DOCUMENT REVIEW REPORT (DRR)
PROJECT PROPOSED CONDOMINIUM DEVELOPMENT FOR SOUTH BEACH DRR NO: SBW-BS-DRR-061
WELIGAMA PROPERTIES (PVT)LTD
PROJECT NO 19005
TO ATTENTION
SBW-RFMAS-022 MAIN METHOD STATEMENT FOR DOOR FRAMES AND REVISE AND SUBMIT
CONTRACTOR SASHES INSTALLATION WORK.
REJECTED
COMMENTS
A) General
1. RFMA for Mahogany Door Sample + frame to be submitted for approval.
2. Demonstrate Method Addressing comments in Mock-up.
3. waterbase application process and codes to be submitted in MS.
Acknowledgement Receipt
Date: …………………………………………………………………
Signature: ………………………………………………
Name: ………..………………………………………………………
Page 1 of 1
PROPOSED SOUTH BEACH
CONDOMINIUM DEVELOPMENT
PROJECT AT WELIGAMA
METHOD STATEMENT
FOR TIMBER DOOR FRAMES AND
SASHES INSTALLATION WORK
Method Statement for Timber Door Frames & Sashes Installation
1. Purpose .................................................................................................................... 3
2. Specification and Drawing Reference ................................................................... 3
3. Door Materials……………………………………………………………………..2
4. Equipment ............................................................................................................... 3
5. PPE Materials……………………………………………………………………...3
6. Manpower………………………………...………………………...……………...4
7. Delivery, Storage and Handling Wooden Frames & Doors…………………….3
8. Methodology……………………………………………………………………….3
8.1 Door Frames Installation……………………………………………………….…3
8.2 Door Sashes Installation………..…………………………………...……….……4
Annexures
1. Purpose
3. Door Materials
• Mahogany Solid Timber Door Frames
• Mahogany Engineered Door Sashes with Mahogany Veneer
• 12mm x 12mm Steel “L” Angle (50 mm long)
• 8mm Drop Anchors Hot Dip Galvanized to
required micron
• 8mm G.I. Thread Bar (30mm long) levels(A.P.S by
Engineer)
• 1 ½” Screw Nails
• Welding Rods
• Epoxy Paint (Nippolac Epoxy Marine Paint – 2 Pack)
• Al Powder Coated Channel to Maintain 10x10 mm Shadow Gap
• Doorma Ironmongery as Specified
4. Equipment
• Hand Saw, Timber Wedges
• Screw Drivers, Pliers, Hammers
• Electric Drill, Hammer Drill, Drill Bits
• Welding Plant, Welding Rods
• Electrical Grinder, Steel Cutting Wheel
• Measuring Tape, Engineering Square, Spirit Level
5. PPE Materials
➢ Following PPE (Personal Protective Equipment) should be provided in order
to all work.
• Safety Helmets
• Safety Boots
• Safety Masks
• Hand Gloves
• High visibility Jacket
6. Manpower
• Site Engineer
• Site supervisors
• Carpenters
• Welder
• Helpers
the “L” angle on that location with screws as shown in “Detail A".
• Place the door frame at the correct position in the reveal and check for vertical
and horizontal alignment. Use the spirit level and plumb bob for this.
• Secure the door frame temporarily using timber wedges. Welded Points have to
• Recheck for level accuracy. Cold Galvanized As Per
• Weld each thread bar to the steel “L” angle. Specifications.
Heating of Door Frame • Fill the 15mm gap between jamb and the stiffener column & lintel using 1:4
is a Concern. Ensure cement plaster and rammed well. Cannot Allow Cavities
Timber is adequately
• Fix the Al powder coated channel around the door frame to make 10x10mm
Protected against Heat ,
Flame and Charring
shadow gap.
During Welding Process. • Prepare the door reveal to the specified size.
As This can effect the
Strength of the member • Clean grout and other bonding materials off timber frames immediately after
plastering.
Barrier Coat, Timber
Sealant coat hand will be
compromised at this 8.2 Door Sashes Installation
point. ensure hand
applied Sealant coats
application to be in the
concealed Face of the • Identify the correct door sash and its type and size.
door Frame. • Check for plumb, squareness and twist of door sash.
• Verify opening dimensions, angles and levels from finish floor level reference
to ensure that frame fit the opening.
• Align and fit the door in the frame to desired location and elevation.
• Install, align and fit the doors in frames with uniform clearance and bevel to
provide 3mm at head and jambs.
• Fix the doors to the frame with specified hinges as per the approved drawings.
• Fix the lock, handles and other accessories at the position showed in the
approved drawing.
• Completed wooden doors shall operate freely and smoothly without rattle or
bound condition. Mandatory : refer the
Door Frame Finishing Process not mentioned? at Architectural Door
Details. updated
what stages will the Sashes and Frames receive Construction Issue.
the Water-base aplications?
Door frame
DETAIL-A
FFL
FIGURE -01
MAIN CONTRCTOR
STATUS
PROPOSED CONDOMINIUM
'L' angle DEVELOPMENT SOUTH BEACH
WELIGAMA PROPERTIES(PVT) LTD AT
DISCIPLINE
SERIES NO.
SHEET NO.
REV NO.
CAD FILE NAME
DETAIL-A
Annexure 02
BUILDMART LANKA(PVT) LTD
Proposed South Beach Condominium Development Project At Weligama
Inspection Check List for Timber Door Frames & Sashes
Installation
Location/ Grid
Floor Level
Inspection Date
Inspection Time
Item
Site Engineer Result of Re-Inspection
Checked Consultant Checked Description of Site Engineer
General Item Consultant Checked
Inspection Defects/ Relevent Checked
Result Signature Result Signature Result Signature Result Signature
Check layouts approval
Timber Door
Check specifications
Frames & Sashes
Check material approvals
Installation
Check method statement
Check for correct type & size of
frames & sashes
Check for plumb, squareness &
twist of frames & sashes
Check for door location against the
approved layout
Check whether the opening size is
correct
Check for correct reference level &
lines
Check the accuracy of marked
drilling points at stiffener columns
for anchoring
Check the accuracy of marked
drilling points of door frame
Check for correct positioning of
door frame at the reveal
Remarks
Name:................................................................ Name:.......................................................................
Signature:.......................................................... Signature:.................................................................
Date:.................................................................. Date:.........................................................................