Y E NG INE S/N.
SEA L, SERVICE BULLETIN
MOS 27-JUL-20 15
27-A PR-2015 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 191 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 094 NO. 1 ENGINE - ENGINE - HPT ROTOR ASSE MB LY (72-46- 00) - HPT STAG E 2 BL ADE P N 607 8T1 1P01 REPLA CE ME NT
PLA N, SERVICE BULLE TIN
MOS
10-JAN-20 01 HRS /MSC -
ENC
SB 72-0 094 R01 NO. 1 ENGINE - ENGINE - HPT ROTOR ASSE MB LY (72-46- 00) - HPT STAG E 2 BL ADE P N 607 8T1 1P01 REPLA CE ME NT CATEGORY 2
PLA N, SERVICE BULLE TIN
MOS
21-MAR-2 001 HRS /MSC -
ENC
SB 72-0 094 R02 NO. 1 ENGINE - HPT STAG E 2 BL ADE P N 607 8T1 1P01 REPLA CE ME NT PLAN, SE RV ICE BULLETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
30-A UG -2001 HRS /MSC - 0
ENC 0
SB 72-0 094 R03 NO. 1 ENGINE - HPT ROTOR ASSEMBL Y ( 72-46- 00) - HPT STA GE 2 BLADE PN 60 78T11P0 1 REP LACEMENT PLA N, CATEGORY 2 NOT A PPLICA BLE - BY ENGINE S/N AS
SERVICE BULLETIN MENTIONED IN TAB LE 1.
MOS 27-JUL-20 15
14-JUL-20 15 HRS /MSC -
ENC
SB 72-0 095 NO. 1 ENGINE - ENGINE - COMBUSTIO N LINE R AND S TAG E 1 NOZZLE (72-42 -00) - INTRO DUCTION OF CATEGORY 7
IMP RO VED-DURAB ILITY S TA GE 1 TURBINE NOZZL E, SERVICE BUL LETIN
MOS
20-MAR-2 001 HRS /MSC -
ENC
SB 72-0 095 R01 NO. 1 ENGINE - COMBUSTIO N LINE R & STAGE 1 NO ZZLE - INTRO O F IMP RO VED DURABILITY STAGE 1 TURBINE CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
NOZZL E, SERVICE BULLETIN
MOS 01-A PR-2011
08-DEC-20 08 HRS /MSC A/R 0
ENC 0
SB 72-0 095 R03 (RJ) NO. 1 ENGINE - [RE GIO NA L JET (RJ) ASB] - A GB ASSE MB LY (72-62 -00) - INTRODUCTION OF IMP RO VED A CCES SORY CATEGORY 3
GEA RB OX AXIS-P GEA RS AND A LTERNATE AXIS-B , -K SPUR GE ARS A ND AXIS-BB , -J, -L SPUR GE ARSHAFTS, SERVICE
BULLE TIN
MOS
HRS /MSC -
ENC

SB 72-0 096 NO. 1 ENGINE - COMPRESSO R SECTIO N- INSPE CTION OF CO MPRE SSOR CA SING AND S POOL , SERVICE BULL ETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
02-JUL-20 02 HRS /MSC - 0
ENC 0
SB 72-0 098 NO. 1 ENGINE - ENGINE - LO W-P RE SSURE TURBINE ROTOR (72 -53-00 ) - REPLA CE ME NT OF SE LECTE DCF34
LOW-P RE SSURE TURB INE DISK S, SERVICE BULLETIN
MOS
25-O CT-20 01 HRS /MSC -
ENC
SB 72-0 098 R01 NO. 1 ENGINE - REPLA CE ME NT OF SE LECTE D CF3 4 L OW-PRESSURE TURBINE DISKS, S ERVICE BULLE TIN
MOS
28-MAY -2003 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 192 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 098 R02 NO. 1 ENGINE - REPLA CE ME NT OF SE LECTE D CF3 4 L OW-PRESSURE TURBINE DISKS, S ERVICE BULLE TIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
16-NOV -2004 HRS /MSC A/R 0
ENC 0
SB 72-0 099 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
24-JUN-2001 HRS /MSC -
ENC
SB 72-0 101 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
29-JUL-20 01 HRS /MSC -
ENC
SB 72-0 102 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D BAL L B EARING DESIGN FOR AXES -P , -J, AND -K BEA RINGS, SE RV ICE CATEGORY 4 COMPLIED WITH - A T MANUFACTURE
BULLE TIN
MOS 01-A PR-2011
07-S EP-20 01 HRS /MSC - 0
ENC 0
SB 72-0 104 NO. 1 ENGINE - ENGINE - HIG H- PRE SSURE TURBINE ROTOR (7 2-46-0 0) - INTRODUCTION OF IMPROV ED HPT S TA GE 1
BLA DE S P N 607 8T1 9P10/P11 , SERVICE B ULL ETIN
MOS
01-O CT-20 01 HRS /MSC -
ENC
SB 72-0 104 R01 NO. 1 ENGINE - INTRO IMPROVE D HPT STAG E 1 BL ADES - P /N 6078T19P 10/11 - EFF SN 87200 1 THRU 8729 99 & 8 73001 CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
THRU 873184 , SERVICE B UL LETIN
MOS 01-A PR-2011
23-FEB -2005 HRS /MSC - 0
ENC 0
SB 72-0 104 R02 NO. 1 ENGINE - ENGINE - HIG H- PRE SSURE TURBINE ROTOR (7 2-46-0 0) - INTRODUCTION OF IMPROV ED HPT S TA GE 1 CATEGORY 7
BLA DE S P N 607 8T1 9P10 AND P N 6078 T19 P11, S ERVICE BULLE TIN
MOS
05-NOV -2013 HRS /MSC -
ENC
SB 72-0 105 NO. 1 ENGINE - INTRODUCTION OF AGB ASS EMBLY PN 6 014T81G 32 WITH METAL PEENING ON AXES L, P, AND K CATEGORY 6 COMPLIED WITH - A T MANUFACTURE
GEA RS , SERVICE B UL LETIN
MOS 01-A PR-2011
13-DEC-20 01 HRS /MSC - 0
ENC 0
SB 72-0 105 R01 NO. 1 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - INTRO DUCTION OF A GB ASSE MB LY PN 601 4T81G32 CATEGORY 6 NOT A PPLICA BLE - BY ENGINE S/N
WITH METAL PE ENING ON A XES L, P, AND K GEARS, SERVICE BULLE TIN
MOS 30-O CT-20 14
22-S EP-20 14 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 193 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 105 R02 NO. 1 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - INTRO DUCTION OF A GB ASSE MB LY PN 601 4T81G32 CATEGORY 6 NOT A PPLICA BLE - BY ENGINE S/N
WITH METAL PE ENING ON A XES L, P, AND K GEARS, SERVICE BULLE TIN
MOS 30-O CT-20 14
29-S EP-20 14 HRS /MSC -
ENC
SB 72-0 106 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO R ROTOR B LADE
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
01-MAR-2 002 HRS /MSC -
ENC
SB 72-0 106 R01 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO R ROTOR B LADE
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
07-NOV -2002 HRS /MSC -
ENC
SB 72-0 106 R02 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO R ROTOR B LADE
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
17-JUN-2003 HRS /MSC -
ENC
SB 72-0 106 R03 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO R ROTOR B LADE
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
16-S EP-20 03 HRS /MSC -
ENC
SB 72-0 106 R04 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO RROTOR BLADE
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
21-JAN-20 04 HRS /MSC -
ENC
SB 72-0 106 R05 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO R RO TO R BLA DE CATEGORY 4
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
26-FEB -2004 HRS /MSC -
ENC
SB 72-0 106 R06 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO R RO TO R BLA DE CATEGORY 4
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
09-JUN-2005 HRS /MSC -
ENC
SB 72-0 106 R07 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY - STAGE 9 COMPRESSO R ROTOR BL ADE REP LACEMENT, CATEGORY 7 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC N/A 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 194 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 107 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
27-JAN-20 02 HRS /MSC -
ENC
SB 72-0 107 R01 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
10-MAY -2002 HRS /MSC -
ENC
SB 72-0 108 NO. 1 ENGINE - ENGINE - HIG H PRESS URE TURBINE ROTOR (72-4 6-00) OR HIGH P RE SSURE TURBINE ROTOR CATEGORY 7 NOT A PPLICA BLE - SUPERSEDED BY RE V 1
(72- 52-00) - IMPROV ED DURA BIL ITY STAGE 2 HP T BLA DE WITH AIRFOIL CAV ITY COATING, S ERVICE BULLE TIN
MOS
01-MAR-2 002 HRS /MSC -
ENC
SB 72-0 108 R01 NO. 1 ENGINE - IMP RO VED DURABILITY STAGE 2 HPT BL ADE WITH AIRFOIL CA VITY COATING, SERVICE BULL ETIN CATEGORY 4
MOS
21-O CT-20 03 HRS /MSC -
ENC
SB 72-0 108 R02 NO. 1 ENGINE - HPT ROTOR OR HPT ROTOR IMPROVE D DURAB ILITY STAGE 2 HP T BLADE WITH A IR FO IL CAVITY CATEGORY 4
COATING - E FF SN 87 2001 THRU 8 72999 & 8730 01 THRU 87 3358, S ERVICE BULLE TIN
MOS
16-NOV -2004 HRS /MSC A/R
ENC
SB 72-0 108 R03 NO. 1 ENGINE - IMP RO VED DURABILITY STAGE 2 HPT BL ADE WITH AIRFOIL CA VITY COATING - E FF SN 872 001 THRU CATEGORY 4
872 999 & 873001 THRU 8733 58, SE RVICE BULLETIN
MOS
23-FEB -2005 HRS /MSC A/R
ENC
SB 72-0 108 R04 NO. 1 ENGINE - IMP RO VED DURABILITY STAGE 2 HPT BL ADE WITH AIRFOIL CA VITY COATING, SERVICE BULL ETIN CATEGORY 4 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
23-FEB -2006 HRS /MSC - 0
ENC 0
SB 72-0 108 R05 NO. 1 ENGINE - HIG H PRESS URE TURBINE ROTOR (72-46 -00) OR HIGH P RE SSURE TURB INE ROTOR (72 -52-00 ) - CATEGORY 4
IMP RO VED DURABILITY STAGE 2 HPT BL ADE WITH AIRFOIL CA VITY COATING, SERVICE BULL ETIN
MOS
27-JAN-20 17 HRS /MSC -
ENC
SB 72-0 109 NO. 1 ENGINE - INS PECTION AND REWORK OF VG SHAFT A FT BEARING SUPP ORT, S ERVICE BULLE TIN CATEGORY 2
MOS
21-MAY -2002 HRS /MSC -
ENC
SB 72-0 109 R01 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INSPECTIO N AND REWORK OF V G S HA FT AFT BEA RING CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
SUPPO RT, S ERV ICE BULLETIN
MOS 01-A PR-2011
03-MAR-2 003 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 195 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 110 NO. 1 ENGINE - REPLA CE ME NT OF VG SHAFT A FT BEARING SUPP ORT, S ERVICE BULLE TIN CATEGORY 3
MOS
21-MAY -2002 HRS /MSC -
ENC
SB 72-0 110 R01 NO. 1 ENGINE - REPLA CE ME NT OF VG SHAFT A FT BEARING SUPP ORT, S ERVICE BULLE TIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
27-FEB -2003 HRS /MSC - 0
ENC 0
SB 72-0 111 NO. 1 ENGINE - ENGINE COMPRESSO R STATOR ( 72-32-0 0) INS PECTION AND TEMPORARY LOCTITE RE WO RK O F VG
SHAFT AFT B EARING SUPPO RT, SE RV ICE BULLETIN
MOS
02-A PR-2002 HRS /MSC -
ENC
SB 72-0 111 R01 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INSPECTIO N AND TEMPORARY LOCTITE REWORK OF VG CATEGORY 2
SHAFT AFT B EARING SUPPO RT, SE RV ICE BULLETIN
MOS
03-MAR-2 003 HRS /MSC -
ENC
SB 72-0 111 R02 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INSPECTIO N AND TEMPORARY LOCTITE REWORK OF VG CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
SHAFT BE ARING SUPPORT, SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 112 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
28-MAR-2 002 HRS /MSC -
ENC
SB 72-0 112 R01 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
29-A PR-2002 HRS /MSC -
ENC
SB 72-0 113 NO. 1 ENGINE - AG B INSPECTIO N &MARKING @ O VERHAUL , SERVICE B UL LETIN CATEGORY 3
MOS
HRS /MSC -
ENC
SB 72-0 113 R01 NO. 1 ENGINE - ACCESSO RY GE ARBOX INSP ECTION AND MARKING AT O VERHAUL, SERVICE BULLETIN CATEGORY 3 NOT A PPLICA BLE
MOS 01-A PR-2011
05-JUN-2003 HRS /MSC - 0
ENC 0
SB 72-0 114 NO. 1 ENGINE - ENGINE - HIG H PRESS URE TURBINE ROTOR (72-4 6-00) - STAGE 1 HP T BLADE BO RES CO PE CATEGORY 2 NOT A PPLICA BLE
INS PECTION AND REPLA CEMENT P LAN, SERVICE BULLETIN
MOS 01-A PR-2011
24-MAY -2002 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 196 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 115 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
12-JUN-2002 HRS /MSC -
ENC
SB 72-0 116 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
23-S EP-20 02 HRS /MSC -
ENC
SB 72-0 117 NO. 1 ENGINE - RE-IDE NTIFICATION OF HPT RO TO R ASS EMBLY, S ERVICE BULLETIN CATEGORY 3 NOT A PPLICA BLE
MOS 01-A PR-2011
13-S EP-20 02 HRS /MSC - 0
ENC 0
SB 72-0 118 NO. 1 ENGINE - ACCESSO RY GE ARBOX FIEL D MANAGEMENT P LAN, SERVICE BULLETIN CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
24-JUL-20 02 HRS /MSC - 0
ENC 0
SB 72-0 118 R01 NO. 1 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - ACCESSO RY GE ARBOX FIEL D MANAGEMENT P LAN, SERVICE BULLETIN CATEGORY 2 COMPLIED WITH - FACTORY INCORPORATED.
NO FURTHER ACTION RE QUIRED.
MOS 16-A PR-2015
HRS /MSC -
ENC
SB 72-0 118 R02 NO. 1 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - ACCESSO RY GE ARBOX FIEL D MANAGEMENT P LAN, SERVICE BULLETIN CATEGORY 2
MOS (EFF)
HRS /MSC -
ENC
SB 72-0 120 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D STAGE 3 AND 5 COMPRESS OR ROTOR L OCKING NUT HA LVES , CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
29-JUL-20 02 HRS /MSC - 0
ENC 0
SB 72-0 121 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
14-A UG -2002 HRS /MSC -
ENC
SB 72-0 122 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - NEW IDENTIFICATION PL ATES PN 102 2T98P02 AND P N 102 3T1 9P02,
SERVICE BULLETIN
MOS
11-NOV -2002 HRS /MSC -
ENC
SB 72-0 122 R01 NO. 1 ENGINE - NEW IDENTIFICATION PL ATE S P N 102 2T9 8P02 AND P N 1023 T1 9P02, SERVICE BULLE TIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
10-JUN-2003 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 197 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 123 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - INTRODUCTION OF FA N BLA DE BUSHING REP AIR, SE RV ICE BULLETIN
MOS
13-DEC-20 02 HRS /MSC -
ENC
SB 72-0 123 R01 NO. 1 ENGINE - INTRODUCTION OF FA N BLA DE BUSHING REPA IR, SE RV ICE BULLETIN CATEGORY 7
MOS
11-A UG -2008 HRS /MSC -
ENC
SB 72-0 123 R02 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - INTRODUCTION OF FA N BLA DE BUSHING REP AIR, SE RV ICE BULLETIN CATEGORY 7
MOS
05-A UG -2013 HRS /MSC -
ENC
SB 72-0 123 R03 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - INTRODUCTION OF FA N BLA DE BUSHING REPA IR, SE RV ICE BULLETIN CATEGORY 7 - TO BE C/W AT ENGINE O /H
MOS 05-JUN-2016
09-A PR-2015 HRS /MSC -
ENC
SB 72-0 123 R04 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - INTRODUCTION OF FA N BLA DE BUSHING REPA IR, SE RV ICE BULLETIN CATEGORY 7 - TO BE C/W AT ENGINE O /H
MOS 02-JUN-2016
21-O CT-20 15 HRS /MSC -
ENC
SB 72-0 124 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
07-NOV -2002 HRS /MSC -
ENC
SB 72-0 125 NO. 1 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-33- 00) - REWORK OF FAN BLADES PN 6018T30 P06 AND PN
601 8T3 0P13, SERVICE BULL ETIN
MOS
03-FEB -2003 HRS /MSC -
ENC
SB 72-0 125 R01 NO. 1 ENGINE - REWORK OF FAN B LADES PN 6 018T30P0 3, PN 6018T30P 05, PN 6018T30 P06, P N 6018 T3 0P07, P N CATEGORY 7
601 8T3 0P13, AND PN 5 922T34P 01, SE RVICE BULLETIN
MOS
19-JUN-2003 HRS /MSC -
ENC
SB 72-0 125 R02 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - REWORK OF FAN BLADES P/N 49 23T56G0 2, P/N 492 3T5 6G05, P/N CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
492 3T5 6G07, P/N 4923 T56 G09, P /N 5922T34P 01, P/N 6 018T30P0 3, P/N 601 8T30P06 , AND P/N 60 18T30P13 , SERVICE
BULLE TIN
MOS 01-A PR-2011
09-JAN-20 08 HRS /MSC - 0
ENC 0

SB 72-0 126 NO. 1 ENGINE - ENGINE - FAN S TATOR ASSE MB LY (72-23 -00) - REWO RK OF FA N CASE OUTER SP ACERS A ND CATEGORY 7
INTRODUCTION OF A NEW AFT FAN CASE , SERVICE B UL LETIN
MOS
03-FEB -2003 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 198 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 126 R01 NO. 1 ENGINE - ENGINE-FAN STATOR ASSEMBL Y-REWORK OF FAN CAS E O UTER SPACERS AND INTRODUCTION OF A CATEGORY 7 NOT A PPLICA BLE
NEW A FT FAN CASE, S ERVICE BULLE TIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 127 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
02-DEC-20 02 HRS /MSC -
ENC
SB 72-0 127 R01 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
10-DEC-20 02 HRS /MSC -
ENC
SB 72-0 128 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR ASSEMBL Y (7 2-32-0 0) - INTRODUCTION O F NEW STAG E 1 AND CATEGORY 4
STAGE 2 COMPRESSO R SHROUD SEA LS PN 50 26T64G1 4, PN 5 026T64G 13 A ND PN 5 026T62G1 1, SERVICE BULLETIN
MOS
17-JAN-20 03 HRS /MSC -
ENC
SB 72-0 128 R01 NO. 1 ENGINE - INTRODUCTION OF NE W STAGE 1 AND S TAG E 2 COMPRES SOR S HROUD S EALS P/N 50 26T64G14 , P/N CATEGORY 7 NOT A PPLICA BLE
502 6T6 4G13 AND P /N 5 026T62G 11, SE RV ICE BULLETIN
MOS 01-A PR-2011
05-FEB -2007 HRS /MSC - 0
ENC 0
SB 72-0 129 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
22-DEC-20 02 HRS /MSC -
ENC
SB 72-0 129 R01 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURB OFAN ENGINES, CATEGORY 8
SERVICE BULLETIN
MOS
05-A PR-2006 HRS /MSC -
ENC
SB 72-0 129 R02 NO. 1 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B TURBOFAN ENG INES , SERVICE BULL ETIN CATEGORY 8
MOS
22-JAN-20 08 HRS /MSC -
ENC
SB 72-0 130 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 TURB OFAN ENGINES, S ERV ICE BULLETIN CATEGORY 8
MOS
06-FEB -2003 HRS /MSC -
ENC
SB 72-0 131 NO. 1 ENGINE - REPLA CE ME NT OF THE FAN BLADE CASE FORWA RD GANG CHANNEL NUT ASSE MB LIE S, SERVICE
BULLE TIN
MOS
08-JUL-20 03 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 199 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 131 R01 NO. 1 ENGINE - FAN STATOR ASSE MB LY (72-23 -00) - REP LACEMENT OF THE FAN BLA DE CASE FORWARD GA NG CATEGORY 7
CHA NNEL NUT ASS EMBLIES, SE RV ICE BULLETIN
MOS
28-JUN-2007 HRS /MSC -
ENC
SB 72-0 131 R02 NO. 1 ENGINE - REPLA CE ME NT OF THE FAN BLADE CASE FORWA RD GANG CHANNEL NUT ASSE MB LIE S, SERVICE CATEGORY 7
BULLE TIN
MOS
30-A UG -2007 HRS /MSC -
ENC
SB 72-0 131 R03 NO. 1 ENGINE - ENGINE - FAN S TATOR ASSE MB LY (72-23 -00) - REP LACEMENT OF THE FAN BL ADE CAS E FORWARD CATEGORY 7 NOT A PPLICA BLE
GANG CHANNEL NUT ASS EMBLIES, S ERV ICE BULLETIN
MOS 01-A PR-2011
08-DEC-20 08 HRS /MSC - 0
ENC 0
SB 72-0 131 R04 NO. 1 ENGINE - FAN STATOR ASSE MB LY (72-23 -00) - REP LACEMENT OF THE FAN BLA DE CASE FORWARD GA NG CATEGORY 7 NOT A PPLICA BLE - RE VIE WE D BY EAG CAMO
CHA NNEL NUT ASS EMBLIES, SE RV ICE BULLETIN ON 23RD NOV, 1 5 A ND FO UND NOT APPL ICABL E
BY ENGINE S /N.
MOS 13-DEC-20 15
06-NOV -2015 HRS /MSC -
ENC
SB 72-0 132 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
23-FEB -2003 HRS /MSC -
ENC
SB 72-0 133 NO. 1 ENGINE - ENGINE - AG B - INTRODUCTION OF NE W O-RING P /N 3035T70P 06, SE RV ICE BULLETIN CATEGORY 7
MOS
21-O CT-20 03 HRS /MSC -
ENC
SB 72-0 133 R01 NO. 1 ENGINE - ENGINE - AG B (7 2-62-0 0) - INTRODUCTION O F NEW O -RING PN 303 5T70P06 FOR CF34-3 A1/-3B CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
TURBO FA N ENGINE , SERVICE B UL LETIN
MOS 01-A PR-2011
07-A PR-2007 HRS /MSC - 0
ENC 0
SB 72-0 134 NO. 1 ENGINE - ENGINE-COMPRESSO R STATOR A SSEMBLY ( 72-3 2-00)- CF3 4 COMPRES SOR V ARIAB LE VANE
ACTUA TING ARM WEAR A T THE COMPRESS OR SP LITLINE., SERVICE BULL ETIN
MOS
HRS /MSC -
ENC
SB 72-0 134 R01 NO. 1 ENGINE - CF3 4 COMPRES SOR V ARIAB LE VANE ACTUATION ARM WEA R AT THE COMPRESSOR SPLITLINE, CATEGORY 2
SERVICE BULLETIN
MOS
HRS /MSC 100 00 100 00
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 200 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 135 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
27-JUL-20 03 HRS /MSC -
ENC
SB 72-0 137 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
02-S EP-20 03 HRS /MSC -
ENC
SB 72-0 138 NO. 1 ENGINE - ACCESSO RY GE AR BO X ASSEMBL Y REWORK, SERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 138 R01 NO. 1 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY REWORK, SERVICE BULLETIN CATEGORY 6
MOS
HRS /MSC -
ENC
SB 72-0 138 R02 NO. 1 ENGINE - ENGINE - ACCESSO RY G EARBOX ASS EMBLY (72-6 2-00) - CF34 ACCESS ORY G EARBOX (AGB) CATEGORY 6
REWORK, SE RV ICE BULLETIN
MOS
15-DEC-20 05 HRS /MSC -
ENC
SB 72-0 138 R03 NO. 1 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY REWORK, SERVICE BULLETIN CATEGORY 6
MOS
09-A UG -2006 HRS /MSC A/R
ENC
SB 72-0 138 R04 NO. 1 ENGINE - ENGINE - ACCESSO RY G EARBOX ASS EMBLY (72-6 2-00) - CF34 ACCESS ORY G EARBOX (AG B) CATEGORY 6
REWORK, SE RV ICE BULLETIN
MOS
22-O CT-20 07 HRS /MSC -
ENC
SB 72-0 138 R05 NO. 1 ENGINE - ENGINE - ACCESSO RY G EARBOX ASS EMBLY (72-6 2-00) - CF34 ACCESS ORY G EARBOX (AG B) CATEGORY 6
REWORK, SE RV ICE BULLETIN
MOS
16-NOV -2007 HRS /MSC -
ENC
SB 72-0 138 R06 NO. 1 ENGINE - ENGINE - ACCESSO RY G EARBOX ASS EMBLY (72-6 2-00) - CF34 ACCESS ORY G EARBOX (AG B) CATEGORY 6 COMPLIED WITH - A T MANUFACTURE
REWORK, SE RV ICE BULLETIN
MOS 01-A PR-2011
30-JAN-20 09 HRS /MSC - 0
ENC 0
SB 72-0 138 R07 NO. 1 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - INTRO DUCTION OF A CCESS ORY GEARBOX AS SEMBLY CATEGORY 6 NOT A PPLICA BLE - RE VIE WE D BY EAG CAMO
P/N 51 54T98G01 AND FIELD REWO RK OP TIONS, S ERV ICE BULLETIN ON 10TH DEC, 15 AND FOUND NOT AP PLICA BLE
BY ENGINE S /N.
MOS 13-DEC-20 15
30-NOV -2015 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 201 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 139 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
30-S EP-20 03 HRS /MSC -
ENC
SB 72-0 141 NO. 1 ENGINE - GE NERAL - SPA RE PA RTS RELEAS E FOR CF34 TURB OFAN ENGINES, SE RV ICE BULLETIN CATEGORY 8
MOS
HRS /MSC -
ENC
SB 72-0 141 R01 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3BTURBO FA N ENGINE S, CATEGORY 8
SERVICE BULLETIN
MOS
20-JAN-20 04 HRS /MSC -
ENC
SB 72-0 142 NO. 1 ENGINE - LIFE L IMITED STAGE 3 THRU 8 COMPRESSO R ROTOR SP OOL PN 6078T56P 05 PART INTRODUCTION, CATEGORY 9
SERVICE BULLETIN
MOS
11-MAY -2004 HRS /MSC -
ENC
SB 72-0 142 R01 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - LIFE L IMITE D STAGE S 3 THRU 8COMPRESSOR ROTO R CATEGORY 9
SPO OL PN 60 78T56P0 5 P ART INTRODUCTIO N, SERVICE BULLE TIN
MOS
20-JAN-20 04 HRS /MSC -
ENC
SB 72-0 142 R02 NO. 1 ENGINE - LIFE L IMITEDSTAG ES 3 THRU 8 CO MP RE SSOR RO TO R SPO OL PN 60 78T56P05 PA RT INTRO DUCTION, CATEGORY 9 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
11-MAY -2004 HRS /MSC - 0
ENC 0
SB 72-0 143 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
03-DEC-20 03 HRS /MSC -
ENC
SB 72-0 144 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
21-DEC-20 03 HRS /MSC -
ENC
SB 72-0 145 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
25-JAN-20 04 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 202 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 145 R01 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
24-FEB -2004 HRS /MSC -
ENC
SB 72-0 147 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - REMOV AL OF INL ET GUIDE V ANE (IGV) AND S TA GES 1 CATEGORY 5
THROUGH 5 SELF-LOCKING NUT P N 4037 T8 4P03, SERVICE BULLE TIN
MOS
30-MAR-2 004 HRS /MSC -
ENC
SB 72-0 147 R01 NO. 1 ENGINE - REMOVAL OF INLE T GUIDE VANE (IGV) AND STAG E 1 THRO UG H 5 SELF LOCKING NUT PN 4 037T84P 03, CATEGORY 9
SERVICE BULLETIN
MOS
01-JUN-2005 HRS /MSC -
ENC
SB 72-0 149 NO. 1 ENGINE - STAGE 3 THROUGH 8 CO MP RE SSOR RO TOR SPO OL PART NUMB ER MARKING INSPECTION, S ERVICE CATEGORY 5 NOT A PPLICA BLE
BULLE TIN
MOS 01-A PR-2011
07-A PR-2004 HRS /MSC - 0
ENC 0
SB 72-0 150 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
07-A PR-2004 HRS /MSC -
ENC
SB 72-0 151 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
13-A PR-2004 HRS /MSC -
ENC
SB 72-0 153 NO. 1 ENGINE - ENGINE - HIG H PRESS URE TURBINE S TA TO R ASS EMBLY (72-4 5-00) - INTRO DUCTION OF S TAG E 2 CATEGORY 7
TURBINE SHROUD AND SEA L S EGMENT PN 6047T95G 14 (20 PIECE CONFIG URATION), SERVICE B UL LETIN
MOS
22-JUN-2004 HRS /MSC -
ENC
SB 72-0 153 R01 NO. 1 ENGINE - INTRODUCTION OF STAGE 2 TURBINE SHROUD & SE AL SEGMENT PN 6047 T95 G14 (20 PIECE CATEGORY 7 NOT A PPLICA BLE
CONFIGURATIO N) , SERVICE B ULL ETIN
MOS 01-A PR-2011
23-MAR-2 005 HRS /MSC A/R 0
ENC 0
SB 72-0 154 NO. 1 ENGINE - INTRODUCTION OF RE WO RK ED STAG E 2 HPT S TA TO R SHROUD PN 5 099T09P 02 (18 PIE CE CATEGORY 7 NOT A PPLICA BLE
CONFIGURATIO N), SERVICE BULLE TIN
MOS 01-A PR-2011
22-JUN-2004 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 203 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 155 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) INTRO DUCTION OF VE NDOR CO DE S FOR STAGES 10 -14 CATEGORY 9
COMPRESSO R ROTOR BL ADES, SE RV ICE BULLETIN
MOS
21-MAY -2004 HRS /MSC -
ENC
SB 72-0 156 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
25-A PR-2004 HRS /MSC -
ENC
SB 72-0 157 NO. 1 ENGINE - COMPRESSO R STATOR ( 72-32- 00) - S TAG ES IG V THRU 5 SELF-LO CK ING NUT FIELD INSPE CTION, CATEGORY 2
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 157 R01 NO. 1 ENGINE - STAGE S IGV THRU 5 S ELF-LOCKING NUT FIE LD INSPECTIO N - EFF S N 8720 04 THRU 87 3999 & 95000 0 CATEGORY 2
THRU 950067 , SERVICE B UL LETIN
MOS
18-MAR-2 005 HRS /MSC A/R
ENC
SB 72-0 157 R02 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - S TAG ES IG V THRU 5 SELF-LO CK ING NUT FIELD CATEGORY 2 NOT A PPLICA BLE
INS PECTION, SE RV ICE BULLETIN
MOS 01-A PR-2011
29-O CT-20 08 HRS /MSC - 0
ENC 0
SB 72-0 158 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE ROTOR (72-53 -00) - INTRO DUCTION OF NEW LPT TURB INE SEAL S, CATEGORY 9
PN 5023T59P 03, PN 5023T67 P02, A ND PN 50 23T64P03 , SERVICE B UL LETIN
MOS
29-MAR-2 005 HRS /MSC -
ENC
SB 72-0 158 R01 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE ROTOR (72-53 -00) - INTRO DUCTION OF NEW LPT TURB INE SEAL S, CATEGORY 9 COMPLIED WITH - A T MANUFACTURE
PN 5023T59P 06, PN 5023T67 P02, A ND PN 50 23T64P04 ., S ERVICE BULLE TIN
MOS 01-A PR-2011
HRS /MSC A/R 0
ENC 0
SB 72-0 159 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
23-MAY -2004 HRS /MSC -
ENC
SB 72-0 160 NO. 1 ENGINE - LIFE L IMITED LPT DISKS STAGE S 3 THRU 6 PN 607 8T91P02 , 6078T02 P04, 60 78T92P0 2 & 60 78T89P03 CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
PARTS INTRO DUCTION, S ERVICE BULLE TIN
MOS 01-A PR-2011
08-S EP-20 04 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 204 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 160 R01 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE ROTOR (72-53 -00) - LIFE LIMITED LO W PRESS URE TURBINE DISKS CATEGORY 7
STAGE S 3 THRU 6 PN 607 8T91P02, PN 60 78T02P04 , PN 6 078T92P0 2, AND P N 6078 T8 9P03 PARTS INTRO DUCTION,
SERVICE BULLETIN
MOS
21-NOV -2011 HRS /MSC -
ENC
SB 72-0 161 NO. 1 ENGINE - REWORK STAGE 2 HP T SHROUD SEG ME TS, SERVICE BULL ETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 72-0 162 NO. 1 ENGINE - HPT STATOR-INTRODUCTION O F REWORKED S TA GE 1 HIGH P RE SSURE TURB INE SEAL SHROUD CATEGORY 7 NOT A PPLICA BLE
SEG ME NTS PN 5902T32G 01, SE RV ICE BULLETIN
MOS 01-A PR-2011
09-DEC-20 04 HRS /MSC A/R 0
ENC 0
SB 72-0 163 NO. 1 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF PTO DRIVE ASSE MB LY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-TO-P TO OIL TUB E A SSEMBLY PN 6012 T90 G02, S ERVICE BULLE TIN
MOS
18-A UG -2004 HRS /MSC -
ENC
SB 72-0 163 R01 NO. 1 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF P TO DRIVE AS SEMBLY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-TO-P TO OIL TUB E A SSEMBLY PN 6 012T90G0 2, SERVICE BULLETIN
MOS
21-O CT-20 04 HRS /MSC -
ENC
SB 72-0 163 R02 NO. 1 ENGINE - INTRODUCTION OF PTO DRIVE ASSEMBL Y P N 603 7T7 2G19 & FRO NT FRAME-TO-P TO OIL TUBE CATEGORY 5
ASS EMBLY PN 6 012T90G 02 - EFF SN 87220 4 THRU 8739 99 & 9 50000 THRU 95010 7, SERVICE B UL LETIN
MOS
02-DEC-20 04 HRS /MSC A/R
ENC
SB 72-0 163 R03 NO. 1 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF PTO DRIVE ASSE MB LY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-T-PTO OIL TUBE AS SEMBLY PN 6012T90G 02, SE RV ICE BULLETIN
MOS
HRS /MSC A/R
ENC
SB 72-0 163 R04 NO. 1 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF P TO DRIVE AS SEMBLY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-TO-P TO OIL TUB E A SSEMBLY PN 6 012T90G0 2, SERVICE BULLETIN
MOS
31-A UG -2005 HRS /MSC -
ENC
SB 72-0 163 R05 NO. 1 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF P TO DRIVE AS SEMBLY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-TO-P TO OIL TUB E A SSEMBLY PN 6 012T90G0 2, SERVICE BULLETIN
MOS
15-DEC-20 05 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 205 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 163 R06 NO. 1 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF P TO DRIVE AS SEMBLY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-TO-P TO OIL TUB E A SSEMBLY PN 6 012T90G0 2, SERVICE BULLETIN
MOS
31-MAR-2 006 HRS /MSC -
ENC
SB 72-0 163 R07 NO. 1 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF PTO DRIVE ASSE MB LY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-T-PTO OIL TUBE AS SEMBLY PN 6012T90G 02, SE RV ICE BULLETIN
MOS
07-JUN-2007 HRS /MSC -
ENC
SB 72-0 163 R08 NO. 1 ENGINE - INTRODUCTION OF PTO DRIVE ASSEMBL Y PN 6037T72G 19 AND FRO NT FRAME-TO- PTO O IL TUB E CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
ASS EMBLY PN 6 012T90G 02, SE RV ICE BULLETIN
MOS 01-A PR-2011
30-JUL-20 08 HRS /MSC - 0
ENC 0
SB 72-0 164 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
20-JUN-2004 HRS /MSC -
ENC
SB 72-0 165 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
25-JUL-20 04 HRS /MSC -
ENC
SB 72-0 166 NO. 1 ENGINE - ENGINE-HPT ROTOR ( 72-46- 00) INTRO DUCTION OF DESTRUCTIVE EVAL UATION METHOD FOR STAGE 1 CATEGORY 7
HPT BL ADE, SERVICE BULLETIN
MOS
03-NOV -2004 HRS /MSC A/R
ENC
SB 72-0 166 R01 NO. 1 ENGINE - ENGINE - HIG H PRESS URE TURBINE ROTOR (72-4 6-00) - INTRO DUCTION OF DESTRUCTIVE CATEGORY 7
EVA LUATION ME THOD FO R STAGE 1 HIG H PRESS URE TURBINE B LADES, S ERVICE BULLETIN
MOS
26-MAR-2 012 HRS /MSC -
ENC
SB 72-0 167 NO. 1 ENGINE - ENGINE-HPT ROTOR ( 72-46- 00) INTRO DUCTION OF AN EVAL UA TION METHOD FOR STAGE 2 HIGHT CATEGORY 7
PRESS URE TURBINE B LADES, S ERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 168 NO. 1 ENGINE - HPT-REWORK O F STAGE 1 HPT BL ADES, SE RV ICE BULLETIN CATEGORY 7 NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 169 NO. 1 ENGINE - HPT ROTOR - REWORK OF S TA GE 2 HPT BLADES, SERVICE BULL ETIN CATEGORY 7 NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 206 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 170 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
22-A UG -2004 HRS /MSC -
ENC
SB 72-0 171 NO. 1 ENGINE - INTRODUCTION OF NE W NO.1 A ND NO .2 BE ARING HO US ING ASSE MB LY PN 60 47T69G0 4 - EFF SN CATEGORY 7
872 004 THRU 87 3999 & 9500 00 THRU 950 329, S ERVICE BULLETIN
MOS
20-JAN-20 05 HRS /MSC A/R
ENC
SB 72-0 171 R01 NO. 1 ENGINE - INTRODUCTION OF NE W NO. 1 AND 2 BE ARING HO US ING ASSE MB LY PN 60 47T69G0 4, SERVICE CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
BULLE TIN
MOS 01-A PR-2011
15-DEC-20 05 HRS /MSC - 0
ENC 0
SB 72-0 173 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
24-O CT-20 04 HRS /MSC -
ENC
SB 72-0 176 NO. 1 ENGINE - ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP (72-41 -00) - INTRODUCTION OF NO. 5 ROLLE R CATEGORY 4
BEA RINGS PN 5 042T13P0 4, PN 5042T13P 05, PN 5022T87 P04, A ND PN 50 22T87P05 , SERVICE B ULL ETIN
MOS
17-DEC-20 04 HRS /MSC -
ENC
SB 72-0 176 R01 NO. 1 ENGINE - INTRODUCTION OF NO .5 ROLLE R BEA RINGS PN 5 042T13P0 4, 502 2T8 7P04 & 5022 T87 P05 - EFF S N CATEGORY 4
872 004 THRU 87 3999 & 9503 56 THRU 950 375, S ERVICE BULLETIN
MOS
18-FEB -2005 HRS /MSC A/R
ENC
SB 72-0 176 R02 NO. 1 ENGINE - INTRODUCTION OF NO .5 ROLLE R BEA RINGS PN 5 042T13P0 4/0 5 & 50 22T87P04 /05 - EFF SN 8720 04 CATEGORY 4
THRU 873999 , 9500 00 THRU 950 332, 9 50356 THRU 95037 5, SERVICE B UL LETIN
MOS
06-A PR-2005 HRS /MSC A/R
ENC
SB 72-0 176 R03 NO. 1 ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP (72-41- 00)-INTRODUCTION O F NO. 5 ROLLER BEARING S CATEGORY 4
PN 5042T13P 04, 50 42T13P05 , 5022 T87 P04, A ND PN 50 22T87P05 - E FF SN 87 2004 THRU 8 73999 , 95000 0 THRU 9503 32,
950 356 THRU 95 0375, SERVICE BULLE TIN
MOS
15-DEC-20 05 HRS /MSC A/R
ENC
SB 72-0 176 R04 NO. 1 ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP-INTRODUCTION OF NO . 5 RO LLER BEARING S P /N CATEGORY 4 COMPLIED WITH - A T MANUFACTURE
504 2T1 3P04, P/N 5042 T13 P05, P /N 5022T8P0 4, AND P/N 5 022T87P0 5, SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 207 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 177 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
30-JAN-20 05 HRS /MSC -
ENC
SB 72-0 178 NO. 1 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - AXIX-L SPUR GEA RS HA FT PN 501 9T38P04 - CATEGORY 5
INS PECTION, SE RV ICE BULLETIN
MOS
18-MAR-2 005 HRS /MSC A/R
ENC
SB 72-0 179 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INTRODUCTION O F A NEW REDESIGNED IGV INNER CATEGORY 5
SUPPO RT SHRO UD PN 50 26T65G0 6, SERVICE B UL LETIN
MOS
06-A PR-2005 HRS /MSC -
ENC
SB 72-0 179 R01 NO. 1 ENGINE - INTRODUCTION OF NE W REDESIGNED IGV INNER SUPPORT S HROUD P N 5026 T6 5G06, SERVICE CATEGORY 5
BULLE TIN
MOS
24-MAY -2005 HRS /MSC A/R
ENC
SB 72-0 179 R02 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INTRODUCTION O F A NEW REDESIGNED IGV INNER CATEGORY 5
SUPPO RT SHRO UD PN 50 26T65G0 6, SERVICE B UL LETIN
MOS
15-DEC-20 05 HRS /MSC -
ENC
SB 72-0 179 R03 NO. 1 ENGINE - INTRODUCTION OF NE W REDESIGNED IGV INNER SUPPORT S HROUD P N 5026 T6 5G06, SERVICE CATEGORY 5
BULLE TIN
MOS
08-A UG -2006 HRS /MSC A/R
ENC
SB 72-0 179 R04 NO. 1 ENGINE - COMPRESSO R STATOR ( 72-32- 00) -INTRO DUCTION OF A NEW REDES IG NED IG V INNER SUPP ORT CATEGORY 5
SHROUD PN 5026T65G 06 , SERVICE B ULL ETIN
MOS
07-S EP-20 07 HRS /MSC -
ENC
SB 72-0 179 R05 NO. 1 ENGINE - INTRODUCTION OF A NEW REDESIGNED IGV INNER S UP PORT SHROUD PN 5026T65 G06, S ERVICE CATEGORY 5
BULLE TIN
MOS
01-JUL-20 08 HRS /MSC -
ENC
SB 72-0 179 R06 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INTRODUCTIO N OF A NEW REDE SIGNED IGV INNER CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
SUPPO RT S HROUD P /N 5 026T65G 06, SE RV ICE BULLETIN
MOS 01-A PR-2011
20-S EP-20 10 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 208 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 179 R07 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INTRODUCTION O F A NEW REDESIGNED IGV INNER CATEGORY 3
SUPPO RT SHRO UD P/N 5026 T6 5G06, SERVICE BULLE TIN
MOS
04-A PR-2011 HRS /MSC -
ENC
SB 72-0 180 NO. 1 ENGINE - ENGINE - HPT MODULE (72-0 0-03) - INTRO DUCTION OF S TA GE 1 TURBINE NOZZLE WITH ALUMINIDE CATEGORY 7
COATING , STAGE 1 TURBINE NOZZLE SEGMENTS, HPT S TA TO R ASS EMBLY, TURBINE SEG ME NT SEALS A ND STA GE 2
FLOWMETER WASHER, S ERVICE BULLETIN
MOS
13-JUN-2005 HRS /MSC -
ENC
SB 72-0 180 R01 NO. 1 ENGINE - ENGINE - HPT MODULE (72-0 0-03) - INTRO DUCTION OF S TA GE 1 TURBINE NOZZLE WITH ALUMINIDE CATEGORY 7 NOT A PPLICA BLE
COATING , STAGE 1 TURBINE NOZZLE SEGMENTS, HPT S TA TO R ASS EMBLY, TURBINE SEG ME NT SEALS A ND STA GE 2
FLOWMETER WASHER, S ERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC A/R 0
ENC 0
SB 72-0 181 NO. 1 ENGINE - ENGINE - HIG H PRESS URE TURBINE S TA TO R (72-4 5-00) - INTRODUCTIO N OF S TA GE 1 HPT STATOR CATEGORY 7
SHROUDS PN 4124 T42 P16, HPT STATOR SHROUD HANGERS PN 5 099T05G1 2, AND TURBINE SEG ME NT SEALS P N
509 9T2 1P39, SERVICE BULL ETIN
MOS
13-JUN-2005 HRS /MSC -
ENC
SB 72-0 181 R01 NO. 1 ENGINE - ENGINE - HIG H PRESS URE TURBINE S TA TO R (72-4 5-00) - INTRODUCTIO N OF S TA GE 1 HPT STATOR CATEGORY 7
SHROUD HANGERS PN 50 99T05G1 2, AND TURB INE SEGMENT SEALS PN 5099 T21 P39, S ERVICE BULLETIN
MOS
HRS /MSC A/R
ENC
SB 72-0 181 R02 NO. 1 ENGINE - ENGINE - HIG H PRESS URE TURBINE S TA TO R (72-4 5-00) - INTRODUCTIO N OF S TA GE 1 HPT STATOR CATEGORY 7
SHROUDS PN 4124 T42 P16, HPT STATOR SHROUD HANGERS PN 5 099T05G1 2, AND TURBINE SEG ME NT SEALS P N
509 9T2 1P39, SERVICE BULL ETIN
MOS
06-O CT-20 05 HRS /MSC -
ENC

