BULAN 6 BULAN 7 BULAN 8
18-Dec-2022 25-Dec-2022 1-Jan-2023 8-Jan-2023 15-Jan-2023 22-Jan-2023 29-Jan-2023 5-Feb-2023
19-Dec-2022 26-Dec-2022 2-Jan-2023 9-Jan-2023 16-Jan-2023 23-Jan-2023 30-Jan-2023 6-Feb-2023
20-Dec-2022 27-Dec-2022 3-Jan-2023 10-Jan-2023 17-Jan-2023 24-Jan-2023 31-Jan-2023 7-Feb-2023
21-Dec-2022 28-Dec-2022 4-Jan-2023 11-Jan-2023 18-Jan-2023 25-Jan-2023 1-Feb-2023 8-Feb-2023
22-Dec-2022 29-Dec-2022 5-Jan-2023 12-Jan-2023 19-Jan-2023 26-Jan-2023 2-Feb-2023 9-Feb-2023
23-Dec-2022 30-Dec-2022 6-Jan-2023 13-Jan-2023 20-Jan-2023 27-Jan-2023 3-Feb-2023 10-Feb-2023
24-Dec-2022 31-Dec-2022 7-Jan-2023 14-Jan-2023 21-Jan-2023 28-Jan-2023 4-Feb-2023 11-Feb-2023
Minggu 22 Minggu 23 Minggu 24 Minggu 25 Minggu 26 Minggu 27 Minggu 28 Minggu 29
50.00
BULAN 8 BULAN 9 BULAN 1
12-Feb-2023 19-Feb-2023 26-Feb-2023 5-Mar-2023 12-Mar-2023 19-Mar-2023 26-Mar-2023 2-Apr-2023
13-Feb-2023 20-Feb-2023 27-Feb-2023 6-Mar-2023 13-Mar-2023 20-Mar-2023 27-Mar-2023 3-Apr-2023
14-Feb-2023 21-Feb-2023 28-Feb-2023 7-Mar-2023 14-Mar-2023 21-Mar-2023 28-Mar-2023 4-Apr-2023
15-Feb-2023 22-Feb-2023 1-Mar-2023 8-Mar-2023 15-Mar-2023 22-Mar-2023 29-Mar-2023 5-Apr-2023
16-Feb-2023 23-Feb-2023 2-Mar-2023 9-Mar-2023 16-Mar-2023 23-Mar-2023 30-Mar-2023 6-Apr-2023
17-Feb-2023 24-Feb-2023 3-Mar-2023 10-Mar-2023 17-Mar-2023 24-Mar-2023 31-Mar-2023 7-Apr-2023
18-Feb-2023 25-Feb-2023 4-Mar-2023 11-Mar-2023 18-Mar-2023 25-Mar-2023 1-Apr-2023 8-Apr-2023
Minggu 30 Minggu 31 Minggu 32 Minggu 33 Minggu 34 Minggu 35 Minggu 36 Minggu 37
214
BULAN 10 BULAN 11 BULAN 1
9-Apr-2023 16-Apr-2023 23-Apr-2023 30-Apr-2023 7-May-2023 14-May-2023 21-May-2023 28-May-2023
10-Apr-2023 17-Apr-2023 24-Apr-2023 1-May-2023 8-May-2023 15-May-2023 22-May-2023 29-May-2023
11-Apr-2023 18-Apr-2023 25-Apr-2023 2-May-2023 9-May-2023 16-May-2023 23-May-2023 30-May-2023
12-Apr-2023 19-Apr-2023 26-Apr-2023 3-May-2023 10-May-2023 17-May-2023 24-May-2023 31-May-2023
13-Apr-2023 20-Apr-2023 27-Apr-2023 4-May-2023 11-May-2023 18-May-2023 25-May-2023 1-Jun-2023
14-Apr-2023 21-Apr-2023 28-Apr-2023 5-May-2023 12-May-2023 19-May-2023 26-May-2023 2-Jun-2023
15-Apr-2023 22-Apr-2023 29-Apr-2023 6-May-2023 13-May-2023 20-May-2023 27-May-2023 3-Jun-2023
Minggu 38 Minggu 39 Minggu 40 Minggu 41 Minggu 42 Minggu 43 Minggu 44 Minggu 45
BULAN 12
4-Jun-2023 11-Jun-2023 18-Jun-2023
5-Jun-2023 12-Jun-2023 19-Jun-2023
6-Jun-2023 13-Jun-2023 20-Jun-2023
7-Jun-2023 14-Jun-2023 21-Jun-2023
8-Jun-2023 15-Jun-2023 22-Jun-2023
9-Jun-2023 16-Jun-2023 23-Jun-2023
10-Jun-2023 17-Jun-2023 24-Jun-2023
Minggu 46 Minggu 47 Minggu 48
CONTRACT CHANGE ORDER (CCO-01)
PEMBANGUNAN MASJID ALI AKBAR TABONA TERNATE
KEGIATAN : PEMBANGUNAN DAN PENGEMBANGAN INFRASTRUKTUR KAWASAN PERMUKIMAN DI KAWASAN STRATEGIS DAERAH PROVINSI
PEKERJAAN
LOKASI
: PEMBANGUNAN MASJID ALI AKBAR TABONA TERNATE
: KOTA TERNATE-MALUKU UTARA
CCO-01
TAHUN ANGGARAN : 2022
KEGIATAN : PEMBANGUNAN DAN PENGEMBANGAN INFRASTRUKTUR KAWASAN PERMUKIMAN DI KAWASAN STRATEGIS DAERAH PROVINSI
PEKERJAAN : PEMBANGUNAN MASJID ALI AKBAR TABONA TERNATE
LOKASI : KOTA TERNATE-MALUKU UTARA
TAHUN ANGGARAN : 2022
RENCANA PROGRESS PEKERJAAN PERMINGGU (%) 0.30 1.57 5.08 6.42 8.50 4.68 7.05 6.57 19.87 8.37 11.10 3.71 6.46 5.97 1.45 0.58 1.19 1.14
KUMULATIF RENCANA PROGRESS PEKERJAAN PERMINGGU (%) 0.00 0.30 1.87 6.95 13.37 21.87 26.54 33.59 40.16 60.03 68.40 79.49 83.21 89.67 95.64 97.09 97.67 98.86 100.00
REALISASI PROGRESS PEKERJAAN PERMINGGU (%) 0.76 1.35
KUMULATIF REALISASI PROGRESS PEKERJAAN PERMINGGU (%) 0.00 0.76 2.11
DEVIASI PERMINGGU (%) 0.46 0.24
KEGIATAN 0 PEMBANGUNAN DAN PENGEMBANGAN INFRASTRUKTUR KAWASAN PERMUKIMAN DI KAWASAN STRATEGIS DAERAH PROVINSI
PEKERJAAN 0 PEMBANGUNAN MASJID ALI AKBAR TABONA TERNATE
LOKASI 0 KOTA TERNATE-MALUKU UTARA
TAHUN ANGGARAN 0 2022
RENCANA PROGRESS PEKERJAAN PERMINGGU (%) 0.30 1.57 5.08 6.42 8.50 4.68 7.05 6.57 19.87 8.37 11.10 3.71 6.46 5.97 1.45 0.58 1.19 1.14
KUMULATIF RENCANA PROGRESS PEKERJAAN PERMINGGU (%) 0.00 0.30 1.87 6.95 13.37 21.87 26.54 33.59 40.16 60.03 68.40 79.49 83.21 89.67 95.64 97.09 97.67 98.86 100.00
REALISASI PROGRESS PEKERJAAN PERMINGGU (%) 0.76 1.35
KUMULATIF REALISASI PROGRESS PEKERJAAN PERMINGGU (%) 0.00 0.76 2.11
RENCANA PROGRESS PEKERJAAN PERMINGGU CCO-01 (%) 0.93 0.47 1.45 4.13 4.47 22.37 17.63 4.64 4.76 16.77 11.79 5.46 0.43 0.66 1.02 1.14
KUMULATIF RENCANA PROGRESS PEKERJAAN PERMINGGU CCO-01 (%) 1.87 2.80 3.27 4.72 8.85 13.32 35.69 53.32 57.96 62.72 79.50 91.29 96.74 97.17 97.84 98.86 100.00
REALISASI PROGRESS PEKERJAAN PERMINGGU CCO-01 (%) 0.24 0.34 0.11 1.61 12.50 12.03 5.45 20.44 12.20 12.20
KUMULATIF REALISASI PROGRESS PEKERJAAN PERMINGGU CCO-01 (%) 0.00 2.11 2.34 2.68 2.79 4.40 16.89 28.93 34.38 54.82 67.01 79.21
DEVIASI PERMINGGU CCO-01 (%) -0.46 -0.59 -1.94 -4.45 3.58 -6.76 -18.94 -3.14 4.29 -0.29
SKETSA GAMBAR
Ø12-200
Ø8-200
Slof S1 300x400
40
Ø12-200
Ø8-150
485
415
40
Ø8-150
Ø12-200 230
160
Ø12-150
30
30
Ø12-150
30
30
Rabat Beton T 10 cm
Urugan Pasir T 5 cm
40 (B)40 40 40 (B)40 40
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 0.10 0.00
2 0.35 0.00 0.00 0.00
3 0.35 -0.55 (0.20) 0.00
-0.20
4 1.05 -0.55 (0.20) -0.58
5 1.05 0.00 0.00 -0.58
-0.40
6 1.30 0.00 0.00 0.00
-0.55 -0.55 -0.55 -0.55
7 1.30 -1.55 (2.02) 0.00
-0.60 8 0.10 -1.55 (2.02) -0.16
Y(EL)
-1.00
-1.20
-1.80
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40
X(DIST)
REKAP VOLUME
NO PANJANG (M') LEBAR (M') TINGGI (M') JUMLAH AREA (M2) VOLUME (M3) KET
SKETSA GAMBAR
PONDASI TALUD
+5.00
50 110
375
Tanah Timbunan
500
160
