DOCUMENT REVIEW REPORT (DRR)

PROJECT PROPOSED CONDOMINIUM DEVELOPMENT FOR SOUTH BEACH DRR NO: SBW-BS-DRR-061
WELIGAMA PROPERTIES (PVT)LTD

PROJECT NO 19005

EMPLOYER SOUTH BEACH WELIGAMA PROPERTIES (PVT) LTD REVISION

PROJECT ARCHITECT BALMOND STUDIO DATE 29.08.23

TO ATTENTION

BUILD MART LANKA (PVT LTD Contractors Representative

Global Project Management consultants Mr. Sanath Priyadharshana

DOCUMENT REFERENCE FROM DESCRIPTION APPROVED

APPROVAL SUBJECT TO CONDITIONS

SBW-RFMAS-022 MAIN METHOD STATEMENT FOR DOOR FRAMES AND REVISE AND SUBMIT
CONTRACTOR SASHES INSTALLATION WORK.

REJECTED

COMMENTS

A) General
1. RFMA for Mahogany Door Sample + frame to be submitted for approval.
2. Demonstrate Method Addressing comments in Mock-up.
3. waterbase application process and codes to be submitted in MS.

Notes : Refer to Marked up comments in submitted RFAMS

From Balmond Studio Handled by


No 30 ,Kumarathungamunidasa Mawatha, Colombo 07 Archt. Kalpa Maduranga
E-mail: sbw@balmondstudio.net Checked by
S. Archt. Raveendra Handagama
Web Site: www.balmondstudio.com

Acknowledgement Receipt
Date: …………………………………………………………………
Signature: ………………………………………………

Name: ………..………………………………………………………

Page 1 of 1
PROPOSED SOUTH BEACH
CONDOMINIUM DEVELOPMENT
PROJECT AT WELIGAMA

METHOD STATEMENT
FOR TIMBER DOOR FRAMES AND
SASHES INSTALLATION WORK
Method Statement for Timber Door Frames & Sashes Installation

TABLE OF CONTENTS PAGE NO.

1. Purpose .................................................................................................................... 3
2. Specification and Drawing Reference ................................................................... 3
3. Door Materials……………………………………………………………………..2
4. Equipment ............................................................................................................... 3
5. PPE Materials……………………………………………………………………...3
6. Manpower………………………………...………………………...……………...4
7. Delivery, Storage and Handling Wooden Frames & Doors…………………….3
8. Methodology……………………………………………………………………….3
8.1 Door Frames Installation……………………………………………………….…3
8.2 Door Sashes Installation………..…………………………………...……….……4

Annexures

1. Annexure 01 – Detail Sketch of Door Frames Installation


2. Annexure 02 - Check list for Door Frames and Sashes Fixing Work

Buildmart Lanka (Pvt) Ltd Page 2


Method Statement for Timber Door Frames & Sashes Installation

1. Purpose

• The main purpose of this method statement is to outline the procedure of


installation timber door frames and sashes.

2. Specification and Drawing Reference

➢ CIDA Specification and BOQ.


➢ Tender Specifications
➢ Working Drawings – Approved Structural Drawings, Architectural & Interior
Design Drawings

3. Door Materials
• Mahogany Solid Timber Door Frames
• Mahogany Engineered Door Sashes with Mahogany Veneer
• 12mm x 12mm Steel “L” Angle (50 mm long)
• 8mm Drop Anchors Hot Dip Galvanized to
required micron
• 8mm G.I. Thread Bar (30mm long) levels(A.P.S by
Engineer)
• 1 ½” Screw Nails
• Welding Rods
• Epoxy Paint (Nippolac Epoxy Marine Paint – 2 Pack)
• Al Powder Coated Channel to Maintain 10x10 mm Shadow Gap
• Doorma Ironmongery as Specified

4. Equipment
• Hand Saw, Timber Wedges
• Screw Drivers, Pliers, Hammers
• Electric Drill, Hammer Drill, Drill Bits
• Welding Plant, Welding Rods
• Electrical Grinder, Steel Cutting Wheel
• Measuring Tape, Engineering Square, Spirit Level

5. PPE Materials
➢ Following PPE (Personal Protective Equipment) should be provided in order
to all work.
• Safety Helmets

Buildmart Lanka (Pvt) Ltd Page 3


Method Statement for Timber Door Frames & Sashes Installation

• Safety Boots
• Safety Masks
• Hand Gloves
• High visibility Jacket

6. Manpower
• Site Engineer
• Site supervisors
• Carpenters
• Welder
• Helpers

7. Delivery, storage and Handling Wooden Doors


• Store doors in clean dry ventilated areas.
• Stack doors flat and off floors, supported to prevent wharfing.
• Store flat over level surface above the floor on wood blocks.
• No other materials are to be placed on top of stacked doors.
• Each door and frame are tagged indicating the door number and location.
• All doors and frames deliver with sealer finished from factory.