SB 72-0 181 R03 NO. 1 ENGINE - INTRODUCTION OF N2 AL LOY STAGE 1 HP TURBINE SHROUDS , SHROUD HANGERS, SE GMENT SEA LS, CATEGORY 7
SERVICE BULLETIN
MOS
15-JAN-20 08 HRS /MSC -
ENC
SB 72-0 181 R04 NO. 1 ENGINE - INTRODUCTION OF N2 AL LOY STAGE 1 HP TURBINE SHROUDS , SHROUD HANGERS, SE GMENT SEA LS, CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
20-A UG -2008 HRS /MSC - 0
ENC 0
SB 72-0 181 R05 NO. 1 ENGINE - HIG H PRESS URE TURBINE S TA TO R (72-4 5-00) - INTRO DUCTION OF N2 ALLO Y STA GE 1 HP TURBINE CATEGORY 7 COMPLIED WITH - P RE VIO US LY BY RE V4 AT
SHROUDS , SHROUD HANGER, AND SE GMENT SEA L, SERVICE BULLETIN MANUFACTURE
MOS 07-JUL-20 14
24-JUN-2014 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 209 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 182 NO. 1 ENGINE - ENGINE - COMBUSTIO N LINE R ASS EMBLY (72-4 1-00) - CO MB US TION LINER FIELD MO DIFICATION AND CATEGORY 6
REPAIR CONFIG URATION, SERVICE B ULL ETIN
MOS
09-FEB -2006 HRS /MSC -
ENC
SB 72-0 182 R01 NO. 1 ENGINE - ENGINE - COMBUSTIO N LINE R ASS EMBLY (72-4 1-00) - CO MB US TION LINER FIELD MODIFICATION AND CATEGORY 6
REPAIR CONFIG URATION, SERVICE B ULL ETIN
MOS
30-MAR-2 006 HRS /MSC -
ENC
SB 72-0 182 R02 NO. 1 ENGINE - ENGINE - COMBUSTIO N LINE R ASS EMBLY (72-4 1-00) - CO MB US TION LINER FIELD MODIFICATION AND CATEGORY 6
REPAIR CONFIG URATION, SERVICE B ULL ETIN
MOS
18-MAY -2006 HRS /MSC -
ENC
SB 72-0 182 R03 NO. 1 ENGINE - COMBUSTIO N LINE R FIEL D MODIFICA TION A ND RE PAIR CONFIGURATIO N, SERVICE BULLE TIN CATEGORY 6 NOT A PPLICA BLE
MOS 01-A PR-2011
22-JUN-2006 HRS /MSC - 0
ENC 0
SB 72-0 183 NO. 1 ENGINE - INTRODUCTION OF RE WO RK ED FRONT-O IL COOL ER BRACKET PN 41 59T34G0 1 & FUEL-OIL CO OLER CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
TUB E TO FUE L FILTER PN 5085 T60 G02 - EFF S N 8720 04 THRU 873 999, 9 50000 THRU 95032 6, SERVICE BUL LETIN
MOS 01-A PR-2011
22-JUN-2005 HRS /MSC A/R 0
ENC 0
SB 72-0 184 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
HRS /MSC INF
ENC
SB 72-0 184 R01 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
15-A UG -2007 HRS /MSC -
ENC
SB 72-0 185 NO. 1 ENGINE - ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP ASSEMBL Y - INTRODUCTION O F RE-WORKED CATEGORY 6
B-S UMP HOUSING PART NO. 4923T00 G01, S ERVICE BULLETIN
MOS
HRS /MSC A/R
ENC
SB 72-0 186 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -3A1/-3B TURBO FA N ENGINE S, SE RV ICE CATEGORY 8
BULLE TIN
MOS
HRS /MSC INF
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 210 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 187 NO. 1 ENGINE - ENGINE - HPT MODULE - INTRO DUCTION OF N5 ALLO Y S TA GE 2 HP TURBINE NOZZLE SEG ME NTS, CATEGORY 7 NOT A PPLICA BLE
SEA LS AND FLOW ME TER WASHERS., SERVICE BULL ETIN
MOS 01-A PR-2011
HRS /MSC A/R 0
ENC 0
SB 72-0 187 R01 NO. 1 ENGINE - ENGINE - HPT MODULE - INTRO DUCTION OF N5 ALLO Y S TA GE 2 HP TURBINE NOZZLE SEG ME NTS, CATEGORY 7
SEA LS AND FLOW ME TER WASHERS., SERVICE BULL ETIN
MOS
13-A PR-2011 HRS /MSC -
ENC
SB 72-0 187 R02 NO. 1 ENGINE - ENGINE - HPT MODULE - INTRO DUCTION OF N5 ALLO Y S TA GE 2 HP TURBINE NOZZLE SEG ME NTS, CATEGORY 7
SEA LS AND FLOW ME TER WASHERS, SE RV ICE BULLETIN
MOS
20-O CT-20 11 HRS /MSC -
ENC
SB 72-0 187 R03 NO. 1 ENGINE - HPT MODULE (72-0 0-03) - INTRO DUCTION OF N5 ALLO Y S TA GE 2 HP TURBINE NO ZZLE SEG ME NTS, CATEGORY 7 COMPLIED WITH - P RE VIO US LY CO MP LIE D
SEA LS, AND FLO WME TER WASHERS, SE RV ICE BULLETIN WITH: N/A DUE TO SB 72- 0187 INCORPORATED
WITH P RO DUCTION
MOS 25-A UG -2020
24-A UG -2020 HRS /MSC -
ENC
SB 72-0 188 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E, SE RV ICE BULLETIN CATEGORY 8
MOS
HRS /MSC INF
ENC
SB 72-0 189 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E, SE RV ICE BULLETIN CATEGORY 8
MOS
HRS /MSC INF
ENC
SB 72-0 189 R01 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/3A1/-3A 2/-3 B TURBO FA N ENGINE S, CATEGORY 8
SERVICE BULLETIN
MOS
11-MAY -2006 HRS /MSC -
ENC
SB 72-0 190 NO. 1 ENGINE - ENGINE - AG B - INTRODUCTION OF AGB CARBON SEALS P/N'S 5 018T49P0 5, 501 6T3 2P05, 4138T09P 03, CATEGORY 5
SERVICE BULLETIN
MOS
HRS /MSC A/R
ENC
SB 72-0 190 R01 NO. 1 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) INTRODUCTION OF AGB CARBON S EALS PNS CATEGORY 5
413 8T0 9P02, 4138T09P 03, 50 16T32P05 , 5016 T32 P06, 5 018T48P 04, 501 8T48P05 , 5018T49 P05, A ND 5018T49P 06, SE RV ICE
BULLE TIN
MOS
14-JUN-2007 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 211 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 190 R02 NO. 1 ENGINE - INTRODUCTION OF AGB CARBON S EALS PNS 413 8T0 9P02, 4138T09P 03, 50 16T32P05 , 5016 T32 P06, CATEGORY 5
501 8T4 8P04, 5018T48P 05, 50 18T49P05 , AND 50 18T49P06 , SERVICE B ULL ETIN
MOS
03-JAN-20 08 HRS /MSC -
ENC
SB 72-0 190 R03 NO. 1 ENGINE - INTRODUCTION OF AGB CARBON S EALS PNS 413 8T0 9P02, 4138T09P 03, 50 16T32P05 , 5016 T32 P06, CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
501 8T4 8P04, 5018T48P 05, 50 18T49P05 , A ND 5018T49 P06, S ERVICE BULLETIN
MOS 01-A PR-2011
20-A UG -2008 HRS /MSC - 0
ENC 0
SB 72-0 191 NO. 1 ENGINE - ENGINE - SP ARE P ARTS RELEA SE, SE RV ICE BULLETIN CATEGORY 8
MOS
HRS /MSC INF
ENC
SB 72-0 192 NO. 1 ENGINE - ENGINE - COMBUSTIO N SECTIO N (72- 41-00) - INTRODUCTIO N OF S TA GE 1 TURBINE NOZZL E S EGMENT CATEGORY 7 NOT A PPLICA BLE
AIRFO IL REPLACEMENT REP AIR, S ERVICE BULLE TIN
MOS 01-A PR-2011
24-S EP-20 09 HRS /MSC - 0
ENC 0
SB 72-0 193 NO. 1 ENGINE - INS PECTION OF HPC S TA GE 2 V G TURNB UCKL ES, SE RV ICE BULLETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
18-MAY -2006 HRS /MSC - 0
ENC 0
SB 72-0 194 NO. 1 ENGINE - REPLA CE ME NT OF SWIRLER AS SEMBLY PN 5071T48 G01, S ERVICE BULLETIN CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
31-MAY -2006 HRS /MSC - 0
ENC 0
SB 72-0 195 NO. 1 ENGINE - UPGRADE OF CF34-1A /-3 A TO CF3 4A2, S ERV ICE BULLETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 72-0 195 R1 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - UPGRADE OF CF34-1A AND CF34-3 A MO DEL ENGINES TO CF34-3A 2, SE RV ICE CATEGORY 7
BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R2 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - UPGRADE OF CF34-1 A A ND CF34- 3A MO DE L E NG INES TO CF34-3 A2, CATEGORY 7
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R3 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - UPGRADE OF CF34-1 A A ND CF34- 3A MO DE L E NG INES TO CF34-3 A2, CATEGORY 7
SERVICE BULLETIN
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 212 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 195 R4 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - UPGRADE OF CF34-1 A A ND CF34- 3A MO DE L E NG INES TO CF34-3 A2, CATEGORY 7
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R5 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - UPGRADE OF CF34-1 A A ND CF34- 3A MO DE L E NG INES TO CF34-3 A2, CATEGORY 7
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R6 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - UPGRADE OF CF34-1 A A ND CF34- 3A MO DE L E NG INES TO CF34-3 A2, CATEGORY 7
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R7 NO. 1 ENGINE - UPGRADE OF CF34-1A AND CF34-3 A MODEL ENGINES TO CF34-3A 2, SE RVICE BULLETIN CATEGORY 7
MOS
HRS /MSC -
ENC
SB 72-0 195 R8 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - UPGRADE OF CF34-1 A A ND CF34- 3A MO DE L E NG INES TO CF34-3 A2, CATEGORY 7
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R9 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - UPGRADE OF CF34-1A AND CF34-3 A MO DEL ENGINES TO CF34-3A 2, SE RV ICE CATEGORY 7 NOT A PPLICA BLE - BY ENGINE MODEL - MSN
BULLE TIN
MOS 16-A PR-2015
HRS /MSC -
ENC
SB 72-0 196 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
30-A PR-2006 HRS /MSC -
ENC
SB 72-0 197 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D ACCESSO RY GE AR BO X AXIS K CRANKING PLUG PN 4189T24G 01 AND CATEGORY 5
RETAIN RING PN AS 3217- 127, S ERVICE BULLETIN
MOS
12-JUN-2006 HRS /MSC A/R
ENC
SB 72-0 197 R01 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D ACCESSO RY GE AR BO X AXIS K CRANKING PLUG PN 4189T24G 01 AND CATEGORY 5
RETAIN RING PN AS 3217- 127, S ERVICE BULLETIN
MOS
12-O CT-20 06 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 213 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 197 R02 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D ACCESSO RY GE AR BO X AXIS K CRANKING PLUG PN 4189T24G 01 AND CATEGORY 5
RETAIN RING PN AS 3217- 127, S ERVICE BULLETIN
MOS
10-A PR-2007 HRS /MSC -
ENC
SB 72-0 197 R03 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D ACCESSO RY GE AR BO X AXIS K CRANKING PLUG PN 4189T24G 01 AND CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
RETAINER RING PN AS 3217- 127, S ERV ICE BULLETIN
MOS 01-A PR-2011
11-A UG -2008 HRS /MSC - 0
ENC 0
SB 72-0 197 R04 NO. 1 ENGINE - ACCESSO RY DRIVE S ECTION (7 2-62-0 0) - INTRODUCTION O F IMPROV ED ACCESS ORY G EAR B OX AXIS CATEGORY 5 COMPLIED WITH - S B 7 2-019 7 R3 IS FACTORY
K CRA NKING PLUG PN 41 89T24G01 AND RE TAINER RING PN AS32 17-127 , SERVICE B UL LETIN INCORPO RA TED. S O NO FURTHER ACTIO N
REQUIRE D FOR SB 72 -0197 R4
MOS 16-A PR-2015
08-JAN-20 15 HRS /MSC -
ENC
SB 72-0 197 R05 NO. 1 ENGINE - ACCESSO RY DRIVE S ECTION (7 2-62-0 0) - INTRODUCTION O F IMPROV ED ACCESS ORY G EAR B OX AXIS CATEGORY 5 NOT A PPLICA BLE - TO A6 -ELD E NG INES BY
K CRA NKING PLUG PN 41 89T24G01 AND RE TAINER RING PN AS32 17-127 , SERVICE B UL LETIN ENGINE S /N.
MOS 27-JUL-20 15
01-JUN-2015 HRS /MSC -
ENC
SB 72-0 198 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 201 NO. 1 ENGINE - REWORK OF STAG E 1 HPT NOZZLE SUPPORT, SE RVICE BULLETIN CATEGORY 6
MOS
13-A PR-2007 HRS /MSC -
ENC
SB 72-0 201 R01 NO. 1 ENGINE - REWORK OF THE S TA GE 1 HPT NO ZZLE SUPPO RT, S ERVICE BULLETIN CATEGORY 6 NOT A PPLICA BLE
MOS 01-A PR-2011
16-NOV -2007 HRS /MSC - 0
ENC 0
SB 72-0 202 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF STAG E 3 CATEGORY 5
SHROUD SECTOR P N 509 9T32G02 FOR CF34-3 B E NG INE MO DE LS, SE RV ICE BULLETIN
MOS
HRS /MSC A/R
ENC
SB 72-0 202 R01 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF STAG E 3 CATEGORY 5
SHROUD SECTOR P N 509 9T32G02 FOR CF34-3 B E NG INE MO DE LS, SE RV ICE BULLETIN
MOS
HRS /MSC A/R
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 214 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 202 R02 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF STAG E 3 CATEGORY 5
SHROUD SECTOR P N 509 9T32G02 FOR CF34-3 B E NG INE MO DE LS, SE RV ICE BULLETIN
MOS
11-A PR-2007 HRS /MSC -
ENC
SB 72-0 202 R03 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF STAG E 3 CATEGORY 5
SHROUD SECTOR P N 509 9T32G02 FOR CF34-3 B E NG INE MO DE LS, SE RV ICE BULLETIN
MOS
02-S EP-20 10 HRS /MSC -
ENC
SB 72-0 202 R04 NO. 1 ENGINE - INTRODUCTION OF STAGE 3 SHRO UD SECTOR PN 5099T32 G02 FO R CF34-3B ENGINE MODEL S, CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
01-NOV -2010 HRS /MSC - 0
ENC 0
SB 72-0 202 R05 NO. 1 ENGINE - LOW PRESSURE TURBINE S TATOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF STAG E 3 SHROUD CATEGORY 5 NOT A PPLICA BLE - RE V 0 4 IS ALREADY C/W. NO
SECTOR P N 509 9T3 2G02 FOR CF34-3B E NG INE MO DE LS, SE RV ICE BULLETIN FURTHER ACTIO N REQUIRE D.
MOS 10-MAR-2 016
08-FEB -2016 HRS /MSC -
ENC
SB 72-0 203 R03 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF STAG E 3 CATEGORY 7 NOT A PPLICA BLE
SHROUD SECTOR P N 509 9T32G02 , PN 60 20T00G0 4, AND PN 6020 T00 G06 FOR USE ON CF34-1 A/-3 A/- 3A2/-3A1 ENGINE
MODELS, SERVICE BULLE TIN
MOS 01-A PR-2011
20-MAY -2009 HRS /MSC A/R 0
ENC 0
SB 72-0 204 REV 01 NO. 1 ENGINE - REWORK HP T STATOR FOR BORESCOPE , SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 72-0 205 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
27-A UG -2006 HRS /MSC -
ENC
SB 72-0 205 R01 NO. 1 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B TURBOFAN ENG INES , SERVICE BULL ETIN CATEGORY 8
MOS
15-O CT-20 08 HRS /MSC -
ENC
SB 72-0 206 NO. 1 ENGINE - HPT STATOR ASSE MB LY-INTRODUCTION OF ALTERNATE B LIND RIVETS TO REPL ACE A FT FLA NG E CATEGORY 7
GANG CHANNEL S, SE RVICE BULLETIN
MOS
21-NOV -2006 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 215 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 206 R01 NO. 1 ENGINE - HIG H PRESS URE TURBINE S TA TO R ASS EMB LY (72-4 5-00)-INTRODUCTION OF ALTERNATE BLIND CATEGORY 7
RIV ETS TO REPLACE AFT FLANGE GA NG CHANNE LS -, SERVICE B UL LETIN
MOS
02-JUN-2009 HRS /MSC -
ENC
SB 72-0 207 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
26-NOV -2006 HRS /MSC -
ENC
SB 72-0 209 NO. 1 ENGINE - INTRODUCTION OF A REDES IGNED FA N BLA DE RETAINING PIN, S ERVICE BULLETIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
28-S EP-20 07 HRS /MSC - 0
ENC 0
SB 72-0 209 R01 NO. 1 ENGINE - FAN ROTOR (72-21 -00) - INTRODUCTION OF A REDESIGNED FAN B LADE RE TAINING PIN, SERVICE CATEGORY 2
BULLE TIN
MOS
28-S EP-20 17 HRS /MSC -
ENC
SB 72-0 210 NO. 1 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B TURBOFAN ENG INES , SERVICE BULL ETIN CATEGORY 8
MOS
15-FEB -2007 HRS /MSC -
ENC
SB 72-0 214 NO. 1 ENGINE - INTRODUCTION OF SPIRA L P AINTING TO THE FORWA RD OUTE R SPINNE R, SERVICE BULL ETIN CATEGORY 7
MOS
05-MAY -2008 HRS /MSC -
ENC
SB 72-0 215 NO. 1 ENGINE - ECI INS PECTION OF FAN BLADE PIN HOLE, SERVICE BULLE TIN CATEGORY 3
MOS
HRS /MSC -
ENC
SB 72-0 215 R01 NO. 1 ENGINE - ECI INS PECTION OF FAN BLADE PIN HOLE, SERVICE BULLE TIN CATEGORY 3 NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 215 R02 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - E CI INSPECTIO N OF FA N BLADE PIN HOLE (FAN BLADE PN CATEGORY 3 NOT A PPLICA BLE - FA CTORY INCORPORATED
601 830P1 4), SERVICE BULLETIN
MOS 22-A PR-2015
HRS /MSC -
ENC
SB 72-0 215 R03 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - E CI INSPECTIO N OF FA N BLADE PIN HOLE , SERVICE B ULL ETIN CATEGORY 3 NOT A PPLICA BLE - FA CTORY INCORPORATED
MOS 16-A PR-2015
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 216 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 216 NO. 1 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B TURBOFAN ENG INES , SERVICE BULL ETIN CATEGORY 8
MOS
27-MAY -2007 HRS /MSC -
ENC
SB 72-0 217 NO. 1 ENGINE - REWORK OF THE A IR BALANCE PISTO N STATIO NA RY SE AL, SE RV ICE BULLETIN CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
27-JUL-20 07 HRS /MSC - 0
ENC 0
SB 72-0 218 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
23-S EP-20 07 HRS /MSC -
ENC
SB 72-0 219 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
28-O CT-20 07 HRS /MSC -
ENC
SB 72-0 221 NO. 1 ENGINE - INTRODUCTION OF FA N BLA DE P/N 60 18T30P1 5, SERVICE B UL LETIN CATEGORY 7
MOS
07-JAN-20 08 HRS /MSC -
ENC
SB 72-0 221 R01 NO. 1 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - INTRODUCTION O F FAN B LADE P /N 6018T30P 15, CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
30-JAN-20 09 HRS /MSC - 0
ENC 0
SB 72-0 222 NO. 1 ENGINE - INTRODUCTION OF A NEW HYDRA ULIC DRAIN LINE, SERVICE B UL LETIN CATEGORY 7
MOS
09-JAN-20 08 HRS /MSC -
ENC
SB 72-0 222 R01 NO. 1 ENGINE - ENGINE - GE NE RAL - INTRODUCTIO N OF A NEW HYDRAULIC DRAIN LINE , SERVICE B UL LETIN CATEGORY 7
MOS
12-JUL-20 11 HRS /MSC -
ENC
SB 72-0 222 R02 NO. 1 ENGINE - ENGINE - GE NE RAL - INTRODUCTIO N OF A NEW HYDRAULIC DRAIN LINE , SERVICE B UL LETIN CATEGORY 7
MOS
05-NOV -2013 HRS /MSC -
ENC
SB 72-0 222 R03 NO. 1 ENGINE - GE NERAL - INTRODUCTIO N OF A NEW HY DRAULIC DRAIN LINE , SERVICE B UL LETIN CATEGORY 7 NOT A PPLICA BLE - THIS S B IS SUPERSE DED BY
REV 4
MOS 18-A PR-2015
03-O CT-20 14 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 217 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 222 R04 NO. 1 ENGINE - GE NERAL - INTRODUCTIO N OF A NEW HY DRAULIC DRAIN LINE , SERVICE B UL LETIN CATEGORY 7 NOT A PPLICA BLE - AT ENGINE OVERHAUL -
CUS TO ME R OPTION
MOS 09-A PR-2015
24-MAR-2 015 HRS /MSC -
ENC
SB 72-0 223 NO. 1 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B ENGINES , SERVICE B ULL ETIN CATEGORY 8
MOS
23-DEC-20 07 HRS /MSC -
ENC
SB 72-0 224 NO. 1 ENGINE - SPA RE PA RTS RELEA SE, SE RV ICE BULLETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 72-0 224 R01 NO. 1 ENGINE - LPT STATOR AS SEMBLY (72 -52-00 ) - CLARIFICA TION OF CONFIGURATIO N AND USAG E O F THE STAG ES CATEGORY 9 COMPLIED WITH - INFO RMATIONAL ONLY
3, 4 , AND 5 SHROUD SECTORS, SE RV ICE BULLETIN
MOS 04-MAY -2016
15-A PR-2016 HRS /MSC -
ENC
SB 72-0 225 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - REBLA DE O F E NG INES SHIPPED WITH CATEGORY 3 NOT A PPLICA BLE
NON-STANDA RD STAGE 9 CO MPRE SSOR BLADE COUNT, SE RV ICE BULLETIN
MOS 01-A PR-2011
11-FEB -2008 HRS /MSC - 0
ENC 0
SB 72-0 226 NO. 1 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B ENGINES , SERVICE B ULL ETIN CATEGORY 8
MOS
HRS /MSC -
ENC
SB 72-0 228 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
28-MAR-2 008 HRS /MSC -
ENC
SB 72-0 229 NO. 1 ENGINE - ENGINE - FAN ROTOR (72-21 -00) - FIELD MANAG EMENT PROGRAM OF FAN BLADES P/N 601 8T30P14 CATEGORY 2
MADE FROM VSMPO MILL SO URCE MATE RIAL., SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 229 R01 NO. 1 ENGINE - FIE LD MANAGEMENT PRO GRAM O F FAN BL ADE S P/N 6018T30 P14 MADE FRO M VSMPO MILL SOURCE CATEGORY 2 NOT A PPLICA BLE
MATERIAL , SERVICE B UL LETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 229 R01 PART A NO. 1 ENGINE - INS PECT FIE LD MANAGE ME NT PROGRAM O F FAN BL ADES P/N 6018T30 P14 MADE FRO M VSMPO MILL CATEGORY 2 NOT A PPLICA BLE
SOURCE MA TERIAL, S ERVICE BULLETIN THE FAN BLADE PIN HOLES
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 218 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 229 R01 PART B NO. 1 ENGINE - REPLA CE FIE LD MANAGE ME NT PROGRAM O F FAN BL ADES P/N 6018 T30 P14 MADE FRO M VSMPO MILL CATEGORY 2 NOT A PPLICA BLE
SOURCE MA TERIAL, S ERVICE BULLETIN FAN B LADE P/N 6018T30 P14
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 230 NO. 1 ENGINE - ENGINE - FAN ROTOR (72-21 -00) - FIELD MANAG EMENT PROGRAM OF FAN BLADES P/N 492 3T56G08 CATEGORY 2
MADE FROM VSMPO MILL SO URCE MATE RIAL, SERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 230 R01 NO. 1 ENGINE - FIE LD MANAGEMENT PRO GRAM O F FAN BL ADE S P/N 4923T56 G08 MADE FROM V SMPO MILL SOURCE CATEGORY 2 NOT A PPLICA BLE
MATERIAL , SERVICE B UL LETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 231 NO. 1 ENGINE - VISUAL INSP ECTION O F FAN CASE AB RA DA BLE RUB STRIP FOR FAN BLADE TIP CONTA CT, S ERV ICE CATEGORY 2
BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 231 R01 NO. 1 ENGINE - VISUAL INSP ECTION O F FAN CASE AB RA DA BLE RUB STRIP FOR FAN B LADE TIP CO NTACT, SERVICE CATEGORY 2
BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 231 R02 NO. 1 ENGINE - VISUAL INSP ECTION O F FAN CASE AB RA DA BLE RUB STRIP FOR FAN BLADE TIP CONTA CT, S ERV ICE CATEGORY 2 NOT A PPLICA BLE
BULLE TIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 236 R01 NO. 1 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B ENGINES , SERVICE B ULL ETIN CATEGORY 8
MOS
16-O CT-20 08 HRS /MSC -
ENC
SB 72-0 237 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RELEA SE FO R CF3 4-1A/-3A/-3A 2/-3 B E NG INES, SERVICE CATEGORY 8
BULLE TIN
MOS
14-O CT-20 08 HRS /MSC -
ENC
SB 72-0 239 NO. 1 ENGINE - ENGINE - COMBUSTOR A SSEMBLY (7 2-00-40 ) - INTRODUCTION OF FL AT WASHER P/N AN960C10L TO CATEGORY 9
HEAT S HIELD THRUST LINK CO VERS ATTACHING PARTS, S ERV ICE BULLETIN
MOS
20-JUL-20 09 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 219 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 240 NO. 1 ENGINE - ENGINE - COMBUSTIO N LINE R ASS EMBLY (72-4 2-00) - INTRO DUCTIO N OF COMBUSTOR INNER LINER, CATEGORY 7
SERVICE BULLETIN
MOS
08-JUN-2009 HRS /MSC -
ENC
SB 72-0 241 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF SHROUD CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SECTOR P ART NUMBE RS FOR S TA GE 4 A ND STAGE 5, S ERVICE BULLETIN
MOS 01-A PR-2011
20-MAY -2009 HRS /MSC - 0
ENC 0
SB 72-0 241 R01 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF SHROUD CATEGORY 7
SECTOR P ART NUMBE RS FOR S TA GE 4 A ND STAGE 5, S ERVICE BULLETIN
MOS
15-JAN-20 13 HRS /MSC -
ENC
SB 72-0 242 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RELEA SE FO R CF3 4-1A/-3A/-3A 1/-3 A2/-3B ENGINES , CATEGORY 8
SERVICE BULLETIN
MOS
03-MAR-2 009 HRS /MSC -
ENC
SB 72-0 243 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RELEA SE FO R CF3 4-1A/-3A/-3A 1/-3 A2/-3B ENGINES (NO. CATEGORY 8
3 BEARING HOUSING) -, SERVICE B UL LETIN
MOS
17-JUN-2009 HRS /MSC -
ENC
SB 72-0 244 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - INTRODUCTION O F STAGE 1 COMPRESSO R ROTOR BL ISK CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
P/N 50 87T84P03 , SERVICE B ULL ETIN
MOS 01-A PR-2011
22-JUN-2009 HRS /MSC - 0
ENC 0
SB 72-0 247 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR - INTRODUCTION O F NEW VG S PINDLE NUT P/N 4037T84 P04, CATEGORY 7
SERVICE BULLETIN
MOS
24-MAR-2 010 HRS /MSC -
ENC
SB 72-0 247 R01 NO. 1 ENGINE - ENGINE - COMPRESSO R STATOR - INTRODUCTION O F NEW VG S PINDLE NUT P/N 4037T84 P04, CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
20-JUL-20 10 HRS /MSC - 0
ENC 0
SB 72-0 249 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RE LEASE FOR CF34-B J ENGINES, SE RV ICE BULLETIN CATEGORY 8
MOS
10-A UG -2010 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 220 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 250 NO. 1 ENGINE - FAN ROTOR (72-21 -00) - REP LACEMENT OF FAN BLADES P/N 601 8T3 0P14 OR P/N 4923T56 G08 MADE CATEGORY 2
FRO M ALL VAC MILL SOURCE MATERIAL , S ERV ICE BULLETIN
DAYS
30-A UG -2010 HRS /MSC -
ENC
SB 72-0 250 R01 NO. 1 ENGINE - FAN ROTOR (72-21 -00) - REP LACEMENT OF FAN BLADES P/N 6 018T30P1 4 O R P/N 492 3T56G08 MADE CATEGORY 2
FRO M ALL VAC MILL SOURCE MATERIAL, SE RV ICE BULLETIN
MOS
01-S EP-20 10 HRS /MSC -
ENC
SB 72-0 251 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - INSP ECTION FOR PART NUMB ER REMARKING A ND CATEGORY 7
INTRODUCTION OF STAG E 1 COMPRESS OR ROTOR BLISK P/N 5087T84 P02, S ERVICE BULLETIN
MOS
24-JAN-20 11 HRS /MSC -
ENC
SB 72-0 251 R01 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - INSPECTION FOR PA RT NUMBER RE MA RK ING AND CATEGORY 7
INTRODUCTION OF STAGE 1 CO MP RE SSOR RO TO R BLISK P/N 508 7T84P02 , SERVICE B ULL ETIN
MOS
23-FEB -2011 HRS /MSC -
ENC
SB 72-0 251 R02 NO. 1 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - INSPECTION FOR PA RT NUMBER RE MA RK ING AND CATEGORY 7
INTRODUCTION OF STAGE 1 CO MP RE SSOR RO TO R BLISK P/N 508 7T84P02 , SERVICE B ULL ETIN
MOS
14-A PR-2011 HRS /MSC -
ENC
SB 72-0 252 NO. 1 ENGINE - ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP (72-41 -00) - INTRODUCTION OF IMP RO VED NO. CATEGORY 6
5 ROLLER BEARING P /N 5 042T13P0 6, SE RVICE BULLETIN
MOS
31-MAR-2 011 HRS /MSC -
ENC
SB 72-0 253 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ TURBOFAN ENGINES, S ERVICE CATEGORY 8
BULLE TIN
MOS
04-MAY -2011 HRS /MSC -
ENC
SB 72-0 254 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - CF34-BJ ENG INE SERIALIZA TION - MANUFA CTURING SEQUENCE, CATEGORY 9
SERVICE BULLETIN
MOS
09-S EP-20 11 HRS /MSC -
ENC
SB 72-0 255 NO. 1 ENGINE - ENGINE - FAN S TATOR (72-2 3-00) - ENGINE MOUNT QUALITY ISSUE, S ERVICE BULLE TIN LIMITED
DIS TRIBUTION
MOS
14-JAN-20 12 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 221 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 255 R01 NO. 1 ENGINE - ENGINE - FAN S TATOR (72-2 3-00) - ENGINE MOUNT QUALITY ISSUE, S ERVICE BULLE TIN LIMITED
DIS TRIBUTION
MOS
02-FEB -2012 HRS /MSC -
ENC
SB 72-0 256 NO. 1 ENGINE - ENGINE - STAGE S IGV THRO UG H 13 COMPRESSO R STATOR (7 2-32-0 0) - INTRODUCTION O F CATEGORY 3
REDESIGNED P INNED IGV INNER S UP PORT SHROUD, IG V O UTER BUSHING, IGV BUSHING , AND IGV UP PER A ND
LOWER SHROUD RING SEGMENTS, S ERV ICE BULLETIN
MOS
13-A PR-2012 HRS /MSC - 300 00 M
ENC
SB 72-0 256 R01 NO. 1 ENGINE - ENGINE - STAGE S IGV THRO UG H 13 COMPRESSO R STATOR (7 2-32-0 0) - INTRODUCTION O F CATEGORY 3 - A T NEXT S HOP V ISIT OF THE ENGINE/MODULE
REDESIGNED P INNED IGV INNER S UP PORT SHROUD, IG V O UTER BUSHING, IGV BUSHING , AND IGV UP PER A ND (CAT 3 ). NEXT DUE 30000 HRS
LOWER SHROUD RING SEGMENTS, S ERV ICE BULLETIN
MOS (EFF)
28-A UG -2013 HRS /MSC -
ENC

SB 72-0 257 NO. 1 ENGINE - ENGINE - STAGE S IGV THRO UG H 13 COMPRESSO R STATOR (7 2-32-0 0) - INTRODUCTION O F CATEGORY 3
REDESIGNED COMPRESS OR IGV THROUGH STAGE 3 LEVE R ARMS, SERVICE BULLETIN
MOS
02-NOV -2012 HRS /MSC -
ENC
SB 72-0 257 R01 NO. 1 ENGINE - ENGINE - STAGE S IGV THRO UG H 13 COMPRESSO R S TA TO R (72- 32-00) - INTRODUCTIO N OF CATEGORY 3
REDESIGNED COMPRESS OR IGV THROUGH STAGE 3 LEVE R ARMS, SERVICE BULLETIN
MOS
03-DEC-20 12 HRS /MSC -
ENC
SB 72-0 257 R02 NO. 1 ENGINE - STAGE S IGV THRO UG H 13 COMPRESSO R STATOR (7 2-32-0 0) - INTRODUCTION OF REDE SIGNED CATEGORY 3 - IN NEXT SHOP VISIT
COMPRESSO R IGV THROUGH S TA GE 3 L EVER ARMS , SERVICE B ULL ETIN
MOS (EFF)
11-FEB -2021 HRS /MSC ESV
ENC
AFL
SB 72-0 258 NO. 1 ENGINE - FAN STATOR (72-23 -00) - INTRO DUCTION OF NEW SHIM P /N 2448M31 P01, S ERVICE BULLETIN CATEGORY 5
MOS (EFF)
30-JUL-20 12 HRS /MSC -
ENC
SB 72-0 259 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ TURBOFAN ENGINES, S ERVICE CATEGORY 8
BULLE TIN
MOS
17-MAY -2013 HRS /MSC -
ENC
SB 72-0 263 NO. 1 ENGINE - CHA NG E OF CF34-3A AND CF34-3A 2 E NG INES FRO M A SCHEDULE D INTERVAL MAINTENANCE PLAN CATEGORY 7 NOT A PPLICA BLE - N/A ENGINE INS TA LLED IS
TO A COMBINED SCHEDULED INTE RV AL AND TASK ORIE NTED MA INTENANCE PL AN, SERVICE BULL ETIN CF- 34-3B
MOS 22-A PR-2015
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 222 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 263 R1 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - CHANG E OF CF34-3A AND CF34-3A 2 E NG INES FRO M A SCHEDULE D INTERVAL CATEGORY 7 NOT A PPLICA BLE - BY ENGINE MODEL
MAINTENANCE P LAN TO A COMBINED SCHE DULE D INTERVAL AND TASK O RIENTED MAINTENANCE PLAN, SE RV ICE
BULLE TIN
MOS 25-FEB -2015
HRS /MSC -
ENC
SB 72-0 263 R2 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - CHANG E OF CF34-3A AND CF34-3A 2 E NG INES FRO M A SCHEDULE D INTERVAL CATEGORY 7 NOT A PPLICA BLE - BY ENGINE MODEL
MAINTENANCE P LAN TO A COMBINED SCHE DULE D INTERVAL AND TASK O RIENTED MAINTENANCE PLAN, SE RV ICE
BULLE TIN
MOS 25-FEB -2015
HRS /MSC -
ENC
SB 72-0 268 NO. 1 ENGINE - ENGINE - REAR MA IN MO UNT A SSEMBLY (72 -44-00 ) - SP OT FLUORESCENT PE NE TRANT INSPECTION CATEGORY 3
OF LH AND RH A FT MO UNT RING L UG S, SERVICE B UL LETIN
MOS (EFF)
19-A UG -2013 HRS /MSC -
ENC
SB 72-0 268 R01 NO. 1 ENGINE - ENGINE - REAR MA IN MO UNT A SSEMBLY (72 -44-00 ) - SP OT FLUORESCENT PE NE TRANT INSPECTION CATEGORY 3
OF LH AND RH A FT MO UNT RING L UG S, SERVICE B UL LETIN
MOS
05-NOV -2013 HRS /MSC ESV
ENC
SB 72-0 268 R02 NO. 1 ENGINE - REAR MA IN MOUNT AS SEMBLY (72 -44-00 ) - SPO T FLUORESCENT PENETRANT INS PECTION OF LH AND CATEGORY 3
RH AFT MOUNT RING LUGS, SERVICE BULLE TIN
MOS
09-JAN-20 14 HRS /MSC ESV
ENC
SB 72-0 270 NO. 1 ENGINE - ENGINE - FAN S TATOR ASSE MB LY (72-00 -23) - FORWARD MOUNT RIB INSPECTIO N, S ERVICE BULLE TIN CATEGORY 2 COMPLIED WITH - CARRIE D OUT NIL DEFECTS
MOS 25-S EP-20 13
20-A UG -2013 HRS /MSC - 766 .9
ENC 324
SB 72-0 270 R01 NO. 1 ENGINE - ENGINE - FAN S TATOR ASSE MB LY (72-00 -23) - FORWARD MOUNT RIB INSPECTIO N, S ERVICE BULLE TIN CATEGORY 2 NOT A PPLICA BLE - ENGINES HAVE NOT B EEN
REMOVED
MOS 23-A PR-2015
05-NOV -2013 HRS /MSC -
ENC
SB 72-0 270 R02 NO. 1 ENGINE - FAN STATOR ASSE MB LY (72-00 -23) - FORWARD MOUNT RIB INSPECTION, S ERVICE BULLE TIN CATEGORY 2 NOT A PPLICA BLE - ENGINES HAVE NOT B EEN
REMOVED
MOS 23-A PR-2015
15-A PR-2014 HRS /MSC -
ENC
SB 72-0 270 R03 NO. 1 ENGINE - FAN STATOR ASSE MB LY (72-00 -23) - FORWARD MOUNT RIB INSPECTION, S ERVICE BULLE TIN CATEGORY 2 NOT A PPLICA BLE - THIS S B IS N/A AS ENGINES
ARE NOT REMOVE D FRO M THE WING TIL L DATE
MOS 16-A PR-2015
09-JAN-20 15 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 223 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 270 R04 NO. 1 ENGINE - FAN STATOR ASSE MB LY (72-00 -23) - FORWARD MOUNT RIB INSPECTION, S ERVICE BULLE TIN CATEGORY 2 NOT A PPLICA BLE - AS ENGINES ARE NOT
REMOVED FROM THE WING TIL L DATE.
MOS 27-JUL-20 15
29-MAY -2015 HRS /MSC -
ENC
SB 72-0 276 NO. 1 ENGINE - EXHAUST CO MP ONENTS (72 -54-00 ) - RELEA SE OF NEW IMPROVE D SCAVE NG E A DA PTE R AND CATEGORY 3 - A T NEXT S HOP V ISIT OF THE ENGINE /
SCAVE NG E CONNECTOR TO THE CF3 4-BJ E NG INE MO DE LS, S ERV ICE BULLETIN MODULE
MOS (EFF)
13-MAR-2 014 HRS /MSC ESV
ENC
SB 72-0 277 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - INTRODUCTION O F NEW S ELF- WRENCHING BOLT P /N CATEGORY 7
402 0T5 3P04, SERVICE BULL ETIN
MOS
02-A PR-2014 HRS /MSC -
ENC
SB 72-0 279 NO. 1 ENGINE - ACCESSO RY DRIVE G EARBOX ASS EMBLY (72- 61-00) - INTRODUCTIO N OF WAS HE RS TO ELIMINATE CATEGORY 6 NOT A PPLICA BLE - SUPERSEDED BY RE V 1
SPL IT LINE FLANGE INTERFE RE NCE, SERVICE BULLE TIN
MOS 18-A PR-2015
29-JAN-20 15 HRS /MSC -
ENC
SB 72-0 279 R01 NO. 1 ENGINE - ACCESSO RY DRIVE G EARBOX ASS EMBLY (72- 61-00) - INTRODUCTIO N OF WAS HE RS TO ELIMINATE CATEGORY 6 NOT A PPLICA BLE - SCHE DULE WHEN AG B B E
SPL IT LINE FLANGE INTERFE RE NCE, SERVICE BULLE TIN REMOVED FO R REPAIR
MOS 02-MAR-2 015
02-MAR-2 015 HRS /MSC -
ENC
SB 72-0 279 R02 NO. 1 ENGINE - ACCESSO RY DRIVE G EARBOX ASS EMBLY (72- 61-00) - INTRODUCTIO N OF WAS HE RS TO ELIMINATE CATEGORY 6
SPL IT LINE FLANGE INTERFE RE NCE, SERVICE BULLE TIN
MOS
25-MAY -2022 HRS /MSC -
ENC
SB 72-0 281 NO. 1 ENGINE - COMBUSTIO N SECTIO N (72- 43-00) - INTRODUCTIO N OF NEW SUPPORT B RA CK ET P/N 25 83M77G0 1 FOR CATEGORY 6 NOT A PPLICA BLE - SUPERSEDED BY RE V 1
WHITE W3 CABL E A SSEMBL Y, SERVICE B UL LETIN DATED 14 TH NO V 2 014
MOS 18-A PR-2015
03-O CT-20 14 HRS /MSC -
ENC
SB 72-0 281 R01 NO. 1 ENGINE - COMBUSTIO N SECTIO N (72- 43-00) - INTRODUCTIO N OF NEW SUPPORT B RA CK ET P/N 25 83M77G0 1 FOR CATEGORY 6 NOT A PPLICA BLE - AT ENGINE REP AIR /
WHITE W3 CABL E A SSEMBL Y, SERVICE B UL LETIN OVE RHAUL
MOS 14-NOV -2014
14-NOV -2014 HRS /MSC -
ENC
SB 72-0 284 NO. 1 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ TURBOFAN ENGINES, S ERVICE CATEGORY 8 NOT A PPLICA BLE - INFORMA TIONAL ONLY
BULLE TIN
MOS 03-O CT-20 14
03-O CT-20 14 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 224 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 287 NO. 1 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - CF34 ACCESSO RY G EARBOX (AG B) CATEGORY 7 NOT A PPLICA BLE - SUPERSEDED BY RE V 1 AT
INTERCHA NG EABILITY MODIFICATIONS, SERVICE BULLE TIN 25TH NOV -2014
MOS 18-A PR-2015
23-O CT-20 14 HRS /MSC -
ENC
SB 72-0 287 R01 NO. 1 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - CF34 ACCESSO RY G EARBOX (AG B) CATEGORY 7 NOT A PPLICA BLE - ONLY DURING ENGINE
INTERCHA NG EABILITY MODIFICATIONS, SERVICE BULLE TIN CHA NG E
MOS 25-NOV -2014
25-NOV -2014 HRS /MSC -
ENC
SB 72-0 288 NO. 1 ENGINE - GE NERAL - REMOVAL OF PARTS FROM IPC, SE RV ICE BULLETIN CATEGORY 9 NOT A PPLICA BLE - INFORMA TIONAL ONLY
MOS 16-JAN-20 15
16-JAN-20 15 HRS /MSC -
ENC
SB 72-0 289 NO. 1 ENGINE - EXHAUST CO MP ONENTS (72 -54-00 ) - QUANTITY CO RRECTIO N FOR MACHINE BOL TS P/N MS95 65-04 , CATEGORY 9 NOT A PPLICA BLE - INFORMA TIONAL ONLY
SERVICE BULLETIN
MOS 16-FEB -2015
16-FEB -2015 HRS /MSC -
ENC
SB 72-0 290 NO. 1 ENGINE - LOW PRESSURE TURBINE S TATOR ASSE MB LY (72-52 -00) - INSPE CTION OF SHRO UD SECTORS O N LPT CATEGORY 2 NOT A PPLICA BLE - N/A BY LPT STA TO R ASS Y.
STATOR A SSEMBL IES P/N 60 20T15G3 0 A ND P/N 6020 T15 G31, S ERVICE BULLE TIN P/N (50 99TI04 06)
MOS 11-MAY -2016
03-MAY -2016 HRS /MSC -
ENC
SB 72-0 291 NO. 1 ENGINE - LOW PRESSURE TURBINE S TATOR ASSE MB LY (72-52 -00) - REP LACEMENT OF LPT S TAG E 3 A ND CATEGORY 2 NOT A PPLICA BLE - N/A BY LPT STA TO R P/N
STAGE 4 SHROUD SECTORS ON LP T STATOR A SSEMBL IES P/N 60 20T15G3 0 A ND P/N 6020 T15 G31, S ERVICE BULLE TIN (509 9T10406 )
MOS 26-MAY -2016
03-MAY -2016 HRS /MSC -
ENC
SB 72-0 292 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - OP ERA TION OF CF34-3B ENGINES IN BOMBARDIE R CHA LLENGER 650 AIRCRAFT CATEGORY 7
WITH MAX IMUM TAKE- OFF AND REDUCE D THRUST TAKE -OFF CAPAB ILITIE S, SERVICE B UL LETIN
MOS
27-JUL-20 17 HRS /MSC -
ENC
SB 72-0 293 NO. 1 ENGINE - COMPRESSO R STATOR ( 72-32- 00) - WEIGHT INSPECTION OF THE CO MP RE SSOR CA SE ASSEMBL Y, CATEGORY 5 NOT A PPLICA BLE - ON A6 -ELD B Y ENG INE S/N.
SERVICE BULLETIN THIS SB REQUIRES NO FURTHE R ACTION.
MOS 27-JUL-20 15
02-JUL-20 15 HRS /MSC -
ENC
SB 72-0 294 NO. 1 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-00-3 2) - INSPECTION OF V G S YSTEM TO CHE CK FOR CATEGORY 3 - A PPLICA BLE BY ENGINE S /N A ND
LOO SENESS , SERVICE B ULL ETIN RECOMME NDED AT NEXT SHOP VISIT.
MOS (EFF)
12-A UG -2015 HRS /MSC ESV
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 225 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 294 R01 NO. 1 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-00-3 2) - INSPECTION OF V G S YSTEM TO CHE CK FOR CATEGORY 3
LOO SENESS , SERVICE B ULL ETIN
MOS (EFF)
14-O CT-20 20 HRS /MSC ESV
ENC
AFL
SB 72-0 295 NO. 1 ENGINE - TURBINE TRANSITION ASSE MB LY (72-51 -00) - REP LACEMENT OF SIL VER P LATED NUTS WITH CATEGORY 4 DEFERRE D - APPLICABLE , BUT NOT A PPROVED
DRY -FILM CO ATED NUTS ON THERMOCOUPLE PROB ES AND PT5 PROBE OR P LUG, SERVICE BULLETIN FOR NOW
MOS 07-A PR-2016
10-MAR-2 016 HRS /MSC - 131 3.0 2
ENC 862
SB 72-0 296 NO. 1 ENGINE - TURBINE TRANSITION ASSE MB LY (72-53 -00) - REP LACEMENT OF SIL VER P LATED NUTS WITH CATEGORY 4 NOT A PPLICA BLE - N/A BY ENGINE MODEL
DRY -FILM CO ATED NUTS ON THERMOCOUPLE PROB ES AND PT5 PROBE, S ERVICE BULLE TIN
MOS 07-A PR-2016
HRS /MSC -
ENC
SB 72-0 297 NO. 1 ENGINE - COMPRESSO R STATOR ( 72-32- 00) - COMPRESS OR CASE THICKNESS SP ECIAL INSPECTIO N FOR NOT A PPLICA BLE - JUST FOR INFORMATION. NO
SPE CIFIC ENGINE SERIAL NUMBERS, SERVICE BULLE TIN ACTIO N REQUIRED.
MOS 02-MAY -2016
HRS /MSC -
ENC
SB 72-0 298 NO. 1 ENGINE - COMPRESSO R ROTOR A SSEMBLY (72 -33-00 ) - STAGE 10 COMPRESS OR BL ADES RE PLACEMENT CATEGORY 3 - A PPLICA BLE - MUST BE DO NE AT NE XT SHOP
PLA N, SERVICE BULLE TIN VISIT.
MOS (EFF)
13-MAY -2016 HRS /MSC ESV
ENC
SB 72-0 301 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - ADMINISTRA TIVE CHA NG E TO UPDATE CF34-B J EIPC MODEL APP LICAB ILITY, CATEGORY 9 NOT A PPLICA BLE
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 302 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - ADMINISTRA TIVE CHA NG E TO UPDATE CF34-B J EIPC MODEL APP LICAB ILITY, CATEGORY 9 NOT A PPLICA BLE - NA BY ENGINE MO DE L
SERVICE BULLETIN CLOSE D
MOS 21-MAY -2017
13-FEB -2017 HRS /MSC -
ENC
SB 72-0 303 NO. 1 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-32-0 0) - INSPECTION OF V G S HA FT FO RWARD B EARING CATEGORY 2 NOT A PPLICA BLE - NA BY ENGINE SN CLOS ED
SUPPO RT, S ERV ICE BULLETIN
MOS 21-MAY -2017
10-MAR-2 017 HRS /MSC -
ENC
SB 72-0 303 R01 NO. 1 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-32-0 0) - INSPECTION OF V G S HA FT FO RWARD B EARING CATEGORY 2 NOT A PPLICA BLE - NO ACTIO N REQUIRE D
SUPPO RT, S ERV ICE BULLETIN CLOSE D
MOS 21-MAY -2017
12-A PR-2017 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 226 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 303 R02 NO. 1 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-32-0 0) - INSPECTION OF V G S HA FT FO RWARD B EARING NOT A PPLICA BLE - NO ACTIO N REQUIRE D
SUPPO RT, S ERV ICE BULLETIN CLOSE D
MOS
20-A PR-2018 HRS /MSC -
ENC
SB 72-0 306 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - REPL ACEMENT OF FAN BLADES WITH MISSING AFTER-REPA IR CATEGORY 2 NOT A PPLICA BLE - NO AFFECTE D BLA DE S,
LANCE PEENING , SERVICE B UL LETIN DOES NOT A PPLY
DAYS 03-NOV -2017
27-S EP-20 17 HRS /MSC -
ENC
SB 72-0 306 R01 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - REPL ACEMENT OF FAN BLADES WITH MISSING AFTER-REPA IR CATEGORY 2 NOT A PPLICA BLE - DUE TO S ERIAL NUMB ERS
LANCE PEENING , SERVICE B UL LETIN OF THE FA N BLA DE S
MOS 24-JUN-2020
02-FEB -2018 HRS /MSC -
ENC
SB 72-0 306 R02 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - REPL ACEMENT OF FAN BLADES WITH MISSING AFTER-REPA IR CATEGORY 2 NOT A PPLICA BLE - DUE TO S ERIAL NUMB ERS
LANCE PEENING , SERVICE B UL LETIN OF THE FA N BLA DE S
DAYS
18-DEC-20 19 HRS /MSC -
ENC
SB 72-0 308 NO. 1 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - S EARCH OF FAN BLADES SENT TO ATI-UK BE TWEE N 2007 AND CATEGORY 2 NOT A PPLICA BLE - SN N/A TO THIS SB.
200 9 WITHIN EV ERY O PERATOR FLEE T, S ERVICE BULLE TIN
MOS 03-JUL-20 18
04-JAN-20 18 HRS /MSC - 157 8.5
ENC 103 6
SB 72-0 309 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - INTRODUCTION OF NE W VA RIABLE G EOMETRY LINKAG E A SSEMBLY WITH CATEGORY 7
IMP RO VED B EARING SUPPO RT, SE RV ICE BULLETIN
MOS
18-A PR-2019 HRS /MSC -
ENC
SB 72-0 310 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ E NG INES, S ERVICE BULLE TIN CATEGORY 8 COMPLIED WITH - INFO RMATIONAL ONLY:
SPA RE PA RTS RELEA SE
MOS 04-JUN-2021
03-JUN-2021 HRS /MSC -
ENC
SB 72-0 311 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - NO. 1 CARBON SEAL REKITTED - O NE -TIME VIS UA L INSPECTIO N OF THE CATEGORY 4
RETAINING JOINT AND RING ENGA GEMENT, SERVICE BULL ETIN
MOS
29-A UG -2018 HRS /MSC -
ENC
SB 72-0 314 NO. 1 ENGINE - FAN STATOR (72-23 -00) - INTRO DUCTION OF NEW NO . 1 BEARING CARBON SEAL P/N 60 47T63P09 , CATEGORY 7
SERVICE BULLETIN
MOS
29-JAN-20 19 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 227 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 315 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - REMOVAL O F SPARE PARTS SUPPORT FOR CF34 -BJ TURB OFA N ENGINES, CATEGORY 9
SERVICE BULLETIN
MOS
22-O CT-20 19 HRS /MSC -
ENC
SB 72-0 315 R01 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - REMOVAL O F SPARE PARTS SUPPORT FOR CF34 -BJ TURB OFA N ENGINES, CATEGORY 9
SERVICE BULLETIN
MOS
13-A PR-2020 HRS /MSC -
ENC
SB 72-0 316 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - RE-CONVERSION O F CF3 4-3B ENGINE S THAT WERE OP ERA TE D IN A CATEGORY 7
CHA LLENGE R 650 AIRCRAFT WITH MTO AND FLEX CAPA BIL ITIES, SE RV ICE BULLETIN
MOS
19-MAR-2 020 HRS /MSC -
ENC
SB 72-0 317 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ E NG INES, S ERVICE BULLE TIN CATEGORY 8 COMPLIED WITH - INFO RMATIONAL ONLY:
SPA RE PA RTS RELEA SE
MOS 14-JUN-2020
05-JUN-2020 HRS /MSC -
ENC
SB 72-0 319 NO. 1 ENGINE - PO WE R TAKEOFF DRIVE ASSEMBL Y ( 72-64- 00) - REP LACEMENT OF P TO ROLL ER BE ARINGS P/N CATEGORY 5 NOT A PPLICA BLE - By Se rial: DUE TO ENGINE
507 1T3 0P03 AND P /N 5 071T30P 04 WITH INNER/OUTER RACE S ERIAL NUMB ERS MISMATCH, SE RV ICE BULLETIN SERIAL NUMBER
MOS
14-DEC-20 20 HRS /MSC -
ENC
AFL
SB 72-0 321 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - ONE-TIME BS I OF NO. 1 A ND 2 B EARING HOUSING AS SEMBLY PLA TE HOLE S, OIL CATEGORY 2 NOT A PPLICA BLE - By Se rial: DUE E NG INE
MANIFOLD, A ND OIL S CAV ENGE TUBE FOR ME TAL -TO -META L CONDITION, SERVICE BULLETIN SERIAL NUMBER (9509 67 AND 9509 68)
MOS
30-JUN-2021 HRS /MSC
ENC
AFL
SB 72-0 323 NO. 1 ENGINE - FAN STATOR (72-21 -00) - INTRO DUCTION OF NO. 1 AND NO. 2 B EARING HOUSING P/N 60 47T69G0 5 A ND CATEGORY 7 NOT A PPLICA BLE - By Se rial: DUE TO ENGINE
SCAVE NG E TUBE P/N 279 9M22G01 , SERVICE B ULL ETIN SERIAL NUMBER
MOS
10-JUN-2021 HRS /MSC -
ENC
AFL
SB 72-0 324 NO. 1 ENGINE - ENGINE - LO W PRESS URE TURBINE ROTOR ASSE MB LY (72-53 -00) - E VALUATION OF THE STAGE CATEGORY 2 NOT A PPLICA BLE - By Se rial: DUE TO SERIAL
4-S TAG E 5, STAGE 5-S TA GE 6 L PT DIS KS AND TURBINE REA R SHAFT DRIV E CONE BOL TED JO INTS, SE RV ICE NUMBE R (95 0967)
BULLE TIN
DAYS
17-JUN-2021 HRS /MSC
ENC
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 228 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 325 NO. 1 ENGINE - LOW PRESSURE TURBINE ROTOR ASSE MBL Y (72-53- 00) - REP LACEMENT OF DRIVE CO NE BO LT AND LIMITED NOT A PPLICA BLE - THIS S ERVICE BULLE TIN
SEL F-RETAINING BOL T (THIS SB IS FOR L IMITE D DISTRIB UTION) ( THIS S B DOE S NOT IMPA CT ALL OPERATORS AND IS DIS TRIBUTION DOES NOT
APP LICAB LE TO AFFECTE D OP ERA TO RS ONLY ), SERVICE B UL LETIN IMP ACT ALL OP ERA TO RS AND IS
APP LICAB LE TO AFFECTE D OP ERA TO RS
ONLY
MOS
24-JUN-2021 HRS /MSC -
ENC
AFL
SB 72-0 325 R01 NO. 1 ENGINE - LOW PRESSURE TURBINE ROTOR ASSE MBL Y (72-53- 00) - REP LACEMENT OF DRIVE CO NE BO LT AND LIMITED NOT A PPLICA BLE - THIS S ERVICE BULLE TIN
SEL F-RETAINING BOL T (THIS SB IS FOR L IMITE D DISTRIB UTION) ( THIS S B DOE S NOT IMPA CT ALL OPERATORS AND IS DIS TRIBUTION DOES NOT
APP LICAB LE TO AFFECTE D OP ERA TO RS ONLY ), SERVICE B UL LETIN IMP ACT ALL OP ERA TO RS AND IS
APP LICAB LE TO AFFECTE D OP ERA TO RS
ONLY
MOS
22-JUL-20 21 HRS /MSC -
ENC
AFL
SB 72-0 326 NO. 1 ENGINE - COMPRESSO R STATOR ( 72-32- 00) - B SI OF THE CO MP RE SSOR MO DULE WITH SPECIAL EQUIP ME NT LIMITED NOT A PPLICA BLE - THIS S ERVICE BULLE TIN IS
(THIS SERVICE BUL LETIN IS FOR L IMITED DISTRIB UTION) (THIS SE RV ICE BULLETIN DOES NOT IMPACT AL L DIS TRIBUTION FOR
OPE RA TO RS AND IS APP LICAB LE TO AFFECTE D OPE RA TO RS ONLY) , SERVICE B ULL ETIN LIMITED DISTRIBUTION
THIS SERVICE B UL LETIN DO ES NO T
IMP ACT ALL OP ERA TO RS AND IS
APP LICAB LE TO AFFECTE D OP ERA TO RS
ONLY
MOS
18-A UG -2021 HRS /MSC -
ENC
AFL
SB 72-0 326 R01 NO. 1 ENGINE - COMPRESSO R STATOR ( 72-32- 00) - B SI OF THE CO MP RE SSOR MO DULE WITH SPECIAL EQUIP ME NT LIMITED
(THIS SERVICE BUL LETIN IS FOR L IMITED DISTRIB UTION (THIS SE RV ICE BULLETIN DOES NOT IMPACT ALL DIS TRIBUTION
OPE RA TO RS AND IS APP LICAB LE TO AFFECTE D OPE RA TO RS ONLY) ), SERVICE B UL LETIN
MOS
02-NOV -2021 HRS /MSC -
ENC
SB 72-0 330 NO. 1 ENGINE - FAN STATOR ASSE MB LY (72-21 -00) - INTRODUCTION OF NO. 1 AND NO. 2 B EARING HOUSING P/N CATEGORY 4
604 7T6 9G06 AND P RE FORMED PACKING P/N J143 8P278, SERVICE BULL ETIN
MOS
20-MAY -2022 HRS /MSC -
ENC
SB 72-0 331 NO. 1 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-32-0 0) - INSPECTION AND REPLA CE ME NT OF RING LIMITED
CONNE CTORS (THIS SERVICE B UL LETIN IS FOR L IMITED DISTRIB UTION) (THIS SE RV ICE BULLETIN DOES NOT IMPACT DIS TRIBUTION
ALL OP ERATORS A ND IS AP PLICAB LE TO AFFECTED OP ERATO RS O NLY ), SERVICE BUL LETIN
MOS
04-MAR-2 022 HRS /MSC -
ENC

SB 72-0 332 NO. 1 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-32-0 0) - INSPECTION AND REPLA CE ME NT OF RING LIMITED
CONNE CTORS (THIS SERVICE B UL LETIN IS FOR L IMITED DISTRIB UTION) (THIS SE RV ICE BULLETIN DOES NOT IMPACT DIS TRIBUTION
ALL OP ERATORS A ND IS AP PLICAB LE TO AFFECTED OP ERATO RS O NLY ), SERVICE BUL LETIN
MOS
04-MAR-2 022 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 229 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 333 NO. 1 ENGINE - REAR MO UNT A SSEMBLY (7 2-44-00 ) - INTRODUCTION OF THRUST MOUNT ASS EMBLY P/N 603 0T5 6G04 CATEGORY 7
WITH A NEW FULLY MACHINED AFT ENGINE MOUNT LINK A SSEMBLY P/N 5 023T22G0 4, SERVICE BUL LETIN
MOS
10-JUN-2022 HRS /MSC -
ENC
SB 73-0 003 R03 NO. 1 ENGINE - FUE L S YSTEM - SE RV ICING/INS PECTION - USE OF FUEL SY STE M ANTI-ICING ADDITIVE AND CATEGORY 2
INS PECTION OF FUEL HE ATE R, SERVICE BULL ETIN
MOS
12-DEC-19 85 HRS /MSC -
ENC
SB 73-0 003 REV 04 NO. 1 ENGINE - SERVICE/INSPCETION OF FUEL HEATER, SE RV ICE BULLETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 73-0 015 REV 01 NO. 1 ENGINE - REPLA CE P0 4 WITH P05 FCU, S ERVICE BULLETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 73-0 016 NO. 1 ENGINE - FUE L L EAK INPS ECTION, SE RV ICE BULLETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 73-0 017 NO. 1 ENGINE - CORRE CTION O F NAMEPLATE ON MFC'S, SERVICE BUL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 73-0 021 NO. 1 ENGINE - INS PECT AND RETORQUE COUPLING CLAMP, S ERVICE BULLE TIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 73-0 023 NO. 1 ENGINE - INS PECT/REPLA CE FUEL LUBE HO SES, S ERVICE BULLE TIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 73-0 026 NO. 1 ENGINE - FUE L S YSTEM - INTRODUCTION OF MAIN FUEL CONTRO L P NS 60 78T55P08 /P0 9/P 10 WITH IMP RO VED CATEGORY 2
VG CABLE BRACKE T, SERVICE BULLE TIN
MOS
06-JUN-1997 HRS /MSC -
ENC
SB 73-0 026 R01 NO. 1 ENGINE - INTRODUCTION OF MA IN FUEL CONTROL PNS 607 8T5 5P08/P09 /P1 0 WITH IMPROV ED VG CABL E CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
BRACKET, SE RV ICE BULLETIN
MOS 01-A PR-2011
23-O CT-19 97 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 230 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 027 NO. 1 ENGINE - REPLA CE ME NT OF FUEL FILTER A SSEMBLY (P N 5071 T7 0P01), SERVICE BULLE TIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
10-O CT-19 95 HRS /MSC - 0
ENC 0
SB 73-0 027 R01 NO. 1 ENGINE - FUE L S YSTEM - REPLA CE ME NT OF FUEL FILTER A SSEMBLY (P N 507 1T7 0P01) , SERVICE BULL ETIN RECOMME NDED NOT A PPLICA BLE - N/A BY ENGINE S/N
MOS 12-JUL-20 16
21-JUN-2016 HRS /MSC -
ENC
SB 73-0 030 NO. 1 ENGINE - REMOVAL AND CLE ANING OF THE MA IN FUEL CONTROL TO IMPROV E COL D SOA K THROTTLE CATEGORY 3 NOT A PPLICA BLE
RESPO NS E, SERVICE BULLETIN
MOS 01-A PR-2011
11-JUL-19 96 HRS /MSC - 0
ENC 0
SB 73-0 032 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - REWORK OF MAIN FUEL CO NTROL TO ADD FO RWARD FLANGE VE NT
GROO VE, SE RV ICE BULLETIN
MOS
13-JUN-1997 HRS /MSC -
ENC
SB 73-0 032 R01 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - REWORK OF MAIN FUEL CO NTROL TO ADD FO RWARD FLANGE VE NT
GROO VE, SE RV ICE BULLETIN
MOS
24-S EP-19 97 HRS /MSC -
ENC
SB 73-0 032 R03 NO. 1 ENGINE - ENGINE A ND FUEL CONTRO L - REWORK OF MAIN FUEL CO NTROL TO ADD FO RWARD FLANGE VE NT CATEGORY 9 NOT A PPLICA BLE - SUPERSEDED
GROO VE, SE RV ICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 73-0 034 NO. 1 ENGINE - FUE L S YSTEM - IMP RO VED P RE FO RMED PACKING S O N THE MAIN FUEL CO NTROL-TO-FUEL PUMP CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
INTERFACE, SE RVICE BULLETIN
MOS 01-A PR-2011
12-JAN-19 98 HRS /MSC - 0
ENC 0
SB 73-0 036 NO. 1 ENGINE - INS PECTION OF MAIN FUEL FILTER FOR NO N-TORQUED FILTER B OWL, SERVICE BULLETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
03-DEC-19 98 HRS /MSC - 0
ENC 0
SB 73-0 038 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D AG B-TO-FUE L P UMP CLAMP CO UP LING, SERVICE BULLE TIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
20-A UG -1999 HRS /MSC - 0
ENC 0
SB 73-0 039 NO. 1 ENGINE - INS PECT/REPLA CE MAIN FUEL FILTER, SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 231 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 041 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F CF3 4 MAIN FUEL
CONTROL S WITH RELOCATED P RE SSURE-RELIEF GROO VE, S ERV ICE BULLETIN
MOS
12-A UG -1999 HRS /MSC -
ENC
SB 73-0 041 R01 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F CF3 4 MAIN FUEL CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
CONTROL S WITH RELOCATED P RE SSURE-RELIEF GROO VE., SERVICE B UL LETIN
MOS 01-A PR-2011
HRS /MSC N/A 0
ENC 0
SB 73-0 041 R02 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F CF3 4 MAIN FUEL CATEGORY 5
CONTROL S WITH RELOCATED P RE SSURE-RELIEF GROO VE, S ERV ICE BULLETIN
MOS
06-DEC-20 13 HRS /MSC -
ENC
SB 73-0 042 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L CONTROL - REP LACEMENT OF FUEL VAL VE BUSHING CATEGORY 6
PREFORMED PA CK ING, S ERVICE BULLETIN
MOS
30-MAR-2 000 HRS /MSC -
ENC
SB 73-0 042 R01 NO. 1 ENGINE - REPLA CE ME NT OF FUEL VALVE BUSHING P RE FO RMED PACKING , SERVICE B ULL ETIN CATEGORY 6 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
09-O CT-20 02 HRS /MSC - 0
ENC 0
SB 73-0 043 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REWORK OF V ARIAB LE GEOMETRY
ACTUA TO R PN 5 050T37G 01, SE RV ICE BULLETIN
MOS
31-O CT-20 02 HRS /MSC -
ENC
SB 73-0 043 R01 NO. 1 ENGINE - ENGINE FUEL CONTROL- FUEL SYS TE M-REWORK OF VARIA BLE GEO ME TRY ACTUATOR, S ERV ICE
BULLE TIN
MOS
HRS /MSC -
ENC
SB 73-0 043 R02 NO. 1 ENGINE - REWORK OF VA RIABL E G EOMETRY A CTUATOR PN 5050 T37 G01, S ERVICE BULLE TIN CATEGORY 6
MOS
17-A PR-2003 HRS /MSC -
ENC
SB 73-0 043 R03 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REWORK OF V ARIAB LE GEOMETRY CATEGORY 6 COMPLIED WITH - A T MANUFACTURE
ACTUA TO R PN 5 050T37G 01, SE RV ICE BULLETIN
MOS 01-A PR-2011
07-A PR-2010 HRS /MSC - 0
ENC 0
SB 73-0 044 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O FCF34 MAIN FUEL
CONTROL S WITH PRODUCT IMPROVE ME NT PACKAG E, SERVICE B UL LETIN
MOS
09-MAR-2 001 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 232 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 044 R01 NO. 1 ENGINE - INTRODUCTION OF CF34 MAIN FUE L CONTROLS WITH P RO DUCT IMP RO VEMENT PA CKA GE, S ERVICE NOT A PPLICA BLE
BULLE TIN
MOS 01-A PR-2011
21-FEB -2002 HRS /MSC - 0
ENC 0
SB 73-0 044 R02 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F CF3 4 MAIN FUEL CATEGORY 6
CONTROL S WITH PRODUCT IMPROVE ME NT PACKAG E, SERVICE B UL LETIN
MOS (EFF)
13-DEC-20 12 HRS /MSC -
ENC
SB 73-0 044 R03 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F CF3 4 MAIN FUEL CATEGORY 6
CONTROL S WITH PRODUCT IMPROVE ME NT PACKAG E, SERVICE B UL LETIN
MOS (EFF)
08-NOV -2013 HRS /MSC -
ENC
SB 73-0 045 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F MODIFIED FUEL VALVE
BUSHING INTO MFC, S ERVICE BULLETIN
MOS
31-JAN-20 01 HRS /MSC -
ENC
SB 73-0 045 R01 NO. 1 ENGINE - INTRODUCTION OF MO DIFIE D FUE L V ALVE BUSHING INTO MFC, S ERVICE BULLETIN CATEGORY 6 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
05-JUL-20 01 HRS /MSC - 0
ENC 0
SB 73-0 045 R02 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F MODIFIED FUEL VALVE CATEGORY 6
BUSHING INTO MFC, S ERVICE BULLETIN
MOS
06-DEC-20 13 HRS /MSC -
ENC
SB 73-0 046 NO. 1 ENGINE - INS PECTION OF MAIN FUEL CO NTROLS FOR THRO TTLE BO DY LE AKAGE , SERVICE B UL LETIN CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
13-JUN-2001 HRS /MSC - 0
ENC 0
SB 73-0 047 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - CF34-1A /-3A /-3 A1/-3A2/-3BRUSSIAN FUELS CATEGORY 9
FLEET LEADER SAMPLING P RO GRAM, SERVICE B ULL ETIN
MOS
24-JAN-20 02 HRS /MSC -
ENC
SB 73-0 047 R01 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - CF34-1A /-3A /-3 A1/-3A2/-3B TS -1 FUELS FLEET CATEGORY 7
LEA DE R SAMPL ING PROGRAM, SE RV ICE BULLETIN
MOS
30-MAR-2 006 HRS /MSC -
ENC
SB 73-0 047 R02 NO. 1 ENGINE - FUE L S YSTEM ( 73-00-0 0)-CF34-1A/-3A /3A 1/-3 A2/-3B TS -1 FUELS FLEE T LEADER SAMPLING PROGRAM, CATEGORY 9 NOT A PPLICA BLE - SUPERSEDED
SERVICE BULLETIN
MOS 01-A PR-2011
30-A UG -2007 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 233 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 048 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - VARIABLE G EOMETRY ACTUATION SYSTEM (73-00 -00) - SPARE PARTS CATEGORY 8
RELEA SE FO R VARIABLE GE OMETRY ACTUATO R REPAIR K IT, SE RVICE BULLETIN
MOS
31-JUL-20 02 HRS /MSC -
ENC
SB 73-0 049 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF S ELECTED CF34 MA IN
FUE L CONTROLS, S ERVICE BULLE TIN
MOS
21-FEB -2003 HRS /MSC -
ENC
SB 73-0 049 R01 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF S ELECTED CF34 MA IN
FUE L CONTROLS, S ERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 73-0 049 R02 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF S ELECTED CF34 MA IN CATEGORY 2 NOT A PPLICA BLE
FUE L CONTROLS., SE RVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 73-0 049 R03 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF S ELECTED CF34 MA IN CATEGORY 2
FUE L CONTROLS, S ERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 73-0 051 NO. 1 ENGINE - FUE L S YSTEM - FUEL MA NIFOLD (7 3-00-0 0) - INTRODUCTION O F FUE L INJE CTORS PN 6 078T63P0 7 A ND CATEGORY 7
PN 6078T64P 07, SE RV ICE BULLETIN
MOS
15-JUN-2004 HRS /MSC -
ENC
SB 73-0 051 R01 NO. 1 ENGINE - FUE L S YSTEM - FUEL MA NIFOLD (7 3-00-0 0) - INTRODUCTION O F FUE L INJE CTORS P N 6078 T6 3P07 CATEGORY 7
AND P N 6078 T6 4P07, S ERVICE BULLE TIN
MOS
15-DEC-20 05 HRS /MSC -
ENC
SB 73-0 051 R02 NO. 1 ENGINE - INTRODUCTION OF FUEL INJECTORS PN 50 83T10P03 , PN 5 083T11P0 3, PN 5 083T12P 03, PN 6078T63P 07, CATEGORY 7
AND P N 6078 T6 4P07, S ERVICE BULLE TIN
MOS
02-NOV -2006 HRS /MSC -
ENC
SB 73-0 051 R03 NO. 1 ENGINE - INTRODUCTION OF FUEL INJECTORS PN 50 83T10P03 , PN 5083 T1 1P03, PN 508 3T12P03 , PN CATEGORY 5
607 8T6 3P07, AND PN 6 078T64P 07, SE RVICE BULLETIN
MOS
23-MAY -2008 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 234 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 051 R04 NO. 1 ENGINE - FUE L S YSTEM - FUEL MA NIFOLD (7 3-00-0 0) - INTRODUCTION O F FUE L INJE CTORS PN 5 083T10P0 3, PN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
508 3T1 1P03, PN 50 83T12P03 , PN 6 078T63P0 7, AND PN 6078 T64 P07, S ERVICE BULLE TIN
MOS 01-A PR-2011
22-JUN-2009 HRS /MSC - 0
ENC 0
SB 73-0 052 NO. 1 ENGINE - FUE L S YSTEM - (73 -00-00 ) - ACTUA TO R HOSE FIRE SLEE VE IMPROVE ME NT, S ERV ICE BULLETIN CATEGORY 5
MOS
01-MAR-2 006 HRS /MSC -
ENC
SB 73-0 052 R01 NO. 1 ENGINE - ACTUA TO R HORE FIRE S LEEVE IMPROVEMENT, SERVICE B UL LETIN CATEGORY 5
MOS
25-O CT-20 06 HRS /MSC -
ENC
SB 73-0 052 R02 NO. 1 ENGINE - ACTUA TO R HOSE FIRE SLEE VE IMPROV EMENT , SERVICE B UL LETIN CATEGORY 5
MOS
HRS /MSC -
ENC
SB 73-0 052 R03 NO. 1 ENGINE - ACTUA TO R HOSE FIRE SLEE VE IMPROV EMENT, S ERVICE BULLETIN CATEGORY 5
MOS
06-FEB -2007 HRS /MSC -
ENC
SB 73-0 052 R04 NO. 1 ENGINE - FUE L S YSTEM - (73 -00-00 ) - ACTUA TO R HOSE FIRE SLEE VE IMPROVE ME NT, S ERV ICE BULLETIN CATEGORY 5 NOT A PPLICA BLE - SUPERSEDED
MOS 01-A PR-2011
09-DEC-20 08 HRS /MSC - 0
ENC 0
SB 73-0 054 NO. 1 ENGINE - INTRODUCTION OF LOOP -CUSHIONED CLAMP PN J12 20G18 FOR IMPROVE D VG ACTUA TO R HOSE CATEGORY 5
CLAMPING , SERVICE B UL LETIN
MOS
HRS /MSC -
ENC
SB 73-0 054 R01 NO. 1 ENGINE - INTRODUCTION OF LOOP -CUSHIONED CLAMP PN J12 20G18 FOR IMPROVE D VG ACTUA TO R HOSE CATEGORY 5
CLAMPING , SERVICE B UL LETIN
MOS
05-JAN-20 07 HRS /MSC -
ENC
SB 73-0 054 R02 NO. 1 ENGINE - FUE L S YSTEM - (73 -00-00 ) - INTRODUCTIO N OF LOOP -CUSHIONED CLAMP P/N J1220 G18 FO R CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
IMP RO VED V G A CTUATOR HOS E CLA MP ING, S ERV ICE BULLETIN
MOS 01-A PR-2011
09-DEC-20 08 HRS /MSC - 0
ENC 0
SB 73-0 055 R01 NO. 1 ENGINE - ACTUA TO R HOSE FIRE SLEE VE IMPROV EMENT, S ERVICE BULLETIN CATEGORY 5
MOS
06-FEB -2007 HRS /MSC A/R
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 235 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 057 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D VG ACTUATO R HOSE (FINAL FIX ), SERVICE BULLETIN CATEGORY 3
MOS
06-FEB -2007 HRS /MSC -
ENC
SB 73-0 057 R01 NO. 1 ENGINE - FUE L S YSTEM ( 73-00-0 0) INTRO DUCTION OF IMPROVED VG ACTUATOR HO SE (FINAL FIX), SERVICE CATEGORY 3
BULLE TIN
MOS
14-JUN-2007 HRS /MSC -
ENC
SB 73-0 057 R02 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D VG ACTUATO R HOSE (FINAL FIX ), SERVICE BULLETIN CATEGORY 3
MOS
02-A UG -2007 HRS /MSC -
ENC
SB 73-0 057 R03 NO. 1 ENGINE - FUE L S YSTEM - (73 -00-00 ) - INTRODUCTIO N OF IMPROVE D VG ACTUA TO R HOSE (FINAL FIX ), SERVICE CATEGORY 3
BULLE TIN
MOS
03-MAR-2 010 HRS /MSC -
ENC
SB 73-0 057 R04 NO. 1 ENGINE - FUE L S YSTEM - (73 -00-00 ) - INTRO DUCTION OF IMPROVED VG ACTUATOR HO SE (FINAL FIX), SERVICE CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
BULLE TIN
MOS 01-A PR-2011
08-NOV -2010 HRS /MSC - 0
ENC 0
SB 73-0 059 NO. 1 ENGINE - CDP RESTORING S PRING INSP ECTION O N BUSINE SS JE T MODELS, S ERVICE BULLE TIN CATEGORY 6
MOS
HRS /MSC -
ENC
SB 73-0 059 R01 NO. 1 ENGINE - MAIN FUE L CONTROL (MFC)-CDP RES TO RING S PRING INSP ECTION O N BUSINESS JE T MODELS, CATEGORY 6
SERVICE BULLETIN
MOS
12-MAR-2 008 HRS /MSC -
ENC
SB 73-0 059 R02 NO. 1 ENGINE - MAIN FUE L CONTROL (MFC)-CDP RES TO RING S PRING INSP ECTION O N BUSINESS JE T MODELS, CATEGORY 6 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
13-A UG -2009 HRS /MSC - 0
ENC 0
SB 73-0 060 NO. 1 ENGINE - REQUIRE ME NTS FO R AND A PPROVAL O F FUEL AND ADDITIVE S, SERVICE BUL LETIN CATEGORY 9 - RECURRING, TO BE CO MP LIE D AT 1 0000
HOURS .
MOS
30-A UG -2007 HRS /MSC 100 00 0 100 00
ENC
SB 73-0 060 R01 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - FUEL AND ADDITIVES - RE QUIREMENTS FOR, CATEGORY 9
AND A PPROVAL OF, S ERVICE BULLETIN
MOS
14-JUL-20 11 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 236 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 060 R02 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - FUEL AND ADDITIVES - RE QUIREMENTS FOR, CATEGORY 9
AND A PPROVAL OF, S ERVICE BULLETIN
MOS
22-JUN-2012 HRS /MSC -
ENC
SB 73-0 060 R03 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - FUEL AND ADDITIVES - RE QUIREMENTS FOR, CATEGORY 9 COMPLIED WITH - INFO RMATIONAL ONLY.
AND A PPROVAL OF, S ERVICE BULLETIN
MOS 13-DEC-20 15
20-NOV -2015 HRS /MSC -
ENC
SB 73-0 060 R04 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - REQUIRE ME NTS FO R, AND APP RO VAL OF FUEL SYS TEM (73-0 0-00) - CATEGORY 9 - FOR INFORMA TION O NL Y
FUE L A ND ADDITIV ES, SE RV ICE BULLETIN
MOS 07-A PR-2016
21-MAR-2 016 HRS /MSC -
ENC
SB 73-0 060 R05 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REQUIREMENTS FOR A ND APPROVA L O F CATEGORY 9
FUE L A ND ADDITIV ES, SE RV ICE BULLETIN
MOS
14-JUN-2019 HRS /MSC -
ENC
SB 73-0 061 NO. 1 ENGINE - INTRODUCTION OF T2 SE NS OR TUBES, S ERVICE BULLE TIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 73-0 061 R1 NO. 1 ENGINE - FUE L S YSTEM - INTRODUCTION OF THE T2 SENSOR TUBES ., S ERVICE BULLE TIN N/A BY PA RT NOT A PPLICA BLE - BY ENGINE MODEL
NUMBE R
MOS 09-JUL-20 15
HRS /MSC -
ENC
SB 73-0 062 NO. 1 ENGINE - INS PECTION OF CONNECTION O RIENTATIO N BETWEEN THE AFT ACTUA TO R HEAD HOS E A SSEMBL Y CATEGORY 2
AND THE MA IN FUEL CONTROL , SERVICE BULL ETIN
MOS
01-A PR-2008 HRS /MSC -
ENC
SB 73-0 062 R01 NO. 1 ENGINE - INS PECTION OF CONNECTION O RIENTATIO N BETWEEN THE AFT ACTUA TO R HEAD HOS E A SSEMBL Y CATEGORY 2
AND THE MA IN FUEL CONTROL , SERVICE BULL ETIN
MOS
01-JUL-20 08 HRS /MSC -
ENC
SB 73-0 062 R02 NO. 1 ENGINE - INS PECTION OF CONNECTION O RIENTATIO N BETWEEN THE AFT ACTUA TO R HEAD HOS E A SSEMBL Y CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
AND THE MA IN FUEL CONTROL , SERVICE BULL ETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 237 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 063 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF HIGH TIME FUEL VALVE CATEGORY 2
THRUST B US HING AND CLIP , SERVICE B ULL ETIN
MOS
09-FEB -2012 HRS /MSC -
ENC
SB 73-0 063 R01 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF HIGH TIME FUEL VALVE CATEGORY 3
THRUST B US HING AND CLIP , SERVICE B ULL ETIN
MOS (EFF) RECURRING
HRS /MSC 100 00 100 00 M
ENC
SB 73-0 064 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF MIN SP EED A DJUSTME NT CATEGORY 6
LEV ER, SERVICE B ULL ETIN
MOS (EFF)
06-DEC-20 13 HRS /MSC -
ENC
SB 73-0 064 R01 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF MIN SP EED A DJUSTME NT CATEGORY 6 - A PPLICA BLE AND RECOMMENDE D
LEV ER, SERVICE B ULL ETIN
MOS 10-MAY -2015
04-A UG -2015 HRS /MSC -
ENC
SB 73-0 065 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L CONTROL (73-00 -00) - REP LACEMENT OF MFC G OVERNOR/CDP CATEGORY 6 NOT A PPLICA BLE - TO A6 -ELD E NG INES AS
BODY, SERVICE BULL ETIN WOODWARD SE RV ICE BULLETIN 8331 6-73-0 10
IS N/A TO A6 -ELD B Y MAIN FUEL CO NTROL
(MFC) S/N MENTIONED IN TA BLE. S /N
INS TAL LED O N A6- ELD ENG 1 = WYGC7021 .
MOS 27-JUL-20 15
23-JUN-2015 HRS /MSC -
ENC
SB 73-0 065 R01 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - FUE L CONTROL (73-00 -00) - REP LACEMENT OF MFC G OVERNOR/CDP CATEGORY 6 NOT A PPLICA BLE - BY MFC P N INS TAL LED
BODY, SERVICE BULL ETIN
MOS 05-A UG -2015
04-A UG -2015 HRS /MSC -
ENC
SB 73-0 066 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ E NG INES, S ERVICE BULLE TIN CATEGORY 8
MOS
19-JUN-2017 HRS /MSC - (s)
ENC
SB 73-0 067 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - VARIABLE G EOMETRY LINKAGE ACTUATION SYSTEM (73-0 0-00) - CATEGORY 2 NOT A PPLICA BLE - By Se rial: DUE TO ENGINE
INS PECTION AND RETORQUE O F VG ACTUA TO R PLA IN NUT, SERVICE B UL LETIN SERIAL NUMBERS
MOS
22-MAY -2020 HRS /MSC
ENC
AFL
SB 73-0 067 R01 NO. 1 ENGINE - ENGINE FUEL AND CONTRO L - VARIABLE G EOMETRY LINKAGE ACTUATION SYSTEM (73-0 0-00) - CATEGORY 2 NOT A PPLICA BLE - By Se rial: DUE TO ENGINE
INS PECTION AND RETORQUE O F VG ACTUA TO R PLA IN NUT, SERVICE B UL LETIN SERIAL NUMBER
MOS
26-A UG -2020 HRS /MSC
ENC
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 238 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 74-0 007 NO. 1 ENGINE - UPGRADE ENGINE ING INTIO N LEA DS , SERVICE BULL ETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 74-0 009 NO. 1 ENGINE - REPLA CE IGNITION EX CITERS, SE RVICE BULLETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 74-0 010 NO. 1 ENGINE - UPGRADE PROGRAM FO R CONTROL AMPLIFIE R PN 5 071T98P 01, SE RVICE BULLETIN CATEGORY 7 NOT A PPLICA BLE
MOS 01-A PR-2011
29-A PR-1997 HRS /MSC - 0
ENC 0
SB 74-0 011 NO. 1 ENGINE - IGNITIO N - ELECTRICAL SYS TE M (74-0 0-00) - INTRO DUCTIO N OF IMPROVED W2 B LUE CABL E CATEGORY 6 NOT A PPLICA BLE
ASS EMBLY, S ERVICE BULLE TIN
MOS 01-A PR-2011
06-JUN-2001 HRS /MSC - 0
ENC 0
SB 74-0 012 NO. 1 ENGINE - ENGINE - ELE CTRICAL SY STEM (74 -00-00 ) - INTRODUCTION OF NE W N1 CO NTROL AMPLIFIER PN CATEGORY 7
507 1T9 8P05 WITH A CIRCUIT BOARD REDES IGN, S ERVICE BULLETIN
MOS
21-O CT-20 04 HRS /MSC -
ENC
SB 74-0 012 R01 NO. 1 ENGINE - INTRODUCTION OF NE W N1 CO NTROL AMPLIFIER PN 50 71T98P05 WITH A CIRCUIT BOA RD RE DE SIG N, CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
16-NOV -2004 HRS /MSC A/R 0
ENC 0
SB 74-0 014 NO. 1 ENGINE - ELE CTRICAL SY STEM - W8 CAB LE AND CONTROL AMPL IFIE R (74- 00-00) - MICROCIRCUIT INSPECTIO N, CATEGORY 5 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
08-JUL-20 08 HRS /MSC - 0
ENC 0
SB 74-0 015 NO. 1 ENGINE - IGNITIO N - ELECTRICAL SYS TE M (74-0 0-00) - IG NITION EXCITER P/N 923 8M6 6P08 INS PECTION, CATEGORY 6
SERVICE BULLETIN
MOS
21-A PR-2010 HRS /MSC -
ENC
SB 74-0 016 NO. 1 ENGINE - IGNITIO N - ELECTRICAL SYS TE M (74-0 0-00) - INTRO DUCTIO N OF NEW IG NITION EXCITE R VIN CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
10-6 31045 -3 (P/N 9238 M66 P11), SERVICE BULLE TIN
MOS 01-A PR-2011
07-O CT-20 10 HRS /MSC - 0
ENC 0
SB 74-0 016 R01 NO. 1 ENGINE - IGNITIO N - ELECTRICAL SYS TE M (74-0 0-00) - INTRO DUCTIO N OF NEW IG NITION EXCITE R VIN CATEGORY 7
10-6 31045 -3 (P/N 9238 M66 P11), SERVICE BULLE TIN
MOS
26-JUL-20 11 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 239 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 75-0 002 NO. 1 ENGINE - AIR - INTRODUCTIO N OF NEW AND REWORKED B-SUMP VENT REGULATOR VALV ES, SE RV ICE
BULLE TIN
MOS
13-JUN-1997 HRS /MSC -
ENC
SB 75-0 002 R01 NO. 1 ENGINE - ENGINE - INTRODUCTION OF NE W AND REWORKE D B-SUMP VENT REG ULA TO R VAL VES, S ERVICE
BULLE TIN
MOS
19-FEB -1998 HRS /MSC -
ENC
SB 75-0 002 R02 NO. 1 ENGINE - ENGINE - INTRODUCTION OF NE W AND REWORKE D B-SUMP VENT REG ULA TO R VAL VES, S ERVICE
BULLE TIN
MOS
HRS /MSC -
ENC
SB 75-0 002 R03 NO. 1 ENGINE - ENGINE - INTRODUCTION OF NE W AND REWORKE D B-SUMP VENT REG ULA TO R VAL VES, S ERVICE CATEGORY 3
BULLE TIN
MOS
HRS /MSC -
ENC
SB 75-0 002 R04 NO. 1 ENGINE - INTRODUCTION OF NE W AND REWORKE D B-SUMP VENT REGULA TO R VAL VES, S ERVICE BULLETIN CATEGORY 3 NOT A PPLICA BLE
MOS 01-A PR-2011
28-JUN-2000 HRS /MSC - 0
ENC 0
SB 75-0 003 NO. 1 ENGINE - INTRODUCTION OF AIR TUBE S PACER PN 3049 T28 P01, S ERVICE BULLE TIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
03-DEC-19 98 HRS /MSC - 0
ENC 0
SB 75-0 004 NO. 1 ENGINE - INTRODUCTION OF NE W T2 SENSOR ANIT-ICING A IR TUBE, SERVICE BULLE TIN CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
07-MAR-2 000 HRS /MSC - 0
ENC 0
SB 79-0 005 REV 01 NO. 1 ENGINE - LUBE PUMP FILTER INSERT TQ CHECK, S ERVICE BULLE TIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 349
SB 79-0 006 NO. 1 ENGINE - OIL SYSTEM - INTRODUCTION A ND FIELD INSTALL ATION OF IMPROVED STAINLES S STE EL OIL TANK
SUPPO RT BEAMS, SERVICE BULLE TIN
MOS
08-A PR-1997 HRS /MSC -
ENC
SB 79-0 006 R01 NO. 1 ENGINE - OIL SYSTEM - INTRODUCTION A ND FIELD INSTALL ATION OF IMPROVED STAINLES S STE EL OIL TANK
SUPPO RT BEAMS, SERVICE BULLE TIN
MOS
19-FEB -1998 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 240 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 79-0 006 R02 NO. 1 ENGINE - OIL SYSTEM - INTRODUCTION A ND FIELD INSTALL ATION OF IMPROVED STAINLES S STE EL OIL TANK CATEGORY 3
SUPPO RT BEAMS, SERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 79-0 006 R03 NO. 1 ENGINE - INTRODUCTION AND FIELD INSTALLA TION O F IMP RO VED S TAINLESS STEE L O IL TANK SUP PORT CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
BEA MS , SERVICE B UL LETIN
MOS 01-A PR-2011
31-MAR-1 999 HRS /MSC - 0
ENC 0
SB 79-0 007 NO. 1 ENGINE - OIL SYSTEM - REPL ACEMENT OF L UB E A ND SCAVENGE PUMP SPUR GE AR, SERVICE B UL LETIN CATEGORY 2
MOS
23-JUN-1997 HRS /MSC -
ENC
SB 79-0 007 R01 NO. 1 ENGINE - REPLA CE ME NT OF LUBE AND S CA VENGE SPUR G EAR, SERVICE BULLETIN CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
16-DEC-19 97 HRS /MSC - 0
ENC 0
SB 79-0 008 NO. 1 ENGINE - OIL SYSTEM - INTRODUCTION O F IMP RO VED (NON-COATED) OIL TANK ON FIELDED ENGINES AND CATEGORY 3
NEW P RO DUCTION ENGINES , AND EL IMINATION O F A-SUMP SCAVENGE PUMP ON NEW PRODUCTIO N ENGINES,
SERVICE BULLETIN
MOS
12-JAN-19 98 HRS /MSC -
ENC