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 0.00
0.90
2 0.00 0.80 0.00 0.00
3 1.60 0.42 0.00 1.28
0.80 0.80
4 1.60 0.00 0.00 0.68
5 0.00 0.00 0.00 0.00
0.70
1 0.00 0.00
0.60
Y(EL)
0.50
0.42
0.40
0.30
0.20
TOTAL 0.00 1.96
TOTAL AREA (M2) 0.979
0.10
X(DIST)
SKETSA GAMBAR
K5 200x200
S1 300x400
20
50
Tanah Timbunan
Elev.Eksisting
100
30
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 0.00
0.60
2 0.00 0.55 0.00 0.00
0.55 0.55 3 0.90 0.55 0.00 0.49
4 0.90 0.00 0.00 0.49
0.50
5 0.00 0.00 0.00 0.00
1 0.00 0.00
0.40
Y(EL)
0.30
0.20
X(DIST)
REKAP VOLUME
NO PANJANG (M') LEBAR (M') TINGGI (M') JUMLAH AREA (M2) VOLUME (M3) KET
SKETSA GAMBAR
BETON K-275
Ø12-200
Ø8-200
Slof S1 300x400
40
40
Ø12-200
Ø8-150
485
485
415
415
40
Ø8-150
Ø12-200
230
160
Ø12-150
30
30
30
Ø12-150
30
30
Rabat Beton T 10 cm
Urugan Pasir T 5 cm
40 (B)40 40
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
0.00 0.00 0.00 1 0.00 0.00
2 3.05 0.00 0.00 0.00
-0.20 3 3.05 -1.55 (4.73) 0.00
4 0.00 -1.55 (4.73) 0.00
-0.40
5 0.00 0.00 0.00 0.00
1 0.00 0.00
-0.60
Y(EL)
-0.80
-1.00
-1.20
-1.40
-1.55 -1.55
-1.60
TOTAL (9.46) 0.00
-1.80 TOTAL AREA (M2) 4.728
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
X(DIST)
SKETSA GAMBAR
K5 200x200
S1 300x400
20
50
Tanah Timbunan
Elev.Eksisting
100
30
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
0.25
1 0.05 0.00
2 0.05 0.20 0.01 0.00
3 0.85 0.20 0.01 0.17
4 0.85 0.00 0.00 0.17
0.20 0.20 0.20
5 0.05 0.00 0.00 0.00
1 0.05 0.00
0.15
Y(EL)
0.10
0.05
-0.05
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90
X(DIST)
SKETSA GAMBAR
+3.75
K1 350x400
40
S1 300x400
Tanah Timbunan
345
395
Elev.Eksisting
20 30
70
80
90
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
4.00 1 0.26 3.75
2 0.56 3.75 0.97 2.09
3.75 3.75
3 0.75 0.00 0.00 2.81
3.50
4 0.05 0.00 0.00 0.00
5 0.26 3.75 0.19 0.00
3.00 1 0.26 3.75
2.50
Y(EL)
2.00
1.50
X(DIST)
SKETSA GAMBAR
+2.75
K1 350x400
40
S1 300x400
Tanah Timbunan
24 5
Elev.Eksisting
30
70
80
90
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.26 2.75
3.00
2 0.56 2.75 0.71 1.53
2.75 2.75 3 0.75 0.00 0.00 2.06
4 0.05 0.00 0.00 0.00
2.50
5 0.26 2.75 0.14 0.00
1 0.26 2.75
2.00
Y(EL)
1.50
1.00
X(DIST)
SKETSA GAMBAR
+2.50
K1 350x400
40
S1 300x400
Tanah Timbunan
220
270
Elev.Eksisting
30
70
80
90
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.05 0.00
3.00
2 0.25 2.50 0.13 0.00
3 0.55 2.50 0.63 1.38
4 0.75 0.00 0.00 1.88
2.50 2.50 2.50 5 0.05 0.00 0.00 0.00
1 0.05 0.00
2.00
Y(EL)
1.50
1.00
X(DIST)
SKETSA GAMBAR
+2.35
K1 350x400
40
S1 300x400
Tanah Timbunan
205
255
Elev.Eksisting
30
70
80
90
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.05 0.00
2.50
2 0.25 2.35 0.12 0.00
2.35 2.35 3 0.55 2.35 0.59 1.29
4 0.75 0.00 0.00 1.76
5 0.05 0.00 0.00 0.00
2.00
1 0.05 0.00
Y(EL)
1.50
1.00
X(DIST)
SKETSA GAMBAR
+2.25
K1 350x400
S1 300x400
40
Tanah Timbunan
195
245
Elev.Eksisting
30
70
80
90
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.05 0.00
2.50
2 0.25 2.25 0.11 0.00
3 0.55 2.25 0.56 1.24
2.25 2.25
4 0.75 0.00 0.00 1.69
5 0.05 0.00 0.00 0.00
2.00
1 0.05 0.00
Y(EL)
1.50
1.00
X(DIST)
SKETSA GAMBAR
+1.75
K1 350x400
40
S1 300x400
Tanah Timbunan
145
195
Elev.Eksisting
30
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.05 0.00
2.00
2 0.25 1.75 0.09 0.00
3 0.55 1.75 0.44 0.96
1.80
1.75 1.75 4 0.75 0.00 0.00 1.31
5 0.05 0.00 0.00 0.00
1.60
1 0.05 0.00
1.40
Y(EL)
1.20
1.00
0.80
0.60
TOTAL 0.53 2.28
0.40 TOTAL AREA (M2) 0.875
0.20
X(DIST)
SKETSA GAMBAR
+1.05
K1 350x400
40
S1 300x400
Tanah Timbunan
75
Elev.Eksisting
30
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 0.00
1.20
2 0.10 1.05 0.00 0.00
3 0.40 1.05 0.11 0.42
1.05 1.05 4 0.50 0.00 0.00 0.53
1.00 5 0.00 0.00 0.00 0.00
1 0.00 0.00
0.80
Y(EL)
0.60
0.40
X(DIST)
SKETSA GAMBAR
+0.70
K1 350x400
S1 300x400
40
Tanah Timbunan
40
30
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 0.00
0.80
2 0.10 0.70 0.00 0.00
3 0.40 0.70 0.07 0.28
0.70 0.70 0.70 4 0.50 0.00 0.00 0.35
5 0.00 0.00 0.00 0.00
1 0.00 0.00
0.60
0.50
Y(EL)
0.40
0.30
0.10
X(DIST)
SKETSA GAMBAR
+0.60
K1 350x400
S1 300x400
40
Tanah Timbunan
30
30
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 0.00
0.70
2 0.10 0.60 0.00 0.00
3 0.40 0.60 0.06 0.24
4 0.50 0.00 0.00 0.30
0.60 0.60 0.60
5 0.00 0.00 0.00 0.00
1 0.00 0.00
0.50
Y(EL)
0.40
0.30
0.20
TOTAL 0.06 0.54
TOTAL AREA (M2) 0.241
0.10
X(DIST)
SKETSA GAMBAR
+0.50
K5 200x200
S1 300x400
40
Tanah Timbunan
20
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 0.00
0.60
2 0.10 0.50 0.00 0.00
3 0.40 0.50 0.05 0.20
4 0.50 0.00 0.00 0.25
0.50 0.50 0.50 5 0.00 0.00 0.00 0.00
1 0.00 0.00
0.40
Y(EL)
0.30
0.20
X(DIST)
SKETSA GAMBAR
+5.00
50
475
600
Tanah Timbunan
125
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 -6.00
0.00 0.00 0.00
2 0.00 0.00 0.00 0.00
3 0.50 0.00 0.00 0.00
4 1.25 -4.75 (2.38) 0.00
-1.00 5 1.25 -6.00 (7.50) -5.94
6 0.00 -6.00 (7.50) 0.00
1 0.00 -6.00
-2.00
Y(EL)
-3.00
-4.00
-7.00
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40
X(DIST)
REKAP VOLUME
NO PANJANG (M') LEBAR (M') TINGGI (M') JUMLAH AREA (M2) VOLUME (M3) KET
159.32
SKETSA GAMBAR
Ø12-200
Ø8-200 40
Slof S1 300x400
Ø12-200
Ø8-150
485
415
40
Ø8-150
Ø12-200
230
160
Ø12-150
30
30
Ø12-150
30
30
Rabat Beton T 10 cm
Urugan Pasir T 5 cm
40 (B)40 40 40 (B)40 40
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 -0.40
2 0.00 0.00 0.00 0.00
0.10
0.05 0.05
3 0.40 0.05 0.00 0.00
0.00 0.00 0.00 4 0.80 0.05 0.02 0.04
-0.10
5 1.20 0.00 0.00 0.06
-0.20
6 1.20 -0.40 (0.48) 0.00
Y(EL)
-0.30
7 0.00 -0.40 (0.48) 0.00
-0.40 -0.40 -0.40