8. Methodology Mandatory : refer the


Architectural Door
8.1 Door Frames Installation Details. updated
Construction Issue.
• Identify the correct door frame and its type and size.
• Check for plumb, squareness and twist of frame.
• Confirm the door location against the approved shop drawing.
• Verify that the dimensions of the opening are as specified in the drawing.
• Check the hardware schedule for correct items and correct sizes.
• Check for correct finished floor level and reference level prior to installation.
• At this site door frames to be fixed with stiffener columns.
• Mark the anchoring points at reveal as the distance shown in figure 1. (Four
points in each side)
• Drill the above points of stiffener columns and fix the drop anchors.
• Fix the Epoxy paint applied G.I. Thread bar into the anchor.
• Mark the above points at the center line of side face of the door frame and fix

Buildmart Lanka (Pvt) Ltd Page 4


Method Statement for Timber Door Frames & Sashes Installation

the “L” angle on that location with screws as shown in “Detail A".
• Place the door frame at the correct position in the reveal and check for vertical
and horizontal alignment. Use the spirit level and plumb bob for this.
• Secure the door frame temporarily using timber wedges. Welded Points have to
• Recheck for level accuracy. Cold Galvanized As Per
• Weld each thread bar to the steel “L” angle. Specifications.

Heating of Door Frame • Fill the 15mm gap between jamb and the stiffener column & lintel using 1:4
is a Concern. Ensure cement plaster and rammed well. Cannot Allow Cavities
Timber is adequately
• Fix the Al powder coated channel around the door frame to make 10x10mm
Protected against Heat ,
Flame and Charring
shadow gap.
During Welding Process. • Prepare the door reveal to the specified size.
As This can effect the
Strength of the member • Clean grout and other bonding materials off timber frames immediately after
plastering.
Barrier Coat, Timber
Sealant coat hand will be
compromised at this 8.2 Door Sashes Installation
point. ensure hand
applied Sealant coats
application to be in the
concealed Face of the • Identify the correct door sash and its type and size.
door Frame. • Check for plumb, squareness and twist of door sash.
• Verify opening dimensions, angles and levels from finish floor level reference
to ensure that frame fit the opening.
• Align and fit the door in the frame to desired location and elevation.
• Install, align and fit the doors in frames with uniform clearance and bevel to
provide 3mm at head and jambs.
• Fix the doors to the frame with specified hinges as per the approved drawings.
• Fix the lock, handles and other accessories at the position showed in the
approved drawing.
• Completed wooden doors shall operate freely and smoothly without rattle or
bound condition. Mandatory : refer the
Door Frame Finishing Process not mentioned? at Architectural Door
Details. updated
what stages will the Sashes and Frames receive Construction Issue.
the Water-base aplications?

Buildmart Lanka (Pvt) Ltd Page 5


Annexure 01
Contractor to be
mindful that the
'L' Angle Screws
Should not
Interfere with the
Lintel Striker plate and
Hinge and other
ironmongery
Stiffener column fastening Screws.

Door frame

DETAIL-A

FFL

FIGURE -01

No. Date Description Issued by

MAIN CONTRCTOR

STATUS

12x12x50mm Steel 8mm G.I. Thread bar


SHOP DRAWING
PROJECT

PROPOSED CONDOMINIUM
'L' angle DEVELOPMENT SOUTH BEACH
WELIGAMA PROPERTIES(PVT) LTD AT

Drop Anchor (8x50mm) WELIGAMA

DISCIPLINE

1 21" Screw ARCHITECTURAL WORKS


DRAWING TITLE

Welding point DETAILS OF DOOR FRAMES INSTALLATION

Door frame DATE :


18.08.2023
SCALE :
DRAWN BY :
CHAMPIKA
CHECKED BY :
As Shown PATHIRANA

PROJECT NO. DRAWING NO.


BLWP/AR/SK/04

SERIES NO.

SHEET NO.

REV NO.
CAD FILE NAME

DETAIL-A
Annexure 02
BUILDMART LANKA(PVT) LTD
Proposed South Beach Condominium Development Project At Weligama
Inspection Check List for Timber Door Frames & Sashes
Installation
Location/ Grid
Floor Level
Inspection Date
Inspection Time
Item
Site Engineer Result of Re-Inspection
Checked Consultant Checked Description of Site Engineer
General Item Consultant Checked
Inspection Defects/ Relevent Checked
Result Signature Result Signature Result Signature Result Signature
Check layouts approval
Timber Door
Check specifications
Frames & Sashes
Check material approvals
Installation
Check method statement
Check for correct type & size of
frames & sashes
Check for plumb, squareness &
twist of frames & sashes
Check for door location against the
approved layout
Check whether the opening size is
correct
Check for correct reference level &
lines
Check the accuracy of marked
drilling points at stiffener columns
for anchoring
Check the accuracy of marked
drilling points of door frame
Check for correct positioning of
door frame at the reveal

Check the verticality &


horizontality of door frame placed

Check the accuracy of welding


work
Re-check the verticality &
horizontality
Check the accuracy of "Al Powder
coated" channel fixing along door
frame
Check the hardware schedule for
correct items & correct sizes
Align & fit the door in the frame
and check for uniform clearance
right round(3mm)
Check for accuracy of fixing
hardware and as per the approved
drawings

Check for completed doors shall


operate freely & smoothly without
rattle or bound condition

Remarks

Site Engineer(Contractor) Consultant Approved

Name:................................................................ Name:.......................................................................
Signature:.......................................................... Signature:.................................................................
Date:.................................................................. Date:.........................................................................