SB 79-0 008 R01 NO. 1 ENGINE - INTRODUCTION OF IMPROVE D (NON-COATED) OIL TANK ON FIELDED ENGINES AND NEW CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
PRODUCTION E NG INES, A ND ELIMINATIO N OF A-SUMP S CA VENGE PUMP O N NEW P RO DUCTION ENGINES , SERVICE
BULLE TIN
MOS 01-A PR-2011
10-MAR-1 999 HRS /MSC - 0
ENC 0
SB 79-0 010 NO. 1 ENGINE - INS PECTION OF NON-COATED TANK PN 5122T11G 01, SE RV ICE BULLETIN CATEGORY 3
MOS
17-JUN-1998 HRS /MSC -
ENC
SB 79-0 010 R01 NO. 1 ENGINE - INS PECTION OF NON-COATED O IL TANK P/N 5122 T11 G01, S ERVICE BULLE TIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
20-A UG -2008 HRS /MSC - 0
ENC 0
SB 79-0 012 R02 NO. 1 ENGINE - OIL - O IL SYS TE M (79- 00-00-) - REDUCED MA STER CHIP DETECTO R INTERV AL, S ERV ICE BULLETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC N/A 0
ENC 0
SB 79-0 012 R03 NO. 1 ENGINE - OIL - O IL SYS TE M (79- 00-00) - REDUCED MA STE R CHIP DETECTOR CHECK INTERVAL , SERVICE CATEGORY 2 NOT A PPLICA BLE - N/A BY SEAL PN INSTALL ED
BULLE TIN ON A6-EL D. INSTALLE D BEA RING IS P/N
504 2T1 3P04
MOS 18-A PR-2015
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 241 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 79-0 012 R04 NO. 1 ENGINE - OIL - O IL SYS TE M (79- 00-00) - REDUCED MA STE R CHIP DETECTOR CHECK INTERVAL , SERVICE CATEGORY 2 NOT A PPLICA BLE - AS SB 72-00 93 R1 C/W
BULLE TIN
MOS 27-JUL-20 15
HRS /MSC -
ENC
SB 79-0 014 NO. 1 ENGINE - OIL - S ERVICE EVA LUATION FO R LUBE AND SCAV ENGE PUMP AS SEMBLY, SERVICE BULL ETIN CATEGORY 7
MOS
04-O CT-20 01 HRS /MSC -
ENC
SB 79-0 016 NO. 1 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - INTRODUCTION O F IMP RO VED L UB E A ND CATEGORY 3 NOT A PPLICA BLE
SCAVE NG E P UMP ASS EMBLY PN 6 087T04P0 6, SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 79-0 018 NO. 1 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - C-SUMP SCAVENGE SCREENLES SFITTINGS - CATEGORY 5
FIE LD REWORK PROGRAM, SERVICE BULLETIN
MOS
22-JAN-20 04 HRS /MSC -
ENC
SB 79-0 018 R01 NO. 1 ENGINE - C-SUMP S CA VENGE SCREENLESS FITTINGS -FIELD REWORK P RO GRAM, SERVICE B UL LETIN CATEGORY 5
MOS
21-O CT-20 04 HRS /MSC -
ENC
SB 79-0 018 R02 NO. 1 ENGINE - C-SUMP S CA VENGE SCREENLESS FITTINGS - FIEL D REWORK PROGRAM - EFF SN 8 72004 THRU CATEGORY 5
873 999 & 950000 THRU 9500 67, SE RVICE BULLETIN
MOS
HRS /MSC N/A
ENC
SB 79-0 018 R03 NO. 1 ENGINE - C-SUMP S CA VENGE SCREENLESS FITTINGS - FIELD REWORK PROGRAM, S ERVICE BULLE TIN CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
25-JAN-20 08 HRS /MSC - 0
ENC 0
SB 79-0 019 NO. 1 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
03-JAN-20 06 HRS /MSC -
ENC
SB 79-0 020 NO. 1 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - INTRODUCTION O F REWORKED LUB E AND CATEGORY 5 NOT A PPLICA BLE
SCAVE NG E P UMP ASS EMBLY PN 6 087T04P0 9 - , SERVICE B ULL ETIN
MOS 01-A PR-2011
27-A PR-2006 HRS /MSC - 0
ENC 0
SB 79-0 021 NO. 1 ENGINE - INTRODUCTION OF A AND B SUMP SUPP LY TUBE ASS EMBLIES PN 41 59T69P0 1, PN 4 159T69P 02, AND CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
HEAT E XCHA NG ER TUBE PN 40 96T90G03 , SERVICE B UL LETIN
MOS 01-A PR-2011
11-JUL-20 06 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 242 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 79-0 024 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
07-S EP-20 07 HRS /MSC -
ENC
SB 79-0 024 R01 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
09-JUL-20 10 HRS /MSC -
ENC
SB 79-0 024 R02 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
12-DEC-20 11 HRS /MSC -
ENC
SB 79-0 024 R03 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
08-MAY -2012 HRS /MSC -
ENC
SB 79-0 024 R04 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9 NOT A PPLICA BLE - INFORMA TIONAL ONLY
MOS 26-NOV -2014
26-NOV -2014 HRS /MSC -
ENC
SB 79-0 024 R05 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9 - INFO RMATION ONLY
MOS 08-NOV -2015
13-O CT-20 15 HRS /MSC -
ENC
SB 79-0 024 R06 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
16-MAR-2 020 HRS /MSC -
ENC
SB 79-0 025 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
07-S EP-20 07 HRS /MSC -
ENC
SB 79-0 025 R01 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
09-JUL-20 10 HRS /MSC -
ENC
SB 79-0 025 R2 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
HRS /MSC -
ENC
SB 79-0 025 R3 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 243 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 79-0 025 R4 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9 NOT A PPLICA BLE - BY ENGINE MODEL - MSN
MOS 18-A PR-2015
HRS /MSC -
ENC
SB 79-0 025 R5 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9 NOT A PPLICA BLE - BY ENGINE MODEL
MOS 11-NOV -2015
HRS /MSC -
ENC
SB 79-0 026 NO. 1 ENGINE - RECALL OF THE LUBE AND SCAVE NG E P UMP ASS EMBLY P/N 608 7T0 4P10 FOR CF34-3B ENGINES, CATEGORY 2
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 79-0 026 R01 NO. 1 ENGINE - RECALL OF THE LUBE AND SCAVE NG E P UMP ASS EMBLY P/N 608 7T0 4P10 FOR CF34-3B ENGINES, CATEGORY 2 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 79-0 027 NO. 1 ENGINE - OIL - O IL SYS TE M (79- 00-00) - INTRODUCTIO N OF HTS OIL COMPA TIBLE PREFORMED PA CK INGS, CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
08-JAN-20 09 HRS /MSC - 0
ENC 0
SB 79-0 028 NO. 1 ENGINE - OIL - O IL SYS TE M (79- 00-00) - INTRODUCTIO N OF IMPROVED OIL FILTER BY PASS SE NS OR P/N CATEGORY 6 COMPLIED WITH - A T MANUFACTURE
406 0T6 4P04, SERVICE BULL ETIN
MOS 01-A PR-2011
29-JUN-2010 HRS /MSC - 0
ENC 0
SB 79-0 031 NO. 1 ENGINE - OIL SYSTEM - HEAT EXCHANGER A ND OIL S UP PLY LINE S (7 9-00-0 0) - INSPECTIO N AND REPLA CE ME NT CATEGORY 2 NOT A PPLICA BLE - THIS S B IS NA B Y ENG INE
OF THE HEAT EX CHANGE R, SERVICE BULLE TIN AND HEAT EXCHANGER S N: INSTALLE D SN IS
ENG 1: SCKB 3633
MOS 18-A PR-2015
03-FEB -2015 HRS /MSC -
ENC

SB 79-0 032 NO. 1 ENGINE - OIL - G ENERAL (79-00 -00) - S PARE PARTS RELE ASE FOR CF34-BJ ENGINES , SERVICE B UL LETIN CATEGORY 8 COMPLIED WITH - INFO RMATIONAL ONLY: O IL -
GENERAL (79 -00-00 ) - SPA RE PA RTS RELEA SE
FOR
CF3 4-BJ E NG INES (SB IDE NTIFIES NEW S PARE
PARTS THAT ARE INTE RCHANGEA BLE WITH
THE O LD PARTS THEY REPL ACE.)
MOS 23-JUL-20 20
21-JUL-20 20 HRS /MSC -
ENC

SB 79-0 033 NO. 1 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - INTRODUCTION O F NEW S UMP DRA IN CATEGORY 7
TUB E-HOSE P/N 28 34M14P01 AND RE DUCER E LBOW P/N 4085T91 P02, S ERVICE BULLETIN
MOS
28-O CT-20 19 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 244 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ENGINE NO. 2 - SB - 950968/6089T11G01


ASB 72-A0 088 NO. 2 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK FIEL D MANAGE ME NT PLAN, AL ERT SERVICE
BULLE TIN
MOS
HRS /MSC A/R
ENC
ASB 72-A0 076 PART 1 NO. 2 ENGINE - ENGINE - VISUAL INSP ECTION O F THE TOTAL TEMPERATURE AND P RE SSURE BO SS CAP., ALERT CATEGORY 1 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 076 PART 2 NO. 2 ENGINE - ENGINE - TORQUE INSPE CTION OF THE TOTAL TE MP ERATURE AND PRESS URE BOS S CAP ., A LERT CATEGORY 1 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 088 R0 1 NO. 2 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK FIEL D MANAGEMENT P LAN, ALE RT SERVICE
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 088 R0 2 NO. 2 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK FIEL D MANAGEMENT P LAN, ALE RT SERVICE
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 088 R0 3 NO. 2 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK FIEL D MANAGEMENT P LAN, ALE RT SERVICE CATEGORY 1
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 088 R0 4 NO. 2 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK FIEL D MANAGEMENT P LAN, ALE RT SERVICE CATEGORY 9 NOT A PPLICA BLE - SUPERSEDED
BULLE TIN
MOS 01-A PR-2011
13-MAR-2 007 HRS /MSC - 0
ENC 0
ASB 72-A0 097 NO. 2 ENGINE - ONE-TIME INSPECTIO N OF HPT BORESCOP E P LUG S, AL ERT SERVICE B UL LETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
16-JUL-20 01 HRS /MSC - 0
ENC 0
ASB 72-A0 136 NO. 2 ENGINE - AG B A SSEMBLY (72-62 -00) - REL OCATION OF AX IS K LANYA RD AND PLUG ASS EMBLY FO R HIG HE R CATEGORY 2
VISIBIL ITY FO R CF3 4-3A1 /-3B TURB OFAN ENGINES, A LERT SERVICE BULLETIN
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 245 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 72-A0 136 R0 1 NO. 2 ENGINE - AG B A SSEMBLY (72-62 -00) - REL OCATION OF AX IS K LANYA RD AND PLUG ASS EMBLY FO R HIG HE R CATEGORY 2
VISIBIL ITY FO R CF3 4-3A1 /-3B TURB OFAN ENGINES, A LERT SERVICE BULLETIN
MOS
10-FEB -2004 HRS /MSC -
ENC
ASB 72-A0 136 R0 2 NO. 2 ENGINE - AG B A SSEMBLY (72-62 -00) - REL OCATION OF AX IS K LANYA RD AND PLUG ASS EMBLY FO R HIG HE R CATEGORY 2
VISIBIL ITY FO R CF3 4-3A1 /-3B TURB OFAN ENGINES, A LERT SERVICE BULLETIN
MOS
10-FEB -2004 HRS /MSC -
ENC
ASB 72-A0 136 R0 3 NO. 2 ENGINE - RELOCATION O F AXIS K L ANYARD AND P LUG A SSEMBL Y FOR HIGHER V IS IBILITY FOR CF34-3 A1/-3B CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
TURBO FA N ENGINE S - EFF SN 872001 THRU 8738 78, 873 880 & 87388 1, ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 136 R0 4 NO. 2 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - RELOCATION O F AXIS K LANYARD AND P LUG A SSEMBL Y FOR HIGHER CATEGORY 2 COMPLIED WITH - REV 3 ALREA DY
VISIBIL ITY FO R CF3 4-3A1 /-3B TURB OFAN ENGINES, A LERT SERVICE BULLETIN ACCOMPLISHED AP R 01 201 1. NO FURTHER
ACTIO N REQUIRED.
MOS 18-A PR-2015
07-JAN-20 15 HRS /MSC -
ENC
ASB 72-A0 136 R0 5 NO. 2 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - RELOCATION O F AXIS K LANYARD AND P LUG A SSEMBL Y FOR HIGHER CATEGORY 2 NOT A PPLICA BLE - BY ENGINES S/N
VISIBIL ITY FO R CF3 4-3A1 /-3B TURB OFAN ENGINES, A LERT SERVICE BULLETIN
MOS 27-JUL-20 15
29-MAY -2015 HRS /MSC -
ENC
ASB 72-A0 140 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - COMPRESS OR ROTOR S POOL STAG ES 3 THRU 8, FIELD CATEGORY 1
MANAGEMENT P LAN, ALE RT SERVICE BULL ETIN
MOS
HRS /MSC -
ENC
ASB 72-A0 140 R0 1 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - COMPRESS OR ROTOR S POOL STAG ES 3 THRU 8, FIELD CATEGORY 1 COMPLIED WITH - A T MANUFACTURE
MANAGEMENT P LAN, ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 148 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE (LP T) ROTOR (72 -53-00 ) - REPLA CE ME NT OR INSP ECTION O F CATEGORY 3
STAGE S 5 AND 6 LP T ROTOR DISKS, A ND INSP ECTION O F STAGE S 3 AND 4 LPT DISK ARMS FOR ARC OUT, ALE RT
SERVICE BULLETIN
MOS
02-S EP-20 04 HRS /MSC -
ENC

ASB 72-A0 148 R0 1 NO. 2 ENGINE - LOW PRESSURE TURBINE (L PT) ROTOR - REPL ACEMENT OR INSPECTIO N OF STA GES 5 AND 6 LPT CATEGORY 5
ROTOR DISKS, AND INSPECTIO N OF STA GES 3 AND 4 LPT DISK ARMS FOR ARC OUT, ALE RT SERVICE BULLE TIN
MOS
10-MAR-2 005 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 246 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 72-A0 148 R0 2 NO. 2 ENGINE - REPLA CE ME NT OR INSPECTION OF S TAG ES 5 AND 6 LPT ROTOR DISKS , AND INS PECTION OF STAG ES CATEGORY 5
3 AND 4 LPT DISK ARMS FOR ARC OUT, ALE RT SERVICE BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 148 R0 3 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE ( LPT) ROTOR (72-53 -00) - REP LACEMENT OR INSPE CTION OF CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
STAGE S 5 AND 6 LP T ROTOR DISKS, A ND INSP ECTION O F STAGE S 3 AND 4 LP T DISK A RMS FOR ARC O UT, A LERT
SERVICE BULLETIN
DAYS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 152 NO. 2 ENGINE - REMOVAL PL AN TO RE PLACE OR INSPECT LPT DISKS FOR ARC-OUT INDICATIONS, ALERT SE RV ICE CATEGORY 1
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 152 R0 1 NO. 2 ENGINE - REMOVAL PL AN TO RE PLACE OR INSPECT LPT DISKS FOR ARC-OUT INDICATIONS, ALERT SE RV ICE CATEGORY 1
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 152 R0 2 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE ROTOR (72-53 -00) - REMO VAL PLAN TO REPL ACE O R INS PECT LPT CATEGORY 1 COMPLIED WITH - A T MANUFACTURE
DIS KS FO R ARC-OUT INDICA TIONS, A LERT SERVICE BUL LETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 200 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE ( 72-53-0 0) - INSPECTIO N OF L PT MODULES, A LERT SE RV ICE CATEGORY 2
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 200 R0 1 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE ( 72-53-0 0) - INSPECTIO N OF L PT MODULES, A LERT SE RV ICE CATEGORY 2
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 200 R0 2 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE ( 72-53-0 0) - INSPECTIO N OF L PT MODULES, A LERT SE RV ICE CATEGORY 2
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 200 R0 3 NO. 2 ENGINE - LOW PRESSURE TURBINE (7 2-52-0 0) - INSPECTION OF L PT MODULES, A LERT SERVICE BULLETIN CATEGORY 2
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 247 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 72-A0 200 R0 4 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE ( 72-52-0 0) - INSPECTIO N OF L PT MODULES, A LERT SE RV ICE CATEGORY 2
BULLE TIN
MOS
HRS /MSC -
ENC
ASB 72-A0 200 R0 5 NO. 2 ENGINE - LOW PRESSURE TURBINE (7 2-52-0 0) - INSPECTION OF L PT MODULES, A LERT SERVICE BULLETIN CATEGORY 2 NOT A PPLICA BLE - N/A BY ENGINE STAG E 3
SHROUD P/N (50 99T3240)
MOS 31-MAY -2016
03-MAY -2016 HRS /MSC -
ENC
ASB 72-A0 212 NO. 2 ENGINE - SHOP LEV EL INSPE CTION FOR FA N DISK ARC-OUT, ALE RT SERVICE BULLE TIN CATEGORY 1 COMPLIED WITH
MOS 01-A PR-2011
HRS /MSC -
ENC
ASB 72-A0 212 R0 1 NO. 2 ENGINE - SHOP LEV EL INSPE CTION FOR FA N DISK ARC-OUT, ALE RT SERVICE BULLE TIN CATEGORY 1 COMPLIED WITH
MOS 01-A PR-2011
HRS /MSC -
ENC
ASB 72-A0 212 R0 2 NO. 2 ENGINE - SHOP LEV EL INSPE CTION FOR FA N DISK ARC-OUT, ALE RT SERVICE BULLE TIN CATEGORY 1 COMPLIED WITH
MOS 01-A PR-2011
HRS /MSC -
ENC
ASB 72-A0 212 R0 3 NO. 2 ENGINE - SHOP LEV EL INSPE CTION FOR FA N DISK ARC-OUT INDICATIONS, ALERT S ERV ICE BULLETIN CATEGORY 1 COMPLIED WITH
MOS 01-A PR-2011
HRS /MSC -
ENC
ASB 72-A0 212 R0 4 NO. 2 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - S HO P L EVEL INS PECTION FO R FAN DISK ARC-O UT CATEGORY 1 NOT A PPLICA BLE
INDICA TIONS, A LERT SERVICE BUL LETIN
DAYS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 212 R0 5 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - S HO P L EVEL INS PECTION FO R FAN DIS K A RC-O UT INDICATIO NS , CATEGORY 1 NOT A PPLICA BLE - AS DISK SERIAL NO IS NOT
ALE RT SERVICE BULL ETIN MENTIONED IN TAB LE 1 O R TABLE 2. INSTALLE D
UNIT O N A/C = P/N (FAN DISK) - 6078 T57 G05,
DIS K S /N FOR ENG 1 = G EE1G G8J, DISK S/N FOR
ENG 2 = GEE1 GGK4.
MOS 27-JUL-20 15
HRS /MSC -
ENC
ASB 72-A0 212 R0 6 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - S HO P L EVEL INS PECTION FO R FAN DIS K A RC-O UT INDICATIO NS , CATEGORY 1 NOT A PPLICA BLE - NA BY DISK PN, CL OSED
ALE RT SERVICE BULL ETIN
MOS 21-MAY -2017
13-MAR-2 017 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 248 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 72-A0 213 NO. 2 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK BORE TACTILE AND VISUAL INS PECTION, CATEGORY 1
ALE RT SERVICE BULL ETIN
MOS
HRS /MSC -
ENC
ASB 72-A0 213 R0 1 NO. 2 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - FAN DISK BORE TACTILE AND VISUAL INS PECTION, CATEGORY 1 NOT A PPLICA BLE
ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 234 NO. 2 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - S HO P L EVEL EDDY CURRENT AND REDUNDANT TACTILE CATEGORY 3 NOT A PPLICA BLE
ENHANCE D VISUAL INSP ECTION FOR FA N DISK ARC-OUT INDICATIO NS, ALERT S ERVICE BULLETIN
MOS 01-A PR-2011
27-O CT-20 08 HRS /MSC - 0
ENC 0
ASB 72-A0 234 R0 1 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - S HO P L EVEL EDDY CURRE NT AND REDUNDANT TACTILE CATEGORY 3 NOT A PPLICA BLE - NA TO BY FA N DIS K P N
ENHANCE D VISUAL INSP ECTION FOR FA N DISK ARC-OUT INDICATIO NS, ALERT S ERVICE BULLETIN CLOSE D
MOS 21-MAY -2017
22-MAR-2 017 HRS /MSC -
ENC
ASB 72-A0 235 NO. 2 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - O N WING REPETITIVE EDDY CURRE NT INSPE CTION FOR CATEGORY 2 NOT A PPLICA BLE
FAN DISK ARC-O UT INDICATIONS, ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 72-A0 235 R0 1 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - O N WING REPETITIVE EDDY CURRE NT INSPE CTION FOR FAN DISK CATEGORY 2 NOT A PPLICA BLE - AS DISK S/N IS NO T
ARC-OUT INDICATIONS, A LERT SE RVICE BULLETIN MENTIONED IN TAB LE 1. INS TAL LED UNIT ON
A/C, FA N DIS K P /N: 607 8T57G05 , DISK S/N FOR
ENG 1: GE E1GG 8J, DISK S/N FOR E NG 2:
GEE 1GGK 4.
MOS 27-JUL-20 15
HRS /MSC -
ENC
ASB 72-A0 235 R0 2 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - O N WING REPETITIVE EDDY CURRE NT INSPE CTION FOR FAN DISK CATEGORY 2 NOT A PPLICA BLE - NA BY ENGINE MS N CLOSE D
ARC-OUT INDICATIONS, A LERT SE RVICE BULLETIN
MOS 21-MAY -2017
22-MAR-2 017 HRS /MSC -
ENC
ASB 72-A0 245 NO. 2 ENGINE - ENGINE - HIG H PRESS URE TURBINE ROTOR (72-4 6-00) - RE MO VAL O F STAGE 1 HPTR REAR COO LING CATEGORY 3 NOT A PPLICA BLE
PLA TE , ALERT S ERVICE BULLE TIN
MOS 01-A PR-2011
13-A UG -2009 HRS /MSC - 0
ENC 0
ASB 72-A0 285 NO. 2 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - IDENTIFICA TION A ND RE PLACEMENT O F SUSPECT CATEGORY 1 NOT A PPLICA BLE - BY A/C S/N
AGB , ALE RT SERVICE BULLE TIN
MOS 30-O CT-20 14
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 249 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 72-A0 285 R0 1 NO. 2 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - IDENTIFICA TION A ND RE PLACEMENT O F SUSPECT CATEGORY 1 NOT A PPLICA BLE - ASB 72-A 0285 R1 N/A BY
AGB , ALE RT SERVICE BULLE TIN INS TAL LED A GB AND SB 72- 0085 IS PO ST SB
MOS 18-A PR-2015
08-JAN-20 15 HRS /MSC -
ENC
ASB 72-A0 286 NO. 2 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INS PECTION OF AG B ASSEMBL IES P/N 6 014T81G2 6, P/N 60 14T81G27 , AND CATEGORY 2 NOT A PPLICA BLE - SB:72-00 85 HAS BE EN
P/N 60 14T81G28 , ALERT S ERVICE BULLE TIN COMPLIED IN PRODUCTION
MOS 30-O CT-20 14
HRS /MSC -
ENC
ASB 72-A0 286 R0 1 NO. 2 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INS PECTION OF AG B ASSEMBL IES P/N 6 014T81G2 6, P/N 60 14T81G27 , AND CATEGORY 2 NOT A PPLICA BLE - N/A TO THIS A/C B Y
P/N 60 14T81G28 , ALERT S ERVICE BULLE TIN INS TAL LED A GB AND SB 72- 0085 IS PO ST SB
FOR E NG INES.
MOS 18-A PR-2015
HRS /MSC -
ENC
ASB 72-A0 286 R0 2 NO. 2 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INS PECTION OF AG B ASSEMBL IES P/N 6 014T81G2 6, P/N 60 14T81G27 , AND CATEGORY 2 NOT A PPLICA BLE - THIS S B IS N/A TO E6-EL D BY
P/N 60 14T81G28 , ALERT S ERVICE BULLE TIN INS TAL LED A GB PN & SN
MOS 18-A PR-2015
HRS /MSC -
ENC
ASB 73-A0 032 R0 2 NO. 2 ENGINE - FUE L S YSTEM - REWORK OF MAIN FUEL CO NTROL TO A DD FO WA RD FL ANGE VENT GROO VES.,
ALE RT SERVICE BULL ETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 033 NO. 2 ENGINE - FUE L S YSTEM - REWORK OF MAIN FUEL CO NTROL FOR OV ERSPEED PROTECTION, AL ERT SERVICE
BULLE TIN
MOS
21-NOV -1997 HRS /MSC -
ENC
ASB 73-A0 033 R0 1 NO. 2 ENGINE - FUE L S YSTEM - REWORK OF MAIN FUEL CO NTROL FOR OV ERSPEED PROTECTION, AL ERT SERVICE
BULLE TIN
MOS
29-MAY -1998 HRS /MSC -
ENC
ASB 73-A0 033 R0 3 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REWORK OF MAIN FUEL CO NTROL FOR
OVE RS PEED PROTECTION, ALE RT SERVICE BULL ETIN
MOS
09-S EP-19 99 HRS /MSC -
ENC
ASB 73-A0 033 R0 4 NO. 2 ENGINE - FUE L S YSTEM- REWO RK OF MA IN FUEL CONTROL FOR OVERSPE ED PROTECTIO N., AL ERT SERVICE
BULLE TIN
MOS
01-NOV -1999 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 250 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 73-A0 033 R0 5 NO. 2 ENGINE - REWORK OF MAIN FUEL CO NTROL FOR OVERSPE ED PROTECTIO N, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 033 R0 6 NO. 2 ENGINE - REWORK OF MAIN FUEL CO NTROL FO R OVE RS PEED PROTECTION - EFF SN 8 72001 THRU 87227 8 & CATEGORY 3
872 280, A LERT SERVICE BUL LETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 033 R0 7 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REWORK OF MAIN FUEL CO NTROL FOR CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
OVE RS PEED PROTECTION, ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
06-MAY -2009 HRS /MSC - 0
ENC 0
ASB 73-A0 037 NO. 2 ENGINE - FUE L S YSTEM - REPLA CE ME NT OF SE LECTED CF34 FUEL CONTROL S., ALERT SE RV ICE BULLETIN CATEGORY 1 NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 73-A0 039 NO. 2 ENGINE - FUE L S YSTEM - INS PECTION AND REPLA CE ME NT OF MAIN FUEL FILTER PN 4106 T62 P01, A LERT CATEGORY 2 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
26-MAR-1 999 HRS /MSC - 0
ENC 0
ASB 73-A0 040 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF B UNA-N MATE RIAL CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
PREFORMED PA CK ING., ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
07-JUL-19 99 HRS /MSC - 0
ENC 0
ASB 73-A0 050 NO. 2 ENGINE - INS PECTION OF MAIN FUEL CO NTROL INPUT DRIV E S HA FT SPLINE, MAIN FUE L P UMP CONTROL CATEGORY 2
DRIVE SHAFT S PLINE, AND MAIN FUE L P UMP SECONDARY DRIVE SHAFT SPLINE, AL ERT SERVICE B UL LETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 050 R0 1 NO. 2 ENGINE - INS PECTION OF MAIN FUEL CO NTROL INPUT DRIV E S HA FT SPLINE, MAIN FUE L P UMP CONTROL CATEGORY 2
DRIVE SHAFT S PLINE AND MAIN FUEL PUMP SE CO NDARY DRIVE SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 050 R0 2 NO. 2 ENGINE - INS PECTION OF MAIN FUEL CO NTROL INPUT DRIV E S HA FT SPLINE, MAIN FUE L P UMP CONTROL CATEGORY 2
DRIVE SHAFT S PLINE AND MAIN FUEL PUMP SE CO NDARY DRIVE SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 050 R0 3 NO. 2 ENGINE - INS PECTION OF MAIN FUEL CO NTROL INPUT DRIV E S HA FT SPLINE, MAIN FUE L P UMP CONTROL CATEGORY 2
DRIVE SHAFT S PLINE, AND MAIN FUE L P UMP SECONDARY DRIVE SHAFT SPLINE, AL ERT SERVICE B UL LETIN
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 251 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 73-A0 050 R0 4 NO. 2 ENGINE - INS PECTION OF MAIN FUEL CO NTROL INPUT DRIV E S HA FT SPLINE, MAIN FUE L P UMP CONTROL CATEGORY 2
DRIVE SHAFT S PLINE, AND MAIN FUE L P UMP SECONDARY DRIVE SHAFT SPLINE, AL ERT SERVICE B UL LETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 050 R0 5 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INSPECTIO N OF MAIN FUEL CONTROL INP UT
DRIVE SHAFT S PLINE, MA IN FUEL PUMP CO NTROL DRIVE SHAFT SPL INE, A ND MA IN FUEL PUMP SECONDARY DRIV E
SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC
ASB 73-A0 050 R0 6 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INSPECTIO N OF MAIN FUEL CONTROL INP UT CATEGORY 2
DRIVE SHAFT S PLINE, MA IN FUEL PUMP CO NTROL DRIVE SHAFT SPL INE, A ND MA IN FUEL PUMP SECONDARY DRIV E
SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC

ASB 73-A0 050 R0 7 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INSPECTIO N OF MAIN FUEL CONTROL INP UT CATEGORY 2
DRIVE SHAFT S PLINE, MA IN FUEL PUMP CO NTROL DRIVE SHAFT SPL INE, A ND MA IN FUEL PUMP SECONDARY DRIV E
SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC - 0
ENC

ASB 73-A0 050 R0 8 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INSPECTIO N OF MAIN FUEL CONTROL INP UT
DRIVE SHAFT S PLINE, MA IN FUEL PUMP CO NTROL DRIVE SHAFT SPL INE, A ND MA IN FUEL PUMP SECONDARY DRIV E
SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC

ASB 73-A0 050 R0 9 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INSPECTIO N OF MAIN FUEL CONTROL INP UT - TO BE COMPLIED BE FO RE 10 000 HRS
DRIVE SHAFT S PLINE, MA IN FUEL PUMP CO NTROL DRIVE SHAFT SPL INE, A ND MA IN FUEL PUMP SECONDARY DRIV E
SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS
HRS /MSC - 100 00 M
ENC

ASB 73-A0 050 R1 0 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INSPECTIO N OF MAIN FUEL CONTROL INP UT CATEGORY 2 - A PPLICA BLE
DRIVE SHAFT S PLINE, MA IN FUEL PUMP CO NTROL DRIVE SHAFT SPL INE, A ND MA IN FUEL PUMP SECONDARY DRIV E
SHAFT SP LINE, ALERT SE RV ICE BULLETIN
MOS (EFF) RECURRING
05-A UG -2016 HRS /MSC 100 00 100 00 M
ENC
ASB 73-A0 068 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - GE NERAL (7 3-00-00 ) - SUSPE NS IO N OF THE US E O F KATHON FP 1.5 CATEGORY 2
BIOCIDE TRE ATME NT, AL ERT SERVICE B UL LETIN
MOS
16-MAR-2 020 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 252 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 79-A0 015 NO. 2 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - FEILD MANAG EMENT PROGRAM TO PREV ENT
B-S UMP OIL REL EASE EV ENTS., AL ERT SERVICE B UL LETIN
MOS
HRS /MSC -
ENC
ASB 79-A0 015 R0 1 NO. 2 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - FIELD MANAG EMENT PROGRAM TO PREV ENT
B-S UMP OIL REL EASE EV ENTS, ALERT S ERVICE BULLETIN
MOS
HRS /MSC -
ENC
ASB 79-A0 015 R0 2 NO. 2 ENGINE - FIE LD MANAGEMENT PRO GRAM TO PREVENT B-SUMP O IL RELEA SE EVENTS, AL ERT SERVICE CATEGORY 1
BULLE TIN
MOS
12-JUL-20 02 HRS /MSC -
ENC
ASB 79-A0 015 R0 3 NO. 2 ENGINE - OIL-LUBE AND S CA VENGE COMPONENTS (7 9-00-0 0) - FIE LD MANAGE ME NT PROGRAM TO PREVE NT CATEGORY 1 NOT A PPLICA BLE
B-S UMP OIL REL EASE EV ENTS., AL ERT SERVICE B UL LETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
ASB 79-A0 015 R0 4 NO. 2 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - FIELD MANAG EMENT PROGRAM TO PREV ENT CATEGORY 1 COMPLIED WITH - S B 7 9-A00 17 HA S B EEN C/W
B-S UMP OIL REL EASE EV ENTS, ALERT S ERVICE BULLETIN ON 01-AP R-1 1 INTE NT OF THIS SB HAS BEEN
ACCOMPLISHED.
MOS 18-A PR-2015
HRS /MSC -
ENC
ASB 79-A0 015 R0 5 NO. 2 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - FIELD MANAG EMENT P RO GRAM TO PREVENT CATEGORY 1 COMPLIED WITH - A PPLICABLE FOR A 6-ELD BY
B-S UMP OIL REL EASE EV ENTS, ALERT S ERVICE BULLETIN ENGINE MODEL . RE FE RE NCE SB 79-A 0017 HAS
BEE N ALREA DY COMPLIED WITH. NO FURTHER
ACTIO N REQUIRED
MOS 27-JUL-20 15
HRS /MSC -
ENC
ASB 79-A0 017 NO. 2 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - B -SUMP SCAV ENGE SCRE ENLESS FITTINGS -
FIE LD REWORK PROGRAM A LERT, ALERT S ERVICE BULLETIN
MOS
HRS /MSC -
ENC
ASB 79-A0 017 R0 1 NO. 2 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - B -SUMP SCAV ENGE SCRE ENLESSFITTING S - CATEGORY 1
FIE LD REWORK PROGRAM, ALE RT SERVICE BULL ETIN
MOS
09-O CT-20 02 HRS /MSC -
ENC
ASB 79-A0 017 R0 2 NO. 2 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - B -SUMP SCAV ENGE SCRE ENLESS FITTINGS - CATEGORY 1 COMPLIED WITH - A T MANUFACTURE
FIE LD REWORK PROGRAM, ALE RT SERVICE BULL ETIN
MOS 01-A PR-2011
06-MAY -2009 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 253 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

ASB 79-A0 017 R0 3 NO. 2 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - B -SUMP SCAV ENGE SCRE ENLESS FITTINGS - CATEGORY 1
FIE LD REWORK PROGRAM, ALE RT SERVICE BULL ETIN
MOS (EFF)
27-A PR-2015 HRS /MSC -
ENC
SB 71-0 000 NO. 2 ENGINE - PO WE R PLANT - GE NE RA L ( 71-00-0 0) - CONSOL IDATED O N- WING INSPE CTION RECOMMENDA TIONS CATEGORY 9
AND S ERV ICING TASK S L IST, S ERV ICE BULLETIN
MOS
14-JAN-20 20 HRS /MSC -
ENC
SB 71-0 000 R01 NO. 2 ENGINE - PO WE R PLANT - GE NE RA L ( 71-00-0 0) - CONSOL IDATED O N- WING INSPE CTION RECOMMENDA TIONS CATEGORY 9 - A /C IS UNDER PPI. SB 71-0 000 R1 WILL BE
AND S ERV ICING TASK S L IST, S ERV ICE BULLETIN EVA LUATED BY NEW O WNER CAMO
ACCORDING TO ENVIRONME NTAL CONDITIO N.
MOS (EFF)
28-JUN-2021 HRS /MSC -
ENC
AFL
SB 72-0 000 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - RECOMMENDED ENGINE MAINTENANCE ACTIONS TO B E TAKE N WHEN AN CATEGORY 3
ENGINE IS IN A SERVICE CENTE R, SERVICE BULLE TIN
MOS
09-JAN-20 20 HRS /MSC ESV
ENC
SB 72-0 000 R01 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - RECOMMENDED ENGINE MAINTENANCE ACTIONS TO B E TAKE N WHEN AN CATEGORY 3
ENGINE IS IN A SERVICE CENTE R, SERVICE BULLE TIN
MOS (EFF)
04-DEC-20 20 HRS /MSC ESV
ENC
AFL
SB 72-0 014 R3 NO. 2 ENGINE - ACCESSO RY DRIVE G EARBOX (AG B): REPL ACE ME NT OF AX IS -A DUPLE X B EARING AND AX IS -BB BALL RECOMME NDED NOT A PPLICA BLE - N/A BY ENGINE MODEL. NO
BEA RING, SE RV ICE BULLETIN FURTHER ACTIO N REQUIRE D.
MOS 10-MAY -2015
HRS /MSC -
ENC
SB 72-0 027 R01 NO. 2 ENGINE - INS PECTION OF LO W- PRESSURE TURBINE (LP T) BORES CO PE PLUGS PN 5 071T39G0 2 A ND CATEGORY 2 NOT A PPLICA BLE
INS TAL LATIO N OF LPT BO RE SCOPE PLUG COVERS PN 3 904T92P 01, SE RVICE BULLETIN
MOS 01-A PR-2011
24-JAN-19 94 HRS /MSC - 0
ENC 0
SB 72-0 028 R1 NO. 2 ENGINE - ACCESSO RY DRIVE G EARBOX (AG B): IMPRO VED AXIS-BB REAR B ALL BEA RING, SERVICE BULLETIN RECOMME NDED NOT A PPLICA BLE - N/A BY ENGINE MODEL. NO
FURTHER ACTIO N REQUIRE D.
MOS 10-MAY -2015
HRS /MSC -
ENC
SB 72-0 030 REV 03 NO. 2 ENGINE - ASB ESTOS ELIMINATION, SERVICE BULL ETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 254 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 035 R01 NO. 2 ENGINE - REAR MA IN MOUNT: REWORK O F ADDITIONAL HO LE FO R FIRE DE TE CTION SY STEM HARNESS, CATEGORY 3 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
27-JAN-20 03 HRS /MSC - 0
ENC 0
SB 72-0 037 REV 01 NO. 2 ENGINE - REWORK BORESCOPE P LUG B OSSES , SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 72-0 040 REV 01 NO. 2 ENGINE - REWORK OF THE COMPRES SOR ROTOR ASSE MB LY, SE RV ICE BULLETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 72-0 041 NO. 2 ENGINE - REPLA CE B- SCO PE PLUG IN HP T CASING , SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 72-0 043 NO. 2 ENGINE - REPLA CE ME NT OF ENGINE IDENT PL ATE , SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 72-0 046 NO. 2 ENGINE - VISUAL AND TORQUE INSPE CT BOSS CAP, SERVICE BULLE TIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 72-0 048 R06 NO. 2 ENGINE - HARDWARE EXP OSED TO A BNO RMAL O PERATING EVENTS, S ERV ICE BULLETIN CATEGORY 9 NOT A PPLICA BLE
MOS 01-A PR-2011
18-MAY -2006 HRS /MSC - 0
ENC 0
SB 72-0 048 R07 NO. 2 ENGINE - HARDWARE EXP OSED TO A BNO RMAL O PERATING EVENTS, S ERV ICE BULLETIN CATEGORY 9
MOS
23-A PR-2012 HRS /MSC -
ENC
SB 72-0 048 R08 NO. 2 ENGINE - ENGINE - GE NE RAL - HARDWARE EXP OSED TO AB NO RMAL OP ERATING EVENTS, SE RV ICE BULLETIN CATEGORY 9
MOS
05-NOV -2013 HRS /MSC -
ENC
SB 72-0 048 R09 NO. 2 ENGINE - GE NERAL - HARDWARE EXP OSED TO AB NO RMAL OP ERATING EVENTS, SE RV ICE BULLETIN CATEGORY 9
MOS
12-S EP-20 17 HRS /MSC -
ENC
SB 72-0 048 R10 NO. 2 ENGINE - GE NERAL - HARDWARE EXP OSED TO AB NO RMAL OP ERATING EVENTS, SE RV ICE BULLETIN CATEGORY 9
MOS
13-JUN-2019 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 255 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 048 R11 NO. 2 ENGINE - GE NERAL - HARDWARE EXP OSED TO AB NO RMAL OP ERATING EVENTS, SE RV ICE BULLETIN CATEGORY 9 COMPLIED WITH - INFO RMATIONAL ONLY:
MOS 23-A UG -2021
18-A UG -2021 HRS /MSC -
ENC
SB 72-0 048 R12 NO. 2 ENGINE - GE NERAL - HARDWARE EXP OSED TO AB NO RMAL OP ERATING EVENTS, SE RV ICE BULLETIN CATEGORY 9
MOS
15-NOV -2021 HRS /MSC -
ENC
SB 72-0 049 REV 01 NO. 2 ENGINE - INTRO KALREZ O-RING, S ERVICE BULLE TIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 72-0 050 R07 NO. 2 ENGINE - INTRODUCTION OF THE IMP RO VED DESIGN HIGH-PRESS URE TURBINE RO TO R ASS EMBLIES PN CATEGORY 2 NOT A PPLICA BLE
507 9T6 1G02/G0 4 A ND ASSO CIATED HARDWARE, SERVICE B UL LETIN
MOS 01-A PR-2011
05-JAN-20 07 HRS /MSC - 0
ENC 0
SB 72-0 051 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - COMPLIANCE A ND INTERCHANGE ABILITY STATEMENTS USED IN CATEGORY 9
CF3 4-BJ S ERVICE BULLE TINS, SERVICE BUL LETIN
MOS
15-JUN-1995 HRS /MSC -
ENC
SB 72-0 051 R01 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - COMPLIANCE A ND INTERCHANGE ABILITY STATEMENTS USED IN CATEGORY 1
CF3 4-BJ S ERVICE BULLETINS, SERVICE BULLE TIN
MOS
11-MAY -2012 HRS /MSC -
ENC
SB 72-0 054 R03 NO. 2 ENGINE - REWORK OF THE HIGH-PRESSURE TURBINE S TATOR BORESCOP E P LUGS TO THRE ADED CATEGORY 3 NOT A PPLICA BLE
CONFIGURATIO N, S ERVICE BULLE TIN
MOS 01-A PR-2011
14-MAR-2 007 HRS /MSC - 0
ENC 0
SB 72-0 055 R01 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D LCF FAN DISKS , SERVICE BULL ETIN CATEGORY 2
MOS
17-JAN-20 03 HRS /MSC -
ENC
SB 72-0 058 NO. 2 ENGINE - ENGINE - COMPRESSO R VA NE- TO -BLADE AXIAL CLEARANCE INCRE ASE, S ERVICE BULLETIN
MOS
08-A PR-1997 HRS /MSC -
ENC
SB 72-0 058 R01 NO. 2 ENGINE - ENGINE - COMPRESSO R VA NE- TO -BLADE AXIAL CLEARANCE INCRE ASE, S ERVICE BULLETIN
MOS
22-NOV -1999 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 256 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 058 R02 NO. 2 ENGINE - ENGINE - COMPRESSO R VA NE- TO -BLADE AXIAL CLEARANCE INCRE ASE, S ERVICE BULLETIN CATEGORY 6
MOS
13-JAN-20 04 HRS /MSC -
ENC
SB 72-0 058 R03 NO. 2 ENGINE - COMPRESSO R VANE- TO- BLADE AXIAL CLEARANCE INCREA SE, S ERVICE BULLETIN CATEGORY 6 NOT A PPLICA BLE
MOS 01-A PR-2011
27-A PR-2006 HRS /MSC - 0
ENC 0
SB 72-0 059 NO. 2 ENGINE - INTRODUCTION OF NE W COMBUSTIO N LINE R WITH IMPROVED WEAR-COATED IGNITER FE RRULE
HARDWARE AND IGNITER WITH WEAR-COATED TIP, S ERVICE BULLE TIN
MOS
12-FEB -1997 HRS /MSC -
ENC
SB 72-0 059 R01 NO. 2 ENGINE - INTRODUCTION OF NE W COMBUSTIO N LINE R WITH IMPROVED WEAR-COATED IG NITER FERRUL E
HARDWARE AND IGNITER WITH WEAR-COATED TIP, S ERVICE BULLE TIN
MOS
30-MAY -1997 HRS /MSC -
ENC
SB 72-0 059 R02 NO. 2 ENGINE - INTRODUCTION OF NE W COMBUSTIO N LINE R WITH IMPROVED WEAR-COATED IGNITER FE RRULE
HARDWARE AND IGNITER WITH WEAR-COATED TIP, S ERVICE BULLE TIN
MOS
19-FEB -1998 HRS /MSC -
ENC
SB 72-0 059 R03 NO. 2 ENGINE - INTRODUCTION OF NE W COMBUSTIO N LINE R WITH IMPROVED WEAR-COATED IGNITER FE RRULE CATEGORY 3
HARDWARE AND IGNITER WITH WEAR-COATED TIP, S ERVICE BULLE TIN
MOS
20-A UG -2008 HRS /MSC -
ENC
SB 72-0 059 R04 NO. 2 ENGINE - ENGINE - COMBUSTIO N LINE R AND S TAG E 1 NOZZLE (72-42 -00) - INTRO DUCTION OF NEW CATEGORY 3
COMBUSTION LINE R WITH IMPROVED WE AR-COATED IGNITER FE RRULE HARDWARE AND IGNITER WITH
WEAR-COATED TIP, SE RV ICE BULLETIN
MOS
14-JAN-20 09 HRS /MSC -
ENC