1 0.00 -0.40
-0.50
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40
X(DIST)
SKETSA GAMBAR
BETON K-275
Ø12-200
Ø8-200
285
Slof S1 300x400
40
40
43 200 43
48
Ø12-200
120
25
Ø8-150
48
485
485
415
415
40
Ø8-150
Ø12-200
230
160
Ø12-150
30
30
30
Ø12-150
30
30
Rabat Beton T 10 cm
Urugan Pasir T 5 cm
40 (B)40 40 40 (B)40 40
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.10 0.00
0.35
2 0.10 0.30 0.03 0.00
0.30 0.30 0.30
3 2.95 0.30 0.03 0.89
0.25
4 2.95 0.00 0.00 0.89
0.20
5 0.10 0.00 0.00 0.00
Y(EL)
0.15
0.10
1 0.10 0.00
0.05
0.00 0.00 0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
X(DIST)
SKETSA GAMBAR
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
0.50
1 0.00 0.00
2 0.49 0.42 0.00 0.00
0.42
0.40 3 0.92 -0.07 (0.04) 0.39
0.30
4 0.73 -0.23 (0.21) -0.05
5 0.47 0.07 0.05 -0.11
0.20 6 0.16 -0.19 (0.09) 0.01
Y(EL)
-0.07
-0.10
-0.20 -0.19
-0.23
-0.30
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
X(DIST)
TOTAL (0.29) 0.24
TOTAL AREA (M2) 0.263
SKETSA GAMBAR
56
30
43
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 0.00
0.40
2 0.00 0.30 0.00 0.00
0.30 0.30 0.30 3 0.56 0.30 0.00 0.17
0.20
4 0.93 -0.13 (0.07) 0.28
5 0.71 -0.32 (0.30) -0.09
0.10 6 0.43 0.00 0.00 -0.14
Y(EL)
-0.20
-0.30
-0.32
-0.40
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
X(DIST)
TOTAL (0.38) 0.22
TOTAL AREA (M2) 0.298
SKETSA GAMBAR
40
35
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.40 0.40
0.90
2 0.40 0.80 0.32 0.16
0.80 0.80 0.80 3 0.75 0.80 0.32 0.60
4 0.75 0.40 0.30 0.60
0.70 5 0.40 0.40 0.30 0.16
1 0.40 0.40
0.60
Y(EL)
0.50
0.30
0.20
0.10
X(DIST)
SKETSA GAMBAR
285
43 200 43
Ø10-150
Ø10-150
48
Ø10-150
120
25
Ø10-150
48
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.43 0.48
0.80
2 0.43 0.73 0.31 0.20
0.73 0.73
0.70
3 2.43 0.73 0.31 1.76
0.60 4 2.43 0.48 1.15 1.76
5 0.43 0.48 1.15 0.20
0.50
0.48 0.48
1 0.43 0.48
Y(EL)
0.40
0.30
0.20
0.10
0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00
X(DIST)
SKETSA GAMBAR
Pek. Sloof
SLOF S2
20 15
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 0.00
0.25
2 0.00 0.20 0.00 0.00
3 0.15 0.20 0.00 0.03
0.20 0.20 0.20 4 0.15 0.00 0.00 0.03
5 0.00 0.00 0.00 0.00
0.15 1 0.00 0.00
Y(EL)
0.10
0.05
X(DIST)
TOTAL 0.00 0.06
TOTAL AREA (M2) 0.030
SKETSA GAMBAR
SLOOF SI
40
30
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 0.00
0.45
2 0.00 0.40 0.00 0.00
0.40 0.40 0.40
3 0.30 0.40 0.00 0.12
0.35 4 0.30 0.00 0.00 0.12
0.30 5 0.00 0.00 0.00 0.00
1 0.00 0.00
Y(EL)
0.25
0.20
0.15
0.10
0.05
X(DIST)
TOTAL 0.00 0.24
TOTAL AREA (M2) 0.120
SKETSA GAMBAR
KOLOM K1
40
35
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 0.00
0.45
2 0.00 0.40 0.00 0.00
0.40 0.40 0.40
3 0.35 0.40 0.00 0.14
0.35 4 0.35 0.00 0.00 0.14
0.30 5 0.00 0.00 0.00 0.00
1 0.00 0.00
Y(EL)
0.25
0.20
0.15
0.10
0.05
X(DIST)
SKETSA GAMBAR
KOLOM K2
20
20
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 0.00 0.00
0.25
2 0.00 0.20 0.00 0.00
0.20 0.20 0.20 3 0.20 0.20 0.00 0.04
4 0.20 0.00 0.00 0.04
0.15
5 0.00 0.00 0.00 0.00
Y(EL)
0.05
X(DIST)
SKETSA GAMBAR
Pek. Kolom K3
KOLOM K3
56
30
43
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
0.40
1 0.00 0.00
2 0.00 0.30 0.00 0.00
0.30 0.30 0.30
3 0.56 0.30 0.00 0.17
0.20 4 0.93 -0.13 (0.07) 0.28
0.10 5 0.71 -0.32 (0.30) -0.09
6 0.43 0.00 0.00 -0.14
Y(EL)
-0.30
-0.32
-0.40
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
X(DIST)
SKETSA GAMBAR
Pek. Kolom K4
KOLOM K4
GRAFIK PERHITUNGAN
No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
0.50
1 0.00 0.00
2 0.49 0.42 0.00 0.00
0.42
0.40 3 0.92 -0.07 (0.04) 0.39
0.30 4 0.73 -0.23 (0.21) -0.05
5 0.47 0.07 0.05 -0.11
0.20
6 0.16 -0.19 (0.09) 0.01
Y(EL)
-0.20 -0.19
-0.23
-0.30
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
X(DIST)
REKAP VOLUME
NO PANJANG (M') LEBAR (M') TINGGI (M') JUMLAH AREA (M2) VOLUME (M3) KET
SHAARE WALL
2 1.20 1 0.86 1.03 Beton K-275
2.85 0.10 3.42 0.34 Lantai Kerja
8.10 0.30 1 2.43 Bekesting
PEK.KOLOM PEDESTAL
3 3.00 1 0.26 0.79 Beton K-275 (K4)
2.60 3.00 1 7.80 Bekesting
PEK. SLOOF
9 22.20 1 0.03 0.67 Beton K-275 (S2)
0.40 1 8.88 Bekesting
SKETSA GAMBAR
Ø12-100 Ø12-150
Ø12-150
35
30
20
Ø12-100
110 Rabat Beton T 10 cm
Urugan Pasir T 5 cm
120
120 285
Ø12-100 43 200 43
Ø12-100
Ø10-150
Ø10-150
48
Ø 12-100
Ø 12-100
Ø10-150
120
120
25
Ø10-150
48
Dia Jarak Panjang Besi Jumlah Total Unit Berat Jumlah Volume
No. Item Pekerjaan Ket
mm m1 A (m1) B (m1) C (m1) D (m1) Kait Batang Panjang (m1) Kg/m1 Bidang Kg
1 P.TELAPAK 16 0.100 0.300 1.100 0.300 1.10 0.14 12 35.28 1.578 20 1113.61 TULANGAN Z
16 0.100 0.300 1.100 0.300 1.10 0.14 12 35.28 1.578 20 1113.61 TULANGAN X
2 P.TELAPAK SHEAR WALL 16 0.150 0.200 2.750 0.200 2.750 0.14 15 90.60 1.578 1 142.99 TULANGAN Z
16 0.150 0.200 2.100 0.200 2.100 0.14 19 91.64 1.578 1 144.63 TULANGAN X
SKETSA GAMBAR
KOLOM PEDESTAL
(A ) VA R IA S I
40
35
6-D16
30
8-Ø12
Ø8-150 40 (B)40 40
Dia Jarak Panjang Besi Jumlah Total Unit Berat Jumlah Volume
No. Item Pekerjaan Ket
mm m1 A (m1) B (m1) C (m1) D (m1) Kait Batang Panjang (m1) Kg/m1 Bidang Kg
1 KOLOM PEDESTAL (K1) 16 6.000 0.150 0.260 0.14 6 39.30 1.578 4 248.10 TUL. POKOK
12 6.000 0.14 8 49.12 0.888 4 174.43
8 0.150 0.170 0.320 0.170 0.32 0.10 41 44.28 0.395 4 69.88 TUL. BEGEL
2 KOLOM PEDESTAL (K1) 16 4.330 0.150 0.260 0.14 6 29.28 1.578 2 92.42 TUL. POKOK
12 4.330 0.14 8 35.76 0.888 2 63.49
8 0.150 0.170 0.320 0.170 0.32 0.10 30 32.26 0.395 2 25.45 TUL. BEGEL
3 KOLOM PEDESTAL (K1) 16 3.000 0.150 0.260 0.14 6 21.30 1.578 8 268.93 TUL. POKOK
12 3.000 0.14 8 25.12 0.888 8 178.40
