SOP-52 Project Planning & Control Job Creation To Completion
SOP-52 Project Planning & Control Job Creation To Completion
Prepared By:SMZ
Rev. No : 01 Checked By: MZT
Rev. Dt : 01-Jan-2006 PROJECT PLANNING & CONTROL Approved By:SAMH
Page: Page 1 of 11
Means:
Phone
In-person
Email
Any others.
Check the ability to meet the order requirements and resolve the difference:
Director/G.M. Corrosion Prevention Services or his assignee with concern function checks (before submission
of the BID) and ensures that; where applicable
Product/services requirements are clearly and adequately defined including specification activities to be
performed against the NPSL abilities and/or material services catalogs.
Scope of work are clearly defined including pre-design servey services operation designing, supply,
feasibility, Erection/installation, commissioning, maintenance, inspection and testing, etc.
Availability of drawings, List of equipment or BOQ, BOM etc. and responsibility of their development.
Designing responsibility and the capability to design.
Responsibility of devices/equipment /material provision.
Availability of resources and responsibility of resources provision including accommodation of labor
onsite.
Availability of infrastructure and work environment including tools, equipment, machines, testing
facilities etc. and responsibility of their provision.
Inspections and testing stages and responsibility.
Worker qualification or experience certificates.
Capable to meet statutory and regulating requirements.
Approval stages.
Time taken to complete the job and the availability of tools and personnel on the basis of running load.
Contract requirements differing form those previously expressed are resolved
Note: Review any other information needed or provided, as per nature of job or work.
If the requirements need further clarification then the company contacts with the client through phone, fax, e-
mail, or send NPSL representative(s) for data collection. If the discrepancy is not cleared then take deviation
and inform the client.
Doc. No : SOP-52 NURICON PETROSERVICES(PTE.) LTD. Prepared By:SMZ
Rev. No : 01 Checked By: MZT
Rev. Dt : 01-Jan-2006 PROJECT PLANNING & CONTROL Approved By:SAMH
Page: Page 3 of 11
b-1
Accepted
Doc. No : SOP-52 NURICON PETROSERVICES(PTE.) LTD. Prepared By:SMZ
Rev. No : 01 Checked By: MZT
Rev. Dt : 01-Jan-2006 PROJECT PLANNING & CONTROL Approved By:SAMH
Page: Page 4 of 11
Amendment
Order Planning
Is designing
involved?
C-1or C-2
No
yes
When the designing is a contractual requirement and NPSL is responsible for that then the
G. M. Corrosion Prevention Services plan and determine
the design and development stages.
the review, verification and validation that are appropriate to each design and
development stage, and
the responsibilities and authorities for design and development.
the participants for review and verification including client representative (if
F-1 required).
Design report Dosier submission and getting its approval from client, after
completion design and development review on computer file.
These input are drive from Client Inquiry / Order / Tender / Initial Information
format (F-39) / Client Information form (F-24) / on site visit of NPSL representative
as per flow C-2 / Design Input & Processes Chart ( CH-01) (where, appropriate) /
any other source etc.
G. M. Corrosion Prevention Services reviews the inputs taken before further action.
Preparation of Drawing
Team Formation
Mobilization of Resources
On the basis of job nature team collects required equipment, tools and other accessories from
store/site.
Onsite Working
Team follows the Manager instructions or Mobilization and Job performance (F-62) or prepares
working strategy along with the client and start working as per Standard Operating Procedures (SOPs)
and NACE specification and prepares the respective activity daily status report ( F-63 ) or client
approved format and send it to the concerned authorities directly or by emails.
Head of the team leader continuously measure and monitor the processes and services. He
prepares work schedule to
During operations monitoring and measured results of different activities / processes are
maintained on daily progress report ( F-63 ) and / or concerned report, or any other project
base doc.
Services are also measure and monitored at different stage from Inquiry receiving to
Invoicing. ( Refer FCH-07 and FCH-08 )
Doc. No : SOP-52 NURICON PETROSERVICES(PTE.) LTD. Prepared By:SMZ
Rev. No : 01 Checked By: MZT
Rev. Dt : 01-Jan-2006 PROJECT PLANNING & CONTROL Approved By:SAMH
Page: Page 11 of 11
After completing the Job, team leader prepares Completion and commission report on Format
(F-25) or on any documents approved and signed by the clients, further a Feedback Report on
Format (F-17) or on the commissioning report or on the job tickets and must get it signed
from the client representative.
Invoicing
Any product which is identified as non-conforming at any stage is tagged as HOLD and the
identifier document the non-conformity on NCR (F-13) and submitted to Managing Director /
Director / G. M. Corrosion Prevention Services for disposition. After evaluation of
Nonconformity, Managing Director / Director / G. M. Corrosion Prevention Services marks
the disposition or action needed on the same form and return to the initiator.