SB 72-0 059 R05 NO. 2 ENGINE - ENGINE - COMBUSTIO N LINE R AND S TAG E 1 NOZZLE (72-42 -00) - INTRO DUCTION OF NEW CATEGORY 3 NOT A PPLICA BLE
COMBUSTION LINE R WITH IMPROVED WE AR-COATED IGNITER FE RRULE HARDWARE AND IGNITER WITH
WEAR-COATED TIP, SE RV ICE BULLETIN
MOS 01-A PR-2011
18-FEB -2009 HRS /MSC - 0
ENC 0
SB 72-0 060 NO. 2 ENGINE - ENGINE - REWORK OF THE P OWER TAKE OFF (PTO) ASS EMBLIES PN 60 37T72G12 /G1 6/G 17 AND
INTRODUCTION OF PTO A SSEMBL Y P N 6037 T7 2G18, SERVICE BULLE TIN
MOS
16-A PR-1997 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 257 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 060 R01 NO. 2 ENGINE - ENGINE - REWORK OF THE P OWER TAKE OFF (PTO) ASS EMBLIES PN 60 37T72G12 /G1 6/G 17 AND
INTRODUCTION OF PTO A SSEMBL Y P N 6037 T7 2G18, SERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 060 R02 NO. 2 ENGINE - ENGINE - REWORK OF THE P OWER TAKE OFF (PTO) ASS EMBLIES PN 60 37T72G12 /G1 6/G 17 AND CATEGORY 3
INTRODUCTION OF PTO A SSEMBL Y P N 6037 T7 2G18, SERVICE BULLE TIN
MOS
08-JUN-2000 HRS /MSC -
ENC
SB 72-0 060 R03 NO. 2 ENGINE - REWORK OF THE P OWER TAKE OFF (PTO) ASS EMBLIES PN 603 7T72G12 /G1 6/G 17 AND INTRODUCTIO N CATEGORY 3 NOT A PPLICA BLE
OF PTO A SSEMBLY PN 6037 T72 G18, S ERVICE BULLE TIN
MOS 01-A PR-2011
11-MAR-2 003 HRS /MSC - 0
ENC 0
SB 72-0 062 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D HIG H-P RE SSURE TURBINE (HPT) S TA GE 1 B LADES WITH INTERNAL CATEGORY 7 NOT A PPLICA BLE
COATING , SERVICE BULL ETIN
MOS 01-A PR-2011
18-JUN-1997 HRS /MSC - 0
ENC 0
SB 72-0 063 NO. 2 ENGINE - REWORK OF COMPRESS OR FORWARD SHAFT PN 5037T01P 03 TO PN 5037 T01 P04, A ND CATEGORY 3
INTRODUCTION OF NE W COMPRESSO R FORWARD SHAFT PN 5037T01P 04, SE RV ICE BULLETIN
MOS
09-O CT-19 97 HRS /MSC -
ENC
SB 72-0 063 R01 NO. 2 ENGINE - REWORK CO MP RE SSOR FO RWARD S HA FT PN 503 7T01P03 TO P04, & INTRODUCTION O F NEW CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
COMPRESSO R FORWA RD SHAFT PN 5037T01P 04 - EFF S N 872 001 THRU 87 2069, SERVICE BULLE TIN
MOS 01-A PR-2011
17-JAN-20 03 HRS /MSC A/R 0
ENC 0
SB 72-0 064 NO. 2 ENGINE - ELIMINATION OF SPLITLINE PINS FROM COMPRES SOR INNER SHROUDS, SERVICE B UL LETIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
23-O CT-19 97 HRS /MSC - 0
ENC 0
SB 72-0 065 NO. 2 ENGINE - INTERCHA NG EABL ITY OF CF34-3B AND CF34-3 B1 ENGINE MODELS, SERVICE BULLE TIN CATEGORY 7
MOS
27-MAR-1 998 HRS /MSC -
ENC
SB 72-0 065 R01 NO. 2 ENGINE - INTERCHA GEAB ILITY OF CF34-3B AND CF34-3B 1 E NG INE MODELS, S ERVICE BULLETIN CATEGORY 7
MOS
10-JUN-2003 HRS /MSC -
ENC
SB 72-0 066 NO. 2 ENGINE - FORWARD FAN SHAFT DESIGN CHANGE , SERVICE BULL ETIN CATEGORY 4 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
19-FEB -1998 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 258 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 067 NO. 2 ENGINE - ENGINE - CF34-3B FLEET LEADER SAMPLING P RO GRAM, SERVICE B ULL ETIN CATEGORY 2
MOS
19-FEB -1998 HRS /MSC -
ENC
SB 72-0 067 R01 NO. 2 ENGINE - ENGINE - CF34-3B FLEET LEADER SAMPLING P RO GRAM, SERVICE B ULL ETIN CATEGORY 2
MOS
HRS /MSC -
ENC
SB 72-0 067 R02 NO. 2 ENGINE - CF3 4-3B FLEET LEADER S AMPLING P RO GRAM, SERVICE BULL ETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
11-DEC-19 98 HRS /MSC -
ENC
SB 72-0 068 NO. 2 ENGINE - ENGINE S ERVICE RECORD (LO GBOO K) E NTRY FO R THE CF34-3B HPT B ALANCE PIS TO N SEA L, CATEGORY 7 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
23-A PR-1998 HRS /MSC - 0
ENC 0
SB 72-0 069 NO. 2 ENGINE - ENGINE - TURBINE TRANSITION ASSE MB LY - REPL ACEMENT OF THE SELF-LO CK ING BUTS ON THE CATEGORY 3
THE RMOCOUPL E P RO BES AND ON THE PT5 PRESSURE PROBE OR P LUG, SE RVICE BULLETIN
MOS
29-MAY -1998 HRS /MSC -
ENC
SB 72-0 069 R01 NO. 2 ENGINE - REPLA CE ME NT OF THE S ELF-LOCKING NUTS O N THE THERMO CO UP LE PROBES AND O N THE PT5 CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
PRESS URE PROBE OR PLUG, S ERVICE BULLETIN
MOS 01-A PR-2011
04-MAR-1 999 HRS /MSC - 0
ENC 0
SB 72-0 070 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR - INSPECTION AND REWORK OF VG A CTUATOR BE LLCRANK CLEV IS,
SERVICE BULLETIN
MOS
01-O CT-19 98 HRS /MSC -
ENC
SB 72-0 070 R01 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR - INSPECTION AND REWORK OF VG A CTUATOR BE LLCRANK CLEV IS,
SERVICE BULLETIN
MOS
06-A PR-1999 HRS /MSC -
ENC
SB 72-0 070 R02 NO. 2 ENGINE - COMPRESSO R STATOR-INS PECTION AND REWORK O F VG ACTUA TO R BEL LCRANK CLEVIS, S ERVICE
BULLE TIN
MOS
09-JUN-1999 HRS /MSC -
ENC
SB 72-0 070 R03 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR - INSPECTION AND REWORK OF VG A CTUATOR BE LLCRANK CLEV IS, CATEGORY 2 COMPLIED WITH - -
SERVICE BULLETIN
MOS 01-A PR-2011
05-JAN-20 11 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 259 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 070 R04 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR - INSPECTION AND REWORK OF VG A CTUATOR BE LLCRANK A ND CATEGORY 2
CLEVIS BUSHING, S ERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 070 R05 NO. 2 ENGINE - COMPRESSO R STATOR - INS PECTION AND EWORK OF V G ACTUATOR B ELLCRANK A ND CLEVIS RECOMME NDED NOT A PPLICA BLE - THIS S B IS N/A TO AG ELD
BUSHING , SERVICE BULL ETIN ENGINES BY ENGINE S/N.
INS TAL LED E NG 1 S /N = 95096 7 A ND ENG 2 S/N =
950 968
NO ACTION REQ
MOS 11-NOV -2015
HRS /MSC -
ENC
SB 72-0 071 NO. 2 ENGINE - INTRODUCTION OF STAGE 5 THROUGH 9 COMPRESS OR ROTOR B LADES WITH IMPROVED CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
WEAR-RESISTANT DOVETAIL COATING, S ERVICE BULLE TIN
MOS 01-A PR-2011
09-NOV -1998 HRS /MSC - 0
ENC 0
SB 72-0 072 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR - INTRODUCTION O F IMPROV ED VG A CTUATOR RING S, SERVICE
BULLE TIN
MOS
19-NOV -1998 HRS /MSC -
ENC
SB 72-0 072 R01 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR - INTRODUCTION O F IMPROV ED VG A CTUATOR RING S., SERVICE CATEGORY 3
BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 072 R02 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D VG ACTUATO R RING - EFF S N 872 001 THRU 87 2373, SERVICE CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
BULLE TIN
MOS 01-A PR-2011
30-MAR-2 004 HRS /MSC A/R 0
ENC 0
SB 72-0 074 NO. 2 ENGINE - ENGINE - COMPRESSO R - INTRODUCTIO N OF IMPROVED VG ACTUATOR SHAFT AND BE LLCRANK
ASS EMBLY, S ERVICE BULLE TIN
MOS
24-NOV -1998 HRS /MSC -
ENC
SB 72-0 074 R01 NO. 2 ENGINE - ENGINE - COMPRESSO R - INTRODUCTIO N OF IMPROVED VG ACTUATOR SHAFT AND BE LLCRANK
ASS EMBLY, S ERVICE BULLE TIN
MOS
06-A PR-1999 HRS /MSC -
ENC
SB 72-0 074 R02 NO. 2 ENGINE - ENGINE - COMPRESSO R (72 -30-00 ) - INTRODUCTIO N OF IMPROVE D VG ACTUA TO R SHAFT AND
BEL LCRA NK AS SEMBLY, SERVICE BULLE TIN
MOS
30-S EP-19 99 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 260 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 074 R03 NO. 2 ENGINE - ENGINE - COMPRESSO R (72 -30-00 ) - INTRODUCTIO N OF IMPROVE D VG ACTUA TO R SHA FT AND
BEL LCRA NK AS SEMBLY, SERVICE BULLE TIN
MOS
02-A UG -2006 HRS /MSC -
ENC
SB 72-0 074 R04 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D VG ACTUATO R SHAFT AND B ELLCRANK ASSEMBL Y, SERVICE CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
BULLE TIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 074 R05 NO. 2 ENGINE - COMPRESSO R (72- 30-00) - INTRODUCTIO N OF IMPROVE D VG ACTUA TO R SHAFT AND B ELLCRANK CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
ASS EMBLY, S ERVICE BULLE TIN
MOS 02-JUN-2014
02-JUL-20 14 HRS /MSC -
ENC
SB 72-0 075 NO. 2 ENGINE - ENGINE - COMBUSTIO N SECTIO N - IMPROVE D REAR MA IN MOUNT FIRE WA LL SEALS , SERVICE
BULLE TIN
MOS
14-JAN-19 99 HRS /MSC -
ENC
SB 72-0 075 R01 NO. 2 ENGINE - IMP RO VED REA R MAIN MOUNT FIREWALL SEA LS, SE RV ICE BULLETIN
MOS
19-FEB -1999 HRS /MSC -
ENC
SB 72-0 075 R02 NO. 2 ENGINE - IMP RO VED REA R MAIN MOUNT FIREWALL SEA LS - EFF SN 87200 1 THRU 8723 36, SE RV ICE BULLETIN CATEGORY 5
MOS
14-MAR-2 003 HRS /MSC A/R
ENC
SB 72-0 075 R03 NO. 2 ENGINE - IMP RO VED REA R MAIN MOUNT FIREWALL SEA LS - EFF S N 872 001 THRU 87 2336, SERVICE BULLE TIN CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
05-MAY -2008 HRS /MSC - 0
ENC 0
SB 72-0 077 REV 05 NO. 2 ENGINE - REWORK SEAL AND IMPROVED SEAL PIN, SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 72-0 078 NO. 2 ENGINE - IMP RO VED L PT ROTOR A SSEMBLY , SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 72-0 079 NO. 2 ENGINE - ENGINE - TURBINE SECTION - IMPROVED HP T STATOR A SSEMBL Y A ND TURBINE TRANSITION CATEGORY 6
ASS EMBLY, S ERVICE BULLE TIN
MOS
11-FEB -1999 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 261 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 079 R01 NO. 2 ENGINE - IMP RO VED HPT STATO R AS SEMBLY AND TURB INE TRANSITIO N ASS EMBLY, S ERVICE BULLETIN CATEGORY 6 NOT A PPLICA BLE
MOS 01-A PR-2011
08-JUN-2000 HRS /MSC - 0
ENC 0
SB 72-0 080 NO. 2 ENGINE - ENGINE - FAN ROTOR - REP LACEMENT OF NO. 1 B ALL BEARING MANUFACTURING LOT, SE RV ICE CATEGORY 2
BULLE TIN
MOS
31-MAR-1 999 HRS /MSC -
ENC
SB 72-0 080 R01 NO. 2 ENGINE - REPLA CE ME NT OF NO. 1 BA LL BEARING MANUFA CTURING LOT, SERVICE B UL LETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
09-JUN-1999 HRS /MSC - 0
ENC 0
SB 72-0 081 NO. 2 ENGINE - CF3 4 COMBUSTION LINER S HE LL A ND DOME P ART NUMBE R AND SE RIAL NUMBE R TRA CK ING, CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
07-JUN-1999 HRS /MSC - 0
ENC 0
SB 72-0 082 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR ASSEMBL Y (7 2-32-0 0) - CF34 CO MP RE SSOR VARIA BLE VANE
ACTUA TING ARM WEAR A R THE COMPRESS OR SP LITLINE, SE RVICE BULLETIN
MOS
23-JUN-1999 HRS /MSC -
ENC
SB 72-0 082 R01 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR ASSEMBL Y (7 2-32-0 0) - CF34 CO MP RE SSOR VARIA BLE VANE
ACTUA TING ARM WEAR A R THE COMPRESS OR SP LITLINE, SE RVICE BULLETIN
MOS
20-A UG -1999 HRS /MSC -
ENC
SB 72-0 082 R02 NO. 2 ENGINE - CF2 3 COMPRES SOR V ARIAB LE VANE ACTUATING ARM WEA R AT THE COMPRESSOR SPLITLINE, CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
12-NOV -1999 HRS /MSC - 0
ENC 0
SB 72-0 083 NO. 2 ENGINE - ENGINE - HIG H PRESS URE TURBINE S TA TO R (72-4 5-00) - RE WORK O F HPT STATOR ASSEMBL Y A ND CATEGORY 7
INTRODUCTION OF IMPROVE D DURAB ILITY STA GE 2 HP T NOZZLE AND HPT INNER CAS E A ND SPLINE S EALS .,
SERVICE BULLETIN
MOS
HRS /MSC A/R
ENC

SB 72-0 083 R01 NO. 2 ENGINE - REWORK OF HPT S TA TO R ASS EMB LY AND INTRODUCTION OF IMPROVE D DURAB ILITY STAGE 2 HP T CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
NOZZE L A ND HP T INNER CA SE AND SPLINE SEALS , SERVICE B UL LETIN
MOS 01-A PR-2011
27-A PR-2005 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 262 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 085 NO. 2 ENGINE - ENGINE - AG B A SSEMBLY (7 2-62-0 0) - INTRODUCTION OF IMPROV ED ACCESS ORY G EARBOX- P
GEA RS , SERVICE B UL LETIN
MOS
08-JUN-2000 HRS /MSC -
ENC
SB 72-0 085 R01 NO. 2 ENGINE - ENGINE - AG B A SSEMBLY (7 2-62-0 0) - INTRODUCTION OF IMPROV ED ACCESS ORY G EARBOX- P
GEA RS , SERVICE B UL LETIN
MOS
11-O CT-20 00 HRS /MSC -
ENC
SB 72-0 085 R02 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D ASS ESSO RY GE ARBOX AXIS-P GE ARS, SERVICE BUL LETIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 085 R03 NO. 2 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INTRODUCTION OF IMPROV ED ACCESSO RY G EARBOX AXIS-P GE ARS CATEGORY 2 NOT A PPLICA BLE - SUPERSEDED BY RE V 4
AND A LTE RNATE AXIS-B, -K SPUR GE ARS A ND AXIS-BB, -J, -L S PUR GEA RS HA FTS, S ERVICE BULLE TIN
MOS 22-A PR-2015
07-O CT-20 14 HRS /MSC -
ENC
SB 72-0 085 R04 NO. 2 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INTRODUCTION OF IMPROV ED ACCESSO RY G EARBOX AXIS-P GE ARS CATEGORY 2 COMPLIED WITH - FACTORY INCORPORATED.
AND A LTE RNATE AXIS-B, -K SPUR GE ARS A ND AXIS-BB, -J, -L S PUR GEA RS HA FTS, S ERVICE BULLE TIN NO FURTHER ACTION RE QUIRED.
MOS 16-A PR-2015
HRS /MSC -
ENC
SB 72-0 085 R05 NO. 2 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INTRODUCTION OF IMPROV ED ACCESSO RY G EARBOX AXIS-P GE ARS CATEGORY 2 NOT A PPLICA BLE - TO A6 -ELD E NG INES
AND A LTE RNATE AXIS-B, -K SPUR GE ARS A ND AXIS-BB, -J, -L S PUR GEA RS HA FTS, S ERVICE BULLE TIN
MOS 27-JUL-20 15
09-JUL-20 15 HRS /MSC -
ENC
SB 72-0 085 R06 NO. 2 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - INTRODUCTION OF IMPROV ED ACCESSO RY G EARBOX AXIS-P GE ARS CATEGORY 2 NOT A PPLICA BLE - RE VIE WE D BY EAG CAMO
AND A LTE RNATE AXIS-B, -K SPUR GE ARS A ND AXIS-BB, -J, -L S PUR GEA RS HA FTS, S ERVICE BULLE TIN ON 23RD NOV, 1 5 A ND FO UND NOT APPL ICABL E
BY ENGINE S /N AND INSTAL LED AG B.
MOS 13-DEC-20 15
16-NOV -2015 HRS /MSC -
ENC

SB 72-0 086 NO. 2 ENGINE - ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B - SUMP ASSE MB LY (72-41 -00) - ONE-TIME
BORES CO PE INSPE CTION O F THE COMBUSTIO N CHA MB ER FRAME S CA VENGE TUB E B RA ZE JOINTS, S ERVICE
BULLE TIN
MOS
23-MAR-2 000 HRS /MSC -
ENC
SB 72-0 086 R01 NO. 2 ENGINE - ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP ASSEMBL Y ( 72-41- 00) - O NE -TIME
BORES CO PE INSPE CTION O F THE COMBUSTIO N CHA MB ER FRAME S CA VENGE TUB E B RA ZE JOINTS, S ERVICE
BULLE TIN
MOS
17-JAN-20 03 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 263 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 086 R02 NO. 2 ENGINE - ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP ASSEMBL Y ( 72-41- 00) - ONE-TIME CATEGORY 3
BORES CO PE INSPE CTION O F THE COMBUSTIO N CHA MB ER FRAME S CA VENGE TUB E BRAZE JO INTS, SERVICE
BULLE TIN
MOS
26-FEB -2004 HRS /MSC -
ENC
SB 72-0 086 R03 NO. 2 ENGINE - ONE-TIME BO RE SCOPE INSP ECTION OF COMBUSTIO N CHA MB ER FRAME S CA VENGE BRAZE JOINTS - CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
EFF SN 8720 04 THRU 872 642, S ERV ICE BULLETIN
MOS 01-A PR-2011
23-MAR-2 005 HRS /MSC A/R 0
ENC 0
SB 72-0 087 NO. 2 ENGINE - ENGINE - COMBUSTIO N LINE R AND S TAG E 1 NOZZLE (72-42 -00) - INTRO DUCTION OF IMPROVED
COMBUSTION LINE R, S ERVICE BULLE TIN
MOS
02-O CT-20 00 HRS /MSC -
ENC
SB 72-0 087 R01 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D COMBUSTIO N LINE R - EFF S N 872 001 THRU 87 2810, SERVICE CATEGORY 7
BULLE TIN
MOS
21-O CT-20 04 HRS /MSC A/R
ENC
SB 72-0 087 R02 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D COMBUSTIO N LINE R, SERVICE BULLE TIN CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
02-JAN-20 07 HRS /MSC - 0
ENC 0
SB 72-0 089 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D STAGE 2 HPT B LADES, S ERV ICE BULLETIN CATEGORY 7 NOT A PPLICA BLE
MOS 01-A PR-2011
03-NOV -2000 HRS /MSC - 0
ENC 0
SB 72-0 090 NO. 2 ENGINE - ADD S AFE TY WIRE AT THE TOTAL TEMPE RA TURE AND PRESS URE BOS S CAP , SERVICE B ULL ETIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
28-FEB -2001 HRS /MSC - 0
ENC 0
SB 72-0 091 NO. 2 ENGINE - FAN SE CTION MODULE (72-1 2-00) - FA N BLA DE PIN HOLE INSPECTIO N, S ERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 091 R01 NO. 2 ENGINE - ENGINE - FAN S ECTION MODULE (72- 21-00) - FA N BLA DE PIN HOL E INSPECTIO N, SERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 091 R02 NO. 2 ENGINE - ENGINE - FAN S ECTION MODULE (72- 21-00) - FA N BLA DE PIN HOL E INSPECTIO N - TO BE C/W PRIOR TO CATEGORY 2
ACCUMULATION O F 1800 0 CYC, SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 264 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 091 R03 NO. 2 ENGINE - ENGINE - FAN S ECTION MODULE (72- 21-00) - FA N BLA DE PIN HOL E INSPECTIO N, SERVICE BULLE TIN CATEGORY 2
MOS
HRS /MSC -
ENC
SB 72-0 091 R04 NO. 2 ENGINE - ENGINE - FAN S ECTION MODULE (72- 21-00) - FA N BLA DE PIN HOL E INSPECTIO N, SERVICE BULLE TIN CATEGORY 2
MOS
HRS /MSC -
ENC
SB 72-0 091 R05 NO. 2 ENGINE - ENGINE - FAN S ECTION MODULE (72- 21-00) - FAN BLADE PIN HOLE INSP ECTION, SE RV ICE BULLETIN CATEGORY 2
MOS
HRS /MSC -
ENC
SB 72-0 091 R06 NO. 2 ENGINE - FAN SE CTION MODULE (72-2 1-00) - FA N BLA DE PIN HOLE INSPECTIO N, S ERVICE BULLE TIN CATEGORY 2
MOS
HRS /MSC -
ENC
SB 72-0 091 R07 NO. 2 ENGINE - FAN SE CTION MODULE (72-2 1-00) - FA N BLA DE PIN HOLE INSPECTIO N, S ERVICE BULLE TIN CATEGORY 2 - A PPLICA BLE TO A 6-ELD BY FA N BLA DE P/N
601 8T3 0P15
(04- 16-201 5)
MOS RECURRING
HRS /MSC
ENC 180 00 0 180 00 M
SB 72-0 092 NO. 2 ENGINE - ENGINE - HPT S TATOR ASSE MB LY - INTRODUCTION O F IMP RO VED B ORESCOPE PLUG, SERVICE CATEGORY 5
BULLE TIN
MOS
28-NOV -2000 HRS /MSC -
ENC
SB 72-0 092 R01 NO. 2 ENGINE - HPT STATOR ASSE MB LY-INTRODUCTION OF IMPROV ED BO RE SCOPE PLUG, S ERVICE BULLE TIN CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
14-DEC-20 01 HRS /MSC - 0
ENC 0
SB 72-0 093 NO. 2 ENGINE - ENGINE - HPT ROTOR ASSE MB LY (72-46- 00) - INTRODUCTION O F IMP RO VED NO.5 BEARING ROTATING CATEGORY 4
AIR SE AL., SERVICE B ULL ETIN
MOS
HRS /MSC -
ENC
SB 72-0 093 R01 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D NO.5 B EARING ROTATING AIR SEA L, SERVICE BUL LETIN CATEGORY 4 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 093 R02 NO. 2 ENGINE - HPT ROTOR ASSEMBL Y ( 72-46- 00) - INTRODUCTION O F IMP RO VED NO. 5 B EARING ROTATING AIR CATEGORY 4 NOT A PPLICA BLE - TO A6 -ELD B Y E NG INE S/N.
SEA L, SERVICE BULLETIN
MOS 27-JUL-20 15
27-A PR-2015 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 265 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 094 NO. 2 ENGINE - ENGINE - HPT ROTOR ASSE MB LY (72-46- 00) - HPT STAG E 2 BL ADE P N 607 8T1 1P01 REPLA CE ME NT
PLA N, SERVICE BULLE TIN
MOS
10-JAN-20 01 HRS /MSC -
ENC
SB 72-0 094 R01 NO. 2 ENGINE - ENGINE - HPT ROTOR ASSE MB LY (72-46- 00) - HPT STAG E 2 BL ADE P N 607 8T1 1P01 REPLA CE ME NT CATEGORY 2
PLA N, SERVICE BULLE TIN
MOS
21-MAR-2 001 HRS /MSC -
ENC
SB 72-0 094 R02 NO. 2 ENGINE - HPT STAG E 2 BL ADE P N 607 8T1 1P01 REPLA CE ME NT PLAN, SE RV ICE BULLETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
30-A UG -2001 HRS /MSC - 0
ENC 0
SB 72-0 094 R03 NO. 2 ENGINE - HPT ROTOR ASSEMBL Y ( 72-46- 00) - HPT STA GE 2 BLADE PN 60 78T11P0 1 REP LACEMENT PLA N, CATEGORY 2 NOT A PPLICA BLE - BY ENGINE S/N AS
SERVICE BULLETIN MENTIONED IN TAB LE 1.
MOS 27-JUL-20 15
14-JUL-20 15 HRS /MSC -
ENC
SB 72-0 095 NO. 2 ENGINE - ENGINE - COMBUSTIO N LINE R AND S TAG E 1 NOZZLE (72-42 -00) - INTRO DUCTION OF CATEGORY 7
IMP RO VED-DURAB ILITY S TA GE 1 TURBINE NOZZL E, SERVICE BUL LETIN
MOS
20-MAR-2 001 HRS /MSC -
ENC
SB 72-0 095 R01 NO. 2 ENGINE - COMBUSTIO N LINE R & STAGE 1 NO ZZLE - INTRO O F IMP RO VED DURABILITY STAGE 1 TURBINE CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
NOZZL E, SERVICE BULLETIN
MOS 01-A PR-2011
08-DEC-20 08 HRS /MSC A/R 0
ENC 0
SB 72-0 095 R03 (RJ) NO. 2 ENGINE - [RE GIO NA L JET (RJ) ASB] - A GB ASSE MB LY (72-62 -00) - INTRODUCTION OF IMP RO VED A CCES SORY CATEGORY 3
GEA RB OX AXIS-P GEA RS AND A LTERNATE AXIS-B , -K SPUR GE ARS A ND AXIS-BB , -J, -L SPUR GE ARSHAFTS, SERVICE
BULLE TIN
MOS
HRS /MSC -
ENC

SB 72-0 096 NO. 2 ENGINE - COMPRESSO R SECTIO N- INSPE CTION OF CO MPRE SSOR CA SING AND S POOL , SERVICE BULL ETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
02-JUL-20 02 HRS /MSC - 0
ENC 0
SB 72-0 098 NO. 2 ENGINE - ENGINE - LO W-P RE SSURE TURBINE ROTOR (72 -53-00 ) - REPLA CE ME NT OF SE LECTE DCF34
LOW-P RE SSURE TURB INE DISK S, SERVICE BULLETIN
MOS
25-O CT-20 01 HRS /MSC -
ENC
SB 72-0 098 R01 NO. 2 ENGINE - REPLA CE ME NT OF SE LECTE D CF3 4 L OW-PRESSURE TURBINE DISKS, S ERVICE BULLE TIN
MOS
28-MAY -2003 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 266 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 098 R02 NO. 2 ENGINE - REPLA CE ME NT OF SE LECTE D CF3 4 L OW-PRESSURE TURBINE DISKS, S ERVICE BULLE TIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
16-NOV -2004 HRS /MSC A/R 0
ENC 0
SB 72-0 099 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
24-JUN-2001 HRS /MSC -
ENC
SB 72-0 101 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
29-JUL-20 01 HRS /MSC -
ENC
SB 72-0 102 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D BAL L B EARING DESIGN FOR AXES -P , -J, AND -K BEA RINGS, SE RV ICE CATEGORY 4 COMPLIED WITH - A T MANUFACTURE
BULLE TIN
MOS 01-A PR-2011
07-S EP-20 01 HRS /MSC - 0
ENC 0
SB 72-0 104 NO. 2 ENGINE - ENGINE - HIG H- PRE SSURE TURBINE ROTOR (7 2-46-0 0) - INTRODUCTION OF IMPROV ED HPT S TA GE 1
BLA DE S P N 607 8T1 9P10/P11 , SERVICE B ULL ETIN
MOS
01-O CT-20 01 HRS /MSC -
ENC
SB 72-0 104 R01 NO. 2 ENGINE - INTRO IMPROVE D HPT STAG E 1 BL ADES - P /N 6078T19P 10/11 - EFF SN 87200 1 THRU 8729 99 & 8 73001 CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
THRU 873184 , SERVICE B UL LETIN
MOS 01-A PR-2011
23-FEB -2005 HRS /MSC - 0
ENC 0
SB 72-0 104 R02 NO. 2 ENGINE - ENGINE - HIG H- PRE SSURE TURBINE ROTOR (7 2-46-0 0) - INTRODUCTION OF IMPROV ED HPT S TA GE 1 CATEGORY 7
BLA DE S P N 607 8T1 9P10 AND P N 6078 T19 P11, S ERVICE BULLE TIN
MOS
05-NOV -2013 HRS /MSC -
ENC
SB 72-0 105 NO. 2 ENGINE - INTRODUCTION OF AGB ASS EMBLY PN 6 014T81G 32 WITH METAL PEENING ON AXES L, P, AND K CATEGORY 6 COMPLIED WITH - A T MANUFACTURE
GEA RS , SERVICE B UL LETIN
MOS 01-A PR-2011
13-DEC-20 01 HRS /MSC - 0
ENC 0
SB 72-0 105 R01 NO. 2 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - INTRO DUCTION OF A GB ASSE MB LY PN 601 4T81G32 CATEGORY 6 NOT A PPLICA BLE - BY ENGINE S/N
WITH METAL PE ENING ON A XES L, P, AND K GEARS, SERVICE BULLE TIN
MOS 30-O CT-20 14
22-S EP-20 14 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 267 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 105 R02 NO. 2 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - INTRO DUCTION OF A GB ASSE MB LY PN 601 4T81G32 CATEGORY 6 NOT A PPLICA BLE - BY ENGINE S/N
WITH METAL PE ENING ON A XES L, P, AND K GEARS, SERVICE BULLE TIN
MOS 30-O CT-20 14
29-S EP-20 14 HRS /MSC -
ENC
SB 72-0 106 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO R ROTOR B LADE
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
01-MAR-2 002 HRS /MSC -
ENC
SB 72-0 106 R01 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO R ROTOR B LADE
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
07-NOV -2002 HRS /MSC -
ENC
SB 72-0 106 R02 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO R ROTOR B LADE
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
17-JUN-2003 HRS /MSC -
ENC
SB 72-0 106 R03 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO R ROTOR B LADE
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
16-S EP-20 03 HRS /MSC -
ENC
SB 72-0 106 R04 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO RROTOR BLADE
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
21-JAN-20 04 HRS /MSC -
ENC
SB 72-0 106 R05 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO R RO TO R BLA DE CATEGORY 4
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
26-FEB -2004 HRS /MSC -
ENC
SB 72-0 106 R06 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - STAGE 9 COMPRESSO R RO TO R BLA DE CATEGORY 4
REPLA CE ME NT, SE RV ICE BULLETIN
MOS
09-JUN-2005 HRS /MSC -
ENC
SB 72-0 106 R07 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY - STAGE 9 COMPRESSO R ROTOR BL ADE REP LACEMENT, CATEGORY 7 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC N/A 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 268 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 107 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
27-JAN-20 02 HRS /MSC -
ENC
SB 72-0 107 R01 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
10-MAY -2002 HRS /MSC -
ENC
SB 72-0 108 NO. 2 ENGINE - ENGINE - HIG H PRESS URE TURBINE ROTOR (72-4 6-00) OR HIGH P RE SSURE TURBINE ROTOR CATEGORY 7 NOT A PPLICA BLE - SUPERSEDED BY RE V 1
(72- 52-00) - IMPROV ED DURA BIL ITY STAGE 2 HP T BLA DE WITH AIRFOIL CAV ITY COATING, S ERVICE BULLE TIN
MOS
01-MAR-2 002 HRS /MSC -
ENC
SB 72-0 108 R01 NO. 2 ENGINE - IMP RO VED DURABILITY STAGE 2 HPT BL ADE WITH AIRFOIL CA VITY COATING, SERVICE BULL ETIN CATEGORY 4
MOS
21-O CT-20 03 HRS /MSC -
ENC
SB 72-0 108 R02 NO. 2 ENGINE - HPT ROTOR OR HPT ROTOR IMPROVE D DURAB ILITY STAGE 2 HP T BLADE WITH A IR FO IL CAVITY CATEGORY 4
COATING - E FF SN 87 2001 THRU 8 72999 & 8730 01 THRU 87 3358, S ERVICE BULLE TIN
MOS
16-NOV -2004 HRS /MSC A/R
ENC
SB 72-0 108 R03 NO. 2 ENGINE - IMP RO VED DURABILITY STAGE 2 HPT BL ADE WITH AIRFOIL CA VITY COATING - E FF SN 872 001 THRU CATEGORY 4
872 999 & 873001 THRU 8733 58, SE RVICE BULLETIN
MOS
23-FEB -2005 HRS /MSC A/R
ENC
SB 72-0 108 R04 NO. 2 ENGINE - IMP RO VED DURABILITY STAGE 2 HPT BL ADE WITH AIRFOIL CA VITY COATING, SERVICE BULL ETIN CATEGORY 4 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
23-FEB -2006 HRS /MSC - 0
ENC 0
SB 72-0 108 R05 NO. 2 ENGINE - HIG H PRESS URE TURBINE ROTOR (72-46 -00) OR HIGH P RE SSURE TURB INE ROTOR (72 -52-00 ) - CATEGORY 4
IMP RO VED DURABILITY STAGE 2 HPT BL ADE WITH AIRFOIL CA VITY COATING, SERVICE BULL ETIN
MOS
27-JAN-20 17 HRS /MSC -
ENC
SB 72-0 109 NO. 2 ENGINE - INS PECTION AND REWORK OF VG SHAFT A FT BEARING SUPP ORT, S ERVICE BULLE TIN CATEGORY 2
MOS
21-MAY -2002 HRS /MSC -
ENC
SB 72-0 109 R01 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INSPECTIO N AND REWORK OF V G S HA FT AFT BEA RING CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
SUPPO RT, S ERV ICE BULLETIN
MOS 01-A PR-2011
03-MAR-2 003 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 269 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 110 NO. 2 ENGINE - REPLA CE ME NT OF VG SHAFT A FT BEARING SUPP ORT, S ERVICE BULLE TIN CATEGORY 3
MOS
21-MAY -2002 HRS /MSC -
ENC
SB 72-0 110 R01 NO. 2 ENGINE - REPLA CE ME NT OF VG SHAFT A FT BEARING SUPP ORT, S ERVICE BULLE TIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
27-FEB -2003 HRS /MSC - 0
ENC 0
SB 72-0 111 NO. 2 ENGINE - ENGINE COMPRESSO R STATOR ( 72-32-0 0) INS PECTION AND TEMPORARY LOCTITE RE WO RK O F VG
SHAFT AFT B EARING SUPPO RT, SE RV ICE BULLETIN
MOS
02-A PR-2002 HRS /MSC -
ENC
SB 72-0 111 R01 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INSPECTIO N AND TEMPORARY LOCTITE REWORK OF VG CATEGORY 2
SHAFT AFT B EARING SUPPO RT, SE RV ICE BULLETIN
MOS
03-MAR-2 003 HRS /MSC -
ENC
SB 72-0 111 R02 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INSPECTIO N AND TEMPORARY LOCTITE REWORK OF VG CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
SHAFT BE ARING SUPPORT, SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 112 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
28-MAR-2 002 HRS /MSC -
ENC
SB 72-0 112 R01 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
29-A PR-2002 HRS /MSC -
ENC
SB 72-0 113 NO. 2 ENGINE - AG B INSPECTIO N &MARKING @ O VERHAUL , SERVICE B UL LETIN CATEGORY 3
MOS
HRS /MSC -
ENC
SB 72-0 113 R01 NO. 2 ENGINE - ACCESSO RY GE ARBOX INSP ECTION AND MARKING AT O VERHAUL, SERVICE BULLETIN CATEGORY 3 NOT A PPLICA BLE
MOS 01-A PR-2011
05-JUN-2003 HRS /MSC - 0
ENC 0
SB 72-0 114 NO. 2 ENGINE - ENGINE - HIG H PRESS URE TURBINE ROTOR (72-4 6-00) - STAGE 1 HP T BLADE BO RES CO PE CATEGORY 2 NOT A PPLICA BLE
INS PECTION AND REPLA CEMENT P LAN, SERVICE BULLETIN
MOS 01-A PR-2011
24-MAY -2002 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 270 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 115 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
12-JUN-2002 HRS /MSC -
ENC
SB 72-0 116 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
23-S EP-20 02 HRS /MSC -
ENC
SB 72-0 117 NO. 2 ENGINE - RE-IDE NTIFICATION OF HPT RO TO R ASS EMBLY, S ERVICE BULLETIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
13-S EP-20 02 HRS /MSC - 0
ENC 0
SB 72-0 118 NO. 2 ENGINE - ACCESSO RY GE ARBOX FIEL D MANAGEMENT P LAN, SERVICE BULLETIN CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
24-JUL-20 02 HRS /MSC - 0
ENC 0
SB 72-0 118 R01 NO. 2 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - ACCESSO RY GE ARBOX FIEL D MANAGEMENT P LAN, SERVICE BULLETIN CATEGORY 2 COMPLIED WITH - FACTORY INCORPORATED.
NO FURTHER ACTION RE QUIRED.NO FURTHER
ACTIO N REQUIRED.
MOS 16-A PR-2015
HRS /MSC -
ENC

SB 72-0 118 R02 NO. 2 ENGINE - AG B A SSEMBLY (7 2-62-00 ) - ACCESSO RY GE ARBOX FIEL D MANAGEMENT P LAN, SERVICE BULLETIN CATEGORY 2
MOS (EFF)
HRS /MSC -
ENC
SB 72-0 120 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D STAGE 3 AND 5 COMPRESS OR ROTOR L OCKING NUT HA LVES , CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
29-JUL-20 02 HRS /MSC - 0
ENC 0
SB 72-0 121 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
14-A UG -2002 HRS /MSC -
ENC
SB 72-0 122 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - NEW IDENTIFICATION PL ATES PN 102 2T98P02 AND P N 102 3T1 9P02,
SERVICE BULLETIN
MOS
11-NOV -2002 HRS /MSC -
ENC
SB 72-0 122 R01 NO. 2 ENGINE - NEW IDENTIFICATION PL ATE S P N 102 2T9 8P02 AND P N 1023 T1 9P02, SERVICE BULLE TIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
10-JUN-2003 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 271 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 123 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - INTRODUCTION OF FA N BLA DE BUSHING REP AIR, SE RV ICE BULLETIN
MOS
13-DEC-20 02 HRS /MSC -
ENC
SB 72-0 123 R01 NO. 2 ENGINE - INTRODUCTION OF FA N BLA DE BUSHING REPA IR, SE RV ICE BULLETIN CATEGORY 7
MOS
11-A UG -2008 HRS /MSC -
ENC
SB 72-0 123 R02 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - INTRODUCTION OF FA N BLA DE BUSHING REP AIR, SE RV ICE BULLETIN CATEGORY 7
MOS
05-A UG -2013 HRS /MSC -
ENC
SB 72-0 123 R03 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - INTRODUCTION OF FA N BLA DE BUSHING REPA IR, SE RV ICE BULLETIN CATEGORY 7 - TO BE C/W AT ENGINE O /H
MOS 05-JUN-2016
09-A PR-2015 HRS /MSC -
ENC
SB 72-0 123 R04 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - INTRODUCTION OF FA N BLA DE BUSHING REPA IR, SE RV ICE BULLETIN CATEGORY 7 - TO BE C/W AT ENGINE O /H
MOS 02-JUN-2016
21-O CT-20 15 HRS /MSC -
ENC
SB 72-0 124 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
07-NOV -2002 HRS /MSC -
ENC
SB 72-0 125 NO. 2 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-33- 00) - REWORK OF FAN BLADES PN 6018T30 P06 AND PN
601 8T3 0P13, SERVICE BULL ETIN
MOS
03-FEB -2003 HRS /MSC -
ENC
SB 72-0 125 R01 NO. 2 ENGINE - REWORK OF FAN B LADES PN 6 018T30P0 3, PN 6018T30P 05, PN 6018T30 P06, P N 6018 T3 0P07, P N CATEGORY 7
601 8T3 0P13, AND PN 5 922T34P 01, SE RVICE BULLETIN
MOS
19-JUN-2003 HRS /MSC -
ENC
SB 72-0 125 R02 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - REWORK OF FAN BLADES P/N 49 23T56G0 2, P/N 492 3T5 6G05, P/N CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
492 3T5 6G07, P/N 4923 T56 G09, P /N 5922T34P 01, P/N 6 018T30P0 3, P/N 601 8T30P06 , AND P/N 60 18T30P13 , SERVICE
BULLE TIN
MOS 01-A PR-2011
09-JAN-20 08 HRS /MSC - 0
ENC 0

SB 72-0 126 NO. 2 ENGINE - ENGINE - FAN S TATOR ASSE MB LY (72-23 -00) - REWO RK OF FA N CASE OUTER SP ACERS A ND CATEGORY 7
INTRODUCTION OF A NEW AFT FAN CASE , SERVICE B UL LETIN
MOS
03-FEB -2003 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 272 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 126 R01 NO. 2 ENGINE - ENGINE-FAN STATOR ASSEMBL Y-REWORK OF FAN CAS E O UTER SPACERS AND INTRODUCTION OF A CATEGORY 7 NOT A PPLICA BLE
NEW A FT FAN CASE, S ERVICE BULLE TIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 127 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
02-DEC-20 02 HRS /MSC -
ENC
SB 72-0 127 R01 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
10-DEC-20 02 HRS /MSC -
ENC
SB 72-0 128 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR ASSEMBL Y (7 2-32-0 0) - INTRODUCTION O F NEW STAG E 1 AND CATEGORY 4
STAGE 2 COMPRESSO R SHROUD SEA LS PN 50 26T64G1 4, PN 5 026T64G 13 A ND PN 5 026T62G1 1, SERVICE BULLETIN
MOS
17-JAN-20 03 HRS /MSC -
ENC
SB 72-0 128 R01 NO. 2 ENGINE - INTRODUCTION OF NE W STAGE 1 AND S TAG E 2 COMPRES SOR S HROUD S EALS P/N 50 26T64G14 , P/N CATEGORY 7 NOT A PPLICA BLE
502 6T6 4G13 AND P /N 5 026T62G 11, SE RV ICE BULLETIN
MOS 01-A PR-2011
05-FEB -2007 HRS /MSC - 0
ENC 0
SB 72-0 129 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
22-DEC-20 02 HRS /MSC -
ENC
SB 72-0 129 R01 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURB OFAN ENGINES, CATEGORY 8
SERVICE BULLETIN
MOS
05-A PR-2006 HRS /MSC -
ENC
SB 72-0 129 R02 NO. 2 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B TURBOFAN ENG INES , SERVICE BULL ETIN CATEGORY 8
MOS
22-JAN-20 08 HRS /MSC -
ENC
SB 72-0 130 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 TURB OFAN ENGINES, S ERV ICE BULLETIN CATEGORY 8
MOS
06-FEB -2003 HRS /MSC -
ENC
SB 72-0 131 NO. 2 ENGINE - REPLA CE ME NT OF THE FAN BLADE CASE FORWA RD GANG CHANNEL NUT ASSE MB LIE S, SERVICE
BULLE TIN
MOS
08-JUL-20 03 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 273 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 131 R01 NO. 2 ENGINE - FAN STATOR ASSE MB LY (72-23 -00) - REP LACEMENT OF THE FAN BLA DE CASE FORWARD GA NG CATEGORY 7
CHA NNEL NUT ASS EMBLIES, SE RV ICE BULLETIN
MOS
28-JUN-2007 HRS /MSC -
ENC
SB 72-0 131 R02 NO. 2 ENGINE - REPLA CE ME NT OF THE FAN BLADE CASE FORWA RD GANG CHANNEL NUT ASSE MB LIE S, SERVICE CATEGORY 7
BULLE TIN
MOS
30-A UG -2007 HRS /MSC -
ENC
SB 72-0 131 R03 NO. 2 ENGINE - ENGINE - FAN S TATOR ASSE MB LY (72-23 -00) - REP LACEMENT OF THE FAN BL ADE CAS E FORWARD CATEGORY 7 NOT A PPLICA BLE
GANG CHANNEL NUT ASS EMBLIES, S ERV ICE BULLETIN
MOS 01-A PR-2011
08-DEC-20 08 HRS /MSC - 0
ENC 0
SB 72-0 131 R04 NO. 2 ENGINE - FAN STATOR ASSE MB LY (72-23 -00) - REP LACEMENT OF THE FAN BLA DE CASE FORWARD GA NG CATEGORY 7 NOT A PPLICA BLE - RE VIE WE D BY EAG CAMO
CHA NNEL NUT ASS EMBLIES, SE RV ICE BULLETIN ON 23RD NOV, 1 5 A ND FO UND NOT APPL ICABL E
BY ENGINE S /N.
MOS 13-DEC-20 15
06-NOV -2015 HRS /MSC -
ENC
SB 72-0 132 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
23-FEB -2003 HRS /MSC -
ENC
SB 72-0 133 NO. 2 ENGINE - ENGINE - AG B - INTRODUCTION OF NE W O-RING P /N 3035T70P 06, SE RV ICE BULLETIN CATEGORY 7
MOS
21-O CT-20 03 HRS /MSC -
ENC
SB 72-0 133 R01 NO. 2 ENGINE - ENGINE - AG B (7 2-62-0 0) - INTRODUCTION O F NEW O -RING PN 303 5T70P06 FOR CF34-3 A1/-3B CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
TURBO FA N ENGINE , SERVICE B UL LETIN
MOS 01-A PR-2011
07-A PR-2007 HRS /MSC - 0
ENC 0
SB 72-0 134 NO. 2 ENGINE - ENGINE-COMPRESSO R STATOR A SSEMBLY ( 72-3 2-00)- CF3 4 COMPRES SOR V ARIAB LE VANE
ACTUA TING ARM WEAR A T THE COMPRESS OR SP LITLINE., SERVICE BULL ETIN
MOS
HRS /MSC -
ENC
SB 72-0 134 R01 NO. 2 ENGINE - CF3 4 COMPRES SOR V ARIAB LE VANE ACTUATION ARM WEA R AT THE COMPRESSOR SPLITLINE, CATEGORY 2
SERVICE BULLETIN
MOS
HRS /MSC 100 00 100 00
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 274 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 135 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
27-JUL-20 03 HRS /MSC -
ENC
SB 72-0 137 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
02-S EP-20 03 HRS /MSC -
ENC
SB 72-0 138 NO. 2 ENGINE - ACCESSO RY GE AR BO X ASSEMBL Y REWORK, SERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 138 R01 NO. 2 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY REWORK, SERVICE BULLETIN CATEGORY 6
MOS
HRS /MSC -
ENC
SB 72-0 138 R02 NO. 2 ENGINE - ENGINE - ACCESSO RY G EARBOX ASS EMBLY (72-6 2-00) - CF34 ACCESS ORY G EARBOX (AGB) CATEGORY 6
REWORK, SE RV ICE BULLETIN
MOS
15-DEC-20 05 HRS /MSC -
ENC
SB 72-0 138 R03 NO. 2 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY REWORK, SERVICE BULLETIN CATEGORY 6
MOS
09-A UG -2006 HRS /MSC A/R
ENC
SB 72-0 138 R04 NO. 2 ENGINE - ENGINE - ACCESSO RY G EARBOX ASS EMBLY (72-6 2-00) - CF34 ACCESS ORY G EARBOX (AG B) CATEGORY 6
REWORK, SE RV ICE BULLETIN
MOS
22-O CT-20 07 HRS /MSC -
ENC
SB 72-0 138 R05 NO. 2 ENGINE - ENGINE - ACCESSO RY G EARBOX ASS EMBLY (72-6 2-00) - CF34 ACCESS ORY G EARBOX (AG B) CATEGORY 6
REWORK, SE RV ICE BULLETIN
MOS
16-NOV -2007 HRS /MSC -
ENC
SB 72-0 138 R06 NO. 2 ENGINE - ENGINE - ACCESSO RY G EARBOX ASS EMBLY (72-6 2-00) - CF34 ACCESS ORY G EARBOX (AG B) CATEGORY 6 COMPLIED WITH - A T MANUFACTURE
REWORK, SE RV ICE BULLETIN
MOS 01-A PR-2011
30-JAN-20 09 HRS /MSC - 0
ENC 0
SB 72-0 138 R07 NO. 2 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - INTRO DUCTION OF A CCESS ORY GEARBOX AS SEMBLY CATEGORY 6 NOT A PPLICA BLE - RE VIE WE D BY EAG CAMO
P/N 51 54T98G01 AND FIELD REWO RK OP TIONS, S ERV ICE BULLETIN ON 10TH DEC, 15 AND FOUND NOT AP PLICA BLE
BY ENGINE S /N.
MOS 13-DEC-20 15
30-NOV -2015 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 275 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 139 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
30-S EP-20 03 HRS /MSC -
ENC
SB 72-0 141 NO. 2 ENGINE - GE NERAL - SPA RE PA RTS RELEAS E FOR CF34 TURB OFAN ENGINES, SE RV ICE BULLETIN CATEGORY 8
MOS
HRS /MSC -
ENC
SB 72-0 141 R01 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3BTURBO FA N ENGINE S, CATEGORY 8
SERVICE BULLETIN
MOS
20-JAN-20 04 HRS /MSC -
ENC
SB 72-0 142 NO. 2 ENGINE - LIFE L IMITED STAGE 3 THRU 8 COMPRESSO R ROTOR SP OOL PN 6078T56P 05 PART INTRODUCTION, CATEGORY 9
SERVICE BULLETIN
MOS
11-MAY -2004 HRS /MSC -
ENC
SB 72-0 142 R01 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - LIFE L IMITE D STAGE S 3 THRU 8COMPRESSOR ROTO R CATEGORY 9
SPO OL PN 60 78T56P0 5 P ART INTRODUCTIO N, SERVICE BULLE TIN
MOS
20-JAN-20 04 HRS /MSC -
ENC
SB 72-0 142 R02 NO. 2 ENGINE - LIFE L IMITEDSTAG ES 3 THRU 8 CO MP RE SSOR RO TO R SPO OL PN 60 78T56P05 PA RT INTRO DUCTION, CATEGORY 9 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
11-MAY -2004 HRS /MSC - 0
ENC 0
SB 72-0 143 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
03-DEC-20 03 HRS /MSC -
ENC
SB 72-0 144 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
21-DEC-20 03 HRS /MSC -
ENC
SB 72-0 145 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
25-JAN-20 04 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 276 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 145 R01 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
24-FEB -2004 HRS /MSC -
ENC
SB 72-0 147 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - REMOV AL OF INL ET GUIDE V ANE (IGV) AND S TA GES 1 CATEGORY 5
THROUGH 5 SELF-LOCKING NUT P N 4037 T8 4P03, SERVICE BULLE TIN
MOS
30-MAR-2 004 HRS /MSC -
ENC
SB 72-0 147 R01 NO. 2 ENGINE - REMOVAL OF INLE T GUIDE VANE (IGV) AND STAG E 1 THRO UG H 5 SELF LOCKING NUT PN 4 037T84P 03, CATEGORY 9
SERVICE BULLETIN
MOS
01-JUN-2005 HRS /MSC -
ENC
SB 72-0 149 NO. 2 ENGINE - STAGE 3 THROUGH 8 CO MP RE SSOR RO TOR SPO OL PART NUMB ER MARKING INSPECTION, S ERVICE CATEGORY 5 NOT A PPLICA BLE
BULLE TIN
MOS 01-A PR-2011
07-A PR-2004 HRS /MSC - 0
ENC 0
SB 72-0 150 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
07-A PR-2004 HRS /MSC -
ENC
SB 72-0 151 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
13-A PR-2004 HRS /MSC -
ENC
SB 72-0 153 NO. 2 ENGINE - ENGINE - HIG H PRESS URE TURBINE S TA TO R ASS EMBLY (72-4 5-00) - INTRO DUCTION OF S TAG E 2 CATEGORY 7
TURBINE SHROUD AND SEA L S EGMENT PN 6047T95G 14 (20 PIECE CONFIG URATION), SERVICE B UL LETIN
MOS
22-JUN-2004 HRS /MSC -
ENC
SB 72-0 153 R01 NO. 2 ENGINE - INTRODUCTION OF STAGE 2 TURBINE SHROUD & SE AL SEGMENT PN 6047 T95 G14 (20 PIECE CATEGORY 7 NOT A PPLICA BLE
CONFIGURATIO N) , SERVICE B ULL ETIN
MOS 01-A PR-2011
23-MAR-2 005 HRS /MSC A/R 0
ENC 0
SB 72-0 154 NO. 2 ENGINE - INTRODUCTION OF RE WO RK ED STAG E 2 HPT S TA TO R SHROUD PN 5 099T09P 02 (18 PIE CE CATEGORY 7 NOT A PPLICA BLE
CONFIGURATIO N), SERVICE BULLE TIN
MOS 01-A PR-2011
22-JUN-2004 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 277 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 155 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) INTRO DUCTION OF VE NDOR CO DE S FOR STAGES 10 -14 CATEGORY 9
COMPRESSO R ROTOR BL ADES, SE RV ICE BULLETIN
MOS
21-MAY -2004 HRS /MSC -
ENC
SB 72-0 156 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
25-A PR-2004 HRS /MSC -
ENC
SB 72-0 157 NO. 2 ENGINE - COMPRESSO R STATOR ( 72-32- 00) - S TAG ES IG V THRU 5 SELF-LO CK ING NUT FIELD INSPE CTION, CATEGORY 2
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 157 R01 NO. 2 ENGINE - STAGE S IGV THRU 5 S ELF-LOCKING NUT FIE LD INSPECTIO N - EFF S N 8720 04 THRU 87 3999 & 95000 0 CATEGORY 2
THRU 950067 , SERVICE B UL LETIN
MOS
18-MAR-2 005 HRS /MSC A/R
ENC
SB 72-0 157 R02 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - S TAG ES IG V THRU 5 SELF-LO CK ING NUT FIELD CATEGORY 2 NOT A PPLICA BLE
INS PECTION, SE RV ICE BULLETIN
MOS 01-A PR-2011
29-O CT-20 08 HRS /MSC - 0
ENC 0
SB 72-0 158 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE ROTOR (72-53 -00) - INTRO DUCTION OF NEW LPT TURB INE SEAL S, CATEGORY 9
PN 5023T59P 03, PN 5023T67 P02, A ND PN 50 23T64P03 , SERVICE B UL LETIN
MOS
29-MAR-2 005 HRS /MSC -
ENC
SB 72-0 158 R01 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE ROTOR (72-53 -00) - INTRO DUCTION OF NEW LPT TURB INE SEAL S, CATEGORY 9 COMPLIED WITH - A T MANUFACTURE
PN 5023T59P 06, PN 5023T67 P02, A ND PN 50 23T64P04 ., S ERVICE BULLE TIN
MOS 01-A PR-2011
HRS /MSC A/R 0
ENC 0
SB 72-0 159 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
23-MAY -2004 HRS /MSC -
ENC
SB 72-0 160 NO. 2 ENGINE - LIFE L IMITED LPT DISKS STAGE S 3 THRU 6 PN 607 8T91P02 , 6078T02 P04, 60 78T92P0 2 & 60 78T89P03 CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
PARTS INTRO DUCTION, S ERVICE BULLE TIN
MOS 01-A PR-2011
08-S EP-20 04 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 278 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 160 R01 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE ROTOR (72-53 -00) - LIFE LIMITED LO W PRESS URE TURBINE DISKS CATEGORY 7
STAGE S 3 THRU 6 PN 607 8T91P02, PN 60 78T02P04 , PN 6 078T92P0 2, AND P N 6078 T8 9P03 PARTS INTRO DUCTION,
SERVICE BULLETIN
MOS
21-NOV -2011 HRS /MSC -
ENC
SB 72-0 161 NO. 2 ENGINE - REWORK STAGE 2 HP T SHROUD SEG ME TS, SERVICE BULL ETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 72-0 162 NO. 2 ENGINE - HPT STATOR-INTRODUCTION O F REWORKED S TA GE 1 HIGH P RE SSURE TURB INE SEAL SHROUD CATEGORY 7 NOT A PPLICA BLE
SEG ME NTS PN 5902T32G 01, SE RV ICE BULLETIN
MOS 01-A PR-2011
09-DEC-20 04 HRS /MSC A/R 0
ENC 0
SB 72-0 163 NO. 2 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF PTO DRIVE ASSE MB LY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-TO-P TO OIL TUB E A SSEMBLY PN 6012 T90 G02, S ERVICE BULLE TIN
MOS
18-A UG -2004 HRS /MSC -
ENC
SB 72-0 163 R01 NO. 2 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF P TO DRIVE AS SEMBLY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-TO-P TO OIL TUB E A SSEMBLY PN 6 012T90G0 2, SERVICE BULLETIN
MOS
21-O CT-20 04 HRS /MSC -
ENC
SB 72-0 163 R02 NO. 2 ENGINE - INTRODUCTION OF PTO DRIVE ASSEMBL Y P N 603 7T7 2G19 & FRO NT FRAME-TO-P TO OIL TUBE CATEGORY 5
ASS EMBLY PN 6 012T90G 02 - EFF SN 87220 4 THRU 8739 99 & 9 50000 THRU 95010 7, SERVICE B UL LETIN
MOS
02-DEC-20 04 HRS /MSC A/R
ENC
SB 72-0 163 R03 NO. 2 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF PTO DRIVE ASSE MB LY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-T-PTO OIL TUBE AS SEMBLY PN 6012T90G 02, SE RV ICE BULLETIN
MOS
HRS /MSC A/R
ENC
SB 72-0 163 R04 NO. 2 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF P TO DRIVE AS SEMBLY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-TO-P TO OIL TUB E A SSEMBLY PN 6 012T90G0 2, SERVICE BULLETIN
MOS
31-A UG -2005 HRS /MSC -
ENC
SB 72-0 163 R05 NO. 2 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF P TO DRIVE AS SEMBLY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-TO-P TO OIL TUB E A SSEMBLY PN 6 012T90G0 2, SERVICE BULLETIN
MOS
15-DEC-20 05 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 279 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 163 R06 NO. 2 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF P TO DRIVE AS SEMBLY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-TO-P TO OIL TUB E A SSEMBLY PN 6 012T90G0 2, SERVICE BULLETIN
MOS
31-MAR-2 006 HRS /MSC -
ENC
SB 72-0 163 R07 NO. 2 ENGINE - ENGINE - PO WE R TAKEO FF DRIVE ASSE MB LY - (7 2-64-0 0) - INTRODUCTION OF PTO DRIVE ASSE MB LY CATEGORY 5
PN 6037T72G 19 AND FRO NT FRAME-T-PTO OIL TUBE AS SEMBLY PN 6012T90G 02, SE RV ICE BULLETIN
MOS
07-JUN-2007 HRS /MSC -
ENC
SB 72-0 163 R08 NO. 2 ENGINE - INTRODUCTION OF PTO DRIVE ASSEMBL Y PN 6037T72G 19 AND FRO NT FRAME-TO- PTO O IL TUB E CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
ASS EMBLY PN 6 012T90G 02, SE RV ICE BULLETIN
MOS 01-A PR-2011
30-JUL-20 08 HRS /MSC - 0
ENC 0
SB 72-0 164 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
20-JUN-2004 HRS /MSC -
ENC
SB 72-0 165 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
25-JUL-20 04 HRS /MSC -
ENC
SB 72-0 166 NO. 2 ENGINE - ENGINE-HPT ROTOR ( 72-46- 00) INTRO DUCTION OF DESTRUCTIVE EVAL UATION METHOD FOR STAGE 1 CATEGORY 7
HPT BL ADE, SERVICE BULLETIN
MOS
03-NOV -2004 HRS /MSC A/R
ENC
SB 72-0 166 R01 NO. 2 ENGINE - ENGINE - HIG H PRESS URE TURBINE ROTOR (72-4 6-00) - INTRO DUCTION OF DESTRUCTIVE CATEGORY 7
EVA LUATION ME THOD FO R STAGE 1 HIG H PRESS URE TURBINE B LADES, S ERVICE BULLETIN
MOS
26-MAR-2 012 HRS /MSC -
ENC
SB 72-0 167 NO. 2 ENGINE - ENGINE-HPT ROTOR ( 72-46- 00) INTRO DUCTION OF AN EVAL UA TION METHOD FOR STAGE 2 HIGHT CATEGORY 7
PRESS URE TURBINE B LADES, S ERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 168 NO. 2 ENGINE - HPT-REWORK O F STAGE 1 HPT BL ADES, SE RV ICE BULLETIN CATEGORY 7 NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 169 NO. 2 ENGINE - HPT ROTOR - REWORK OF S TA GE 2 HPT BLADES, SERVICE BULL ETIN CATEGORY 7 NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 280 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 170 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
22-A UG -2004 HRS /MSC -
ENC
SB 72-0 171 NO. 2 ENGINE - INTRODUCTION OF NE W NO.1 A ND NO .2 BE ARING HO US ING ASSE MB LY PN 60 47T69G0 4 - EFF SN CATEGORY 7
872 004 THRU 87 3999 & 9500 00 THRU 950 329, S ERVICE BULLETIN
MOS
20-JAN-20 05 HRS /MSC A/R
ENC
SB 72-0 171 R01 NO. 2 ENGINE - INTRODUCTION OF NE W NO. 1 AND 2 BE ARING HO US ING ASSE MB LY PN 60 47T69G0 4, SERVICE CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
BULLE TIN
MOS 01-A PR-2011
15-DEC-20 05 HRS /MSC - 0
ENC 0
SB 72-0 173 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
24-O CT-20 04 HRS /MSC -
ENC
SB 72-0 176 NO. 2 ENGINE - ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP (72-41 -00) - INTRODUCTION OF NO. 5 ROLLE R CATEGORY 4
BEA RINGS PN 5 042T13P0 4, PN 5042T13P 05, PN 5022T87 P04, A ND PN 50 22T87P05 , SERVICE B ULL ETIN
MOS
17-DEC-20 04 HRS /MSC -
ENC
SB 72-0 176 R01 NO. 2 ENGINE - INTRODUCTION OF NO .5 ROLLE R BEA RINGS PN 5 042T13P0 4, 502 2T8 7P04 & 5022 T87 P05 - EFF S N CATEGORY 4
872 004 THRU 87 3999 & 9503 56 THRU 950 375, S ERVICE BULLETIN
MOS
18-FEB -2005 HRS /MSC A/R
ENC
SB 72-0 176 R02 NO. 2 ENGINE - INTRODUCTION OF NO .5 ROLLE R BEA RINGS PN 5 042T13P0 4/0 5 & 50 22T87P04 /05 - EFF SN 8720 04 CATEGORY 4
THRU 873999 , 9500 00 THRU 950 332, 9 50356 THRU 95037 5, SERVICE B UL LETIN
MOS
06-A PR-2005 HRS /MSC A/R
ENC
SB 72-0 176 R03 NO. 2 ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP (72-41- 00)-INTRODUCTION O F NO. 5 ROLLER BEARING S CATEGORY 4
PN 5042T13P 04, 50 42T13P05 , 5022 T87 P04, A ND PN 50 22T87P05 - E FF SN 87 2004 THRU 8 73999 , 95000 0 THRU 9503 32,
950 356 THRU 95 0375, SERVICE BULLE TIN
MOS
15-DEC-20 05 HRS /MSC A/R
ENC
SB 72-0 176 R04 NO. 2 ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP-INTRODUCTION OF NO . 5 RO LLER BEARING S P /N CATEGORY 4 COMPLIED WITH - A T MANUFACTURE
504 2T1 3P04, P/N 5042 T13 P05, P /N 5022T8P0 4, AND P/N 5 022T87P0 5, SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 281 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 177 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
30-JAN-20 05 HRS /MSC -
ENC
SB 72-0 178 NO. 2 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - AXIX-L SPUR GEA RS HA FT PN 501 9T38P04 - CATEGORY 5
INS PECTION, SE RV ICE BULLETIN
MOS
18-MAR-2 005 HRS /MSC A/R
ENC
SB 72-0 179 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INTRODUCTION O F A NEW REDESIGNED IGV INNER CATEGORY 5
SUPPO RT SHRO UD PN 50 26T65G0 6, SERVICE B UL LETIN
MOS
06-A PR-2005 HRS /MSC -
ENC
SB 72-0 179 R01 NO. 2 ENGINE - INTRODUCTION OF NE W REDESIGNED IGV INNER SUPPORT S HROUD P N 5026 T6 5G06, SERVICE CATEGORY 5
BULLE TIN
MOS
24-MAY -2005 HRS /MSC A/R
ENC
SB 72-0 179 R02 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INTRODUCTION O F A NEW REDESIGNED IGV INNER CATEGORY 5
SUPPO RT SHRO UD PN 50 26T65G0 6, SERVICE B UL LETIN
MOS
15-DEC-20 05 HRS /MSC -
ENC
SB 72-0 179 R03 NO. 2 ENGINE - INTRODUCTION OF NE W REDESIGNED IGV INNER SUPPORT S HROUD P N 5026 T6 5G06, SERVICE CATEGORY 5
BULLE TIN
MOS
08-A UG -2006 HRS /MSC A/R
ENC
SB 72-0 179 R04 NO. 2 ENGINE - COMPRESSO R STATOR ( 72-32- 00) -INTRO DUCTION OF A NEW REDES IG NED IG V INNER SUPP ORT CATEGORY 5
SHROUD PN 5026T65G 06 , SERVICE B ULL ETIN
MOS
07-S EP-20 07 HRS /MSC -
ENC
SB 72-0 179 R05 NO. 2 ENGINE - INTRODUCTION OF A NEW REDESIGNED IGV INNER S UP PORT SHROUD PN 5026T65 G06, S ERVICE CATEGORY 5
BULLE TIN
MOS
01-JUL-20 08 HRS /MSC -
ENC
SB 72-0 179 R06 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INTRODUCTIO N OF A NEW REDE SIGNED IGV INNER CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
SUPPO RT S HROUD P /N 5 026T65G 06, SE RV ICE BULLETIN
MOS 01-A PR-2011
20-S EP-20 10 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 282 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 179 R07 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR (72-32- 00) - INTRODUCTION O F A NEW REDESIGNED IGV INNER CATEGORY 3
SUPPO RT SHRO UD P/N 5026 T6 5G06, SERVICE BULLE TIN
MOS
04-A PR-2011 HRS /MSC -
ENC
SB 72-0 180 NO. 2 ENGINE - ENGINE - HPT MODULE (72-0 0-03) - INTRO DUCTION OF S TA GE 1 TURBINE NOZZLE WITH ALUMINIDE CATEGORY 7
COATING , STAGE 1 TURBINE NOZZLE SEGMENTS, HPT S TA TO R ASS EMBLY, TURBINE SEG ME NT SEALS A ND STA GE 2
FLOWMETER WASHER, S ERVICE BULLETIN
MOS
13-JUN-2005 HRS /MSC -
ENC
SB 72-0 180 R01 NO. 2 ENGINE - ENGINE - HPT MODULE (72-0 0-03) - INTRO DUCTION OF S TA GE 1 TURBINE NOZZLE WITH ALUMINIDE CATEGORY 7 NOT A PPLICA BLE
COATING , STAGE 1 TURBINE NOZZLE SEGMENTS, HPT S TA TO R ASS EMBLY, TURBINE SEG ME NT SEALS A ND STA GE 2
FLOWMETER WASHER, S ERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC A/R 0
ENC 0
SB 72-0 181 NO. 2 ENGINE - ENGINE - HIG H PRESS URE TURBINE S TA TO R (72-4 5-00) - INTRODUCTIO N OF S TA GE 1 HPT STATOR CATEGORY 7
SHROUDS PN 4124 T42 P16, HPT STATOR SHROUD HANGERS PN 5 099T05G1 2, AND TURBINE SEG ME NT SEALS P N
509 9T2 1P39, SERVICE BULL ETIN
MOS
13-JUN-2005 HRS /MSC -
ENC
SB 72-0 181 R01 NO. 2 ENGINE - ENGINE - HIG H PRESS URE TURBINE S TA TO R (72-4 5-00) - INTRODUCTIO N OF S TA GE 1 HPT STATOR CATEGORY 7
SHROUD HANGERS PN 50 99T05G1 2, AND TURB INE SEGMENT SEALS PN 5099 T21 P39, S ERVICE BULLETIN
MOS
HRS /MSC A/R
ENC
SB 72-0 181 R02 NO. 2 ENGINE - ENGINE - HIG H PRESS URE TURBINE S TA TO R (72-4 5-00) - INTRODUCTIO N OF S TA GE 1 HPT STATOR CATEGORY 7
SHROUDS PN 4124 T42 P16, HPT STATOR SHROUD HANGERS PN 5 099T05G1 2, AND TURBINE SEG ME NT SEALS P N
509 9T2 1P39, SERVICE BULL ETIN
MOS
06-O CT-20 05 HRS /MSC -
ENC