8 0.150 0.170 0.320 0.170 0.32 0.10 21 22.68 0.395 8 71.59 TUL. BEGEL
4 KOLOM PEDESTAL (K2) 16 6.000 0.150 0.260 0.14 6 39.30 1.578 1 62.02 TUL. POKOK
12 6.000 0.14 8 49.12 0.888 1 43.61
8 0.150 0.170 0.320 0.170 0.32 0.10 41 44.28 0.395 1 17.47 TUL. BEGEL
5 KOLOM PEDESTAL (K4) 16 3.000 0.150 0.260 0.14 6 21.30 1.578 1 33.62 TUL. POKOK
12 3.000 0.14 8 25.12 0.888 1 22.30
8 0.150 0.170 0.320 0.170 0.32 0.10 21 22.68 0.395 1 8.95 TUL. BEGEL
SKETSA GAMBAR
KOLOM K3
56
30
KOLOM K2 (SHEAR WALL)
43
28-Ø12
25
Ø8-150
200 KOLOM K4
20-Ø12
Ø8-150
28-Ø12
Ø8-150
Dia Jarak Panjang Besi Jumlah Total Unit Berat Jumlah Volume
No. Item Pekerjaan Ket
mm m1 A (m1) B (m1) C (m1) D (m1) Kait Batang Panjang (m1) Kg/m1 Bidang Kg
1 K2 SHEAR WALL 12 3.000 0.150 0.260 0.14 20 71.00 0.888 1 63.03 TUL. POKOK
8 0.150 1.900 0.150 1.900 0.150 0.10 21 88.20 0.395 1 34.80 TUL. BEGEL
2 PEDESTAL K3 12 6.000 0.150 0.260 0.14 28 183.40 0.888 1 162.82 TUL. POKOK
8 0.150 0.800 0.200 0.980 0.200 0.10 41 93.48 0.395 1 36.88 TUL. BEGEL
3 PEDESTAL K4 12 3.000 0.150 0.260 0.14 28 99.40 0.888 1 88.24 TUL. POKOK
8 0.150 1.100 0.150 0.820 0.150 0.10 21 48.72 0.395 1 19.22 TUL. BEGEL
SKETSA GAMBAR
SLOF S2
SLOOF BAWAH SI SLOOF SI
20
40
40
15
30 30
8-Ø12
12-Ø12 12-Ø12
Ø6-150
Ø8-150 Ø8-150
Dia Jarak Panjang Besi Jumlah Total Unit Berat Jumlah Volume
No. Item Pekerjaan Ket
mm m1 A (m1) B (m1) C (m1) D (m1) Kait Batang Panjang (m1) Kg/m1 Bidang Kg
SKETSA GAMBAR
KOLOM K1 KOLOM K2
40
20
20
35
6-D16
8-Ø12 8-Ø12
Ø8-150 Ø6-150
Dia Jarak Panjang Besi Jumlah Total Unit Berat Jumlah Volume
No. Item Pekerjaan Ket
mm m1 A (m1) B (m1) C (m1) D (m1) Kait Batang Panjang (m1) Kg/m1 Bidang Kg
SKETSA GAMBAR
KOLOM K3
56
30
KOLOM K2 (SHEAR WALL)
43
28-Ø12
25
Ø8-150
200 KOLOM K4
20-Ø12
Ø8-150
28-Ø12
Ø8-150
Dia Jarak Panjang Besi Jumlah Total Unit Berat Jumlah Volume
No. Item Pekerjaan Ket
mm m1 A (m1) B (m1) C (m1) D (m1) Kait Batang Panjang (m1) Kg/m1 Bidang Kg
1 KOLOM K2 SHEAR WALL 12 4.250 0.14 20 87.80 0.888 1 77.95 TUL. POKOK
8 0.150 1.900 0.150 1.900 0.150 0.10 29 123.20 0.395 1 48.61 TUL. BEGEL
SKETSA GAMBAR
25
40
35
15
25 20
4-Ø16 4-Ø16
Dia Jarak Panjang Besi Jumlah Total Unit Berat Jumlah Volume
No. Item Pekerjaan Ket
mm m1 A (m1) B (m1) C (m1) D (m1) Kait Batang Panjang (m1) Kg/m1 Bidang Kg
Sketsa
KOLOM PEDESTAL
(A) VARIASI
40
35
6-D16
30
8-Ø12
Ø8-150 40 (B)40 40
Sketsa
KOLOM PEDESTAL
40
25
35 415
Ø12-200
Ø8-200
470
Ø12-200
6-D16 Ø8-200
8-Ø12
Ø12-150
30
Ø12-150
Rabat Beton T 10 cm
Ø8-150
Urugan Pasir T 5 cm
Volume Total
Panjang Lebar Sisi Tinggi Jumlah KPD Area Keterangan
BH Volume
a b c d e f=(e/c) g = (exf) h
0.40 0.35 2.00 7.00 0.14 0.28 1.96 Beton K-275
Sketsa
75
155
70
120
Volume Total
Panjang Lebar Sisi Tinggi Jumlah KPD Jumlah Keterangan
BH Volume
a b c d e f=(e/c) g = (exf) h
85.69 0.70 0.80 47.99 GALIAN PONDASI MENERUS
Sketsa
Volume Total
Panjang A B Tinggi AREA Jumlah Keterangan
BH Volume
a b c d e f=(e/c) g = (exf) h
21.98 0.30 0.60 1.55 0.45 0.70 15.33 15.33
Sketsa
75
70
Volume Total
Panjang Lebar Sisi Tinggi Panjang Area Keterangan
BH Volume
a b c d e f=(e/c) g = (exf) h
135.00 0.70 0.70 66.15 GALIAN PONDASI
Sketsa
5
35
30
120 Ø12-150
Ø12-150
120 Rabat Beton T 10 cm
Urugan Pasir T 5 cm
Ø12-100 285
Ø12-100
43 200 43
Ø10-150
Ø10-150
Ø12-100
48
Ø12-100
Ø10-150
120
120
25
Ø10-150
48
Jarak Panjang Total
Panjang Lebar Kait Besi Jumlah Panjang Lapisan Bj Bj Dia Total Berat Keterangan
Tulangan Besi Panjang
a b c d e = (a+d) f=(e/c) g = (exf) h I =(gxh) j k l=(ixj) m
1.20 0.10 0.20 1.40 12.00 16.80 2.00 33.60 0.8874 12 29.82
1.20 0.10 0.20 1.40 12.00 16.80 2.00 33.60 0.8874 12 29.82
2.00 0.15 0.20 2.20 13.33 29.33 2.00 58.67 0.8874 12 52.06
1.20 0.15 0.20 1.40 8.00 11.20 2.00 22.40 0.8874 12 19.88
2.00 0.15 0.20 2.20 13.33 29.33 2.00 58.67 0.8874 12 104.12
1.20 0.15 0.20 1.40 8.00 11.20 2.00 22.40 0.8874 12 39.76
Sketsa
SLOOF SI
40
30
12-Ø12
Ø8-150
Sketsa
KOLOM K1
40
35
6-D16
8-Ø12
Ø8-150
Sketsa
Sketsa
KOLOM PEDESTAL
40
35
6-D16
8-Ø12
Ø8-150
Sketsa
KOLOM K1
40
35
6-D16
8-Ø12
Ø8-150
Volume Total
Panjang Lebar Sisi Tinggi Jumlah KPD Area Keterangan
BH Volume
a b c d e f=(e/c) g = (exf) h
0.40 0.35 4.00 15.00 0.14 0.56 8.40 Beton K-275
Sketsa
SEG M EN 3B
144
121
121
201
SEG M EN 2A
421
SEGM EN 4
SEGM EN 3
V O ID
575
854
SEG M EN 1A
442
SEGMEN 2
1782
822
344
SEGMEN 1
798
504
520
5.20 0.15 0.04 5.24 34.67 181.65 2.00 363.31 0.61625 10 223.89 Segmen 1
4.40 0.15 0.04 4.44 29.33 130.24 1.00 130.24 0.61625 10 80.26 Segmen 1A
5.20 0.15 0.04 5.24 34.67 181.65 1.00 181.65 0.61625 10 111.94 Segmen 1A
8.22 0.15 0.04 8.26 54.80 452.65 2.00 905.30 0.61625 10 557.89 Segmen 2
5.04 0.15 0.04 5.08 33.60 170.69 2.00 341.38 0.61625 10 210.37 Segmen 2
4.21 0.15 0.04 4.25 28.07 119.28 1.00 119.28 0.61625 10 73.51 Segmen 2A
5.04 0.15 0.04 5.08 33.60 170.69 1.00 170.69 0.61625 10 105.19 Segmen 2A
8.54 0.15 0.04 8.58 56.93 488.49 2.00 976.98 0.61625 10 602.06 Segmen 3
3.44 0.15 0.04 3.48 22.93 79.81 2.00 159.62 0.61625 10 98.36 Segmen 3
1.44 0.15 0.04 1.48 9.60 14.21 1.00 14.21 0.61625 10 8.76 Segmen 3A
1.21 0.15 0.04 1.25 8.07 10.08 1.00 10.08 0.61625 10 6.21 Segmen 3A
5.75 0.15 0.04 5.79 38.33 221.95 2.00 443.90 0.61625 10 273.55 Segmen 4
2.01 0.15 0.04 2.05 13.40 27.47 2.00 54.94 0.61625 10 33.86 Segmen 4
7.70 0.15 0.04 7.74 51.33 397.32 2.00 794.64 0.61625 10 489.70 Segmen 5
1.28 0.15 0.04 1.32 8.53 11.26 2.00 22.53 0.61625 10 13.88 Segmen 5
4.60 0.15 0.04 4.64 30.67 142.29 1.00 142.29 0.61625 10 87.69 Segmen 6
3.68 0.15 0.04 3.72 24.53 91.26 1.00 91.26 0.61625 10 56.24 Segmen 6
2.01 0.15 0.04 2.05 13.40 27.47 1.00 27.47 0.61625 10 16.93 Segmen 7
