RESURFACING 2022-23 LUS

KM 147.50 TO KM 162.90
DATE LENGTH WIDTH (M) TOTAL EXTRA TOTAL TOTAL BC 30 MM CORRECTION WORK BM 50 BITUMEN FOR BITUMEN FOR EMULUSION EMULUSION TOTAL HRS RUN
(M) AREA IN 10% FOR AREA AREA MM BC 30 MM CORRECTION FOR TACK FOR TACK QTY IN PER DAY
SQM CURVE & FOR BC IN FOR BM IN WORK COAT BC COAT BM CUM
PASSING SQM SQM
PLACES

NORMS PER 10 SQM NORMS PER 10 SQM NORMS PER NORMS PER 10 NORMS PER NORMS PER 10
10 SQM SQM 10 SQM SQM

STONE STONE SAND STONE STONE SAND 30.07 KG/10 37.40 KG/10 2.50 KG/10 2.50 KG/10 SQM
CHIPS CHIPS (CUM/10S CHIPS CHIPS (CUM/10S SQM SQM SQM
11.20 MM 6.70 MM QM) 13.20 MM 6.70 MM QM)
(CUM/10S (CUM/10S (CUM/10S (CUM/10S
QM) QM) QM) QM)

10% 10% 0.1125 0.1076 0.2084 0.2565 0.3633 0.0797 30.070 37.400 2.500 2.500

1-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
2-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
3-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
4-Sep-22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
5-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
6-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
7-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
8-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
9-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
10-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
11-Sep-22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
12-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
13-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
14-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
15-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
16-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
17-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
18-Sep-22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
19-Sep-22 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
20-Sep-22 4882.80 3.75 18310.50 1831.05 20141.55 2014.16 226.59 216.72 419.75 51.66 73.17 16.05 60565.64 7532.94 5035.39 503.54 1003.96 167
4882.80 3.75 18310.50 1831.05 20141.55 2014.16 226.59 216.72 419.75 51.66 73.17 16.05 60565.64 7532.94 5035.39 503.54 1003.96 167

68098.58 5538.93
VG-10 68.10 EMLSN 5.54 MT
420.881214771 27.69463125
CORRECTION WORK BM 50 MM BC 30 MM
NORMS PER 10 SQM NORMS PER 10 SQM
STONE STONE SAND STONE STONE SAND
CHIPS 13.20 CHIPS 6.70 (CUM/10SQ CHIPS 11.20 CHIPS 6.70 (CUM/10SQ
MM MM M) MM MM M)
(CUM/10SQ (CUM/10SQ (CUM/10SQ (CUM/10SQ
M) M) M) M)

0.2565 0.3633 0.0797 0.1125 0.1076 0.2084