SB 72-0 181 R03 NO. 2 ENGINE - INTRODUCTION OF N2 AL LOY STAGE 1 HP TURBINE SHROUDS , SHROUD HANGERS, SE GMENT SEA LS, CATEGORY 7
SERVICE BULLETIN
MOS
15-JAN-20 08 HRS /MSC -
ENC
SB 72-0 181 R04 NO. 2 ENGINE - INTRODUCTION OF N2 AL LOY STAGE 1 HP TURBINE SHROUDS , SHROUD HANGERS, SE GMENT SEA LS, CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
20-A UG -2008 HRS /MSC - 0
ENC 0
SB 72-0 181 R05 NO. 2 ENGINE - HIG H PRESS URE TURBINE S TA TO R (72-4 5-00) - INTRO DUCTION OF N2 ALLO Y STA GE 1 HP TURBINE CATEGORY 7 COMPLIED WITH - P RE VIO US LY BY RE V4 AT
SHROUDS , SHROUD HANGER, AND SE GMENT SEA L, SERVICE BULLETIN MANUFACTURE
MOS 07-JUL-20 14
24-JUN-2014 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 283 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 182 NO. 2 ENGINE - ENGINE - COMBUSTIO N LINE R ASS EMBLY (72-4 1-00) - CO MB US TION LINER FIELD MO DIFICATION AND CATEGORY 6
REPAIR CONFIG URATION, SERVICE B ULL ETIN
MOS
09-FEB -2006 HRS /MSC -
ENC
SB 72-0 182 R01 NO. 2 ENGINE - ENGINE - COMBUSTIO N LINE R ASS EMBLY (72-4 1-00) - CO MB US TION LINER FIELD MODIFICATION AND CATEGORY 6
REPAIR CONFIG URATION, SERVICE B ULL ETIN
MOS
30-MAR-2 006 HRS /MSC -
ENC
SB 72-0 182 R02 NO. 2 ENGINE - ENGINE - COMBUSTIO N LINE R ASS EMBLY (72-4 1-00) - CO MB US TION LINER FIELD MODIFICATION AND CATEGORY 6
REPAIR CONFIG URATION, SERVICE B ULL ETIN
MOS
18-MAY -2006 HRS /MSC -
ENC
SB 72-0 182 R03 NO. 2 ENGINE - COMBUSTIO N LINE R FIEL D MODIFICA TION A ND RE PAIR CONFIGURATIO N, SERVICE BULLE TIN CATEGORY 6 NOT A PPLICA BLE
MOS 01-A PR-2011
22-JUN-2006 HRS /MSC - 0
ENC 0
SB 72-0 183 NO. 2 ENGINE - INTRODUCTION OF RE WO RK ED FRONT-O IL COOL ER BRACKET PN 41 59T34G0 1 & FUEL-OIL CO OLER CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
TUB E TO FUE L FILTER PN 5085 T60 G02 - EFF S N 8720 04 THRU 873 999, 9 50000 THRU 95032 6, SERVICE BUL LETIN
MOS 01-A PR-2011
22-JUN-2005 HRS /MSC A/R 0
ENC 0
SB 72-0 184 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
HRS /MSC INF
ENC
SB 72-0 184 R01 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
15-A UG -2007 HRS /MSC -
ENC
SB 72-0 185 NO. 2 ENGINE - ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP ASSEMBL Y - INTRODUCTION O F RE-WORKED CATEGORY 6
B-S UMP HOUSING PART NO. 4923T00 G01, S ERVICE BULLETIN
MOS
HRS /MSC A/R
ENC
SB 72-0 186 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -3A1/-3B TURBO FA N ENGINE S, SE RV ICE CATEGORY 8
BULLE TIN
MOS
HRS /MSC INF
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 284 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 187 NO. 2 ENGINE - ENGINE - HPT MODULE - INTRO DUCTION OF N5 ALLO Y S TA GE 2 HP TURBINE NOZZLE SEG ME NTS, CATEGORY 7 NOT A PPLICA BLE
SEA LS AND FLOW ME TER WASHERS., SERVICE BULL ETIN
MOS 01-A PR-2011
HRS /MSC A/R 0
ENC 0
SB 72-0 187 R01 NO. 2 ENGINE - ENGINE - HPT MODULE - INTRO DUCTION OF N5 ALLO Y S TA GE 2 HP TURBINE NOZZLE SEG ME NTS, CATEGORY 7
SEA LS AND FLOW ME TER WASHERS., SERVICE BULL ETIN
MOS
13-A PR-2011 HRS /MSC -
ENC
SB 72-0 187 R02 NO. 2 ENGINE - ENGINE - HPT MODULE - INTRO DUCTION OF N5 ALLO Y S TA GE 2 HP TURBINE NOZZLE SEG ME NTS, CATEGORY 7
SEA LS AND FLOW ME TER WASHERS, SE RV ICE BULLETIN
MOS
20-O CT-20 11 HRS /MSC -
ENC
SB 72-0 187 R03 NO. 2 ENGINE - HPT MODULE (72-0 0-03) - INTRO DUCTION OF N5 ALLO Y S TA GE 2 HP TURBINE NO ZZLE SEG ME NTS, CATEGORY 7 COMPLIED WITH - P RE VIO US LY CO MP LIE D
SEA LS, AND FLO WME TER WASHERS, SE RV ICE BULLETIN WITH: N/A DUE TO SB 72- 0187 INCORPORATED
WITH P RO DUCTION
MOS 25-A UG -2020
24-A UG -2020 HRS /MSC -
ENC
SB 72-0 188 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E, SE RV ICE BULLETIN CATEGORY 8
MOS
HRS /MSC INF
ENC
SB 72-0 189 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E, SE RV ICE BULLETIN CATEGORY 8
MOS
HRS /MSC INF
ENC
SB 72-0 189 R01 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/3A1/-3A 2/-3 B TURBO FA N ENGINE S, CATEGORY 8
SERVICE BULLETIN
MOS
11-MAY -2006 HRS /MSC -
ENC
SB 72-0 190 NO. 2 ENGINE - ENGINE - AG B - INTRODUCTION OF AGB CARBON SEALS P/N'S 5 018T49P0 5, 501 6T3 2P05, 4138T09P 03, CATEGORY 5
SERVICE BULLETIN
MOS
HRS /MSC A/R
ENC
SB 72-0 190 R01 NO. 2 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) INTRODUCTION OF AGB CARBON S EALS PNS CATEGORY 5
413 8T0 9P02, 4138T09P 03, 50 16T32P05 , 5016 T32 P06, 5 018T48P 04, 501 8T48P05 , 5018T49 P05, A ND 5018T49P 06, SE RV ICE
BULLE TIN
MOS
14-JUN-2007 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 285 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 190 R02 NO. 2 ENGINE - INTRODUCTION OF AGB CARBON S EALS PNS 413 8T0 9P02, 4138T09P 03, 50 16T32P05 , 5016 T32 P06, CATEGORY 5
501 8T4 8P04, 5018T48P 05, 50 18T49P05 , AND 50 18T49P06 , SERVICE B ULL ETIN
MOS
03-JAN-20 08 HRS /MSC -
ENC
SB 72-0 190 R03 NO. 2 ENGINE - INTRODUCTION OF AGB CARBON S EALS PNS 413 8T0 9P02, 4138T09P 03, 50 16T32P05 , 5016 T32 P06, CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
501 8T4 8P04, 5018T48P 05, 50 18T49P05 , A ND 5018T49 P06, S ERVICE BULLETIN
MOS 01-A PR-2011
20-A UG -2008 HRS /MSC - 0
ENC 0
SB 72-0 191 NO. 2 ENGINE - ENGINE - SP ARE P ARTS RELEA SE, SE RV ICE BULLETIN CATEGORY 8
MOS
HRS /MSC INF
ENC
SB 72-0 192 NO. 2 ENGINE - ENGINE - COMBUSTIO N SECTIO N (72- 41-00) - INTRODUCTIO N OF S TA GE 1 TURBINE NOZZL E S EGMENT CATEGORY 7 NOT A PPLICA BLE
AIRFO IL REPLACEMENT REP AIR, S ERVICE BULLE TIN
MOS 01-A PR-2011
24-S EP-20 09 HRS /MSC - 0
ENC 0
SB 72-0 193 NO. 2 ENGINE - INS PECTION OF HPC S TA GE 2 V G TURNB UCKL ES, SE RV ICE BULLETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
18-MAY -2006 HRS /MSC - 0
ENC 0
SB 72-0 194 NO. 2 ENGINE - REPLA CE ME NT OF SWIRLER AS SEMBLY PN 5071T48 G01, S ERVICE BULLETIN CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
31-MAY -2006 HRS /MSC - 0
ENC 0
SB 72-0 195 NO. 2 ENGINE - UPGRADE OF CF34-1A /-3 A TO CF3 4A2, S ERV ICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R1 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - UPGRADE OF CF34-1A AND CF34-3 A MO DEL ENGINES TO CF34-3A 2, SE RV ICE CATEGORY 7
BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R2 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - UPGRADE OF CF34-1 A A ND CF34- 3A MO DE L E NG INES TO CF34-3 A2, CATEGORY 7
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R3 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - UPGRADE OF CF34-1 A A ND CF34- 3A MO DE L E NG INES TO CF34-3 A2, CATEGORY 7
SERVICE BULLETIN
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 286 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 195 R4 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - UPGRADE OF CF34-1 A A ND CF34- 3A MO DE L E NG INES TO CF34-3 A2, CATEGORY 7
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R5 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - UPGRADE OF CF34-1 A A ND CF34- 3A MO DE L E NG INES TO CF34-3 A2, CATEGORY 7
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R6 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - UPGRADE OF CF34-1 A A ND CF34- 3A MO DE L E NG INES TO CF34-3 A2, CATEGORY 7
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R7 NO. 2 ENGINE - UPGRADE OF CF34-1A AND CF34-3 A MODEL ENGINES TO CF34-3A 2, SE RVICE BULLETIN CATEGORY 7
MOS
HRS /MSC -
ENC
SB 72-0 195 R8 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - UPGRADE OF CF34-1 A A ND CF34- 3A MO DE L E NG INES TO CF34-3 A2, CATEGORY 7
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 195 R9 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - UPGRADE OF CF34-1A AND CF34-3 A MO DEL ENGINES TO CF34-3A 2, SE RV ICE CATEGORY 7 NOT A PPLICA BLE - BY ENGINE MODEL - MSN
BULLE TIN
MOS 16-A PR-2015
HRS /MSC -
ENC
SB 72-0 196 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
30-A PR-2006 HRS /MSC -
ENC
SB 72-0 197 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D ACCESSO RY GE AR BO X AXIS K CRANKING PLUG PN 4189T24G 01 AND CATEGORY 5
RETAIN RING PN AS 3217- 127, S ERVICE BULLETIN
MOS
12-JUN-2006 HRS /MSC A/R
ENC
SB 72-0 197 R01 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D ACCESSO RY GE AR BO X AXIS K CRANKING PLUG PN 4189T24G 01 AND CATEGORY 5
RETAIN RING PN AS 3217- 127, S ERVICE BULLETIN
MOS
12-O CT-20 06 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 287 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 197 R02 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D ACCESSO RY GE AR BO X AXIS K CRANKING PLUG PN 4189T24G 01 AND CATEGORY 5
RETAIN RING PN AS 3217- 127, S ERVICE BULLETIN
MOS
10-A PR-2007 HRS /MSC -
ENC
SB 72-0 197 R03 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D ACCESSO RY GE AR BO X AXIS K CRANKING PLUG PN 4189T24G 01 AND CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
RETAINER RING PN AS 3217- 127, S ERV ICE BULLETIN
MOS 01-A PR-2011
11-A UG -2008 HRS /MSC - 0
ENC 0
SB 72-0 197 R04 NO. 2 ENGINE - ACCESSO RY DRIVE S ECTION (7 2-62-0 0) - INTRODUCTION O F IMPROV ED ACCESS ORY G EAR B OX AXIS CATEGORY 5 COMPLIED WITH - S B 7 2-019 7 R3 IS FACTORY
K CRA NKING PLUG PN 41 89T24G01 AND RE TAINER RING PN AS32 17-127 , SERVICE B UL LETIN INCORPO RA TED. S O NO FURTHER ACTIO N
REQUIRE D FOR SB 72 -0197 R4
MOS 16-A PR-2015
08-JAN-20 15 HRS /MSC -
ENC
SB 72-0 197 R05 NO. 2 ENGINE - ACCESSO RY DRIVE S ECTION (7 2-62-0 0) - INTRODUCTION O F IMPROV ED ACCESS ORY G EAR B OX AXIS CATEGORY 5 NOT A PPLICA BLE - TO A6 -ELD E NG INES BY
K CRA NKING PLUG PN 41 89T24G01 AND RE TAINER RING PN AS32 17-127 , SERVICE B UL LETIN ENGINE S /N.
MOS 27-JUL-20 15
01-JUN-2015 HRS /MSC -
ENC
SB 72-0 198 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 201 NO. 2 ENGINE - REWORK OF STAG E 1 HPT NOZZLE SUPPORT, SE RVICE BULLETIN CATEGORY 6
MOS
13-A PR-2007 HRS /MSC -
ENC
SB 72-0 201 R01 NO. 2 ENGINE - REWORK OF THE S TA GE 1 HPT NO ZZLE SUPPO RT, S ERVICE BULLETIN CATEGORY 6 NOT A PPLICA BLE
MOS 01-A PR-2011
16-NOV -2007 HRS /MSC - 0
ENC 0
SB 72-0 202 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF STAG E 3 CATEGORY 5
SHROUD SECTOR P N 509 9T32G02 FOR CF34-3 B E NG INE MO DE LS, SE RV ICE BULLETIN
MOS
HRS /MSC A/R
ENC
SB 72-0 202 R01 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF STAG E 3 CATEGORY 5
SHROUD SECTOR P N 509 9T32G02 FOR CF34-3 B E NG INE MO DE LS, SE RV ICE BULLETIN
MOS
HRS /MSC A/R
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 288 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 202 R02 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF STAG E 3 CATEGORY 5
SHROUD SECTOR P N 509 9T32G02 FOR CF34-3 B E NG INE MO DE LS, SE RV ICE BULLETIN
MOS
11-A PR-2007 HRS /MSC -
ENC
SB 72-0 202 R03 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF STAG E 3 CATEGORY 5
SHROUD SECTOR P N 509 9T32G02 FOR CF34-3 B E NG INE MO DE LS, SE RV ICE BULLETIN
MOS
02-S EP-20 10 HRS /MSC -
ENC
SB 72-0 202 R04 NO. 2 ENGINE - INTRODUCTION OF STAGE 3 SHRO UD SECTOR PN 5099T32 G02 FO R CF34-3B ENGINE MODEL S, CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
01-NOV -2010 HRS /MSC - 0
ENC 0
SB 72-0 202 R05 NO. 2 ENGINE - LOW PRESSURE TURBINE S TATOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF STAG E 3 SHROUD CATEGORY 5 NOT A PPLICA BLE - RE V 0 4 IS ALREADY C/W. NO
SECTOR P N 509 9T3 2G02 FOR CF34-3B E NG INE MO DE LS, SE RV ICE BULLETIN FURTHER ACTIO N REQUIRE D.
MOS 12-MAR-2 016
08-FEB -2016 HRS /MSC -
ENC
SB 72-0 203 R03 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF STAG E 3 CATEGORY 7 NOT A PPLICA BLE
SHROUD SECTOR P N 509 9T32G02 , PN 60 20T00G0 4, AND PN 6020 T00 G06 FOR USE ON CF34-1 A/-3 A/- 3A2/-3A1 ENGINE
MODELS, SERVICE BULLE TIN
MOS 01-A PR-2011
20-MAY -2009 HRS /MSC A/R 0
ENC 0
SB 72-0 204 REV 01 NO. 2 ENGINE - REWORK HP T STATOR FOR BORESCOPE , SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 72-0 205 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
27-A UG -2006 HRS /MSC -
ENC
SB 72-0 205 R01 NO. 2 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B TURBOFAN ENG INES , SERVICE BULL ETIN CATEGORY 8
MOS
15-O CT-20 08 HRS /MSC -
ENC
SB 72-0 206 NO. 2 ENGINE - HPT STATOR ASSE MB LY-INTRODUCTION OF ALTERNATE B LIND RIVETS TO REPL ACE A FT FLA NG E CATEGORY 7
GANG CHANNEL S, SE RVICE BULLETIN
MOS
21-NOV -2006 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 289 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 206 R01 NO. 2 ENGINE - HIG H PRESS URE TURBINE S TA TO R ASS EMB LY (72-4 5-00)-INTRODUCTION OF ALTERNATE BLIND CATEGORY 7
RIV ETS TO REPLACE AFT FLANGE GA NG CHANNE LS -, SERVICE B UL LETIN
MOS
02-JUN-2009 HRS /MSC -
ENC
SB 72-0 207 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
26-NOV -2006 HRS /MSC -
ENC
SB 72-0 209 NO. 2 ENGINE - INTRODUCTION OF A REDES IGNED FA N BLA DE RETAINING PIN, S ERVICE BULLETIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
28-S EP-20 07 HRS /MSC - 0
ENC 0
SB 72-0 209 R01 NO. 2 ENGINE - FAN ROTOR (72-21 -00) - INTRODUCTION OF A REDESIGNED FAN B LADE RE TAINING PIN, SERVICE CATEGORY 2
BULLE TIN
MOS
28-S EP-20 17 HRS /MSC -
ENC
SB 72-0 210 NO. 2 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B TURBOFAN ENG INES , SERVICE BULL ETIN CATEGORY 8
MOS
15-FEB -2007 HRS /MSC -
ENC
SB 72-0 214 NO. 2 ENGINE - INTRODUCTION OF SPIRA L P AINTING TO THE FORWA RD OUTE R SPINNE R, SERVICE BULL ETIN CATEGORY 7
MOS
05-MAY -2008 HRS /MSC -
ENC
SB 72-0 215 NO. 2 ENGINE - ECI INS PECTION OF FAN BLADE PIN HOLE, SERVICE BULLE TIN CATEGORY 3
MOS
HRS /MSC -
ENC
SB 72-0 215 R01 NO. 2 ENGINE - ECI INS PECTION OF FAN BLADE PIN HOLE, SERVICE BULLE TIN CATEGORY 3 NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 215 R02 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - E CI INSPECTIO N OF FA N BLADE PIN HOLE (FAN BLADE PN CATEGORY 3 NOT A PPLICA BLE - FA CTORY INCORPORATED
601 830P1 4), SERVICE BULLETIN
MOS 22-A PR-2015
HRS /MSC -
ENC
SB 72-0 215 R03 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - E CI INSPECTIO N OF FA N BLADE PIN HOLE , SERVICE B ULL ETIN CATEGORY 3 NOT A PPLICA BLE - FA CTORY INCORPORATED
MOS 16-A PR-2015
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 290 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 216 NO. 2 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B TURBOFAN ENG INES , SERVICE BULL ETIN CATEGORY 8
MOS
27-MAY -2007 HRS /MSC -
ENC
SB 72-0 217 NO. 2 ENGINE - REWORK OF THE A IR BALANCE PISTO N STATIO NA RY SE AL, SE RV ICE BULLETIN CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
27-JUL-20 07 HRS /MSC - 0
ENC 0
SB 72-0 218 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
23-S EP-20 07 HRS /MSC -
ENC
SB 72-0 219 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
28-O CT-20 07 HRS /MSC -
ENC
SB 72-0 221 NO. 2 ENGINE - INTRODUCTION OF FA N BLA DE P/N 60 18T30P1 5, SERVICE B UL LETIN CATEGORY 7
MOS
07-JAN-20 08 HRS /MSC -
ENC
SB 72-0 221 R01 NO. 2 ENGINE - ENGINE - FAN ROTOR ASSE MB LY (72-21- 00) - INTRODUCTION O F FAN B LADE P /N 6018T30P 15, CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
30-JAN-20 09 HRS /MSC - 0
ENC 0
SB 72-0 222 NO. 2 ENGINE - INTRODUCTION OF A NEW HYDRA ULIC DRAIN LINE, SERVICE B UL LETIN CATEGORY 7
MOS
09-JAN-20 08 HRS /MSC -
ENC
SB 72-0 222 R01 NO. 2 ENGINE - ENGINE - GE NE RAL - INTRODUCTIO N OF A NEW HYDRAULIC DRAIN LINE , SERVICE B UL LETIN CATEGORY 7
MOS
12-JUL-20 11 HRS /MSC -
ENC
SB 72-0 222 R02 NO. 2 ENGINE - ENGINE - GE NE RAL - INTRODUCTIO N OF A NEW HYDRAULIC DRAIN LINE , SERVICE B UL LETIN CATEGORY 7
MOS
05-NOV -2013 HRS /MSC -
ENC
SB 72-0 222 R03 NO. 2 ENGINE - GE NERAL - INTRODUCTIO N OF A NEW HY DRAULIC DRAIN LINE , SERVICE B UL LETIN CATEGORY 7 NOT A PPLICA BLE - THIS S B IS SUPERSE DED BY
REV 4
MOS 18-A PR-2015
03-O CT-20 14 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 291 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 222 R04 NO. 2 ENGINE - GE NERAL - INTRODUCTIO N OF A NEW HY DRAULIC DRAIN LINE , SERVICE B UL LETIN CATEGORY 7 NOT A PPLICA BLE - AT ENGINE OVERHAUL -
CUS TO ME R OPTION
MOS 24-MAR-2 015
24-MAR-2 015 HRS /MSC -
ENC
SB 72-0 223 NO. 2 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B ENGINES , SERVICE B ULL ETIN CATEGORY 8
MOS
23-DEC-20 07 HRS /MSC -
ENC
SB 72-0 224 R01 NO. 2 ENGINE - LPT STATOR AS SEMBLY (72 -52-00 ) - CLARIFICA TION OF CONFIGURATIO N AND USAG E O F THE STAG ES CATEGORY 9 COMPLIED WITH - INFO RMATIONAL ONLY
3, 4 , AND 5 SHROUD SECTORS, SE RV ICE BULLETIN
MOS 04-MAY -2016
15-A PR-2016 HRS /MSC -
ENC
SB 72-0 225 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR A SSEMBLY (7 2-33-0 0) - REBLA DE O F E NG INES SHIPPED WITH CATEGORY 3 NOT A PPLICA BLE
NON-STANDA RD STAGE 9 CO MPRE SSOR BLADE COUNT, SE RV ICE BULLETIN
MOS 01-A PR-2011
11-FEB -2008 HRS /MSC - 0
ENC 0
SB 72-0 226 NO. 2 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B ENGINES , SERVICE B ULL ETIN CATEGORY 8
MOS
HRS /MSC -
ENC
SB 72-0 228 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
28-MAR-2 008 HRS /MSC -
ENC
SB 72-0 229 NO. 2 ENGINE - ENGINE - FAN ROTOR (72-21 -00) - FIELD MANAG EMENT PROGRAM OF FAN BLADES P/N 601 8T30P14 CATEGORY 2
MADE FROM VSMPO MILL SO URCE MATE RIAL., SE RV ICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 229 R01 NO. 2 ENGINE - FIE LD MANAGEMENT PRO GRAM O F FAN BL ADE S P/N 6018T30 P14 MADE FRO M VSMPO MILL SOURCE CATEGORY 2 NOT A PPLICA BLE
MATERIAL , SERVICE B UL LETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 229 R01 PART A NO. 2 ENGINE - INS PECT FIE LD MANAGE ME NT PROGRAM O F FAN BL ADES P/N 6018T30 P14 MADE FRO M VSMPO MILL CATEGORY 2 NOT A PPLICA BLE
SOURCE MA TERIAL, S ERVICE BULLETIN THE FAN BLADE PIN HOLES
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 229 R01 PART B NO. 2 ENGINE - REPLA CE FIE LD MANAGE ME NT PROGRAM O F FAN BL ADES P/N 6018 T30 P14 MADE FRO M VSMPO MILL CATEGORY 2 NOT A PPLICA BLE
SOURCE MA TERIAL, S ERVICE BULLETIN FAN B LADE P/N 6018T30 P14
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 292 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 230 NO. 2 ENGINE - ENGINE - FAN ROTOR (72-21 -00) - FIELD MANAG EMENT PROGRAM OF FAN BLADES P/N 492 3T56G08 CATEGORY 2
MADE FROM VSMPO MILL SO URCE MATE RIAL, SERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 230 R01 NO. 2 ENGINE - FIE LD MANAGEMENT PRO GRAM O F FAN BL ADE S P/N 4923T56 G08 MADE FROM V SMPO MILL SOURCE CATEGORY 2 NOT A PPLICA BLE
MATERIAL , SERVICE B UL LETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 231 NO. 2 ENGINE - VISUAL INSP ECTION O F FAN CASE AB RA DA BLE RUB STRIP FOR FAN BLADE TIP CONTA CT, S ERV ICE CATEGORY 2
BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 231 R01 NO. 2 ENGINE - VISUAL INSP ECTION O F FAN CASE AB RA DA BLE RUB STRIP FOR FAN B LADE TIP CO NTACT, SERVICE CATEGORY 2
BULLE TIN
MOS
HRS /MSC -
ENC
SB 72-0 231 R02 NO. 2 ENGINE - VISUAL INSP ECTION O F FAN CASE AB RA DA BLE RUB STRIP FOR FAN BLADE TIP CONTA CT, S ERV ICE CATEGORY 2 NOT A PPLICA BLE
BULLE TIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 72-0 236 R01 NO. 2 ENGINE - SPA RE PA RTS RELEA SE FO R CF34 -1A/-3A/-3A1 /-3A 2/-3B ENGINES , SERVICE B ULL ETIN CATEGORY 8
MOS
16-O CT-20 08 HRS /MSC -
ENC
SB 72-0 237 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RELEA SE FO R CF3 4-1A/-3A/-3A 2/-3 B E NG INES, SERVICE CATEGORY 8
BULLE TIN
MOS
14-O CT-20 08 HRS /MSC -
ENC
SB 72-0 239 NO. 2 ENGINE - ENGINE - COMBUSTOR A SSEMBLY (7 2-00-40 ) - INTRODUCTION OF FL AT WASHER P/N AN960C10L TO CATEGORY 9
HEAT S HIELD THRUST LINK CO VERS ATTACHING PARTS, S ERV ICE BULLETIN
MOS
20-JUL-20 09 HRS /MSC -
ENC
SB 72-0 240 NO. 2 ENGINE - ENGINE - COMBUSTIO N LINE R ASS EMBLY (72-4 2-00) - INTRO DUCTIO N OF COMBUSTOR INNER LINER, CATEGORY 7
SERVICE BULLETIN
MOS
08-JUN-2009 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 293 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 241 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF SHROUD CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SECTOR P ART NUMBE RS FOR S TA GE 4 A ND STAGE 5, S ERVICE BULLETIN
MOS 01-A PR-2011
20-MAY -2009 HRS /MSC - 0
ENC 0
SB 72-0 241 R01 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE S TA TOR ASSE MB LY (72-52 -00) - INTRO DUCTION OF SHROUD CATEGORY 7
SECTOR P ART NUMBE RS FOR S TA GE 4 A ND STAGE 5, S ERVICE BULLETIN
MOS
15-JAN-20 13 HRS /MSC -
ENC
SB 72-0 242 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RELEA SE FO R CF3 4-1A/-3A/-3A 1/-3 A2/-3B ENGINES , CATEGORY 8
SERVICE BULLETIN
MOS
03-MAR-2 009 HRS /MSC -
ENC
SB 72-0 243 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RELEA SE FO R CF3 4-1A/-3A/-3A 1/-3 A2/-3B ENGINES (NO. CATEGORY 8
3 BEARING HOUSING) -, SERVICE B UL LETIN
MOS
17-JUN-2009 HRS /MSC -
ENC
SB 72-0 244 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - INTRODUCTION O F STAGE 1 COMPRESSO R ROTOR BL ISK CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
P/N 50 87T84P03 , SERVICE B ULL ETIN
MOS 01-A PR-2011
22-JUN-2009 HRS /MSC - 0
ENC 0
SB 72-0 247 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR - INTRODUCTION O F NEW VG S PINDLE NUT P/N 4037T84 P04, CATEGORY 7
SERVICE BULLETIN
MOS
24-MAR-2 010 HRS /MSC -
ENC
SB 72-0 247 R01 NO. 2 ENGINE - ENGINE - COMPRESSO R STATOR - INTRODUCTION O F NEW VG S PINDLE NUT P/N 4037T84 P04, CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
20-JUL-20 10 HRS /MSC - 0
ENC 0
SB 72-0 249 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RE LEASE FOR CF34-B J ENGINES, SE RV ICE BULLETIN CATEGORY 8
MOS
10-A UG -2010 HRS /MSC -
ENC
SB 72-0 250 NO. 2 ENGINE - FAN ROTOR (72-21 -00) - REP LACEMENT OF FAN BLADES P/N 601 8T3 0P14 OR P/N 4923T56 G08 MADE CATEGORY 2
FRO M ALL VAC MILL SOURCE MATERIAL , S ERV ICE BULLETIN
DAYS
30-A UG -2010 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 294 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 250 R01 NO. 2 ENGINE - FAN ROTOR (72-21 -00) - REP LACEMENT OF FAN BLADES P/N 6 018T30P1 4 O R P/N 492 3T56G08 MADE CATEGORY 2
FRO M ALL VAC MILL SOURCE MATERIAL, SE RV ICE BULLETIN
MOS
01-S EP-20 10 HRS /MSC -
ENC
SB 72-0 251 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - INSP ECTION FOR PART NUMB ER REMARKING A ND CATEGORY 7
INTRODUCTION OF STAG E 1 COMPRESS OR ROTOR BLISK P/N 5087T84 P02, S ERVICE BULLETIN
MOS
24-JAN-20 11 HRS /MSC -
ENC
SB 72-0 251 R01 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - INSPECTION FOR PA RT NUMBER RE MA RK ING AND CATEGORY 7
INTRODUCTION OF STAGE 1 CO MP RE SSOR RO TO R BLISK P/N 508 7T84P02 , SERVICE B ULL ETIN
MOS
23-FEB -2011 HRS /MSC -
ENC
SB 72-0 251 R02 NO. 2 ENGINE - ENGINE - COMPRESSO R ROTOR (7 2-33-0 0) - INSPECTION FOR PA RT NUMBER RE MA RK ING AND CATEGORY 7
INTRODUCTION OF STAGE 1 CO MP RE SSOR RO TO R BLISK P/N 508 7T84P02 , SERVICE B ULL ETIN
MOS
14-A PR-2011 HRS /MSC -
ENC
SB 72-0 252 NO. 2 ENGINE - ENGINE - COMBUSTIO N CHA MB ER FRAME A ND B-SUMP (72-41 -00) - INTRODUCTION OF IMP RO VED NO. CATEGORY 6
5 ROLLER BEARING P /N 5 042T13P0 6, SE RVICE BULLETIN
MOS
31-MAR-2 011 HRS /MSC -
ENC
SB 72-0 253 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ TURBOFAN ENGINES, S ERVICE CATEGORY 8
BULLE TIN
MOS
04-MAY -2011 HRS /MSC -
ENC
SB 72-0 254 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - CF34-BJ ENG INE SERIALIZA TION - MANUFA CTURING SEQUENCE, CATEGORY 9
SERVICE BULLETIN
MOS
09-S EP-20 11 HRS /MSC -
ENC
SB 72-0 255 NO. 2 ENGINE - ENGINE - FAN S TATOR (72-2 3-00) - ENGINE MOUNT QUALITY ISSUE, S ERVICE BULLE TIN LIMITED
DIS TRIBUTION
MOS
14-JAN-20 12 HRS /MSC -
ENC
SB 72-0 255 R01 NO. 2 ENGINE - ENGINE - FAN S TATOR (72-2 3-00) - ENGINE MOUNT QUALITY ISSUE, S ERVICE BULLE TIN LIMITED
DIS TRIBUTION
MOS
02-FEB -2012 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 295 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 256 NO. 2 ENGINE - ENGINE - STAGE S IGV THRO UG H 13 COMPRESSO R STATOR (7 2-32-0 0) - INTRODUCTION O F CATEGORY 3
REDESIGNED P INNED IGV INNER S UP PORT SHROUD, IG V O UTER BUSHING, IGV BUSHING , AND IGV UP PER A ND
LOWER SHROUD RING SEGMENTS, S ERV ICE BULLETIN
MOS
13-A PR-2012 HRS /MSC - 300 00 M
ENC
SB 72-0 256 R01 NO. 2 ENGINE - ENGINE - STAGE S IGV THRO UG H 13 COMPRESSO R STATOR (7 2-32-0 0) - INTRODUCTION O F CATEGORY 3 - A T NEXT S HOP V ISIT OF THE ENGINE/MODULE
REDESIGNED P INNED IGV INNER S UP PORT SHROUD, IG V O UTER BUSHING, IGV BUSHING , AND IGV UP PER A ND (CAT 3 ). NEXT DUE 30000 HRS
LOWER SHROUD RING SEGMENTS, S ERV ICE BULLETIN
MOS (EFF)
28-A UG -2013 HRS /MSC -
ENC

SB 72-0 257 NO. 2 ENGINE - ENGINE - STAGE S IGV THRO UG H 13 COMPRESSO R STATOR (7 2-32-0 0) - INTRODUCTION O F CATEGORY 3
REDESIGNED COMPRESS OR IGV THROUGH STAGE 3 LEVE R ARMS, SERVICE BULLETIN
MOS
02-NOV -2012 HRS /MSC -
ENC
SB 72-0 257 R01 NO. 2 ENGINE - ENGINE - STAGE S IGV THRO UG H 13 COMPRESSO R S TA TO R (72- 32-00) - INTRODUCTIO N OF CATEGORY 3
REDESIGNED COMPRESS OR IGV THROUGH STAGE 3 LEVE R ARMS, SERVICE BULLETIN
MOS
03-DEC-20 12 HRS /MSC -
ENC
SB 72-0 257 R02 NO. 2 ENGINE - STAGE S IGV THRO UG H 13 COMPRESSO R STATOR (7 2-32-0 0) - INTRODUCTION OF REDE SIGNED CATEGORY 3 - IN NEXT SHOP VISIT
COMPRESSO R IGV THROUGH S TA GE 3 L EVER ARMS , SERVICE B ULL ETIN
MOS (EFF)
11-FEB -2021 HRS /MSC ESV
ENC
AFL
SB 72-0 258 NO. 2 ENGINE - FAN STATOR (72-23 -00) - INTRO DUCTION OF NEW SHIM P /N 2448M31 P01, S ERVICE BULLETIN CATEGORY 5
MOS (EFF)
30-JUL-20 12 HRS /MSC -
ENC
SB 72-0 259 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ TURBOFAN ENGINES, S ERVICE CATEGORY 8
BULLE TIN
MOS
17-MAY -2013 HRS /MSC -
ENC
SB 72-0 263 NO. 2 ENGINE - CHA NG E OF CF34-3A AND CF34-3A 2 E NG INES FRO M A SCHEDULE D INTERVAL MAINTENANCE PLAN CATEGORY 7 NOT A PPLICA BLE - N/A ENGINE INS TA LLED IS
TO A COMBINED SCHEDULED INTE RV AL AND TASK ORIE NTED MA INTENANCE PL AN, SERVICE BULL ETIN CF- 34-3B
MOS 22-A PR-2015
HRS /MSC -
ENC
SB 72-0 263 R1 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - CHANG E OF CF34-3A AND CF34-3A 2 E NG INES FRO M A SCHEDULE D INTERVAL CATEGORY 7 NOT A PPLICA BLE - BY ENGINE MODEL
MAINTENANCE P LAN TO A COMBINED SCHE DULE D INTERVAL AND TASK O RIENTED MAINTENANCE PLAN, SE RV ICE
BULLE TIN
MOS 25-FEB -2015
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 296 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 263 R2 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - CHANG E OF CF34-3A AND CF34-3A 2 E NG INES FRO M A SCHEDULE D INTERVAL CATEGORY 7 NOT A PPLICA BLE - BY ENGINE MODEL
MAINTENANCE P LAN TO A COMBINED SCHE DULE D INTERVAL AND TASK O RIENTED MAINTENANCE PLAN, SE RV ICE
BULLE TIN
MOS 25-FEB -2015
HRS /MSC -
ENC
SB 72-0 268 NO. 2 ENGINE - ENGINE - REAR MA IN MO UNT A SSEMBLY (72 -44-00 ) - SP OT FLUORESCENT PE NE TRANT INSPECTION CATEGORY 3
OF LH AND RH A FT MO UNT RING L UG S, SERVICE B UL LETIN
MOS (EFF)
19-A UG -2013 HRS /MSC -
ENC
SB 72-0 268 R01 NO. 2 ENGINE - ENGINE - REAR MA IN MO UNT A SSEMBLY (72 -44-00 ) - SP OT FLUORESCENT PE NE TRANT INSPECTION CATEGORY 3
OF LH AND RH A FT MO UNT RING L UG S, SERVICE B UL LETIN
MOS
05-NOV -2013 HRS /MSC ESV
ENC
SB 72-0 268 R02 NO. 2 ENGINE - REAR MA IN MOUNT AS SEMBLY (72 -44-00 ) - SPO T FLUORESCENT PENETRANT INS PECTION OF LH AND CATEGORY 3
RH AFT MOUNT RING LUGS, SERVICE BULLE TIN
MOS
09-JAN-20 14 HRS /MSC ESV
ENC
SB 72-0 270 NO. 2 ENGINE - ENGINE - FAN S TATOR ASSE MB LY (72-00 -23) - FORWARD MOUNT RIB INSPECTIO N, S ERVICE BULLE TIN CATEGORY 2 COMPLIED WITH - CARRIE D OUT 7 2-0270 NIL
DEFECTS
MOS 25-S EP-20 13
20-A UG -2013 HRS /MSC - 766 .9
ENC 323
SB 72-0 270 R01 NO. 2 ENGINE - ENGINE - FAN S TATOR ASSE MB LY (72-00 -23) - FORWARD MOUNT RIB INSPECTIO N, S ERVICE BULLE TIN CATEGORY 2 NOT A PPLICA BLE - ENGINES HAVE NOT B EEN
REMOVED
MOS 23-A PR-2015
05-NOV -2013 HRS /MSC -
ENC
SB 72-0 270 R02 NO. 2 ENGINE - FAN STATOR ASSE MB LY (72-00 -23) - FORWARD MOUNT RIB INSPECTION, S ERVICE BULLE TIN CATEGORY 2 NOT A PPLICA BLE - ENGINES HAVE NOT B EEN
REMOVED
MOS 23-A PR-2015
15-A PR-2014 HRS /MSC -
ENC
SB 72-0 270 R03 NO. 2 ENGINE - FAN STATOR ASSE MB LY (72-00 -23) - FORWARD MOUNT RIB INSPECTION, S ERVICE BULLE TIN CATEGORY 2 NOT A PPLICA BLE - THIS S B IS N/A AS ENGINES
ARE NOT REMOVE D FRO M THE WING TIL L DATE
MOS 16-A PR-2015
09-JAN-20 15 HRS /MSC -
ENC
SB 72-0 270 R04 NO. 2 ENGINE - FAN STATOR ASSE MB LY (72-00 -23) - FORWARD MOUNT RIB INSPECTION, S ERVICE BULLE TIN CATEGORY 2 NOT A PPLICA BLE - AS ENGINES ARE NOT
REMOVED FROM THE WING TIL L DATE.
MOS 27-JUL-20 15
29-MAY -2015 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 297 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 276 NO. 2 ENGINE - EXHAUST CO MP ONENTS (72 -54-00 ) - RELEA SE OF NEW IMPROVE D SCAVE NG E A DA PTE R AND CATEGORY 3 - A T NEXT S HOP V ISIT OF THE ENGINE /
SCAVE NG E CONNECTOR TO THE CF3 4-BJ E NG INE MO DE LS, S ERV ICE BULLETIN MODULE
MOS (EFF)
13-MAR-2 014 HRS /MSC ESV
ENC
SB 72-0 277 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - INTRODUCTION O F NEW S ELF- WRENCHING BOLT P /N CATEGORY 7
402 0T5 3P04, SERVICE BULL ETIN
MOS
02-A PR-2014 HRS /MSC -
ENC
SB 72-0 279 NO. 2 ENGINE - ACCESSO RY DRIVE G EARBOX ASS EMBLY (72- 61-00) - INTRODUCTIO N OF WAS HE RS TO ELIMINATE CATEGORY 6 NOT A PPLICA BLE - SUPERSEDED BY RE V 1
SPL IT LINE FLANGE INTERFE RE NCE, SERVICE BULLE TIN
MOS 18-A PR-2015
29-JAN-20 15 HRS /MSC -
ENC
SB 72-0 279 R01 NO. 2 ENGINE - ACCESSO RY DRIVE G EARBOX ASS EMBLY (72- 61-00) - INTRODUCTIO N OF WAS HE RS TO ELIMINATE CATEGORY 6 NOT A PPLICA BLE - SCHE DULE WHEN AG B B E
SPL IT LINE FLANGE INTERFE RE NCE, SERVICE BULLE TIN REMOVED FO R REPAIR
MOS 02-MAR-2 015
02-MAR-2 015 HRS /MSC -
ENC
SB 72-0 279 R02 NO. 2 ENGINE - ACCESSO RY DRIVE G EARBOX ASS EMBLY (72- 61-00) - INTRODUCTIO N OF WAS HE RS TO ELIMINATE CATEGORY 6
SPL IT LINE FLANGE INTERFE RE NCE, SERVICE BULLE TIN
MOS
25-MAY -2022 HRS /MSC -
ENC
SB 72-0 281 NO. 2 ENGINE - COMBUSTIO N SECTIO N (72- 43-00) - INTRODUCTIO N OF NEW SUPPORT B RA CK ET P/N 25 83M77G0 1 FOR CATEGORY 6 NOT A PPLICA BLE - SUPERSEDED BY RE V 1
WHITE W3 CABL E A SSEMBL Y, SERVICE B UL LETIN DATED 14 TH NO V 2 014
MOS 18-A PR-2015
03-O CT-20 14 HRS /MSC -
ENC
SB 72-0 281 R01 NO. 2 ENGINE - COMBUSTIO N SECTIO N (72- 43-00) - INTRODUCTIO N OF NEW SUPPORT B RA CK ET P/N 25 83M77G0 1 FOR CATEGORY 6 NOT A PPLICA BLE - AT ENGINE REP AIR /
WHITE W3 CABL E A SSEMBL Y, SERVICE B UL LETIN OVE RHAUL
MOS 14-NOV -2014
14-NOV -2014 HRS /MSC -
ENC
SB 72-0 284 NO. 2 ENGINE - ENGINE - GE NE RAL (7 2-00-0 0) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ TURBOFAN ENGINES, S ERVICE CATEGORY 8 NOT A PPLICA BLE - INFORMA TIONAL ONLY
BULLE TIN
MOS 03-O CT-20 14
03-O CT-20 14 HRS /MSC -
ENC
SB 72-0 287 NO. 2 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - CF34 ACCESSO RY G EARBOX (AG B) CATEGORY 7 NOT A PPLICA BLE - SUPERSEDED BY RE V 1 AT
INTERCHA NG EABILITY MODIFICATIONS, SERVICE BULLE TIN 25TH NOV -2014
MOS 18-A PR-2015
23-O CT-20 14 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 298 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 287 R01 NO. 2 ENGINE - ACCESSO RY GE ARBOX ASS EMBLY (72-6 2-00) - CF34 ACCESSO RY G EARBOX (AG B) CATEGORY 7 NOT A PPLICA BLE - ONLY DURING ENGINE
INTERCHA NG EABILITY MODIFICATIONS, SERVICE BULLE TIN CHA NG E
MOS 25-NOV -2014
25-NOV -2014 HRS /MSC -
ENC
SB 72-0 288 NO. 2 ENGINE - GE NERAL - REMOVAL OF PARTS FROM IPC, SE RV ICE BULLETIN CATEGORY 9 NOT A PPLICA BLE - INFORMA TIONAL ONLY
MOS 16-JAN-20 15
16-JAN-20 15 HRS /MSC -
ENC
SB 72-0 289 NO. 2 ENGINE - EXHAUST CO MP ONENTS (72 -54-00 ) - QUANTITY CO RRECTIO N FOR MACHINE BOL TS P/N MS95 65-04 , CATEGORY 9 NOT A PPLICA BLE - INFORMA TIONAL ONLY
SERVICE BULLETIN
MOS 16-FEB -2015
16-FEB -2015 HRS /MSC -
ENC
SB 72-0 290 NO. 2 ENGINE - LOW PRESSURE TURBINE S TATOR ASSE MB LY (72-52 -00) - INSPE CTION OF SHRO UD SECTORS O N LPT CATEGORY 2 COMPLIED WITH - N/A BY LPT S TATOR ASSY .
STATOR A SSEMBL IES P/N 60 20T15G3 0 A ND P/N 6020 T15 G31, S ERVICE BULLE TIN P/N (50 99TI04 06)
MOS 24-MAY -2016
03-MAY -2016 HRS /MSC -
ENC
SB 72-0 291 NO. 2 ENGINE - LOW PRESSURE TURBINE S TATOR ASSE MB LY (72-52 -00) - REP LACEMENT OF LPT S TAG E 3 A ND CATEGORY 2 NOT A PPLICA BLE - N/A BY LPT STA TO R P/N
STAGE 4 SHROUD SECTORS ON LP T STATOR A SSEMBL IES P/N 60 20T15G3 0 A ND P/N 6020 T15 G31, S ERVICE BULLE TIN (509 9T10406 )
MOS 26-MAY -2016
03-MAY -2016 HRS /MSC -
ENC
SB 72-0 292 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - OP ERA TION OF CF34-3B ENGINES IN BOMBARDIE R CHA LLENGER 650 AIRCRAFT CATEGORY 7
WITH MAX IMUM TAKE- OFF AND REDUCE D THRUST TAKE -OFF CAPAB ILITIE S, SERVICE B UL LETIN
MOS
27-JUL-20 17 HRS /MSC -
ENC
SB 72-0 293 NO. 2 ENGINE - COMPRESSO R STATOR ( 72-32- 00) - WEIGHT INSPECTION OF THE CO MP RE SSOR CA SE ASSEMBL Y, CATEGORY 5 NOT A PPLICA BLE - ON A6 -ELD B Y ENG INE S/N.
SERVICE BULLETIN THIS SB REQUIRES NO FURTHE R ACTION.
MOS 27-JUL-20 15
02-JUL-20 15 HRS /MSC -
ENC
SB 72-0 294 NO. 2 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-00-3 2) - INSPECTION OF V G S YSTEM TO CHE CK FOR CATEGORY 3 - A PPLICA BLE BY S/N AND RECOMMENDED AT
LOO SENESS , SERVICE B ULL ETIN NEXT S HO P VIS IT.
MOS (EFF)
12-A UG -2015 HRS /MSC ESV
ENC
SB 72-0 294 R01 NO. 2 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-00-3 2) - INSPECTION OF V G S YSTEM TO CHE CK FOR CATEGORY 3
LOO SENESS , SERVICE B ULL ETIN
MOS (EFF)
14-O CT-20 20 HRS /MSC ESV
ENC
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 299 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 295 NO. 2 ENGINE - TURBINE TRANSITION ASSE MB LY (72-51 -00) - REP LACEMENT OF SIL VER P LATED NUTS WITH CATEGORY 4 DEFERRE D - APPLICABLE , BUT NOT A PPROVED
DRY -FILM CO ATED NUTS ON THERMOCOUPLE PROB ES AND PT5 PROBE OR P LUG, SERVICE BULLETIN FOR NOW
MOS 07-A PR-2016
10-MAR-2 016 HRS /MSC - 131 3.0 2
ENC 861
SB 72-0 296 NO. 2 ENGINE - TURBINE TRANSITION ASSE MB LY (72-53 -00) - REP LACEMENT OF SIL VER P LATED NUTS WITH CATEGORY 4 NOT A PPLICA BLE - N/A BY ENGINE MODEL.
DRY -FILM CO ATED NUTS ON THERMOCOUPLE PROB ES AND PT5 PROBE, S ERVICE BULLE TIN
MOS 07-A PR-2016
HRS /MSC -
ENC
SB 72-0 297 NO. 2 ENGINE - COMPRESSO R STATOR ( 72-32- 00) - COMPRESS OR CASE THICKNESS SP ECIAL INSPECTIO N FOR NOT A PPLICA BLE - JUST FOR INFORMATION. NO
SPE CIFIC ENGINE SERIAL NUMBERS, SERVICE BULLE TIN ACTIO N REQUIRED.
MOS 02-MAY -2016
HRS /MSC -
ENC
SB 72-0 298 NO. 2 ENGINE - COMPRESSO R ROTOR A SSEMBLY (72 -33-00 ) - STAGE 10 COMPRESS OR BL ADES RE PLACEMENT CATEGORY 3 - A PPLICA BLE - MUST BE DO NE AT NE XT SHOP
PLA N, SERVICE BULLE TIN VISIT.
MOS (EFF)
13-MAY -2016 HRS /MSC ESV
ENC
SB 72-0 301 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - ADMINISTRA TIVE CHA NG E TO UPDATE CF34-B J EIPC MODEL APP LICAB ILITY, CATEGORY 9 NOT A PPLICA BLE
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 72-0 302 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - ADMINISTRA TIVE CHA NG E TO UPDATE CF34-B J EIPC MODEL APP LICAB ILITY, CATEGORY 9 NOT A PPLICA BLE - NA BY ENGINE MO DE L
SERVICE BULLETIN CLOSE D
MOS 21-MAY -2017
13-FEB -2017 HRS /MSC -
ENC
SB 72-0 303 NO. 2 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-32-0 0) - INSPECTION OF V G S HA FT FO RWARD B EARING CATEGORY 2 NOT A PPLICA BLE - NA BY ENGINE SN CLOS ED
SUPPO RT, S ERV ICE BULLETIN
MOS 21-MAY -2017
10-MAR-2 017 HRS /MSC -
ENC
SB 72-0 303 R01 NO. 2 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-32-0 0) - INSPECTION OF V G S HA FT FO RWARD B EARING CATEGORY 2 NOT A PPLICA BLE - NO ACTIO N REQUIRE D
SUPPO RT, S ERV ICE BULLETIN CLOSE D
MOS 21-MAY -2017
12-A PR-2017 HRS /MSC -
ENC
SB 72-0 303 R02 NO. 2 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-32-0 0) - INSPECTION OF V G S HA FT FO RWARD B EARING NOT A PPLICA BLE - NO ACTIO N REQUIRE D
SUPPO RT, S ERV ICE BULLETIN CLOSE D
MOS
20-A PR-2018 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 300 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 306 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - REPL ACEMENT OF FAN BLADES WITH MISSING AFTER-REPA IR CATEGORY 2 NOT A PPLICA BLE - DO ES NO T APP LY DUE TO
LANCE PEENING , SERVICE B UL LETIN NO AFFECTED B LADES
DAYS 03-NOV -2017
27-S EP-20 17 HRS /MSC -
ENC
SB 72-0 306 R01 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - REPL ACEMENT OF FAN BLADES WITH MISSING AFTER-REPA IR CATEGORY 2 NOT A PPLICA BLE - DUE TO S ERIAL NUMB ERS
LANCE PEENING , SERVICE B UL LETIN OF THE FA N BLA DE S
MOS 24-JUN-2020
02-FEB -2018 HRS /MSC -
ENC
SB 72-0 306 R02 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - REPL ACEMENT OF FAN BLADES WITH MISSING AFTER-REPA IR CATEGORY 2 NOT A PPLICA BLE - DUE TO S ERIAL NUMB ERS
LANCE PEENING , SERVICE B UL LETIN OF THE FA N BLA DE S
DAYS
18-DEC-20 19 HRS /MSC -
ENC
SB 72-0 308 NO. 2 ENGINE - FAN ROTOR ASSEMBL Y ( 72-21- 00) - S EARCH OF FAN BLADES SENT TO ATI-UK BE TWEE N 2007 AND CATEGORY 2 NOT A PPLICA BLE - N/A PART #S N# .
200 9 WITHIN EV ERY O PERATOR FLEE T, S ERVICE BULLE TIN
MOS 03-JUL-20 18
04-JAN-20 18 HRS /MSC - 157 8.5
ENC 103 5
SB 72-0 309 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - INTRODUCTION OF NE W VA RIABLE G EOMETRY LINKAG E A SSEMBLY WITH CATEGORY 7
IMP RO VED B EARING SUPPO RT, SE RV ICE BULLETIN
MOS
18-A PR-2019 HRS /MSC -
ENC
SB 72-0 310 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ E NG INES, S ERVICE BULLE TIN CATEGORY 8 COMPLIED WITH - INFO RMATIONAL ONLY:
SPA RE PA RTS RELEA SE
MOS 04-JUN-2021
03-JUN-2021 HRS /MSC -
ENC
SB 72-0 311 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - NO. 1 CARBON SEAL REKITTED - O NE -TIME VIS UA L INSPECTIO N OF THE CATEGORY 4
RETAINING JOINT AND RING ENGA GEMENT, SERVICE BULL ETIN
MOS
29-A UG -2018 HRS /MSC -
ENC
SB 72-0 314 NO. 2 ENGINE - FAN STATOR (72-23 -00) - INTRO DUCTION OF NEW NO . 1 BEARING CARBON SEAL P/N 60 47T63P09 , CATEGORY 7
SERVICE BULLETIN
MOS
29-JAN-20 19 HRS /MSC -
ENC
SB 72-0 315 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - REMOVAL O F SPARE PARTS SUPPORT FOR CF34 -BJ TURB OFA N ENGINES, CATEGORY 9
SERVICE BULLETIN
MOS
22-O CT-20 19 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 301 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 315 R01 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - REMOVAL O F SPARE PARTS SUPPORT FOR CF34 -BJ TURB OFA N ENGINES, CATEGORY 9
SERVICE BULLETIN
MOS
13-A PR-2020 HRS /MSC -
ENC
SB 72-0 316 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - RE-CONVERSION O F CF3 4-3B ENGINE S THAT WERE OP ERA TE D IN A CATEGORY 7
CHA LLENGE R 650 AIRCRAFT WITH MTO AND FLEX CAPA BIL ITIES, SE RV ICE BULLETIN
MOS
19-MAR-2 020 HRS /MSC -
ENC
SB 72-0 317 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ E NG INES, S ERVICE BULLE TIN CATEGORY 8 COMPLIED WITH - INFO RMATIONAL ONLY:
SPA RE PA RTS RELEA SE
MOS 14-JUN-2020
05-JUN-2020 HRS /MSC -
ENC
SB 72-0 319 NO. 2 ENGINE - PO WE R TAKEOFF DRIVE ASSEMBL Y ( 72-64- 00) - REP LACEMENT OF P TO ROLL ER BE ARINGS P/N CATEGORY 5 NOT A PPLICA BLE - By Se rial: DUE TO ENGINE
507 1T3 0P03 AND P /N 5 071T30P 04 WITH INNER/OUTER RACE S ERIAL NUMB ERS MISMATCH, SE RV ICE BULLETIN SERIAL NUMBER
MOS
14-DEC-20 20 HRS /MSC -
ENC
AFL
SB 72-0 321 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - ONE-TIME BS I OF NO. 1 A ND 2 B EARING HOUSING AS SEMBLY PLA TE HOLE S, OIL CATEGORY 2 NOT A PPLICA BLE - By Se rial: DUE E NG INE
MANIFOLD, A ND OIL S CAV ENGE TUBE FOR ME TAL -TO -META L CONDITION, SERVICE BULLETIN SERIAL NUMBER (9509 67 AND 9509 68)
MOS
30-JUN-2021 HRS /MSC
ENC
AFL
SB 72-0 323 NO. 2 ENGINE - FAN STATOR (72-21 -00) - INTRO DUCTION OF NO. 1 AND NO. 2 B EARING HOUSING P/N 60 47T69G0 5 A ND CATEGORY 7 NOT A PPLICA BLE - By Se rial: DUE TO ENGINE
SCAVE NG E TUBE P/N 279 9M22G01 , SERVICE B ULL ETIN SERIAL NUMBER
MOS
10-JUN-2021 HRS /MSC -
ENC
AFL
SB 72-0 324 NO. 2 ENGINE - ENGINE - LO W PRESS URE TURBINE ROTOR ASSE MB LY (72-53 -00) - E VALUATION OF THE STAGE CATEGORY 2 NOT A PPLICA BLE - By Se rial: DUE TO SERIAL
4-S TAG E 5, STAGE 5-S TA GE 6 L PT DIS KS AND TURBINE REA R SHAFT DRIV E CONE BOL TED JO INTS, SE RV ICE NUMBE R (95 0968)
BULLE TIN
DAYS
17-JUN-2021 HRS /MSC
ENC
AFL
SB 72-0 325 NO. 2 ENGINE - LOW PRESSURE TURBINE ROTOR ASSE MBL Y (72-53- 00) - REP LACEMENT OF DRIVE CO NE BO LT AND LIMITED NOT A PPLICA BLE - THIS S ERVICE BULLE TIN
SEL F-RETAINING BOL T (THIS SB IS FOR L IMITE D DISTRIB UTION) ( THIS S B DOE S NOT IMPA CT ALL OPERATORS AND IS DIS TRIBUTION DOES NOT
APP LICAB LE TO AFFECTE D OP ERA TO RS ONLY ), SERVICE B UL LETIN IMP ACT ALL OP ERA TO RS AND IS
APP LICAB LE TO AFFECTE D OP ERA TO RS
ONLY
MOS
24-JUN-2021 HRS /MSC -
ENC
AFL