3.11 0.15 0.04 3.15 20.73 65.31 1.00 65.31 0.61625 10 40.25 Segmen 7
Total Berat 3616.40 Kg
BACK UP DATA
KEGIATAN : PEMBANGUNAN DAN PENGEMBANGAN INFRASTRUKTUR KAWASAN PERMUKIMAN DI KAWASAN STRATEGIS
DAERAH PROVINSI
PEKERJAAN : PEMBANGUNAN MASJID ALI AKBAR TABONA TERNATE
LOKASI : KOTA TERNATE-MALUKU UTARA
TAHUN ANGGARAN : 2022
ITEM PEKERJAAN : TULANGAN KOLOM PEDESTAL SLOOF KOLOM
Sketsa
KOLOM K1
40
25
Ø12-200
Ø8-200
35
415
470
Ø12-200
Ø8-200
6-D16
Ø12-150
8-Ø12
30
Ø12-150
Rabat Beton T 10 cm
Urugan Pasir T 5 cm
Ø8-150
Sketsa
RING BALOK B1
40
25
12-Ø12
Ø8-150
Volume Total
Panjang Lebar Sisi Tinggi Panjang Area Keterangan
BH Volume
a b c d e f=(e/c) g = (exf) h
0.40 0.25 125.22 0.10 12.52 12.52 Beton K-275
Sketsa
RING BALOK B1
40 25
12-Ø12
Ø8-150
Sketsa
RING BALOK B2
35
20
12-Ø12
Ø8-150
Volume Total
Panjang Lebar Sisi Tinggi Panjang Area Keterangan
BH Volume
a b c d e f=(e/c) g = (exf) h
0.40 0.25 125.22 0.10 12.52 12.52 Beton K-275
Sketsa
BAC UP DATA
SKET GAMBAR
175.3990
GRAFIK PERHITUNGAN
1. PELAT LANTAI No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 17.90 0.00
20.00
2 17.90 4.18 74.84 0.00
18.00 17.82 17.82
17.82 17.82 3 12.86 4.18 74.84 53.77
16.00 4 12.86 8.07 103.78 53.77
14.00 5 7.88 8.07 103.78 63.58
12.00 11.94 11.94 6 7.88 9.71 76.57 63.58
Y(EL)
-5.00
-6.00
-7.00
-8.00
-9.00
-9.45 -9.45
-10.00
0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.20 2.40 2.60
X(DIST)
TOTAL (45.36) -18.90
TOTAL AREA (M2) 0.000
BAC UP DATA
SKET GAMBAR
175.3990
GRAFIK PERHITUNGAN
1. PELAT LANTAI No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 17.90 0.00
20.00
2 17.90 4.18 74.84 0.00
18.00 17.82 17.82
17.82 17.82 3 12.86 4.18 74.84 53.77
16.00 4 12.86 8.07 103.78 53.77
14.00 5 7.88 8.07 103.78 63.58
12.00 11.94 11.94 6 7.88 9.71 76.57 63.58
Y(EL)
BAC UP DATA
SKET GAMBAR
175.3990
GRAFIK PERHITUNGAN
1. PELAT LANTAI No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 17.90 0.00
20.00
2 17.90 4.18 74.84 0.00
18.00 17.82 17.82
17.82 17.82 3 12.86 4.18 74.84 53.77
16.00 4 12.86 8.07 103.78 53.77
14.00 5 7.88 8.07 103.78 63.58
12.00 11.94 11.94 6 7.88 9.71 76.57 63.58
Y(EL)
BAC UP DATA
SKET GAMBAR
175.3990
GRAFIK PERHITUNGAN
1. PELAT LANTAI No X(DIST) Y(EL) Xn*Yn+1 Yn*Xn-1 VOLUME (M2)
1 17.90 0.00
20.00
2 17.90 4.18 74.84 0.00
18.00 17.82 17.82
17.82 17.82 3 12.86 4.18 74.84 53.77
16.00 4 12.86 8.07 103.78 53.77
14.00 5 7.88 8.07 103.78 63.58
12.00 11.94 11.94 6 7.88 9.71 76.57 63.58
Y(EL)
4 Kolom Utama K1 30/30 Dimensi Luas(m2) Tinggi Volume Unit Tot Vol
Beton K-275 0.3 0.3 0.09 3.65 0.3285 17 5.5845
Bekesting 0.3 0.3 1.2 3.65 4.38 17 74.46
Besi Beton Panjang Jum.Tul P.Tot Berat/m Berat Tot Volume
Dia.14 3.65 6 21.9 1.58 34.602
Dia.12 3.65 2 7.3 0.89 6.497
Dia.8 1.2 24.333333 29.2 0.39 11.388
Total = 52.487 17 892.279
5 Kolom Praktis 15/15 Dimensi Luas(m2) Tinggi Volume Unit Tot Vol
Beton K-275 0.15 0.15 0.0225 3.65 0.082125 8 0.657
Bekesting 0.15 0.15 0.6 3.65 2.19 8 17.52
Besi Beton Panjang Jum.Tul P.Tot Berat/m Berat Tot Volume
Dia. 10 3.65 4 14.6 0.616 8.9936
Dia. 8 0.6 24.333333 14.6 0.39 5.694
Total = 14.6876 8 117.5008
6 Pelat Lantai Dimensi Luas(m2) Tinggi Volume Unit Tot Vol
Beton K-275 7.99 5.21 0.12 4.995348 22.710924
5.05 3.89 0.12 2.35734
9.85 5 0.12 5.91
a t b Luas(m2) Tebal Plat
1.31 7.71 7.59 34.3095 0.12 4.11714
Segitiga 10.26 8.66 0.12 44.4258 5.331096
Bekesting 7.99 5.21 41.6279
Besi Beton Panjang Jum.Tul P.Tot Berat/m Berat Tot Volume
Memanjang Dia.12 15.85 64.333333 1019.6833 0.89 1815.04
Melintang Dia.12 9.65 105.66667 1019.6833 0.89 1815.04
Total = 3630.072667 3630.0727
7 Pelat Atap Dimensi Luas(m2) Tinggi Volume Unit Tot Vol
Beton K-275 7.97 4.82 0.12 38.4154 4.609848 18.023838
5.1 3.89 0.12 19.839 2.38068
9.67 5 0.12 48.35 5.802
Segitiga 10.15 8.59 0.12 43.59425 5.23131
Total = 18.023838
Bekesting 150.19865
Besi Beton Panjang Jum.Tul P.Tot Berat/m Berat Tot Volume
Memanjang Dia. 12 21 38.55 809.55 0.89 720.4995
Melintang Dia.12 7.71 105 809.55 0.89 720.4995
Total = 1440.999 1440.999
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
1 2 3
Terbilang : Delapan Ratus Empat Puluh Sembilan Juta Empat Ratus Empat Puluh Sembilan Ribu Tuju Ratus Rupiah
###
###
###
TTD ###
HASBI HAMISI
Direktur
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PEMBANGUNAN DAN PENGEMBANGAN INFRASTRUKTUR KAWASAN PERMUKIMAN DI KAWASAN STRATEGIS DAERAH PROVINSI
PEKERJAAN : PEMBANGUNAN MASJID ALI AKBAR TABONA TERNATE
LOKASI : KOTA TERNATE-MALUKU UTARA
TAHUN ANGGARAN : 2022
KEGIATAN : PEMBANGUNAN DAN PENGEMBANGAN INFRASTRUKTUR KAWASAN PERMUKIMAN DI KAWASAN STRATEGIS DAERAH PROVINSI
PEKERJAAN : PEMBANGUNAN MASJID ALI AKBAR TABONA TERNATE
LOKASI : KOTA TERNATE-MALUKU UTARA
TAHUN ANGGARAN : 2022
B. UPAH
1 Pekerja 1.6500 Oh Rp 120,000.00 Rp 198,000.00
2 Tukang Batu 0.2750 Oh Rp 173,700.00 Rp 47,767.50
3 Kepala Tukang 0.0280 Oh Rp 208,000.00 Rp 5,824.00
4 Mandor 0.0830 Oh Rp 208,000.00 Rp 17,264.00
JUMLAH Rp 1,581,432.60
B. UPAH
1 Pekerja 0.3200 Oh Rp 120,000.00 Rp 38,400.00
2 Tukang Kayu 0.3300 Oh Rp 173,700.00 Rp 57,321.00
3 Kepala Tukang 0.0330 Oh Rp 208,000.00 Rp 6,864.00
4 Mandor 0.0060 Oh Rp 208,000.00 Rp 1,248.00
JUMLAH Rp 220,683.00
B. UPAH
1 Pekerja 0.0600 Oh Rp 120,000.00 Rp 7,200.00
2 Tukang Las Konstruksi 0.0600 Oh Rp 173,700.00 Rp 10,422.00
3 Kepala Tukang 0.0060 Oh Rp 208,000.00 Rp 1,248.00
4 Mandor 0.0030 Oh Rp 208,000.00 Rp 624.00
JUMLAH #NAME?
40 MCB (BH)
A. BAHAN
1 MCB 16 A 1.0000 Bh Rp 115,000.00 Rp 115,000.00
B. UPAH
1 Upah Pasang 0.1000 Oh #NAME? #NAME?
JUMLAH #NAME?
