This is to confirm that the cluster section of the site under the Purchase Order No. ID-TA-
SPBU-TELCO-0010-OS has passed Civil ATP of PT Telkom Akses.
Complicated Civil Work ATP of the cluster section shall not otherwise affect in anyway the
obligation of Subcontractor to complete all obligations Subcontractor as set forth in the
Contract Documents.
Within the Warranty Period and/or Extended Warranty Period(s), Subcontractor undertakes,
at its own expenses, all and any responsibility on errors, Defects and Deficiencies, or
omissions discovered in respect of any Equipment, Service and Functions within the Network
addressed herein.
This attachments BoQ of site JL. Patimura Banjarsari (SPBU:24-34114) is temporary valid
for payment only, final BoQ shall base on PT. Telkom Akses confirmation after BA recon.
And below the summary of this site:
This Confirmation is issued by PT. FiberHome Technologies and granted to the PT. Telco
Media
Zheng Huining
(Senior Project Manager)
CW ATP BOQ
Project : TELKOM AKSES’s (PT. TELKOM AKSES) GPON FTTH Network Project
Site ID : REG01-0003
Location / STO : JL. Patimura Banjarsari (SPBU:24-34114)
Subcont : PT. TELCO MEDIA
Volume
Value SPBU : 24-34114
No Designator Unit
JL. Patimura Banjarsari
Material Jasa Material Jasa Qty
2,6
1 UTP-CAT6-SPBU meter
78
x √ 251
-
2,6
2 Screen-4-SPBU meter
78
x √ 353
-
BC-MTR-Galv.2-3.6- 98,91 88,7
3 SPBU
meter
5 50
√ √ 35
40,87 2,6
4 TC-IN-SPBU meter
4 60
√ √ 2
34,79 9,5
5 T-PWR-SPBU pcs
1 98
√ √ 5
56,27 4,7
6 ACPDB-MCB-32A-SPBU pcs
4 99
√ √ 2
2,6
7 BC-16-SPBU meter
60
x √ 6
26,43 75,3
8 BC-MTR-PVC-1 Meter
1 11
√ √ 10
13,29 2,9
9 NYM 3X2,5mm SPBU Meter
9 85
√ √ 150
27,47 3,5
10 PP-OF-OUT-1,5-SPBU Meter
2 71
√ √ 69
7,985,00
Material 4
6,249,88
Jasa 9
14,234,89
Total 3