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 302 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 72-0 325 R01 NO. 2 ENGINE - LOW PRESSURE TURBINE ROTOR ASSE MBL Y (72-53- 00) - REP LACEMENT OF DRIVE CO NE BO LT AND LIMITED NOT A PPLICA BLE - THIS S ERVICE BULLE TIN
SEL F-RETAINING BOL T (THIS SB IS FOR L IMITE D DISTRIB UTION) ( THIS S B DOE S NOT IMPA CT ALL OPERATORS AND IS DIS TRIBUTION DOES NOT
APP LICAB LE TO AFFECTE D OP ERA TO RS ONLY ), SERVICE B UL LETIN IMP ACT ALL OP ERA TO RS AND IS
APP LICAB LE TO AFFECTE D OP ERA TO RS
ONLY
MOS
22-JUL-20 21 HRS /MSC -
ENC
AFL
SB 72-0 326 NO. 2 ENGINE - COMPRESSO R STATOR ( 72-32- 00) - B SI OF THE CO MP RE SSOR MO DULE WITH SPECIAL EQUIP ME NT LIMITED NOT A PPLICA BLE - THIS S ERVICE BULLE TIN IS
(THIS SERVICE BUL LETIN IS FOR L IMITED DISTRIB UTION) (THIS SE RV ICE BULLETIN DOES NOT IMPACT AL L DIS TRIBUTION FOR
OPE RA TO RS AND IS APP LICAB LE TO AFFECTE D OPE RA TO RS ONLY) , SERVICE B ULL ETIN LIMITED DISTRIBUTION
THIS SERVICE B UL LETIN DO ES NO T
IMP ACT ALL OP ERA TO RS AND IS
APP LICAB LE TO AFFECTE D OP ERA TO RS
ONLY
MOS
18-A UG -2021 HRS /MSC -
ENC
AFL
SB 72-0 326 R01 NO. 2 ENGINE - COMPRESSO R STATOR ( 72-32- 00) - B SI OF THE CO MP RE SSOR MO DULE WITH SPECIAL EQUIP ME NT LIMITED
(THIS SERVICE BUL LETIN IS FOR L IMITED DISTRIB UTION (THIS SE RV ICE BULLETIN DOES NOT IMPACT ALL DIS TRIBUTION
OPE RA TO RS AND IS APP LICAB LE TO AFFECTE D OPE RA TO RS ONLY) ), SERVICE B UL LETIN
MOS
02-NOV -2021 HRS /MSC -
ENC
SB 72-0 330 NO. 2 ENGINE - FAN STATOR ASSE MB LY (72-21 -00) - INTRODUCTION OF NO. 1 AND NO. 2 B EARING HOUSING P/N CATEGORY 4
604 7T6 9G06 AND P RE FORMED PACKING P/N J143 8P278, SERVICE BULL ETIN
MOS
20-MAY -2022 HRS /MSC -
ENC
SB 72-0 331 NO. 2 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-32-0 0) - INSPECTION AND REPLA CE ME NT OF RING LIMITED
CONNE CTORS (THIS SERVICE B UL LETIN IS FOR L IMITED DISTRIB UTION) (THIS SE RV ICE BULLETIN DOES NOT IMPACT DIS TRIBUTION
ALL OP ERATORS A ND IS AP PLICAB LE TO AFFECTED OP ERATO RS O NLY ), SERVICE BUL LETIN
MOS
04-MAR-2 022 HRS /MSC -
ENC
SB 72-0 332 NO. 2 ENGINE - COMPRESSO R STATOR A SSEMBL Y (7 2-32-0 0) - INSPECTION AND REPLA CE ME NT OF RING LIMITED
CONNE CTORS (THIS SERVICE B UL LETIN IS FOR L IMITED DISTRIB UTION) (THIS SE RV ICE BULLETIN DOES NOT IMPACT DIS TRIBUTION
ALL OP ERATORS A ND IS AP PLICAB LE TO AFFECTED OP ERATO RS O NLY ), SERVICE BUL LETIN
MOS
04-MAR-2 022 HRS /MSC -
ENC
SB 72-0 333 NO. 2 ENGINE - REAR MO UNT A SSEMBLY (7 2-44-00 ) - INTRODUCTION OF THRUST MOUNT ASS EMBLY P/N 603 0T5 6G04 CATEGORY 7
WITH A NEW FULLY MACHINED AFT ENGINE MOUNT LINK A SSEMBLY P/N 5 023T22G0 4, SERVICE BUL LETIN
MOS
10-JUN-2022 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 303 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 003 R03 NO. 2 ENGINE - FUE L S YSTEM - SE RV ICING/INS PECTION - USE OF FUEL SY STE M ANTI-ICING ADDITIVE AND CATEGORY 2
INS PECTION OF FUEL HE ATE R, SERVICE BULL ETIN
MOS
12-DEC-19 85 HRS /MSC -
ENC
SB 73-0 003 REV 04 NO. 2 ENGINE - SERVICE/INSPCETION OF FUEL HEATER, SE RV ICE BULLETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 73-0 015 REV 01 NO. 2 ENGINE - REPLA CE P0 4 WITH P05 FCU, S ERVICE BULLETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 73-0 016 NO. 2 ENGINE - FUE L L EAK INPS ECTION, SE RV ICE BULLETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 73-0 017 NO. 2 ENGINE - CORRE CTION O F NAMEPLATE ON MFC'S, SERVICE BUL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 73-0 021 NO. 2 ENGINE - INS PECT AND RETORQUE COUPLING CLAMP, S ERVICE BULLE TIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 73-0 023 NO. 2 ENGINE - INS PECT/REPLA CE FUEL LUBE HO SES, S ERVICE BULLE TIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 73-0 026 NO. 2 ENGINE - FUE L S YSTEM - INTRODUCTION OF MAIN FUEL CONTRO L P NS 60 78T55P08 /P0 9/P 10 WITH IMP RO VED CATEGORY 2
VG CABLE BRACKE T, SERVICE BULLE TIN
MOS
06-JUN-1997 HRS /MSC -
ENC
SB 73-0 026 R01 NO. 2 ENGINE - INTRODUCTION OF MA IN FUEL CONTROL PNS 607 8T5 5P08/P09 /P1 0 WITH IMPROV ED VG CABL E CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
BRACKET, SE RV ICE BULLETIN
MOS 01-A PR-2011
23-O CT-19 97 HRS /MSC - 0
ENC 0
SB 73-0 027 NO. 2 ENGINE - REPLA CE ME NT OF FUEL FILTER A SSEMBLY (P N 5071 T7 0P01), SERVICE BULLE TIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
10-O CT-19 95 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 304 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 027 R01 NO. 2 ENGINE - FUE L S YSTEM - REPLA CE ME NT OF FUEL FILTER A SSEMBLY (P N 507 1T7 0P01) , SERVICE BULL ETIN RECOMME NDED NOT A PPLICA BLE - N/A BY ENGINE S/N
MOS 12-JUL-20 16
21-JUN-2016 HRS /MSC -
ENC
SB 73-0 030 NO. 2 ENGINE - REMOVAL AND CLE ANING OF THE MA IN FUEL CONTROL TO IMPROV E COL D SOA K THROTTLE CATEGORY 3 NOT A PPLICA BLE
RESPO NS E, SERVICE BULLETIN
MOS 01-A PR-2011
11-JUL-19 96 HRS /MSC - 0
ENC 0
SB 73-0 032 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - REWORK OF MAIN FUEL CO NTROL TO ADD FO RWARD FLANGE VE NT
GROO VE, SE RV ICE BULLETIN
MOS
13-JUN-1997 HRS /MSC -
ENC
SB 73-0 032 R01 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - REWORK OF MAIN FUEL CO NTROL TO ADD FO RWARD FLANGE VE NT
GROO VE, SE RV ICE BULLETIN
MOS
24-S EP-19 97 HRS /MSC -
ENC
SB 73-0 032 R03 NO. 2 ENGINE - ENGINE A ND FUEL CONTRO L - REWORK OF MAIN FUEL CO NTROL TO ADD FO RWARD FLANGE VE NT CATEGORY 9 NOT A PPLICA BLE - SUPERSEDED
GROO VE, SE RV ICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 73-0 034 NO. 2 ENGINE - FUE L S YSTEM - IMP RO VED P RE FO RMED PACKING S O N THE MAIN FUEL CO NTROL-TO-FUEL PUMP CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
INTERFACE, SE RVICE BULLETIN
MOS 01-A PR-2011
12-JAN-19 98 HRS /MSC - 0
ENC 0
SB 73-0 036 NO. 2 ENGINE - INS PECTION OF MAIN FUEL FILTER FOR NO N-TORQUED FILTER B OWL, SERVICE BULLETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
03-DEC-19 98 HRS /MSC - 0
ENC 0
SB 73-0 038 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D AG B-TO-FUE L P UMP CLAMP CO UP LING, SERVICE BULLE TIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
20-A UG -1999 HRS /MSC - 0
ENC 0
SB 73-0 039 NO. 2 ENGINE - INS PECT/REPLA CE MAIN FUEL FILTER, SERVICE B UL LETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 73-0 041 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F CF3 4 MAIN FUEL
CONTROL S WITH RELOCATED P RE SSURE-RELIEF GROO VE, S ERV ICE BULLETIN
MOS
12-A UG -1999 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 305 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 041 R01 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F CF3 4 MAIN FUEL CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
CONTROL S WITH RELOCATED P RE SSURE-RELIEF GROO VE., SERVICE B UL LETIN
MOS 01-A PR-2011
HRS /MSC N/A 0
ENC 0
SB 73-0 041 R02 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F CF3 4 MAIN FUEL CATEGORY 5
CONTROL S WITH RELOCATED P RE SSURE-RELIEF GROO VE, S ERV ICE BULLETIN
MOS
06-DEC-20 13 HRS /MSC -
ENC
SB 73-0 042 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L CONTROL - REP LACEMENT OF FUEL VAL VE BUSHING CATEGORY 6
PREFORMED PA CK ING, S ERVICE BULLETIN
MOS
30-MAR-2 000 HRS /MSC -
ENC
SB 73-0 042 R01 NO. 2 ENGINE - REPLA CE ME NT OF FUEL VALVE BUSHING P RE FO RMED PACKING , SERVICE B ULL ETIN CATEGORY 6 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
09-O CT-20 02 HRS /MSC - 0
ENC 0
SB 73-0 043 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REWORK OF V ARIAB LE GEOMETRY
ACTUA TO R PN 5 050T37G 01, SE RV ICE BULLETIN
MOS
31-O CT-20 02 HRS /MSC -
ENC
SB 73-0 043 R01 NO. 2 ENGINE - ENGINE FUEL CONTROL- FUEL SYS TE M-REWORK OF VARIA BLE GEO ME TRY ACTUATOR, S ERV ICE
BULLE TIN
MOS
HRS /MSC -
ENC
SB 73-0 043 R02 NO. 2 ENGINE - REWORK OF VA RIABL E G EOMETRY A CTUATOR PN 5050 T37 G01, S ERVICE BULLE TIN CATEGORY 6
MOS
17-A PR-2003 HRS /MSC -
ENC
SB 73-0 043 R03 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REWORK OF V ARIAB LE GEOMETRY CATEGORY 6 COMPLIED WITH - A T MANUFACTURE
ACTUA TO R PN 5 050T37G 01, SE RV ICE BULLETIN
MOS 01-A PR-2011
07-A PR-2010 HRS /MSC - 0
ENC 0
SB 73-0 044 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O FCF34 MAIN FUEL
CONTROL S WITH PRODUCT IMPROVE ME NT PACKAG E, SERVICE B UL LETIN
MOS
09-MAR-2 001 HRS /MSC -
ENC
SB 73-0 044 R01 NO. 2 ENGINE - INTRODUCTION OF CF34 MAIN FUE L CONTROLS WITH P RO DUCT IMP RO VEMENT PA CKA GE, S ERVICE NOT A PPLICA BLE
BULLE TIN
MOS 01-A PR-2011
21-FEB -2002 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 306 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 044 R02 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F CF3 4 MAIN FUEL CATEGORY 6
CONTROL S WITH PRODUCT IMPROVE ME NT PACKAG E, SERVICE B UL LETIN
MOS (EFF)
13-DEC-20 12 HRS /MSC -
ENC
SB 73-0 044 R03 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F CF3 4 MAIN FUEL CATEGORY 6
CONTROL S WITH PRODUCT IMPROVE ME NT PACKAG E, SERVICE B UL LETIN
MOS (EFF)
08-NOV -2013 HRS /MSC -
ENC
SB 73-0 045 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F MODIFIED FUEL VALVE
BUSHING INTO MFC, S ERVICE BULLETIN
MOS
31-JAN-20 01 HRS /MSC -
ENC
SB 73-0 045 R01 NO. 2 ENGINE - INTRODUCTION OF MO DIFIE D FUE L V ALVE BUSHING INTO MFC, S ERVICE BULLETIN CATEGORY 6 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
05-JUL-20 01 HRS /MSC - 0
ENC 0
SB 73-0 045 R02 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - INTRODUCTION O F MODIFIED FUEL VALVE CATEGORY 6
BUSHING INTO MFC, S ERVICE BULLETIN
MOS
06-DEC-20 13 HRS /MSC -
ENC
SB 73-0 046 NO. 2 ENGINE - INS PECTION OF MAIN FUEL CO NTROLS FOR THRO TTLE BO DY LE AKAGE , SERVICE B UL LETIN CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
13-JUN-2001 HRS /MSC - 0
ENC 0
SB 73-0 047 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - CF34-1A /-3A /-3 A1/-3A2/-3BRUSSIAN FUELS CATEGORY 9
FLEET LEADER SAMPLING P RO GRAM, SERVICE B ULL ETIN
MOS
24-JAN-20 02 HRS /MSC -
ENC
SB 73-0 047 R01 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - CF34-1A /-3A /-3 A1/-3A2/-3B TS -1 FUELS FLEET CATEGORY 7
LEA DE R SAMPL ING PROGRAM, SE RV ICE BULLETIN
MOS
30-MAR-2 006 HRS /MSC -
ENC
SB 73-0 047 R02 NO. 2 ENGINE - FUE L S YSTEM ( 73-00-0 0)-CF34-1A/-3A /3A 1/-3 A2/-3B TS -1 FUELS FLEE T LEADER SAMPLING PROGRAM, CATEGORY 9 NOT A PPLICA BLE - SUPERSEDED
SERVICE BULLETIN
MOS 01-A PR-2011
30-A UG -2007 HRS /MSC - 0
ENC 0
SB 73-0 048 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - VARIABLE G EOMETRY ACTUATION SYSTEM (73-00 -00) - SPARE PARTS CATEGORY 8
RELEA SE FO R VARIABLE GE OMETRY ACTUATO R REPAIR K IT, SE RVICE BULLETIN
MOS
31-JUL-20 02 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 307 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 049 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF S ELECTED CF34 MA IN
FUE L CONTROLS, S ERVICE BULLE TIN
MOS
21-FEB -2003 HRS /MSC -
ENC
SB 73-0 049 R01 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF S ELECTED CF34 MA IN
FUE L CONTROLS, S ERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 73-0 049 R02 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF S ELECTED CF34 MA IN CATEGORY 2 NOT A PPLICA BLE
FUE L CONTROLS., SE RVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 73-0 049 R03 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF S ELECTED CF34 MA IN CATEGORY 2
FUE L CONTROLS, S ERVICE BULLE TIN
MOS
HRS /MSC -
ENC
SB 73-0 051 NO. 2 ENGINE - FUE L S YSTEM - FUEL MA NIFOLD (7 3-00-0 0) - INTRODUCTION O F FUE L INJE CTORS PN 6 078T63P0 7 A ND CATEGORY 7
PN 6078T64P 07, SE RV ICE BULLETIN
MOS
15-JUN-2004 HRS /MSC -
ENC
SB 73-0 051 R01 NO. 2 ENGINE - FUE L S YSTEM - FUEL MA NIFOLD (7 3-00-0 0) - INTRODUCTION O F FUE L INJE CTORS P N 6078 T6 3P07 CATEGORY 7
AND P N 6078 T6 4P07, S ERVICE BULLE TIN
MOS
15-DEC-20 05 HRS /MSC -
ENC
SB 73-0 051 R02 NO. 2 ENGINE - INTRODUCTION OF FUEL INJECTORS PN 50 83T10P03 , PN 5 083T11P0 3, PN 5 083T12P 03, PN 6078T63P 07, CATEGORY 7
AND P N 6078 T6 4P07, S ERVICE BULLE TIN
MOS
02-NOV -2006 HRS /MSC -
ENC
SB 73-0 051 R03 NO. 2 ENGINE - INTRODUCTION OF FUEL INJECTORS PN 50 83T10P03 , PN 5083 T1 1P03, PN 508 3T12P03 , PN CATEGORY 5
607 8T6 3P07, AND PN 6 078T64P 07, SE RVICE BULLETIN
MOS
23-MAY -2008 HRS /MSC -
ENC
SB 73-0 051 R04 NO. 2 ENGINE - FUE L S YSTEM - FUEL MA NIFOLD (7 3-00-0 0) - INTRODUCTION O F FUE L INJE CTORS PN 5 083T10P0 3, PN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
508 3T1 1P03, PN 50 83T12P03 , PN 6 078T63P0 7, AND PN 6078 T64 P07, S ERVICE BULLE TIN
MOS 01-A PR-2011
22-JUN-2009 HRS /MSC - 0
ENC 0

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 308 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 052 NO. 2 ENGINE - FUE L S YSTEM - (73 -00-00 ) - ACTUA TO R HOSE FIRE SLEE VE IMPROVE ME NT, S ERV ICE BULLETIN CATEGORY 5
MOS
01-MAR-2 006 HRS /MSC -
ENC
SB 73-0 052 R01 NO. 2 ENGINE - ACTUA TO R HORE FIRE S LEEVE IMPROVEMENT, SERVICE B UL LETIN CATEGORY 5
MOS
25-O CT-20 06 HRS /MSC -
ENC
SB 73-0 052 R02 NO. 2 ENGINE - ACTUA TO R HOSE FIRE SLEE VE IMPROV EMENT , SERVICE B UL LETIN CATEGORY 5
MOS
HRS /MSC -
ENC
SB 73-0 052 R03 NO. 2 ENGINE - ACTUA TO R HOSE FIRE SLEE VE IMPROV EMENT, S ERVICE BULLETIN CATEGORY 5
MOS
06-FEB -2007 HRS /MSC -
ENC
SB 73-0 052 R04 NO. 2 ENGINE - FUE L S YSTEM - (73 -00-00 ) - ACTUA TO R HOSE FIRE SLEE VE IMPROVE ME NT, S ERV ICE BULLETIN CATEGORY 5 NOT A PPLICA BLE - SUPERSEDED
MOS 01-A PR-2011
09-DEC-20 08 HRS /MSC - 0
ENC 0
SB 73-0 054 NO. 2 ENGINE - INTRODUCTION OF LOOP -CUSHIONED CLAMP PN J12 20G18 FOR IMPROVE D VG ACTUA TO R HOSE CATEGORY 5
CLAMPING , SERVICE B UL LETIN
MOS
HRS /MSC -
ENC
SB 73-0 054 R01 NO. 2 ENGINE - INTRODUCTION OF LOOP -CUSHIONED CLAMP PN J12 20G18 FOR IMPROVE D VG ACTUA TO R HOSE CATEGORY 5
CLAMPING , SERVICE B UL LETIN
MOS
05-JAN-20 07 HRS /MSC -
ENC
SB 73-0 054 R02 NO. 2 ENGINE - FUE L S YSTEM - (73 -00-00 ) - INTRODUCTIO N OF LOOP -CUSHIONED CLAMP P/N J1220 G18 FO R CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
IMP RO VED V G A CTUATOR HOS E CLA MP ING, S ERV ICE BULLETIN
MOS 01-A PR-2011
09-DEC-20 08 HRS /MSC - 0
ENC 0
SB 73-0 055 R01 NO. 2 ENGINE - ACTUA TO R HOSE FIRE SLEE VE IMPROV EMENT, S ERVICE BULLETIN CATEGORY 5
MOS
06-FEB -2007 HRS /MSC A/R
ENC
SB 73-0 057 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D VG ACTUATO R HOSE (FINAL FIX ), SERVICE BULLETIN CATEGORY 3
MOS
06-FEB -2007 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 309 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 057 R01 NO. 2 ENGINE - FUE L S YSTEM ( 73-00-0 0) INTRO DUCTION OF IMPROVED VG ACTUATOR HO SE (FINAL FIX), SERVICE CATEGORY 3
BULLE TIN
MOS
14-JUN-2007 HRS /MSC -
ENC
SB 73-0 057 R02 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D VG ACTUATO R HOSE (FINAL FIX ), SERVICE BULLETIN CATEGORY 3
MOS
02-A UG -2007 HRS /MSC -
ENC
SB 73-0 057 R03 NO. 2 ENGINE - FUE L S YSTEM - (73 -00-00 ) - INTRODUCTIO N OF IMPROVE D VG ACTUA TO R HOSE (FINAL FIX ), SERVICE CATEGORY 3
BULLE TIN
MOS
03-MAR-2 010 HRS /MSC -
ENC
SB 73-0 057 R04 NO. 2 ENGINE - FUE L S YSTEM - (73 -00-00 ) - INTRO DUCTION OF IMPROVED VG ACTUATOR HO SE (FINAL FIX), SERVICE CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
BULLE TIN
MOS 01-A PR-2011
08-NOV -2010 HRS /MSC - 0
ENC 0
SB 73-0 059 NO. 2 ENGINE - CDP RESTORING S PRING INSP ECTION O N BUSINE SS JE T MODELS, S ERVICE BULLE TIN CATEGORY 6
MOS
HRS /MSC -
ENC
SB 73-0 059 R01 NO. 2 ENGINE - MAIN FUE L CONTROL (MFC)-CDP RES TO RING S PRING INSP ECTION O N BUSINESS JE T MODELS, CATEGORY 6
SERVICE BULLETIN
MOS
12-MAR-2 008 HRS /MSC -
ENC
SB 73-0 059 R02 NO. 2 ENGINE - MAIN FUE L CONTROL (MFC)-CDP RES TO RING S PRING INSP ECTION O N BUSINESS JE T MODELS, CATEGORY 6 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
13-A UG -2009 HRS /MSC - 0
ENC 0
SB 73-0 060 NO. 2 ENGINE - REQUIRE ME NTS FO R AND A PPROVAL O F FUEL AND ADDITIVE S, SERVICE BUL LETIN CATEGORY 9 - RECURRING, TO BE CO MP LIE D AT 1 0000
HOURS .
MOS
30-A UG -2007 HRS /MSC 100 00 0 100 00
ENC
SB 73-0 060 R01 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - FUEL AND ADDITIVES - RE QUIREMENTS FOR, CATEGORY 9
AND A PPROVAL OF, S ERVICE BULLETIN
MOS
14-JUL-20 11 HRS /MSC -
ENC
SB 73-0 060 R02 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - FUEL AND ADDITIVES - RE QUIREMENTS FOR, CATEGORY 9
AND A PPROVAL OF, S ERVICE BULLETIN
MOS
22-JUN-2012 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 310 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 060 R03 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - FUEL AND ADDITIVES - RE QUIREMENTS FOR, CATEGORY 9 COMPLIED WITH - INFO RMATIONAL ONLY.
AND A PPROVAL OF, S ERVICE BULLETIN
MOS 13-DEC-20 15
20-NOV -2015 HRS /MSC -
ENC
SB 73-0 060 R04 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - REQUIRE ME NTS FO R, AND APP RO VAL OF FUEL SYS TEM (73-0 0-00) - CATEGORY 9 - FOR INFORMA TION O NL Y
FUE L A ND ADDITIV ES, SE RV ICE BULLETIN
MOS 07-A PR-2016
21-MAR-2 016 HRS /MSC -
ENC
SB 73-0 060 R05 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REQUIREMENTS FOR A ND APPROVA L O F CATEGORY 9
FUE L A ND ADDITIV ES, SE RV ICE BULLETIN
MOS
14-JUN-2019 HRS /MSC -
ENC
SB 73-0 061 NO. 2 ENGINE - INTRODUCTION OF T2 SE NS OR TUBES, S ERVICE BULLE TIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 73-0 061 R1 NO. 2 ENGINE - FUE L S YSTEM - INTRODUCTION OF THE T2 SENSOR TUBES ., S ERVICE BULLE TIN N/A BY PA RT NOT A PPLICA BLE - BY ENGINE MODEL
NUMBE R
MOS 09-JUL-20 15
HRS /MSC -
ENC
SB 73-0 062 NO. 2 ENGINE - INS PECTION OF CONNECTION O RIENTATIO N BETWEEN THE AFT ACTUA TO R HEAD HOS E A SSEMBL Y CATEGORY 2
AND THE MA IN FUEL CONTROL , SERVICE BULL ETIN
MOS
01-A PR-2008 HRS /MSC -
ENC
SB 73-0 062 R01 NO. 2 ENGINE - INS PECTION OF CONNECTION O RIENTATIO N BETWEEN THE AFT ACTUA TO R HEAD HOS E A SSEMBL Y CATEGORY 2
AND THE MA IN FUEL CONTROL , SERVICE BULL ETIN
MOS
01-JUL-20 08 HRS /MSC -
ENC
SB 73-0 062 R02 NO. 2 ENGINE - INS PECTION OF CONNECTION O RIENTATIO N BETWEEN THE AFT ACTUA TO R HEAD HOS E A SSEMBL Y CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
AND THE MA IN FUEL CONTROL , SERVICE BULL ETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 73-0 063 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF HIGH TIME FUEL VALVE CATEGORY 2
THRUST B US HING AND CLIP , SERVICE B ULL ETIN
MOS
09-FEB -2012 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 311 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 73-0 063 R01 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF HIGH TIME FUEL VALVE CATEGORY 3
THRUST B US HING AND CLIP , SERVICE B ULL ETIN
MOS (EFF) RECURRING
HRS /MSC 100 00 100 00 M
ENC
SB 73-0 064 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF MIN SP EED A DJUSTME NT CATEGORY 6
LEV ER, SERVICE B ULL ETIN
MOS (EFF)
06-DEC-20 13 HRS /MSC -
ENC
SB 73-0 064 R01 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L S YSTEM ( 73-00-0 0) - REPL ACEMENT OF MIN SP EED A DJUSTME NT CATEGORY 6 - A PPLICA BLE AND RECOMMENDE D
LEV ER, SERVICE B ULL ETIN
MOS 10-MAY -2015
04-A UG -2015 HRS /MSC -
ENC
SB 73-0 065 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L CONTROL (73-00 -00) - REP LACEMENT OF MFC G OVERNOR/CDP CATEGORY 6 NOT A PPLICA BLE - TO A6 -ELD E NG INES AS
BODY, SERVICE BULL ETIN WOODWARD SE RV ICE BULLETIN 8331 6-73-0 10
IS N/A TO A6 -ELD B Y MAIN FUEL CO NTROL
(MFC) S/N MENTIONED IN TA BLE. S /N
INS TAL LED O N A6- ELD ENG 1 = WYGC6789 .
MOS 27-JUL-20 15
23-JUN-2015 HRS /MSC -
ENC
SB 73-0 065 R01 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - FUE L CONTROL (73-00 -00) - REP LACEMENT OF MFC G OVERNOR/CDP CATEGORY 6 NOT A PPLICA BLE - BY MFC P N INS TAL LED
BODY, SERVICE BULL ETIN
MOS 05-A UG -2015
04-A UG -2015 HRS /MSC -
ENC
SB 73-0 066 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ E NG INES, S ERVICE BULLE TIN CATEGORY 8
MOS
19-JUN-2017 HRS /MSC - (s)
ENC
SB 73-0 067 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - VARIABLE G EOMETRY LINKAGE ACTUATION SYSTEM (73-0 0-00) - CATEGORY 2 NOT A PPLICA BLE - By Se rial: DUE TO ENGINE
INS PECTION AND RETORQUE O F VG ACTUA TO R PLA IN NUT, SERVICE B UL LETIN SERIAL NUMBERS
MOS
22-MAY -2020 HRS /MSC
ENC
AFL
SB 73-0 067 R01 NO. 2 ENGINE - ENGINE FUEL AND CONTRO L - VARIABLE G EOMETRY LINKAGE ACTUATION SYSTEM (73-0 0-00) - CATEGORY 2 NOT A PPLICA BLE - By Se rial: DUE TO ENGINE
INS PECTION AND RETORQUE O F VG ACTUA TO R PLA IN NUT, SERVICE B UL LETIN SERIAL NUMBER
MOS
26-A UG -2020 HRS /MSC
ENC
AFL
SB 74-0 007 NO. 2 ENGINE - UPGRADE ENGINE ING INTIO N LEA DS , SERVICE BULL ETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 312 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 74-0 009 NO. 2 ENGINE - REPLA CE IGNITION EX CITERS, SE RVICE BULLETIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 74-0 010 NO. 2 ENGINE - UPGRADE PROGRAM FO R CONTROL AMPLIFIE R PN 5 071T98P 01, SE RVICE BULLETIN CATEGORY 7 NOT A PPLICA BLE
MOS 01-A PR-2011
29-A PR-1997 HRS /MSC - 0
ENC 0
SB 74-0 011 NO. 2 ENGINE - IGNITIO N - ELECTRICAL SYS TE M (74-0 0-00) - INTRO DUCTIO N OF IMPROVED W2 B LUE CABL E CATEGORY 6 NOT A PPLICA BLE
ASS EMBLY, S ERVICE BULLE TIN
MOS 01-A PR-2011
06-JUN-2001 HRS /MSC - 0
ENC 0
SB 74-0 012 NO. 2 ENGINE - ENGINE - ELE CTRICAL SY STEM (74 -00-00 ) - INTRODUCTION OF NE W N1 CO NTROL AMPLIFIER PN CATEGORY 7
507 1T9 8P05 WITH A CIRCUIT BOARD REDES IGN, S ERVICE BULLETIN
MOS
21-O CT-20 04 HRS /MSC -
ENC
SB 74-0 012 R01 NO. 2 ENGINE - INTRODUCTION OF NE W N1 CO NTROL AMPLIFIER PN 50 71T98P05 WITH A CIRCUIT BOA RD RE DE SIG N, CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
16-NOV -2004 HRS /MSC A/R 0
ENC 0
SB 74-0 014 NO. 2 ENGINE - ELE CTRICAL SY STEM - W8 CAB LE AND CONTROL AMPL IFIE R (74- 00-00) - MICROCIRCUIT INSPECTIO N, CATEGORY 5 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
08-JUL-20 08 HRS /MSC - 0
ENC 0
SB 74-0 015 NO. 2 ENGINE - IGNITIO N - ELECTRICAL SYS TE M (74-0 0-00) - IG NITION EXCITER P/N 923 8M6 6P08 INS PECTION, CATEGORY 6
SERVICE BULLETIN
MOS
21-A PR-2010 HRS /MSC -
ENC
SB 74-0 016 NO. 2 ENGINE - IGNITIO N - ELECTRICAL SYS TE M (74-0 0-00) - INTRO DUCTIO N OF NEW IG NITION EXCITE R VIN CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
10-6 31045 -3 (P/N 9238 M66 P11), SERVICE BULLE TIN
MOS 01-A PR-2011
07-O CT-20 10 HRS /MSC - 0
ENC 0
SB 74-0 016 R01 NO. 2 ENGINE - IGNITIO N - ELECTRICAL SYS TE M (74-0 0-00) - INTRO DUCTIO N OF NEW IG NITION EXCITE R VIN CATEGORY 7
10-6 31045 -3 (P/N 9238 M66 P11), SERVICE BULLE TIN
MOS
26-JUL-20 11 HRS /MSC -
ENC
SB 75-0 002 NO. 2 ENGINE - AIR - INTRODUCTIO N OF NEW AND REWORKED B-SUMP VENT REGULATOR VALV ES, SE RV ICE
BULLE TIN
MOS
13-JUN-1997 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 313 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 75-0 002 R01 NO. 2 ENGINE - ENGINE - INTRODUCTION OF NE W AND REWORKE D B-SUMP VENT REG ULA TO R VAL VES, S ERVICE
BULLE TIN
MOS
19-FEB -1998 HRS /MSC -
ENC
SB 75-0 002 R02 NO. 2 ENGINE - ENGINE - INTRODUCTION OF NE W AND REWORKE D B-SUMP VENT REG ULA TO R VAL VES, S ERVICE
BULLE TIN
MOS
HRS /MSC -
ENC
SB 75-0 002 R03 NO. 2 ENGINE - ENGINE - INTRODUCTION OF NE W AND REWORKE D B-SUMP VENT REG ULA TO R VAL VES, S ERVICE CATEGORY 3
BULLE TIN
MOS
HRS /MSC -
ENC
SB 75-0 002 R04 NO. 2 ENGINE - INTRODUCTION OF NE W AND REWORKE D B-SUMP VENT REGULA TO R VAL VES, S ERVICE BULLETIN CATEGORY 3 NOT A PPLICA BLE
MOS 01-A PR-2011
28-JUN-2000 HRS /MSC - 0
ENC 0
SB 75-0 003 NO. 2 ENGINE - INTRODUCTION OF AIR TUBE S PACER PN 3049 T28 P01, S ERVICE BULLE TIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
03-DEC-19 98 HRS /MSC - 0
ENC 0
SB 75-0 004 NO. 2 ENGINE - INTRODUCTION OF NE W T2 SENSOR ANIT-ICING A IR TUBE, SERVICE BULLE TIN CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
07-MAR-2 000 HRS /MSC - 0
ENC 0
SB 79-0 005 REV 01 NO. 2 ENGINE - LUBE PUMP FILTER INSERT TQ CHECK, S ERVICE BULLE TIN NOT A PPLICA BLE
MOS 07-JUL-20 14
HRS /MSC - 802 .78
ENC 348
SB 79-0 006 NO. 2 ENGINE - OIL SYSTEM - INTRODUCTION A ND FIELD INSTALL ATION OF IMPROVED STAINLES S STE EL OIL TANK
SUPPO RT BEAMS, SERVICE BULLE TIN
MOS
08-A PR-1997 HRS /MSC -
ENC
SB 79-0 006 R01 NO. 2 ENGINE - OIL SYSTEM - INTRODUCTION A ND FIELD INSTALL ATION OF IMPROVED STAINLES S STE EL OIL TANK
SUPPO RT BEAMS, SERVICE BULLE TIN
MOS
19-FEB -1998 HRS /MSC -
ENC
SB 79-0 006 R02 NO. 2 ENGINE - OIL SYSTEM - INTRODUCTION A ND FIELD INSTALL ATION OF IMPROVED STAINLES S STE EL OIL TANK CATEGORY 3
SUPPO RT BEAMS, SERVICE BULLE TIN
MOS
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 314 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 79-0 006 R03 NO. 2 ENGINE - INTRODUCTION AND FIELD INSTALLA TION O F IMP RO VED S TAINLESS STEE L O IL TANK SUP PORT CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
BEA MS , SERVICE B UL LETIN
MOS 01-A PR-2011
31-MAR-1 999 HRS /MSC - 0
ENC 0
SB 79-0 007 NO. 2 ENGINE - OIL SYSTEM - REPL ACEMENT OF L UB E A ND SCAVENGE PUMP SPUR GE AR, SERVICE B UL LETIN CATEGORY 2
MOS
23-JUN-1997 HRS /MSC -
ENC
SB 79-0 007 R01 NO. 2 ENGINE - REPLA CE ME NT OF LUBE AND S CA VENGE SPUR G EAR, SERVICE BULLETIN CATEGORY 2 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
16-DEC-19 97 HRS /MSC - 0
ENC 0
SB 79-0 008 NO. 2 ENGINE - OIL SYSTEM - INTRODUCTION O F IMP RO VED (NON-COATED) OIL TANK ON FIELDED ENGINES AND CATEGORY 3
NEW P RO DUCTION ENGINES , AND EL IMINATION O F A-SUMP SCAVENGE PUMP ON NEW PRODUCTIO N ENGINES,
SERVICE BULLETIN
MOS
12-JAN-19 98 HRS /MSC -
ENC

SB 79-0 008 R01 NO. 2 ENGINE - INTRODUCTION OF IMPROVE D (NON-COATED) OIL TANK ON FIELDED ENGINES AND NEW CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
PRODUCTION E NG INES, A ND ELIMINATIO N OF A-SUMP S CA VENGE PUMP O N NEW P RO DUCTION ENGINES , SERVICE
BULLE TIN
MOS 01-A PR-2011
10-MAR-1 999 HRS /MSC - 0
ENC 0
SB 79-0 010 NO. 2 ENGINE - INS PECTION OF NON-COATED TANK PN 5122T11G 01, SE RV ICE BULLETIN CATEGORY 3
MOS
17-JUN-1998 HRS /MSC -
ENC
SB 79-0 010 R01 NO. 2 ENGINE - INS PECTION OF NON-COATED O IL TANK P/N 5122 T11 G01, S ERVICE BULLE TIN CATEGORY 3 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
20-A UG -2008 HRS /MSC - 0
ENC 0
SB 79-0 012 R02 NO. 2 ENGINE - OIL - O IL SYS TE M (79- 00-00-) - REDUCED MA STER CHIP DETECTO R INTERV AL, S ERV ICE BULLETIN CATEGORY 2 NOT A PPLICA BLE
MOS 01-A PR-2011
HRS /MSC N/A 0
ENC 0
SB 79-0 012 R03 NO. 2 ENGINE - OIL - O IL SYS TE M (79- 00-00) - REDUCED MA STE R CHIP DETECTOR CHECK INTERVAL , SERVICE CATEGORY 2 NOT A PPLICA BLE - N/A BY SEAL PN INSTALL ED
BULLE TIN ON A6-EL D. INSTALLE D BEA RING IS P/N
504 2T1 3P04
MOS 18-A PR-2015
HRS /MSC -
ENC
SB 79-0 012 R04 NO. 2 ENGINE - OIL - O IL SYS TE M (79- 00-00) - REDUCED MA STE R CHIP DETECTOR CHECK INTERVAL , SERVICE CATEGORY 2 NOT A PPLICA BLE - AS SB 72-00 93 R1 C/W
BULLE TIN
MOS 27-JUL-20 15
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 315 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 79-0 014 NO. 2 ENGINE - OIL - S ERVICE EVA LUATION FO R LUBE AND SCAV ENGE PUMP AS SEMBLY, SERVICE BULL ETIN CATEGORY 7
MOS
04-O CT-20 01 HRS /MSC -
ENC
SB 79-0 016 NO. 2 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - INTRODUCTION O F IMP RO VED L UB E A ND CATEGORY 3 NOT A PPLICA BLE
SCAVE NG E P UMP ASS EMBLY PN 6 087T04P0 6, SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 79-0 018 NO. 2 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - C-SUMP SCAVENGE SCREENLES SFITTINGS - CATEGORY 5
FIE LD REWORK PROGRAM, SERVICE BULLETIN
MOS
22-JAN-20 04 HRS /MSC -
ENC
SB 79-0 018 R01 NO. 2 ENGINE - C-SUMP S CA VENGE SCREENLESS FITTINGS -FIELD REWORK P RO GRAM, SERVICE B UL LETIN CATEGORY 5
MOS
21-O CT-20 04 HRS /MSC -
ENC
SB 79-0 018 R02 NO. 2 ENGINE - C-SUMP S CA VENGE SCREENLESS FITTINGS - FIEL D REWORK PROGRAM - EFF SN 8 72004 THRU CATEGORY 5
873 999 & 950000 THRU 9500 67, SE RVICE BULLETIN
MOS
HRS /MSC N/A
ENC
SB 79-0 018 R03 NO. 2 ENGINE - C-SUMP S CA VENGE SCREENLESS FITTINGS - FIELD REWORK PROGRAM, S ERVICE BULLE TIN CATEGORY 5 COMPLIED WITH - A T MANUFACTURE
MOS 01-A PR-2011
25-JAN-20 08 HRS /MSC - 0
ENC 0
SB 79-0 019 NO. 2 ENGINE - ENGINE - GE NE RAL - SPA RE PA RTS RELEAS E FOR CF34 -1A/-3A/-3A1 /-3A 2/- 3B TURBOFAN E NG INES, CATEGORY 8
SERVICE BULLETIN
MOS
03-JAN-20 06 HRS /MSC -
ENC
SB 79-0 020 NO. 2 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - INTRODUCTION O F REWORKED LUB E AND CATEGORY 5 NOT A PPLICA BLE
SCAVE NG E P UMP ASS EMBLY PN 6 087T04P0 9 - , SERVICE B ULL ETIN
MOS 01-A PR-2011
27-A PR-2006 HRS /MSC - 0
ENC 0
SB 79-0 021 NO. 2 ENGINE - INTRODUCTION OF A AND B SUMP SUPP LY TUBE ASS EMBLIES PN 41 59T69P0 1, PN 4 159T69P 02, AND CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
HEAT E XCHA NG ER TUBE PN 40 96T90G03 , SERVICE B UL LETIN
MOS 01-A PR-2011
11-JUL-20 06 HRS /MSC - 0
ENC 0
SB 79-0 024 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
07-S EP-20 07 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 316 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 79-0 024 R01 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
09-JUL-20 10 HRS /MSC -
ENC
SB 79-0 024 R02 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
12-DEC-20 11 HRS /MSC -
ENC
SB 79-0 024 R03 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
08-MAY -2012 HRS /MSC -
ENC
SB 79-0 024 R04 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9 NOT A PPLICA BLE - INFORMA TIONAL ONLY
MOS 26-NOV -2014
26-NOV -2014 HRS /MSC -
ENC
SB 79-0 024 R05 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9 - INFO RMATION ONLY
MOS 08-NOV -2015
13-O CT-20 15 HRS /MSC -
ENC
SB 79-0 024 R06 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
16-MAR-2 020 HRS /MSC -
ENC
SB 79-0 025 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
07-S EP-20 07 HRS /MSC -
ENC
SB 79-0 025 R01 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
09-JUL-20 10 HRS /MSC -
ENC
SB 79-0 025 R2 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
HRS /MSC -
ENC
SB 79-0 025 R3 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9
MOS
HRS /MSC -
ENC
SB 79-0 025 R4 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9 NOT A PPLICA BLE - BY ENGINE MODEL - MSN
MOS 18-A PR-2015
HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 317 Of 318
© Camp Systems
AD/SI Status Report AIRCRAFT
CL-605 S/N 5866 (AP-HKD): 2250.8HRS, 1507 AFL as of 17-Jun-2022 All Bulletins
Report Date: 24-Jun-2022

Task No. Description Unit Interval Compliance Next Due Disposition MOC

SB 79-0 025 R5 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - A PPROVED OILS, SE RV ICE BULLETIN CATEGORY 9 NOT A PPLICA BLE - BY ENGINE MODEL
MOS 11-NOV -2015
HRS /MSC -
ENC
SB 79-0 026 NO. 2 ENGINE - RECALL OF THE LUBE AND SCAVE NG E P UMP ASS EMBLY P/N 608 7T0 4P10 FOR CF34-3B ENGINES, CATEGORY 2
SERVICE BULLETIN
MOS
HRS /MSC -
ENC
SB 79-0 026 R01 NO. 2 ENGINE - RECALL OF THE LUBE AND SCAVE NG E P UMP ASS EMBLY P/N 608 7T0 4P10 FOR CF34-3B ENGINES, CATEGORY 2 NOT A PPLICA BLE
SERVICE BULLETIN
MOS 01-A PR-2011
HRS /MSC - 0
ENC 0
SB 79-0 027 NO. 2 ENGINE - OIL - O IL SYS TE M (79- 00-00) - INTRODUCTIO N OF HTS OIL COMPA TIBLE PREFORMED PA CK INGS, CATEGORY 7 COMPLIED WITH - A T MANUFACTURE
SERVICE BULLETIN
MOS 01-A PR-2011
08-JAN-20 09 HRS /MSC - 0
ENC 0
SB 79-0 028 NO. 2 ENGINE - OIL - O IL SYS TE M (79- 00-00) - INTRODUCTIO N OF IMPROVED OIL FILTER BY PASS SE NS OR P/N CATEGORY 6 COMPLIED WITH - A T MANUFACTURE
406 0T6 4P04, SERVICE BULL ETIN
MOS 01-A PR-2011
29-JUN-2010 HRS /MSC - 0
ENC 0
SB 79-0 031 NO. 2 ENGINE - OIL SYSTEM - HEAT EXCHANGER A ND OIL S UP PLY LINE S (7 9-00-0 0) - INSPECTIO N AND REPLA CE ME NT CATEGORY 2 NOT A PPLICA BLE - THIS S B IS NA B Y ENG INE
OF THE HEAT EX CHANGE R, SERVICE BULLE TIN AND HEAT EXCHANGER S N: INSTALLE D SN'S
ARE ENG 2: SCKB3 615
MOS 18-A PR-2015
03-FEB -2015 HRS /MSC -
ENC

SB 79-0 032 NO. 2 ENGINE - OIL - G ENERAL (79-00 -00) - S PARE PARTS RELE ASE FOR CF34-BJ ENGINES , SERVICE B UL LETIN CATEGORY 8 COMPLIED WITH - INFO RMATIONAL ONLY: O IL -
GENERAL (79 -00-00 ) - SPA RE PA RTS RELEA SE
FOR
CF3 4-BJ E NG INES (SB IDE NTIFIES NEW S PARE
PARTS THAT ARE INTE RCHANGEA BLE WITH
THE O LD PARTS THEY REPL ACE.)
MOS 23-JUL-20 20
21-JUL-20 20 HRS /MSC -
ENC

SB 79-0 033 NO. 2 ENGINE - OIL - L UB E A ND SCAVENGE COMPONENTS (79-00- 00) - INTRODUCTION O F NEW S UMP DRA IN CATEGORY 7
TUB E-HOSE P/N 28 34M14P01 AND RE DUCER E LBOW P/N 4085T91 P02, S ERVICE BULLETIN
MOS
28-O CT-20 19 HRS /MSC -
ENC

?-Insufficient Inform ation +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estim ated Due (New Requirem ent) (EFF)-Effective C/W
(EBT)-Estim ated Base Tim e 318 Of 318
© Camp Systems
CL-605 S/N 5866 AP-HKD
OWNER: PRINCELY JETS (PVT.) LTD. OPERATOR: PRINCELY JETS (PVT.) LTD. OPERATOR: PRINCELY JETS
ADDRESS: ATTN: TAHA ANSARI ADDRESS: ATTN: TAHA ANSARI ADDRESS: NO. 10, 3RD FLOOR
KARACHI SINDH KARACHI SINDH KARACHI 75520
PHONE: 030 0-2001127 (MOBILE) PHONE: 030 0-2001127 (MOBILE) PHONE: 011-92-21 -521-54 88
FAX: FAX: FAX: 011-92-21 -521-03 60

ANALYS T: SANDRA PINILLA +1-514-63 6-7423 (OFFICE) 800-787-9 749 (EFAX-CARDS)


EMAIL: SPINILLA@CAMPSYSTEMS.COM 514-636-2020 (OFFICE) 631-980-4 222 (EFAX-CARDS)
WWW.CAMPSYSTEMS.COM

AIRCRAFT SERIAL/REGNO: 5866/AP-HKD MODEL: CL-605 MANUFACTURER: BOMBARDIER AVIATION


DATES LAST ACTUALS
CERTIFICATION DATE: 01-APR-2011 2250.8 A/C HRS as of 17-JUN-20 22
INSERVICE DATE: 17-APR-2012
MANUFACTURER DATE: 25-MAR-20 11 1507 AFL as of 17-JUN-20 22

APU SERIAL/PART: P-3 10/38 00804-1 MODEL: GTCP 36-15 0 (CL) MANUFACTURER: HONEYWELL
INSTALLED ON 26-APR-2 017 LAST ACTUALS
2109 APU HRS 3596 APU HRS as of 31-MAY-2022

0 APUS 0 APUS as of 31-MAY-2022

ENGINE NO. 1 SERIAL/PART: 950967/6089T11G01 MODEL: CF-34-3B (CIMMS) MANUFACTURER: GENERAL ELECTRIC
INSTALLED ON 28-FEB-20 11 LAST ACTUALS
0 ENG. HRS 0 A/C HRS 2250.8 ENG. HRS as of 17-JUN-20 22

0 ENC 1518 ENC as of 17-JUN-20 22

ENGINE NO. 2 SERIAL/PART: 950968/6089T11G01 MODEL: CF-34-3B (CIMMS) MANUFACTURER: GENERAL ELECTRIC
INSTALLED ON 28-FEB-20 11 LAST ACTUALS
0 ENG. HRS 0 A/C HRS 2250.8 ENG. HRS as of 17-JUN-20 22

0 ENC 1517 ENC as of 17-JUN-20 22

BOM BARDIER AND CHALLENGER ARE TRADEMARKS OF BOMBARDIER, INC.