58 Membuat dan Memasang 1 m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I.
A. BAHAN
1 Balok Kayu 1.1000 M3 Rp 7,475,000.00 Rp 8,222,500.00
2 Paku 10 cm 1.2500 Kg Rp 21,000.00 Rp 26,250.00
3 Lem Kayu 1.0000 Kg Rp 40,000.00 Rp 40,000.00
B. UPAH
1 Pekerja 7.0000 Oh Rp 120,000.00 Rp 840,000.00
2 Tukang Kayu 21.0000 Oh Rp 173,700.00 Rp 3,647,700.00
3 Kepala Tukang 2.1000 Oh Rp 208,000.00 Rp 436,800.00
4 Mandor 0.3500 Oh Rp 208,000.00 Rp 72,800.00
JUMLAH Rp 13,286,050.00
59 Membuat dan Memasang 1 m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas II.
A. BAHAN
1 Balok Kayu 1.2000 M3 Rp 7,475,000.00 Rp 8,970,000.00
2 Paku 10 cm 1.2500 Kg Rp 21,000.00 Rp 26,250.00
3 Lem Kayu 1.0000 Kg Rp 40,000.00 Rp 40,000.00
B. UPAH
1 Pekerja 6.0000 Oh Rp 120,000.00 Rp 720,000.00
2 Tukang Kayu 18.0000 Oh Rp 173,700.00 Rp 3,126,600.00
3 Kepala Tukang 1.8000 Oh Rp 208,000.00 Rp 374,400.00
4 Mandor 0.3000 Oh Rp 208,000.00 Rp 62,400.00
JUMLAH Rp 13,319,650.00
60 Membuat dan Memasang 1 m2 Daun Pintu Panel, Kayu Kelas II A
A. BAHAN
1 Papan Kayu 0.0400 M3 Rp 3,450,000.00 Rp 138,000.00
2 Lem Kayu 0.5000 Kg Rp 40,000.00 Rp 20,000.00
B. UPAH
1 Pekerja 1.0000 Oh Rp 120,000.00 Rp 120,000.00
2 Tukang Kayu 3.0000 Oh Rp 173,700.00 Rp 521,100.00
3 Kepala Tukang 0.3000 Oh Rp 208,000.00 Rp 62,400.00
4 Mandor 0.0500 Oh Rp 208,000.00 Rp 10,400.00
JUMLAH Rp 871,900.00
61 Membuat dan Memasang 1 m2 Pintu dan Jendela Kaca, Kayu Kelas II.
A. BAHAN
1 Papan Kayu 0.0240 M3 Rp 3,450,000.00 Rp 82,800.00
2 Lem Kayu 0.3000 Kg Rp 40,000.00 Rp 12,000.00
B. UPAH
1 Pekerja 0.8000 Oh Rp 120,000.00 Rp 96,000.00
2 Tukang Kayu 2.4000 Oh Rp 173,700.00 Rp 416,880.00
3 Kepala Tukang 0.2400 Oh Rp 208,000.00 Rp 49,920.00
4 Mandor 0.0400 Oh Rp 208,000.00 Rp 8,320.00
JUMLAH Rp 665,920.00
62 Membuat dan Memasang 1 m2 Pintu dan Jendela Jalusi, Kayu Kelas II.
A. BAHAN
1 Papan Kayu 0.0640 M3 Rp 3,450,000.00 Rp 220,800.00
2 Lem Kayu 0.5000 Kg Rp 40,000.00 Rp 20,000.00
B. UPAH
1 Pekerja 1.0000 Oh Rp 120,000.00 Rp 120,000.00
2 Tukang Kayu 3.0000 Oh Rp 173,700.00 Rp 521,100.00
3 Kepala Tukang 0.3000 Oh Rp 208,000.00 Rp 62,400.00
4 Mandor 0.0500 Oh Rp 208,000.00 Rp 10,400.00
JUMLAH Rp 954,700.00
B. UPAH
1 Pekerja 0.8000 Oh Rp 120,000.00 Rp 96,000.00
2 Tukang Kayu 2.0000 Oh Rp 173,700.00 Rp 347,400.00
3 Kepala Tukang 0.2000 Oh Rp 208,000.00 Rp 41,600.00
4 Mandor 0.0500 Oh Rp 208,000.00 Rp 10,400.00
JUMLAH Rp 616,150.00
B. UPAH
1 Pekerja 0.2000 Oh Rp 120,000.00 Rp 24,000.00
2 Tukang Kayu 0.3000 Oh Rp 173,700.00 Rp 52,110.00
3 Kepala Tukang 0.0300 Oh Rp 208,000.00 Rp 6,240.00
4 Mandor 0.0100 Oh Rp 208,000.00 Rp 2,080.00
JUMLAH Rp 145,915.00
B. UPAH
1 Pekerja 0.1000 Oh Rp 120,000.00 Rp 12,000.00
2 Tukang Kayu 0.2000 Oh Rp 173,700.00 Rp 34,740.00
3 Kepala Tukang 0.0200 Oh Rp 208,000.00 Rp 4,160.00
4 Mandor 0.0050 Oh Rp 208,000.00 Rp 1,040.00
JUMLAH Rp 91,300.00
B. UPAH
1 Pekerja 0.1500 Oh Rp 120,000.00 Rp 18,000.00
2 Tukang Kayu 0.2000 Oh Rp 173,700.00 Rp 34,740.00
3 Kepala Tukang 0.0200 Oh Rp 208,000.00 Rp 4,160.00
4 Mandor 0.0800 Oh Rp 208,000.00 Rp 16,640.00
JUMLAH Rp 149,400.00
B. UPAH
1 Pekerja 0.1500 Oh Rp 120,000.00 Rp 18,000.00
2 Tukang Kayu 0.2000 Oh Rp 173,700.00 Rp 34,740.00
3 Kepala Tukang 0.0200 Oh Rp 208,000.00 Rp 4,160.00
4 Mandor 0.0800 Oh Rp 208,000.00 Rp 16,640.00
JUMLAH Rp 144,540.00
70 Pemasangan 1 m1 Atap Nok Seng BJLS 0.30 mm
A. BAHAN
1 Seng Plat BJLS 30 0.8900 Lbr Rp 95,650.00 Rp 85,128.50
2 Paku Seng' 0.0600 Kg Rp 40,000.00 Rp 2,400.00
B. UPAH
1 Pekerja 0.1250 Oh Rp 120,000.00 Rp 15,000.00
2 Tukang Kayu 0.2500 Oh Rp 173,700.00 Rp 43,425.00
3 Kepala Tukang 0.0250 Oh Rp 208,000.00 Rp 5,200.00
4 Mandor 0.0060 Oh Rp 208,000.00 Rp 1,248.00
JUMLAH Rp 152,401.50
( Rp )
( Rp ) ###
BAHAN BANGUNAN (Material Batu)
1 Air Bersih Ltr 1,500.00 1,500.00
2 Paving Blok tebal 6 cm BH 2,000.00 2,000.00
3 Batu Kali/Gunung (dia. 30-50) M3 144,000.00 144,000.00
4 Batu Kali/Gunung (dia. 20/20, 15/20, 10/15, 10/10) M3 144,000.00 144,000.00
5 Batu Kali/Gunung Pecah (dia. 20/20, 15/20, 10/15, 10/10) M3 144,000.00 144,000.00
6 Batu Pecah 3/5 M3 345,000.00 345,000.00
7 Batu Pecah 2/3 (Koral) M3 403,000.00 403,000.00
8 Batu Pecah 1/2 M3 403,000.00 403,000.00
9 Split/Abu Batu (0,01 - 0,02 mm) M3 345,000.00 345,000.00
10 Kerikl Beton/Koral Beton M3 403,000.00 403,000.00
11 Batu Tempel Hitam M3 - 0.00
12 Batu Bata Tela Press BH 1,725.00 1,725.00
13 Roster Beton BH 42,000.00 42,000.00
14 Agregat Halus M3 295,000.00 295,000.00
15 Agregat Kasar M3 235,000.00 235,000.00
16 Agregat Base Kls A M3 - ###
17 Agregat Base Kls B M3 - ###
18 Agregat Base Kls C (sirtu) M3 - ###
BAHAN BANGUNAN (Material Pasir dan Tanah)
1 Pasir Beton Halus (Hotmix) / Pasir Gali / Pasir Kali M3 345,000.00 345,000.00
2 Pasir Pasangan ( Pasir Kali/Pantai) M3 345,000.00 345,000.00
3 Pasir Urug (Timbunan) M3 159,000.00 159,000.00
4 Tanah Urug Pilihan (Timbunan) M3 101,000.00 101,000.00
5 Pasir Urug (pasir Alas) M3 159,000.00 159,000.00
6 Pasir Halus M3 345,000.00 345,000.00
7 Agregat Kls C (Sirtu/Kali) M3 0.00 ###
BAHAN BANGUNAN (Material Kayu)
1 Perancah Kayu M3 2,000,000.00 2,000,000.00
2 Kayu Kls I M3 7,475,000.00 7,475,000.00
3 Kayu Kls II M3 3,450,000.00 3,450,000.00
4 Papan Kayu Kls I M3 7,125,000.00 7,125,000.00
5 Papan Kayu Kls II M3 3,450,000.00 3,450,000.00
6 Balok Kayu Kls I (8/12) M3 7,475,000.00 7,475,000.00
7 Balok Kayu Kls I (5/10) M3 7,475,000.00 7,475,000.00
8 Balok Kayu Kls I (5/5) M3 7,475,000.00 7,475,000.00
9 Dolken Kayu Galam (Kaso) M3 0.00 ###
10 Multipleks/Playwood 9 mm Lbr 0.00 ###
Material Pabrik
Bahan Besi dan Kaca
1 Paku Campur 5 - 15 centi KG 21,000.00 21,000.00
2 Paku 10 centi 21,000.00 21,000.00
3 Paku Beton KG 22,000.00 22,000.00
4 Paku Tripleks KG 28,500.00 28,500.00
5 Paku Seng KG 40,000.00 40,000.00
6 Paku Genteng KG 0.00 0.00
7 Sekrup Fixer DOS 15,360.00 15,360.00
8 Paku Sekrup Beton KG 21,000.00 21,000.00
9 Paku Sekrup KG 21,000.00 21,000.00
10 Reng U tipe 41 -33 BH 11,000.00 11,000.00
11 Screw 12 - 14 x 20 Pc 11,000.00 11,000.00
12 Screw 10 - 16 x 16 Pc 13,000.00 13,000.00
13 Sealent Tube 25,000.00 25,000.00
14 Kaca Bening 3 mm M2 205,000.00 205,000.00
15 Kaca Polos/Riben 5 mm M2 480,000.00 480,000.00
16 Kaca Tempered Clear 5 mm M2 120,000.00 120,000.00
17 Kaca Tempered Clear 12 mm M2 670,000.00 670,000.00
18 Floor Hinges Set 900,000.00 900,000.00
19 Over Panel Set 950,000.00 950,000.00
20 Top Patch Fitting Set 650,000.00 650,000.00
21 Bottom Patch Fitting Set 650,000.00 650,000.00
22 Bottom Patch Lock+Cylinder Set 950,000.00 950,000.00
23 Pull Handle Set 1,300,000.00 1,300,000.00
24 Besi Hollow 2/4 Btg 40,000.00 40,000.00
25 Besi Hollow Galvanis 4x4x1 mm Btg 50,000.00 50,000.00
26 Besi Hollow Galvanis 4x4x2x6 Btg 303,700.00 303,700.00
27 Besi Pipa Galvanis M' 120,000.00 120,000.00
28 List Alluminium U M' 70,000.00 70,000.00
29 Aluminium Profil Warna 4" M' 50,000.00 50,000.00
30 Allumunium Composite M2 420,000.00 420,000.00
31 Braket Siku/Spigot/Stifner Btg 60,000.00 60,000.00
32 Besi Strip Tbl 5 mm Kg 110,000.00 110,000.00
33 Baja Ringan; Main truss (C75-0,75) Staf 138,000.00 138,000.00
34 Kawat Ikat/Bendrat Kg 52,675.00 52,675.00
35 Ramset/ Dinabolt Bh 8,000.00 8,000.00
36 Keramik Granit 60 x 60 DOS 200,000.00 200,000.00
37 Keramik Tegel 40 x 40 DOS 180,000.00 180,000.00
38 Keramik Tegel 20 x 25 DOS 140,000.00 140,000.00
39 Keramik Tegel 25 x 25 DOS 144,000.00 144,000.00
40 Keramik Tegel 25 x 50 DOS 160,000.00 160,000.00
41 Keramik tegel 30 x 30 DOS 100,000.00 100,000.00
42 Tripleks 3 mm Lbr 75,000.00 75,000.00
43 Tripleks 4 mm Lbr 85,000.00 85,000.00
44 Tripleks 5 mm Lbr 95,000.00 95,000.00
45 Tripleks 6 mm Lbr 100,000.00 100,000.00
46 Tripleks 7 mm Lbr 105,000.00 105,000.00
47 Tripleks 8 mm Lbr 110,000.00 110,000.00
48 Gypsum Lbr 70,000.00 70,000.00
49 List Gypsum Profil M' 30,000.00 30,000.00
50 List Profil Plafond Kayu Kls II M' 45,000.00 45,000.00
51 Tepung Gypsum Kg 40,000.00 40,000.00
52 tape Textile M' 20,000.00 20,000.00
53 Paku Gypsum Kg 15,000.00 15,000.00
54 Baut dinabolt Pc - ###
55 Besi Beton dia. 8 Staf 51,750.00 51,750.00
56 Besi Beton Dia. 10 Staf 82,225.00 82,225.00
57 Besi Beton Dia. 12 Staf 118,500.00 118,500.00
58 Besi Beton Dia. 16 Staf 316,000.00 316,000.00
59 Besi Beton Polos/Ulir Kg 23,500.00 23,500.00
60 Besi Baja WF 300x150x6,5x9 Staf - ###
61 Besi Profil Kanal C 125 Staf - ###
62 Busbar Fasa Bh - ###
63 Minyak Bekesting Liter 33,000.00 33,000.00
64 Balon Philips LED 7 Watt Bh 35,000.00 35,000.00
65 Balon Philips LED 9 Watt Bh 40,000.00 40,000.00
66 Balon Philips LED 10 Watt Bh 50,000.00 50,000.00
67 Balon Philips LED 11 Watt Bh 60,000.00 60,000.00
68 Balon Philips LED 12 Watt Bh 70,000.00 70,000.00
69 Balon Philips LED 16 Watt Bh 90,000.00 90,000.00
70 Balon Philips LED 25 Watt BH 50,000.00 50,000.00
71 Lampu Downlight LED Philips 12 watt BH 200,000.00 200,000.00
72 Lampu Downlight LED Philips 25 watt BH 220,000.00 220,000.00
73 Lampu Kristal Besar BH 10,000,000.00 10,000,000.00
74 Lampu Hias BH 3,000,000.00 3,000,000.00
75 Lampu Hias Tempel BH 550,000.00 550,000.00
76 Lampu Sorot 100 watt BH 350,000.00 350,000.00
77 Stop Kontak Bh 53,350.00 53,350.00
78 Saklar Tunggal Bh 44,275.00 44,275.00
79 Saklar Ganda Bh 47,300.00 47,300.00
80 Stop Kontak AC Bh 35,000.00 35,000.00
81 Mangko Tanam Panasonic BH 25,000.00 25,000.00
82 T. Dos BH 25,000.00 25,000.00
83 MCB 16 A BH 115,000.00 115,000.00
84 Stick Arde Tembaga BH 250,000.00 250,000.00
85 Klem no. 10 DOS 15,000.00 15,000.00
86 Klem no. 14 DOS 25,000.00 25,000.00
87 Kabel NYM 4 x 6 mm M' 30,000.00 30,000.00
88 Kabel NYM 4 x 3,5 mm M' 27,000.00 27,000.00
89 Kabel NYM 3 x 1,5 mm M' 25,300.00 25,300.00
90 Kabel NYM 2 x 1,5 mm M' 25,300.00 25,300.00
91 Kabel NYY 4 x 10 mm M' 85,000.00 85,000.00
92 Kabel NYY 3 x 4 mm Rol 1,250,000.00 1,250,000.00
93 Kabel NYY 3 x 2,5 mm Rol 650,000.00 650,000.00
94 Kabel NYM 3 x 2,5 mm Rol 650,000.00 650,000.00
95 Kabel NYM 2 x 2,5 mm Rol 640,000.00 640,000.00
96 Pipa Listrik pvc Clipsal Staf 25,000.00 25,000.00
97 Box Pendingin (cooler box) kap.120 L Bh - ###
98 Conveyor L=3 m Unit - ###
99 Cat Tembok Fres 25 Kg 633,000.00 633,000.00
100 Cat Tembok Catylac Interior 25 Kg 803,000.00 803,000.00
101 Cat Tembok Komilex 20 Kg 259,000.00 259,000.00
102 Cat Tembok Matex 20 Kg 384,000.00 384,000.00
103 Cat Tembok No-Drop 20 Kg 917,000.00 917,000.00
104 Cat Tembok Aries 20 Kg 158,000.00 158,000.00
105 Cat Dasar/Alkali Lenkote 20 Kg 1,091,000.00 1,091,000.00
106 Cat Dasar/Alkali Nipon 3 in 1 20 L 830,000.00 830,000.00
107 Cat Dasar/Alkali Dulux Alkali 20 L 953,000.00 953,000.00
108 Cat Dasar/Alkali Mowilex Alakli 20 L 1,077,000.00 1,077,000.00
109 Cat Kayu/Besi Avian 1L 70,000.00 70,000.00
110 Cat Kayu/Besi V-Gloss 1L 58,900.00 58,900.00
111 Cat Kayu/Besi Glotex 1L 59,000.00 59,000.00
112 Cat Meni Kg 65,000.00 65,000.00
113 Dempul Kg 45,000.00 45,000.00
114 Lem Kayu Kg 40,000.00 40,000.00
115 Dolken Btg - ###
116 Down Ligth 5 Inchi Bh 50,000.00 50,000.00
117 Engsel Jendela Bh 120,000.00 120,000.00
118 Engsel Pintu Bh 130,000.00 130,000.00
119 Grendel Jendela Bh 90,000.00 90,000.00
120 Grendel Pintu Bh 100,000.00 100,000.00
121 Kait Angin Bh 90,000.00 90,000.00
122 Floor Drain Bh 35,000.00 35,000.00
123 Semen Portland Tonasa Zak 71,875.00 71,875.00
124 Semen PC Bosowa Zak 87,850.00 87,850.00
125 Semen Conch Zak 65,560.00 65,560.00
126 Semen Putih Kg 17,940.00 17,940.00
127 Semen Warna Kg 17,940.00 17,940.00
128 Kunci Pintu Biasa SET 600,000.00 600,000.00
129 Kunci Pintu Antik SET 700,000.00 700,000.00
130 Kunci Pintu KM/WC SET 445,000.00 445,000.00
131 Handle Pintu BH 98,000.00 98,000.00
132 Engsel Pintu BH 78,000.00 78,000.00
133 Engsel Jendela BH 59,900.00 59,900.00
134 Pipa PVC 10 " M 32,500.00 32,500.00
135 Pipa PVC 4 ' M 30,000.00 30,000.00
136 Pipa PVC 3 ' M 27,500.00 27,500.00
137 Pipa PVC 2 ' M 25,000.00 25,000.00
138 Pipa PVC 3/4 ' M 25,000.00 25,000.00
139 Pipa PVC 1 " M 27,500.00 27,500.00
140 Pipa PVC 1/2 " M 22,500.00 22,500.00
141 Kran Air BH 25,000.00 25,000.00
142 Wastafel BH 1,000,000.00 1,000,000.00
143 Septictank 1,5 m x 2 m x 2 m BH 4,500,000.00 4,500,000.00
144 Seal Tape BH 5,000.00 5,000.00
145 Klosed Duduk BH 1,750,000.00 1,750,000.00
146 Closed Jongkok BH 451,000.00 451,000.00
Bahan Atap
1 Atap Enamel (bahan + Pasang) M2 2,490,000.00 2,490,000.00
2 Seng Gelombang 0.20 Lbr 60,000.00 60,000.00
3 Seng Gelombang 0.25 Lbr 78,000.00 78,000.00
4 Seng Gelombang 0.3 Lbr 83,400.00 83,400.00
5 Seng Plat BJLS 30 Lbr 95,650.00 95,650.00
6 Spandek M2 37,750.00 37,750.00
7 Nok Atap Spandek Lbr 54,900.00 54,900.00
8 Genteng Metal Multiroof Lbr 130,000.00 130,000.00
9 Nok Genteng Metal Multiroof Lbr 70,000.00 70,000.00
10 Atap Rumbia/Daun Kirai/Daun Sagu Lbr - ###
11 Atap Onduline Lbr - ###
12 Nok Onduline Lbr - ###
13 Ornamen Dinding GRC (Cetak + Pemasangan) M2 - ###
DAFTAR HARGA SATUAN ALAT
KEGIATAN : PEMBANGUNAN DAN PENGEMBANGAN INFRASTRUKTUR KAWASAN PERMUKIMAN DI KAWASAN STRATEGIS DAERAH PROVINSI
PEKERJAAN : PEMBANGUNAN MASJID ALI AKBAR TABONA TERNATE
LOKASI : KOTA TERNATE-MALUKU UTARA
TAHUN ANGGARAN : 2022
HARGA SATUAN
NO ALAT SATUAN
( Rp )
1 Pek. Balok Beton Bertulang B1 25/50 K-225 101.1 0.25 0.5 1 M3 12.6375 M3
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Beton Bertulang
1 Pek. Balok Beton Bertulang B2 20/30 K-225 44.8 0.2 0.3 1 M3 2.688
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Beton Bertulang
1 Pek. Balok Beton Bertulang B3 15/20 K-250 71.6 0.15 0.2 1 M3 2.148
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Beton Bertulang
1 Pek. Ring Balok Beton Bertulang RB2 20/30 K-250 142.1 0.2 0.3 1 M3 8.526
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Beton Bertulang
1 Pek. Ring Balok Beton Bertulang RB3 15/20 K-250 28.87 0.15 0.2 1 M3 0.8661
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Beton Bertulang
PANJANG LEBAR TINGGI
NO URAIAN PEKERJAAN RUMUS UNIT SAT VOLUME
(M) (M) (M)
a b c d
1 Pek. Plat Lantai Beton Bertulang K-250 Luas Total = 31.5 6.8 0.12 = 214.2 m2
Luas Bukaan = 0 18 = 0 m2
Luas Lantai = 214.2 - 0 = 214.2 m2
Volume = 214.2 x 0.12 = 25.704 M3 25.704
Bekesting 31.5 6.8 214.2 M2
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Beton Bertulang
PANJANG LEBAR TINGGI
NO URAIAN PEKERJAAN RUMUS UNIT SAT VOLUME
(M) (M) (M)
a b c d
M3 6.59
1 Pek. Kolom Beton Bertulang
Beton Kolom K2 25/25 0.25 0.25 3.55 7 M3 1.553125
Beton Kolom Kp 12/12 0.12 0.12 3.55 11 M3 0.56232
Beton Kolom K1 30/30 0.3 0.3 3.55 14 M3 4.473
Bekseting K1 3.55 1.2 14 59.64
K2 3.55 1 7 24.85
total 84.49 M2