Updates Report © CAMP SYSTEMS 1 Of 18


Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR

AIRCRAFT Serial #: 5866 Reg #: AP-HKD


05H0100 100 HOUR CHEC K Processed By: PRINCELY JETS EN GINEERING

C/W WARR TRA NS ACTION DATE: 13-JUN-2022 06:06:21


MOS 10-JUN-2022 REASO N: - - MOS
HRS 224 5.5 0 TECH: HRS
AFL 150 5 INS P: LAB OR HRS: 0 COST: $0.00 AFL
34-00-CUS-9003 UPDATE 1 & 2 FMS AND IFIS E-MA P WITH LATEST DATABASE Processed By: PRINCELY JETS EN GINEERING

C/W WARR TRA NS ACTION DATE: 20-JUN-2022 10:02:09


DAYS 17-JUN-2022 REASO N: - - DAYS
HRS 225 0.8 0 TECH: HRS
AFL 150 7 INS P: LAB OR HRS: 0 COST: AFL
34-00-CUS-9002 UPDATE JEPPESEN PROLIN E 21 ELECTRONIC CHARTS IN FSU WITH LA TEST CYC LE Processed By: PRINCELY JETS EN GINEERING

C/W WARR TRA NS ACTION DATE: 20-JUN-2022 10:13:07


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 0 TECH: HRS
AFL 150 5 INS P: LAB OR HRS: 0 COST: AFL
05H0400 400 HOUR CHEC K Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:58:47


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 AFL

27-60-00-201 LUBRICATION FLIGHT SPOILER FLEXSHAFT & C ON TR OL C ABLE END S Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:58:53


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

32-00-01-204 LUBRICATION MAIN LAN DING GEA R (MLG) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:58:57


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

32-00-01-205 LUBRICATION NOSE LA NDING GEAR (NLG) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:01


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

32-00-01-206 LUBRICATION MAIN LAN DING GEA R (MLG) DOORS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:05


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

© CAMP SYSTEMS 2 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
32-00-01-207 LUBRICATION NOSE LA NDING GEAR (NLG) DOORS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:09


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

32-50-00-201 OPERATIONAL TEST NOSEWHEEL STEER ING SELECTOR AND A RMIN G VALVE Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:13


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

44-21-65-601 OPERATIONAL TEST OF THE PASSENGER NOTIFICATION SYSTEM Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:17


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

52-10-00-202 LUBRICATION PASSENGER D OOR (EXTERNA L) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:21


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

05H0800 800 HOUR CHEC K Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:00:23


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 AFL

21-20-00-201 OPERATIONA L TEST PRESSURE-BULKHEAD CHEC K VALVES Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:00:28


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

21-51-00-301 CLEAN WATER SEPARATOR Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:00:32


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-10-00-204 OPERATIONA L TEST AILERON ANTIFLOAT MECH ANISM. Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:00:37


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

© CAMP SYSTEMS 3 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
27-13-04-101 OPERATIONAL TEST ROLL DISCONNEC T SYSTEM (C MR*/MRB ) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:00:42


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-14-01-101 FUNCTIONAL TEST AILERON POWER CONTROL UNITS (PCUS). (CMR**) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:00:47


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-15-07-101 DETAILED INSPECTION NO. 2 AILERON FLIGHT CONTROLS DAMPER (CMR**) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:00:51


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-15-07-101 DETAILED INSPECTION NO. 1 AILERON FLIGHT CONTROLS DAMPER (CMR**) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:00:55


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-21-00-101 FUNCTION AL TEST RUDD ER BACKLASH (CMR**) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:00


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-32-00-101 OPERATIONAL TEST ELEVATOR DISC ON NEC T SYSTEM (CMR*) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:06


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-33-01-101 FUNCTIONAL TEST ELEVA TOR BACKLA SH (C MR*) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:11


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-34-04-102 DETAILED INSPECTION LIB ELEVATOR FLUTTER DA MPERS (CMR**) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:15


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

© CAMP SYSTEMS 4 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
27-34-04-102 DETAILED INSPECTION RIB ELEVA TOR FLUTTER D AMPER S (CMR**) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:20


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-34-04-102 DETAILED INSPECTION ROB ELEVATOR FLUTTER DAMPERS (CMR **) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:24


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-34-04-102 DETAILED INSPECTION LOB ELEVATOR FLUTTER DAMPERS (CMR**) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:28


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-35-00-201 OPERATIONAL TEST SIN GLE CHA NNEL OF STALL PROTECTION COMPUTER Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:33


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-35-00-202 OPERATIONAL TEST DUAL C HANNEL OF STALL PROTEC TION COMPUTER Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:37


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-40-00-205 OPERATIONA L TEST PITC H TRIM SWITCH Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:42


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-40-00-206 OPERATIONAL TEST HORIZONTAL STABILIZER TRIM SYSTEM Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:46


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-50-00-207 VISUAL CHECK INBOA RD AN D OUTBOARD FLAP AC TU ATORS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:51


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

© CAMP SYSTEMS 5 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
32-00-01-201 FUNCTIONAL TEST LANDING-GEAR EMERGENC Y-EXTENSION SYSTEM Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:01:56


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

32-40-00-201 FUNCTION AL TEST BRAK E A CCUMU LATORS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:02:00


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

32-40-00-204 LUBRICATION MAIN LANDING GEA R (MLG) BRAK E CONTR OL VALVE ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:02:04


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

71-61-00-202 LUBRICATION BA LLSCREW ACTUATORS SUPPORT BUSHINGS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:02:09


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

78-30-00-202 LUBRICATION THRU ST-REVERSER B ALLSCR EW ACTUA TORS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:02:36


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

05H2400 2400 HOU R CHECK Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:17:01


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 AFL

21-30-00-205 OPERATIONA L TEST EMERGENCY DEPRESS SWITC H/LIGHT Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:17:07


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

21-33-01-101 OPERATIONAL TEST CABIN PRESSUR E AC QU ISITION MODULE (CMR **) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:17:11


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

© CAMP SYSTEMS 6 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
21-50-00-201 OPERATIONA L TEST RAM-AIR SHUTOFF VALVE Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:17:16


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

24-20-00-201 DISCARD RH IDG CHARGE (OIL-IN ) FILTER ELEMEN T Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:17:21


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

24-20-00-201 DISCARD LH IDG CH ARGE (OIL-IN) FILTER ELEMENT Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:17:25


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

24-20-00-202 DISCARD RH IDG SCAVENGE (OIL-OUT) FILTER ELEMEN T Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:17:31


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

24-20-00-202 DISCARD LH IDG SCAVEN GE (OIL-OUT) FILTER ELEMENT Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:17:37


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

26-20-00-204 FUNCTIONAL TEST EN GINE FIRE SHUTOFF-RELA Y CIRCUITRY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:17:47


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-50-00-202 DETAILED INSPECTION LH N O.4 FLEXIBLE DRIVE SHA FT ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:17:55


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-50-00-202 DETAILED INSPECTION RH NO.3 FLEXIB LE DR IVE SHAFT ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:18:03


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

© CAMP SYSTEMS 7 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
27-50-00-202 DETAILED INSPECTION RH NO.1 FLEXIB LE DR IVE SHAFT ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:18:11


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-50-00-202 DETAILED INSPECTION RH NO.2 FLEXIB LE DR IVE SHAFT ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:18:20


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-50-00-202 DETAILED INSPECTION LH N O.2 FLEXIBLE DRIVE SHA FT ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:18:31


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-50-00-202 DETAILED INSPECTION RH NO.4 FLEXIB LE DR IVE SHAFT ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:18:46


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-50-00-202 DETAILED INSPECTION LH N O.5 FLEXIBLE DRIVE SHA FT ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:19:02


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-50-00-202 DETAILED INSPECTION RH NO.5 FLEXIB LE DR IVE SHAFT ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:19:19


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-50-00-202 DETAILED INSPECTION LH N O.3 FLEXIBLE DRIVE SHA FT ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:19:39


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

27-50-00-202 DETAILED INSPECTION LH N O.1 FLEXIBLE DRIVE SHA FT ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:19:51


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

© CAMP SYSTEMS 8 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
27-50-00-208 FUNCTIONAL TEST INBOAR D AND OU TBOARD FLAP ACTUA TORS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:02


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

28-24-00-101 OPERATIONAL TEST AUXILIARY POWER UNIT (APU) FUEL FEED SHUTOFF-VALVE A ND NEGATIVE-G Processed By: CAMP
SHUTOFF-VALVE FOR IN TERNA L LEAK S (CMR*)
C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:06
MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL
30-10-00-201 FUNCTIONAL TEST SENSOR DETECTION C IRCUIT Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:11


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

31-41-00-203 OPERATIONAL TEST ELECTRONIC FLIGHT INSTR UMENT SYSTEM (EFIS) Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:16


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

52-10-00-201 FUNCTIONAL TEST PA SSENGER-DOOR LATCH MEC HANISM Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:19


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

71-13-00-201 DETAILED INSPECTION THRU ST REVERSER SLID ER B LOC KS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:23


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

71-12-00-202 DETAILED INSPECTION CORE BLOW-OUT DOOR S Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:27


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

78-30-00-203 LUBRICATION THRU ST-REVERSER FLEXSHAFTS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:53


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

© CAMP SYSTEMS 9 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
78-30-00-204 DETAILED INSPECTION FLEXSHAFT DRIVE Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:58


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

34-00-CUS-9001 UPDATE LOAD MK V EGPWS TERR AIN DA TABASE Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 04:24:16


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

26-22-04-900-801-01 APU FIRE EXTINGUISHER BOTTLE Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:01:43 Off: 472 428-2 267 0T
MOS 13-JUN-2022 REASO N: U - UNKNO WN On: 472 428-2 369 3T MOS
HRS 224 5.8 3 TECH: 27CS EJME HRS
AFL 150 5 INS P: LAB OR HRS: 0 COST: $0.00 AFL
26-20-00-209 DETAILED INSPECTION OF THE AUXILIARY POWER UNIT (A PU) FIRE-EXTINGUISHER CONTAIN ER Processed By: CAMP
(MRB)
C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:01:49
MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL
30-40-00-301 DETAILED INSPECTION OF THE WINDSHIELD /SID E WIND OW AERODYNAMIC SEAL. Processed By: CAMP
NOTE: WHIC HEVER INTERVA L COMES FIR ST
C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:01:53
MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL
35-11-07-900-801-03 3RD CREW MEMBER OXYGEN REGULA TOR MASK ASSEMB LY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:02:00 Off: MC10-13-0 3 SE5 37781
MOS 13-JUN-2022 REASO N: A - TIME E XPIRE D On: MC10-13-0 3 B09 2420 MOS
HRS 224 5.8 3 TECH: 27CS EJME HRS
AFL 150 5 INS P: LAB OR HRS: 0 COST: $0.00 AFL
35-00-00-206 RESTORATION 3RD C REW MEMBER OXYGEN REGULATOR MASK ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:02:05


MOS 19-MAY -2016 REASO N: - - MOS
HRS TECH: HRS
AFL INS P: LAB OR HRS: 0 COST: AFL
35-00-00-206 RESTORATION 3RD C REW MEMBER OXYGEN REGULATOR MASK ASSEMBLY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:02:06


MOS 13-JUN-2022 REASO N: - - MOS
HRS TECH: HRS
AFL INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

© CAMP SYSTEMS 10 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
30-12-00-102 FUNCTIONAL TEST OF THE LOW TEMPERA TU RE GR OU ND WING ANTI-IC E (LTGWA IS) OVERHEAT Processed By: CAMP
CIRCUIT - (POST SB 605-30-001) (C MR**)

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:02:09


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL
26-14-51-900-801-01 BAGGAGE BAY SMOKE D ETECTOR Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:22:56 Off: 473 597-2 115 6
MOS 13-JUN-2022 REASO N: B - FAILURE On: 473 597-2 SHA04 32 MOS
HRS 224 5.8 3 TECH: 27CS EJME HRS
AFL 150 5 INS P: LAB OR HRS: 0 COST: $0.00 AFL
26-14-51-900-802-01 LAVATORY SMOKE DETEC TOR Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:23:01 Off: 473 597-2 116 2
MOS 13-JUN-2022 REASO N: B - FAILURE On: 473 597-2 SHA04 79 MOS
HRS 224 5.8 3 TECH: 27CS EJME HRS
AFL 150 5 INS P: LAB OR HRS: 0 COST: $0.00 AFL
605-32-007 PART A ACCOMPLISH SPECIAL CHECK - MAIN LANDING GEAR - LU BRICA TION AND INSPEC TION OF LH/RH Processed By: CAMP
MAIN LANDING GEAR (MLG) SHOCK STRU T LOWER PIN 19146-3, SERVICE BULLETIN LUBRIC ATION
OF LH/RH MLG SHOCK STRUT LOWER PIN

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:23:05


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 AFL
CW METHOD: COMPLIED WITH
FAA 2021-20-13 PARA (G) LH REPETITIVE LUBRICATION LH MLG SHOCK STRUT LOWER PINS PN 19146-3 Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:23:08


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL
CW METHOD: COMPLIED WITH
FAA 2021-20-13 PARA (G) RH REPETITIVE LUBRIC ATION RH MLG SH OC K STR UT LOWER PINS PN 19146-3 Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:23:11


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL
CW METHOD: COMPLIED WITH
21-51-34-900-801-01 LH PRESSURE REGULA TING VA LVE Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 06:20:16 Off: 321 3876-1 2 277 7
MOS 13-JUN-2022 REASO N: U - UNKNO WN On: 604 -97602 -1 307 6 MOS 0
HRS 224 5.8 3 TECH: 46CS EJME HRS 0
AFL 150 5 INS P: LAB OR HRS: 0 COST: $0.00 AFL 0

© CAMP SYSTEMS 11 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
31-31-04-900-801-01 FDR TR IAXIAL ACCELER OMETER Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 06:20:22 Off: 300 1-01-1 11 091 8-DT94 77K
MOS 13-JUN-2022 REASO N: B - FAILURE On: 300 1-01-1 11 052 2-DT83 45U MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: BSUK 47 CS LAB OR HRS: 0 COST: $0.00 AFL

31-52-01-900-801-01 LAMP DRIVER UN IT Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 06:20:27 Off: 622 -9822- 001 28G 5K
MOS 13-JUN-2022 REASO N: B - FAILURE On: 622 -9822- 001 667 MOS
HRS 224 5.8 3 TECH: 10CS EJME HRS
AFL 150 5 INS P: LAB OR HRS: 0 COST: $0.00 AFL
32-40-00-202 SPECIAL DETAILED INSPECTION R OB MLG WHEEL Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 06:20:33


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

32-40-00-206 DETAILED INSPECTION ROB MLG WHEEL Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 06:20:37


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: 12P L E JME LAB OR HRS: 0 COST: AFL

32-41-01-900-802-04 ROB MLG TIRE Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 06:20:42 Off: 027 -697-0 836 3R0 0134
MOS 13-JUN-2022 REASO N: U - UNKNO WN On: 027 -697-0 131 9P051 01 MOS 0
HRS 224 5.8 3 TECH: MNG 3 986 HRS 0
AFL 150 5 INS P: MNG 3 986 LAB OR HRS: 0 COST: $0.00 AFL 0

34-12-01-900-801-01 INTEGRATED STAN DBY INSTRUMENT Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 06:20:49 Off: C16786 MA 01 C16786 00792 8
MOS 13-JUN-2022 REASO N: U - UNKNO WN On: C16786 MA 01 C16786 03579 9 MOS
HRS 224 5.8 3 TECH: HRS
AFL 150 5 INS P: BSUK 47 CS LAB OR HRS: 0 COST: $0.00 AFL

605-27-010 PART A ACCOMPLISH, SERVICE BULLETIN SPECIAL CHECK - TEMPOR ARY PERIODIC TESTING OF THE Processed By: CAMP
RUDDER PCU LOA D LIMITERS
C/W WARR TRA NS ACTION DATE:
MOS REASO N: - - MOS
HRS TECH: HRS
AFL INS P: LAB OR HRS: 0 COST: $0.00 AFL
CW METHOD:

© CAMP SYSTEMS 12 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
605-27-010 PART B ACCOMPLISH, SERVICE BULLETIN SPECIAL CHECK - ONE-TIME VISUAL IN SPEC TION OF THE Processed By: CAMP
RUDDER PCU LOAD LIMITERS AND REPLACE THE LOA D LIMITER (IF TH E NU T AND END C AP OF
THE RUDDER PCU LOAD LIMITER IS NOT CRIMPED PROPERLY)

C/W WARR TRA NS ACTION DATE:


MOS REASO N: - - MOS
HRS /MSC TECH: HRS /MSC
AFL INS P: LAB OR HRS: 0 COST: $0.00 AFL
CW METHOD:
605-27-010 PART C ACCOMPLISH SPECIAL CHECK/MODIFICATION - RU DDER CONTROL SYSTEM - INSPECTION OF Processed By: CAMP
RUDDER LOAD LIMITER, SERVIC E B ULLETIN MODIFICA TION - REPLACEMENT OF THE RUDDER PCU
LOAD LIMITER (S)

C/W WARR TRA NS ACTION DATE:


MOS REASO N: - - MOS
HRS TECH: HRS
AFL INS P: LAB OR HRS: 0 COST: $0.00 AFL
CW METHOD:

ENGINE NO. 1 Serial #: 950967 Part #: 6089T11G01


72-00-GE-9007 NO. 1 ENGINE - VISUAL INSPECTION OF THE OVERBOARD DRAIN OF THE ENGINE COMBUSTOR OR Processed By: CAMP
EVIDENCE OF LEA KAGE.
C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:32
MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC
72-00-GE-9009 NO. 1 ENGINE - VISUAL CHECK U NDER COWL - FOR SECURITY OF TUBING, HOSES, AND Processed By: CAMP
ELECTRIC AL CONNECTORS.
C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:36
MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC
72-00-GE-9010 NO. 1 ENGINE - VISUAL CHECK U NDER COWL - FOR FU EL OR OIL LEAKS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:45


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC

72-00-GE-9011 NO. 1 ENGINE - VISUAL CHECK U NDER COWL - STRUC TU RAL INTEGRITY OF ENGINE CASES AN D Processed By: CAMP
FLANGES (INCLUDING LOOSE, MISSING, OR B ROKEN ATTACHIN G H ARDWARE).

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:58


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC

© CAMP SYSTEMS 13 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
72-00-GE-9012 NO. 1 ENGINE - VISUAL CHECK UNDER COWL - ENGINE VARIAB LE GEOMETRY SYSTEM FOR Processed By: CAMP
DAMAGED, MISSING, OR LOOSE PA RTS, AND THA T THE R OD -END B EAR INGS A RE SEATED
CORRECTLY.

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:00:08


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC
72-00-GE-9013 NO. 1 ENGINE - VISUAL INSPECTION THE INTEGRITY OF ENGINE MOU NT SYSTEM (INCLUDIN G FA N Processed By: CAMP
STATOR FORWARD ENGINE MOUNT, FA N CASING, THR UST MOUNT ASSEMBLY, AN D THE REAR
MAIN MOUNT).

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:00:19


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC
72-00-GE-9022 NO. 1 ENGINE - VISUAL CHECK OF THE ENGINE OIL FILTER B YPASS IN DICATOR. Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:02:14


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC

72-30-00-205 NO. 1 ENGINE - LUBRICATION VARIABLE GEOMETRY LINKAGE ROD EN D BEARINGS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:02:31


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

72-20-00-207 NO. 1 ENGINE - DETAILED INSPECTION ENGINE MA STER CHIP DETEC TOR INDIC ATOR Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:16:56


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

72-50-00-208 NO. 1 ENGINE - VISUAL CHECK EXH AUST CEN TERBODY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:32


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

73-10-00-204 NO. 1 ENGINE - DETAILED INSPECTION ENGINE FUEL MAN IFOLD Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:50


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

© CAMP SYSTEMS 14 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
12-10-00-201 NO. 1 ENGINE - SER VICE THE ENGINE OIL TA NK Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 04:24:07


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

72-00-GE-9001 NO. 1 ENGINE - DOWNLOAD OF BOTH ENGINES FOR TREN D MONITORING - E-MA IL TO Processed By: CAMP
GEAEREMOTESERVICES@AE.GE.C OM - NOTE: CL5866 - RESET MDC D ATA: DISK OPS, PRESS: SKP,
CHKLST, UP, SEL, DWN & THEN CONFIR M RESET

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 04:24:19


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC
72-20-00-201 NO. 1 ENGINE - GENER AL VISUAL INSPEC TION OF FAN BLAD ES Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 04:24:26


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

72-20-00-202 NO. 1 ENGINE - GENER AL VISUAL INSPEC TION FAN SPINNER Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 04:24:37


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

72-20-00-210 NO. 1 ENGINE - GENER AL VISUAL INSPEC TION FAN SHROUD CORE MATERIAL Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 04:24:41


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

72-40-00-205 NO. 1 ENGINE - GENER AL VISUAL INSPEC TION THERMAL B LANKET Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:02:14


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 6 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

ENGINE NO. 2 Serial #: 950968 Part #: 6089T11G01


72-00-GE-9007 NO. 2 ENGINE - VISUAL INSPECTION OF THE OVERBOARD DRAIN OF THE ENGINE COMBUSTOR OR Processed By: CAMP
EVIDENCE OF LEA KAGE.

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:26


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC

© CAMP SYSTEMS 15 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
72-00-GE-9009 NO. 2 ENGINE - VISUAL CHECK U NDER COWL - FOR SECURITY OF TUBING, HOSES, AND Processed By: CAMP
ELECTRIC AL CONNECTORS.
C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:40
MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC
72-00-GE-9010 NO. 2 ENGINE - VISUAL CHECK U NDER COWL - FOR FU EL OR OIL LEAKS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:49


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC

72-00-GE-9011 NO. 2 ENGINE - VISUAL CHECK U NDER COWL - STRUC TU RAL INTEGRITY OF ENGINE CASES AN D Processed By: CAMP
FLANGES (INCLUDING LOOSE, MISSING, OR B ROKEN ATTACHIN G H ARDWARE).
C/W WARR TRA NS ACTION DATE: 23-JUN-2022 02:59:53
MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC
72-00-GE-9012 NO. 2 ENGINE - VISUAL CHECK UNDER COWL - ENGINE VARIAB LE GEOMETRY SYSTEM FOR Processed By: CAMP
DAMAGED, MISSING, OR LOOSE PA RTS, AND THA T THE R OD -END B EAR INGS A RE SEATED
CORRECTLY.

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:00:03


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC
72-00-GE-9013 NO. 2 ENGINE - VISUAL INSPECTION THE INTEGRITY OF ENGINE MOU NT SYSTEM (INCLUDIN G FA N Processed By: CAMP
STATOR FORWARD ENGINE MOUNT, FA N CASING, THR UST MOUNT ASSEMBLY, AN D THE REAR
MAIN MOUNT).

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:00:14


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC
72-00-GE-9022 NO. 2 ENGINE - VISUAL CHECK OF THE ENGINE OIL FILTER B YPASS IN DICATOR. Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:02:20


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC

72-30-00-205 NO. 2 ENGINE - LUBRICATION VARIABLE GEOMETRY LINKAGE ROD EN D BEARINGS Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:02:26


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

© CAMP SYSTEMS 16 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
72-20-00-207 NO. 2 ENGINE - DETAILED INSPECTION ENGINE MA STER CHIP DETEC TOR INDIC ATOR Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:16:49


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

72-50-00-208 NO. 2 ENGINE - VISUAL CHECK EXH AUST CEN TERBODY Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:38


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

73-10-00-204 NO. 2 ENGINE - DETAILED INSPECTION ENGINE FUEL MAN IFOLD Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 03:20:46


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

12-10-00-201 NO. 2 ENGINE - SER VICE THE ENGINE OIL TA NK Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 04:24:12


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

72-00-GE-9001 NO. 2 ENGINE - DOWNLOAD OF BOTH ENGINES FOR TREN D MONITORING - E-MA IL TO Processed By: CAMP
GEAEREMOTESERVICES@AE.GE.C OM - NOTE: CL5866 - RESET MDC D ATA: DISK OPS, PRESS: SKP,
CHKLST, UP, SEL, DWN & THEN CONFIR M RESET

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 04:24:22


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: ENC
72-20-00-202 NO. 2 ENGINE - GENER AL VISUAL INSPEC TION FAN SPINNER Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 04:24:29


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

72-20-00-201 NO. 2 ENGINE - GENER AL VISUAL INSPEC TION OF FAN BLAD ES Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 04:24:33


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

72-20-00-210 NO. 2 ENGINE - GENER AL VISUAL INSPEC TION FAN SHROUD CORE MATERIAL Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 04:24:44


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

© CAMP SYSTEMS 17 Of 18
Maintenance Transactions Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 24-MAY-2022 to 24-JUN-2022

Owner/Operator: PRINCELY JETS ( PVT.) LTD. Report Date: 24-JUN-2022

TASK NO TASK DESCR IPTION COMPONENT INFORMA TION COMPONENT TIME AT INSTALLATION
PART NUMBER SERIA L NUMB ER TSN TSO TSR
72-40-00-205 NO. 2 ENGINE - GENER AL VISUAL INSPEC TION THERMAL B LANKET Processed By: CAMP

C/W WARR TRA NS ACTION DATE: 23-JUN-2022 05:02:18


MOS 13-JUN-2022 REASO N: - - MOS
HRS 224 5.8 3 TECH: HRS
ENC 151 5 INS P: 12P L E JME LAB OR HRS: 0 COST: $0.00 ENC

© CAMP SYSTEMS 18 Of 18
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 1 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 05-TIME LIMITS/MAINTENANCE CHECKS
05-0 0-CUS -9004 RENEWAL INSURANCE CERTIFICA TE
MOS 08-S EP-20 21 TECH : INS P :
HRS 219 2.3 8 LABOR HRS : ICAO:
AFL 147 4 SERVICE RE MARKS --
05-0 0-CUS -9005 RENEWAL C OF A
MOS 06-A PR-2022 TECH : AMINULLA H MENGAL INS P : AMINULLA H MENGAL
HRS 221 2.1 7 LABOR HRS : ICAO:
AFL 149 0 SERVICE RE MARKS --
MOS 18-A UG -2021 TECH : INS P :
HRS - LABOR HRS : ICAO:
SCHEDUL ED AFL 0 SERVICE RE MARKS --
05H010 0 100 HOUR CHECK
MOS 10-JUN-2022 TECH : INS P :
HRS 224 5.5 0 LABOR HRS : ICAO:
AFL 150 5 0 SERVICE RE MARKS --
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
05H040 0 400 HOUR CHECK
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 0 SERVICE RE MARKS --
05H080 0 800 HOUR CHECK
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 0 SERVICE RE MARKS --
05H240 0 240 0 HOUR CHECK
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 0 SERVICE RE MARKS --
05M00 6 6 MONTH CHECK
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --
MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
05M01 2 12 MONTH CHECK
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
05M02 4 24 MONTH CHECK
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 2 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
FAA 2021- 13-12 TIME LIMITS/MA INTENANCE CHECK - MAINTENANCE / INSPE CTION P LAN - RE VIS E
DAYS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


CHAPTER 08-LEVELING AND WEIGHING
08-1 0-CUS -9001 WEIGHT AND BA LANCE - AIRCRAFT RE-WEIGH
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHA EL SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
CHAPTER 11-PLACARDS AND MARKINGS
11-3 0-65-6 01 GENERAL VISUAL INS PECTION OF THE CAB IN P LACARDS - INTERNAL
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
11-CUS-00 1 INS PECT ADHESIVE DECAL TYP E REG ISTRATIO N FOR P RE SENCE AND LEGIBILITY PER SA N MARINO REGISTRA TION REQ UIREMENTS CAA CAP 08 APP 3 (25).
MOS 18-MAR-2 022 TECH : CRS 4W5R53 6D INS P : PCD 3
HRS 219 5.7 0 LABOR HRS : ICAO:
AFL 147 6 SERVICE RE MARKS --
CHAPTER 12-SERVICING
12-1 5-65-6 01 SANITIZATIO N OF THE POTABLE WATER SYSTEM
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 3 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 21-AIR CONDITIONING
21-2 0-00-2 01 OPE RA TIONAL TEST P RE SSURE -BULKHEAD CHECK VAL VES
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
21-3 0-00-2 05 OPE RA TIONAL TEST E ME RG ENCY DEPRESS S WITCH/LIG HT
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
21-3 3-01-1 01 OPE RA TIONAL TEST CAB IN P RE SSURE A CQ UISITION MO DULE (CMR**)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
21-5 0-00-2 01 OPE RA TIONAL TEST RAM-AIR S HUTOFF VAL VE
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
21-5 1-00-3 01 CLEAN WATE R SEP ARATOR
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
21-5 1-34-9 00-80 1-01 LH PRE SSURE REG UL ATING VALV E
Removed: 321 3876-1 2 277 7 MOS 16-MAY -2016 TSR:4 13-JUN-2022 TSR:77 TECH : 46CS EJME INS P :
Installed: 604 -97602 -1 307 6 HRS 134 3.4 8 TSR:0 224 5.8 3 TSR:90 2.3 5 REASON : UNK NO WN LABOR HRS : ICAO:
UNS CHEDULED AFL 866 TSR:0 150 5 TSR:63 9 PRICE : 0
CHAPTER 22-AUTO FLIGHT
FAA 2018- 06-06 AUTOPILOT S YSTEM - RUDDER CO NTROLS - YAW DA MP ER UNCO MMANDED MOV EMENT
MOS 20-A PR-2022 TECH : INS P :
HRS 222 0.8 0 LABOR HRS : ICAO:
AFL 149 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH - AS PER AD NUMB ER CF-2016 -38

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 4 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 23-COMMUNICATIONS
23-1 1-04-9 00-80 1-01 UPPER FWD VHF NO.1 ANTENNA
Removed: S65 -8280- 10 312 6 MOS 14-MAR-2 022 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
Installed: S65 -8280- 10 312 6 HRS 219 4.6 0 219 4.6 0 REASON : TIME EXP IRED LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 147 5 PRICE : 0
Removed: S65 -8280- 10 310 -21501 MOS 01-A PR-2011 TSN:0 14-MAR-2 022 TSN:13 1 TECH : INS P :
Installed: S65 -8280- 10 312 6 HRS 0 TSN:0 219 4.6 0 TSN:21 94.6 REASON : TIME EXP IRED LABOR HRS : ICAO:
SCHEDUL ED AFL 0 TSN:0 147 5 TSN:14 75 PRICE :
23-7 1-CUS -2001 PERFORM DOWNLOAD AND ANALY SIS O F THE CVR
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHA EL SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
231 104-09 01 VHF 3/AFT.UPPE R ANTENNA , VHF ANTENNA
Removed: S65 -8280- 10 310 -22412 MOS 17-A PR-2012 TSN:0 14-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: S65 -8280- 10 265 1 HRS 16.20 TSN:0 219 4.6 0 TSN:21 78.4 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 10 TSN:0 147 5 TSN:14 65 PRICE :
605 -23-00 2 MODIFICA TION - DATALINK S YSTEM - INS TA LLATIO N OF THE DATA LINK SYS TE M (A/C 57 01 - 59 90), S ERVICE BULLETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -23-00 2 REV 01 MODIFICA TION - DATALINK S YSTEM - INS TA LLATIO N OF THE DATA LINK SYS TE M (A/C 57 01 - 59 90), S ERVICE BULLETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -23-00 2 REV 02 MODIFICA TION - DATALINK S YSTEM - INS TA LLATIO N OF THE DATA LINK SYS TE M, SERVICE BULLE TIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -23-00 2 REV 03 MODIFICA TION - DATALINK S YSTEM - INS TA LLATIO N OF THE DATA LINK SYS TE M, SERVICE BULLE TIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 5 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
605 -23-00 2 REV 04 MODIFICA TION - DATALINK S YSTEM - INS TA LLATIO N OF THE DATA LINK SYS TE M, SERVICE BULLE TIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -23-00 2 REV 05 MODIFICA TION - DATALINK S YSTEM - INS TA LLATIO N OF THE DATA LINK SYS TE M, SERVICE BULLE TIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -23-00 6 REV 02 MODIFICA TION - COCKPIT VO ICE RECORDE R (CVR) S YSTEM - INS TAL LATIO N OF RECORDER INDEPENDENT POWER SUPPLY (RIPS) FOR CVR, SERVICE BUL LETIN
MOS 09-JUL-20 21 TECH : INS P :
HRS LABOR HRS : ICAO:
AFL 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH - PREVIOUSLY COMPLIED WITH: B ASIC ISSUE IN P RO DUCTION


605 -23-00 9 REV 02 MODIFICA TION - SA TE LLITE COMMUNICA TION ( SATCO M) SY STEM - INSTAL LATION OF THE SATELLITE COMMUNICATIO N (SATCOM) SAT-2200 SY STEM, SERVICE B ULL ETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -23-01 4 MODIFICA TION - SA TE LLITE COMMUNICA TION S YSTEM ( SATCO M) - INSTAL LATION OF S ATCO M INMARSAT DISCONNECT SWITCH, SERVICE B UL LETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 6 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 24-ELECTRICAL POWER
24-0 0-00-3 01 OPE RA TIONAL TEST (CYCLING) OF THE THERMAL CIRCUIT BREAK ERS
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
24-2 0-00-2 01 DIS CA RD LH IDG CHARGE (OIL-IN) FIL TER ELEMENT
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
24-2 0-00-2 01 DIS CA RD RH IDG CHA RG E (O IL- IN) FILTER E LEMENT
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
24-2 0-00-2 02 DIS CA RD LH IDG S CAV ENGE (OIL-OUT) FILTER EL EMENT
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
24-2 0-00-2 02 DIS CA RD RH IDG SCAVENGE (O IL- OUT) FILTER ELEMENT
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
24-2 0-00-2 06 OPE RA TIONAL TEST CAB IN P OWER S HUT-OFF SWITCH
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
24-2 0-00-2 07 FUNCTIONAL TEST AIR DRIVEN GENERATOR (A DG ) HEA TER
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
24-2 3-00-1 01 OPE RA TIONAL TEST A IR DRIVEN G ENERATO R (ADG) . (CMR*)
MOS 18-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 5.7 0 LABOR HRS : ICAO:
AFL 147 6 SERVICE RE MARKS --
24-3 0-00-2 02 FUNCTIONAL TEST MA IN BATTE RY (CAPA CITY CHECK) ( MRB)
Part: 175 6-3 090 52001 79A6CMOS 21-FEB -2022 TECH : DAN MOL L INS P : SKINNER
HRS LABOR HRS : ICAO:
AFL 0 SERVICE RE MARKS --
Part: 175 6-3 090 52001 79A6CMOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
24-3 0-00-2 02-C OVE RHAUL MAIN BATTERY
Part: 175 6-3 090 52001 79A6CMOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
24-3 0-00-2 03 FUNCTIONAL TEST APU B ATTERY (CAPA CITY CHECK) (MRB)
Part: 401 78-26 090 52001 C00 3BMOS 21-FEB -2022 TECH : DAN MOL L INS P : SKINNER
HRS LABOR HRS : ICAO:
AFL 0 SERVICE RE MARKS --
Part: 401 78-26 090 52001 C00 3BMOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 7 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
24-3 0-00-2 03-C OVE RHAUL APU BATTERY
Part: 401 78-26 090 52001 C00 3BMOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHA EL SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
24-3 2-01-9 00-80 1-01 MAIN BATTERY
Removed: 175 6-3 090 52001 79A6CMOS 04-MAR-2 021 TSO:0 14-MAR-2 022 TSO:12 TECH : EAS A.1 45.0572 INS P : EAS A.1 45.0572
Installed: 175 6-3 090 52001 79A6CHRS 212 1.7 3 TSO:0 219 4.6 0 TSO:72.87 REASON : SERVICE LABOR HRS : ICAO: ISL
UNS CHEDULED AFL 143 7 TSO:0 147 5 TSO:38 PRICE : 0
24-3 2-04-9 00-80 1-01 APU BATTERY
Removed: 401 78-26 090 52001 C00 3BMOS 04-MAR-2 021 TSO:0 14-MAR-2 022 TSO:12 TECH : EAS A.1 45.0572 INS P : EAS A.1 45.0572
Installed: 401 78-26 090 52001 C00 3BHRS 212 1.7 3 TSO:0 219 4.6 0 TSO:72.87 REASON : SERVICE LABOR HRS : ICAO: ISL
UNS CHEDULED AFL 143 7 TSO:0 147 5 TSO:38 PRICE : 0
24-5 2-65-6 01 OPE RA TIONAL TEST O F THE GROUND FAULT INTE RRUPTORS (GFI)
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 8 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 25-EQUIPMENT/FURNISHINGS
25-2 1-65-6 01 OPE RA TIONAL CHE CK OF THE PAS SENGER SEAT INERTIA REELS (INCL UDING DIVANS)
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-2 1-65-6 02 DETAIL ED VISUAL INS PECTION OF THE P ASSE NG ER SE AT RESTRAINTS.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-2 1-65-6 03 DETAIL ED INSPECTIO N OF THE PASS ENG ER S EATS ( INCLUDING DIVANS AND JUMP SEAT) FO R ATTA CHMENT AND LOCKING.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-3 0-65-6 01 GENERAL VISUAL INS PECTION OF THE G ALLEY WAS TE CONTA INER.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-4 0-65-6 01 GENERAL VISUAL INS PECTION OF THE L AVATORY WASTE CO NTAINE R.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 0-00-2 01 OPE RA TIONAL TEST E ME RG ENCY LO CA TOR TRANSMITTER (ELT) SYSTEM.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MOS 03-S EP-20 21 TECH : AT-L 7894 7 B DL -C INS P : QI 7 8979 BDL-C
HRS 219 2.3 8 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 4 0 SERVICE RE MARKS --
25-6 0-00-2 02 DIS CA RD EMERGENCY LO CA TO R TRA NS MITTE R (ELT) BATTERY
Part: 452 -0133 386 221-00 4 MOS 03-S EP-20 21 TECH : AT-L 7894 7 B DL -C INS P : QI 7 8979 BDL-C
HRS 219 2.3 8 LABOR HRS : ICAO:
AFL 147 4 SERVICE RE MARKS --
MSC MSC
25-6 0-00-2 03 DETAIL ED INSPECTIO N EMERGENCY LOCATOR TRANSMITTER (E LT) BA TTERY
Part: 452 -0133 386 221-00 4 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 0-00-2 03 DETAIL ED INSPECTIO N EMERGENCY LOCATOR TRANSMITTER (E LT) BA TTERY
Part: 452 -0133 386 221-00 4 MOS 03-S EP-20 21 TECH : AT-L 7894 7 B DL -C INS P : QI 7 8979 BDL-C
HRS 219 2.3 8 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 4 0 SERVICE RE MARKS --
25-6 2-01-9 00-80 1-01 EMERGENCY LOCATOR TRANSMITTER (E LT) BA TTERY
Removed: 452 -0133 370 563-00 6 MOS 26-A PR-2017 TSN:11 03-S EP-20 21 TSN:64 TECH : 27CS EJME INS P :
Installed: 452 -0133 386 221-00 4 HRS 136 3.8 0 TSN:0 219 2.3 8 TSN:82 8.5 8 REASON : TIME EXP IRED LABOR HRS : ICAO:
UNS CHEDULED AFL 883 TSN:0 147 4 TSN:59 1 PRICE : 0
25-6 2-04-9 00-80 1-01 ELT - E ME RG ENCY LO CA TOR TRANSMITTER
Removed: 453 -5060 105 69 MOS 20-A UG -2017 TSN:79 18-MAR-2 022 TSN:13 4 TECH : 02P L E JME INS P :
Installed: 453 -5060 105 69 HRS 136 4.2 0 TSN:13 64.20 219 5.7 0 TSN:21 95.7 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 885 TSN:88 5 147 6 TSN:14 76 PRICE : 0

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 9 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
25-6 3-65-6 01 DETAIL ED INSPECTIO N OF THE EMERGENCY E XIT LIFE LINE.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N 3RD CREW LIFE V EST
Part: 636 00-505 L51 62076 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N LH#2 CA BIN LIFE VE ST
Part: S65 -8280- 10 L17 65573 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHA EL SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N PILOT CREW - LIFE V EST
Part: 636 00-505 L51 62088 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N LH#1 CA BIN LIFE VE ST
Part: S65 -8280- 10 L17 65572 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N COPILOT CREW - LIFE V EST
Part: 636 00-505 L51 62070 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N LH#3 CA BIN LIFE VE ST
Part: S65 -8280- 10 L17 65574 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N DIVA N #2 LIFE VE ST
Part: S65 -8280- 10 L17 65581 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N LH#4 CA BIN LIFE VE ST
Part: S65 -8280- 10 L17 65575 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N DIVA N #1 LIFE VE ST
Part: S65 -8280- 10 L17 65578 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N RH#2 CABIN L IFE VEST
Part: S65 -8280- 10 L17 65577 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N RH#1 CABIN L IFE VEST
Part: S65 -8280- 10 L17 65576 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 10 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
25-6 3-65-6 02 DETAIL ED INSPECTIO N DIVA N #4 LIFE VE ST
Part: S65 -8280- 10 L17 65579 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N DIVA N #3 LIFE VE ST
Part: S65 -8280- 10 L17 65580 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N DIVA N #4 LIFE VE ST
Part: 636 00-105 L17 65579 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N DIVA N #3 LIFE VE ST
Part: 636 00-105 L17 65580 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N DIVA N #2 LIFE VE ST
Part: 636 00-105 L17 65581 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N DIVA N #1 LIFE VE ST
Part: 636 00-105 L17 65578 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N RH#2 CABIN L IFE VEST
Part: 636 00-105 L17 65577 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N RH#1 CABIN L IFE VEST
Part: 636 00-105 L17 65576 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N LH#4 CA BIN LIFE VE ST
Part: 636 00-105 L17 65575 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N LH#2 CA BIN LIFE VE ST
Part: S65 -8280- 10 L17 65573 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N LH#1 CA BIN LIFE VE ST
Part: S65 -8280- 10 L17 65572 MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N LH#3 CA BIN LIFE VE ST
Part: 636 00-105 L17 65574 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 11 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
25-6 3-65-6 02 DETAIL ED INSPECTIO N LH#2 CA BIN LIFE VE ST
Part: 636 00-105 L17 65573 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 02 DETAIL ED INSPECTIO N LH#1 CA BIN LIFE VE ST
Part: 636 00-105 L17 65572 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N LH#2 CABIN LIFE V EST
Part: S65 -8280- 10 L17 65573 MOS 27-JAN-20 22 TECH : DAN MOL L INS P : MICHA EL SKINNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N LH#1 CABIN LIFE V EST
Part: S65 -8280- 10 L17 65572 MOS 27-JAN-20 22 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N LH#3 CABIN LIFE V EST
Part: S65 -8280- 10 L17 65574 MOS 27-JAN-20 22 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N DIV AN #2 LIFE V EST
Part: S65 -8280- 10 L17 65581 MOS 27-JAN-20 22 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N LH#4 CABIN LIFE V EST
Part: S65 -8280- 10 L17 65575 MOS 27-JAN-20 22 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N DIV AN #1 LIFE V EST
Part: S65 -8280- 10 L17 65578 MOS 27-JAN-20 22 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N RH# 2 CAB IN LIFE VEST
Part: S65 -8280- 10 L17 65577 MOS 27-JAN-20 22 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N RH# 1 CAB IN LIFE VEST
Part: S65 -8280- 10 L17 65576 MOS 27-JAN-20 22 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N DIV AN #4 LIFE V EST
Part: S65 -8280- 10 L17 65579 MOS 27-JAN-20 22 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N DIV AN #3 LIFE V EST
Part: S65 -8280- 10 L17 65580 MOS 27-JAN-20 22 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 12 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
25-6 3-65-6 03 RESTORATIO N DIV AN #4 LIFE V EST
Part: 636 00-105 L17 65579 MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N DIV AN #3 LIFE V EST
Part: 636 00-105 L17 65580 MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N DIV AN #2 LIFE V EST
Part: 636 00-105 L17 65581 MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N DIV AN #1 LIFE V EST
Part: 636 00-105 L17 65578 MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N RH# 2 CAB IN LIFE VEST
Part: 636 00-105 L17 65577 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHA EL SKINNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N RH# 1 CAB IN LIFE VEST
Part: 636 00-105 L17 65576 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHA EL SKINNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N LH#4 CABIN LIFE V EST
Part: 636 00-105 L17 65575 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N LH#2 CABIN LIFE V EST
Part: S65 -8280- 10 L17 65573 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N LH#1 CABIN LIFE V EST
Part: S65 -8280- 10 L17 65572 MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N LH#3 CABIN LIFE V EST
Part: 636 00-105 L17 65574 MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N LH#2 CABIN LIFE V EST
Part: 636 00-105 L17 65573 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHA EL SKINNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 03 RESTORATIO N LH#1 CABIN LIFE V EST
Part: 636 00-105 L17 65572 MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 13 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
25-6 3-65-6 04 DETAIL ED INSPECTIO N #2 (DIVA N AFT) L IFE RA FT
Part: 101 5FA SA-6K 4-1-10 5 10UL-0 1720 MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 04 DETAIL ED INSPECTIO N #1 (DIVA N FWD) LIFE RAFT
Part: 101 5FA SA-6K 4-1-10 5 10UL-0 1721 MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
Part: 101 5FA SA-6K 4-1-10 5 10UL-0 1721 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 04 DETAIL ED INSPECTIO N #2 (DIVA N AFT) L IFE RA FT
Part: 101 5FA SA-6K 4-1-10 5 10UL-0 1720 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 04 DETAIL ED INSPECTIO N #1 (DIVA N FWD) LIFE RAFT
Part: 101 5FA SA-6K 4-1-10 5 10UL-0 1721 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
25-6 3-65-6 05 RESTORATIO N #2 (DIV AN AFT) L IFE RAFT
Part: 101 5FA SA-6K 4-1-10 5 10UL-0 1720 MOS 28-FEB -2022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
25-6 3-65-6 05 RESTORATIO N #1 (DIV AN FWD) LIFE RAFT
Part: 101 5FA SA-6K 4-1-10 5 10UL-0 1721 MOS 28-FEB -2022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
25-6 3-65-6 06 VISUAL INSP ECTION WARDROBE FIRST A ID KIT OF THE FIRST AID KIT S EAL.
Part: 725 057/72504 0 210 420-00 1LEWMOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 09 RESTORATIO N OF THE FL ASHLIGHTS .
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 10 DETAIL ED INSPECTIO N OF THE SMOKE GOG GLES .
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
25-6 3-65-6 11 DETAIL ED INSPECTIO N OF THE SMOKE HOODS.
MOS 12-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
256 300-09 04 LH#1 CABIN LIFE V EST
Removed: S65 -8280- 10 L17 65572 MOS 14-MAR-2 022 TSO:0 14-MAR-2 022 TSO:0 TECH : INS P :
Installed: S65 -8280- 10 L17 65572 HRS 219 4.6 0 TSO:0 219 4.6 0 TSO:0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 TSO:0 147 5 TSO:0 PRICE : 0
Removed: 636 00-105 L17 65572 MOS 17-A PR-2012 14-MAR-2 022 TECH : INS P :
Installed: S65 -8280- 10 L17 65572 HRS 16.20 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 10 147 5 PRICE :

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 14 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
256 300-09 05 LH#2 CABIN LIFE V EST
Removed: S65 -8280- 10 L17 65573 MOS 14-MAR-2 022 TSO:0 14-MAR-2 022 TSO:0 TECH : DAN MOL L INS P : MICHAEL SK INNER
Installed: S65 -8280- 10 L17 65573 HRS 219 4.6 0 TSO:0 219 4.6 0 TSO:0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 TSO:0 147 5 TSO:0 PRICE : 0
Removed: 636 00-105 L17 65573 MOS 17-A PR-2012 14-MAR-2 022 TECH : INS P :
Installed: S65 -8280- 10 L17 65573 HRS 16.20 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 10 147 5 PRICE :
256 300-09 06 LH#3 CABIN LIFE V EST
Removed: 636 00-105 L17 65574 MOS 17-A PR-2012 14-MAR-2 022 TECH : INS P :
Installed: S65 -8280- 10 L17 65574 HRS 16.20 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 10 147 5 PRICE :
256 300-09 07 LH#4 CABIN LIFE V EST
Removed: 636 00-105 L17 65575 MOS 17-A PR-2012 14-MAR-2 022 TECH : INS P :
Installed: S65 -8280- 10 L17 65575 HRS 16.20 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 10 147 5 PRICE :
256 300-09 08 RH# 1 CAB IN LIFE VES T
Removed: 636 00-105 L17 65576 MOS 17-A PR-2012 14-MAR-2 022 TECH : INS P :
Installed: S65 -8280- 10 L17 65576 HRS 16.20 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 10 147 5 PRICE :
256 300-09 09 RH# 2 CAB IN LIFE VES T
Removed: 636 00-105 L17 65577 MOS 17-A PR-2012 14-MAR-2 022 TECH : INS P :
Installed: S65 -8280- 10 L17 65577 HRS 16.20 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 10 147 5 PRICE :
256 300-09 10 DIV AN #1 LIFE V EST
Removed: 636 00-105 L17 65578 MOS 17-A PR-2012 14-MAR-2 022 TECH : INS P :
Installed: S65 -8280- 10 L17 65578 HRS 16.20 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 10 147 5 PRICE :
256 300-09 11 DIV AN #2 LIFE V EST
Removed: 636 00-105 L17 65581 MOS 04-MAR-2 021 14-MAR-2 022 TECH : CH.145 .05 72 INS P : CH.145 .05 72
Installed: S65 -8280- 10 L17 65581 HRS 212 1.7 3 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO: ISL
SCHEDUL ED AFL 143 7 147 5 PRICE : 0
256 300-09 12 DIV AN #3 LIFE V EST
Removed: 636 00-105 L17 65580 MOS 17-A PR-2012 14-MAR-2 022 TECH : INS P :
Installed: S65 -8280- 10 L17 65580 HRS 16.20 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 10 147 5 PRICE :
256 300-09 13 DIV AN #4 LIFE V EST
Removed: 636 00-105 L17 65579 MOS 04-MAR-2 021 14-MAR-2 022 TECH : CH.145 .05 72 INS P : CH.145 .05 72
Installed: S65 -8280- 10 L17 65579 HRS 212 1.7 3 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO: ISL
SCHEDUL ED AFL 143 7 147 5 PRICE : 0
256 310-09 01 #1 (DIV AN FWD) LIFE RAFT
Removed: 101 5FA SA-6K 4-1-10 5 10UL-0 1721 MOS 14-MAR-2 022 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
Installed: 101 5FA SA-6K 4-1-10 5 10UL-0 1721 HRS 219 4.6 0 219 4.6 0 REASON : MOD/UPG RA DE LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 147 5 PRICE : 0
Removed: 101 5FA SA-6K 4-1-10 5 10UL-0 1721 MOS 04-MAR-2 021 14-MAR-2 022 TECH : CH.145 .05 72 INS P : CH.145 .05 72
Installed: 101 5FA SA-6K 4-1-10 5 10UL-0 1721 HRS 212 1.7 3 219 4.6 0 REASON : MOD/UPG RA DE LABOR HRS : ICAO: ISL
SCHEDUL ED AFL 143 7 147 5 PRICE : 0
256 310-09 02 #2 (DIV AN AFT) LIFE RAFT
Removed: 101 5FA SA-6K 4-1-10 5 10UL-0 1720 MOS 04-MAR-2 021 14-MAR-2 022 TECH : CH.145 .05 72 INS P : CH.145 .05 72
Installed: 101 5FA SA-6K 4-1-10 5 10UL-0 1720 HRS 212 1.7 3 219 4.6 0 REASON : MOD/UPG RA DE LABOR HRS : ICAO: ISL
SCHEDUL ED AFL 143 7 147 5 PRICE : 0

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 15 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
256 311-09 01 NO. 1 LIFE RAFT EL T TRA NS MITTE R
Removed: 3RK00 201 139 887 MOS 02-O CT-20 20 14-MAR-2 022 TECH : TR.145 .07 9 INS P : TR.145 .07 9
Installed: 3RK00 201 139 042 HRS 202 6.5 7 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO: ISL
UNS CHEDULED AFL 136 6 147 5 PRICE : 0
256 311-09 01A REPLA CE NO. 1 LIFE RAFT E LT TRA NS MITTE R BATTERY
Part: 3RK00 201 139 042 MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC
256 311-09 02 NO. 2 LIFE RAFT EL T TRA NS MITTE R
Removed: SRB-40 6 139 042 MOS 12-JAN-20 21 14-MAR-2 022 TECH : INS P :
Installed: SRB-40 6 139 887 HRS 208 6.2 2 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 141 2 147 5 PRICE : 0
256 311-09 02A REPLA CE NO. 2 LIFE RAFT E LT TRA NS MITTE R BATTERY
Part: SRB-40 6 139 887 MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC
256 320-09 01 SMOKE HOO D
Removed: MR-10008 N S/N UNKNOWNMOS 12-MAR-2 022 12-MAR-2 022 TECH : ZACH BRANDT INS P : DAN MOL L
Installed: MR-10008 N SN-UNKNOWN HRS 219 4.6 0 219 4.6 0 REASON : TIME EXP IRED LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 147 5 PRICE : 0
Removed: MR-10008 N P11 00074 MOS 17-A PR-2012 TSN:12 12-MAR-2 022 TSN:13 1 TECH : INS P :
Installed: MR-10008 N S/N UNKNOWNHRS 16.20 TSN:0 219 4.6 0 TSN:21 78.4 REASON : TIME EXP IRED LABOR HRS : ICAO:
SCHEDUL ED AFL 10 TSN:0 147 5 TSN:14 65 PRICE :
256 320-09 02 SMOKE HOO D
Removed: MR-10008 N P11 00068 MOS 17-A PR-2012 TSN:12 12-MAR-2 022 TSN:13 1 TECH : INS P :
Installed: MR-10008 N SN-UNKNOWN HRS 16.20 TSN:0 219 4.6 0 TSN:21 78.4 REASON : TIME EXP IRED LABOR HRS : ICAO:
SCHEDUL ED AFL 10 TSN:0 147 5 TSN:14 65 PRICE :
259 910-09 01 LAV ATORY V ANITY ASSY FLUSH,1 X1 SWITCH PANEL
Removed: 260 0-1-41 -T1 4PA 3X2 3T MOS 17-A PR-2012 18-MAR-2 022 TECH : INS P :
Installed: 260 0-1-41 -T1 4PA 3X2 3T HRS 16.20 219 5.7 0 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 147 6 PRICE :
259 910-09 02 LAV ATORY V ANITY ASSY CALL,1X1 SWITCH PANEL
Removed: 260 0-1-42 -T1 4PA 3X2 3V MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 0-1-42 -T1 4PA 3X2 3V HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :
259 910-09 03 BULKHEA D ASS Y, LHS LIG HTS,1X4 SWITCH PANEL
Removed: 260 0-1-43 -T1 4PA 3X1 CJ MOS 17-A PR-2012 18-MAR-2 022 TECH : INS P :
Installed: 260 0-1-43 -T1 4PA 3X1 CJ HRS 16.20 219 5.7 0 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 147 6 PRICE :
259 910-09 04 WARDROB E JUMPSEA T,1X1 SWITCH P ANEL
Removed: 260 0-1-44 -T1 4PA 3X2 3P MOS 17-A PR-2012 18-MAR-2 022 TECH : INS P :
Installed: 260 0-1-44 -T1 4PA 3X2 3P HRS 16.20 219 5.7 0 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 147 6 PRICE :
259 910-09 05 WARDROB E ENTRY,1X4 SWITCH P ANEL
Removed: 260 0-1-45 -T1 4PA 3X2 3R MOS 17-A PR-2012 18-MAR-2 022 TECH : INS P :
Installed: 260 0-1-45 -T1 4PA 3X2 3R HRS 16.20 219 5.7 0 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 147 6 PRICE :

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 16 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
259 910-09 06 LHS, P ASSENGE R LH PASSE NG ERS S WITCH PANEL
Removed: 260 1-1-10 -T1 4PA 3YG MF MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 1-1-10 -T1 4PA 3YG MF HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :
259 910-09 07 LHS, P ASSENGE R LH PASSE NG ERS S WITCH PANEL
Removed: 260 1-1-10 -T1 4PA 3YG MG MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 1-1-10 -T1 4PA 3YG MG HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :
259 910-09 08 RHS FWD, PASS ENGER L H PAS SENGERS SWITCH PA NE L
Removed: 260 1-1-10 -T1 4PA 3YG MD MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 1-1-10 -T1 4PA 3YG MD HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :
259 910-09 09 LHS, P ASSENGE R RH PA SSENGERS SWITCH P ANEL
Removed: 260 1-1-11 -T1 4PA 3X2 HR MOS 17-A PR-2012 18-MAR-2 022 TECH : INS P :
Installed: 260 1-1-11 -T1 4PA 3X2 HR HRS 16.20 219 5.7 0 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 147 6 PRICE :
259 910-09 10 RHS FWD, PASS ENGER RH P ASSE NG ERS S WITCH PANEL
Removed: 260 1-1-11 -T1 4PA 3X2 HP MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 1-1-11 -T1 4PA 3X2 HP HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :
259 910-09 11 LHS, P ASSENGE R RH PA SSENGERS SWITCH P ANEL
Removed: 260 1-1-11 -T1 4PA 3X2 HT MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 1-1-11 -T1 4PA 3X2 HT HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :
259 910-09 12 FWD DIVA N ARMRE ST AS SY PASS ENG ERS SWITCH PANEL
Removed: 260 1-1-8-T14 PA 3X2 HN MOS 26-A PR-2017 TSR:0 18-MAR-2 022 TSR:59 TECH : 27CS EJME INS P :
Installed: 260 1-1-8-T14 PA 3X2 HN HRS 136 3.8 0 TSR:0 219 5.7 0 TSR:83 1.9 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 883 TSR:0 147 6 TSR:59 3 PRICE : 0
259 910-09 13 AFT DIVAN A RMREST ASSY PAS SENGERS SWITCH P ANE L
Removed: 260 1-1-9-T14 PA 3X2 HV MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 1-1-9-T14 PA 3X2 HV HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :
259 911-09 01 AFT DIVAN A RMREST ASSY AUDIO CONTRO L P ANEL
Removed: 260 1-2-2-T14 PA 3X2 3K MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 1-2-2-T14 PA 3X2 3K HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :
259 911-09 02 LHS, P ASSENGE R LH AUDIO CO NTROL PANEL
Removed: 260 1-2-2-T14 PA 3X2 3L MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 1-2-2-T14 PA 3X2 3L HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :
259 911-09 03 FWD DIVA N ARMRE ST AS SY AUDIO CONTROL PANEL
Removed: 260 1-2-3-T14 PA 3YG NJ MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 1-2-3-T14 PA 3YG NJ HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :
259 911-09 04 LHS, P ASSENGE R RH AUDIO CONTRO L P ANEL
Removed: 260 1-2-3-T14 PA 3YG NF MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 1-2-3-T14 PA 3YG NF HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 17 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
259 911-09 06 LHS, P ASSENGE R RH AUDIO CONTRO L P ANEL
Removed: 260 1-2-3-T14 PA 3YG NG MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 1-2-3-T14 PA 3YG NG HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :
259 911-09 07 SIDELEDGE ASS Y, RHS A FT AUDIO CO NTROL PANEL
Removed: 260 1-2-3-T14 PA 3YG NH MOS 17-A PR-2012 TSN:0 18-MAR-2 022 TSN:11 9 TECH : INS P :
Installed: 260 1-2-3-T14 PA 3YG NH HRS 16.20 TSN:0 219 5.7 0 TSN:21 79.5 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 6 TSN:14 66 PRICE :

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 18 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 26-FIRE PROTECTION
26-1 4-51-9 00-80 1-01 BAG GAGE BA Y SMOKE DETE CTOR
Removed: 473 597-2 115 6 MOS 26-A PR-2017 TSN:72 13-JUN-2022 TSN:13 4 TECH : 27CS EJME INS P :
Installed: 473 597-2 SHA04 32 HRS 136 3.8 0 TSN:13 63.80 224 5.8 3 TSN:22 45.83 REASON : FAILURE LABOR HRS : ICAO:
SCHEDUL ED AFL 883 TSN:88 3 150 5 TSN:15 05 PRICE : 0
26-1 4-51-9 00-80 2-01 LAV ATORY S MO KE DE TE CTOR
Removed: 473 597-2 116 2 MOS 26-A PR-2017 TSN:72 13-JUN-2022 TSN:13 4 TECH : 27CS EJME INS P :
Installed: 473 597-2 SHA04 79 HRS 136 3.8 0 TSN:13 63.80 224 5.8 3 TSN:22 45.83 REASON : FAILURE LABOR HRS : ICAO:
SCHEDUL ED AFL 883 TSN:88 3 150 5 TSN:15 05 PRICE : 0
26-1 4-65-6 01 RESTORATIO N OF THE LAVA TO RY SMOK E DETECTOR.
MOS 26-A PR-2022 TECH : INS P :
HRS 222 0.8 0 LABOR HRS : ICAO:
AFL 149 0 SERVICE RE MARKS --
26-1 4-65-6 02 RESTORATIO N OF THE BAGG AGE COMPARTME NT SMOKE DETECTO R.
MOS 26-A PR-2022 TECH : INS P :
HRS 222 0.8 0 LABOR HRS : ICAO:
AFL 149 0 SERVICE RE MARKS --
26-2 0-00-1 01 DIS CA RD OF THE L H#1 DISCHA RG E CARTRIGE OF THE ENG INE FIRE-EX TINGUIS HE R CONTAINERS, PA RT NO .89 7776-0 1
Part: 897 776-01 430 02 MOS 01-DEC-20 21 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
26-2 0-00-1 01 DIS CA RD OF THE L H#2 DISCHA RG E CARTRIGE OF THE ENGINE FIRE -EXTINGUISHER CONTAINERS, PART NO.89777 6-01
Part: 897 776-01 429 85 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
26-2 0-00-1 01 DIS CA RD THE RH#1 DISCHARGE CARTRIDG ES OF THE E NG INE FIRE-EX TINGUIS HER CONTAINERS, PA RT NO .89 7776-0 1
Part: 897 776-01 429 95 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
26-2 0-00-1 01 DIS CA RD THE RH#2 DISCHA RG E CARTRIDGES OF THE ENGINE FIRE -EXTINGUISHER CONTAINERS, PART NO.89777 6-01
Part: 897 776-01 429 64 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
26-2 0-00-1 01 DIS CA RD OF THE L H#1 DISCHA RG E CARTRIGE OF THE ENG INE FIRE-EX TINGUIS HE R CONTAINERS, PA RT NO .89 7776-0 1
Part: 897 776-01 430 02 MOS 02-JAN-20 22 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS - LABOR HRS : ICAO:
SCHEDUL ED AFL 0 SERVICE RE MARKS --
26-2 0-00-1 01 DIS CA RD THE RH#1 DISCHARGE CARTRIDG ES OF THE E NG INE FIRE-EX TINGUIS HER CONTAINERS, PA RT NO .89 7776-0 1
Part: 897 776-01 429 95 MOS 01-DEC-20 21 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS TIME ACCRUED: - LABOR HRS : ICAO:
SCHEDUL ED AFL TSN:3 0 SERVICE RE MARKS --

26-2 0-00-1 01 DIS CA RD OF THE L H#2 DISCHA RG E CARTRIGE OF THE ENGINE FIRE -EXTINGUISHER CONTAINERS, PART NO.89777 6-01
Part: 897 776-01 429 85 MOS 01-DEC-20 21 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS TIME ACCRUED: - LABOR HRS : ICAO:
SCHEDUL ED AFL TSN:3 0 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 19 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
26-2 0-00-1 01 DIS CA RD THE RH#2 DISCHA RG E CARTRIDGES OF THE ENGINE FIRE -EXTINGUISHER CONTAINERS, PART NO.89777 6-01
Part: 897 776-01 429 64 MOS 01-DEC-20 21 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS TIME ACCRUED: - LABOR HRS : ICAO:
SCHEDUL ED AFL TSN:3 0 SERVICE RE MARKS --

26-2 0-00-2 04 FUNCTIONAL TEST ENGINE FIRE SHUTO FF-RELAY CIRCUITRY


MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
26-2 0-00-2 05 FUNCTIONAL TEST (WEIG HT CHECK) OF THE COCKPIT PORTABLE FIRE- EXTINGUISHER CONTAINER
Part: 30H673 Y-2 1307 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
26-2 0-00-2 07 DETAIL ED INSPECTIO N OF THE LH ENGINE FIRE-EXTING UISHER CONTAINE R (MRB)
Part: 899 486-2 ACB99 19 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
26-2 0-00-2 07 DETAIL ED INSPECTIO N OF THE RH ENGINE FIRE-E XTINGUIS HE R CONTA INER (MRB)
Part: 899 486-2 AAX 4872 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
26-2 0-00-2 09 DETAIL ED INSPECTIO N OF THE AUXIL IARY POWER UNIT (AP U) FIRE- EXTINGUISHER CONTAINER (MRB)
Part: 472 428-2 369 3T MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
Part: 472 428-2 267 0T MOS 26-A PR-2022 TSN:25 .03 TECH : INS P :
HRS 222 0.8 0 TIME ACCRUED: TSN:15 - LABOR HRS : ICAO:
SCHEDUL ED AFL 149 0 TSN:2 0 SERVICE RE MARKS --

26-2 1-04-2 01 DETAIL ED INSPECTIO N LH E NG INE FIRE EXTINGUISHER PRES SURE GA UG E


MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
26-2 1-04-2 01 DETAIL ED INSPECTIO N RH ENGINE FIRE EX TINGUISHER PRESSURE GAUGE
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
26-2 1-07-9 00-80 1-01 LH#1 DISCHARGE CARTRIDG E
Removed: 897 776-01 430 02 MOS 14-MAR-2 022 TSN:0 14-MAR-2 022 TSN:0 TECH : DAN MOL L INS P : MICHAEL SK INNER
Installed: 897 776-01 430 02 HRS 219 4.6 0 TSN:0 219 4.6 0 TSN:0 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 TSN:0 147 5 TSN:0 PRICE : 0
Removed: 897 776-01 430 02 MOS 14-MAR-2 022 TSN:0 14-MAR-2 022 TSN:0 TECH : DAN MOL L INS P : MICHAEL SK INNER
Installed: 897 776-01 430 02 HRS 219 4.6 0 TSN:0 219 4.6 0 TSN:0 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 TSN:0 147 5 TSN:0 PRICE : 0
Removed: 897 776-01 327 11 MOS 26-A PR-2017 14-MAR-2 022 TECH : 27CS EJME INS P :
Installed: 897 776-01 430 02 HRS 136 3.8 0 219 4.6 0 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 883 147 5 PRICE : 0

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 20 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
26-2 1-07-9 00-80 1-02 RH# 1 DISCHA RG E CARTRIDGE
Removed: 897 776-01 429 95 MOS 14-MAR-2 022 TSN:3 14-MAR-2 022 TSN:3 TECH : DAN MOL L INS P : MICHAEL SK INNER
Installed: 897 776-01 429 95 HRS 219 4.6 0 TSN:0 219 4.6 0 TSN:0 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 TSN:0 147 5 TSN:0 PRICE : 0
Removed: 897 776-01 327 26 MOS 26-A PR-2017 14-MAR-2 022 TECH : 27CS EJME INS P :
Installed: 897 776-01 429 95 HRS 136 3.8 0 TSN:13 47.60 219 4.6 0 TSN:21 78.4 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 883 TSN:87 3 147 5 TSN:14 65 PRICE : 0
26-2 1-07-9 00-80 1-03 LH#2 DISCHARGE CARTRIDG E
Removed: 897 776-01 429 85 MOS 14-MAR-2 022 TSN:3 18-MAR-2 022 TSN:3 TECH : DAN MOL L INS P : MICHAEL SK INNER
Installed: 897 776-01 429 85 HRS 219 4.6 0 TSN:0 219 5.7 0 TSN:1.1 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 TSN:0 147 6 TSN:1 PRICE : 0
Removed: 897 776-01 327 10 MOS 26-A PR-2017 14-MAR-2 022 TECH : 27CS EJME INS P :
Installed: 897 776-01 429 85 HRS 136 3.8 0 219 4.6 0 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 883 147 5 PRICE : 0
26-2 1-07-9 00-80 1-04 RH# 2 DISCHA RG E CARTRIDGE
Removed: 897 776-01 429 64 MOS 14-MAR-2 022 TSN:3 18-MAR-2 022 TSN:3 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
Installed: 897 776-01 429 64 HRS 219 4.6 0 TSN:0 219 5.7 0 TSN:1.1 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 TSN:0 147 6 TSN:1 PRICE : 0
Removed: 897 776-01 327 31 MOS 26-A PR-2017 14-MAR-2 022 TECH : 27CS EJME INS P :
Installed: 897 776-01 429 64 HRS 136 3.8 0 TSN:13 47.60 219 4.6 0 TSN:21 78.4 REASON : TIME EXP IRED LABOR HRS : ICAO:
UNS CHEDULED AFL 883 TSN:87 3 147 5 TSN:14 65 PRICE : 0
26-2 1-07-9 00-80 1-05 APU DISCHARGE CARTRIDG E
Removed: 897 776-01 430 11 MOS 14-MAR-2 022 TSN:3 14-MAR-2 022 TSN:3 TECH : DAN MOL L INS P : MICHAEL SK INNER
Installed: 897 776-01 430 11 HRS 219 4.6 0 TSN:0 219 4.6 0 TSN:0 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 TSN:0 147 7 TSN:2 PRICE : 0
Removed: 897 776-01 326 98 MOS 26-A PR-2017 14-MAR-2 022 TECH : 27CS EJME INS P :
Installed: 897 776-01 430 11 HRS 136 3.8 0 TSN:13 47.60 219 4.6 0 TSN:21 78.4 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 883 TSN:87 3 147 5 TSN:14 65 PRICE : 0
26-2 2-04-1 01 DIS CA RD OF THE DISCHA RG E CARTRIDGES OF THE AUXILIARY P OWER UNIT (APU) FIRE E XTINGUIS HE R CONTA INERS, P ART NO. 897 776-01
Part: 897 776-01 430 11 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
Part: 897 776-01 430 11 MOS 01-DEC-20 21 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS TIME ACCRUED: - LABOR HRS : ICAO:
SCHEDUL ED AFL TSN:3 0 SERVICE RE MARKS --

26-2 2-04-2 01 DETAIL ED INSPECTIO N APU FIRE E XTINGUISHE R PRESS URE GAUGE
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
26-2 2-04-9 00-80 1-01 APU FIRE EXTINGUISHER BO TTLE
Removed: 472 428-2 267 0T MOS 26-A PR-2017 TSO:0 13-JUN-2022 TSO:62 TECH : 27CS EJME INS P :
Installed: 472 428-2 369 3T HRS 136 3.8 0 TSO:0 224 5.8 3 TSO:882.03 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 883 TSO:0 150 5 TSO:622 PRICE : 0
26-2 5-65-6 01 WEIGHT CHE CK AFT CAB INET, LHS PORTABLE FIRE EXTING UISHER - (FUNCTIONAL TES T)
Part: 466 090 Y-2 97106 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 21 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
26-2 5-65-6 01 WEIGHT CHE CK FWD WARDROB E PORTA BLE FIRE EXTINGUISHER - (FUNCTIO NA L TEST)
Part: 30H673 Y-5 10168 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 22 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 27-FLIGHT CONTROLS
27-0 0-00-2 06 DETAIL ED INSPECTIO N RUDDER A ND ELEVA TO R CONTROL CABL ES IN THE AFT EQUIPMENT COMPARTME NT
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
27-1 0-00-2 04 OPE RA TIONAL TEST A ILE RO N ANTIFLOA T MECHA NISM.
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-1 3-04-1 01 OPE RA TIONAL TEST ROL L DISCONNE CT SYSTEM (CMR*/MRB)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-1 4-01-1 01 FUNCTIONAL TEST AIL ERON PO WE R CONTROL UNITS (PCUS). (CMR**)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-1 5-07-1 01 DETAIL ED INSPECTIO N NO. 1 AILERON FLIGHT CONTRO LS DA MPE R (CMR**)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-1 5-07-1 01 DETAIL ED INSPECTIO N NO. 2 AILERON FLIGHT CONTRO LS DA MPE R (CMR**)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-2 1-00-1 01 FUNCTIONAL TEST RUDDER BA CK LASH (CMR**)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-3 2-00-1 01 OPE RA TIONAL TEST E LEVATOR DISCONNECT SYS TE M (CMR*)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-3 3-01-1 01 FUNCTIONAL TEST ELEVA TO R BACKL ASH (CMR*)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-3 4-04-1 02 DETAIL ED INSPECTIO N LOB EL EVATOR FLUTTE R DAMPERS (CMR**)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-3 4-04-1 02 DETAIL ED INSPECTIO N LIB E LEVA TOR FL UTTER DAMPE RS (CMR**)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-3 4-04-1 02 DETAIL ED INSPECTIO N RIB ELE VATOR FLUTTE R DAMPERS (CMR**)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 23 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
27-3 4-04-1 02 DETAIL ED INSPECTIO N ROB ELEV ATO R FLUTTER DA MP ERS (CMR**)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-3 5-00-2 01 OPE RA TIONAL TEST S INGLE CHANNE L O F STALL PROTECTION COMPUTER
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-3 5-00-2 02 OPE RA TIONAL TEST DUAL CHA NNEL OF STALL PROTECTION COMPUTER
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-4 0-00-2 05 OPE RA TIONAL TEST P ITCH TRIM S WITCH
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-4 0-00-2 06 OPE RA TIONAL TEST HORIZO NTAL STABILIZER TRIM SYSTEM
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-4 1-00-1 01 OPE RA TIONAL TEST (B ITE) OF THE HO RIZONTA L-STABILIZE R TRIM-CONTROL SY STE M (HSTCS) (CMR**)
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHA EL SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
27-5 0-00-2 02 DETAIL ED INSPECTIO N LH NO.1 FL EXIBLE DRIVE SHAFT AS SEMBLY
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-5 0-00-2 02 DETAIL ED INSPECTIO N RH NO.1 FLEX IBL E DRIV E SHA FT ASSE MB LY
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-5 0-00-2 02 DETAIL ED INSPECTIO N LH NO.2 FL EXIBLE DRIVE SHAFT AS SEMBLY
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-5 0-00-2 02 DETAIL ED INSPECTIO N RH NO.2 FLEX IBL E DRIV E SHA FT ASSE MB LY
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-5 0-00-2 02 DETAIL ED INSPECTIO N LH NO.3 FL EXIBLE DRIVE SHAFT AS SEMBLY
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-5 0-00-2 02 DETAIL ED INSPECTIO N RH NO.3 FLEX IBL E DRIV E SHA FT ASSE MB LY
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 24 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
27-5 0-00-2 02 DETAIL ED INSPECTIO N LH NO.4 FL EXIBLE DRIVE SHAFT AS SEMBLY
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-5 0-00-2 02 DETAIL ED INSPECTIO N RH NO.4 FLEX IBL E DRIV E SHA FT ASSE MB LY
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-5 0-00-2 02 DETAIL ED INSPECTIO N LH NO.5 FL EXIBLE DRIVE SHAFT AS SEMBLY
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-5 0-00-2 02 DETAIL ED INSPECTIO N RH NO.5 FLEX IBL E DRIV E SHA FT ASSE MB LY
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-5 0-00-2 03 LUBRICATION B ALL NUT OF THE FLAP ACTUATORS
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
27-5 0-00-2 05 LUBRICATION FLAP VA NE ACTUATOR RODS
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
27-5 0-00-2 06 LUBRICATION B ENT-UP TRA ILING E DG E (BUTE ) DOOR HINGE
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
27-5 0-00-2 07 VISUAL CHECK INB OARD AND O UTBO ARD FLAP ACTUATORS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-5 0-00-2 08 FUNCTIONAL TEST INBOA RD AND OUTBOARD FLA P A CTUATORS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
27-6 0-00-2 01 LUBRICATION FLIGHT SP OIL ER FLEXS HA FT & CONTROL CA BLE ENDS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
TCCA CF- 2013-1 8 P ART HORIZONTAL STAB TRIM ACTUA TO R (HSTA) - L OOSE BO LTS O N THE SP UR GEAR TIME LIMIT MAINTENANCE CHECKS CHA NG E - - P ERFO RM TA SK 27-41 -00-10 1
(II)( B)
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 25 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 28-FUEL
28-2 4-00-1 01 OPE RA TIONAL TEST A UX ILIARY POWER UNIT (APU) FUE L FEED SHUTOFF-VAL VE AND NEGATIVE-G SHUTO FF-VA LVE FOR INTERNAL LEA KS (CMR*)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
605 -28-01 2 IS 01 MODIFICA TION - FUEL SYSTEM - E NG INE AND APU FUEL BO OST P UMP SEA LING IMP RO VEMENT, SERVICE BULL ETIN INFO RMATION SHEE T
MOS 04-JUN-2021 TECH : INS P :
HRS LABOR HRS : ICAO:
AFL 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH - PREVIOUSLY COMPLIED WITH: WO:T7-EZE-33 , MNG JET, 12-A PR-2021
FAA 2017- 22-06 FUE L - REPE TITIVE INS PECTIONS FOR FUEL LEAK AGE AT THE ENGINE AND A PU FUEL PUMPS , AND RELA TED INVE STIGA TIVE AND CORRECTIVE ACTIONS IF NECESSARY
MOS 03-S EP-20 21 TECH : AM 79044 BDL-C INS P : QI 7 8954 BDL-C
HRS 219 2.3 8 LABOR HRS : ICAO:
AFL 147 4 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH - NO DEFECT


FAA 2017- 22-06 PA RA A GENERAL VISUAL INSP ECTION FOR TRACES OF FUEL COMING FROM THE RIGHT- HAND ENG INE BOO ST PUMP AT THE L OCATION OF THE BELLY FAIRING SCRE W (FS412 , BL 0.0) A ND
(G)( 1) ACCOMPLISH A LL A PPLICABLE CORRECTIVE ACTIONS
MOS 03-S EP-20 21 TECH : INS P :
HRS 219 2.3 8 LABOR HRS : ICAO:
AFL 147 4 SERVICE RE MARKS --
MSC MSC

MOC:NOT APPL ICABLE - DUE TO AIRCRAFT MSN (5 866) EFFECTIVE FOR CL-60 0-2B16 , MSN:53 01 THROUGH 56 65
FAA 2017- 22-06 PA RA A GENERAL VISUAL INSP ECTION FOR TRACES OF FUEL COMING FROM THE L EFT-HAND E NG INE BOOS T PUMP A T THE LO CA TION OF THE B ELLY FAIRING S CREW (FS412, BL 0.0) AND
(G)( 2) ACCOMPLISH A LL A PPLICABLE CORRECTIVE ACTIONS
MOS 03-S EP-20 21 TECH : INS P :
HRS 219 2.3 8 LABOR HRS : ICAO:
AFL 147 4 SERVICE RE MARKS --
MSC MSC

MOC:NOT APPL ICABLE - DUE TO AIRCRAFT MSN (5 866) EFFECTIVE FOR CL-60 0-2B16 , MSN:53 01 THROUGH 56 65
FAA 2017- 22-06 PA RA A GENERAL VISUAL INSP ECTION FOR TRACES OF FUEL COMING FROM THE E FP EL ECTRICAL WIRING CO NDUIT OUTL ET AT THE LOWER BODY FA IRING AREA FOR E NG INE EFPS AND AT
(G)( 3) THE RIGHT-HAND L ANDING L IG HT CO MP ARTMENT FOR THE APU EFP AND ACCO MP LIS H ALL APP LICAB LE CO RRECTIV E A CTIONS
MOS 03-S EP-20 21 TECH : INS P :
HRS 219 2.3 8 LABOR HRS : ICAO:
AFL 147 4 SERVICE RE MARKS --
MSC MSC

MOC:NOT APPL ICABLE - DUE TO AIRCRAFT MSN (5 866) EFFECTIVE FOR CL-60 0-2B16 , MSN:53 01 THROUGH 56 65

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 26 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
FAA 2017- 22-06 PA RA A GENERAL VISUAL INSP ECTION FOR TRACES OF FUEL COMING FROM THE RIGHT- HAND ENG INE BOO ST PUMP AT THE L OCATION OF THE BELLY FAIRING SCRE W (FS412 , BL 0.0) A ND
(H)(1) ACCOMPLISH A LL A PPLICABLE RELA TED INVE STIGA TIVE AND CORRECTIVE ACTIONS
MOS 03-S EP-20 21 TECH : AM 79044 BDL-C INS P : QI 7 8954 BDL-C
HRS 219 2.3 8 LABOR HRS : ICAO:
AFL 147 4 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH - NO DEFECT


FAA 2017- 22-06 PA RA A GENERAL VISUAL INSP ECTION FOR TRACES OF FUEL COMING FROM THE L EFT-HAND E NG INE BOOS T PUMP A T THE LO CA TION OF THE B ELLY FAIRING S CREW (FS412, BL 0.0) AND
(H)(2) ACCOMPLISH A LL A PPLICABLE RELA TED INVE STIGA TIVE AND CORRECTIVE ACTIONS
MOS 03-S EP-20 21 TECH : AM 79044 BDL-C INS P : QI 7 8954 BDL-C
HRS 219 2.3 8 LABOR HRS : ICAO:
AFL 147 4 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH - NO DEFECT


FAA 2017- 22-06 PA RA A GENERAL VISUAL INSP ECTION O F THE RIGHT-HAND L ANDING L IGHT COMPA RTMENT FOR TRACES OF FUEL COMING FRO M THE AP U EFP AND ACCOMPLISH AL L A PPLICABLE RELATED
(H)(3) INV ESTIG ATIVE AND CORRECTIVE ACTIO NS
MOS 03-S EP-20 21 TECH : AM 79044 BDL-C INS P : QI 7 8954 BDL-C
HRS 219 2.3 8 LABOR HRS : ICAO:
AFL 147 4 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH - NO DEFECT


CHAPTER 29-HYDRAULIC POWER
29-1 1-00-3 01 FUNCTIONAL TEST (ACIDITY INS P) OF HYDRAULIC FL UID (S YST #1 & #2)
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
29-1 2-00-3 01 FUNCTIONAL TEST (ACIDITY INS P) OF HYDRAULIC FL UID (S YST #3 )
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 27 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 30-ICE AND RAIN PROTECTION
30-1 0-00-2 01 FUNCTIONAL TEST SENSOR DE TE CTION CIRCUIT
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
30-1 2-00-1 02 FUNCTIONAL TEST OF THE L OW TEMPERATURE G RO UND WING A NTI-ICE (LTGWAIS) OVERHEAT CIRCUIT - (POS T SB 605- 30-001 ) (CMR**)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
30-4 0-00-3 01 DETAIL ED INSPECTIO N OF THE WINDSHIELD/SIDE WINDOW AERODYNAMIC SEAL .
NOTE: WHICHEVER INTERVAL COMES FIRST
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
MOS 20-A PR-2022 TECH : INS P :
HRS 222 0.8 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 149 0 0 SERVICE RE MARKS --
CHAPTER 31-INDICATING/RECORDING SYSTEMS
31-0 0-CUS -9001 PERFORM DOWNLOAD AND ANALY SIS O F THE FDR
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHA EL SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
31-3 1-04-9 00-80 1-01 FDR TRIAXIAL ACCELEROMETER
Removed: 300 1-01-1 11 091 8-DT94 77K MOS 13-MAR-2 020 13-JUN-2022 TECH : INS P : BSUK 47 CS
Installed: 300 1-01-1 11 052 2-DT83 45U HRS 192 6.4 0 224 5.8 3 REASON : FAILURE LABOR HRS : ICAO:
UNS CHEDULED AFL 127 5 150 5 PRICE : 0
31-3 1-07-9 00-80 1-01 FDR - FLIGHT DATA RE CO RDER
Removed: 210 0-2045 -22 000 80499 7 MOS 01-A PR-2011 TSN:0 18-MAR-2 022 TSN:13 1 TECH : INS P :
Installed: 210 0-2045 -22 000 80499 7 HRS 0 TSN:0 219 5.7 0 TSN:21 95.7 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 0 TSN:0 147 6 TSN:14 76 PRICE :
31-4 1-00-2 03 OPE RA TIONAL TEST E LECTRONIC FLIGHT INSTRUME NT SYSTEM (EFIS)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
31-5 2-01-9 00-80 1-01 LAMP DRIVE R UNIT
Removed: 622 -9822- 001 28G 5K MOS 26-A PR-2015 13-JUN-2022 TECH : 10CS EJME INS P :
Installed: 622 -9822- 001 667 HRS 107 0.7 7 224 5.8 3 REASON : FAILURE LABOR HRS : ICAO:
UNS CHEDULED AFL 688 150 5 PRICE : 0
FAA 2021- 23-12 APP LIA NCE AD - INDICATING / RECORDING / NA VIG ATIO N - RA DIO (RADA R) AL TIMETER - AFM REVISION TO INCORPORATE LIMITATIONS
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 28 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 32-LANDING GEAR
32-0 0-01-2 01 FUNCTIONAL TEST LANDING-GE AR EMERGE NCY-E XTENSIO N SYS TE M
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
32-0 0-01-2 04 LUBRICATION MAIN LA NDING G EAR (MLG )
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
32-0 0-01-2 05 LUBRICATION NOS E L ANDING G EAR ( NLG )
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
32-0 0-01-2 06 LUBRICATION MAIN LA NDING G EAR (MLG ) DOO RS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
32-0 0-01-2 07 LUBRICATION NOS E L ANDING G EAR ( NLG ) DOO RS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
32-4 0-00-2 01 FUNCTIONAL TEST BRAKE ACCUMULATORS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
32-4 0-00-2 02 SPE CIAL DETAIL ED INSPECTIO N ROB ML G WHEEL
Part: 501 2373 AUG08 -2882 MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
32-4 0-00-2 04 LUBRICATION MAIN LA NDING G EAR (MLG ) B RA KE CO NTROL VALV E A SSEMBL Y
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
32-4 0-00-2 06 DETAIL ED INSPECTIO N ROB ML G WHEEL
Part: 501 2373 AUG08 -2882 MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
MSC MSC
32-4 1-01-9 00-80 2-04 ROB MLG TIRE
Removed: 027 -697-0 836 3R0 0134 MOS 04-S EP-20 20 13-JUN-2022 TECH : MNG 3 986 INS P : MNG 3 986
Installed: 027 -697-0 131 9P051 01 HRS 199 7.5 8 224 5.8 3 REASON : UNK NO WN LABOR HRS : ICAO: LTBA
UNS CHEDULED AFL 134 4 150 5 PRICE : 0
32-5 0-00-2 01 OPE RA TIONAL TEST NOS EWHE EL STEERING SEL ECTOR AND ARMING VAL VE
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 29 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
605 -32-00 7 SPE CIAL CHE CK - MAIN LANDING GEA R - LUBRICATIO N AND INSPECTIO N OF L H/RH MAIN LANDING GEA R (MLG) SHOCK STRUT LOWER P IN 1 9146- 3, SERVICE B UL LETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -32-00 7 IS 04 SPE CIAL CHE CK - MAIN LANDING GEA R - LUBRICATIO N AND INSPECTIO N OF L H/RH MAIN LANDING GEA R (MLG) SHOCK STRUT LOWER P IN 1 9146- 3, SERVICE B UL LETIN INFORMA TION
SHEET
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -32-00 7 P ART A ACCOMPLISH S PECIA L CHECK - MAIN LA NDING GE AR - LUBRICATION A ND INSPE CTION OF LH/RH MAIN LA NDING G EAR (MLG ) S HO CK STRUT LOWER PIN 1914 6-3, SE RV ICE BULLETIN
LUBRICATION O F LH/RH MLG SHOCK STRUT LOWER PIN
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --

MOC:COMPL IED WITH


605 -32-00 7 P ART B ACCOMPLISH S PECIA L CHECK - MAIN LA NDING GE AR - LUBRICATION A ND INSPE CTION OF LH/RH MAIN LA NDING G EAR (MLG ) S HO CK STRUT LOWER PIN 1914 6-3, SE RV ICE BULLETIN DVI
INS PECTION OF LH/RH MLG SHOCK S TRUT LOWER PIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --

MOC:COMPL IED WITH


605 -32-00 7 P ART C ACCOMPLISH S PECIA L CHECK - MAIN LA NDING GE AR - LUBRICATION A ND INSPE CTION OF LH/RH MAIN LA NDING G EAR (MLG ) S HO CK STRUT LOWER PIN 1914 6-3, SE RV ICE BULLETIN
NONDE STRUCTIVE TESTING (NDT) INS PECTION OF L H/RH MLG SHOCK S TRUT LO WE R PIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 30 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
FAA 2021- 20-13 MLG SHOCK STRUT LO WER PINS: REPETITIVE LUBRICA TION, DETAIL ED VISUAL INS PECTIONS (DVI) , AND NON-DESTRUCTIV E TEST (NDT) INSP ECTIONS; REPL ACEME NT IF NE CE SSARY
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


FAA 2021- 20-13 PA RA (G) LH REP ETITIVE LUB RICATIO N LH MLG SHOCK STRUT LOWER P INS PN 1 9146-3
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --

MOC:COMPL IED WITH


FAA 2021- 20-13 PA RA (G) RH REPETITIVE LUBRICA TION RH MLG S HO CK STRUT LOWER PINS PN 1 9146- 3
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --

MOC:COMPL IED WITH


MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --

MOC:COMPL IED WITH


FAA 2021- 20-13 PA RA (G) LH REP ETITIVE LUB RICATIO N LH MLG SHOCK STRUT LOWER P INS PN 1 9146-3
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --

MOC:COMPL IED WITH


FAA 2021- 20-13 PA RA (H) LH DVI OF THE L H MLG SHOCK STRUT LO WER PINS HAV ING PN 1 9146-3
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


FAA 2021- 20-13 PA RA (H) RH DVI OF THE RH MLG SHOCK STRUT L OWER PINS HAV ING PN 1 9146-3
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 31 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
FAA 2021- 20-13 PA RA (I) RH NDT INSP ECTION FOR CRACKING AND DAMAGE OF THE RH MLG SHOCK S TRUT LOWE R PINS HAVING PN 19 146-3
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

MOC:COMPL IED WITH


FAA 2021- 20-13 PA RA (I) LH NDT INSPECTIO N FOR CRACKING AND DAMAG E O F THE LH ML G S HO CK STRUT LOWER PINS HAVING P N 191 46-3
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

MOC:COMPL IED WITH


TCCA CF- 2020-5 4 R01 LANDING GE AR - MAIN LANDING GEAR (MLG) SHOCK STRUT LO WER PIN CRACKING
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


TCCA CF- 2020-5 4 R01 LUBRICATION O F LEFT HAND (L H) MLG SHOCK STRUT LO WER PIN
PART I LH
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --

MOC:COMPL IED WITH


TCCA CF- 2020-5 4 R01 LUBRICATION O F RIGHT HAND (RH) MLG SHOCK S TRUT LO WE R PIN
PART I RH
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --

MOC:COMPL IED WITH


TCCA CF- 2020-5 4 R01 DVI OF THE LH MLG SHOCK STRUT LOWER PIN
PART II LH
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --

MOC:COMPL IED WITH


TCCA CF- 2020-5 4 R01 DVI OF THE RH MLG SHOCK STRUT LO WER PIN
PART II RH
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 32 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
TCCA CF- 2020-5 4 R01 NDT INSP ECTION O F THE LH ML G SHO CK S TRUT LOWER PIN
PART III LH
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --

MOC:COMPL IED WITH


TCCA CF- 2020-5 4 R01 NDT INSP ECTION O F THE RH MLG SHOCK STRUT LOWER P IN
PART III RH
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --

MOC:COMPL IED WITH


TCCA CF- 2020-5 4 R01 CRA CK S O R DAMAGE FINDINGS O N THE MLG SHOCK STRUT L OWER PIN
PART IV
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 33 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 33-LIGHTS
33-2 4-65-6 01 OPE RA TIONAL TEST O F THE ORDINANCE SIGNS.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
33-5 0-00-2 01 FUNCTIONAL TEST CO CK PIT EMERGENCY L IGHTS POWER-SUPPL Y.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
33-5 0-00-2 01 FUNCTIONAL TEST RH CA BIN EMERGENCY LIG HTS POWER-SUPP LY.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
33-5 0-00-2 01 FUNCTIONAL TEST BAGG AGE BAY - FWD EMERGENCY L IGHTS POWER-SUPPL Y.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
33-5 0-00-2 01 FUNCTIONAL TEST BAGG AGE BAY - AFT EMERGE NCY LIGHTS PO WE R-S UP PLY.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
33-5 0-00-2 02 OPE RA TIONAL TEST E ME RG ENCY LIGHTS
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
33-5 1-01-9 00-80 1-01 COCKPIT EMERGENCY LIGHTS PO WE R SUPPL Y
Removed: 60-1 321-1 251 99 MOS 14-MAR-2 022 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
Installed: 60-1 321-1 251 99 HRS 219 4.6 0 219 5.6 0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 147 5 PRICE : 0
Removed: 60-1 321-1 251 99 MOS 25-S EP-20 19 14-MAR-2 022 TECH : MC 317 1 INS P :
Installed: 60-1 321-1 251 99 HRS 188 0.3 0 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 123 6 147 5 PRICE : 0
33-5 1-01-9 00-80 1-02 RH CABIN EMERGE NCY LIGHTS PO WE R SUPPL Y
Removed: 60-1 321-1 245 82 MOS 14-MAR-2 022 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
Installed: 60-1 321-1 245 82 HRS 219 4.6 0 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 147 5 PRICE : 0
Removed: 60-1 321-1 245 82 MOS 08-A PR-2019 14-MAR-2 022 TECH : INS P : MC 317 1
Installed: 60-1 321-1 245 82 HRS 171 6.2 0 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 112 5 147 5 PRICE : 0
33-5 1-01-9 00-80 1-03 BAG GAGE BA Y - FWD EMERGENCY LIGHTS PO WE R SUPPL Y
Removed: 60-1 321-1 245 78 MOS 14-MAR-2 022 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
Installed: 60-1 321-1 245 78 HRS 219 4.6 0 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 147 5 PRICE : 0
Removed: 60-1 321-1 245 78 MOS 08-A PR-2019 14-MAR-2 022 TECH : INS P : MC 317 1
Installed: 60-1 321-1 245 78 HRS 171 6.2 0 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 112 5 147 5 PRICE : 0

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 34 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
33-5 1-01-9 00-80 1-04 (AFT) E ME RG ENCY LIGHTS P OWER S UPP LY
Removed: 60-1 321-1 245 86 MOS 14-MAR-2 022 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
Installed: 60-1 321-1 245 86 HRS 219 4.6 0 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 147 5 PRICE : 0
Removed: 60-1 321-1 245 86 MOS 08-A PR-2019 14-MAR-2 022 TECH : INS P : MC 317 1
Installed: 60-1 321-1 245 86 HRS 171 6.2 0 219 4.6 0 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED AFL 112 5 147 5 PRICE : 0
33-5 2-65-6 01 OPE RA TIONAL TEST O F THE INTERIOR E ME RG ENCY LIGHTS.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
33-5 2-65-6 03 FUNCTIONAL TEST OF THE S ELF-IL LUMINATED EX IT S IG N.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
605 -33-00 5 REV 01 MODIFICA TION - FLOO DL IGHTING PANEL - COCKPIT FLOODLIGHT GA SKET INSTALLA TION TO PREVE NT WATE R ING RE SS, SE RV ICE BULLETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -33-00 5 REV 02 MODIFICA TION - FLOO DL IGHTING PANEL - COCKPIT FLOODLIGHT GA SKET INSTALLA TION TO PREVE NT WATE R ING RE SS, SE RV ICE BULLETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


FAA 2018- 20-21 FLOODLIGHTING PANEL - COCKPIT FLOO DL IG HT WA TER PENETRATION / COCKPIT FLOODLIGHT GA SKET SEAL INS TA LLATIO N
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


TCCA CF- 2016-4 0 FLOODLIGHTING PANEL – COCK PIT FLOODLIGHT GA SKET S EAL INSTAL LATIO N
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 35 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 34-NAVIGATION
34-0 0-CUS -9001 UPDATE L OAD MK V EGP WS TERRAIN DA TA BASE
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
MOS 25-A UG -2021 TECH : EAS A.1 45.4275 INS P : EAS A.1 45.4275
HRS 219 0.4 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 3 0 SERVICE RE MARKS --
34-0 0-CUS -9002 UPDATE JEP PESEN PROLINE 2 1 E LECTRONIC CHA RTS IN FSU WITH LATEST CYCLE
MOS 13-JUN-2022 TECH : INS P :
HRS 224 5.8 0 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
MOS 20-MAY -2022 TECH : INS P :
HRS 222 7.8 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 149 9 0 SERVICE RE MARKS --
MOS 20-MAY -2022 TECH : INS P :
HRS 222 7.8 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 149 9 0 SERVICE RE MARKS --
MOS 28-A PR-2022 TECH : INS P :
HRS 222 7.8 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 149 9 0 SERVICE RE MARKS --
MOS 20-A PR-2022 TECH : INS P :
HRS 222 0.8 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 149 0 0 SERVICE RE MARKS --
MOS 20-A PR-2022 TECH : INS P :
HRS 222 0.8 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 148 7 0 SERVICE RE MARKS --
MOS 18-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 5.7 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 6 0 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 36 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
34-0 0-CUS -9003 UPDATE 1 & 2 FMS AND IFIS E-MAP WITH LATEST DATAB ASE
DAYS 17-JUN-2022 TECH : INS P :
HRS 225 0.8 0 LABOR HRS : ICAO:
AFL 150 7 SERVICE RE MARKS --
DAYS 20-MAY -2022 TECH : INS P :
HRS 222 7.8 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 149 9 0 SERVICE RE MARKS --
DAYS 21-A PR-2022 TECH : INS P :
HRS 222 0.8 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 148 7 0 SERVICE RE MARKS --
DAYS 06-A PR-2022 TECH : INS P :
HRS 221 2.1 7 - LABOR HRS : ICAO:
SCHEDUL ED AFL 149 0 0 SERVICE RE MARKS --
DAYS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
DAYS 25-A UG -2021 TECH : EAS A.1 45.4275 INS P : EAS A.1 45.4275
HRS 219 0.4 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 3 0 SERVICE RE MARKS --
34-0 0-CUS -9004 UPDATE DATAB ASE GRAPHICA L WX DATA E XPIRE D
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC
34-1 1-00-2 01 FUNCTIONAL TEST PITOT-STATIC SYS TE M
MOS 08-MAR-2 022 TECH : DAN MOL L INS P : 205 93
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
34-1 1-00-2 03 SERVICING VISUAL DRAIN
MOS 08-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
34-1 2-01-9 00-80 1-01 INTEG RATED STANDB Y INSTRUMENT
Removed: C16786 MA 01 C16786 00792 8 MOS 13-MAR-2 020 13-JUN-2022 TECH : INS P : BSUK 47 CS
Installed: C16786 MA 01 C16786 03579 9 HRS 192 6.4 0 224 5.8 3 REASON : UNK NO WN LABOR HRS : ICAO:
UNS CHEDULED AFL 127 5 150 5 PRICE : 0
34-1 2-CA-200 RECERTIFY THE INTEGRATED S TA NDBY INS TRUMENT PER 14 CFR 9 1.4 11 P ART 43, APP. E
MOS 08-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
34-1 3-00-1 02 FUNCTIONAL TEST OF THE NO. 1 A IR DA TA COMPUTE R (ADC) (RV SM QUAL IFIE D A/C)
MOS 08-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
34-1 3-00-1 02 FUNCTIONAL TEST OF THE NO. 2 A IR DA TA COMPUTE R (ADC) (RV SM QUAL IFIE D A/C)
MOS 08-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 37 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
34-1 3-CA-200 RECERTIFY NO. 1 A IR DA TA COMPUTE R (ADC) PER 14 CFR 91.411
MOS 08-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
34-1 3-CA-200 RECERTIFY NO. 2 A IR DA TA COMPUTE R (ADC) PER 14 CFR 91.411
MOS 08-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
34-5 4-CA-200 RECERTIFY NO.1 TRANSP ONDE R - PER 1 4 CFR 91 .41 3 P ART 43, A PP. F
MOS 08-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
34-5 4-CA-200 RECERTIFY NO.2 TRANSP ONDE R - PER 1 4 CFR 91 .41 3 P ART 43, A PP. F
MOS 08-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
605 -34-00 7 REV 03 MODIFICA TION - FLIGHT MANAGEMENT S YSTEM - INS TA LLATIO N OF THE FAA V-SPE ED DATABAS E, SE RVICE BULLETIN
MOS 03-S EP-20 21 TECH : AV 539 28 BDL INS P : QI 7 8979 BDL-C
HRS 219 2.3 8 LABOR HRS : ICAO:
AFL 147 4 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH - NO DEFECTS NO TED.


TCCA CF- 2021-5 2 APP LIA NCE AD - NAVIGATION - AE RO PLANE - P RO HIBITION OF OP ERATIONS REQUIRING RADIO ALTIMETER IN THE PRESENCE OF 5G C-BAND WIRELES S B RO ADBAND INTERFERENCE
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 38 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 35-OXYGEN
35-0 0-00-2 06 RESTORATIO N 3RD CREW MEMBE R OXY GEN REG UL ATO R MASK AS SEMBLY
Part: MC10-13-0 3 B09 2420 MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
35-0 0-00-2 07 DIS CA RD OF THE O XYGE N CYLINDER.
Part: 806 371-31 1 CO912 0024 MOS 14-MAR-2 022 TECH : INS P :
HRS LABOR HRS : ICAO:
AFL SERVICE RE MARKS --
Part: 806 371-31 1 C09120 024 MOS 01-O CT-20 21 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS TIME ACCRUED: - LABOR HRS : ICAO:
SCHEDUL ED AFL TSN:5 0 SERVICE RE MARKS --

35-0 0-00-2 08 GENERAL VISUAL INS PECTION OXYG EN INDICA TION SYSTEM
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
35-0 0-00-2 10 RESTORATIO N OF THE OXYG EN CYLINDER REGULATOR.
Part: 806 371-31 1 CO912 0024 MOS 18-MAR-2 022 TECH : INS P :
HRS 219 5.7 0 LABOR HRS : ICAO:
AFL 147 6 SERVICE RE MARKS --
35-0 0-00-2 10 RESTORATIO N OF THE OXYG EN CYLINDER REGULATOR.
Part: 806 371-31 1 C09120 024 MOS 14-MAR-2 022 TSN:1.10 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 TIME ACCRUED: TSN:1 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --

35-1 1-07-9 00-80 1-03 3RD CREW MEMBE R OXY GEN REG UL ATO R MASK AS SEMBLY
Removed: MC10-13-0 3 SE5 37781 MOS 26-A PR-2017 TSO:13 13-JUN-2022 TSO:75 TECH : 27CS EJME INS P :
Installed: MC10-13-0 3 B09 2420 HRS 136 3.8 0 TSO:0 224 5.8 3 TSO:882.03 REASON : TIME EXP IRED LABOR HRS : ICAO:
SCHEDUL ED AFL 883 TSO:0 150 5 TSO:622 PRICE : 0
35-2 3-65-6 01 OPE RA TIONAL TEST O F THE PA SSENGE R OXY GEN S YSTEM.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
35-2 3-65-6 03 OPE RA TIONAL TEST O F THE CREW O XYGEN SYSTEM MODIFICATIONS MAS KS.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
35-2 3-65-6 04 RESTORATIO N OF THE CREW OXY GEN S YSTEM MODIFICATIO NS MASKS
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
35-2 3-65-6 05 GENERAL VISUAL INS PECTION WA RDROBE PO RTABL E O XYGE N BOTTLE OF THE PORTABLE OX YGEN CY LINDER, REGULATOR, AND MAS K.
Part: 560 0-9C1A-Y ON P13 04045 0 MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 39 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
35-2 3-65-6 07 DETAIL ED INSPECTIO N OF THE PROTECTIVE BREATHING EQUIPMENT (PBE ).
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
35-2 8-98-9 00-80 2-01 OXY GEN CYL INDER
Removed: 806 371-31 1 C07080 487 MOS 30-A PR-2020 TSO:41 14-MAR-2 022 TSO:64 TECH : INS P : MNG 4 091
Installed: 806 371-31 1 C09120 024 HRS 193 0.2 0 TSO:460.50 219 4.6 0 TSO:724.9 REASON : TIME EXP IRED LABOR HRS : ICAO:
SCHEDUL ED AFL 127 7 TSO:328 147 5 TSO:526 PRICE : 0
Removed: 806 371-31 1 C09120 024 MOS 14-MAR-2 022 TSO:0 12-MAR-2 022 TSO:0 TECH : DAN MOL L INS P : MICHAEL SK INNER
Installed: 806 371-31 1 CO912 0024 HRS 219 4.6 0 TSO:0 219 5.7 0 TSO:1.1 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 TSO:0 147 6 TSO:1 PRICE : 0
352 310-09 01 WARDROB E (DISCARD TASK 25 -60-02 -602) PBE
Removed: MR-10042 N E21 02564 MOS 14-MAR-2 022 TSN:8 14-MAR-2 022 TSN:8 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
Installed: MR-10042 N E21 02564 HRS 219 4.6 0 TSN:0 219 4.6 0 TSN:0 REASON : UNK NO WN LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 TSN:0 147 5 TSN:0 PRICE : 0
Removed: MR-10042 N E11 02220 MOS 17-A PR-2012 TSN:7 14-MAR-2 022 TSN:12 6 TECH : INS P :
Installed: MR-10042 N E21 02564 HRS 16.20 TSN:0 219 4.6 0 TSN:21 78.4 REASON : UNK NO WN LABOR HRS : ICAO:
UNS CHEDULED AFL 10 TSN:0 147 5 TSN:14 65 PRICE :

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 40 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 38-WATER/WASTE
38-1 0-65-6 01 DETAIL ED INSPECTIO N OF THE AIR PRESSURE RE GULATOR.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
38-1 0-65-6 02 FUNCTIONAL TEST OF THE A IR PRESSURE REG UL ATOR.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
38-1 0-65-6 03 GENERAL VISUAL INS PECTION OF THE WATER DISTRIBUTIO N LINES.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
38-1 0-65-6 04 GENERAL VISUAL INS PECTION OF THE WATER TA NK .
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
38-1 0-65-6 05 RESTORATIO N OF THE BLEE D AIR FIL TE R.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
38-1 0-65-6 06 RESTORATIO N OF THE WATER FIL TER ASSE MB LY (REPLACE FILTER CA RTRIDGE )
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
38-1 0-65-6 10 OPE RA TIONAL TEST O F THE FLOO R MAT ACTIV ATED SO LENOID VAL VE.
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
CHAPTER 44-CABIN SYSTEMS
44-2 1-65-6 01 OPE RA TIONAL TEST O F THE PA SSENGE R NOTIFICATION SY STEM
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 41 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 52-DOORS
52-1 0-00-2 01 FUNCTIONAL TEST PASS ENG ER-DOOR L ATCH ME CHANISM
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
52-1 0-00-2 02 LUBRICATION P ASSENGE R DOOR (EXTERNAL)
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
52-2 0-00-2 03 LUBRICATION E ME RG ENCY EXIT DOO R
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
52-4 5-00-3 01 LUBRICATION O F THE SE RV ICE DO OR LO CK S
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 - LABOR HRS : ICAO:
SCHEDUL ED AFL 147 5 0 SERVICE RE MARKS --
CHAPTER 53-FUSELAGE
53-2 0-00-1 88 SPE CIAL DETAIL ED INSPECTIO N OF THE UP PER L ATCH PINS OF THE PASS ENGER DOO R
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
53-ZL-0 0-217 GENERAL VISUAL INS PECTION MID-FUSE LAGE COMPARTMENT - LOWER INTE RNAL (FS589 .0 TO FS 621.0)
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
53-ZL-0 0-220 GENERAL VISUAL INS PECTION FLIGHT COMPA RTMENT - EXTERNAL
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
53-ZL-0 0-228 GENERAL VISUAL INS PECTION AFT EQUIPMENT COMPARTMENT - INTERNAL
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 42 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 55-STABILIZERS
605 -55-00 1 MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM RA DO ME A SSEMBLY , SERVICE B ULL ETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 P ART A MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM RA DO ME A SSEMBLY , SERVICE B ULL ETIN MO DIFICATIO N - (REMOVAL OF
VERTICAL STAB ILIZER VISO RS AND FAIRINGS) REPLA CE ME NT OF UPPE R MID FA IRING AS SEMBLY/SATCOM RADOME ASS EMBLY AND SHEL F ASS EMBLY
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 P ART B MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM RA DO ME A SSEMBLY , SERVICE B ULL ETIN MO DIFICATIO N - RE PLACEMENT
OF SHELF AS SEMBLY ONLY
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 REV 01 MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM RA DO ME A SSEMBLY , SERVICE B ULL ETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 REV 01 PA RT ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - (REMOVAL OF VERTICAL STABILIZE R VISORS AND FAIRINGS) REPLACEMENT O F UPPER MID FAIRING ASSE MB LY / SATCOM RADOME
A ASS EMBLY AND SHEL F ASS EMBLY
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 43 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
605 -55-00 1 REV 01 PA RT ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - REPLACEMENT O F SHELF ASSE MBL Y O NL Y
B
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 REV 02 MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM RA DO ME A SSEMBLY , SERVICE B ULL ETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 REV 02 PA RT ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - (REMOVAL OF VERTICAL STABILIZE R VISORS AND FAIRINGS) REPLACEMENT O F UPPER MID FAIRING ASSE MB LY/SATCOM RADOME
A ASS EMBLY AND SHEL F ASS EMBLY
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 REV 02 PA RT ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - REPLACEMENT O F SHELF ASSE MBL Y O NL Y
B
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 REV 03 MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM RA DO ME A SSEMBLY , SERVICE B ULL ETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 REV 03 PA RT ACCOMPLISH, SERVICE B UL LETIN MODIFICATION - ( REMO VAL OF V ERTICA L S TA BIL IZER V IS ORS A ND FA IRINGS ) REP LACEMENT OF UPP ER MID FAIRING A SSEMBLY /SA TCOM RADO ME
A ASS EMBLY AND SHEL F ASS EMBLY
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 44 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
605 -55-00 1 REV 03 PA RT ACCOMPLISH, SERVICE B UL LETIN MODIFICATION - REP LACEMENT OF SHE LF AS SEMBLY ONLY
B
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 REV 04 MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM RA DO ME A SSEMBLY , SERVICE B ULL ETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 REV 04 PA RT ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - (REMOVAL OF VERTICAL STABILIZE R VISORS AND FAIRINGS) REPLACEMENT O F UPPER MID FAIRING ASSE MB LY/SATCOM RADOME
A ASS EMBLY AND SHEL F ASS EMBLY
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 REV 04 PA RT ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - REPLACEMENT O F SHELF ASSE MBL Y O NL Y
B
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 REV 05 MODIFICA TION - VE RTICA L S TA BIL IZER - INS TA LLATIO N OF THE ANTENNA SHELF ASSE MB LY AND NEW SA TCOM RA DO ME A SSEMBLY , SERVICE B ULL ETIN
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


605 -55-00 1 REV 05 PA RT ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - (REMOVAL OF VERTICAL STABILIZE R VISORS AND FAIRINGS) REPLACEMENT O F UPPER MID FAIRING ASSE MB LY/SATCOM RADOME
A ASS EMBLY AND SHEL F ASS EMBLY
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 45 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
605 -55-00 1 REV 05 PA RT ACCOMPLISH, SERVICE B UL LETIN MO DIFICATION - REPLACEMENT O F SHELF ASSE MBL Y O NL Y
B
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH


CHAPTER 56-WINDOWS
56-1 0-00-1 04 SPE CIAL DETAIL ED INSPECTIO N B OLTS AT R/H WINDSHIELD AND SIDE WINDOW T- PLATE.
MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
56-1 0-00-1 04 SPE CIAL DETAIL ED INSPECTIO N BOL TS AT L/H WINDSHIELD AND SIDE WINDO W T-PLATE.
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 0 SERVICE RE MARKS --
CHAPTER 71-POWER PLANT
71-1 2-00-2 02 DETAIL ED INSPECTIO N CORE B LOW-OUT DOO RS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
71-1 3-00-2 01 DETAIL ED INSPECTIO N THRUST REVE RS ER SL IDER B LOCKS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
71-6 1-00-2 02 LUBRICATION B ALLSCREW A CTUATORS SUPPORT B USHINGS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
CHAPTER 76-ENGINE CONTROLS
76-1 1-00-1 01 FUNCTIONAL TEST RIGHT ENGINE THROTTL E CONTROL GEARBO X, PART NUMBER 2 10014 0-005/-00 7/-0 10. (CMR**)
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHA EL SKINNER
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
76-1 1-00-1 01 FUNCTIONAL TEST LEFT ENGINE THROTTLE CONTRO L G EARBOX , PART NUMB ER 21 00140 -005/-007 /-01 0. (CMR**)
MOS 14-MAR-2 022 TECH : INS P :
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
761 113-01 01A FUNCTIONAL TEST OF THE E NG INE THROTTLE CO NTROL GEA RB OX
(76- 11-00- 101)
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --
761 113-01 02A FUNCTIONAL TEST OF THE E NG INE THROTTLE CO NTROL GEA RB OX
(76- 11-00- 101)
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 LABOR HRS : ICAO:
AFL 147 5 SERVICE RE MARKS --

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 46 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 78-EXHAUST
78-3 0-00-2 02 LUBRICATION THRUST-REVE RS ER BA LLSCREW A CTUATORS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
78-3 0-00-2 03 LUBRICATION THRUST-REVE RS ER FLEX SHA FTS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
78-3 0-00-2 04 DETAIL ED INSPECTIO N FLEXSHAFT DRIV E
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
AFL 150 5 SERVICE RE MARKS --
CHAPTER 05-TIME LIMITS/MAINTENANCE CHECKS
APU Model : GTCP 36-150 (CL) Serial # P-310 Part # 3800804-1
050 500 APU - 5 00 HO UR CHECK
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS 0 SERVICE RE MARKS --
APUS APUS
050 750 APU - 7 50 HO UR CHECK
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS 0 SERVICE RE MARKS --
APUS APUS
051 500 APU - 1 500 HOUR CHE CK
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS 0 SERVICE RE MARKS --
APUS APUS
CHAPTER 24-ELECTRICAL POWER
APU Model : GTCP 36-150 (CL) Serial # P-310 Part # 3800804-1
24-2 0-00-2 05 APU - DETAILED INSPE CTION A PU GE NE RATOR/ADAPTOR DRY CAVITY
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS SERVICE RE MARKS --
APUS APUS

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 47 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 49-AIRBORNE AUXILIARY POWER
APU Model : GTCP 36-150 (CL) Serial # P-310 Part # 3800804-1
49-1 1-00-2 01 APU - O PERATIO NA L TES T OF THE APU E NCLO SURE DRAINS
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS 0 SERVICE RE MARKS --
APUS APUS
49-1 1-00-2 02 APU - DETAILED INSPE CTION O F THE AP U ENCLOSURE ASSEMBL Y
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS 0 SERVICE RE MARKS --
APUS APUS
49-3 1-00-2 01 APU - G ENERAL VIS UA L INSPECTIO N OF THE APU FUEL SY STE M COMPONENTS
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS 0 SERVICE RE MARKS --
APUS APUS
49-3 1-00-2 02 APU - G ENERAL VIS UA L INSPECTIO N OF THE APU FUEL FIL TER DIFFERENTIAL PRESSURE INDICATOR
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS 0 SERVICE RE MARKS --
APUS APUS
49-4 3-00-2 01 APU - O PERATIO NA L TES T OF THE APU E XTERNA L REMOTE SWITCH
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS SERVICE RE MARKS --
APUS APUS
49-5 1-00-3 01 APU - RES TO RA TION L OAD CONTROL VALV E (O N- WING CLE ANING) OF THE AUXILIA RY PO WE R UNIT (A PU) LO AD CONTRO L V ALVE FIL TE R
Part: 388 5091-4 053 9 MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS SERVICE RE MARKS --
APUS APUS
49-8 1-00-2 01 APU - DETAILED INSPE CTION O F THE AP U EXHAUST SYSTEMS
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS SERVICE RE MARKS --
APUS APUS
49-8 1-00-2 03 APU - DETAILED INSPE CTION O F THE AP U EXHAUST SHIEL D AND VISOR ASSE MB LY
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS SERVICE RE MARKS --
APUS APUS
49-9 1-00-2 01 APU - DETAILED INSPE CTION O F THE AP U MAGNETIC CHIP DE TECTOR
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS SERVICE RE MARKS --
APUS APUS

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 48 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
49-9 1-00-2 02 APU - DISCARD OF THE AUXILIA RY PO WE R UNIT ( APU) O IL FIL TER ELEMENT
Part: 365 303-1 21-6 4521 MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS SERVICE RE MARKS --
APUS APUS
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 - LABOR HRS : ICAO:
SCHEDUL ED APUS 0 SERVICE RE MARKS --
APUS APUS
49-9 1-00-2 03 APU - DISCARD OF THE APU OIL
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS SERVICE RE MARKS --
APUS APUS
499 100-00 1 APU - O IL FIL TE R ELEMENT
Removed: 365 303-1 130 10724 9262 MOS 26-A PR-2015 14-MAR-2 022 TECH : 10CS EJME INS P :
Installed: 365 303-1 21-6 4521 HRS 163 5 353 8 REASON : SERVICE LABOR HRS : ICAO:
UNS CHEDULED APUS PRICE : 0
APUS

499 110-00 1 APU - S OAP CHE CK O IL


MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS SERVICE RE MARKS --
APUS APUS
APU-49 R10 APU - IMPLEMENTATIO N OF THE HONEYWELL SPE CTROMETRIC O IL AND FILTER ANALY SIS P RO GRAM (SO AP) FOR HONEYWEL L A UX ILIARY POWER UNITS (AP US ), SERVICE INFO RMATION
LETTER
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 353 8 LABOR HRS : ICAO:
APUS
MSC MSC SERVICE RE MARKS --

MOC:COMPL IED WITH

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 49 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 12-SERVICING
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01
12-1 0-00-2 01 NO. 1 ENGINE - SERVICE THE ENGINE OIL TANK
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 0 SERVICE RE MARKS --
ENC 151 6 ENC
MOS 20-A PR-2022 TECH : INS P :
HRS 222 0.8 0 0 - LABOR HRS : ICAO:
SCHEDUL ED ENC 150 1 0 SERVICE RE MARKS --
ENC 150 1 ENC
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 0 - LABOR HRS : ICAO:
SCHEDUL ED ENC 148 6 0 SERVICE RE MARKS --
ENC 148 6 ENC

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 50 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 72-ENGINE
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01
72-0 0-GE- 9001 NO. 1 ENGINE - DOWNLOAD OF BO TH ENGINES FOR TREND MONITO RING - E-MAIL TO G EAEREMOTESE RV ICES@ AE.GE.COM - NOTE: CL586 6 - RESE T MDC DA TA : DISK OP S, PRESS : SKP,
CHK LST, UP, SE L, DWN & THEN CO NFIRM RESET
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 SERVICE RE MARKS --
ENC 151 6 ENC
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 0 - LABOR HRS : ICAO:
SCHEDUL ED ENC 148 6 0 SERVICE RE MARKS --
ENC 148 6 ENC
72-0 0-GE- 9007 NO. 1 ENGINE - VISUAL INSP ECTION O F THE OV ERBOARD DRAIN OF THE ENGINE COMBUSTOR O R EVIDENCE O F LEA KAGE.
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 SERVICE RE MARKS --
ENC 151 6 ENC
72-0 0-GE- 9009 NO. 1 ENGINE - VISUAL CHE CK UNDER COWL - FOR S ECURITY OF TUBING, HOSE S, AND EL ECTRICA L CONNECTORS.
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 SERVICE RE MARKS --
ENC 151 6 ENC
72-0 0-GE- 9010 NO. 1 ENGINE - VISUAL CHE CK UNDER COWL - FOR FUEL OR O IL LEA KS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 SERVICE RE MARKS --
ENC 151 6 ENC
72-0 0-GE- 9011 NO. 1 ENGINE - VISUAL CHE CK UNDER COWL - STRUCTURA L INTE GRITY OF E NG INE CA SES AND FLANGE S (INCLUDING L OOSE , MISS ING, O R BROKE N ATTA CHING HARDWARE).
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 SERVICE RE MARKS --
ENC 151 6 ENC
72-0 0-GE- 9012 NO. 1 ENGINE - VISUAL CHE CK UNDER COWL - ENGINE V ARIAB LE GEOMETRY SYSTEM FO R DAMAGED, MISSING , OR L OOSE PA RTS, A ND THAT THE ROD-END BE ARINGS ARE SEATED
CORRE CTLY .
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 SERVICE RE MARKS --
ENC 151 6 ENC
72-0 0-GE- 9013 NO. 1 ENGINE - VISUAL INSP ECTION THE INTEGRITY OF ENGINE MOUNT SYSTEM (INCLUDING FA N STATOR FORWARD ENGINE MO UNT, FAN CASING, THRUST MO UNT A SSEMBLY , AND THE
REAR MA IN MOUNT).
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 SERVICE RE MARKS --
ENC 151 6 ENC
72-0 0-GE- 9022 NO. 1 ENGINE - VISUAL CHE CK OF THE ENGINE OIL FILTER BYPAS S INDICATOR.
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 SERVICE RE MARKS --
ENC 151 6 ENC

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 51 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
72-0 048 R11 NO. 1 ENGINE - GE NERAL - HARDWARE EXP OSED TO AB NO RMAL OP ERATING EVENTS, SE RV ICE BULLETIN
MOS 23-A UG -2021 TECH : INS P :
HRS LABOR HRS : ICAO:
ENC 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH - INFORMATIONAL ONLY :


72-0 310 NO. 1 ENGINE - GE NERAL (7 2-00-00 ) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ E NG INES, S ERVICE BULLE TIN
MOS 04-JUN-2021 TECH : INS P :
HRS LABOR HRS : ICAO:
ENC 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH - INFORMATIONAL ONLY : SPARE PARTS RE LEASE


72-2 0-00-2 01 NO. 1 ENGINE - GE NERAL VISUAL INS PECTION OF FAN B LADES
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 0 SERVICE RE MARKS --
ENC 151 6 ENC
72-2 0-00-2 02 NO. 1 ENGINE - GE NERAL VISUAL INS PECTION FA N SPINNE R
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 0 SERVICE RE MARKS --
ENC 151 6 ENC
72-2 0-00-2 07 NO. 1 ENGINE - DETAIL ED INSPECTIO N ENGINE MASTER CHIP DE TECTOR INDICATOR
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 0 SERVICE RE MARKS --
ENC 151 6 ENC
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 0 - LABOR HRS : ICAO:
SCHEDUL ED ENC 148 6 0 SERVICE RE MARKS --
ENC 148 6 ENC
72-2 0-00-2 10 NO. 1 ENGINE - GE NERAL VISUAL INS PECTION FA N SHROUD CORE MATERIAL
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 0 SERVICE RE MARKS --
ENC 151 6 ENC
72-3 0-00-2 05 NO. 1 ENGINE - LUBRICATION V ARIAB LE GEOMETRY LINKA GE RO D END BE ARINGS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 0 SERVICE RE MARKS --
ENC 151 6 ENC
72-4 0-00-2 05 NO. 1 ENGINE - GE NERAL VISUAL INS PECTION THERMAL BLANKE T
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 0 SERVICE RE MARKS --
ENC 151 6 ENC

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 52 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
72-5 0-00-2 08 NO. 1 ENGINE - VISUAL CHE CK EX HAUST CE NTERBO DY
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 0 SERVICE RE MARKS --
ENC 151 6 ENC
CHAPTER 73-ENGINE FUEL AND CONTROL
ENGINE NO. 1 Model : CF-34-3B (CIMMS) Serial # 950967 Part # 6089T11G01
73-1 0-00-2 04 NO. 1 ENGINE - DETAIL ED INSPECTIO N ENGINE FUEL MA NIFOLD
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 6 0 SERVICE RE MARKS --
ENC 151 6 ENC
CHAPTER 12-SERVICING
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
12-1 0-00-2 01 NO. 2 ENGINE - SERVICE THE ENGINE OIL TANK
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 0 SERVICE RE MARKS --
ENC 151 5 ENC
MOS 20-A PR-2022 TECH : INS P :
HRS 222 0.8 0 0 - LABOR HRS : ICAO:
SCHEDUL ED ENC 150 0 0 SERVICE RE MARKS --
ENC 150 0 ENC
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 0 - LABOR HRS : ICAO:
SCHEDUL ED ENC 148 5 0 SERVICE RE MARKS --
ENC 148 5 ENC

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 53 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
CHAPTER 72-ENGINE
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
72-0 0-GE- 9001 NO. 2 ENGINE - DOWNLOAD OF BO TH ENGINES FOR TREND MONITO RING - E-MAIL TO G EAEREMOTESE RV ICES@ AE.GE.COM - NOTE: CL586 6 - RESE T MDC DA TA : DISK OP S, PRESS : SKP,
CHK LST, UP, SE L, DWN & THEN CO NFIRM RESET
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 SERVICE RE MARKS --
ENC 151 5 ENC
MOS 14-MAR-2 022 TECH : CRS 4W5R53 6D INS P : CRS 4W5R53 6D
HRS 219 4.6 0 0 - LABOR HRS : ICAO:
SCHEDUL ED ENC 148 5 0 SERVICE RE MARKS --
ENC 148 5 ENC
72-0 0-GE- 9007 NO. 2 ENGINE - VISUAL INSP ECTION O F THE OV ERBOARD DRAIN OF THE ENGINE COMBUSTOR O R EVIDENCE O F LEA KAGE.
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 SERVICE RE MARKS --
ENC 151 5 ENC
72-0 0-GE- 9009 NO. 2 ENGINE - VISUAL CHE CK UNDER COWL - FOR S ECURITY OF TUBING, HOSE S, AND EL ECTRICA L CONNECTORS.
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 SERVICE RE MARKS --
ENC 151 5 ENC
72-0 0-GE- 9010 NO. 2 ENGINE - VISUAL CHE CK UNDER COWL - FOR FUEL OR O IL LEA KS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 SERVICE RE MARKS --
ENC 151 5 ENC
72-0 0-GE- 9011 NO. 2 ENGINE - VISUAL CHE CK UNDER COWL - STRUCTURA L INTE GRITY OF E NG INE CA SES AND FLANGE S (INCLUDING L OOSE , MISS ING, O R BROKE N ATTA CHING HARDWARE).
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 SERVICE RE MARKS --
ENC 151 5 ENC
72-0 0-GE- 9012 NO. 2 ENGINE - VISUAL CHE CK UNDER COWL - ENGINE V ARIAB LE GEOMETRY SYSTEM FO R DAMAGED, MISSING , OR L OOSE PA RTS, A ND THAT THE ROD-END BE ARINGS ARE SEATED
CORRE CTLY .
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 SERVICE RE MARKS --
ENC 151 5 ENC
72-0 0-GE- 9013 NO. 2 ENGINE - VISUAL INSP ECTION THE INTEGRITY OF ENGINE MOUNT SYSTEM (INCLUDING FA N STATOR FORWARD ENGINE MO UNT, FAN CASING, THRUST MO UNT A SSEMBLY , AND THE
REAR MA IN MOUNT).
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 SERVICE RE MARKS --
ENC 151 5 ENC
72-0 0-GE- 9022 NO. 2 ENGINE - VISUAL CHE CK OF THE ENGINE OIL FILTER BYPAS S INDICATOR.
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 SERVICE RE MARKS --
ENC 151 5 ENC

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 54 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
72-0 048 R11 NO. 2 ENGINE - GE NERAL - HARDWARE EXP OSED TO AB NO RMAL OP ERATING EVENTS, SE RV ICE BULLETIN
MOS 23-A UG -2021 TECH : INS P :
HRS LABOR HRS : ICAO:
ENC 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH - INFORMATIONAL ONLY :


72-0 310 NO. 2 ENGINE - GE NERAL (7 2-00-00 ) - SP ARE P ARTS RELEA SE FO R CF3 4-BJ E NG INES, S ERVICE BULLE TIN
MOS 04-JUN-2021 TECH : INS P :
HRS LABOR HRS : ICAO:
ENC 0 SERVICE RE MARKS --
MSC MSC

MOC:COMPL IED WITH - INFORMATIONAL ONLY : SPARE PARTS RE LEASE


72-2 0-00-2 01 NO. 2 ENGINE - GE NERAL VISUAL INS PECTION OF FAN B LADES
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 0 SERVICE RE MARKS --
ENC 151 5 ENC
72-2 0-00-2 02 NO. 2 ENGINE - GE NERAL VISUAL INS PECTION FA N SPINNE R
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 0 SERVICE RE MARKS --
ENC 151 5 ENC
72-2 0-00-2 07 NO. 2 ENGINE - DETAIL ED INSPECTIO N ENGINE MASTER CHIP DE TECTOR INDICATOR
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 0 SERVICE RE MARKS --
ENC 151 5 ENC
MOS 14-MAR-2 022 TECH : DAN MOL L INS P : MICHAEL SK INNER
HRS 219 4.6 0 0 - LABOR HRS : ICAO:
SCHEDUL ED ENC 148 5 0 SERVICE RE MARKS --
ENC 148 5 ENC
72-2 0-00-2 10 NO. 2 ENGINE - GE NERAL VISUAL INS PECTION FA N SHROUD CORE MATERIAL
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 0 SERVICE RE MARKS --
ENC 151 5 ENC
72-3 0-00-2 05 NO. 2 ENGINE - LUBRICATION V ARIAB LE GEOMETRY LINKA GE RO D END BE ARINGS
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 0 SERVICE RE MARKS --
ENC 151 5 ENC
72-4 0-00-2 05 NO. 2 ENGINE - GE NERAL VISUAL INS PECTION THERMAL BLANKE T
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 0 SERVICE RE MARKS --
ENC 151 5 ENC

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS
History Report
CL-605 S/N 5866 (AP-HKD): 2250.8 HRS, 1507 AFL as of 17-Jun-2022 01-JUN-2021 to 24-JUN-2022
Owner/Operator: PRINCELY JETS (PVT.) LTD. Report Date: 24-JUN-2022
Page 55 of 55
TASK NO DESCRIPTION COMPONENT INSTALLED AND/OR COMPONENT TIMES AFTER REMOVAL
SERVICE/INSPECTION COMPLIED WITH
PART NO. SERIAL NO. C/W TIME SINCE C/W TIME SINCE
72-5 0-00-2 08 NO. 2 ENGINE - VISUAL CHE CK EX HAUST CE NTERBO DY
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 0 SERVICE RE MARKS --
ENC 151 5 ENC
CHAPTER 73-ENGINE FUEL AND CONTROL
ENGINE NO. 2 Model : CF-34-3B (CIMMS) Serial # 950968 Part # 6089T11G01
73-1 0-00-2 04 NO. 2 ENGINE - DETAIL ED INSPECTIO N ENGINE FUEL MA NIFOLD
MOS 13-JUN-2022 TECH : INS P : 12P L E JME
HRS 224 5.8 3 LABOR HRS : ICAO:
ENC 151 5 0 SERVICE RE MARKS --
ENC 151 5 ENC

(D)-- Deleted From Status (M)-- Migrated History Record


© CAMP SYSTEMS

You might also like