Besi Beton panjang berat/m Berat jum.kolom Berat tot 317.89777 Kg
K2 Tul.dia. 16 (4 bh) 3.55 1.583 22.4786 7 157.3502
tul.dia.12 ( 4 bh) 3.55 0.891 12.6522 7 88.5654
Tul.segkang dia.8 26.033333 0.395 10.283167 7 71.982167
panjang berat/m Berat jum.kolom Berat tot 661.97087 Kg
K1 Tul.dia. 16 (4 bh) 3.55 1.583 22.4786 14 314.7004
tul.dia.12 ( 4 bh) 3.55 0.891 12.6522 14 177.1308
Tul.segkang dia.8 30.766667 0.395 12.152833 14 170.13967
Total 979.8686 Kg
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Lantai dan Dinding
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Lantai dan Dinding
1 Pek. Plesteran Dinding Vol. Plesteran = 2 x Vol. Pas Dinding 2 x 551.12 = 1102.2414 M2
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Lantai dan Dinding
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Lantai dan Dinding
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Lantai dan Dinding
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Lantai dan Dinding
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Pintu Jendela Ventilasi
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Pintu Jendela Ventilasi
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Pintu Jendela Ventilasi
JUMLAH
NO URAIAN PEKERJAAN RUMUS UNIT SAT VOLUME
ENGSEL
a b c d
90.00 BH
1 Pas. Engsel Pintu axd
PJ1 3 5 15
PJ2 3 5 15
PJ3 6 3 18
P1 3 4 12
P2 3 2 6
P3 3 8 24
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Pintu Jendela Ventilasi
JUMLAH
NO URAIAN PEKERJAAN RUMUS UNIT SAT VOLUME
ENGSEL
a b c d
1 Pas. Engsel Jendela 220.00 BH
PJ1 10 5 50
PJ2 10 5 50
PJ3 12 3 36
J1 16 5 80
V1 2 2 4
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Pintu Jendela Ventilasi
a b c d
220.00 BH
1 Pas. Kait Angin
PJ1 10 5 50
PJ2 10 5 50
PJ3 12 3 36
J1 16 5 80
V1 2 2 4
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Pintu Jendela Ventilasi
a b c d
30.00 BH
1 Pas. Grendel Pintu
PJ1 1 5 5
PJ2 1 5 5
PJ3 2 3 6
P1 1 4 4
P2 1 2 2
P3 1 8 8
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Pintu Jendela Ventilasi
a b c d
110.00 BH
1 Pas. Grendel Jendela
PJ1 5 5 25
PJ2 5 5 25
PJ3 6 3 18
J1 8 5 40
V1 1 2 2
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Pintu Jendela Ventilasi
a b c d
PJ1 1 5 5
PJ2 1 5 5
PJ3 1 3 3
P1 1 4 4
P2 1 2 2
P3 1 8 8
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Plafond
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Plafond
1 Pas. Langit-Langit Plafond Tripleks vol. plafond = vol. rangka plafond 681.5 M2
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Plafond
SKETSA/GAMBAR KERJA
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Instalasi Sanitasi Air
Sayap Kanan 4
Sayap Kiri 4
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Instalasi Sanitasi Air
Sayap Kanan 4
Sayap Kiri 4
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Instalasi Listrik
3 MCB 16 A 2 BH
4 Saklar Ganda Tanam 18 BH
5 Saklar Tunggal 2 BH
6 Stop Kontak 31 BH
7 Sto Kontak AC 10 BH
8 Lampu TL 8 watt 10 BH
9 Lampu TL 18 watt 88 BH
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Pengecatan
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI II
ITEM PEKERJAAN : Pekerjaan Kuda-Kuda dan Atap
SKETSA/GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LANTAI I
ITEM PEKERJAAN : Pekerjaan Tangga Beton
B. UPAH
1 Tukang Cat
2 Kepala Tukang
3 Mandor 0.0175 Oh Rp 208,000.00 Rp 3,640.00
4 Pekerja 0.0180 Oh Rp 120,000.00 Rp 2,160.00
Jumlah Rp 45,750.00
Overhead & Profit Rp 6,862.50
JUMLAH Rp 52,612.50
ANALISA HARGA SATUAN
KEGIATAN : PEMBANGUNAN DAN PENGEMBANGAN INFRASTRUKTUR KAWASAN PERMUKIMAN DI KAWASAN STRATEGIS DAERAH PROVINSI
1 MCB (BH)
A. BAHAN
1 MCB 16 A 1.0000 Bh Rp 115,000.00 Rp 115,000.00
B. UPAH
1 Upah Pasang 0.1000 Oh Rp 173,700.00 Rp 17,370.00
Jumlah Rp 132,370.00
Overhead & Profit Rp 19,855.50
JUMLAH Rp 152,225.50
B. UPAH
1 Pekerja 0.0600 Oh Rp 120,000.00 Rp 7,200.00
2 Tukang Las Konstruksi 0.0600 Oh Rp 173,700.00 Rp 10,422.00
3 Kepala Tukang 0.0060 Oh Rp 208,000.00 Rp 1,248.00
4 Mandor 0.0030 Oh Rp 208,000.00 Rp 624.00
JUMLAH Rp 23,301.00
KEGIATAN : PEMBANGUNAN DAN PENGEMBANGAN INFRASTRUKTUR KAWASAN PERMUKIMAN DI KAWASAN STRATEGIS DAERAH PROVINSI
B. UPAH
1 Pekerja 1.6500 Oh Rp 120,000.00 Rp 198,000.00
2 Tukang Batu 0.2750 Oh Rp 173,700.00 Rp 47,767.50
3 Kepala Tukang 0.0280 Oh Rp 208,000.00 Rp 5,824.00
4 Mandor 0.0830 Oh Rp 208,000.00 Rp 17,264.00
JUMLAH Rp 1,581,432.60
B. UPAH
1 Pekerja 0.6600 Oh Rp 120,000.00 Rp 79,200.00
2 Tukang Kayu 0.3300 Oh Rp 173,700.00 Rp 57,321.00
3 Kepala Tukang 0.0330 Oh Rp 208,000.00 Rp 6,864.00
4 Mandor 0.0060 Oh Rp 208,000.00 Rp 1,248.00
Jumlah Rp 295,983.00
Overhead & Profit Rp 44,397.45
JUMLAH Rp 340,380.45
59 Membuat dan Memasang 1 m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas II.
A. BAHAN
1 Balok Kayu 1.2000 M3 Rp 3,450,000.00 Rp 4,140,000.00
2 Paku 10 cm 1.2500 Kg Rp 21,000.00 Rp 26,250.00
3 Lem Kayu 1.0000 Kg Rp 40,000.00 Rp 40,000.00
B. UPAH
1 Pekerja 6.0000 Oh Rp 120,000.00 Rp 720,000.00
2 Tukang Kayu 18.0000 Oh Rp 173,700.00 Rp 3,126,600.00
3 Kepala Tukang 1.8000 Oh Rp 208,000.00 Rp 374,400.00
4 Mandor 0.3000 Oh Rp 208,000.00 Rp 62,400.00
JUMLAH Rp 8,489,650.00
61 Membuat dan Memasang 1 m2 Pintu dan Jendela Kaca, Kayu Kelas II.
A. BAHAN
1 Papan Kayu 0.0240 M3 Rp 3,450,000.00 Rp 82,800.00
2 Lem Kayu 0.3000 Kg Rp 40,000.00 Rp 12,000.00
B. UPAH
1 Pekerja 0.8000 Oh Rp 120,000.00 Rp 96,000.00
2 Tukang Kayu 2.4000 Oh Rp 173,700.00 Rp 416,880.00
3 Kepala Tukang 0.2400 Oh Rp 208,000.00 Rp 49,920.00
4 Mandor 0.0400 Oh Rp 208,000.00 Rp 8,320.00
JUMLAH Rp 665,920.00
62 Membuat dan Memasang 1 m2 Pintu dan Jendela Jalusi, Kayu Kelas II.
A. BAHAN
1 Papan Kayu 0.0640 M3 Rp 3,450,000.00 Rp 220,800.00
2 Lem Kayu 0.5000 Kg Rp 40,000.00 Rp 20,000.00
B. UPAH
1 Pekerja 1.0000 Oh Rp 120,000.00 Rp 120,000.00
2 Tukang Kayu 3.0000 Oh Rp 173,700.00 Rp 521,100.00
3 Kepala Tukang 0.3000 Oh Rp 208,000.00 Rp 62,400.00
4 Mandor 0.0500 Oh Rp 208,000.00 Rp 10,400.00
JUMLAH Rp 954,700.00
B. UPAH
1 Pekerja 0.8000 Oh Rp 120,000.00 Rp 96,000.00
2 Tukang Kayu 2.0000 Oh Rp 173,700.00 Rp 347,400.00
3 Kepala Tukang 0.2000 Oh Rp 208,000.00 Rp 41,600.00
4 Mandor 0.0500 Oh Rp 208,000.00 Rp 10,400.00
JUMLAH Rp 616,150.00
B. UPAH
1 Pekerja 0.2000 Oh Rp 120,000.00 Rp 24,000.00
2 Tukang Kayu 0.3000 Oh Rp 173,700.00 Rp 52,110.00
3 Kepala Tukang 0.0300 Oh Rp 208,000.00 Rp 6,240.00
4 Mandor 0.0100 Oh Rp 208,000.00 Rp 2,080.00
JUMLAH Rp 145,915.00
B. UPAH
1 Pekerja 0.1000 Oh Rp 120,000.00 Rp 12,000.00
2 Tukang Kayu 0.2000 Oh Rp 173,700.00 Rp 34,740.00
3 Kepala Tukang 0.0200 Oh Rp 208,000.00 Rp 4,160.00
4 Mandor 0.0050 Oh Rp 208,000.00 Rp 1,040.00
JUMLAH Rp 91,300.00
12 Mengerjakan 1 M2 Kasau dan Reng Genteng Metal Rangka Kayu Kelas II.
A. BAHAN
1 Kayu Kls II 0.0140 M3 Rp 3,450,000.00 Rp 48,300.00
2 Paku Genteng 0.1500 Kg Rp 21,000.00 Rp 3,150.00
B. UPAH
1 Pekerja 0.1000 Oh Rp 120,000.00 Rp 12,000.00
2 Tukang Kayu 0.1000 Oh Rp 173,700.00 Rp 17,370.00
3 Kepala Tukang 0.0100 Oh Rp 208,000.00 Rp 2,080.00
4 Mandor 0.0500 Oh Rp 208,000.00 Rp 10,400.00
JUMLAH Rp 93,300.00
KEGIATAN : PEMBANGUNAN DAN PENGEMBANGAN INFRASTRUKTUR KAWASAN PERMUKIMAN DI KAWASAN STRATEGIS DAERAH PROVINSI
PEKERJAAN : PEMBANGUNAN MASJID ALI AKBAR TABONA TERNATE
LOKASI : KOTA TERNATE-MALUKU UTARA
TAHUN ANGGARAN : 2022